Sustainability Appraisal of the Luton Local Plan

Total Page:16

File Type:pdf, Size:1020Kb

Sustainability Appraisal of the Luton Local Plan Sustainability Appraisal of the Luton Local Plan Sustainability Report on the Proposed Submission Local Plan Client: Luton Borough Council Report No.: UE-130 Luton LP SA Report_12_151007 Version: 12 Status: Final Date: October 2015 Author: NP/SP Checked: SP Approved: NP Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 Contents Non-Technical Summary i About Sustainability Appraisal i About Luton Local Plan i Purpose and Context of the Sustainability Report i The Sustainability Appraisal Scoping Stage ii Appraisal of Strategic Alternatives ii Assessment of Alternative Options iii Likely Significant Effects of the Proposed Submission Local Plan iii Recommendations iii Monitoring iv Next Steps iv Consultation Arrangements iv 1 Introduction 1 1.1 Purpose of this Report 1 1.2 The Luton Local Plan 1 1.3 The Study Area 2 1.4 The Wider Sub-region 5 1.5 Sustainable Development 6 2 Methodology 9 2.1 Integrated Sustainability Appraisal 9 2.2 Habitats Regulations Assessment 10 2.3 Stages of Sustainability Appraisal 10 2.4 Approach to the Assessment 10 2.5 Limitations to the Sustainability Appraisal 14 3 Scoping 17 3.1 Scoping Report 17 3.2 Scoping Consultation and Review 17 3.3 Policy, Plan and Programme Review 18 Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 3.4 Gathering Baseline Data 18 3.5 Key Sustainability Issues 19 3.6 The Sustainability Appraisal Framework 19 4 Current and Future Characteristics of the Area and Existing Sustainability Issues 27 4.1 Introduction 27 4.2 Summary of Baseline Conditions and Likely Evolution in Absence of the Plan 27 4.3 Key Sustainability Issues 35 5 Sustainability Appraisal Framework 39 5.1 Introduction 39 6 Testing Objectives, Identifying Alternatives 41 6.1 Vision and Objectives of the Proposed Submission Local Plan 41 6.2 Assessing the Plan’s Objectives against the SA Objectives 43 6.3 Identifying Reasonable Alternatives 44 7 Assessment of Alternative Options 51 7.1 Assessment of Strategic Alternatives 51 7.2 Assessment of Sites for Allocation 65 8 Assessment of Proposed Submission Local Plan 69 8.1 High Level Assessment of Policies 69 8.2 Detailed Assessment Matrices 69 8.3 Appraisal Commentary by SA Objective 70 8.4 Cumulative Effects Assessment 82 9 Mitigation and Monitoring 87 9.1 Summary of Mitigation 87 9.2 Requirements for Monitoring 90 9.3 Monitoring Proposals 90 10 Summary and Consultation Arrangements 93 10.1 Summary and Next Steps 93 10.2 Representations 94 Appendix A: Annex 1 of the SEA Directive A Appendix B: Site Assessment Criteria C Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 Appendix C: Consultation Responses E Appendix D: PPP Review (Updated May 2015) G Appendix E: Baseline Data (Updated May 2015) I Appendix F: Site Assessments and High Level Assessment for Long List J Appendix G: Site Assessments and High Level Assessment for Short List L Appendix H: Justification for Preferred Sites N Appendix I: High Level Assessment of Policies P Appendix J: Detailed Assessment Matrices R Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 List of Tables and Figures Table 2.1: SA/SEA stages and those addressed in this report 11 Table 2.2: Significance matrix 14 Table 3.1: Summary of Policy, Plan and Programme Review 21 Table 4.1: Key sustainability issues for the Luton Local Plan 36 Table 5.1: Sustainability Appraisal Objectives 39 Table 6.1: Local Plan Strategic Objectives 42 Table 6.2: Compatibility assessment between plan objectives and SA Objectives 43 Table 7.1: Appraisal of Strategic Alternatives: Residential target and location of unmet need 53 Table 7.2: Appraisal of Strategic Alternatives: Employment development target 54 Table 7.3: Appraisal of Strategic Alternatives: Release of employment sites 56 Table 7.4: Appraisal of Strategic Alternatives: Converting TC employment sites to residential 57 Table 7.5: Appraisal of Strategic Alternatives: Housing density 58 Table 7.6: Appraisal of Strategic Alternatives: Land south of Stockwood Park 59 Table 7.7: Appraisal of Strategic Alternatives: Butterfield Park 60 Table 7.8: Appraisal of Strategic Alternatives: Century Park 61 Table 7.9: Appraisal of Strategic Alternatives: Napier Park 63 Table 7.10: Appraisal of Strategic Alternatives: Power Court 64 Table 8.1: Scale of Significance: Biodiversity & Landscape - Strategic Allocations 71 Table 8.2: Scale of Significance: Green Infrastructure - Strategic Allocations 72 Table 8.3: Scale of Significance: Air, water, soil - Strategic Allocations 73 Table 8.4: Scale of Significance: Flood risk - Strategic Allocations 74 Table 8.5: Scale of Significance: Carbon emissions - Strategic Allocations 75 Table 8.6: Scale of Significance: Resource efficiency - Strategic Allocations 76 Table 8.7: Scale of Significance: Heritage assets - Strategic Allocations 77 Table 8.8: Scale of Significance: Poverty & social inclusion - Strategic Allocations 78 Table 8.9: Scale of Significance: Crime - Strategic Allocations 78 Table 8.10: Scale of Significance: Health - Strategic Allocations 79 Table 8.11: Scale of Significance: Housing - Strategic Allocations 80 Table 8.12: Scale of Significance: Vitality of centres – Strategic Allocations 80 Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 Table 8.13: Scale of Significance: Transport & accessibility - Strategic Allocations 81 Table 8.14: Scale of Significance: Employment, learning & skills - Strategic Allocations 82 Table 8.15: Cumulative, synergistic and indirect effects 82 Table 9.1: Summary of proposed mitigation 87 Table 9.2: Proposed monitoring framework 90 Figure 1.1: Luton Local Plan Key Diagram 3 Figure 1.2: Five Guiding Principles of the UK Sustainable Development Strategy, Securing the Future (2005) 7 Abbreviations AGLV Area of Great Landscape Value ALC Agricultural Land Classification ALLV Area of Local Landscape Value AONB Area of Outstanding Natural Beauty AQMA Air Quality Management Area CEMP Construction Environmental Management Plan CHP Combined Heat and Power CO2 Carbon dioxide CWS Country Wildlife Site DAM Detailed Assessment Matrix Dph Dwellings per hectare DWS District Wildlife Site FZ Flood Zone GI Green Infrastructure Sustainability Report on the Proposed Submission Luton Local Plan October 2015 UE-130 Luton LP SA Report_12_151007 Abbreviations (cont.) HLA High Level Assessment HRA Habitats Regulations Assessment l/p/d Litres per person per day LVIA Landscape and Visual Impact Assessment NPPF National Planning Policy Framework NPPG National Planning Practice Guidance NVQ National Vocations Qualification PDL Previously Developed Land PPP Policy, plan or programme SA Sustainability Appraisal SAM Scheduled Ancient Monument SEA Strategic Environmental Assessment SNCI Site of Nature Conservation Importance SPZ Source Protection Zone SSSI Site of Special Scientific Interest SuDS Sustainable Drainage System TPO Tree Preservation Order Sustainability Report on the Proposed Submission Luton Local Plan October 2015 Non-Technical Summary UE-130 Luton LP SA Report_12_151007 0 Non-Technical Summary 0.1 About Sustainability Appraisal 0.1.1 A Sustainability Appraisal (SA) is being carried out alongside the development of the Luton Local Plan 2011-2031. 0.1.2 Local Planning Authorities such as Luton Borough Council use SA to assess plans against a set of sustainability objectives developed in consultation with local stakeholders and communities. This assessment helps the Council to identify the relative environmental, social and economic performance of possible strategic, policy and site options, and to evaluate which of these may be more sustainable. 0.1.3 SA is a statutory process incorporating the requirements of the European Union Strategic Environmental Assessment Directive. 0.2 About Luton Local Plan 0.2.1 The Proposed Submission Luton Local Plan sets out policies, development allocations and actions to meet the environmental, social and economic challenges facing the borough over the 20 year period from 2011. When adopted it will provide a strategy for the distribution and level of development and supporting infrastructure, a set of proposals to meet that strategy, policies against which to assess planning applications, and proposals for monitoring the success of the plan. 0.3 Purpose and Context of the Sustainability Report 0.3.1 The purpose of this Sustainability Report is to: Identify, describe and evaluate the likely significant effects of the Local Plan and its reasonable alternatives; and Provide an early and effective opportunity for statutory consultees, interested parties and the public to offer views on any aspect of the SA process which has been carried out to date. 0.3.2 The Sustainability Report contains: An outline of the contents and main objectives of the Local Plan and its relationship with other plans, programmes and strategies; Relevant aspects of the current state of the environment and key sustainability issues for the borough; i Sustainability Report on the Proposed Submission Luton Local Plan October 2015 Non-Technical Summary UE-130 Luton LP SA Report_12_151007 The SA Framework against which the Local Plan has been assessed; An appraisal of alternative strategic directions that the Local Plan could reasonably take; An assessment of alternative options for meeting Local Plan strategy; An explanation
Recommended publications
  • Parish News Inside Pages MAY 2007
    The Parish @ Large SCHOOLS PARISH COUNCILLORS Slip End Lower: 720152 Christine Benson: 456200 Five Oaks: 726058 [email protected] Streetfield: 613421 Stephen Fuell: 417792 Ashton: 663511 [email protected] Philip Penman: 455185 Manshead: 608641 [email protected] Geoff Daniel: 424363 [email protected] SPORT Ken Crossett 414168 Bowling Club: 412506 [email protected] Tennis: 733253 Mike McKevitt: 720596 Darts League: 425323 [email protected] Football: 418494 Janet Crawley: 07752 902070 [email protected] Cricket: 414157 CLERK TO THE PARISH COUNCIL Nikkie West: 402312 [email protected] HALLS Village Hall: 723109 DISTRICT COUNCILLORS Peter Edwards Hall: 455185 Anne Spencer 713267 [email protected] Philip Penman: 455185 [email protected] COMMUNITY Ruth Gammons 738398 Brownies: 723109 [email protected] Beavers: 725297 COUNTY COUNCILLOR Cubs: 414157 Richard Stay: 724685 Fly Tipping (SBDC): 472222 [email protected] Friendship Club: 452978 MEMBER OF PARLIAMENT Slip End Assoc: 414796 Margaret Moran: 01582 731882 Mother’s Union: 738435 Playgroup: 728865 Toddler Group 405931 CHURCHES Allotments: 736892 St Andrew’s Church FoSELS (PTA): Rev Joy Daniel 01582 424363 Tracey Burgess Wardens: Tony Willson 482681 Women’s Institute: 421034 Ken Crossett 414168 Police: 473412 Aley Green Methodist Church Aircraft noise: 395382 Minister: Rev Julia Dowding 730129 Fly tipping: 01582 474031 Senior Steward: Ann Meader 733668 SHOPS & SERVICES Post Office: At the Crossroads, telephone 401069 Monday to Friday 6.30 to 21.00 Saturday 7.00 to 21.00 - Sunday 7.30 to 21.00 Garage: Slip End Garage, Markyate Road, telephone 456888 Website: slipend.co.uk - 1 - PARISH NOTES Coronation Garden Big News this month is that the re-Opening of Coronation Garden will take place on Saturday 19th May! You’ll all be aware that a lot of work has gone Crime Reporting on, both in re-construction and behind the Local Police with their information unit will be scenes, involving many locals.
    [Show full text]
  • Urban Capacity Report July 2017
    Central Bedfordshire Council www.centralbedfordshire.gov.uk Urban Capacity Report July 2017 - 1 - Central Bedfordshire Urban Capacity Report Central Bedfordshire Urban Capacity Report 1. Introduction 1.1 The Urban Capacity Report sets out the different strands of policy and practice that, as a combined approach, demonstrate the Council are seeking every opportunity across Central Bedfordshire to maximise the use of available land within settlements, before looking to greenfield sites within the countryside in order to accommodate future growth requirements. This will ensure the Local Plan meets the requirements of the NPPF and the emerging direction of future policy as set out in the Housing White Paper. 2. Key Findings 2.1 The Urban Capacity Report discusses the following strands of policy and practice: Luton, Dunstable and Houghton Regis Urban Capacity Potential Study (2016) 2.2 Luton, Dunstable and Houghton Regis have a significant role to play in contributing towards growth within the Luton Housing Market Area (HMA). The Council commissioned Nexus Planning to prepare an Urban Capacity Study to identify the potential for achieving additional capacity from developments within the Luton, Dunstable and Houghton Regis conurbation. The Study conducted a two stage assessment: Stage One – A baseline assessment confirming the sites identified in the SHLAAs and ELRs for Central Bedfordshire and Luton Borough were still suitable for residential development. No new sites were considered. Stage Two – Testing the sites against alternative densities to see whether they could be increased to deliver additional homes. 2.3 The study concluded there may be an opportunity to increase development capacity by 148-496 dwellings within Central Bedfordshire, achieved through increasing density.
    [Show full text]
  • Future Luton: Making Best Use of Our Runway
    Future LuToN: Making best use of our runway Surface Access Strategy Report October 2019 Future LuToN: Making best use of our runway Surface Access Strategy Report Contents Page 1 Introduction 5 Context 5 Surface access 5 Importance of surface access to the airport expansion plans 5 Mode choice, demand management and mitigation 6 Existing airport planning permission and current enhancements to transport 7 Recent and on-going airport improvements 7 Purpose of this report 7 Structure of this report 7 2 Overall Surface Access Strategy 10 Overview 10 On-site principles 10 Parking locations and type 10 Forecourt layout 13 Public transport arrangements/ walking and cycling 17 Background committed improvements - Century Park Access Road (CPAR) 19 Background committed improvements - East Luton improvements 21 3 Public transport strategy 23 Existing modal split 23 Existing Airport Surface Access Strategy (2018-2022) 24 Transport policy 25 Modal split trends 26 Existing public transport offer 27 Public transport improvements 28 Forecasting assumptions 38 Rail capacity assessment 39 Comparative analysis with other airports 40 Summary 42 4 Transport modelling approach 44 Modelling framework 44 CBLTM-LTN strategic model 45 CBLTM-LTN model base and time periods 46 CLTM-LTN model coverage 47 CBLTM-LTN key work phases 47 1 Future LuToN: Making best use of our runway Surface Access Strategy Report VISSIM model 48 VISSIM model base and time periods 49 VISSIM model development, calibration and validation 49 VISSIM model forecasting 50 VISSIM outputs 51 5
    [Show full text]
  • Newlands Road – Outline Application for the Erection of 394 Residential Units with Associated Open Space, Landscaping and Car Parking
    AGENDA ITEM 11 COMMITTEE: DEVELOPMENT CONTROL DATE: 23RD MAY 2017 SUBJECT: LAND ADJACENT TO CADDINGTON ROAD AND NEWLANDS ROAD – OUTLINE APPLICATION FOR THE ERECTION OF 394 RESIDENTIAL UNITS WITH ASSOCIATED OPEN SPACE, LANDSCAPING AND CAR PARKING. APPROVAL OF RESERVED MATTERS RELATING TO (APPEARANCE, LANDSCAPING, LAYOUT AND SCALE) HOUSES OF PLANNING PERMISSION 14/01609/OUT DATED 26TH MARCH 2015. (APPLICANT: TEMPLEVIEW DEVELOPMENTS LTD) (APPLICATION NO: 17/00319/REM) REPORT BY: DEVELOPMENT CONTROL MANAGER CONTACT OFFICER: DAVID HALL 546317 IMPLICATIONS: LEGAL COMMUNITY SAFETY EQUALITIES ENVIRONMENT FINANCIAL CONSULTATIONS STAFFING OTHER WARDS AFFECTED: FARLEY PURPOSE 1. To advise Members of a current application for approval of reserved matter, and to seek their decision. RECOMMENDATION(S) 2. Development Control Committee is recommended to approved subject to the condition set out below:- 1. Condition 2 of permission 14/01609/OUT dated 26th March 2015 is hereby discharged in relation to the reserved matters relating to layout, scale, appearance and landscaping as shown on the submitted drawings: BE/1385/16/PL02; /PL03; BE1385/16/PL101; /PL102; /PL103; /Pl104; /PL105; /PL106; /PL107; /PL108; /PL109; /PL110; /PL111; /PL112; /PL113; /PL114; /PL115; /PL116; /PL117; /PL118; /PL119; /PL120; /PL121; /PL122; /PL123; /PL201; /PL202; /PL203; /PL204; /PL205; /PL206; /PL207; /PL208; /PL209; /PL210; /PL211; /PL212; /PL213; /PL214; /PL215; /PL216; /PL217; /PL301; /PL302; BE1385/17/PL01 Rev.A; BE1385/23M/001; 6121 Landscape Management Plan; 6121/ASP1.0; /ASP1.1; /ASP1.2; /ASP1.3; /ASP1.4; /ASP2.0; /ASP2.1; /ASP2.2; /ASP2.3; /ASP2.4; LP01: LP02; and LP03. REPORT The Site and Surroundings 3. The application site is a long, almost rectangular area of land, which has a central pinch-point on its eastern side.
    [Show full text]
  • LUTON LOCAL PLAN (2011-31) Pre Submission Version Consultation Response - Summary
    ANNEX 6 - LUTON LOCAL PLAN (2011-31) Pre Submission Version Consultation Response - Summary Date: 22 March 2016 1 Contents Page Introduction 5 Statistical summary of the response to the consultation 6 Section-by-section breakdown of the response………………………………………………………………….. 10 • Duty to Co-operate ………………………………………………………………………………………………… 10 • Chapter 1 - Introduction and Background………………………………………………………………. 18 • Chapter 2 - Setting the Scene…………………………………………………………………………………. 22 • Chapter 3 - Vision & Objectives………………………………………………………………………………. 26 • Chapter 4 - Spatial Development Strategy: 34 o Policy LP1 – Presumption in favour of sustainable development……………….. 34 o Policy LP2 – Spatial Development Strategy………………………………………………… 38 o Policy LP3 – Luton Town Centre Strategy…………………………………………………… 56 o Policy LP4 – Green Belt………………………………………………………………………………. 61 o Policy LP5 – Land south of Stockwood Park……………………………………………….. 66 o Policy LP6 – London Luton Airport……………………………………………………………… 75 o Policy LP7 – Butterfield Green Technology Park…………………………………………. 84 o Policy LP8 – Napier Park…………………………………………………………………………….. 92 o Policy LP9 – Power Court…………………………………………………………………………… 95 o Policy LP10 – High Town……………………………………………………………………………. 101 o Policy LP11 – Creative Quarter…………………………………………………………………… 104 o Policy LP12 – Marsh Farm………………………………………………………………………….. 107 • Chapter 5 - Growing Luton’s Economy including Policy LP 13 - Economic Strategy & 110 Policy LP 14 - Employment Areas ………………………………………………………………………….. • Chapter 6 – Housing……………………………………………………………………………………………….
    [Show full text]
  • The Bedfordshire Naturalist
    The Bedfordshire Naturalist JOURNAL OF THE) BEDFORDSHIRE NATURAL HISTORY SOCIETY FOR THE YEAR 1973 No. 28 ONE POUND PUBLISHED BY THE BEDFORDSHIRE NATURAL HISTORY SOCIETY ; \',;i!ili.*;.;';¥H"';;II~",h""~i'" ~.,,," ef., "-'; •. ; ' .. , ~;~~ __"",-.~_~~_,_c_.-.-~' • ~- -----'--~--,~-~'. - ~".-<~-;)fM~.N'''F ,I THE BEDFORDSHIRE NATURALIST THE JOURNAL OF THE THE BEDFORDSHIRE NATURAL HISTORY SOCIETY Edited byR. V. A. Wagstaff No. 2~ 1973 CONTENTS ,1. OFFICERS OF THE SOCIETY 2. STATEMENT OF ACCOUNTS, 3. REPORT' OF THE COUNCIL ' 4 4. PROCEEDINGS: INDOOR AND FIELD MEETINGS 4, STUDENT ACTIVITIES 'THE FUNGUS FORAY' '7 5. REPORTS OF RECORDERS: BOTANY (FLOWERING PLANTS) BRYOPHYTES 9 METEOROu:laY 10 , MOLLuscA' G. 13 LEECHES AND FLATWORMS- '. 13 SPIDERS 14 LEPIDOPTERA 14 DRAGONFLIES' , ,15 BUGS 16- BIRDS , 16, MAMMALS 31 7. THEED PEARSE 34 8. THE DOORMOUSE IN A SOUTH BEDFORl?SHmE ,WOOD 35 9. THE .HARVEST 'MOUSE IN BEDFORDSHIRE 35 10. FLEAS OF THE ':HAiWEST' MOUSE 41 H. ' HARVEST MICE ~. UNDERGROUND BREEDING IN CAPTIVITY 44 12. THE B. T.O. ORNITHOLoGICAL ATLAS 1968-72 46 13. MISTLETOE SURvEy AT WREST PARK 51 14. FIELD WORK IN MAULDEN WOOD, 52 15i PUTNOE WOOD 1973 " 56 16. NEW ,NEMBERS, 56 BEDFORDSHIRE NATURAL HISTORY SOCIETY 1974 Chairmmf: H.A.S. KEY Hon. Becreta,ry: ~ D, GREEN, Red Cow Fa~Cottage,. Bidwell, Dunstable. Hon. Treasurer: j.M. DYMOND. 91 PUtnoe LIme, Bedford. Hon. Progrlllnme .sIlC~tary: D.G. RANDS. 51 Wychwood Aveniie, Luton. Hon. Librarian: R. B. STEPHENSoN, 17 Pentland Rise, PUtnoe, Bedford. Committee: D. Anderson . C. Banks P.F. Bonham W.J, Champkin A. Ford B.S., Nau A.R.Outen Mrs E.B.
    [Show full text]
  • Gpeaton Green Park London Luton Airport
    FREEHOLD COMMERCIAL LAND FOR SALE g eaton green park ep london luton airport • Just 1/4 mile from Luton Airport • Substantial main road frontage • Suitable for Various Uses Subject to Planning • 0.25 to 5.39 Acres freehold land for sale LOCATION The site is situated at the junction of Eaton Green Road and Vauxhall M1 J10 Way, bordering the perimeter and within quarter of a mile of Luton CAPABILITY GREEN Airport. The M1 Motorway (Junction 10) is only 2 miles via the A1081 which is currently being upgraded giving direct access to the Airport. Luton Parkway station, with regular services to St Pancras International Station/Eurostar is 1.5 miles. Luton Town Centre is PARKWAY within 2.5 Miles with Luton Retail Park and Leisure facilities close LUTON AIRPORT by. LUTON AIRPORT Luton Airport is London’s third largest with both scheduled and GM MOTORS chartered services to a wide range of International European and Domestic destinations. NAPIER PARK The site is close to Napier Park, a 55 acre site shortly to be the subject of a £400m mixed use redevelopment focussing primarily on housing and employment uses. Further information can be obtained at www.napierpark.co.uk PLANNING The site is within an established employment area and the Local Authority will favourably consider industrial/distribution (B1, B2 and B8 uses), as well as various other uses including motor related, hotel/ conference and drive thru uses. Interested parties should direct their enquiries to Luton Borough Council Planning Department Tel: 01582 546000 GRANT ASSISTANCE The site is located within an assisted area where a company may be eligible for Grants (SFI) for launching a new business, expanding or modernising an existing operation, upgrading or developing a new product or service.
    [Show full text]
  • Central Area Report Neighbourhood Governance Progress Report: October 2015 – January 2016
    AGENDA ITEM: 9 Central Area Report Neighbourhood Governance Progress Report: October 2015 – January 2016 Date: 15th March 2016 Name of Chair: Mohammed Riaz Reporting Officer: Marek Lubelski This report gives an overview of progress on addressing community priorities in Central Luton under the themes of ‘safer and stronger communities’, ‘health and wellbeing’ and ‘environment and economy’ as agreed by local people, councillors and council partners as part of the ‘Your Say, Your Way’ programme. Luton Clinical Commissioning Group Central Area Updates November 2015 to February 2016 The High Town Team Community The High Town Team - a group of people made up of High Town councillors, Development residents, LBC staff and representatives Three of the four Central Area from local organisations who originally wards have been lucky to have came together to access ’Portas’ funding had community workers carrying to improve the ‘High Street’ – continues out development work in their to meet regularly to develop ideas that neighbourhoods over the past year. will bring more people and businesses to Saints, Biscot and High Town workers the area and improve High Town Road. have been employed by the Nehemiah One of the latest initiatives sees the Foundation to work alongside arrival of a new website that encourages local people and a diverse range of businesses to come to High Town organisations and groups to facilitate and tells the local community what is projects and community interaction. happening in their neighbourhood, how These projects have varied across to get involved and what opportunities Keeping Fit there are in an area only five minutes the areas but all have one thing in common; they all brought people Luton’s communities are set to from town and 25 minutes from benefit from new homes being built together when they were set up, and London.
    [Show full text]
  • Pushing the Envelope
    HIGHWAYS PUSHING THE ENVELOPE Nuttall has used a mix of embankment construction methods After more than 20 years, a closed rail line in Luton has a new role to play in easing the town’s congestion problem. The route is being widened using innovative solutions to make way for a guided busway. Claire Symes reports. XWRQ $LUSRUW PD\ KDYH SXW WKH GHGLFDWHG EXV URXWH ² RI ZKLFK WKHQ XVH WKH H[LVWLQJ URDG QHWZRUN URXWH WR HQVXUH LW LV ZLGH HQRXJK %HGIRUGVKLUH WRZQ RQ WKH PDS NP ZLOO EH D WZLQWUDFN JXLGHG WROLQNZLWKRWKHUGHVWLQDWLRQVµ IRU WKH WZLQWUDFN EXVZD\EXW DOVR LDV WKH URXWH IRU D IDVW JHWDZD\ EXVZD\ ,W IROORZV WKH URXWH RI D 1XWWDOOVWDUWHGZRUNRQWKHGHVLJQ WR LPSURYH KLJKZD\ FOHDUDQFH WR (XURSH DQG EH\RQG EXW JHWWLQJ UDLOZD\ OLQH WKDW ZDV FORVHG LQ WKH DQGEXLOGFRQWUDFWLQ-XQH7KH RQ WKH QHZ RYHUEULGJHV ´7ZR RI DURXQGWKHWRZQLWVHOILVQRWVRHDV\ PLGV 7KH GHYHORSPHQW ZLOO VFKHPHZDVLQLWLDOO\YDOXHGDW 0 WKH EULGJHV DUH EHLQJ FRPSOHWHO\ ,Q VRPH DUHDV RI /XWRQ FDU DOVRLQFOXGHNPRIGHGLFDWHGF\FOH EXWKDVEHHQUHYLVHGXSWR 0DV UHEXLOWIRXUZLOOIHDWXUHQHZGHFNV RZQHUVKLS LV DV ORZ DV ZD\ DQG NP RI FRPELQHG F\FOH WKHVFRSHRIZRUNKDVFKDQJHGVLQFH RQH[LVWLQJDEXWPHQWVDQGWKUHHDUH PHDQLQJ WKDW PDQ\ SHRSOH UHO\ DQGPDLQWHQDQFHDFFHVVWUDFN WKHFRQWUDFWZDVOHW EHLQJ UHPRYHGµ VD\V 0DUTXDQG RQ EXV VHUYLFHV %XW DW SHDN KRXUV 7KHEXVZD\HVVHQWLDOO\UXQVHDVW ,VVXHV WKH VLWH WHDP KDV KDG WR ´7KH PRVW FRPSOLFDWHG SDUW LV VHYHUH WUDIILF FRQJHVWLRQ PDNHV WRZHVWDQGZLOOSURYLGHJXDUDQWHHG GHDOZLWKLQFOXGHZRUNLQJRQFKDON EHWZHHQ WKH IRRWEDOO FOXE DQG WKH WKHVH VHUYLFHV XQSUHGLFWDEOH DQG D MRXUQH\
    [Show full text]
  • Luton and Southern Bedfordshire Green Infrastructure Plan 2009
    Luton and southern Bedfordshire Green Infrastructure Plan 2009 Produced by the Greensand Trust on behalf of Luton and southern Bedfordshire Joint Technical Unit Luton and South Bedfordshire Green Infrastructure plan 2009 2 Contents Foreword ......................................................................................................................................... 6 Acknowledgements ....................................................................................................................... 7 EXECUTIVE SUMMARY ................................................................................................................. 8 1. Introduction ............................................................................................................................. 12 1.1 Need for this Plan ......................................................................................................... 12 1.2 Policy Background ........................................................................................................ 14 1.3 What is Green Infrastructure? ...................................................................................... 15 1.4 Aim & Objectives ..................................................................................................... 16 2. Context .................................................................................................................................. 17 2.1 Environmental Context ................................................................................................
    [Show full text]
  • Dallow, Farley and South Area Committee
    SOUTH LUTON AREA COMMITTEE 14th January 2008 at 7.52 p.m. PRESENT: Councillor Farooq (Chair); Councillors Ireland, Raquib, Taylor and Timoney. 1 APOLOGIES FOR ABSENCE (REF: 1) Apologies for absence from the meeting were received on behalf of Councillors Ashraf, Harris and M. Hussain. 2 MINUTES (REF: 2.1) Resolved: That the Minutes of the meeting of the Committee held on 2nd October 2007, be taken as read, approved as a correct record and signed by the Chair. 3 PUBLIC QUESTION TIME (REF: 9) There were no questions raised by members of the public on this occasion. 4 EAST LUTON CORRIDOR SCHEME - UPDATE (REF: 11) Mr. Alan Jones, Public Liaison Officer, Birse Civils Ltd. updated the Committee with regard to the work on the East Luton Corridor as follows: • There had been a considerable delay at the Eaton Green roundabout as during excavation work last summer a large number of services had been located which had not previously been chartered on any service drawings which meant a new survey had been required and a new design for the road layout proposed, no further work had been able to be done whilst awaiting the survey to be undertaken and results provided; • The amount of traffic cones were a cause of concern at the Eaton Green roundabout, but cones were in place to protect the open trenches • Work would re-commence by the end of January 2008 and should be completed by the summer. • Work on the four bridges was 95% complete with minor work such as handrails to be completed.
    [Show full text]
  • Someries Castle
    TRANSACTIONS. O 45 31 BY THE REV. H. FOWLER, M.A. A few remarks on the ancient associations of this parish may perhaps be suitable as an introduction to our subject. It appears that the earliest notice of Luton is that in the Anglo-Saxon chronicle under the date 571. In that year, it states, Cuthwolf, who was brother of Ceawlin, King of the West Saxons, fought against the Britons at Bedcanford (i.e. Bedford), and took from them four towns ; one of these was AEgelsburig, or Aylesbury, and another Ligeanburg. Ligeanburg has been con- sidered to be the same locality as Lygetune, mentioned in a charter of King Offa ; and this is, undoubtedly, Luton. Ligeanburg or Lygetune means the town on the Lygea, the river now called the Lea. There is a hamlet, formerly called Lygebury, now Limbury ; this perpetuates the name of the British town ; it is on the Lea, about two miles north-west of the modern Luton. The British town itself I take to be a large circular earthwork existing in Leagrave Marsh, about three- quarters of a mile east from Limbury (I am quoting the description in Davis' History of Luton). Its area is about thirty acres, and it is close to the Icknield-way. We may, I think, call this the British Luton. (Davis, however, supposes it to be a Roman camp.) The 32 S. ALBANS ARCHITECTURAL & ARCHAEOLOGICAL SOCIETY. fighting which preceded its capture, seems to have taken place along a branch of Watling Street, passing through Toddington, Chalgrave, and Chalton. All along this line up to Leagrave Marsh, Saxon weapons and orna- ments, bosses of shields, and bones have been found.* The earliest Saxon settlement seems to have been on the east side of the Lea about a mile from the modern town, on the old road to Barton, as indicated by Saxon pottery and other vestiges of occupation dug up there.
    [Show full text]