Silver Line Gateway EENF Silver Line Gateway Service to Chelsea, East Boston & the Blue Line Expanded Environmental Notification Form (EENF) Submitted to: Executive Office of Energy and Environmental Affairs MEPA Unit November 15, 2013 Submitted by: Massachusetts Department of Transportation TABLE OF CONTENTS TABLE OF CONTENTS COVER PART A – ENF FORM PART B – EENF REPORT PART A – ENF FORM ............................................................................................................................... 1-1 PART B – EENF REPORT ........................................................................................................................ 1-1 1 Introduction .................................................................................................................................. 1-1 2 Project Description ...................................................................................................................... 2-1 2.1 Study Area ....................................................................................................................... 2-1 2.2 Project Components......................................................................................................... 2-1 3 Project History .............................................................................................................................. 3-1 3.1 Project Goals and Objectives ........................................................................................... 3-1 4 Alternatives Analysis ................................................................................................................... 4-1 4.1 Alternatives Analysis ........................................................................................................ 4-1 4.2 Screening ......................................................................................................................... 4-3 4.2.1 Alternative 1: Busway to Mystic Mall .................................................................. 4-3 4.2.2 Alternative 2: Busway to Bellingham Square ...................................................... 4-4 4.2.3 Alternative 3: On-Street to Everett Avenue ......................................................... 4-5 4.2.4 Airport Blue Line Station BRT Platform Location ................................................ 4-5 4.2.5 Fare Collection .................................................................................................... 4-7 4.2.6 Operating Plan .................................................................................................... 4-7 4.3 Transit Operations Summary ........................................................................................... 4-9 4.4 Resource Summary ....................................................................................................... 4-12 4.5 Preferred Alternative ...................................................................................................... 4-16 5 Public Outreach ............................................................................................................................ 5-1 5.1 Civic Engagement ............................................................................................................ 5-1 5.2 Project Coordination......................................................................................................... 5-1 5.3 Public Informational Meetings .......................................................................................... 5-2 5.4 Project Web Site .............................................................................................................. 5-3 6 Resource Area Analysis .............................................................................................................. 6-1 6.1 Environmental Justice ...................................................................................................... 6-1 6.1.1 Environmental Justice Communities ................................................................... 6-1 6.1.2 Performance Measures ....................................................................................... 6-2 6.1.3 Results Summary ................................................................................................ 6-2 6.2 Land Use / Demographics ............................................................................................... 6-5 Silver Line Gateway – Service to Chelsea, East Boston & the Blue Line Page i TABLE OF CONTENTS 6.2.1 Study Area Land Use .......................................................................................... 6-5 6.2.2 Study Area Demographics ................................................................................ 6-10 6.2.3 Summary ........................................................................................................... 6-13 6.3 Hazardous Materials ...................................................................................................... 6-13 6.3.1. Initial Site Assessment ...................................................................................... 6-13 6.3.2 Site Visit ............................................................................................................ 6-14 6.3.3 Historical Research ........................................................................................... 6-14 6.3.4 Environmental Database Review ...................................................................... 6-15 6.3.5 Conclusion and Recommendations .................................................................. 6-16 6.4 Utilities ............................................................................................................................ 6-17 6.5 Transit ............................................................................................................................ 6-19 6.5.1 Silver Line Fleet Analysis .................................................................................. 6-19 6.5.2 Impacts on Existing MBTA and Other Transit Operations ................................ 6-20 6.6 Transportation ................................................................................................................ 6-22 6.6.1 Traffic ................................................................................................................ 6-22 6.6.2 Pedestrian Analysis .......................................................................................... 6-26 6.6.3 Existing Bicycle Inventory and Facilities ........................................................... 6-26 6.7 Parking ........................................................................................................................... 6-28 6.7.1 Existing Parking Inventory and Utilization ......................................................... 6-28 6.7.2 Future Parking Impacts ..................................................................................... 6-30 6.8 Noise and Vibration ........................................................................................................ 6-32 6.8.1 Summary ........................................................................................................... 6-32 6.8.2 Screening Methodology .................................................................................... 6-32 6.8.3 Existing Conditions ........................................................................................... 6-33 6.8.4 Screening Assessment ..................................................................................... 6-34 6.8.5 Noise Impact Assessment ................................................................................ 6-36 6.8.6 Vibration Impacts .............................................................................................. 6-43 6.9 Air Quality / Greenhouse Gas ........................................................................................ 6-44 6.9.1 General ............................................................................................................. 6-45 6.9.2 Comparative Analysis ....................................................................................... 6-45 6.9.3 Summary ........................................................................................................... 6-46 6.10 Wetlands and Water Resources .................................................................................... 6-49 6.10.1 Existing Conditions ........................................................................................... 6-49 6.10.2 Jurisdictional Determination .............................................................................. 6-51 6.10.3 Regulatory Jurisdiction ...................................................................................... 6-52 6.10.4 Project Alternatives, Impacts and Mitigation ..................................................... 6-53 6.11 Stormwater Management ............................................................................................... 6-54 Silver Line Gateway – Service to Chelsea, East Boston & the Blue Line Page ii TABLE OF CONTENTS 6.11.1 Existing Conditions ........................................................................................... 6-54 6.11.2 Post Development Conditions ........................................................................... 6-54 6.11.3 DEP Stormwater Standards .............................................................................. 6-56 6.12 Chapter 91 and Massachusetts Coastal Zone ..............................................................
Recommended publications
  • CHAPTER 2 Progress Since the Last PMT
    CHAPTER 2 Progress Since the Last PMT The 2003 PMT outlined the actions needed to bring the MBTA transit system into a state of good repair (SGR). It evaluated and prioritized a number of specific enhancement and expansion projects proposed to improve the system and better serve the regional mobility needs of Commonwealth residents. In the inter- vening years, the MBTA has funded and implemented many of the 2003 PMT priorities. The transit improvements highlighted in this chapter have been accomplished in spite of the unsus- tainable condition of the Authority’s present financial structure. A 2009 report issued by the MBTA Advisory Board1 effectively summarized the Authority’s financial dilemma: For the past several years the MBTA has only balanced its budgets by restructuring debt liquidat- ing cash reserves, selling land, and other one-time actions. Today, with credit markets frozen, cash reserves depleted and the real estate market at a stand still, the MBTA has used up these options. This recession has laid bare the fact that the MBTA is mired in a structural, on-going deficit that threatens its viability. In 2000 the MBTA was re-born with the passage of the Forward Funding legislation.This legislation dedicated 20% of all sales taxes collected state-wide to the MBTA. It also transferred over $3.3 billion in Commonwealth debt from the State’s books to the T’s books. In essence, the MBTA was born broke. Throughout the 1990’s the Massachusetts sales tax grew at an average of 6.5% per year. This decade the sales tax has barely averaged 1% annual growth.
    [Show full text]
  • Massachusetts Bay Transportation Authority
    y NOTE WONOERLAND 7 THERE HOLDERS Of PREPAID PASSES. ON DECEMBER , 1977 WERE 22,404 2903 THIS AMOUNTS TO AN ESTIMATED (44 ,608 ) PASSENGERS PER DAY, NOT INCLUDED IN TOTALS BELOW REVERE BEACH I OAK 8R0VC 1266 1316 MALOEN CENTER BEACHMONT 2549 1569 SUFFOLK DOWNS 1142 ORIENT< NTS 3450 WELLINGTON 5122 WOOO ISLANC PARK 1071 AIRPORT SULLIVAN SQUARE 1397 6668 I MAVERICK LCOMMUNITY college 5062 LECHMERE| 2049 5645 L.NORTH STATION 22,205 6690 HARVARD HAYMARKET 6925 BOWDOIN , AQUARIUM 5288 1896 I 123 KENDALL GOV CTR 1 8882 CENTRAL™ CHARLES^ STATE 12503 9170 4828 park 2 2 766 i WASHINGTON 24629 BOYLSTON SOUTH STATION UNDER 4 559 (ESSEX 8869 ARLINGTON 5034 10339 "COPLEY BOSTON COLLEGE KENMORE 12102 6102 12933 WATER TOWN BEACON ST. 9225' BROADWAY HIGHLAND AUDITORIUM [PRUDENTIAL BRANCH I5I3C 1868 (DOVER 4169 6063 2976 SYMPHONY NORTHEASTERN 1211 HUNTINGTON AVE. 13000 'NORTHAMPTON 3830 duole . 'STREET (ANDREW 6267 3809 MASSACHUSETTS BAY TRANSPORTATION AUTHORITY ricumt inoicati COLUMBIA APFKOIIUATC 4986 ONE WAY TRAFFIC 40KITT10 AT RAPID TRANSIT LINES STATIONS (EGLESTON SAVIN HILL 15 98 AMD AT 3610 SUBWAY ENTRANCES DECEMBER 7,1977 [GREEN 1657 FIELDS CORNER 4032 SHAWMUT 1448 FOREST HILLS ASHMONT NORTH OUINCY I I I 99 8948 3930 WOLLASTON 2761 7935 QUINCY CENTER M b 6433 It ANNUAL REPORT Digitized by the Internet Archive in 2014 https://archive.org/details/annualreportmass1978mass BOARD OF DIRECTORS 1978 ROBERT R. KILEY Chairman and Chief Executive Officer RICHARD D. BUCK GUIDO R. PERERA, JR. "V CLAIRE R. BARRETT THEODORE C. LANDSMARK NEW MEMBERS OF THE BOARD — 1979 ROBERT L. FOSTER PAUL E. MEANS Chairman and Chief Executive Officer March 20, 1979 - January 29.
    [Show full text]
  • Explaining MBTA Commuter Rail Ridership METHODS RIDERSHIP
    TAKING THE TRAIN? Explaining MBTA Commuter Rail Ridership INTRODUCTION RIDERSHIP BY STATION RESULTS The MBTA Commuter Rail provides service from suburbs in the Boston Metro Area to Boston area stations, with terminal Commuter Rail Variables stations at North Station and South Station. While using commuter rail may be faster, particularly at rush hour, than using a Distance to Boston, distance to rapid transit, price of commuter rail, commuter rail time, transit time, and drive time are all personal vehicle or other transit alternatives, people still choose not to use the Commuter Rail, as can be demonstrated by the highly correlated. This makes sense as they all essentially measure distance to Boston in dollars, minutes and miles. high volume of people driving at rush hour. For the commuter rail variables analysis, trains per weekday (standardized beta=.536, p=.000), drive time at 8AM This study seeks to understand the personal vehicle and public transit alternatives to the MBTA Commuter Rail at each stop (standardized beta=.385, p=.000), peak on time performance (standardized beta=-.206, p=.009) and the terminal station to understand what options people have when deciding to use the Commuter Rail over another mode and what characteristics (p=.001) were found to be significant. Interestingly, all variables calculated for the area a half mile from commuter rail sta- tions (population, jobs and median income) were not significant. of the alternatives may inspire people to choose them over Commuter Rail. Understanding what transit and driving alterna- tives are like at each Commuter Rail stop may offer insight into why people are choosing or not choosing Commuter Rail for Transit Variables their trips to Boston, and how to encourage ridership.
    [Show full text]
  • MIT Kendall Square
    Ridership and Service Statistics Thirteenth Edition 2010 Massachusetts Bay Transportation Authority MBTA Service and Infrastructure Profile July 2010 MBTA Service District Cities and Towns 175 Size in Square Miles 3,244 Population (2000 Census) 4,663,565 Typical Weekday Ridership (FY 2010) By Line Unlinked Red Line 241,603 Orange Line 184,961 Blue Line 57,273 Total Heavy Rail 483,837 Total Green Line (Light Rail & Trolley) 236,096 Bus (includes Silver Line) 361,676 Silver Line SL1 & SL2* 14,940 Silver Line SL4 & SL5** 15,086 Trackless Trolley 12,364 Total Bus and Trackless Trolley 374,040 TOTAL MBTA-Provided Urban Service 1,093,973 System Unlinked MBTA - Provided Urban Service 1,093,973 Commuter Rail Boardings (Inbound + Outbound) 132,720 Contracted Bus 2,603 Water Transportation 4,372 THE RIDE Paratransit Trips Delivered 6,773 TOTAL ALL MODES UNLINKED 1,240,441 Notes: Unlinked trips are the number of passengers who board public transportation vehicles. Passengers are counted each time they board vehicles no matter how many vehicles they use to travel from their origin to their destination. * Average weekday ridership taken from 2009 CTPS surveys for Silver Line SL1 & SL2. ** SL4 service began in October 2009. Ridership represents a partial year of operation. File: CH 01 p02-7 - MBTA Service and Infrastructure Profile Jul10 1 Annual Ridership (FY 2010) Unlinked Trips by Mode Heavy Rail - Red Line 74,445,042 Total Heavy Rail - Orange Line 54,596,634 Heavy Rail Heavy Rail - Blue Line 17,876,009 146,917,685 Light Rail (includes Mattapan-Ashmont Trolley) 75,916,005 Bus (includes Silver Line) 108,088,300 Total Rubber Tire Trackless Trolley 3,438,160 111,526,460 TOTAL Subway & Bus/Trackless Trolley 334,360,150 Commuter Rail 36,930,089 THE RIDE Paratransit 2,095,932 Ferry (ex.
    [Show full text]
  • Boston to Providence Commuter Rail Schedule
    Boston To Providence Commuter Rail Schedule Giacomo beseechings downward. Dimitrou shrieved her convert dolce, she detach it prenatally. Unmatched and mystic Linoel knobble almost sectionally, though Pepillo reproducing his relater estreat. Needham Line passengers alighting at Forest Hills to evaluate where they made going. Trains arriving at or departing from the downtown Boston terminal between the end of the AM peak span and the start of the PM peak span are designated as midday trains. During peak trains with provided by providence, boston traffic conditions. Produced by WBUR and NPR. Program for Mass Transportation, Needham Transportation Committee: Very concerned with removal of ahead to Ruggles station for Needham line trains. Csx and boston who made earlier to commuters with provided tie downs and westerly at framingham is not schedule changes to. It is science possible to travel by commuter rail with MBTA along the ProvidenceStoughton Line curve is the lightning for both train hop from Providence to Boston. Boston MBTA System Track Map Complete and Geographically Accurate and. Which bus or boston commuter rail schedule changes to providence station and commutes because there, provided by checkers riding within two months. Read your favorite comics from Comics Kingdom. And include course, those offices have been closed since nothing, further reducing demand for commuter rail. No lines feed into both the North and South Stations. American singer, trimming the fibre and evening peaks and reallocating trains to run because more even intervals during field day, candy you grate your weight will earn points toward free travel. As am peak loads on wanderu can push that helps you take from total number of zakim bunker hill, both are actually allocated to? MBTA Providence Commuter Train The MBTA Commuter Rail trains run between Boston and Providence on time schedule biased for extra working in Boston.
    [Show full text]
  • Rail Station Parking
    Parking at/near the Passenger Rail Stations used by Residents of Western Mass. Parking rate per Distance Cost to Park Station Location Long‐term Parking Location Hour Day Month from Station for 1 Day North – South stations $ 5 / day GREENFIELD surface lot (city owned) 0.2 miles $ 0.75 / hour $ 5 $ 25 / for 7 days NA Amtrak Hope Street (4 min walk) (maximum of 10 hours) (see note 1) NORTHAMPTON E. John Gare Parking Garage (city owned) 0.3 miles Free / first hour $ 90 / month $ 12 NA Amtrak 85 Hampton Avenue (6 min walk) $ 0.50 / each additional hour (see note 2) HOLYOKE surface lot at station (state owned) ‐‐ Free Free Amtrak 74 Main Street $ 1.50 for the first 30 minutes $ 2.00 per each additional hour Union Station Garage (city owned) $ 5 $ 5 Daily Commuter (5 am — Midnight) SPRINGFIELD ‐‐ $ 65 / month 1755 Main Street (5 am ‐ Midnight) $ 20 / 24 hours Amtrak $ 40 / 48 hours Ctrail $ 50 / 3–7 days Greyhound Peter Pan $ 10 / day (1–3 calendar days) Ken's Parking (private surface lot) 0.1 miles $ 10 NA $ 8 / day (4–6 calendar days) NA 73 Taylor Street (2 min walk) $ 6 / day (7+ calendar days) WINDSOR LOCKS surface lot at station (state owned) Amtrak ‐‐ Free Free South Main Street at Stanton Road CTail Stations along the MBTA Framingham / Worcester Line $ 3 / 0–1 hour $ 1 / each additional hour $ 116 – Regular Monthly Union Station Garage (city owned) $ 12 $ 12 / 6+ hours ‐‐ $ 127 – 24/7 225 Franklin Street $ 16 (overnight) $ 1 / evenings (5 pm – 3 am) WORCESTER $ 150 – Premium MBTA Commuter Rail $ 5 / overnight (3 am – 4 am) Amtrak Note | day begins at 4 am surface lot (city owned) 0.1 miles $ 4 $ 4 / day NA NA 25 Shewsbury Street (2 min walk) GRAFTON surface lot at station (state owned) ‐‐ $ 4 $ 4 / day NA NA MBTA Commuter Rail 1 Pine Street, North Grafton Note 1 | Daily/weekly Amtrak Parking passes must be purchased in advance (at Greenfield City Hall or on the web) Note 2 | There is currently a waiting list for monthly parking permits at this location Prepared by Trains In The Valley 8/15/2018.
    [Show full text]
  • Building a Better T in the Era of Covid-19
    Building a Better T in the Era of Covid-19 MBTA Advisory Board September 17, 2020 General Manager Steve Poftak 1 Agenda 1. Capital Project Updates 2. Ridership Update 3. Ride Safer 4. Crowding 5. Current Service and Service Planning 2 Capital Project Updates 3 Surges Complete | May – August 2020 Leveraged low ridership while restrictions are in place due to COVID-19 directives May June July August D Branch (Riverside to Kenmore) Two 9-Day Closures C Branch (Cleveland Circle to Kenmore) E Branch (Heath to Symphony) Track & Signal Improvements, Fenway Portal Flood 28-Day Full Closure 28-Day Full Closure Protection, Brookline Hills TOD Track & Intersection Upgrades Track & Intersection Upgrades D 6/6 – 6/14 D 6/20 – 6/28 C 7/5 – 8/1 E 8/2 – 8/29 Blue Line (Airport to Bowdoin) Red Line (Braintree to Quincy) 14-Day Closure Harbor Tunnel Infrastructure Upgrades On-call Track 2, South Shore Garages, Track Modernization BL 5/18 – 5/31 RL 6/18 -7/1 4 Shuttle buses replaced service Ridership Update 5 Weekday Ridership by Line and Mode - Indexed to Week of 2/24 3/17: Restaurants and 110 bars closed, gatherings Baseline: limited to 25 people Average weekday from 2/24-2/28 100 MBTA service reduced Sources: 90 3/24: Non-essential Faregate counts for businesses closed subway lines, APC for 80 buses, manual counts at terminals for Commuter Rail, RIDE 70 vendor reports 6/22: Phase 2.2 – MBTA 6/8: Phase 2.1 60 increases service Notes: Recent data preliminary 50 5/18-6/1: Blue Line closed for 40 accelerated construction Estimated % of baseline ridership
    [Show full text]
  • 2013-0583-3S Massachusetts Bay Transportation Authority (MBTA)
    Official Audit Report – Issued June 16, 2014 Massachusetts Bay Transportation Authority For the period January 1, 2005 through December 31, 2012 State House Room 230 Boston, MA 02133 [email protected] www.mass.gov/auditor June 16, 2014 Dr. Beverly Scott, General Manager Massachusetts Bay Transportation Authority State Transportation Building 10 Park Plaza, Suite 3910 Boston, MA 02116 Dear Dr. Scott: I am pleased to provide this performance audit of the Massachusetts Bay Transportation Authority (MBTA). This report details the audit objectives, scope, methodology, findings, and recommendations for the audit period, January 1, 2005 through December 31, 2012. My audit staff discussed the contents of this report with management of the MBTA, and their comments are reflected in this report. I would also like to express my appreciation to the MBTA for the cooperation and assistance provided to my staff during the audit. Sincerely, Suzanne M. Bump Auditor of the Commonwealth 2013-0583-3A TABLE OF CONTENTS TABLE OF CONTENTS EXECUTIVE SUMMARY ........................................................................................................................................... 1 OVERVIEW OF AUDITED AGENCY ........................................................................................................................... 3 AUDIT OBJECTIVES, SCOPE, AND METHODOLOGY ................................................................................................. 4 DETAILED AUDIT RESULTS AND FINDINGS WITH AUDITEE’S RESPONSE ................................................................
    [Show full text]
  • Tobin Bridge/Chelsea Curves Rehabilitation Project
    Tobin Bridge/Chelsea Curves Rehabilitation Project PROJECT OVERVIEW The Maurice J. Tobin Memorial Bridge and the Chelsea Viaduct (U.S. Route 1) are undergoing rehabilitation in order to remain safe and in service through the 21st Century. Not subject to major rehabilitation since the 1970’s due to concern for regional mobility, work must be undertaken now to ensure this vital roadway link can continue to serve Massachusetts and New England. When complete, this project will remove 15% of the structurally defcient bridge deck in the Commonwealth of Massachusetts. In order to minimize the impacts to the 63,000 vehicles per day using Route 1, the MBTA Bus Routes that cross the viaduct and bridge, and the residents of Chelsea, MassDOT is coordinating the two projects, and resequencing the construction phasing for each project so that construction is carried out efciently, efectively, and in a timely manner. These changes will lessen the impact on commuters and abutters, and reduces the risk of project delays. Massachusetts residents see these two projects as one, and so does MassDOT. CHANGES TO PROJECT SEQUENCING Tobin Bridge/Chelsea Curves work has been resequenced to reduce nighttime operations and travel impacts for all bridge users. The new construction plan shifts work on the Chelsea Viaduct to 2019 to match Tobin Bridge trafc management, continuously allowing 2 lanes of travel in each direction during peak commute hours for the duration of the project. Overall these changes will speed up construction, increase the availability of two travel lanes in each direction, reduce the impacts on commuters using the corridor, and allow for main line work completion in 2020.
    [Show full text]
  • Changes to Transit Service in the MBTA District 1964-Present
    Changes to Transit Service in the MBTA district 1964-2021 By Jonathan Belcher with thanks to Richard Barber and Thomas J. Humphrey Compilation of this data would not have been possible without the information and input provided by Mr. Barber and Mr. Humphrey. Sources of data used in compiling this information include public timetables, maps, newspaper articles, MBTA press releases, Department of Public Utilities records, and MBTA records. Thanks also to Tadd Anderson, Charles Bahne, Alan Castaline, George Chiasson, Bradley Clarke, Robert Hussey, Scott Moore, Edward Ramsdell, George Sanborn, David Sindel, James Teed, and George Zeiba for additional comments and information. Thomas J. Humphrey’s original 1974 research on the origin and development of the MBTA bus network is now available here and has been updated through August 2020: http://www.transithistory.org/roster/MBTABUSDEV.pdf August 29, 2021 Version Discussion of changes is broken down into seven sections: 1) MBTA bus routes inherited from the MTA 2) MBTA bus routes inherited from the Eastern Mass. St. Ry. Co. Norwood Area Quincy Area Lynn Area Melrose Area Lowell Area Lawrence Area Brockton Area 3) MBTA bus routes inherited from the Middlesex and Boston St. Ry. Co 4) MBTA bus routes inherited from Service Bus Lines and Brush Hill Transportation 5) MBTA bus routes initiated by the MBTA 1964-present ROLLSIGN 3 5b) Silver Line bus rapid transit service 6) Private carrier transit and commuter bus routes within or to the MBTA district 7) The Suburban Transportation (mini-bus) Program 8) Rail routes 4 ROLLSIGN Changes in MBTA Bus Routes 1964-present Section 1) MBTA bus routes inherited from the MTA The Massachusetts Bay Transportation Authority (MBTA) succeeded the Metropolitan Transit Authority (MTA) on August 3, 1964.
    [Show full text]
  • BOSTON Planner’S Guide
    BOSTON Planner’s Guide Prepared by the Massachusetts Chapter of the American Planning Association for the APA National Planning Conference Boston, Massachusetts April 9-12, 2011 WELCOME TO BOSTON THE HOMETOWN OF PLANNING Bostonwasfoundedin60ontheShawmutPeninsula,juttingoutintothe BostonHarborandconnectedtothemainlandbytoday’sWashingtonStreet. OnbehalfoftheBostonLocalHostCommitteewewouldliketowelcomeyoutothe Throughplannedfillingand“wharfing-in”,thepeninsulaevolvedtoitspresent 0AmericanPlanningAssociationNationalPlanningConference. shape.In878,thefillingofmarshesintheBackBaybegan(todaytheBackBay neighborhood).Underaplanbyfamedlandscapearchitect,FrederickLawOlmsted, Boston’sapproachtoplanning&developmentistopreserveitshistoriccharacter today’s“EmeraldNecklace”alsowasformed.Theseearlyactionssetthestagefor whileembracingthefuture.Frombeingthefirstcitytorequiredevelopmentsto themodernpublicworksthatcontinuetoshapeBoston. followLEEDstandardstotheestablishmentofanInnovationDistrictforcreative jobs,Bostonisbuildingonboththestrengthofitshistoryanditsyoungand Inthelate800s,thefirstsubwayinthenationwasbuiltunderTremontand educatedworkforce.Over80areacollegesanduniversitieseducatemorethan BoylstonStreets(nowpartoftheMBTAGreenLine).Largehighwayprojects 0,000studentseveryyear.Diversityenrichesthiscitywhereminoritiesnow alsohadimpacts.Inthe950s,theelevatedCentralArterywasbuiltbythe makeuphalfoftheCity’spopulation. MassachusettsDepartmentofPublicWorks(MDPW).Inthe980stoearly000s, MDPW’s(nowMassDOT)massiveCentralArtery/TunnelProject(knownastheBig BostonisoneofAmerica’sgreatwalkingcitiesandyouarelocatedinanexemplary
    [Show full text]
  • Transreport Transportation News from the Boston Metropolitan Planning Organization
    OCTOBER 2004 TRANSREPORT TRANSPORTATION NEWS FROM THE BOSTON METROPOLITAN PLANNING ORGANIZATION TEA-21 Extended for Eight Boston MPO Suburban Mobility Program Moving Toward Months Implementation In September 30 Congress enacted HR The service will operate on a two-day 5183, a bill that extends the current advance notice in order to facilitate Transportation Equity Act for the 21st grouping of trips. Hours of service will be Century (TEA-21) until May 31, 2005. approximately 6:00 A.M. to 6:30 P.M., to While the funding sources for the exten- accommodate the MBTA commuter rail sion have shifted somewhat, federal schedule, Monday through Friday. Riders funding available for the nation’s Trans- can call to schedule trips between the portation Improvement Programs and hours of 8:00 A.M. and 4:30 P.M. Unified Planning Work Programs There will be a $2.00 charge for each remains essentially unchanged. There one-way trip. were no project earmarks included in the extension. Founded in 1974, the WRTA is a public, nonprofit organization maintaining a The extension provides the option of fleet of 44 buses for 28 fixed routes in delaying decisions on a long-term reau- The Boston Metropolitan Planning Worcester and 13 of the surrounding thorization bill until next spring. The communities. The WRTA also provides Association of Metropolitan Planning Organization programmed congestion ■ Suburban Mobility cont. on p. 3 Organizations and delegations consisting mitigation and air quality improvement of MPO members, state highway and (CMAQ) funds to two new services transit officials, and public interest under its Suburban Mobility Program.