Tapping and Ashby)

Total Page:16

File Type:pdf, Size:1020Kb

Tapping and Ashby) ofCity Wanneroo AMENDMENT NO. 26 TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN NO. 3 This Amendment to the Agreed Structure Plan has been prepared under the provisions of the City of Wanneroo District Planning Scheme No. 2 RECORD OF AMENDMENTS MADE TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN NO. 3 Amendment No. Summary of the Amendment Date approved by WAPC 1 To recode certain lots located at the southern part of the Agreed 1 April 2005 Structure Plan area from R20 to R40 2 Modifies the road layout and the distribution of the Public Open 1 April 2005 Space areas over Lot 2706 Pinjar Road, Tapping. 3 Modifies the road layout, density codes and the distribution of 1 April 2005 Public Open Space over Crown Reserve 27294, Lots 1, 20, 21 and 22 Wanneroo Road and Lots 14, 15, 17, 18 and Pt Lot 101 Clarkson Avenue, Tapping. 4 Recodes minor portions of Lot 13 Wanneroo Road, Ashby from 1 April 2005 R20 to R40 5 Recodes Lots 235-259 Taplow Parade, portion of Lot 25 Pinjar 1 April 2005 Road and portion of Lot 9006 Pinjar Road, Ashby from R20 to R40. 6 Recodes minor portions of Lots 25 and 26 Pinjar Road, Ashby from 15 June 2005 R20 to R40 7 Recodes the residential portion of Lots 23 & 24 Ashley Road, 27 June 2005 Tapping from R20 to R30 & R40 8 Recodes Lot 135 Paxton Way, Ashby from R20 to R40 22 June 2006 9 Modifies the road layout of Lot 501 Conti Road & Lot 502 & Lot 29 Aug 2006 9601 Pinjar Road, Ashby and recodes a portion of that land from R20 to R40. 10 Recodes Lots 118 and 120 Gosford Meander and Lots 121 and 5 Dec 2006 134 Paxton Way, Ashby from R20 to R40 13 Recodes the following lots in Ashby from R20 to R40: 30.6.08 Lots 101, 104, 106-116, 123-126, 273-274, 277-278, 283, 285-287, 289, 291-293 Gosford Meander Lots 129-132, 136-137, 246-250, 280-282 Sistina Road Lots 138-144 Hennessy Drive Lots 251-263 Shipton Loop Lots 264-267 Cranley Link Lot 9013 Pinjar Road, Sinagra 11 Rezones Lot 9602 Pinjar Road, Ashby from Residential to Centre SAT Matter No. Zone, with a maximum net lettable area of 4600m², & Community DR 171/2008 Purpose Site; and 10.9.08 Rezones Lot 25 Ashley Road, Tapping from Centre Zone to Residential Zone with a density coding of R20 14 Recodes Lot 208 Grallina Way, Tapping from R20 to R30 10.3.09 2 16 • Deletes the Community Purpose site from Lot 9603 Pinjar 23.3.10 Road, Ashby and relocates it on a portion of Lot 9031 Waldburg Drive, Tapping • Recodes a portion of Lot 9031Ashley Road, Tapping from Residential R20 to R40. 12 • Rezones Lot 19 Clarkson Avenue, Tapping from Residential 9.5.11 Precinct to Commercial Zone and Residential Precinct (R40); • Modifies Schedule 1 to include the NLA as 1100m²; and • Includes an additional provision relating to the Commercial Zone 18 • Recodes Lot 9603 Pinjar Road, Ashby from Residential R20 to 23.1.12 Residential R30, R40 and R60 excepting for the future R20 lots abutting Conti Road; and • Recodes a portion of Lot 501 Conti Road, Ashby to the east of Fomiatti Street from Residential R40 to Residential R60 and from Residential R20 to Residential R30, R40 and R60 excepting for the future R20 lots abutting Conti Road. 20 Amends 'Schedule 1 – Retail Floorspace Provision' to permit a 1.3.13 maximum retail floorspace limit of 7,000m NLA (rounded to the nearest 50m). 21 Modifies Schedule 1 to include the NLA for Lot 19 Clarkson 2.9.13 Avenue, Tapping as 1900m². 17 Modifies the road layout on Lots 21 and 24 Carosa Road, Ashby 20.11.12 and recodes portion of Lots 21 and 24 Carosa Road, Ashby in the Residential zone from R20 to R25, R40 and R60. 19 Recodes Lot 9017 Lautrec Loop, Ashby from R20 to R30 22.7.13 22 • Recodes portions of Lots 9623 and 9624 Pinjar Road, Ashby 16.2.15 from Residential R60 to Residential R80 • Identifies areas to be designated as 'Height Limit A' and 'Height Limit B' • Inserts Provision 7 – Residential Design Code Variations 24 Recodes portion of Lot 1 (96) Clarkson Avenue, Tapping from 30.3.15 Residential R20 to Residential R40 23 Recodes the eastern portion of Lot 19 (20) Clarkson Avenue, 13.10.16 Tapping from Residential R40 to Residential R60 and inserts a new Clause 4.1.1 – Subdivision and Development Requirements for Residential zoned land. 25 Amends the development requirements for the Commercial zone 13.10.16 and modifies Schedule 1 to include the NLA for Lot 19 Clarkson Avenue, Tapping as 4300m² 26 Rezones Lot 9630 (14) Blackberry Drive, Ashby from Residential to Mixed Use Zone. Amends Part 1 - Statutory Planning Section to insert provisions relating to the Mixed Use zone. 3 AMENDMENT NO. 26 TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN NO. 3 The City of Wanneroo, pursuant to its District Planning Scheme No. 2, hereby amends the above Agreed Structure Plan by: 1. Amending the Agreed Structure Plan map to rezone Lot 9630 (14) Blackberry Drive, Ashby from Residential to Mixed Use Zone. 2. Amending the Part 1 - Statutory Planning Section to insert provision 4.6 as outlined below: 4.6 MIXED USE ZONE The permissibility of uses is to be in accordance with the Mixed Use Zone as specified under the scheme. Objectives General objectives for the Mixed Use Zone are: a) encourage a diversity of land uses and a diversity of housing types; b) act as a transition between the Residential and Commercial zones and provide flexibility in design of developments to encourage a variety of mixed use, residential and non-residential uses; and c) promote developments that continue support Blackberry Drive as an active focus for the community by means of appropriate commercial uses. Criteria Criteria to be satisfied in this zone are: a) the provisions of the Mixed Use zone in the Scheme and of the relevant Residential Planning Code provisions as indicated on Plan 2 ‘The Local Structure Plan’ shall apply to this zone; b) building heights are to be consistent with clause 7; c) vehicle access from Blackberry Drive is permitted for non-residential developments. 4 Z:\Jobs Working\2526 - 2550\2530\Drawings\2530-report figures\130911 2530 Proposed ASP.jpg A B SUBJECT SITE MIXED USE R80 Scale Bar (m) SCALE 1:12,500 @ A4 0 200 DATE 3 May 2017 PROPOSED ASP MAP FILE 170501 4929 Proposed ASP.dwg REVISION 3/DR/Rev/01.05.2017 LOT 9631 (14) BLACKBERRY DRIVE 2/IA/Rev/11.06.2014 ASHBY, WESTERN AUSTRALIA DISCLAIMER: THIS DOCUMENT IS AND REMAINS THE PROPERTY OF PLANNING SOLUTIONS AND MAY NOT BE COPIED IN WHOLE OR IN PART WITHOUT THE WRITTEN CONSENT OF PLANNING SOLUTIONS. ALL AREAS, DISTANCES AND ANGLES ARE APPROXIMATE ONLY AND ARE SUBJECT TO SURVEY. BASEPLAN SOURCE: STREET-DIRECTORY.COM.AU EAST WANNEROO ZONING PLAN - CELL 1 Includes Amendments 11 & 12 AVENUE CLARKSON ROAD ASHLEY WANNEROO CONTI ROAD CAROSA ROAD ¯ ROAD ROAD Legend CELL BOUNDARY JAR PIN BUFFER PRECINCT * * * * * * COMMERCIAL CENTRE ZONE 0100 200 400 600 800 EE Produced by Planning & Sustainability EE RESIDENTIAL Metres 31 May 2011 This Structure Plan Amendment is prepared under the provisions of the City of Wanneroo District Planning Scheme No. 2 IT IS CERTIFIED THAT THIS STRUCTURE PLAN AMENDMENT NO.26 TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN NO. 3 WAS APPROVED BY RESOLUTION OF THE WESTERN AUSTRALIAN PLANNING COMMISSION ON ……………………………… Signed for and on behalf of the Western Australian Planning Commission ………………………………………………. an officer of the Commission duly authorised by the Commission pursuant to section 24 of the Planning and Development Act 2005 for that purpose, in the presence of: …………………………………………. Witness …………………………….. Date …………………….. Date of Expiry 6 PART 2 - EXPLANATORY REPORT AMENDMENT NO. 26 TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN NO. 3 7 Proposed Structure Plan Amendment East Wanneroo Cell 1 (Tapping and Ashby) ASP 3 LOT 9631 (14) Blackberry Drive Ashby, Western Australia v Prepared for Endeavor Properties Pty Ltd Copyright Statement 2017 © Planning Solutions (Aust) Pty Ltd All rights reserved. Other than for the purposes of and subject to the conditions prescribed under the Copyright Act 1968 (Cth), no part of this report may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic or otherwise, without the prior written permission of Planning Solutions (Aust) Pty Ltd. No express or implied warranties are made by Planning Solutions (Aust) Pty Ltd regarding the information and analysis contained in this report. In particular, but without limiting the preceding exclusion, Planning Solutions (Aust) Pty Ltd will not verify, and will not assume responsibility for, the accuracy and completeness of information provided to us. This report has been prepared with particular attention to our Client’s instructions and the relevant features of the subject site. Planning Solutions (Aust) Pty Ltd accepts no liability whatsoever for: 1. a third party’s use of, or reliance upon, this report; 2. use of, or reliance upon, this report in relation to any land other than the subject site; or 3. the Client’s implementation, or application, of the strategies recommended in this report. Direct all inquiries to: Planning Solutions Level 1 251 St Georges Terrace Perth, Western Australia 6000 All correspondence to: GPO Box 2709 Cloisters Square PO 6850 Phone: 08 9227 7970 Fax: 08 9227 7971 Email: [email protected] Web: www.planningsolutions.com.au 9 Project details Job number 4929 Client Endeavour Properties Pty Ltd Prepared by Planning Solutions Consultant Team Architect Oldfield Knott Architects Pty Ltd Traffic Engineering Transcore Document Control Revision number File name Document date Rev 0 150403 4929 Structure Plan 3 April 2017 Amendment - Mixed Use Zone 10 Proposed amendment to the East Wanneroo Cell 1 (Tapping and Ashby) Agreed Structure Plan No.
Recommended publications
  • TRAFFIC IMPACT ASSESSMENT Lot 1665, Wanneroo Road, Sinagra Local Structure Plan - Transport Impact Assessment
    APPENDIX F TRAFFIC IMPACT ASSESSMENT Lot 1665, Wanneroo Road, Sinagra Local Structure Plan - Transport Impact Assessment Lot 1665, Wanneroo Road, Sinagra Local Structure Plan - Transport Impact Assessment CW1011200 Prepared for Stockland 9 July 2019 9 July 2019 Cardno i Lot 1665, Wanneroo Road, Sinagra Local Structure Plan - Transport Impact Assessment Contact Information Document Information Cardno (WA) Pty Ltd Prepared for Stockland ABN 77 009 119 000 Project Name Local Structure Plan - Transport Impact 11 Harvest Terrace Assessment West Perth WA 6005 Australia File Reference CW1011200-TR-R001-D- TIA-V2BS-SJL.docx www.cardno.com Phone +61 8 9273 3888 Job Reference CW1011200 Fax +61 8 9486 8664 Date 9 July 2019 Version Number D Author(s): Nuzra Davahir Effective Date 9/07/2019 Graduate Traffic Engineer Approved By: Ray Cook Date Approved 9/07/2019 Manager – Traffic and Transport Document History Version Effective Date Description of Revision Prepared by Reviewed by A 29/03/19 Structure Plan Upgrade ND SJL B 18/04/19 For Issue BS SJL C 06/05/19 For Issue - Final BS SJL D 09/07/19 For Issue BS SJL © Cardno. Copyright in the whole and every part of this document belongs to Cardno and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person other than by agreement with Cardno. This document is produced by Cardno solely for the benefit and use by the client in accordance with the terms of the engagement. Cardno does not and shall not assume any responsibility or liability whatsoever to any third party arising out of any use or reliance by any third party on the content of this document.
    [Show full text]
  • Wanneroo Times Joondalup 30102018
    Allegedkangaroo Kaleidoscope set to killer to plead guilty illuminate Joondalup PAGE 3 PAGE 5 TimesJoondalup Communitynews.com.au SEESEE PAPAGEGE 4F4 FOORR DDETETAAILSILS TUESDAY, OCTOBER 30, 2018 www.tempoint.com.au/promotion/ Velvet touch to classic ENDEAVOUR Theatre Company’s next produc- tion is apantomime. Cinderella andThe Vel- vet Slipper will be staged from November 10 to 18. Company president Christine Evans said the new slant on an old favourite, Cinderella, would come with plenty of action, jokes and audience participation. “Pantomimes seem to be popular at this time of CINDERELLA AND year,” she said. “And the THE VELVET SLIPPER kids love them.” WHEN: November 10-17, 6pm; matinee Novem- Endeavour Theatre Compa- ber 11 &18, 2.30pm. ny actors Shirley Di Paolo, VENUE: Hamersley Community Recreation Cen- Clyde Goodenough, Denise tre, Belvedere Road, Hamersley. Mignon, Lesley Pascoe and TICKETS: $22, concession $19, children under 12 Angelica Franz. $15, children under 5free. Picture: Martin Kennealey BOOKINGS: 9341 7926. www.communitypix.com.au d487731 Newroads take shape Lucy Jarvis project in late 2018, which termined during the de- south of East Road to help in November.Itwillinstall ers, rollers, dump trucks, will include building a tailed design stage after it southbound motorists. barriers on Wanneroo graders, bob cats, water MAIN Roads has released a road bridge, as well as on awarded the contract. Vehicles will still be al- Road, Joondalup Drive and carts and light vehicles. concept plan for the $65 mil- and off ramps with traffic Changes to surrounding lowed to turn right from the northernside of the Night works, starting this lion Wanneroo Road-Ocean signals.
    [Show full text]
  • Wanneroo Road and Ocean Reef Road Interchange
    MAIN ROADS WESTERN AUSTRALIA PROJECT UPDATE JUNE 2019 Wanneroo Road and Ocean Reef Road Interchange Site establishment and preliminary construction activity has begun on the Wanneroo Road and Ocean Reef Road Interchange following the award of a design Ground-breaking and construction ceremony marks contract. start of project The first sod was turned on 10 going over Ocean Reef Road. • Site investigations to identify March 2019, officially marking the the location of services and The interchange will improve commencement of the $64.8 million commencement of service connectivity in all directions, reduce project, which is jointly funded by the relocations travel times between coastal suburbs Australian ($51.84 million) and State and employment centres such as ($12.96 million) Governments. The • The construction of a new access Wangara and Malaga, and improve road ceremony was led by the Hon. Minister road to Cockman House safety. for Transport Rita Saffioti, along with • Temporary diversion of the shared other dignitaries and project team path adjacent to Cockman House members. First stage of construction Construction of the Wanneroo Road and • Establishment of traffic management Ocean Reef Road Interchange is now Improving safety at one of Perth’s and site facilities underway, with the first stage of works most congested intersections involving: The majority of these works will be Main Roads has awarded a design undertaken from 7am to 7pm, Monday • Demolition of the former BP service and construction contract to WBHO to Saturday. Out of hours works may station site and other redundant Infrastructure Pty Ltd – SRG Civil Pty be required to complete parts of the job buildings.
    [Show full text]
  • Reconciliation Action Plan 2018/19 – 2021/22 Dr
    Reconciliation Action Plan 2018/19 – 2021/22 Dr. Richard Walley OAM performing Welcome to Country. Bulgalla – Banksia (Menziesii). Message from the Mayor I am pleased to present the City of process, delivering strong cultural practices and cultural Wanneroo Innovate Reconciliation outcomes and positive impacts for protocols and history, including the Action Plan (RAP) 2018/19-2021/22. our community. impact of past Government policies. The City’s journey to reconciliation This RAP symbolises our commitment Underpinning this pillar is a strong started in 2010 when Council to continuously work towards commitment to staff training and resolved to develop its inaugural improving relationships, opportunities community education programs RAP, implemented through and respect within the City. to improve cultural understanding and awareness. 2012-2014. Reconciliation at the City aspires The inaugural RAP sought to to foster mutual respect where The pillar of ‘Opportunities’ focusses create awareness for residents and Aboriginal people and other on building strategies to increase employees of the City’s commitment Australians come together to learn, employment opportunities and to reconciliation and a greater appreciate and grow proud of the the support and engagement understanding of Aboriginal culture rich Aboriginal culture that has of Aboriginal organisations and in the City of Wanneroo. existed for thousands of years and businesses. It identifies ways that continues today. the City can refine, prioritise and The RAP 2018/19-2021/22 is focus its actions to achieve real a result of extensive community The actions in the RAP are based results in employment and training consultation, together with the RAP on the three pillars of Relationships, outcomes for Aboriginal Australians.
    [Show full text]
  • Proposed Service Station Lot 1 (No.1351) Wanneroo Road, Tapping Transport Impact Assessment
    Proposed Service Station Lot 1 (No.1351) Wanneroo Road, Tapping Transport Impact Assessment PREPARED FOR: BP Australia Pty Ltd November 2019 Document history and status Date Author Revision Approved by Revision type approved S Maharjan, M r01 B Bordbar 17/04/2019 Draft Rasouli S Maharjan r01a M Rasouli 18/11/2019 Final File name: t19.016.sm.r01a Author: S Maharjan, M Rasouli Project manager: Mohammad Rasouli Client: BP Australia Pty Ltd Project: Lot 1 (No.1351) Wanneroo Road, Proposed Service Station Document revision: r01a Project number: t19.016 Copyright in all drawings, reports, specifications, calculations and other documents provided by the Consultant in connection with the Project shall remain the property of the Consultant. The Client alone shall have a license to use the documents referred to above for the purpose of completing the Project, but the Client shall not use, or make copies of, such documents in connection with any work not included in the Project, unless written approval is obtained from the Consultant or otherwise agreed through a separate contract. TABLE OF CONTENTS 1.0 SUMMARY .................................................................................................................. 1 2.0 INTRODUCTION ....................................................................................................... 2 3.0 EXISTING SITUATION ............................................................................................... 4 3.1 EXISTING SITE USE, ACCESS AND PARKING ...............................................................................................
    [Show full text]
  • Wanneroo Cover Outside.Cdr
    PLANT SPECIES REFERRED TO IN THESE NOTES Natives Narrow-leaved Red Mallee Eucalyptus foecunda Banbar Melaleuca teretifolia One-sided Bottlebrush Calothamnus quadrifidus Bare Twigrush Baumea juncea Pajang Acacia lasiocarpa Basket Bush Spyridium globulosum Pale Rush Juncus pallidus Birds and Reserves Boobialla Myoporum insulare Parrot Bush Dryandra sessilis Blueboy Stirlingia latifolia Pink Fan Trigger Plant Stylidium utriculariodes of the Bull Banksia Banksia grandis Pink Summer Calytrix Calytrix fraseri Bulrush Typha angustifolia Pineapple Bush Dasypogon bromeliifolius City of Wanneroo Bulrush Typha domingensis Prickly Moses Acacia pulchella Candlestick Banksia Banksia attenuata Quandong Santalum acuminatum Chenille Honeymyrtle Melaleuca huegelii Redheart Eucalyptus decipiens Chinese Brake Pteris vittata Reed Triggerplant Stylidium junceum Christmas Tree Nuytsia floribunda Regelia Regelia inops Chuck Exocarpus sparteus Rough Honeymyrtle Melaleuca scabra Coastal Blackbutt Eucalyptus todtiana Seaheath Frankenia pauciflora Coastal Daisybush Olearia axillaris Shining Fanflower Scaevola nitida Slender Coastal Honeymyrtle Melaleuca acerosa Slender Podolepis Podolepis gracilis Coastal Leschenaultia Leschenaultia linariodes Snakebush Hemiandra pungens Coastal Wattle Acacia cyclops Stalked Guinea Flower Hibbertia racemosa Cockies Tongues Templetonia retusa Summer-scented Wattle Acacia rostellifera Common Smokebush Conospermum stoechadis Swamp Banksia Banksia littoralis Common Woollybush Adenanthos cygnorum Swamp Teatree Leptospermum ellipticum
    [Show full text]
  • Two Rocks Yanchep Mindarie Wanneroo Perth 20Km
    Two Rocks Marina • Shops Leemans • BBQ Landing • Cafes Yanchep National Park • Chocolate Drops • Yanchep Inn • Aboriginal Cultural Experience • Caves Club Capricorn • Picnics • Walks • BBQ Yanchep • Fishing Cockatoo Walk Trail Yanchep Lagoon Yanchep Central Shopping Centre Jumanga Olives • Castle Invasion Laser Skirmish and Paintball • Leopard Lodge KAROBORUP RD NORTH Ocean View Tavern Alkimos KINGSBRIDGE BVD Antique Arms & Armour JINDALEE BVD Portofinos at Quinns • Barbagallo Raceway Quinns Rocks • WA Sporting Car Club Mindarie Mi Casa Ocean Keys Shopping Centre 10th Light Marina Horse Trail NEERABUP RD CLARKSON Carramar COOGEE RD TRAIN STATION Golf Course Onyesha Neerabup Spa • The Boat Ale House National Park ROUSSET RD • Indian Ocean Academy Brewing Company Wanneroo Equestrian • Mindarie Marina Hotel Botanic Gardens • MadCat Photography & Mini Golf ROUSSET RD Wanneroo Civic Centre OPPORTUNITY Activity Marina PLAY SPACE • Wanneroo Library & Cultural Centre • Aquamotion Yellagonga Dining Snorkelling • Café Elixir Regional Park • Wanneroo Tavern Wanneroo Central Attraction Whale Watching Shopping Centre Accommodation Surf Spot Wanneroo Cockman House Local Produce Yaberoo Budjara Walk Trail Parkland Cockatoo Walk Trail Wanneroo Markets Paul Conti Wines Wanneroo Civic Centre Perth - Clarkson Train Line Kingsway Ezi-Gro Orchids Perth Sports Complex 0 1 2 3 4 5 Kilometres Kingsway 20km City Shopping Marangaroo Centre Golf Course Hillarys Boat Harbour This map provides an approximate indication of the location of key attractions and amenities
    [Show full text]
  • Wanneroo Road/Ocean Reef Road Interchange Now Fully Open
    PROJECT UPDATE OCTOBER 2020 Wanneroo Road/Ocean Reef Road Interchange now fully open The Wanneroo Road/ Ocean Reef Road Interchange was officially Traffic moved on to the new Jointly funded by the Australian opened by the Minister for Wanneroo Road bridge over ($58.56M) and State Governments Transport, Hon Rita Saffioti Ocean Reef Road in late July, one ($14.64M), the new interchange will: MLA and Local Members month ahead of schedule. • Alleviate pressures on the existing on 13 October 2020. More than 70,000 vehicles move road network through this interchange every day, • Enhance travel reliability and the opening of the new bridge • Improve safety for all road users marked the culmination of a 16 • Support economic activity through month project to improve traffic flow a more effective road network and safety at Perth’s seventh most • Secure transport efficiencies for congested interchange. the fast growing north-eastern You can now enjoy a safer, more corridor. efficient journey whether you’re using The project has created the roads or paths. approximately 350 direct and indirect jobs during construction. Ocean Reef Road under the new Wanneroo Road bridge Landscapes taking shape PROJECT MAP Landscaping commenced in July and has been designed to reflect the remnant wetland and woodland vegetation that is a feature of the local area, and is typical of the Swan Coastal Plain. It has also been carefully curated to integrate with existing City of Wanneroo streetscapes. The project features carefully selected native vegetation. The design includes trees, shrubs and stored at a specialist nursery offsite, groundcovers featuring species such for replanting within the project THE PROJECT HAS as Banksia, Eucalypts, Melaleucas and landscaping.
    [Show full text]
  • AMENDMENT No.23 to the EAST WANNEROO CELL 1 (TAPPING
    AMENDMENT No.23 TO THE EAST WANNEROO CELL 1 (TAPPING AND ASHBY) AGREED STRUCTURE PLAN No.3 This Amendment to the Agreed Structure Plan is prepared under the provisions of Part 9 of the City of Wanneroo District Planning Scheme No. 2 EAST WANNEROO CELL 1 AGREED STRUCTURE PLAN Original plan finally adopted by Council & WAPC is dated 6 May 2004 (this includes Amendment No. 1) Amendment Description of Amendment WAPC Council Date of No. Adopted Adopted consolidated plan 1 To recode certain lots located at 1 April 27 April 6 May 2004 the southern part of the Agreed 2005 2004 Structure Plan area from R20 to R40 2 Modifies the road layout and the 1 April 11 Aug 28 Sept 2005 distribution of the Public Open 2005 2004 Space areas over Lot 2706 Pinjar Road, Tapping. 3 Modifies the road layout, density 1 April 9 Sept 28 Sept 2005 codes and the distribution of Public 2005 2004 Open Space over Crown Reserve 27294, Lots 1, 20, 21 and 22 Wanneroo Road and Lots 14, 15, 17, 18 and Pt Lot 101 Clarkson Avenue, Tapping. 4 Recodes minor portions of Lot 13 1 April 5 Oct 2004 28 Sept 2005 Wanneroo Road, Ashby from R20 2005 to R40 5 Recodes Lots 235-259 Taplow 1 April 15 March 28 Sept 2005 Parade, portion of Lot 25 Pinjar 2005 2005 Road and portion of Lot 9006 Pinjar Road, Ashby from R20 to R40. 6 Recodes minor portions of Lots 25 15 June 6 May 28 Sept 2005 and 26 Pinjar Road, Ashby from R20 2005 2005 to R40 7 Recodes the residential portion of 27 June 9 Sept 28 Sept 2005 Lots 23 & 24 Ashley Road, Tapping 2005 2005 from R20 to R30 & R40 8 Recodes Lot 135 Paxton Way, 22 June 28 Feb 22 June 2006 Ashby from R20 to R40 2006 2006 Amendment Description of Amendment WAPC Council Date of No.
    [Show full text]
  • Western Australia: a Small Area Perspective
    ......................................................................F E A T U R E A R T I C L E – Western Australia: A Small Area Perspective INTRODUCTION Western Australia occupies the western third of the Australian continent, comprising a land area of about 2,529,880 square kilometres. The administration of the urban and regional areas of this large and diverse State is divided amongst 142 local government authorities; nine development commissions; and a number of State and Commonwealth government departments and organisations. The demand for information relating to small geographic areas (such as Local Government Areas — LGAs) and broader regions (such as development commission regions) continues to increase. The Australian Bureau of Statistics (ABS) is committed to identifying and disseminating social, economic and environmental data for small areas to assist governments and communities seeking to enhance local and regional well–being in an environmentally sustainable way. The results of this on–going data gathering from ABS and non–ABS information sources are compiled and available in the ABS' Western Australian Regional Profiles, more details of which are provided on page 26, and through the Integrated Regional Data Base, details of which are available on the ABS website at www.abs.gov.au (select Products & Services/Key Products). This article presents selected social and economic data for LGAs from the 2002 Regional Profiles to provide a mosaic of social and economic life in urban and regional Western Australia. A significant proportion of the social data has been drawn from the 2001 Census of Population and Housing. The Census is the most comprehensive source of information about the characteristics of people in Australia and the dwellings in which they live.
    [Show full text]
  • Shipwrecks of the Wanneroo Coast
    weeks later, on May 2 the ship’s anchor chain broke and Rocks Reef 2.4 kilometres from Eglinton Rocks. Delicate the unlucky vessel drifted to its present position, only 270 drinking glasses and other tableware from the wreck are HIPWRECKS OF THE metres from the same beach where it had been previously displayed at the Gloucester Lodge Museum at Yanchep. stranded. Eventually it was sold for scrap. In October 1969, An anchor and other artefacts can be seen at the Western a fire broke out while salvors were dismantling the hulk and Australian Museum Shipwreck Galleries in Fremantle. GPS SWANNEROO COAST they were forced to swim to safety. Over the last 30 years location 31° 38.54' S 115° 39.53' E. the wreck’s hull plating has collapsed, exposing the interior Lalla 1917 of the hold and the bridge. Due to the weakened state of the Introduction Built in 1874 in Nova Scotia, Canada as a three-masted European mariners visited the coast adjacent to the City hull structure, the wreck is not considered safe. wooden barque, the 1,087-tonne Lalla was converted for of Wanneroo long before the British established the Swan WH-301 Gemini 1993 use as a hulk in 1906. It was lost on August 17, 1917 while River colony in 1829. The earliest known wreck is the WH-301, also known as Gemini, was one of two identical being towed away for scuttling. The tow-line parted and the Dutch United East India Company ship, Vergulde Draeck, steel hopper barges built in 1962 and registered as WH–301 hulk disappeared somewhere off Halls Bank, pushed along that foundered in 1656.
    [Show full text]
  • Two Rocks Marina Master Plan
    TWO ROCKS MARINA MASTER PLAN Prepared for Department of Transport 13 February 2020 1 2 4 3 5 8 4 6 7 4 10 11 9 13 14 12 15 20 16 5 19 17 6 3 18 5 22 23 21 24 25 26 15 27 3 29 28 4 5 4 30 31 POPE STREET 32 33 34 3 37 35 38 28 36 39 Legend 1 Future emergency 25 Protected swimming zone access 26 Beach 29 41 40 2 Ocean pool 27 Bridge and decked zone 3 Amenities 28 Pedestrian Plaza with 4 Public access parking Restaurants and boardwalk 5 Parkland with shelters, BBQ 29 Public pens facilities and seating 30 Food, beverage and retail 6 Fuel facility 5 31 Entry landscaping 7 Breakwater 32 Realigned entry road 22 8 Landmark feature 33 Clear vista to the water 9 Commercial jetty 34 Bridge link connecting to 4 10 Receival facilities rooftop of building. Lift access to lower street level 11 Yard for accessibility. 12 100m commercial wharf with 35 Short stay accommodation boat lifter with parking 42 13 Boat stacker for 200 vessels 36 Public access boardwalk 15 14 Commercial pens 37 Public berth 15 Tree lined shared use path 38 Paved connection from town centre to waterside 43 16 Boat ramp parking 39 Landscaping to improve 17 Boat ramps heritage wall amenity 44 18 Sea Rescue 40 Link to town centre plaza and 5 22 King Nepture sculpture 4 19 Staircase to Sovereign Drive 41 Terraced lawn 20 Commercial buildings 42 Landmark rock and recreation 21 Yacht club area 5 22 Playground 43 Residential development lots 45 23 Access ramp to beach 44 Commercial development opportunity 24 Focal stage area 45 New access road and footpath Yield Summary Total car parking bays: 914 Total boat trailer parking bays: 320 Total boat pens: 564 TWO ROCKS MARINATwo Rocks EXPANSION Marina Master Plan MASTER PLAN 0 20 80 160m Revision Date Scale Client Project Name Drawing D 25.09.19 1:2000@A0 Department of Transport Two Rocks Town Centre Marina Expansion Two Rocks Marina Two Rocks, WA Master Plan Master Plan Indicative layout only - not for construction.
    [Show full text]