SEATTLE AIRPORT BELMONT AVE E BOREN AVE BELMONT AVE SUMMIT AVE Kobe Terrace E MAYNARD AVE S

Total Page:16

File Type:pdf, Size:1020Kb

SEATTLE AIRPORT BELMONT AVE E BOREN AVE BELMONT AVE SUMMIT AVE Kobe Terrace E MAYNARD AVE S BROADWAY E JAMES ST HARVARD AVE E 8TH AVE S Wing Luke Asian Museum BOYLSTON AVE E AIRPORT WAY SOUTH BOYLSTON AVE JEFFERSON ST SEATAC 7TH AVE S 90 SEATTLE AIRPORT BELMONT AVE E BOREN AVE BELMONT AVE SUMMIT AVE Kobe Terrace E MAYNARD AVE S . O Park LI E. DENNY WAY SUMMIT AVE E VE FIRST SUMMIT AVE MINOR AVE S. KING ST WA TERRY AVE INTERNATIONAL Y S. WELLER ST HILL 5 S. JACKSON ST 6TH AVE S CRAWFORD PL 0 1,000 ft E. PIKE ST E. MERCER ST E. PINE ST 6TH AVE S DISTRICT/ E. UNION ST 9TH AVE E. REPUBLICAN ST BELLEVUE AVE E BELLEVUE AVE MADISON ST International District/ CHINATOWN 200 m Chinatown Station SPRING ST 5TH AVE S 8TH AVE MELROSE AVE E MELROSE AVE 5 CAPITOL SENECA ST YESLER WAY HILL JAMES ST 4TH AVE S EASTLAKE AVE N CHERRY ST OLIVE WAY S. MAIN ST King Street TERRY AVE Freeway 7TH AVE Smith Station 3RD AVE S Park Tower HOWELL ST YALE AVE N Klondike Gold Rush Safeco YALE AVE Pioneer Square National Historic Park Field S. ATLANTIC ST Seattle Station 2ND AVE S S. ROYAL BROUGHAM WAY 4TH AVE PONTIUS AVE N Two Union Square Public Library 9TH AVE Convention CASCADE Place Qwest Field PLAYGROUND Station Washington 3RD AVE Pioneer Occidental State Convention MINOR AVE N Square Park OCCIDENTAL AVE S & Trade Center SPRING ST Seattle Transit Tunnel BOREN AVE S. KING ST CASCADE COLUMBIA ST 8TH AVE SENECA ST S. JACKSON ST SODO S. WASHINGTON ST 1ST AVE S 1ST AVE S FAIRVIEW AVE N UNIVERSITY ST MARION ST 7TH AVE 6TH AVE MADISON ST UNION ST Waterfront Streetcar JOHN ST Pacific Place 99 BOREN AVE N Benaroya University St. POST AVE Free Ride ALASKAN WAY S TERRY AVE 5TH AVE PIKE ST Hall Station MERCER ST THOMAS ST Nordstrom 4TH AVE WESTERN AVE HARRISON ST REPUBLICAN ST 9TH AVE Seattle Streetcar Westlake TERRY AVE N South Lake Union Line Center 99 Pier Westlake 50 WESTLAKE AVE Station ALASKAN WAY WESTLAKE AVE N 3RD AVE Seattle Art Pier Pier Macy’s PINE ST Museum WEST ALASKAN WAY VIADUCT53 52 2ND AVE EDGE STEWART ST 9TH AVE N Seattle Center 1ST AVE Denny 8TH AVE Monorail Post Alley Park Pike Place Market VIRGINIA ST 8TH AVE N 7TH AVE WESTERN AVE II I2 I Pier 2 JOHN ST I0 57 9 3 6TH AVE 8 4 756 Waterfront DEXTER AVE N Park LENORA ST 5TH AVE Victor 4TH AVE BLANCHARD ST AURORA AVE N Steinbrueck Park Seattle QUEEN ANNE 3RD AVE BELLTOWN Aquarium 6TH AVE N BELL ST 2ND AVE 99 TAYLOR AVE N 1ST AVE 4TH AVE Seattle-Bremerton Ferry Seattle-Bainbridge Island Ferry Experience 5TH AVE N WALL ST Music Project 3RD AVE BATTERY ST ALASKANPier WAY Space VINE ST 66 Needle Memorial Bell Harbor Stadium CEDAR ST International Marion Oliver 1ST AVE Monorail ELLIOTT AVE Conference Center McCaw Hall Station Pacific Science Center CLAY ST The Children’s WESTERN AVE Museum BROAD ST DENNY Waterfront Streetcar SEATTLE CENTER DENNY WAY REGRADE Free Ride 2ND AVE N Puget Sound Key Arena EAGLE ST WARREN AVE N Olympic Sculpture Park N S BAY ST 1ST AVE N Pier ROY ST JOHN ST 70 MERCER ST THOMAS ST QUEEN ANNE AVE N 1ST AVE W Myrtle Edwards Park.
Recommended publications
  • Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan L Design Master Studio, Autumn 2014 [Larch 501/Arch504]
    Blue Urbanism: Inviting Urban Play on Seattle's North Waterfront Scan l Design Master Studio, Autumn 2014 [Larch 501/Arch504] Instructors: Nancy Rottle (LA), Jim Nicholls (ARCH), and Leann Andrews (PhD BE) Teaching Assistant: VeraEve Giampietro (LA & UDP) With Gehl Architects/Cititek: Bianca Hermansen GUIDING PRINCIPLES FOR SEATTLE'S CENTRAL WATERFRONT (adopted by City Council): • Create a waterfront for all. • Put the shoreline and innovative, sustainable design at the forefront. • Reconnect the city to its waterfront. • Embrace and celebrate Seattle’s past, present and future. • Improve Access and Mobility (for people and goods). • Create a bold vision that is adaptable over time. • Develop consistent leadership–from concept to construction to operations. PROJECT DESCRIPTION Seattle's Central Waterfront is heralded as one of the most significant civic projects in the city's history. With imminent removal of the Alaskan Way Viaduct and current replacement of the aging Elliott Bay Seawall, Seattle has begun to envision and enact a great "waterfront for all." Removal of the viaduct and rerouting of Alaskan Way along the waterfront will create abundant new and qualitatively different public space, while the seawall replacement will provide for a more ecologically functional edge. However, while the team led by James Corner Field Operations has proposed and designed a new waterfront between Piers 48 and 62/63, less attention has been paid to the waterfront segment between Piers 62/63 and the Olympic Sculpture Park. With the reconfiguration of Alaskan Way, this northern segment offers rich opportunities for better public, pedestrian, bicycle and ecological space along a less-traveled roadway.
    [Show full text]
  • Parks and Recreation
    PARKS AND RECREATION Parks and Recreation Overview of Facilities and Programs The Department of Parks and Recreation manages 400 parks and open areas in its approximately 6,200 acres of property throughout the City, works with the public to be good stewards of the park system, and provides safe and welcoming opportunities for the public to play, learn, contemplate, and build community. The park system comprises about 10% of the City’s land area; it includes 485 buildings, 224 parks, 185 athletic fields, 122 children's play areas, 24 community centers, 151 outdoor tennis courts, 22 miles of boulevards, an indoor tennis center, two outdoor and eight indoor swimming pools, four golf courses, studios, boat ramps, moorage, fishing piers, trails, camps, viewpoints and open spaces, a rock climbing site, a conservatory, a classical Japanese garden, and a waterfront aquarium. The development of this system is guided by the Seattle Parks & Recreation Plan 2000, the 38 neighborhood plans, the Joint Athletic Facilities Development Program with the Seattle School District, the 1999 Seattle Center and Community Centers Levy, the 2000 Parks Levy, and DPR’s annual update to the Major Maintenance Plan. 2000 Parks Levy In November 2000, Seattle voters approved a $198.2 million levy lid lift for Parks and Recreation. The levy closely follows the plan forged by the Pro Parks 2000 Citizens Planning Committee. The levy is designed to fund more than 100 projects to improve maintenance and enhance programming of existing parks, including the Woodland Park Zoo; acquire, develop and maintain new neighborhood parks, green spaces, playfields, trails and boulevards; and add out-of-school and senior activities.
    [Show full text]
  • For Sale: $14,500,000 Opportunity Zone Redevelopment Assemblage International District, Seattle, Wa 98104
    FOR SALE: $14,500,000 OPPORTUNITY ZONE REDEVELOPMENT ASSEMBLAGE INTERNATIONAL DISTRICT, SEATTLE, WA 98104 SITE HIGHLIGHTS Elliott Bay • 29,190 SF of Land Ferries • 18,588 Building SF • Transit Oriented Development Opportunity Seattle CBD • Located in an Opportunity Zone Port of Seattle • 5 min. walk from King Street Station and across the street from Streetcar Station • Zoning Exempt from MHA (Mandatory Housing Affordability) Contributions King Street Station Pioneer Square 8th Ave S 8TH AVE S Chinatown Street Car Station S JACKSON ST // 409 8th Ave S Stadium District International District/ Chinatown Light Rail Station 701 S Jackson St International District SUBJECT SITE 21,588 VPD SCOTT CLEMENTS DAVID BUTLER 1218 Third Avenue www.orioncp.com P// 206.445.7664 P// 206.445.7665 Suite 2200 P// 206.734.4100 [email protected] [email protected] Seattle, WA 98101 Established in 2010 SEATTLE STREETCAR ImpSErAoTvingTLE communi S TREETCAty links R E GALER ST E HIGHLAND ST Volunteer Park We’re building a SEATTLE ASIAN Lake Union ART MUSEUM VE N modern streetcar FAIRVIEW & CAMPUS DRIVE VIEW A E E PROSPECT ST AIR FRED HUTCHINSON E F V MUSEUM OF CANCER RESEARCH CENTER A HISTORY AND CAMPUS DRIVE H T 0 INDUSTRY 1 system that will FRED HUTCHINSON CANCER RESEARCH CENTER Lake Union Lake Union BELMONT A PPark CENTER ALOHA ST Cheshiahud FOR E ALOHA ST Lake Union WOODEN Loop Trail BOATS VE E provide new VALLEY ST VALLEY ST LAKE UNION PARK E ROY ST ROY ST mobility options, MERCER ST E MERCER ST T BROAD S TERRY & MERCER support economic WESTLAKE & MERCER
    [Show full text]
  • Frommer's Seattle 2004
    01 541277 FM.qxd 11/17/03 9:37 AM Page i Seattle 2004 by Karl Samson Here’s what the critics say about Frommer’s: “Amazingly easy to use. Very portable, very complete.” —Booklist “Detailed, accurate, and easy-to-read information for all price ranges.” —Glamour Magazine “Hotel information is close to encyclopedic.” —Des Moines Sunday Register “Frommer’s Guides have a way of giving you a real feel for a place.” —Knight Ridder Newspapers 01 541277 FM.qxd 11/17/03 9:37 AM Page ii About the Author Karl Samson makes his home in the Northwest. He also covers the rest of Wash- ington for Frommer’s. In addition, Karl is the author of Frommer’s Arizona. Published by: Wiley Publishing, Inc. 111 River St. Hoboken, NJ 07030-5744 Copyright © 2004 Wiley Publishing, Inc., Hoboken, New Jersey. All rights reserved. No part of this publication may be reproduced, stored in a retrieval sys- tem or transmitted in any form or by any means, electronic, mechanical, photo- copying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, 978/750-8400, fax 978/646-8600. Requests to the Publisher for per- mission should be addressed to the Legal Department, Wiley Publishing, Inc., 10475 Crosspoint Blvd., Indianapolis, IN 46256, 317/572-3447, fax 317/572-4447, E-Mail: [email protected].
    [Show full text]
  • Alaskan Way Viaduct & Seawall Replacement Program
    Alaskan Way Viaduct & Seawall Replacement Program Central Waterfront 01.09 Learning, Listening, and Moving Ahead - Replacing the Alaskan Way Viaduct and Seawall A diverse group of elected offi cials, transportation “As I spoke with individuals and business leaders, fi ve objectives agencies and experts, interest groups, and the public have emerged that guided my decision making. First, the solution must worked over the last year on a solution for the Alaskan improve safety by removing the existing unsafe viaduct. Second, Way Viaduct and Seawall along the central waterfront. the solution must be affordable, and the state’s contribution to Six principles guided the evaluation of possible solutions and eight scenarios were evaluated. Each scenario included the solution must not be over $2.8 billion. Third, the solution investments to transit, city streets, I-5, SR 99, and demand must cause the least construction disruption to our maritime management strategies. What we learned provides a industry and central waterfront businesses. Fourth, the solution critical foundation for reaching a decision. must provide capacity and mobility now and in the future, for freight, vehicles, and transit users. And fi fth, the solution must The following is a summary of the six guiding principles: contribute to improving the health of our environment and open up Seattle’s waterfront. I have concluded that the bored tunnel • Improve public safety. hybrid alternative is the most balanced solution and best meets these objectives.” • Provide effi cient movement of people and –Governor Chris Gregoire goods now and in the future. • Maintain or improve downtown Seattle, “This agreement will improve our transportation system, improve regional, the port and state economies.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX L Economics Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Economics Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Economics Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ................................................................................................................. 1 1.1 Introduction ................................................................................................................................................ 1 1.2 Build Alternatives Overview ....................................................................................................................... 2 1.2.1 Overview of Bored Tunnel Alternative (Preferred) ..........................................................................
    [Show full text]
  • Portuguese Trams Imported by Gales Creek Enterprises
    Volume 25 Issue 1 Spring 2020 Reminder to members: Please be sure your dues are In This Issue up to date. 2020 dues were due Jan 1, 2020. If it has Portuguese Trams – Richard Thompson ……………..…..…………….…1 been longer than one year since you renewed, go to Oregon Electric Railway Historical Society News…………………………2 Willamette Shore Trolley Update – Dave Rowe …………………..……..12 our website: oregontrolley.com and download an Donation Request ……………..…………………………………..…..……14 application by clicking: Become a Member. Portuguese Trams It has been 25 years since the OERHS departed Glenwood, yet the following story should be of interest to Imported by Gales Creek newer members because a Portuguese streetcar joined the collection at Powerland in 2006. Porto No. 210 (renumbered Enterprises (1974-1993) 201 before arrival) is not a part of the Trolley Park story, of course, but it is similar to the streetcars that were kept there. Richard Thompson Car 210 was one of a series built during 1938-45 to replace the Brill and St. Louis Car Company classics. A sense of familiarity might also come from the fact that vintage Beginning in 1974, Gales Creek Enterprises (GCE), Portuguese trams share a kinship with our beloved Council headed by Oregon Electric Railway Historical Society Crest cars 503 and 506. (OERHS) co-founder Paul Class, provided at least 70 vintage streetcars to launch trolley operations in a half-dozen American cities. In the process Paul almost single-handedly started what we now call the “heritage streetcar” movement. His company imported many streetcars from Australia and Brazil, but the largest part of that pioneering effort involved trams from Portugal.
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX M Air Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: PARSONS BRINCKERHOFF J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Air Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Air Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Summary ..............................................................................................................................................1 1.1 Alternatives Considered .............................................................................................................................1 1.2 Build Alternatives Overview .......................................................................................................................2 1.2.1 Bored Tunnel Overview ..................................................................................................................
    [Show full text]
  • Presentation
    What’s Up Next In The Seattle Squeeze March 23rd Transit Service Change 1 Buses Coming Out of Downtown Seattle Transit Tunnel On March 23rd, to make room for the expansion of the Washington State Convention Center and upcoming construction to expand Link light rail service, 830 buses serving seven routes will say goodbye to the Downtown Seattle Transit Tunnel and will operate exclusively on surface streets. Westlake Customer Service Office will close • Last operating business day was March 6th, 2019. • ORCA cards can still be purchased or reloaded at nearby locations and at Westlake ticket vending machines. 2 New boarding locations for 15 routes Tunnel routes and some surface street routes will shift to new pathways on 2nd, 3rd, 4th, 5th and 6th Avenues. Current Tunnel Routes Surface Street Pathway 41 (all-day) 3rd Ave (SB and NB) 74 (peak service only) Additional surface routes will 2nd Ave (SB) also move to this pathway: 76, 5th/6th Ave (NB) 77, 301, 308,316 255 (all-day) Additional surface routes will 5th Ave (SB) also move to this pathway: 5th/6th Ave (NB) 252, 257, 311 101 (all-day) 102 (peak service only) nd th 150 (all-day) 2 Ave (SB) - 4 Ave (NB) 550 (all-day) (Sound Transit) 3rd Avenue All-Door Boarding • Just like RapidRide routes, Metro will expand off board payment and all-door boarding to all 42 routes along 3rd Avenue between Jackson and Denny Way and along the Westlake corridor through South Lake Union. • ORCA readers will be installed at bus stop locations using phased construction through 2020.
    [Show full text]
  • As a Di‘Erent Route Through Downtown Buses Continuing INTERBAY Swedish S
    N 152 St to Shoreline CC Snohomish County– to Aurora toAuroraVill toMtlk to Richmond NE 150 St toWoodinvilleviaBothell 373 5 SHORELINE 355 Village Beach Downtown Seattle toNSt Terr to Shoreline CC toUWBothell 308 512 402 405 410 412 347 348 77 330 309 toHorizonView 312 413 415 416 417 421 NE 145 St 373 308 NE 145 St ­toKenmoreP&R N 145 St 304 316 Transit in Seattle 422 425 435 510 511 65 308 toUWBothell 513 Roosevelt Wy N Frequencies shown are for daytime period. See Service Guide N 143 St 28 Snohomish County– 346 512 301 303 73 522 for a complete summary of frequencies and days of operation. 5 64 University District 5 E 304 308 For service between 1:30–4:30 am see Night Owl map. 512 810 821 855 860 E N 871 880 y 3 Av NW 3 Av Jackson Park CEDAR W Frequent Service N 135 St Golf Course OLYMPIC y Linden Av N Linden Av PARK t Bitter i Every 15 minutes or better, until 7 pm, Monday to Friday. C HILLS weekdays Lake e 372 Most lines oer frequent service later into the night and on NW 132 St Ingraham k a Ashworth Av N Av Ashworth N Meridian Av NE 1 Av NE 15 Av NE 30 Av L weekends. Service is less frequent during other times. (express) 373 77 N 130 St Roosevelt Wy NE 372 weekends 28 345 41 Link Light Rail rapid transit North- every 10 minutes BITTER LAKE acres 8 Av NW 8 Av Park 5 NW 125 St N 125 St Haller NE 125 St E RapidRide limited stop bus for a faster ride 345 Lake NE 125 St every 10–12 minutes 346 PINEHURST 8 Frequent Bus every 10–12 minutes BROADVIEW 99 347 348 continues as LAKE CITY 75 Frequent Bus every 15 minutes 41 345 NE 120 St Northwest
    [Show full text]
  • ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report
    ALASKAN WAY VIADUCT REPLACEMENT PROJECT Final Environmental Impact Statement APPENDIX Q Hazardous Materials Discipline Report Submitted by: PARSONS BRINCKERHOFF Prepared by: SHANNON & WILSON, INC J U L Y 2 0 1 1 Alaskan Way Viaduct Replacement Project Final EIS Hazardous Materials Discipline Report The Alaskan Way Viaduct Replacement Project is a joint effort between the Federal Highway Administration (FHWA), the Washington State Department of Transportation (WSDOT), and the City of Seattle. To conduct this project, WSDOT contracted with: Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 In association with: Coughlin Porter Lundeen, Inc. EnviroIssues, Inc. GHD, Inc. HDR Engineering, Inc. Jacobs Engineering Group, Inc. Magnusson Klemencic Associates, Inc. Mimi Sheridan, AICP Parametrix, Inc. Power Engineers, Inc. Shannon & Wilson, Inc. William P. Ott Construction Consultants SR 99: Alaskan Way Viaduct Replacement Project July 2011 Hazardous Materials Discipline Report Final EIS This Page Intentionally Left Blank TABLE OF CONTENTS Chapter 1 Introduction and Summary ........................................................................................... 1 1.1 Introduction .......................................................................................................................... 1 1.2 Build Alternatives Overview ................................................................................................. 2 1.2.1 Bored Tunnel Alternative ..........................................................................................
    [Show full text]
  • First Hill Link Connector: IDS to Capitol Hill
    First Hill Link Connector: IDS to Capitol Hill (John St.) via First Hill Project Number N7a Project Locator Map Subarea North King Primary Mode Impacted Link Facility Type Link Service Version Number 9.0 Date Last Modified 4/24/2008 Short Project Description Enhance transit service connections between First Hill, the Central Link light rail line, and downtown Seattle transit hubs with new streetcar service along the Jackson Street / Broadway Avenue corridor between the International District and Broadway/John. EIS Required Project Purpose: increase regional transit accessibility to First Hill. Cost in Millions of 2007$ Streetcar Low High Agency Admin Environmental Clearance and PE Final Design, Specs, Permitting ROW Acquisition Construction Vehicles Contingency Total $120.0 $120.0 Annual O&M $5.2 Design Basis Conceptual Environmental Documentation Required Environmental Impact Statement Required Environmental Assessment Required Environmental Checklist Required Relationships to Other Projects Relationship Project Project Partners City of Seattle DOT King County Metro First Hill Link Connector: IDS to Capitol Hill (John St.) via First Hill Long Description This capital project scope, and the companion capital cost estimate, are intended to include the entire project development cycle (agency and project administration, environmental clearance, design, all aspects of property acquisition, permits, agreements, construction, testing, commissioning and contingencies) from project initiation through the start-up of the revenue operations. This project would enhance transit service connections between First Hill, the Central Link light rail line, and downtown Seattle transit hubs with new transit service along the Jackson Street / Broadway Avenue corridor. Streetcar service would be provided between International District Station and Capitol Hill Station via Jackson Street, 12th Ave, Boren Avenue, and Broadway and would extend as far north as John Street.
    [Show full text]