For Sale: $14,500,000 Opportunity Zone Redevelopment Assemblage International District, Seattle, Wa 98104

Total Page:16

File Type:pdf, Size:1020Kb

For Sale: $14,500,000 Opportunity Zone Redevelopment Assemblage International District, Seattle, Wa 98104 FOR SALE: $14,500,000 OPPORTUNITY ZONE REDEVELOPMENT ASSEMBLAGE INTERNATIONAL DISTRICT, SEATTLE, WA 98104 SITE HIGHLIGHTS Elliott Bay • 29,190 SF of Land Ferries • 18,588 Building SF • Transit Oriented Development Opportunity Seattle CBD • Located in an Opportunity Zone Port of Seattle • 5 min. walk from King Street Station and across the street from Streetcar Station • Zoning Exempt from MHA (Mandatory Housing Affordability) Contributions King Street Station Pioneer Square 8th Ave S 8TH AVE S Chinatown Street Car Station S JACKSON ST // 409 8th Ave S Stadium District International District/ Chinatown Light Rail Station 701 S Jackson St International District SUBJECT SITE 21,588 VPD SCOTT CLEMENTS DAVID BUTLER 1218 Third Avenue www.orioncp.com P// 206.445.7664 P// 206.445.7665 Suite 2200 P// 206.734.4100 [email protected] [email protected] Seattle, WA 98101 Established in 2010 SEATTLE STREETCAR ImpSErAoTvingTLE communi S TREETCAty links R E GALER ST E HIGHLAND ST Volunteer Park We’re building a SEATTLE ASIAN Lake Union ART MUSEUM VE N modern streetcar FAIRVIEW & CAMPUS DRIVE VIEW A E E PROSPECT ST AIR FRED HUTCHINSON E F V MUSEUM OF CANCER RESEARCH CENTER A HISTORY AND CAMPUS DRIVE H T 0 INDUSTRY 1 system that will FRED HUTCHINSON CANCER RESEARCH CENTER Lake Union Lake Union BELMONT A PPark CENTER ALOHA ST Cheshiahud FOR E ALOHA ST Lake Union WOODEN Loop Trail BOATS VE E provide new VALLEY ST VALLEY ST LAKE UNION PARK E ROY ST ROY ST mobility options, MERCER ST E MERCER ST T BROAD S TERRY & MERCER support economic WESTLAKE & MERCER SOUTH LAKE UNION SOUTH LAKE UNION N REPUBLICAN ST E REPUBLICAN ST N E N V E E N N A V V E E E A E A E V V K A A A R SOUTH LAKE UNION V A R E A L H H O T T E T T X R S 8 9 U E U E 1.3 miles V growth, and D STREETCAR A E HARRISON ST E W HARRISON ST L L E Streetcar B Maintenance Facility E THOMAS ST WESTLAKE & THOMAS TERRY & THOMAS strengthen SOUTH LAKE UNION SOUTH LAKE UNION THOMAS ST N E SOUTH V A S CAPITOL U LAKE UNION I GROUP HEALTH T E JOHN ST N N HILL CAPITOL HILL O N N N E P N E E CAMPUS V E V V E A V connections in A A V A W A Y N R E I E R E O Y L V R R N A A I Denny Park E R O I Y T B M A F E DENNY WAY DENNY WAY BROADWAY & DENNY WESTLAKE & 9THDENNY CORNISH E OLIVE W COLLEGE CAPITOL HILL Seattle’s densest DENNY TRIANGLE OF THE ARTS YALE A VE E HOWELL ST E E E E E E E E E E 8TH A E E E E E E E E E FOR SALE: $14,500,000E Cal V V V V V V V V V V A A A A A A A A A VE A Anderson H H H H H H H H H SEATTLE H T T T T T T T T T T DENNY Park neighborhoods.T 3 9 0 4 6 5 7 1 2 7TH A 8 1 1 2 1 1 1 1 1 1 Y S CENTRAL 1 L VE COLLEGE P TER TRIANGLE T SEATTLE POLICE E OLIVE ST E BA T L WEST PRECINCT G E E A E E WESTLAKE & 7TH E 6TH A E E E N E E E V V DENNY TRIANGLE E V V V A A V A A A OPPORTUNITYVE ZONE REDEVELOPMENT ASSEMBLAGE T HOWELL S A E N T E D T I U O S N R T V M O O A S BELL S E R V M 9TH A M L L E PINE ST L R L U Y L E A T E S E T O M VE B H B T S B DIMITRIOU’S US DISTRICT AR 8TH A BROADWAY & PIKEPINE JAZZ ALLEY COURT TEW CAPITOL HILL ANCHARD SINTERNATIONALS DISTRICT, SEATTLE, WA 98104 BL VE T 7TH A AY E PIKE ST LENORA S VE OLIVE W T T PARAMOUNT THEATRE E MADISON S E BELLTOWN VIRGINIA S WESTLAKE HUB T Y A E UNION ST COMMUTE TO DOWNTOWN SEATTLE MCGRAW SQUARE W PINE S HAR D A V O ARD A R 3RD & STEWART WASHINGTON BO B YLS WESTLAKE CENTER WESTLAKE STATE VE CENTER CONVENTION TON A CENTER SUMMIT A E SPRING ST MOORE VE THEATRE T MINOR A ACT VE Westlake 2 12 4 14 PIKE S 6TH A THEATRE Park VE VE VIRGINIA E MARION ST Freeway MASON MINS MINS MINS MINS T Park MEDICAL BROADWAY & MARION COMMERCIAL UNION S CENTER CORE FIRST HILL 1ST & PIKEPINE 5TH AVENUE T BOREN A PIKE PLACE MARKET T E COLUMBIA ST AL THEATRE SEATTLE TRANSIT SCORE ASKAN MARION S UNIVERSITY UNIVERSITY S TERR VE The Subject Site is a Walker’s Paradise, daily THE SWEDISH W PIKE PLACE THE AY TRIPLE DOOR T Y A MEDICAL MARKET SHOWBOX 9TH A BENAROYA VE CENTER HALL 5TH A SENECA S E CHERRY ST errands do not require a car and it's only a VE VE 8TH A AY 4TH A PIER 59: SEATTLE FIRST ART VE AMES W one minute walk from the First Hill Streetcar SEATTLE 3RD A VE HILL E J AQUARIUM MUSEUM US APPEALS CENTRAL WALK SCORE VE COURT DISTRICT 2ND A T SEATTLE FRYE ART line at the Chinatown stop. Waterfront PUBLIC MUSEUM Park 1S WES VE SPRING S LIBRARY T A 100 E JEFFERSON ST TERN A VE ELLIOT T BROADWAY & TERRACE FIRST HILL VE T A MADISON S This location is in the International District VE T E TERRACE ST MARION S neighborhood of Seattle. Nearby parks 1ST & MADISONSPRING T CENTRAL BUSINESS 98 SEATTLE DISTRICT MUNICIPAL E ALDER ST COLUMBIA S HARBORVIEW include Hing Hay Park, Kobe Terrace Park and COURT MEDICAL FIRST HILL T SEATTLE CENTER CITY Y S SEATTLE CENTER POLICE CITY HALL T 2.5 MILES E SPRUCE ST International Children's Park. CHERR HEADQUARTERS STREETCAR CONNECTOR T T ALDER S 1.2 miles JAMES S FIND UNIQUE E KING COUNTY JEFFERSON S E FIR ST E V COURTHOUSE T A PIER 52 RETAILERS, SPECIALTY 1ST & CHERRYCOLUMBIA Pioneer H COLMAN DOCK: SMITH City Hall T Square TERRACE S YESLER & BROADWAY 4 WASHINGTON STATE PIONEER SQUARE 1 Park TOWER Park YESLER TERRACE FERRIES GROCERIES,E YESLER WAY FESTIVALS, PIER 50: PIONEER YESLER BOREN A WATER TAXIS COMMUNITY BAILEY GATZERT ELEMENTARY S CENTER VE S S S SQUARE S ART & GOOD-EATS 2ND A E E E E SCHOOL V S WASHINGTON ST V V V A A A A Kobe VE EX D H H Occidental H 14TH & WASHINGTON R T T Elliott Bay T Terrace 3 4 5 Park 6 Park CENTRAL DISTRICT S TENSION S YESLER E HERE! V S MAIN ST A 7TH & JACKSON TERRACE Occidental D CHINATOWN N Mall 2 S JACKSON ST S JACKSON ST KING UNION OCCIDENTAL MALL STREET STATION 5TH & JACKSON 12TH & JACKSON PIONEER SQUARE JAPANTOWN LITTLE SAIGON STATION/ S KING ST S KING ST AMTRACK CHINATOWN GATE S S CHINATOWN E E V Streetcar Route V A A RAINIER A INTERNATIONAL S WELLER ST H H T T 2 UWAJIMAYA SUBJECT0 SITE 1 DISTRICT 1 GOODWILL Planned Streetcar Route VILLAGE HISTORIC CHINATOWN GATE VE S S S LANE ST E S S V Streetcar Stop A E E V V D A A R A H H N T S DEARBORN ST T 7 8 SEA Y Planned Streetcar Stop A T M CENTURY LINK TLE BL FIELD VD S Streetcar Sound Transit Link Light Rail Station Maintenance S CHARLES ST S Facility E V A Sound Transit Link Light Rail Route L A T N E S PLUMER ST D I C C S O Y S E A V A EVENT T S CENTER 1 ASKAN W AL EDGAR MARTINEZ DR S AIRPOR S T W E V A A SAFECO FIELD Y S H T 6 S ATLANTIC ST TRANSIT HUB // BUSES & LIGHT RAIL KING STREET STATION SCOTT CLEMENTS DAVID BUTLER 1218 Third Avenue www.orioncp.com P// 206.445.7664 P// 206.445.7665 Suite 2200 P// 206.734.4100 [email protected] [email protected] Seattle, WA 98101 Established in 2010.
Recommended publications
  • Parks and Recreation
    PARKS AND RECREATION Parks and Recreation Overview of Facilities and Programs The Department of Parks and Recreation manages 400 parks and open areas in its approximately 6,200 acres of property throughout the City, works with the public to be good stewards of the park system, and provides safe and welcoming opportunities for the public to play, learn, contemplate, and build community. The park system comprises about 10% of the City’s land area; it includes 485 buildings, 224 parks, 185 athletic fields, 122 children's play areas, 24 community centers, 151 outdoor tennis courts, 22 miles of boulevards, an indoor tennis center, two outdoor and eight indoor swimming pools, four golf courses, studios, boat ramps, moorage, fishing piers, trails, camps, viewpoints and open spaces, a rock climbing site, a conservatory, a classical Japanese garden, and a waterfront aquarium. The development of this system is guided by the Seattle Parks & Recreation Plan 2000, the 38 neighborhood plans, the Joint Athletic Facilities Development Program with the Seattle School District, the 1999 Seattle Center and Community Centers Levy, the 2000 Parks Levy, and DPR’s annual update to the Major Maintenance Plan. 2000 Parks Levy In November 2000, Seattle voters approved a $198.2 million levy lid lift for Parks and Recreation. The levy closely follows the plan forged by the Pro Parks 2000 Citizens Planning Committee. The levy is designed to fund more than 100 projects to improve maintenance and enhance programming of existing parks, including the Woodland Park Zoo; acquire, develop and maintain new neighborhood parks, green spaces, playfields, trails and boulevards; and add out-of-school and senior activities.
    [Show full text]
  • One Center City Near-Term Action Plan
    ONE CENTER CITY SEATTLE'S NEAR-TERM ACTION PLAN EXECUTIVE SUMMARY Office of Planning and Community Development March 2018 One Center City | Seattle's Near-Term Action Plan Summary What is One Center City? The One Center City Near-Term Action Plan, developed by the City of Seattle, King County Metro, Sound Transit, and the Downtown Seattle Association, identifies $30 million in key projects and programs that will keep people and the economy moving even as major public and private construction projects reduce capacity on our roads, and disrupt travel over the next five years. Everett Seattle Center City Seattle Center City is comprised of 10 neighborhoods within four regional Regional Center – focal point for planned growth, centers.* 5 economic development, and #!" transportation infrastructure.* Approximately SNOHOMISH Link Light Rail (Existing) COUNTY 262,000 PEOPLE Link Light Rail (ST2 Buildout) Lynnwood commute to or through Center City Ferry Bothell each day from around the region. Data Source: Puget More than 75 percent of daily Sound Regional Council, King County Metro commuters opt for transit, walking, biking, rideshare or teleworking. K KirklandAt the same time, many choose to I live in the Center City and work in T other regional centers. Silverdale S Redmond A #!"405 Seattle KING COUNTY P Bellevue C CENTER CITY O U Bremerton #!"90 N Issaquah T Y Renton Burien Approximately SeaTac SOUTH CAPITOL UPTOWN LAKE UNION HILL Kent 250,000 BELL DENNY TRIANGLE PIKE/PINE #!"5 TOWN PEOPLELink Federal Way Auburn commute to or through COMMERCIAL
    [Show full text]
  • DRAFT 2019 Table of Contents
    DRAFT 2019 Table of Contents Section Page Introduction........................................................................................................................ 1 Priorities & Strategies for 2019-2024.....................................................................3 The Agency..........................................................................................................................5 Physical Plant and Properties.....................................................................................8 Service Characteristics & Fares............................................................................... 13 2018 Activities & Accomplishments ..................................................................... 24 2019-2024 Services, Programs, Facilities & Equipment.............................. 34 Financial Plan .................................................................................................................. 47 Appendix A: Environmental Determination of Non-Significance ...................... 51 Appendix B: Public Comments .......................................................................................... 53 Appendix C: Fuel Consumption and Accident Data .................................................. 54 Introduction I N T The Transit Development Plan (TDP) is required by Washington State, Revised Code of R O Washington (RCW) 35.58.2795. The plan is updated annually and submitted to the D U C Washington State Department of Transportation (WSDOT). T I O N Our plan summarizes accomplishments
    [Show full text]
  • Superintendent's Report
    Board of Park Commissioners Meeting Minutes March 23, 2006 Board of Park Commissioners: Present: Angela Belbeck Jack Collins Terry Holme, Acting Chair Debbie Jackson Amit Ranade Excused: Kate Pflaumer, Chair Seattle Parks and Recreation Staff: B.J. Brooks, Deputy Superintendent Sandy Brooks, Coordinator Commission Chair Kate Pflaumer was at another community meeting; Deputy Superintendent B.J. Brooks attended for Superintendent Bounds. Acting Chair Terry Holme called the meeting to order at 6:00 p.m. Commissioner Belbeck moved approval of the Acknowledgment of Correspondence, the March 9 minutes, and the March 23 agenda. Commissioner Jackson seconded. The vote was taken and motion passed. Superintendent’s Report Deputy Superintendent Brooks reported on the following: New Park Named Counterbalance Park: This is the name selected for the new park located at the northeast corner of the intersection of Queen Anne Ave N and Roy Street. The name honors the counterbalance trolley system that once took people up and down Queen Anne Avenue, a unique element of Seattle’s history. For more information on the naming, please see http://www.cityofseattle.net/news/detail.asp?ID=5976&Dept=14 Online Registration Pilot Project: Online registration is now available for 14 community centers. During last week alone, 157 registrations for spring quarter classes were scheduled online. This compares to 67 online registrations for all of fall quarter. The system is still a work in progress, but clearly the word is getting out about this option. For more information on the “Seattle Park and Recreation Connection (SPARC)” online registration pilot, please see http://egov1.seattle.gov/parks/Start/Start.asp?SCheck=532108811&SDT=38806.3667013889 Commissioners asked about Parks’ future plans for online registration and whether those without computer access will still be able to register by telephone or mail.
    [Show full text]
  • National Register of Historic Places Multiple Property Documentation Form
    NPS Form 10-900-b OMB No. 1024-0018 United States Department of the Interior National Park Service National Register of Historic Places Multiple Property Documentation Form This form is used for documenting property groups relating to one or several historic contexts. See instructions in National Register Bulletin How to Complete the Multiple Property Documentation Form (formerly 16B). Complete each item by entering the requested information. ___X___ New Submission ________ Amended Submission A. Name of Multiple Property Listing Seattle’s Olmsted Parks and Boulevards (1903–68) B. Associated Historic Contexts None C. Form Prepared by: name/title: Chrisanne Beckner, MS, and Natalie K. Perrin, MS organization: Historical Research Associates, Inc. (HRA) street & number: 1904 Third Ave., Suite 240 city/state/zip: Seattle, WA 98101 e-mail: [email protected]; [email protected] telephone: (503) 247-1319 date: December 15, 2016 D. Certification As the designated authority under the National Historic Preservation Act of 1966, as amended, I hereby certify that this documentation form meets the National Register documentation standards and sets forth requirements for the listing of related properties consistent with the National Register criteria. This submission meets the procedural and professional requirements set forth in 36 CFR 60 and the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation. _______________________________ ______________________ _________________________ Signature of certifying official Title Date _____________________________________ State or Federal Agency or Tribal government I hereby certify that this multiple property documentation form has been approved by the National Register as a basis for evaluating related properties for listing in the National Register.
    [Show full text]
  • CASCADES Train Time Schedule & Line Route
    CASCADES train time schedule & line map CASCADES Eugene Station View In Website Mode The CASCADES train line (Eugene Station) has 3 routes. For regular weekdays, their operation hours are: (1) Eugene Station: 7:25 AM - 2:20 PM (2) King Street Station (Seattle): 5:30 AM - 4:40 PM (3) Union Station (Portland): 6:10 PM Use the Moovit App to ƒnd the closest CASCADES train station near you and ƒnd out when is the next CASCADES train arriving. Direction: Eugene Station CASCADES train Time Schedule 12 stops Eugene Station Route Timetable: VIEW LINE SCHEDULE Sunday 7:25 AM - 2:20 PM Monday 7:25 AM - 2:20 PM King Street Station South Weller Street Overpass, Seattle Tuesday 7:25 AM - 2:20 PM Tukwila Station Wednesday 7:25 AM - 2:20 PM Tacoma Station Thursday 7:25 AM - 2:20 PM 1001 Puyallup Avenue, Tacoma Friday 7:25 AM - 2:20 PM Centennial Station (Olympia-Lacey) Saturday 7:25 AM - 2:20 PM 6600 Yelm Hwy Se, Thurston County Centralia Station 210 Railroad Avenue, Centralia CASCADES train Info Kelso Station Direction: Eugene Station 501 1st Avenue South, Kelso Stops: 12 Trip Duration: 380 min Vancouver Station Line Summary: King Street Station, Tukwila Station, 1301 West 11th Street, Vancouver Tacoma Station, Centennial Station (Olympia-Lacey), Centralia Station, Kelso Station, Vancouver Station, Union Station (Portland) Union Station (Portland), Oregon City Station, Salem 800 Northwest 6th Avenue, Portland Staion, Albany Station, Eugene Station Oregon City Station 1757 Washington Street, Oregon City Salem Staion 500 13th St Se, Salem Albany Station
    [Show full text]
  • Reimagining King Street Station Through a Racial Equity and Social Justice Lens
    REIMAGINING KING STREET STATION THROUGH A RACIAL EQUITY AND SOCIAL JUSTICE LENS May 2018 University of Washington Evans School of Public Policy & Governance Chuan Fan, Geoffrey Gund, Yash Tulsyan, and Jessica Vu M © Tina Kayoma TABLE OF CONTENTS Acknowledgements ....................................................................................................................... 3 Executive Summary ...................................................................................................................... 4 Chapter 1: Introduction ............................................................................................................... 6 Background ................................................................................................................................. 6 Our Team .................................................................................................................................... 7 Our Process ................................................................................................................................. 8 Research Questions ..................................................................................................................... 8 Our Client and the Local Context ............................................................................................... 9 The Office of Arts and Culture ............................................................................................... 9 ARTS and Racial Equity ......................................................................................................
    [Show full text]
  • Department of Parks and Recreation New Or Expanded Capital Facilities Proj
    Department of Parks and Recreation New or Expanded Capital Facilities Proj. ID Project Title Capacity 2014* Location K730145 12th Avenue Square Park This project will add 7,332 0 12th AVE/E James CT Development - 2008 Parks square foot of pedestrian friendly Levy (formerly East James space to Seattle Parks. Court) K733239-02 12th Avenue Square Park This project will provide a small 0 564 12th AVE Development - Pro Parks urban park. (Formerly 12th Avenue Park) K730138 Bell Street Park Boulevard This project will provide 17,000 0 Bell ST Development square feet of pedestrian and environmentally-friendly amenities such as swales, natural landscaping, and benches. K73484 Belltown Neighborhood This project will provide 0 2407 1st Ave Center approximately 6,000 square feet of leased space on an ongoing basis to accommodate community gatherings in the Belltown area. K730144 Bitter Lake Reservoir Park This project will add nearly three 0 Linden AVE N/N 143rd ST Renovation acres of open space and park amenities to the City's park and recreation resources. K730031 Community Food Gardens and This project adds community 0 Citywide P-Patches gardens and P-Patches to afford more opportunities to the public for growing food locally. K732424 Crew Quarters Replacement This project adds space to house 75 6500 Sand Point WAY NE (Magnuson Park) landscape crew staff and volunteers for the ongoing care of Magnuson Park. This crew quarters facility will improve service efficiency, reduce travel time, fuel usage, and other costs. K730139 Donations- Green Space This project will acquire various 0 Citywide new properties. K730148 East John Street Open Space This project adds green, 0 Summit AVE E/E John ST Development environmentally sensitive improvements in an existing park.
    [Show full text]
  • 201 South King Street Cleanup Id#: 1966 Prospective
    October 19, 2012 Washington State Department of Ecology Northwest Region 3190 160th Avenue SE Bellevue, Washington 98008-5452 Attn: Mr. Russ Olsen RE: PARTIAL CERTIFICATE OF COMPLETION WEST BLOCK OF THE NORTH LOT DEVELOPMENT CLEANUP ACTION NORTH LOT DEVELOPMENT 201 SOUTH KING STREET SEATTLE, WASHINGTON 98104 CLEANUP ID#: 1966 PROSPECTIVE PURCHASER CONSENT DECREE NO. 11-2-27892-1 Dear Mr. Olsen: This letter has been prepared to document for the Washington State Department of Ecology (Ecology) the completion of the capital cleanup action elements, including source control and containment, for the West Block of the North Lot Property (Property) as part of the Cleanup Action Plan (CAP) implementation. As documented below, future development can proceed without the need to penetrate below ground level on the West Block. Therefore, on behalf of North Lot Development (NLD), we request that Ecology issue a Partial Certificate of Completion (PCC) for the West Block. The Property is located in the south end Central Business District, southeast of the intersection of South King Street and Occidental Avenue South in Seattle, Washington (Figure 1). NLD is conducting a cleanup action pursuant to the Prospective Purchaser Consent Decree (PPCD), North Lot Development Site, Seattle, Washington (effective on September 26, 2011) and the CAP (Landau Associates 2011a), as part of development of the Property for commercial and residential uses. The West Block consists of the portion of the Property west of the 2nd Avenue right-of-way/Center Drive Lane (Figure 2). As outlined in the CAP and the approved Seattle Master Use Permit, the West Block is being developed first.
    [Show full text]
  • Amtrak Station Program and Planning Guidelines 1
    Amtrak Station Program and Planning Guidelines 1. Overview 5 6. Site 55 1.1 Background 5 6.1 Introduction 55 1.2 Introduction 5 6.2 Multi-modal Planning 56 1.3 Contents of the Guidelines 6 6.3 Context 57 1.4 Philosophy, Goals and Objectives 7 6.4 Station/Platform Confi gurations 61 1.5 Governing Principles 8 6.5 Track and Platform Planning 65 6.6 Vehicular Circulation 66 6.7 Bicycle Parking 66 2. Process 11 6.8 Parking 67 2.1 Introduction 11 6.9 Amtrak Functional Requirements 68 2.2 Stakeholder Coordination 12 6.10 Information Systems and Way Finding 69 2.3 Concept Development 13 6.11 Safety and Security 70 2.4 Funding 14 6.12 Sustainable Design 71 2.5 Real Estate Transactional Documents 14 6.13 Universal Design 72 2.6 Basis of Design 15 2.7 Construction Documents 16 2.8 Project Delivery methods 17 7. Station 73 2.9 Commissioning 18 7.1 Introduction 73 2.10 Station Opening 18 7.2 Architectural Overview 74 7.3 Information Systems and Way Finding 75 7.4 Passenger Information Display System (PIDS) 77 3. Amtrak System 19 7.5 Safety and Security 78 3.1 Introduction 19 7.6 Sustainable Design 79 3.2 Service Types 20 7.7 Accessibility 80 3.3 Equipment 23 3.4 Operations 26 8. Platform 81 8.1 Introduction 81 4. Station Categories 27 8.2 Platform Types 83 4.1 Introduction 27 8.3 Platform-Track Relationships 84 4.2 Summary of Characteristics 28 8.4 Connection to the station 85 4.3 Location and Geography 29 8.5 Platform Length 87 4.4 Category 1 Large stations 30 8.6 Platform Width 88 4.5 Category 2 Medium Stations 31 8.7 Platform Height 89 4.6 Category 3 Caretaker Stations 32 8.8 Additional Dimensions and Clearances 90 4.7 Category 4 Shelter Stations 33 8.9 Safety and Security 91 4.8 Thruway Bus Service 34 8.10 Accessibility 92 8.11 Snow Melting Systems 93 5.
    [Show full text]
  • EMPIRE BUILDER Train Time Schedule & Line Route
    EMPIRE BUILDER train time schedule & line map Empire Builder View In Website Mode The train line Empire Builder has 2 routes. For regular weekdays, their operation hours are: (1) Chicago Union Station Amtrak: 6:40 PM (2) Seattle King Street Station Amtrak: 2:15 PM Use the Moovit App to ƒnd the closest EMPIRE BUILDER train station near you and ƒnd out when is the next EMPIRE BUILDER train arriving. Direction: Chicago Union Station Amtrak EMPIRE BUILDER train Time Schedule 40 stops Chicago Union Station Amtrak Route Timetable: VIEW LINE SCHEDULE Sunday 6:40 PM Monday 6:40 PM Seattle King Street Station Amtrak 303 South Jackson Street, Seattle Tuesday 6:40 PM Edmonds Amtrak Wednesday 6:40 PM 190 Sunset Avenue South, Edmonds Thursday 6:40 PM Everett Amtrak Friday 6:40 PM 3201 Smith Ave, Everett Saturday 6:40 PM Leavenworth Icicle Station Amtrak 11645 North Rd, Chelan County Wenatchee Columbia Station Amtrak 1 E Kittitas St, Wenatchee EMPIRE BUILDER train Info Direction: Chicago Union Station Amtrak Ephrata Amtrak Stops: 40 114 1st Ave Nw, Ephrata Trip Duration: 2715 min Line Summary: Seattle King Street Station Amtrak, Spokane Amtrak Edmonds Amtrak, Everett Amtrak, Leavenworth 221 W 1st Ave, Spokane Icicle Station Amtrak, Wenatchee Columbia Station Amtrak, Ephrata Amtrak, Spokane Amtrak, Sandpoint Amtrak Sandpoint Amtrak, Libby Amtrak, Whiteƒsh Amtrak, West Glacier Amtrak, Essex Amtrak, Browning Libby Amtrak Amtrak, Cut Bank Amtrak, Shelby Amtrak, Havre 100 Mineral Ave, Lincoln County Amtrak, Malta Amtrak, Glasgow Amtrak, Wolf Point Amtrak, Williston Amtrak, Stanley Amtrak, Minot Whiteƒsh Amtrak Amtrak, Rugby Amtrak, Devils Lake Amtrak, Grand 500 Depot St, Flathead County Forks Amtrak, Fargo Amtrak, Detroit Lakes Amtrak, Staples Amtrak, St.
    [Show full text]
  • Presentation
    What’s Up Next In The Seattle Squeeze March 23rd Transit Service Change 1 Buses Coming Out of Downtown Seattle Transit Tunnel On March 23rd, to make room for the expansion of the Washington State Convention Center and upcoming construction to expand Link light rail service, 830 buses serving seven routes will say goodbye to the Downtown Seattle Transit Tunnel and will operate exclusively on surface streets. Westlake Customer Service Office will close • Last operating business day was March 6th, 2019. • ORCA cards can still be purchased or reloaded at nearby locations and at Westlake ticket vending machines. 2 New boarding locations for 15 routes Tunnel routes and some surface street routes will shift to new pathways on 2nd, 3rd, 4th, 5th and 6th Avenues. Current Tunnel Routes Surface Street Pathway 41 (all-day) 3rd Ave (SB and NB) 74 (peak service only) Additional surface routes will 2nd Ave (SB) also move to this pathway: 76, 5th/6th Ave (NB) 77, 301, 308,316 255 (all-day) Additional surface routes will 5th Ave (SB) also move to this pathway: 5th/6th Ave (NB) 252, 257, 311 101 (all-day) 102 (peak service only) nd th 150 (all-day) 2 Ave (SB) - 4 Ave (NB) 550 (all-day) (Sound Transit) 3rd Avenue All-Door Boarding • Just like RapidRide routes, Metro will expand off board payment and all-door boarding to all 42 routes along 3rd Avenue between Jackson and Denny Way and along the Westlake corridor through South Lake Union. • ORCA readers will be installed at bus stop locations using phased construction through 2020.
    [Show full text]