MANO RIVER UNION ROAD DEVELOPMENT and TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) – 47.1Km SANNIQUELLIE-LOGUATUO ROAD SECTION

Total Page:16

File Type:pdf, Size:1020Kb

MANO RIVER UNION ROAD DEVELOPMENT and TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) – 47.1Km SANNIQUELLIE-LOGUATUO ROAD SECTION Language: English Original: English PROJECT: MANO RIVER UNION ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) – 47.1Km SANNIQUELLIE-LOGUATUO ROAD SECTION COUNTRY: MULTINATIONAL (COTE D’IVOIRE & LIBERIA) ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) SUMMARY SEPTEMBER 2017 Team Leader P.D. TAMBAH, Transport Engineer COLR/PICU.1 7072 Team J. B. AGUMA, Principal Transport Economist, RDGE4/PICU.1 5012 Members: A. BOCKARIE, Infrastructure Engineer, COSL/PICU.1 6259 C.R. MHANGO, Environmental Officer SNSC 4411 E.B. KAHUBIRE, Social Development SNSC 1541 Officer Appraisal Team B. NGENGE, Principal Procurement Officer COLR/SNFI.1 7062 F.K. KOROMA, Financial Management COSL/SNFI.2 Specialist 6272 Division Jean-Noel ILBOUDO RDGW.3 5012 Manager Sector Director Amadou OUMAROU PICU0 3075 Acting Director Marie-Laure AKIN-OLUGBADE RDGW 7778 General 1 ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT (ESIA) SUMMARY Project Title: MANO RIVER UNION ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME (MRU/RDTFP) (PHASE II) – SANNIQUELLIE – LOGUATUO ROAD SECTION Project Number: P-ZI-DBO-172 Country: MULTINATIONAL (COTE D’IVOIRE & LIBERIA) Sector: PICU Project Category: 1 INTRODUCTION After the war that ended in 2003, the Government of Liberia, with the assistance of the donor community, developed in 2008 the first Poverty Reduction Strategy (PRS). The PRS defined the development programme of the Government of Liberia. Since then, a new Poverty Reduction Strategy called The “Agenda for Transformation, Steps toward Liberia RISING 2030”, covering the period 2012-2017 has been developed and is now underway. The activities related to Infrastructure are now part of Pillar II – Economic Transformation, more specifically Sector Goal C: Infrastructure. As part of infrastructure development, the Sanniquellie- Logartuo Road Section is expected to be rehabilitated with financing from the European Union (EU); the African Development Bank (AfDB) and the European Investment Bank (EIB). The Mano River Union Road Development and Transport Facilitation Programme (MRU/RDTFP) is being implemented in Phases and the Sanniquellie to Loguatuo (47.1km) is part of the MRU/RDTFP Phase II. The other AfDB financed interventions in the Liberian road transport sector include: (i) Paving Harper-Karloken Road (50 km), (ii) Paving of Karloken – Fish Town (80 km) and Harper Junction to Cavalla Customs (16 km), including the construction of a Bridge over the Cavalla River. The two (2) road sections under the proposed Programme are spur links of the Trans-West African Highway Corridor. The overall objective of the second Phase of the Programme (as was the case with the ongoing first phase) is to boost the post-conflict economic recovery of the two countries in the MRU region by improving road infrastructure and promoting intra- community and regional trade. Specifically, the Programme seeks to improve transport conditions on the two road sections in order to reduce transport costs, facilitate the free movement of persons and goods between the two countries and improve the living conditions of programme area communities. The expected outcomes include: (a) reduced transport costs and travel time; (b) enhanced potential for agriculture thereby contributing to poverty reduction among communities on the corridors; (c) improved road safety, and (d) improved regional trade and integration. The ESIA report and standalone detailed ESMP for this project was prepared by Tri-Star Collaborative in March 2018 based on the Environmental Impact Assessment Procedural Guidelines (2006) produced by the Liberia EPA, EU Guidelines and AfDB requirement standards. It reflects the current impact on the physical, biological and socio-cultural environment based on the current road design. 2 FIGURE 1: LOCATION OF THE PROJECT POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK The ESIA for the proposed Sanniquellie Loguatuo road project will be conducted within the policy, legal and institutional framework of the Liberia, EPA, EU, AfDB and relevant international environmental conventions to which the Government of Liberia is a signatory. The Environmental Protection Agency (EPA) is the environmental regulatory authority in charge of issuing environmental guidelines and reviewing the Environmental Impact Assessment process. 2.1 National Legislation and Policy 2.1.1 1986 Constitution of the Republic of Liberia Article 7 of the 1986 Constitution of the Republic of Liberia sets the fundamental basis for the Constitutional, legislative, and institutional frameworks for the protection and management of the environment. It also encourages public participation in the protection and management of the environment and the natural resources of Liberia. 2.1.2 The National Environmental Policy of Liberia of 2002 It provides the systematic and logical framework by which to address environmental issues. Section 4.7 of the policy calls for an EIA on all major developmental, socioeconomic and land use activities in any form which may have adverse effect/impact on the environment to one degree or another 2.1.3 The Environmental Protection and Management Act of 2002 The approved law provides for: regulations for conducting EIAs; tools for environmental management; a framework for the effective enforcement of environmental standards; Sector- 3 specific regulations; integration of concepts of international environmental laws into national environmental protection and development frameworks. 2.1.4 The Environmental Protection Agency Act of 2002 This act provides for: an autonomous entity empowered to ensure that environmental policies and laws are implemented and a Policy Council to propose and update environmental policies as required/needed. The Environmental Protection Agency Act (2002) mandates the EPA as the principal authority in Liberia for the management of the environment. Liberia is a signatory to several international conventions and agreements and legal obligations concerned with environmental and social issues. 2.1.5 Community Rights Law This provides for Community rights guidance regarding ownership and use of forest land resources. It aims to empower communities to fully engage in the sustainable management of the forests of Liberia by creating a legal framework that defines and supports community rights in the management of forest resources; and for all forest resources on community forest lands to be owned by local communities. It also recognises community land tenure rights such that they shall apply to tenure systems recognized by the Constitution and laws of Liberia; and that all matters related to land tenure and proprietorship to be dealt with by the Land Commission in accordance with national land policies issued and legislations enacted. 2.1.6 Customary Law of 2009 This provides that: the administration of justice in the hinterland are government-created customary courts, presided over by the chiefs while commissioners and superintendents are involved with administrative duties and as agents of executive oversight. (Article 65 of the Constitution); statutory circuit courts are legally allowed to review customary law decisions; and the administration of] tribal affairs through tribal chiefs who shall govern freely according to tribal customs and traditions so long as these are not contrary to [statutory] law. (Article 29, the General Rule of Administration within customary law includes a number of guidelines that deal with land ownership, resource allocation and appropriate measures for decision-making that will come into play in all phases of the Sanniquellie Loguatuo roady Project). 2.1.7 The National Transport Master Plan The focus of this plan is on a number of strategic objectives, namely to: rehabilitate, reconstruct and construct primary/secondary, feeder and neighborhood roads; improve the transport sector through effective systems and infrastructure for quality service provision and improve urban and rural transport; and build human resource capacity. 2.2 International Policies and Standards 2.2.1 AfDB Policies and Requirement Standards The consultant has taken into account the International environmental and social requirements of the project financing institutions; these include the African Development Bank policies. The Social and Environmental assessment of the project was therefore carried in accordance with the AfDB policies and guidelines as follows: Policy on Environment (2004); Involuntary Resettlement Policy (2003); Policy for Integrated Water Resources Management (2000); Handbook on Stakeholder Consultation and Participation (2001); and the AfDB Bank Group Policy on Disclosure and Access to Information (May2011). The AfDB’s Integrated Safeguard System sets out the five Operational Safeguard requirements that AfDB projects have to comply with; OS1 on Environmental and Social Assessment; OS 2 on Involuntary Resettlement; OS3 on Biodiversity and Ecosystem Services; OS4 on Pollution Prevention and Control, Greenhouse gases, Hazardous Materials, and Resource Efficiency; and 4 OS5 on Labour Conditions. The project triggers the five operational safeguards as outlined below. • OS 1: Environmental and Social Assessment: since the project requires Environmental and Social Assessment of anticipated impacts, including on cultural heritage and vulnerable groups and requires public consultation, grievance procedures. The project has prepared Detailed ESIA studies and a standalone ESMP and RAP that includes Stakeholder Engagement and Grievance Redress Mechanism. • OS 2: Involuntary
Recommended publications
  • Profile of Internal Displacement : Sierra Leone
    PROFILE OF INTERNAL DISPLACEMENT : SIERRA LEONE Compilation of the information available in the Global IDP Database of the Norwegian Refugee Council (as of 15 October, 2003) Also available at http://www.idpproject.org Users of this document are welcome to credit the Global IDP Database for the collection of information. The opinions expressed here are those of the sources and are not necessarily shared by the Global IDP Project or NRC Norwegian Refugee Council/Global IDP Project Chemin Moïse Duboule, 59 1209 Geneva - Switzerland Tel: + 41 22 799 07 00 Fax: + 41 22 799 07 01 E-mail : [email protected] CONTENTS CONTENTS 1 PROFILE SUMMARY 6 EXECUTIVE SUMMARY 6 CAUSES AND BACKGROUND OF DISPLACEMENT 9 BACKGROUND TO THE CONFLICT 9 CHRONOLOGY OF SIGNIFICANT EVENTS SINCE INDEPENDENCE (1961 - 2000) 9 HISTORICAL OUTLINE OF THE FIRST EIGHT YEARS OF CONFLICT (1991-1998) 13 CONTINUED CONFLICT DESPITE THE SIGNING OF THE LOME PEACE AGREEMENT (JULY 1999-MAY 2000) 16 PEACE PROCESS DERAILED AS SECURITY SITUATION WORSENED DRAMATICALLY IN MAY 2000 18 RELATIVELY STABLE SECURITY SITUATION SINCE SIGNING OF CEASE-FIRE AGREEMENT IN ABUJA ON 10 NOVEMBER 2000 20 CIVIL WAR DECLARED OVER FOLLOWING THE FULL DEPLOYMENT OF UNAMSIL AND THE COMPLETION OF DISARMAMENT (JANUARY 2002) 22 REGIONAL EFFORTS TO MAINTAIN PEACE IN SIERRA LEONE (2002) 23 SIERRA LEONEANS GO TO THE POLLS TO RE-ELECT AHMAD TEJAN KABBAH AS PRESIDENT (MAY 2002) 24 SIERRA LEONE’S SPECIAL COURT AND TRUTH AND RECONCILIATION COMMISSION START WORK (2002-2003) 25 MAIN CAUSES OF DISPLACEMENT 28 COUNTRYWIDE DISPLACEMENT
    [Show full text]
  • Productive and Decent Work for Youth in the Mano River Union: Guinea
    UNIDO AFRICAN UNION YEN UNOWA Productive and Decent Work for Youth in the Mano River Union: Guinea, Liberia, Sierra Leone and in Côte d’Ivoire 4.5 million youth need employment: An agenda for a multi-stakeholder programme ISSUES PAPER February 2007 CONTENTS Introduction I. Youth Employment - a stimulus to peace and economic stability II. What has been achieved? • Job creation for youth: Past and on-going efforts by Governments and various stakeholders • Gaps and missing links III. The Way Ahead • Balancing demand and supply • Exploring new productive opportunities • Best practices IV. Funding Mechanisms Annexes a. Youth unemployment rates in MRU and Côte d’Ivoire b. Policy initiatives: - Inclusion of youth employment in PRSPs/budgets - Inclusion of youth in national employment policies and other initiatives c. Examples of youth-targeted programmes to increase demand for labour d. Examples of youth-targeted programmes to improve the supply of labour e. Proposed initiatives in the Mano River Union and in Côte d’Ivoire Introduction This Issues Paper is intended to guide the discussions at the UNIDO/African Union (AU) High-Level Consultative Meeting, organized in cooperation with The United Nations Office for West Africa (UNOWA), and the United Nations Secretary-General’s Youth Employment Network (YEN) on Productive and Decent Work for Youth, in the countries of the Mano River Union (MRU): Sierra Leone, Liberia, Guinea, and in Côte d’Ivoire. The Issues Paper: Addresses the urgent need to create employment for 4.5 million youth aged between
    [Show full text]
  • The Mano River Union Trade Facilitation Study
    REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES) AFRICAN DEVELOPMENT BANK NEPAD, REGIONAL INTEGRATION AND TRADE DEPARTMENT ATR B, 5th Floor 13 Avenue de Ghana, B.P. 323 - 1002 Tunis-Belvédère, Tunisia The Mano River Union Trade Facilitation Study The African Development Bank invites Consultants to express their interest in undertaking a Trade Facilitation Needs Assessment Study for the Mano River Union (MRU). The services included under this assignment are: A review of relevant background materials on the MRU, including the Treaty and its Protocols that define the legal framework, principles and polices for intra-union trade; A review of state of trade and integration in the MRU; the trends, patterns of trade flows, including informal trade; Identification trade policy handicaps, including human; institutional; non-tariff barriers that hinder movements of goods, services and persons - Rules of Origin, Customs Procedures, Technical Barriers, Regulations and administrative measures etc. A review of relevant trade facilitation regulations; Assessment of critical trade facilitation needs, especially in the areas of transport and transit corridor facilitation, border operations and management, legal issues associated with transit border management; customs procedures, systems connectivity and automation, the legal/regulatory frameworks, This should also be linked to the new concept of the MRU growth triangle programme; Assessment of and situate the MRU roles in the overall trade policy and trade facilitation process vis-à-vis
    [Show full text]
  • Final Declaration of the Sub-Regional Meeting on Lassa Fever Control in the Mano River Union Countries, Freetown, Sierra Leone, 13-14 September 2004
    Final Declaration of the Sub-Regional Meeting on Lassa Fever Control in the Mano River Union Countries, Freetown, Sierra Leone, 13-14 September 2004 The Ministers of Health of the Mano River Union Countries, namely, Guinea, Liberia and Sierra Leone, held a meeting in Freetown on 13-14 September 2004 with the goal to adopt a joint Sub-Regional strategy for Lassa fever control in the MRU countries, 2004-2008. The Ministers of Health of the Mano River Union Countries: Alarmed by the continued endemic and epidemic transmission of Lassa virus in the Sub-Region Concerned about the recent epidemics in Sierra Leone and Liberia Recognising the need to protect 58 million population potentially at risk of contracting Lassavirus infection in West Africa The Ministers of Health of the Mano River Union Countries adopt the following Declaration on Lassa fever prevention and control in the Mano River Union Countries and commit themselves as follows: 1. Implement the adopted “Sub-Regional Strategic Plan of Action for Lassa Fever Prevention and Control, 2004-2008.” 2. Convene annual Sub-Regional meetings, to be rotated among MRU and other interested countries. 3. Encourage the inclusion of additional, potentially affected countries. 4. Convene periodic meetings of the technical groups to address specific issues The Parties will jointly pursue the following objectives: 5. Among others, the technical groups will collaborate on the following issues: a. Exchange of scientific information and materials. b. Address cross-cutting activities 6. Collaboration in the area of patient management, namely— a. Adopt a standardised clinical case definition b. Common treatment guidelines c.
    [Show full text]
  • Guinea Côte D'ivoire Liberia
    Mount Nimba Ecosystem Roger W. Luke and Saye Thompson [email protected] +231777397418/+231886576131 and +2317770242935 Liberia, Ivory Coast and Guinea Size: Total 3 countries: 29,093 ha (290,93 km2) Guinea: 12,540 ha, Côte d'Ivoire: 5,000 ha, and Liberia: 11,553 hectares Côte d'Ivoire Guinea Liberia Page 1 of 5 Participants in coordinating the ongoing transboundary cooperation: National Government: • Liberian (Forestry Development Authority (FDA)) • Guinean (CEGENS) • Ivorian Government Local Government: • Nimba County Protected area administration: • East Nimba Nature Reserve Management (ENNR) • ENNR Co-management Committee International NGOs: • Conservation International • Fauna and Flora International National NGOs: • East Nimba Nature Reserve Co-management Committee (CMC) • Skills and Agriculture Development Services (SADS) • Rural Integrated Center for Community Empowerment (RICCE) Local NGOs: • Agriculture Relief Services (ARS) Intergovernmental organizations: • Mano River Union (MRU) Multi-National Corporations: • United National Development Program (UNDP) Community-based Organizations: • Gbalay-geh Youth Association Objectives: The Transboundary Collaboration is characterized by a composition of natural ecosystems evolving from several ecological and geo- physical processes that have obtained to the creation of many habitat types such as montane gallery forest, secondary thickets, or woody grass land, secondary hill forests, moist evergreen forest, swamp or wetter secondary forests. As a result of the diverse vegetative uniqueness of the site, accommodation is provided for many species of conservation relevance including the endemic Nimba Toad, endangered Nimba Otter Shrew, and African Swallow-tail butterfly; socially the area main habitants are the Mano and the Gio. Despite of the three countries they have the same culture and are intermarriage. Very common and spongy borders and conduct their local trade by frequent crossing and transacting their economic activities.
    [Show full text]
  • Multinational
    AFRICAN DEVELOPMENT FUND MULTINATIONAL A SUB-REGIONAL HIV/AIDS PROGRAMME FOR THE REFUGEES, INTERNALLY DISPLACED POPULATION AND THEIR HOST COMMUNITIES IN THE MANO RIVER UNION BASIN COUNTRIES AND CÔTE D’IVOIRE APPRAISAL REPORT SOCIAL DEVELOPMENT DEPARTMENT OCSD CENTRAL AND WEST REGIONS JULY 2004 TABLE OF CONTENTS PROJECT INFORMATION SHEET, CURRENCY AND MEASURES, LISTS OF TABLES, LIST OF ANNEXES, LIST OF ABREVIATIONS, BASIC DATA SHEET, PROJECT LOGICAL FRAMEWORK AND EXECUTIVE SUMMARY i-ix 1. PROJECT ORIGIN AND BACKGROUND....................................................................1 1.1 Origin and History of the Project……………………………………………………1 2. THE MANO RIVER UNION ..........................................................................................2 2.1 An overview...............………………………………………………………………2 2.2 The Status of the HIV/AIDS Epidemic in the Sub-Region ........................................3 2.3 MRU Governments’ Sector Policies and Strategies ..................................................5 2.4 Institutional Framework of STI/HIV/AIDS Control..................................................5 2.5 Health Systems in the Mano River Basin Countries..................................................6 2.6 Interventions of Development Partners in STI/HIV/AIDS control ...........................7 2.7 Challenges and Constraints........................................................................................8 3. THE PROGRAMME......................................................................................................10
    [Show full text]
  • Policy & Practice Brief
    ISSUE # 006 Policy & Practice Brief May Knowledge for durable peace 2011 A REGIONAL APPROACH TO PEACEBUILDING - THE MANO RIVER REGION1 Dorcas Ettang, Grace Maina and Warigia Razia “Contemporary conflict creates a web of interlocking conflicts involving the transfer of populations, arms, armies, finances, and conflict goods across increasingly porous borders”2 UN Cartographi THE MANO RIVER REGION Nouakchott The boundaries and names shown and the designations MAURITANIA used on this map do not imply official endorsement or Sen Rosso ega Tombouctou acceptance by the United Nations. l 'Ayoûn C Kaédi el 'Atroûs� Néma Se Gao Saint-Louis C tio NIGER N Thiès Tahoua CHAD Departme Diourbel Dakar Kaolack SENEGAL Kayes MALI Zinder Diffa Gambia Tambacounda Niamey GAMBIA Maradi Lake r ige Dosso Banjul N Chad N Ziguinchor Bamako BURKINA FASO Niger t of Ouagadougou Birnin Kebbi Kano Maiduguri Bissau F Potiskum iel GUINEA- Dabola D BISSAU Sikasso Boke Bobo-Dioulasso S Kaduna U G U INEA pport BENIN Gombe Kindia Kankan e Djougou nu A NIGERIA e Conakry B Volta Abuja T Korhogo Tamale Sokode Parakou L SIERRA Freetown LEONE A Ogbomosho CÔTE D'IVOIRE Lake O Savalou Bo Bouaké Ngaoundéré N Volta G Oshogbo Lac de O T Bonthe Kossou GHANA T Ibadan I Kumasi Enugu B Benin City Yamoussoukro a Lagos C LIBERIA n d Monrovia a Koforidua Porto-Novo m Agboville Lomé Buchanan Gagnoa a CAMEROON Bight of Benin Port Calabar O Accra Harcout C Abidjan Sassandra C Takoradi a Douala Yaoundé E pe Th A Cape Palmas ree Malabo N Points E Q Gulf of Guinea U 0 100 200 300 400 500 km Bight of A T Campo Biafra O R SAO TOME I 0 100 200 300 mi AL CONGO AND PRINCIPE GUINEA GABON Map No.
    [Show full text]
  • Mano River Union (MRU)
    No. 13608 LIBERIA and SIERRA LEONE Mano River Declaration establishing the Mano River Union between Liberia and Sierra Leone. Concluded at Malema on 3 October 1973 First Protocol to the above-mentioned Declaration: Principles and procedures for the adoption of Pro tocols. Concluded at Bo on 3 October 1974 Second Protocol to the above-mentioned Declaration: Institutions of the Mano River Union. Concluded at Bo on 3 October 1974 Third Protocol to the above-mentioned Declaration: Celebration of the signing of the Declaration. Con cluded at Bo on 3 October 1974 Fourth Protocol to the above-mentioned Declaration: Financial arrangements of the Mano River Union. Concluded at Bo on 3 October 1974 Fifth Protocol to the above-mentioned Declaration: General Convention on privileges and immunities of the Mano River Union. Concluded at Bo on 3 October 1974 Sixth Protocol to the above-mentioned Declaration: Registration of the Mano River Declaration and its Protocols with the Secretariats of the Organization of African Unity and the United Nations Organization. Concluded at Bo on 3 October 1974 Authentic texts: English. Registered by the Secretary-General of the Mano River Union, acting on behalf of the Parties, on 1 November 1974. Vol.952,1-13608 266 United Nations — Treaty Series • Nations Unies — Recueil des Traités 1974 THE MANO RIVER DECLARATION1 We, the Presidents of Liberia and Sierra Leone, Desiring to establish a firm economic foundation for lasting peace, friendship, freedom and social progress between our countries, In pursuance of our determination as already affirmed in the Joint Statements issued on 16th March, 1971, and 28th January,.
    [Show full text]
  • HUMAN SECURITY in the MANO RIVER UNION Empowering Women to Counter Gender-Based Violence in Border Communities
    HUMAN SECURITY IN THE MANO RIVER UNION Empowering women to counter gender-based violence in border communities Richard Reeve May 2010 Understanding conflict. Building peace. About International Alert International Alert is an independent peacebuilding organisation that has worked for over 20 years to lay the foundations for lasting peace and security in communities affected by violent conflict. Our multifaceted approach focuses both in and across various regions; aiming to shape policies and practices that affect peacebuilding; and helping build skills and capacity through training. Our field work is based in Africa, South Asia, the South Caucasus, Latin America, Lebanon and the Philippines. Our thematic projects work at local, regional and international levels, focusing on cross- cutting issues critical to building sustainable peace. These include business and economy, gender, governance, aid, security and justice. We are one of the world’s leading peacebuilding NGOs with more than 125 staff based in London and our 13 field offices. To learn more, visit www.international-alert.org. © International Alert 2010 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without full attribution. Layout by D. R. Ink, [email protected] Front cover image: © Sando Moore Human security in the Mano River Union Empowering women to counter gender-based violence in border communities 2 International Alert Author profile Richard Reeve Richard Reeve is Security Manager with International Alert’s Peacebuilding Issues Programme. He has researched, written and taught on security and justice issues and peace support interventions in West Africa since 2001.
    [Show full text]
  • LAND RESOURCES in the MANO RIVER UNION AREA Final Report of the Land Resources Survey Project, Mano River Union W.J. Veldkamp
    LAND RESOURCES IN THE MANO RIVER UNION AREA Final report of the Land Resources Survey project, Mano River Union Scanned from original by ISRIC - World Soil Information, as ICSU World Data Centre for Soils. The purpose is to make a safe depository for endangered documents and to make the accrued information available for consultation, following Fair Use Guidelines. Every effort is taken to respect Copyright of the materials within the archives where the identification of the Copyright holder is clear and, where feasible, to contact the originators. For questions please contact [email protected] W.J. Veldkamp indicating the item reference number concerned. Land Resources Survey project Economic Affairs Division Mano River Union Freetown, Monrovia Sierra Leone, Liberia October 1980 - 1 - Land resources in the Mano River Union area; final report of the Land Resources Survey project of the Mano River Union. CONTENTS Page Summary 3 Introduction General characterization of the Mano River Union (MRU-) area Generalized picture of the soils in the MRU-area 11 3•1 Interior Basement Complex 11 3.2 Coastal Plain 23 Existing information and results from the Land Resources Survey project 27 k.1 Reconnaissance or smaller scale 28 k.2 Semi-detailed scale 32 k.3 Detailed and very detailed scale 3U Conclusions and recommendations k3 5.1 Conclusions k3 5.1.1 General U3 5.1.2 Technical k3 5.1.3 Suitability k6 5.1.*+ Specific hi 5.2 Recommendations k& References 51 This report can be obtained through the Mano River Union, P.M.B. 133, Freetown, Sierra Leone P.O.Box 9050, Monrovia, Liberia.
    [Show full text]
  • Langue : ANGLAIS
    AFRICAN DEVELOPMENT BANK GROUP MULTINATIONAL Public Disclosure Authorized MANO RIVER UNION: LIBERIA-COTE D’IVOIRE: ROAD DEVELOPMENT AND TRANSPORT FACILITATION PROGRAMME - PHASE 2 PICU/RDGW DEPARTMENTS September 2018 Public DisclosurePublic Authorized TABLE OF CONTENTS I. Strategic Thrust and Rationale ................................................................................................ 1 1.1 Programme Linkages with National and Regional Strategies ...................................... 1 1.2 Rationale for Bank's Involvement ……...……………………………………………2 1.3 Donors Coordination .................................................................................................... 2 II. Programme Description.......................................................................................................... 3 2.1 Programme Objectives and Components ..................................................................... 3 2.2 Technical Solutions Adopted and Alternative Solutions Considered .......................... 4 2.3 Programme Type……………………………………………………………………..5 2.4 Programme Cost and Financing arrangement .............................................................. 5 2.5 Programme target areas and Population ....................................................................... 7 2.6 Participatory process to Programme Identification, Design and Implementation ....... 7 2.7 Bank Group Experience and Lessons Reflected in Programme Design ...................... 8 2.8 Programme Performance Indicators ............................................................................
    [Show full text]
  • Mano River Basin • Lenght:320 Km
    Prompting and strengthening transboundary water cooperation: Can a benefit focus help? Dr. Alejandro Iza Director, Environmental Law Centre Head, Environmental Law Programme INTERNATIONAL UNION FOR CONSERVATION OF NATURE Outline • BRIDGE • Practical experiences • Instruments to anchor cooperation INTERNATIONAL UNION FOR CONSERVATION OF NATURE BRIDGE INTERNATIONAL UNION FOR CONSERVATION OF NATURE BRIDGE BRIDGE: (Building River Dialogue and Governance): • Supports capacities of countries in shared basins to adopt effective arrangements to ensure international cooperation • Promotes the achievement and implementation of agreements and institutions for effective water governance at local, national, basin and global levels INTERNATIONAL UNION FOR CONSERVATION OF NATURE Methodology Demonstration Learning Dialogue Leadership Advice and Support INTERNATIONAL UNION FOR CONSERVATION OF NATURE Where? INTERNATIONAL UNION FOR CONSERVATION OF NATURE PRACTICAL EXPERIENCES INTERNATIONAL UNION FOR CONSERVATION OF NATURE Mano River Basin • Lenght:320 km • Basin: 8,250 km2 • Shared between: – Guinea(GIN) – Liberia (LBR) – Sierra Leone (SLE) • Population in the basin: 179,952 TWAP INTERNATIONAL UNION FOR CONSERVATION OF NATURE Mano River Basin: Background • Political unrest and civil wars – 1989-1996, 1999-2003 Civil wars in Liberia – 1991-2002 Civil war in Sierra Leone – 2010 First free and fair election in Guinea its since independence in 1958 • Ebola – Late 2013, Ebola virus was diagnosed in the forest region of Guinea – Mid 2014, the epidemic spread
    [Show full text]