District Irrigation Plan, 2016-22 ,

December 2016

1

Contents Executive Summary ...... 8 Introduction ...... 12 i. Background ...... 12 ii. Vision ...... 17 iii. Objective ...... 18 iv. Strategy/approach ...... 18 v. Programme Components ...... 19 v. Rationale/ Justification ...... 21 vi. Methodology ...... 21 1 General Information of the ...... 22 1.1 District Profile ...... 22 1.2 Demography ...... 23 1.3 Biomass and Livestock ...... 27 1.4 Agro-Ecology, Climate, Hydrology and Topography ...... 30 1.5 Soil Type ...... 30 1.6 Land Use Pattern ...... 32 2 District Water Profile ...... 35 2.1 Area Wise, Crop Wise Irrigation Status ...... 35 2.2 Production and Productivity of Major Crops ...... 39 2.3 Irrigation Based Classification ...... 40 3 Water Availability ...... 41 3.1 Status of Water Availability ...... 44 3.2 Status of Ground Water Availability ...... 48 3.3 Status of Command Area ...... 49 3.4 Existing type of Irrigation ...... 50 4 Water Requirement / Demand ...... 53 4.1 Domestic Water Demand ...... 53 4.2 Crop Water Requirement ...... 54 4.3 Livestock Water Requirement ...... 57 4.4 Industrial Water Requirement ...... 58 4.5 Water Demand for Power Generation ...... 59

2

4.6 Total Water Demand of the district for various sectors...... 59 4.7 Water Budget ...... 60 5 Strategic Action Plan for Irrigation in District under PMKSY ...... 61 5.1 Component wise Strategic Action Plan ...... 61 5.2 Department wise allocation of budget ...... 62 5.3 Year wise Strategic Action Plan ...... 63 5.4 Monitoring and Evaluation ...... 64 5.5 Output & Outcome ...... 64 5.6 Suggestions ...... 65 Bibliography ...... 66 Annexure ...... 67 List of Water Use Associations of District Jind ...... 67 Photographs of Irrigation Interventions in ...... 69 Strategic Action Plan Abstract ...... 72

3

LIST OF TABLES Table 1-1 District Profile ...... 22 Table 1-2 Administrative Structure ...... 23 Table 1-3 Gender Wise Classification of Population ...... 24 Table 1-4 Category wise population ...... 25 Table 1-5 Locality wise population ...... 26 Table 1-6 District Population Abstract ...... 27 Table 1-7 Population of Small Animals ...... 28 Table 1-8 Population of Large Animals ...... 29 Table 1-9 Agro-Ecology Data ...... 30 Table 1-10 Soil Classification ...... 31 Table 1-11 Land Use Pattern ...... 32 Table 2-1 Area wise Irrigation Status of Agriculture Crops (2015-16) - District Summary ...... 35 Table 2-2 Area wise Irrigation Status of Agriculture Crops (205-16) - Block wise Summary ...... 36 Table 2-3 Area under Horticulture Crops (2015-16)- District Summary ...... 39 Table 2-4 Production Data of Major Agricultural Crops under Irrigated Conditions (2015-16) .... 40 Table 2-5 Production Data of Major Horticulture Crops (2015-16) ...... 40 Table 2-6 Irrigation Based Classification –Year 2015-16 ...... 40 Table 3-1Status of Water Availability of Jind District ...... 44 Table 3-2 Details of STP ...... 45 Table 3-3 Block wise water availability ...... 46 Table 3-4Status of Ground Water Availability ...... 48 Table 3-5 Status of Canal Command ...... 49 Table 3-6 Status of other services command ...... 49 Table 3-7 Existing Type of Irrigation ...... 50 Table 4-1 Present Domestic Water Demand (2016) ...... 53 Table 4-2 Projected Domestic Water Demand (2022) ...... 54 Table 4-3 Block wise water demand- Agriculture Crops ...... 55 Table 4-4Total Crop water demand- district summary ...... 56 Table 4-5Crop wise water requirement ...... 57 Table 4-6Livestock water demand ...... 57 Table 4-7Animal wise water requirement ...... 58 Table 4-8 Industrial Water Requirement ...... 58 Table 4-9 Total Water Demand ...... 59 Table 4-10 Water Budget ...... 60 Table 5-1Component Wise Budget Requirement (Rs Lakhs) ...... 62 Table 5-2 Department wise budget requirement (Rs Lakhs) ...... 63 Table 5-3 Output & Outcome ...... 64 Table 5-4 Increase in income of farmers ...... 65

4

LIST OF FIGURES Figure 1-1 Block wise population distribution ...... 24 Figure 1-2 Gender wise population distribution ...... 25 Figure 1-3 Category wise population ...... 26 Figure 1-4 Locality wise population distribution ...... 27 Figure 1-5Block wise Population of Small Animals ...... 28 Figure 1-6 Population of large animals ...... 29 Figure 1-7 Percent Area of Blocks ...... 33 Figure 2-1Gross Irrigated and Rainfed area under Agriculture Crops ...... 36 Figure 2-2 Block wise area under agriculture crops ...... 39 Figure 3-1 Status of Water Availability ...... 45 Figure 4-1Block wise Domestic Water Requirement (MCM) ...... 54 Figure 4-2 Block Wise Water Potential to be created ...... 55 Figure 4-3Crop water demand & existing water potential ...... 56 Figure 5-1 Component Wise Budget Allocation ...... 62 Figure 5-2 Year Wise Budget Requirement ...... 63

5

LIST OF MAPS Map 1-1Location Map of Jind District ...... 22 Map 1-2 Soil Map of district ...... 31 Map 1-3 Slope Map of district ...... 32 Map 1-4 Land Use Land Cover Map 2015 ...... 34 Map 3-1 Drainage Map of Jind District ...... 41 Map 3-2 Sub-Basin & Watershed Map ...... 44 Map 3-3 Index Plan of Canals - CADA ...... 51 Map 3-4 Index Plan of Canals, Water resources division ...... 52

6

LIST OF ABBREVIATIONS PMKSY Pradhan Mantri Krishi Sinchai Yojna AIBP Accelerated Irrigation Benefit Programme MoWR,RD &GR Ministry of Water Resources, River Development & Ganga Rejuvenation DoLR Department of Land Resources CGWB Central Ground water Board DAC Department of Agriculture and Cooperation NEC National Executive Committee CADWM Command Area Development and Water Management IWMP Integrated Watershed Management Programme MGNREGS Mahatma Gandhi National Rural Employment Guarantee Scheme RIDF Rural Infrastructure Development Fund MPLAD Member of Parliament Local Area Development MLALAD Member of Legislative Assembly Local Area Development DIP District Irrigation Plan DAP District Agriculture Plans STP Sewage Treatment Plant Qtn/yr Quintals per year Lpcd Litres per capita per day MCM Million Cubic Meter BCM Billion Cubic Meter GA Geographical Area Irr Irrigated RF Rainfed Ha Hectare Sqm Square Kilometer Yr Year

7

Executive Summary

Government of launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency and productivity of current water use to bring more prosperity to the rural areas. Priorities of Government of India were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16thLok Sabha where it was emphasized that “Each drop of water is precious. Government is committed to giving high priority to water security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all options including linking of rivers, where feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, water conservation and ground water recharge will be nurtured. Micro irrigation will be popularized to ensure ‘Per drop-More crop”.

PMKSY programme is an amalgamation of on-going schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed and Convergence with MGNREGA were brought together under the umbrella program of PMKSY. Further the scheme seeks convergence with other schemes like Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD), etc.

PMKSY will be implemented in an area development mode only by adopting a decentralized state level planning and projectised execution structure that will allow the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be supervised and coordinated utilizing the existing mechanism and structure available under Rashtriya Krishi Vikas Yojana (RKVY) program with state agriculture department acting as the State Nodal Agency for implementation of PMKSY. However, the implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the respective program ministry/department.

8

The 05 chapters along with introduction chapter, explains the profile of district, its water requirement for agriculture and allied sector, water availability, assessment of water requirement for various sectors and strategic action plan for augmentation and effective management of available water resources.

District Profile: Jind district lies in the North of Haryana between 29.03’ and 29.51’ North latitude & 75.53’ and 76.47’ East longitude. It has an average elevation of 227 metres (744 feet). Jind district consists of three Sub-Divisions namely Jind, & and seven blocks namely Jind, Narwana, Safidon, Pillukhera, , & Julana. Jind district occupies 7th position in population size during 2011.According to Census 2011, Jind had population of 13,34,152 of which male and female were 7,13,006 and 6,21,146 respectively. The livestock population in the district, as per Livestock census 2012, is 81,34,781 of which 75,08,907 are small animals, and 6,25,874 are large animals.

The climate of the district can be classified as tropical and semi-arid, with very hot summer and cold winter. The normal annual rainfall of the district is 515 mm, and normal monsoon Rainfall is 433 mm. The land of district Jind is plain and fertile. Soils are medium to heavy in texture and pH varies from 7.5 to 9.1.The soils of the Jind district are sandy loam to loam in texture.

Agriculture in Jind: As per the data of Year 2015-16, out of gross cropped area of 4,73,451 ha (exclusive of horticulture crops) in the district, 4,58,364 ha (or 96.81%) is irrigated while 15,087 ha (3.19%) is rainfed. Kharif crops have a share of 2,35,422 ha (or 49.72%), and Rabi crops have a share of 2,38,029 ha (or 50.28%). Paddy, Cotton and are the Major crops cultivated in kharif season with an area share of 48.79 per cent, 26.77 per cent and 12.10 per cent respectively. In rabi season, 91 per cent area, i.e. 2,16,610 ha was covered under . Other major crops cultivated during Rabi season include Sugarcane and Sarson. Further, the total area under horticulture crops was 12,785 ha during 2015-16.The entire area under cultivation of horticulture crops is irrigated.

As per the data of Year 2015-16, among agriculture crops, wheat has highest production (79,90,000 quintals/yr), and Sugarcane & Fodder has highest average yield (67,750 Kg/ha) in the district. In terms of cost of cultivation, sugarcane is most expensive (Rs 1,62,000/ha) and Sarson is the cheapest (Rs 27,500/ha) in the district. Among horticulture crops, Cauliflower has highest production (26,179 quintals/yr), and Citrus has highest average yield (4123 Kg/ha) in the district.

9

District Water Profile: The district Jind constitutes a part of the Punjab -Haryana plain which is largely flat, featureless and monotonous alluvial upland plain and is formed of Pleistocene and sub Recent alluvial deposits of the Indo-Gangetic system. The area of Jind district is irrigated by two canal systems, viz the Western Canal and the Bhakra Canal1. These two systems are interlinked by the Narwana and Barwala link canals of the Bhakra Canal system. The major sources of water availability are shallow tube wells and major & medium irrigation canals. Other sources of water availability include deep tube wells and untreated effluents from STP.

As per 2015-16 data provided by irrigation department and ground water department, the total annual water availability of the district was 1672.471 MCM, out of which share of surface water is 380.14 MCM (22.72%) and ground water 1292.331 MCM (77.28%). As per Central Ground Water Board report 2013, the status of ground water is Over- exploited in 3 blocks namely Alewa, Narwana and Safidon; Critical in 1 block namely Jind; and Semi critical in 3 blocks namely Julana, Uchana and PilluKhera. None of the blocks of district falls under safe category.

Demand for water sources and the gap: The present & projected water demand from various sectors such as domestic, livestock, agriculture, industrial and power in the district is assessed. The total present water demand from various sectors is 2466.03 MCM, while future water demand (2022) will be 2470.61 MCM. To meet this demand, total of 380.14 MCM of surface water and 1292.331 MCM of ground water are available in the district. Therefore, the present water gap is to the tune of 793.559 MCM, and the projected water gap (2022) shall be to the tune of 798.139 MCM. To bridge this gap, strategic action plan has been prepared by various departments.

Proposed plan: Total planned outlay for six years works out to be Rs. 537.3665 Crores, including component of Rs 125.421 Crores of state irrigation schemes and Rs 2.695 Crores of other loan projects. Maximum share of Rs. 298.831 Crores (55.60%) is for Har Khet Ko Pani Component, followed by state irrigation schemes of Rs 125.421 Crores (23.3%), followed by AIBP Component of Rs. 109.22 Crores (20.3%), and marginal share of Per Drop More Crop Component of Rs 1.195 Crores (0.20%). Considering department wise fund requirement, maximum share of Rs.294.194 Crores (54.75%) is for Irrigation Departments, followed by CADA of Rs 241.866 Crores (45.01%) and marginal share of Horticulture Department and ASCO.

1 Central Ground Water Board Report, 2011

10

The Strategic Action Plan of PMKSY will be monitored by the respective departments through the regular reporting system and component wise progress will be monitored by the District Level Irrigation Committee. During the upcoming six financial years, command area of 2,06,335 ha will be covered in the district by various departments, under Pradhan Mantri Krishi Sinachyi Yojna. Out of this area, 1,49,726 hectares will be covered by Irrigation Department, 48,795 hectares will be covered by Command Area Development Authority (CADA), 4,400 hectares will be covered by ASCO and area of 3414 ha by Horticulture Department. The proposed activities will generate income of Rs 92.274 Crores, employment of 18,45,675 man-days and the overall crop yield will increase by 10%. Accordingly, it is proposed that the farmer’s income will increase proportionately. The increase in annual income of farmer’s cultivating agriculture crops is assessed to be Rs 216.65 Crores.

11

Introduction i. Background Preparation of decentralized area specific district planning process visualized in various plans took concrete shape through the years and initiatives like specific guidelines on methodologies and processes for preparation of district plans; framework for preparation of perspective plan, medium term and annual plans by then planning commission in 1969 and the 73rd and 74th constitutional amendments conferring constitutional status to Panchayats at district and sub district level; local self-government in urban areas; constitution of district planning committee to consolidate the plans prepared at Panchayats and municipalities and prepare a draft development plan for the whole district.

The decentralized planning process was further strengthened through emphasis by planning commission on preparation of district level plans and making it an integral part of the process of preparation of the states 11th five year plan. The Planning commission issued guidelines in August 2006 for preparation of the district plans. The guidelines define the District Planning as ‘the process of preparing an integrated plan for the local government sector in a district taking into account the resources (natural, human and financial) available and covering the sectorial activities and schemes assigned to the district level and below and those implemented through local governments in a state. The document that embodies this statement of resources and their allocation for various purposes is known as the District Plan”.

Government of India through a resolution in National Development Council on 29th May 2007 conceived a special Additional Central Assistance Scheme (ACAS) to address the slow growth of agriculture and allied sectors by incentivizing states to draw up plans for their agriculture sectors more comprehensively. The NDC resolution states "GoI introduced a new Additional Central Assistance Scheme to incentivize states to draw up plans for their agriculture sector more comprehensively, taking agro-climatic conditions, natural resource issues and technology into account, and integrating livestock, poultry and fisheries, etc. This involved a new scheme for Additional Central Assistance (ACA) to State Plans, administered by the Union Ministry of Agriculture over and above its existing Centrally Sponsored Schemes, to supplement the State-specific strategies including special schemes for beneficiaries of land reforms. The newly created National Rainfed Area Authority on request, was to assist States in planning for rainfed areas".

12

The NDC in its resolution advised the states to prepare a comprehensive district agriculture plans (C-DAP) that will fully utilize available resources and include allied agriculture sectors. Further, GOI issued a manual on preparation of comprehensive district agriculture plans to help the states prepare C-DAP. As per these guidelines, the objective of district planning is ‘to design an integrated and participatory action plan for the development of local area in general and agriculture and allied sectors in particular’. The objectives of Comprehensive District Agriculture Plan (C-DAP) were:

 To prepare a Comprehensive District Agriculture Plan (C-DAP) through participatory process involving various organisations and stakeholders.  To enable optimum utilisation of scarce natural, physical & financial resources.  To assess and plan for the infrastructure required to support the agriculture development.  To establish linkages with the required institutional support services, like credit, technology transfer, ICT, research etc.  To evolve an action plan for achieving sustainable agricultural growth with food security and cropping system that will improve farmers’ income.

The guidelines required the state/district authorities to (i) ensure that the agricultural plans are prepared for the district and then integrated into the agricultural plans of the State based on the agro-climatic conditions, availability of technology, trained manpower and natural resources; (ii) local needs / crops / feed and fodder / animal husbandry / dairying / fisheries / priorities are reflected in the plan; (iii) productivity gaps for important crops and livestock and fisheries are reduced; and (iv) the returns to the farmers from these are maximized.

The latest move in the process of strengthening of decentralized planning process was the Government of India guidelines issued in 2015 in the form of a template for the preparation of District Irrigation Plan (DIP) and State Irrigation Plan (SIP) as part of the Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) program and made the preparation of DIP and SIP mandatory for the states to receive funds from the program. The present report is a product of these long drawn efforts of Government of India to strengthen the decentralized planning process in the country focusing on the vital resource i.e., water.

Water is of vital importance for human & animal life, maintenance of ecological balance and promotion of developmental activities. Considering its vital importance and ever increasing demand for water, in the face of population growth, urbanization & industrialization and considerations of climatic change, making water, an increasingly a scarce resource, available to multiple uses, planning and management of this vital

13

resources, utilization of water economically, optimally and equitably assumes greater importance.

According to the 12th Five year Plan the water budget estimates of India by Ministry of Water Resources suggests an availability of 1123 billion cubic meters (BCM) against a current estimated demand of 710 BCM. The Standing Committee of the Ministry of Water Resources estimates that this water demand will rise to 1093 BCM by 2025. Though the existing water availability in the immediate future seems to be adequate, with the near constant supply of water resources in the face of increasing demand on account of population growth, urbanisation and industrialization will strain the water supply- demand balance.

The per capita water availability which stood at 5,177 cubic meters in 1951 was reduced to 1820 cubic meters in 2001 while the international prescribed limit is 1800 cubic meters. The projected per capita availability of water is 1341 cubic meters in 2025 and 1140 cubic meters in 2050 suggesting shortage of water in the medium term2. Further, the all India water balance estimates does not reflect the variations in water balance across time and space- certain areas having a positive water balance and the others facing acute shortage. The problem is further accentuated by water quality related issues.

With the abundant surface and ground water supply in the first five decades since independence, more than 80 percent of the total available water resources were allocated for irrigation purposes and the rest meeting the domestic and industrial demands. In a recent study3on the demand for water from agriculture, domestic and industrial uses in 2000, 2025 and 2050 seems to suggest that domestic demand (34 BCM in 2000, 66 BCM in 2025 and 101 BCM in 2050) and industrial demand (42 BCM in 2000, 92 BCM in 2025 and 161 BCM in 2050) for water will utilize the total balance water available while agriculture demand for water will be (605 BCM in 2000, 675 BCM in 2025 and 637 BCM in 2050). This change is partly because of the changing sectorial contributions of India’s GDP and also partly because of dynamics of irrigation development in the country where the initial expansion in area under irrigation is propelled by the availability of abundant water resources and availability of good quality land. This is no longer the case in many of the states where the availability of land and water are serious constraints for further expansion of irrigation. Further, as per the erstwhile planning commission up to March

2Ministry of Water Resources (2011), Strategic Plan for Ministry of Water Resources, Government of India, New 3Amarasinghe, U.A., Shah T., Turral, H. and Anand, B.K. 2007. India’s water future to 2025- 2050:Business-as-usual scenario and deviations. Research Report 123, International Water Management Institute, Colombo.

14

2012 out of 141 million hectares of net sown area in the country 114 (or 81%) million hectares is Irrigation Potential Created (IPC) and 88 (or 62%) million hectares is Irrigation Potential Utilised (IPU) leaving almost 20% of irrigated potential unutilized. This leaves 40 percent of the net sown area in the country dependent on rainfall which makes farming a high risk and less productive.

The competing demands for water resources and the emerging issues and concerns were to be addressed through certain basic principles and commonality in approaches in dealing with planning, development and management of water resources4 under an Integrated Water Resource Management framework. The main objectives of water resource management as delineated in National Water Policy 2012 are: a) Planning, development and management of water resources need to be governed by common integrated perspective considering local, regional, State and national context, having an environmentally sound basis, keeping in view the human, social and economic needs. b) Principle of equity and social justice must inform use and allocation of water. c) Good governance through transparent informed decision making is crucial to the objectives of equity, social justice and sustainability. Meaningful intensive participation, transparency and accountability should guide decision making and regulation of water resources. d) Water needs to be managed as a common pool community resource held, by the state, under public trust doctrine to achieve food security, support livelihood, and ensure equitable and sustainable development for all. e) Water is essential for sustenance of eco-system, and therefore, minimum ecological needs should be given due consideration. f) Safe Water for drinking and sanitation should be considered as pre-emptive needs, followed by high priority allocation for other basic domestic needs (including needs of animals), achieving food security, supporting sustenance agriculture and minimum eco-system needs. Available water, after meeting the above needs, should be allocated in a manner to promote its conservation and efficient use. g) All the elements of the water cycle, i.e., evapo-transpiration, precipitation, runoff, river, lakes, soil moisture, and ground water, sea, etc., are interdependent and the basic hydrological unit is the river basin, which should be considered as the basic hydrological unit for planning. h) Given the limits on enhancing the availability of utilizable water resources and increased variability in supplies due to climate change, meeting the future needs will depend more on demand management, and hence, this needs to be given

4Ministry of Water Resources, National Water Policy, 2012, Government of India, .

15

priority, especially through (a) evolving an agricultural system which economizes on water use and maximizes value from water, and (b) bringing in maximum efficiency in use of water and avoiding wastages. i) Water quality and quantity are interlinked and need to be managed in an integrated manner, consistent with broader environmental management approaches inter-alia including the use of economic incentives and penalties to reduce pollution and wastage. j) The impact of climate change on water resources availability must be factored into water management related decisions. Water using activities need to be regulated keeping in mind the local geo climatic and hydrological situation.

The National Water Policy 2012 drives the water resource management program planning and management in the country. Government of India launched Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) to address the constraints in providing assured irrigation as well as increasing efficiency and productivity of current water use to bring more prosperity to the rural areas. Priorities of Government of India were reflected in the Hon’ble President’s address to the joint Session of the Parliament of 16th where he indicated that “Each drop of water is precious. Government is committed to giving high priority to water security. It will complete the long pending irrigation projects on priority and launch the ‘Pradhan Mantri Krishi Sinchayee Yojana’ with the motto of ‘Har Khet Ko Pani’. There is a need for seriously considering all options including linking of rivers, where feasible; for ensuring optimal use of our water resources to prevent the recurrence of floods and drought. By harnessing rain water through ‘Jal Sanchay’ and ‘Jal Sinchan’, we will nurture water conservation and ground water recharge. Micro irrigation will be popularised to ensure ‘Per drop-More crop”.

PMKSY is an amalgamation of on-going schemes of Ministry of Water Resources, River Development and Ganga Rejuvenation, Ministry of Agriculture & Cooperation and Ministry of Rural Development. The existing schemes AIBP, CADWM, MI, SWMA, Watershed & Convergence with MGNREGA were brought together under the umbrella program of PMKSY. Further the scheme seeks convergence with scheme likeMahatma Gandhi National Rural Employment Guarantee Scheme (MGNRES), Rashtriya Krishi Vikas Yojana (RKVY), Jawaharlal Nehru National Solar Mission and Rural Electrification programmes (JLNNSM&REP), Rural Infrastructure Development Fund (RIDF), Members of Parliament Local Area Development Scheme (MPLAD), Members of Legislative Assembly Local Area Development Fund (MLALAD), Local Body Funds (LBF), Working Plan of State Forest Department (WPSFD) etc.

16

The PMKSY will be implemented in an area development mode only by adopting a decentralized state level planning and projectised execution structure that will allow the state to draw up their own irrigation development plans based on DIPs and SIPs with a horizon of 5-7 years. The program will be implemented as part of Rashtriya Krishi Vikas Yojana (RKVY) with state agriculture department acting as the State Nodal Agency. However, the implementing departments for the four components like AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Per drop more crop) and PMKSY (watershed development) will be decided by the respective program ministry/department.

The funds under this program would be provided to the states as per the pattern of assistance of Centrally Sponsored Schemes (CSS) decided by the Ministry of Finance and NITI Aayog. During 2015-16 the existing pattern of assistance of ongoing scheme was continued. An outlay of Rs. 50,000 crore has been approved for 2015-20. The financial assistance provided to the state governments from this centrally sponsored scheme is subject to fulfilment of certain conditions. Firstly, a state will become eligible to access PMKSY fund only if it has prepared the District Irrigation Plans (DIP) and State Irrigation Plan (SIP), excepting for the initial year, and the expenditure in water resource development for agriculture sector in the year under consideration is not less than the baseline expenditure, which is defined as the average of the expenditure in irrigation sector irrespective of the department in the state plan in three years prior to the year under consideration. Secondly, States will be given additional weightage for levying charges on water and electricity for irrigation purposes, so as to ensure sustainability of the programme. Thirdly, interstate allocation of PMKSY fund will be decided based on

 Share of percentage of unirrigated area in the state vis-à-vis national average including prominence of areas classified under Desert Development Programme (DDP) and Drought Prone Area Development Programme (DPAP)  Increase in percentage share of expenditure on water resource development for agriculture sector in State Plan expenditure in the previous year over three years prior to it and  Improvement in irrigation efficiency in the state. ii. Vision The overreaching vision of Pradhan Mantri Krishi Sinchayee Yojana (PMKSY) will be to ensure access to some means of protective irrigation to all agricultural farms in the country, to produce ‘per drop more crop’, thus bringing much desired rural prosperity.

17

iii. Objective The objectives of the PMKSY are to:

a) Achieve convergence of investments in irrigation at the field level (preparation of district level and, if required, sub district level water use plans). b) Enhance the physical access of water on the farm and expand cultivable area under assured irrigation (Har Khet Ko Pani) c) Integration of water source, distribution and its efficient use, to make best use of water through appropriate technologies and practices. d) Improve on-farm water use efficiency to reduce wastage and increase availability both in duration and extent, e) Enhance the adoption of precision-irrigation and other water saving technologies (More crop per drop). f) Enhance recharge of aquifers and introduce sustainable water conservation practices g) Ensure the integrated development of rainfed areas using the watershed approach towards soil and water conservation, regeneration of ground water, arresting runoff, providing livelihood options and other NRM activities. h) Promote extension activities relating to water harvesting, water management and crop alignment for farmers and grass root level field functionaries. i) Explore the feasibility of reusing treated municipal waste water for peri-urban agriculture, and j) Attract greater private investments in irrigation. iv. Strategy/approach To achieve these objectives PMKSY adopted strategies that include

a) Creation of new water sources; repair, restoration and renovation of defunct water sources; construction of water harvesting structures, secondary & micro storage, groundwater development, enhancing potentials of traditional water bodies at level like Jal Mandir (Gujarat); Khatri, Kuhl (H.P.); Zabo (Nagaland); Eri, Ooranis (T.N.); Dongs (Assam); Katas, Bandhas (Odisha and M.P.) etc. b) Developing/augmenting distribution network where irrigation sources (both assured and protective) are available or created; c) Promotion of scientific moisture conservation and run off control measures to improve ground water recharge so as to create opportunities for farmers to access recharged water through shallow tube/dug wells;

18

d) Promoting efficient water conveyance and field application devices within the farm viz, underground piping system, Drip & Sprinklers, pivots, rain-guns and other application devices etc.; e) Encouraging community irrigation through registered user groups/farmer producers’ organisations/NGOs; and f) Farmer oriented activities like capacity building, training and exposure visits, demonstrations, farm schools, skill development in efficient water and crop management practices (crop alignment) including large scale awareness on more crop per drop of water through mass media campaign, exhibitions, field days, and extension activities through short animation films etc. v. Programme Components

PMKSY has following four components: 1. Accelerated Irrigation Benefit Programme (AIBP):To focus on faster completion of ongoing Major and Medium Irrigation including National Projects

2. PMKSY (Har Khet Ko Pani): a) Creation of new water sources through Minor Irrigation (both surface and ground water) b) Repair, restoration and renovation of water bodies; strengthening carrying capacity of traditional water sources, construction rain water harvesting structures (Jal Sanchay) c) Command area development, strengthening and creation of distribution network from source to the farm d) Ground water development in the areas where it is abundant, so that sink is created to store runoff/ flood water during peak rainy season e) Improvement in water management and distribution system for water bodies to take advantage of the available source which is not tapped to its fullest capacity (deriving benefits from low hanging ). At least 10% of the command area to be covered under micro/precision irrigation f) Diversion of water from source of different location where it is plenty to nearby water scarce areas, lift irrigation from water bodies/rivers at lower elevation to supplement requirements beyond IWMP and MGNREGS irrespective of irrigation command g) Creating and rejuvenating traditional water storage systems like Khatri, Kuhl etc. at feasible locations.

3. PMKSY (Per Drop More Crop) a) Programme management, preparation of State/District Irrigation Plan, approval of annual action plan, Monitoring etc.

19

b) Promoting efficient water conveyance and precision water application devices like drips, sprinklers, pivots, rain-guns in the farm (Jal Sinchan) c) Topping up of input cost particularly under civil construction beyond permissible limit (40%), under MGNREGS for activities like lining inlet, outlet, silt traps, distribution system etc. d) Construction of micro irrigation structures to supplement source creation activities including tube wells and dug wells (in areas where ground water is available and not under semi critical/ critical/ over exploited category of development) which are not supported under AIBP, PMKSY (Har Khet Ko Pani), PMKSY (Watershed) and MGNREGS as per block/district irrigation plan. e) Secondary storage structures at tail end of canal system to store water when available in abundance (rainy season) or from perennial sources like streams for use during dry periods through effective on-farm water management; f) Water lifting devices like diesel/ electric/ solar pump-sets including water carriage pipes, underground piping system. g) Extension activities for promotion of scientific moisture conservation and agronomic measures including cropping alignment to maximise use of available water including rainfall and minimise irrigation requirement (Jal Sanrakshan); h) Capacity building, training and awareness campaign including low cost publications, use of pico projectors and low cost films for encouraging potential use water source through technological, agronomic and management practices including community irrigation. i) The extension workers will be empowered to disseminate relevant technologies under PMKSY only after requisite training is provided to them especially in the area of promotion of scientific moisture conservation and agronomic measures, improved/ innovative distribution system like pipe and box outlet system, etc. Appropriate Domain Experts will act as Master Trainers. j) Information Communication Technology (ICT) interventions through NeGP-A to be made use in the field of water use efficiency, precision irrigation technologies, on farm water management, crop alignment etc. and also to do intensive monitoring of the Scheme.

4. PMKSY (Watershed Development) a) Effective management of runoff water and improved soil & moisture conservation activities such as ridge area treatment, drainage line treatment, rain water harvesting, in-situ moisture conservation and other allied activities on watershed basis.

20

b) Converging with MGNREGS for creation of water source to full potential in identified backward rainfed blocks including renovation of traditional water bodies v. Rationale/ Justification In reference to the status and need of irrigation, the water resource management including irrigation related priorities was identified for Jind district by the peoples’ representatives of district with support from administration and technical experts. For instance the reports of Comprehensive District Agriculture Plan (C-DAP) prepared as part of Rashtriya Krishi Vikas Yojana (RKVY), Potential Linked Credit Plans (PLP) of NABARD and the Integrated District Development Plan etc. identified number of irrigation related issues for Jind district including (i) promoting water use efficiency through sprinkler and drip irrigation; (iii) promoting protected poly-house cultivation to minimize risk factors and enhance quality and productivity; (iv) Improvement of on-farm water delivery and efficiency of existing irrigation systems; (v) promotion of soil conservation of arable & non-arable land through engineering measures; (vi) creation of new water harvesting structures, check dams, ponds, tanks, etc. (vii) increase the forest cover in the district and (viii) land improvement measures. vi. Methodology During the course of preparation of District Irrigation Plan (DIP) the team visited Jind district to collect data and have interaction with all the stakeholders. Methodology adopted to prepare DIP is outlined in brief as under:  Collection of primary and secondary data from multiple sources including Season and Crop Reports, Statistical Handbook, District Census Handbook and other published documents and websites of different departments  Meetings with state government departments and related institutions were held  GIS maps of the area’s/clusters were studied to understand the land morphology, topography of the district.  Discussions were held with officers of agriculture department, horticulture department, assistant soil conservation officer (ASCO), animal husbandry department, Haryana Agriculture University, irrigation department, command area and development authority (CADA), revenue department, rural development department, forest department, public health & engineering department, industrial department, power department, Krishi Vigyan Kendra (KVK) and Haryana Space Application Centre (HARSAC). Discussion with District Development Manager of NABARD for Jind district was also held during the visit.

On the basis of analysis of data,the projections of various components of PMKSY and Department wise plan for six years from 2016-17 to 2021-22 are given in Chapter 5.

21

Chapter –I

1 General Information of the District 1.1 District Profile Jind district lies in the North of Haryana between 29.03’ and 29.51’ North latitude & 75.53’ and 76.47’ East longitude. It has an average elevation of 227 metres (744 feet).The district is surrounded by of and on the North, on the West, on the South and Sonepat on the East. It has an area of 2702 sq K.M. Jind district occupies 7th position in population size during 2011.According to Census 2011, Jind had population of 13,34,152 of which male and female were 7,13,006 and 6,21,146 respectively. In 2001 census, Jind had a population of 11,89,827 of which males were 6,42,282 and remaining 5,47,545 were females. Table 1-1 District Profile

Name of the District District Code Latitude Longitude

Jind 77 29.03 ˚N 75.53 ˚E to 29.51 ˚N to 76.47 ˚E Source: District Website

Map 1-1Location Map of Jind District

22

Administrative Structure Jind district consists of three Sub-Divisions namely Jind, Narwana & Safidon and seven blocks namely Jind, Narwana, Safidon, Pillukhera, Uchana, Alewa & Julana.

Table 1-2 Administrative Structure District Sub Division Sub Tehsil Blocks Jind Jind Jind Alewa Jind Julana Alewa Julana

Narwana Narwana Uchana Narwana Uchana

Safidon Safidon Pillukhera Safidon Pillukhera Source: District Website

Administrative Setup Administratively, the Deputy Commissioner is the overall incharge of the general administration in the district and performs the duties of the District Magistrate and the District Collector. Below the Deputy Commissioner is the Additional Deputy Commissioner who assists the Deputy Commissioner in the work relating to general administration, rural development, etc. The Deputy Commissioner along with ADC, Chief Executive Officer of Zila Parishad, Superintendent of Police and other senior officers of the district looks after the development and regulatory functions in the district.

The Zila Parishad, elects its President and Vice-President from amongst the elected members. The term of office of members is five years. An officer in the senior scale of I.A.S. is deputed by the State government as the Chief Executive Officer to the Zila Parishad. The Parishad is also assisted by various departments of the district. At the community Development Block level, each Panchayat Samiti has an elected Chairman and Vice Chairman. The Block Development and Panchayat Officer works as Executive Officer of the Panchayat Samiti. The statutory urban local bodies are municipal councils, municipal committees, etc. Process of governance at the lowest level is Gram Panchayat which makes adequate arrangements for development in various fields in rural areas.

1.2 Demography As per Census of India 2011, Jind district had population of 13,34,152 of which male and female were 7,13,006 and 6,21,146 respectively. The decadal growth in population of the district has been 12.13%, in comparison to 2001 census. As per Census of India 2011, the

23

population density of Jind district was 494 people per sq. km. As per Census of India 2011, the literacy rate in the district was 71.4 per cent whereas it was 62.1 per cent during 2001 Census. In Jind district, Jind block has the highest population (358737) whereas Alewa block has the lowest (89541).

Table 1-3 Gender Wise Classification of Population S. No. Block Name Male Female Children* Total 1 Jind 191515 167222 44207 358737 2 Julana 79412 68512 18813 147924 3 Alewa 48227 41314 11734 89541 4 Uchana 105362 91656 24676 197018 5 Narwana 152630 134673 35299 287303 6 Pillukhera 49284 42059 12000 91343 7 Safidon 86576 75710 21825 162286 Total 713006 621146 168554 1334152 Source: Census of India, 2011* < 6 years of age

Figure 1-1 Block wise population distribution

24

Figure 1-2 Gender wise population distribution

Table 1-4 Category wise population S. No. Block Name SC General& OBC Total 1 Jind 70197 288540 358737 2 Julana 32603 115321 147924 3 Alewa 18859 70682 89541 4 Uchana 43994 153024 197018 5 Narwana 65336 221967 287303 6 Pillukhera 18334 73009 91343 7 Safidon 32528 129758 162286 Total 281851 1052301 1334152 Source: Census of India, 2011

It can be observed that the majority of population in the district belong to general category. The proportion of ST population is zero. The proportion of SC population in the district is marginal (21.125%) and is nearly uniform (around 20%) in all the blocks.

25

Figure 1-3 Category wise population

Table 1-5 Locality wise population S. Name of Rural Urban No. Block Male Female Total Male Female Total 1 Jind 102262 88883 191145 89253 78339 167592 2 Julana 69504 59665 129169 9908 8847 18755 3 Alewa 48227 41314 89541 0 0 0 4 Uchana 96495 83708 180203 8867 7948 16815 5 Narwana 119606 105607 225213 33024 29066 62090 6 Pillukhera 46318 39422 85740 2966 2637 5603 7 Safidon 68107 59451 127558 18469 16259 34728 Total 550519 478050 1028569 162487 143096 305583 Source: Census of India, 2011

26

Figure 1-4 Locality wise population distribution

It can be observed that the district is predominantly rural, with their proportion being 77.1% of the total population. The total population living in rural areas is 10,28,569 of which males and females are 550,519 and 478,050 respectively. Alewa block has 100% rural population, while Jind block has highest urban population of 1,67,592 in the district. The general Sex Ratio of the district which was 852 in 2001 has increased to 871 in 2011.

Table 1-6 District Population Abstract Description Rural Urban

Population (%) 77.10 % 22.90 % Total Population 1,028,569 305,583 Male Population 550,519 162,487 Female Population 478,050 143,096 Child Population (0-6) 131,390 37,164 Sex Ratio 868 881 Child Sex Ratio (0-6) 839 833 Average Literacy 68.85 % 80.11 % Male Literacy 78.89 % 87.25 % Female Literacy 57.34 % 72.07 %

Source: Census of India 2011 1.3 Biomass and Livestock The livestock population in the district, as per Livestock census 2012, is 81,34,781 of which 75,08,907 are small animals, and6,25,874are large animals. As compared to Livestock Census 2007, the district recorded increase of 75.88% in the population of

27

poultry, and increase of 5.19% in the population of Goats in the year 2012. However, the population of pigs decreased by 32% and the population of sheep decreased by 36.35% in the year 2012, as compared to the year 2007. Therefore, the annual growth in the population of small animals of the district can be considered as 15.17% (in case of poultry), 1.038% (in case of goats), -6.4% (in case of pigs) and -7.27% (in case of sheep), for the period from year 2007 to 2012.

Table 1-7 Population of Small Animals Name of Block Small Animals (Nos) Poultry Pigs Goats Sheep Total Jind 2004784 2060 2154 4700 2013698 Alewa 466371 958 948 2773 471050 Julana 449774 437 1091 3650 454952 Narwana 836170 2991 2892 6833 848886 Uchana 838357 2126 1777 6174 848434 Safidon 1733223 1176 956 2412 1737767 PilluKhera 1130994 814 622 1690 1134120 Total 7459673 10562 10440 28232 7508907 Source: Livestock Census 2012

It can be observed that population of poultry is highest in the category of small animals, followed by Sheep, Pig and Goats. Further, the population of small animals is highest in Jind Taluka and lowest in Julana Taluka.

Figure 1-5Block wise Population of Small Animals

28

Table 1-8 Population of Large Animals Name of Large Animals District Cattle Buffalo Draft Animals Total (Nos.) (Nos.) Horses & Ponies Mules &Donkeys Camels (Nos) (Nos) (Nos) (Nos) Jind 1,18,986 5,03,955 2,065 766 102 625874 Source: Livestock Census 2012

It can be observed that population of Buffalo is highest in the category of large animals, followed by Cattle, followed by draft animals including Horses & Ponies, Mules & Donkeys and Camels.

Figure 1-6 Population of large animals

As compared to Livestock Census 2007, the district recorded increase of 0.4% in the population of buffalo in the year 2012; while decrease of 1.60% in the population of cattle, decrease of 13.2% in the population of horses & ponies, decrease of 8.59% in the population of mules &donkeys, and decrease of 70.26% in the population of camels. Therefore, the annual growth in the population of large animals of the district can be considered as 0.08% (in case of buffalo), -0.32% (in case of cattle), -2.64% (in case of horses & ponies),-1.718% (in case of mules &donkeys) and -14.05% (in case of camels) for the period from year 2007 to 2012.

29

1.4 Agro-Ecology, Climate, Hydrology and Topography

The district falls under the Agro Ecological Sub Region of Northern Plain &Central Highlands, and Agro-Climatic Region of Trans Gangetic Plain (VI). 5The land is totally plain with slope from North East to South and South Western direction. The climate of the district can be classified as tropical and semi-arid, with very hot summer and cold winter.

The climate is extremely hot and dry in summer and the temperature touches 45 degree Celsius in the month of May and June. It is hot and humid in the rainy season (i.e. July, August and early September) while it is extremely cold in the months of November to February and the temperature goes down to as low as 4degree Celsius6. The hot weather season starts from mid-March to last week of the June followed by the south west monsoon which lasts upto September. The transition period from September to October forms the post- monsoon season. The winter season starts late in November and remains upto first week of March. The normal annual rainfall of the district is 515 mm, and normal monsoon Rainfall is 433 mm.

Table 1-9 Agro-Ecology Data Agro Type Normal No. of Potential Evapo Transpiration (PET) Ecological of Annual Rainy Summer Winter Rainy Cumulative Total Zone Terrain Rainfall (mm) Days Type Sub Plain 515 72 1400 400 800 2600 Tropic

Source: Agriculture Department

1.5 Soil Type The land of district Jind is plain and fertile. Soils are medium to heavy in texture and pH varies from 7.5 to 9.1.The soils of the Jind district are sandy loam to loam in texture. The soil health of the district is of medium fertility. As per the soil health indices 92% soil is low and 8% is medium in per cent organic carbon. Similar trend is for available phosphorus (54% low and 45% medium in available phosphorous). The potassium status of soil is better than organic carbon and phosphorus. Almost all the soils are deficient in nitrogen, phosphorous and potash. Salinity and alkalinity are the serious problems particularly in the irrigated area. Besides, soil erosion due to winds is also a major problem.

5 District Agriculture Contingency Plan, Jind 2011 6 Comprehensive District Agricultural Plan, Jind 2012

30

Table 1-10 Soil Classification Sub District Soil Type Area Ha Land Slope 0-3% (ha) 3-8% Ha) 8-25% (ha) <25% (ha) Jind Coarse Loamy 96150 95150 1000 0 0 Saffido Fine Loamy 47246 47246 0 0 0 Narwana Coarse Loamy 103511 103511 0 0 0 Total 246907 245907 1000 0 0 Source: ASCO, Jind

According to physical characteristics, these soils may be divided into Sandy, Kallar and Sierozem soil. Sandy soils are found in parts of all the blocks of the district. Bajra, Jowar and gram crops are generally grown in these soils. Kallar soils are found in Safidon block of district. This type of soil is formed due to alkaline reaction. Sierozem soils are light yellowish brown to pale brown in colour. Soils are calcareous and normally have a kankar layer at a depth of 0.75m to 1.25m. Soil depth in all the blocks of district is more than 20 cm.

Map 1-2 Soil Map of district

31

Map 1-3 Slope Map of district 1.6 Land Use Pattern As per the information provided by the Agriculture Department, total geographical area of the district is 2,74,024 ha. Net area under cultivation of different crops is 2,38,826 ha. The share of net area sown to total geographical area is 87.15 per cent. The cropping intensity of the district is 198%.

Table 1-11 Land Use Pattern Name of No. of Total Area under Agriculture Area Area under Area under Block G.A under Wasteland Other use (ha) Forest (ha) (ha) (ha) Gross Net Cropping cropped Sown Intensity area area Jind 67 47621 78533 39584 198 900 Nil 29029 Alewa 22 23447 42336 21290 199 Julana 39 34987 59786 30470 196 Narwana 61 64596 113621 57051 199 Uchana 47 50395 88730 44688 199 Safidon 44 30269 51570 26176 197 P. Khera 27 22709 38875 19567 199 Total 307 274024 473451 238826 198 900 Nil 29029 Source: Agriculture Department, Jind

32

The district covers total of 307 villages in seven blocks. The share of geographical area of each block in the district is depicted in the following figure.

Figure 1-7 Percent Area of Blocks

33

Map 1-4 Land Use Land Cover Map 2015

34

Chapter –II

2 District Water Profile

Agriculture and animal husbandry are the bases of all economic activities of the district. Agriculture is not merely an occupation of the people but it is a tradition, a way of life which has shaped their thought, outlook and culture. Agricultural activities have undergone a remarkable change during the period of green revolution. This became possible because of the well spread network of irrigation facilities in the form of canal and minors.

2.1 Area Wise, Crop Wise Irrigation Status

Out of gross cropped area of 4,73,451 ha (exclusive of horticulture crops) in the district, 4,58,364 ha (or 96.81%) is irrigated while 15,087 ha (3.19%) is rainfed. The cropped area is irrigated by either surface water sources or ground water sources or both. The cropped area irrigated by surface water sources is about 2,17,922 hectares (46%) and by ground water sources is about3,13,102 hectares (66.13%). There are only two cropping seasons namely Kharif and Rabi in the district. Kharif crops have a share of 2,35,422 ha (or 49.72%), and Rabi crops have a share of 2,38,029 ha (or 50.28%).Paddy, Cotton and Sugarcane are the Major crops cultivated in kharif season with an area share of 48.79 per cent, 26.77 per cent and 12.10 per cent respectively. In rabi season, 91 per cent area, i.e. 2,16,610 ha was covered under wheat. Other major crops cultivated during Rabi season include Sugarcane and Sarson.

Table 2-1 Area wise Irrigation Status of Agriculture Crops (2015-16) - District Summary Crop Type Kharif (in ha) Rabi (in ha) Summer Total (in ha) Irr RF Tot Irr RF Tot Tot Irr RF Tot Wheat and 114854 0 114854 216610 0 216610 0 331464 0 331464 Paddy Bajra, 16237 12038 28275 566 87 653 0 16803 12125 28928 Maize Moong 624 80 704 116 0 116 0 740 80 820 Arhar Sarson 57 12 69 2324 2088 4412 0 2381 2100 4481 Cotton 63017 2 63019 0 0 0 0 63017 2 63019 S.cane, 27881 620 28501 16078 160 16238 0 43959 780 44739 Fodder, Etc Grand 222670 12752 235422 235694 2335 238029 0 458364 15087 473451 Total Source: Agriculture Department, Jind

35

Figure 2-1Gross Irrigated and Rainfed area under Agriculture Crops

Out of total gross cropped area under Agriculture, Narwana block has a share of 24.03 per cent, followed by Uchana block (18.78%) and Jind block (16.40%). Julana block has the largest rainfed area of the district, i.e. 4186 ha, whereas Safidon block is totally irrigated. Block wise area under various crops in irrigated and rainfed situation is highlighted in following table.

Table 2-2 Area wise Irrigation Status of Agriculture Crops (205-16) - Block wise Summary 1. Block: Jind Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 20157 0 20157 35460 0 35460 0 0 0 55617 0 55617 and Paddy Bajra, 3537 2247 5784 76 3 79 0 0 0 3613 2250 5863 Maize Moong 12 1 13 19 0 19 0 0 0 31 1 32 Arhar Sarson 8 4 12 770 458 1228 0 0 0 778 462 1240 Cotton 7297 0 7297 0 0 0 0 0 0 7297 0 7297 S.cane, 5060 247 5307 2304 30 2334 0 0 0 7364 277 7641 Fodder, Etc Total 36071 2499 38570 38629 491 39120 0 0 0 74700 2990 77690 2. Block: Julana Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 9666 0 9666 27350 0 27350 0 0 0 37016 0 37016 and

36

Paddy Bajra, 3447 2989 6436 77 4 81 0 0 0 3524 2993 6517 Maize Moong 563 60 623 48 0 48 0 0 0 611 60 671 Arhar Sarson 6 1 7 574 1100 1674 0 0 0 580 1101 1681 Cotton 8054 2 8056 0 0 0 0 0 0 8054 2 8056 S.cane, 4063 16 4079 1264 14 1278 0 0 0 5327 30 5357 Fodder, Etc Total 25799 3068 28867 29313 1118 30431 0 0 0 55112 4186 59298 3. Block: Alewa Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 12897 0 12897 19761 0 19761 0 0 0 32658 0 32658 and Paddy Bajra, 699 497 1196 49 18 67 0 0 0 748 515 1263 Maize Moong 9 4 13 14 0 14 0 0 0 23 4 27 Arhar Sarson 9 3 12 80 17 97 0 0 0 89 20 109 Cotton 5228 0 5228 0 0 0 0 0 0 5228 0 5228 S.cane, 1785 115 1900 1324 27 1351 0 0 0 3109 142 3251 Fodder, Etc Total 20627 619 21246 21228 62 21290 0 0 0 41855 681 42536 4. Block: Safidon Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 21649 0 21649 24056 0 24056 0 0 0 45705 0 45705 and Paddy Bajra, 1635 0 1635 0 0 0 0 0 0 1635 0 1635 Maize Moong 31 0 31 20 0 20 0 0 0 51 0 51 Arhar Sarson 24 0 24 130 0 130 0 0 0 154 0 154 Cotton 133 0 133 0 0 0 0 0 0 133 0 133 S.cane, 2709 0 2709 1748 0 1748 0 0 0 4457 0 4457 Fodder, Etc Total 26181 0 26181 25954 0 25954 0 0 0 52135 0 52135 5. Block: Pilukhera Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 15329 0 15329 18448 0 18448 0 0 0 33777 0 33777

37

and Paddy Bajra, 712 8 720 6 0 6 0 0 0 718 8 726 Maize Moong 0 0 0 0 0 0 0 0 0 0 0 0 Arhar Sarson 1 0 1 107 0 107 0 0 0 108 0 108 Cotton 277 0 277 0 0 0 0 0 0 277 0 277 S.cane, 3204 36 3240 918 29 947 0 0 0 4122 65 4187 Fodder, Etc Total 19523 44 19567 19479 29 19508 0 0 0 39002 73 39075 6. Block: Uchana Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 7712 0 7712 39836 0 39836 0 0 0 47548 0 47548 and Paddy Bajra, 2503 2804 5307 176 29 205 0 0 0 2679 2833 5512 Maize Moong 5 13 18 9 0 9 0 0 0 14 13 27 Arhar Sarson 5 4 9 431 317 748 0 0 0 436 321 757 Cotton 25900 0 25900 0 0 0 0 0 0 25900 0 25900 S.cane, 5147 149 5296 3843 47 3890 0 0 0 8990 196 9186 Fodder, Etc Total 41272 2970 44242 44295 393 44688 0 0 0 85567 3363 88930

7. Block: Narwana Crop Kharif Rabi Summer Total Type Irr RF Tot Irr RF Tot Irr RF Tot Irr RF Tot Wheat 27444 0 27444 51699 0 51699 0 0 0 79143 0 79143 and Paddy Bajra, 3704 3493 7197 182 33 215 0 0 0 3886 3526 7412 Maize Moong 4 2 6 6 0 6 0 0 0 10 2 12 Arhar Sarson 4 0 4 232 196 428 0 0 0 236 196 432 Cotton 16128 0 16128 0 0 0 0 0 0 16128 0 16128 S.cane, 5913 57 5970 4677 13 4690 0 0 0 10590 70 10660 Fodder, Etc Total 53197 3552 56749 56796 242 57038 0 0 0 109993 3794 113787 Source: Agriculture Department, Jind

38

Figure 2-2 Block wise area under agriculture crops

The district was having a total area of 12,785 ha under horticulture crops during 2015- 16.The entire area under cultivation of horticulture crops is irrigated. Out of the total area under horticulture crops, area of 5520 ha (43.17%) is cultivated in Kharif season, and area of 7265 ha (56.83%) is cultivated in Rabi season.

Table 2-3 Area under Horticulture Crops (2015-16)- District Summary Crop Type Kharif (Area in ha) Rabi (Area in ha) Total Irr RF Tot Irr RF Tot Irr RF Tot Radish 454 0 454 195 0 195 649 0 649 Onion 269 0 269 626 0 626 895 0 895 Cauliflower 797 0 797 200 0 200 997 0 997 Others 4000 0 4000 6244 0 6244 10244 0 10244 Total 5520 0 5520 7265 0 7265 12785 0 12785 Source: Horticulture Department, Jind

2.2 Production and Productivity of Major Crops

It can be observed that under irrigated conditions wheat has highest production (79,90,000 quintals/yr), and Sugarcane & Fodder has highest average yield (67,750 Kg/ha) in Jind district. In terms of cost of cultivation, sugarcane is most expensive (Rs 1,62,000/ha) and Sarson is the cheapest (Rs 27,500/ha) in Jind district. The details of the area, production, yield and cost of cultivation of major agriculture crops under irrigated conditions are provided in the following Table.

39

Table 2-4 Production Data of Major Agricultural Crops under Irrigated Conditions (2015-16)

Crops Area (ha ) Production Yield (Kgs/ha) Cost of Cultivation (qtn/yr) (Rs./ha) Kharif Season Paddy 114854 3300000 2873 73000 Bajra and maize 16237 220000 1355 31250 Cotton 63017 363800 577 70000 S.Cane & Fodder 4000 2710000 67750 162000 Rabi Season Wheat 216610 7990000 3688 52500 Bajra and maize 566 23860 4215 28000 Sarson 2324 33690 1450 27500 Source: Agriculture Department, Jind

It can be observed that in the category of horticulture crops, Cauliflower has highest production (26,179 quintals/yr), and Citrus has highest average yield (4123 Kg/ha) in Jind district. The details of the area, production and yield of major horticulture crops are provided in the following Table.

Table 2-5 Production Data of Major Horticulture Crops (2015-16)

Horticulture Crops Area (in Ha) Production(Qtn/Yr) Yield (Kg/Ha) Radish 649 12861 1982 Onion 895 15747 1759 Cauliflower 997 26179 2626 Fruits Guava 447 10007 2239 Citrus 204.65 8438 4123 Ber 267.4 2975 1113 Source: Horticulture Department, Jind

2.3 Irrigation Based Classification Total gross cultivated area of the district (agriculture + horticulture) is 4,71,149 Ha, out of which the gross irrigated area is 4,71,149 Ha and gross unirrigated area is 15,087 Ha.

Table 2-6 Irrigation Based Classification –Year 2015-16 Crop Type Area under cultivation (Ha) Gross Irrigated Total Rain fed Total Agriculture Crops 458364 15087 473451 Horticulture Crops 12785 0 12785 Total 471149 15087 486236 Source: Agriculture & Horticulture Department, Jind

40

Chapter –III

3 Water Availability

The district Jind constitutes a part of the Punjab -Haryana plain which is largely flat, featureless and monotonous alluvial upland plain and is formed of Pleistocene and sub recent alluvial deposits of the Indo-Gangetic system. It is dotted only sporadically with sand dunes and depression, yielding a local relief of not more than 6m. The district does not offer much physiographic diversity.

Most of the rainfall (app. 80%) occurs from the middle of June to September. Flash floods are mainly caused by heavy rains during this period. During winters, some cyclonic rainfall occurs mainly from January to March. There is no perennial river in the district. Only a small river Chautangnadi enters the district near the village Mundh and debouches near village Bosini into district after covering about a distance of ten kilometers in Jind district.

Map 3-1 Drainage Map of Jind District

41

Sources of Irrigation:

The sources of irrigation in Jind include: Tube Well (Shallow &Deep) and Irrigation Canals.The area of Jind district is irrigated by two canal systems, viz. the and the Bhakra Canal7. These two systems are interlinked by the Narwana and Barwala link canals of the Bhakra Canal system. Earlier due to the seasonal fall in the river Yamuna, the source of Western Yamuna (Jumna) Canal, there was a fall in its discharge at the canal headworks whichresulted in rotational closures for its various branches. With the augmentation of water supply from Bhakra Canal through the Narwana and Barwala Link Canals and Augmentation Canal the supply in the Western Yamuna Canal had been fully replenished and its various branches running in the district have now regular supplies.

Western Yamuna Canal

The canal takes off from the Yamuna at Tajewala headworks ( district) where a very strong masonry dam is built across the river. The branch bifurcates from the main Western Yamuna (Jumna) Canal at lndri (). About 49.0 kilometres further down, the Branch takes off from main branch of the Western Yamuna (Jumna) Canal at Munak. The Sirsa Branch and the Hansi Branch with its Sunder sub- branch and their various distributaries irrigate the district.

(A) Sirsa Branch

The Sirsa Branch takes off from the Western Yamuna (Jumna) Canal at Indri (Kamal district). This canal irrigates area in the northern part of the Jind district. It was not a perennial canal because with the recession of flow in the Yamuna, all the distributaries of the Western Yamuna (Jumna) Canal could not be simultaneously fed. Hence the different distributaries were rotational.

In 1954, the Narwana Branch of the Bhakra Canal was excavated with its outfall into the Sirsa Branch near Budhera, a village ten kilometres south-west of Thanesar and in 1972, another feeder channel, namely, Barwala Link Canal was constructed to pour water from Bhakra Main Line Canal into Sirsa Branch. The Sirsa Branch system was reoriented with its shifting from Western Yamuna (Jumna) Canal to Bhakra Canal. The distributaries which take off from Sirsa Branch and provide irrigation in the Jind district are Habri sub- branch with its Jakhauli and Rajaund distributaries, Sudkian distributary, Dhanauri

7 Central Ground Water Board Report, 2011

42

distributary, Dhamtan distributary, Barwala Branch with its Surbra distributary and Pabra distributary.

(B) Hansi Branch The Hansi Branch takes off from western Yamuna Canal at Munak and enters the District near Anta Village in Safidon Tehsil. With augmentation of water supply from Bhakra Canal and Augmentation Canal, the Hansi Branch was made perennial. The distributaries which take off from Hansi Branch and provide irrigation in the Jind district are Jind distributaries No. 1-8, Muana distributary and Butana Branch and Sunder sub-branch. The Butana Branch takes off at R.D. 58,310 of Hansi Branch and Sunder sub-branch from Butana Branch at RD. 1, 74,920. A number of direct outlets and minors irrigate southern part of district.

Narwana Branch Link Canal

The Sarusti distributary and distributary of Narwana Branch Link Canal irrigate some areas of the Jind district in its tail reaches. The Sarusti distributary takes off from Bibipurlake and irrigates the district through Khanauri and Haripur minors. The Nardak distributary takes off from Narwana Branch Link Canal at R.D. 54,249 and irrigates some areas through Uplana, Salwan, Padana, Rodh, Moana, Kaul and Tail minors.

43

Map 3-2 Sub-Basin & Watershed Map 3.1 Status of Water Availability

Table 3-1Status of Water Availability of Jind District Source Volume of water (in MCM) Kharif Rabi Total Surface Irrigation Canals 181.96 185.8 367.76 Treated Effluent STP 2.1 2.1 4.2 Un treated Effluent 4.09 4.09 8.18 Sub-Total 188.15 191.99 380.14 Ground Water Deep Tube well 0.28 0.371 0.651 Shallow Tube well 667.4 624.28 1291.68 Sub-Total 667.68 624.651 1292.331 TOTAL 855.83 816.641 1672.471 Source: District Irrigation Department& Ground Water Department Year 2015-16

It can be observed that the major sources of water availability are shallow tube wells and major & medium irrigation canals. Other sources of water availability include deep tube wells and untreated effluents from STP. The total annual water availability of the district

44

is 1672.471 MCM, out of which share of surface water is 380.14 MCM (22.72%)and ground water 1292.331 MCM (77.28%).

Figure 3-1 Status of Water Availability

Details of sewage treatment plants in Jind district are given in the following table. Presently, there are 8 sewage treatment plants operational in the district. The treated effluent from these plants is utilized for irrigation purpose.

Table 3-2 Details of STP

Name of Block No of STP Capacity Existing Plants Jind 2 15 MLD, 5 MLD Julana 1 4 MLD Narwana 3 3.5 MLD, 3.75 MLD, 2 MLD Uchana 2 2 MLD, 1.5 MLD Under Construction Safidon 1 9 MLD Under Planning Jind 1 5 MLD

Details of block wise water availability are given in the following table. It can be observed that water availability is highest in Narwana block, followed by Jind block, and followed by Safidon block.

45

Table 3-3 Block wise water availability Source Volume of water (in MCM) Kharif Rabi Total Block: Jind I. Surface Irrigation I. Canals 12.7 13.38 26.08 ii Treated Effluent STP 0.56 0.56 1.12 iii Un treated Effluent 1.14 1.14 2.28 Sub-Total 14.4 15.08 29.48 II Ground Water i. Deep Tube well 0.01 0.061 0.071 ii. Shallow Tube well 112.37 113.42 225.79 Sub-Total 112.38 113.481 225.861 TOTAL 126.78 128.561 255.341 Block: Alewa Source Kharif Rabi Total I. Surface Irrigation I. Canals 13.73 13.63 27.36 ii Treated Effluent STP 0.62 0.62 1.24 iii Un treated Effluent 1.35 1.35 2.7 Sub-Total 15.7 15.6 31.3 II Ground Water i. Deep Tube well 0.03 0.04 0.07 ii. Shallow Tube well 94.35 94.28 188.63 Sub-Total 94.38 94.32 188.7 TOTAL 110.08 109.92 220 Block: Julana Source Kharif Rabi Total I. Surface Irrigation I. Canals 18.98 19.48 38.46 ii Treated Effluent STP 0.6 0.6 1.2 iii Un treated Effluent 1.2 1.2 2.4 Sub-Total 20.78 21.28 42.06 II Ground Water i. Deep Tube well 0.01 0.01 0.02 ii. Shallow Tube well 50.33 65.34 115.67 Sub-Total 50.34 65.35 115.69 TOTAL 71.12 86.63 157.75 Block: Narwana Source Kharif Rabi Total I. Surface Irrigation I. Canals 53 54 107

46

ii Treated Effluent STP 0 0 0 iii Un treated Effluent 0 0 0 Sub-Total 53 54 107 II Ground Water i. Deep Tube well 0 0 0 ii. Shallow Tube well 200 121.32 321.32 Sub-Total 200 121.32 321.32 TOTAL 253 175.32 428.32 Block: Uchana Source Kharif Rabi Total I. Surface Irrigation I. Canals 27.56 27.73 55.29 ii Treated Effluent STP 0.32 0.32 0.64 iii Un treated Effluent 0.4 0.4 0.8 Sub-Total 27.56 27.73 55.29 II Ground Water i. Deep Tube well 0.23 0.26 0 ii. Shallow Tube well 80.35 86.2 166.55 Sub-Total 80.35 86.2 166.55 TOTAL 107.91 113.93 221.84 Block: Safidon Source Kharif Rabi Total I. Surface Irrigation I. Canals 23.96 23.88 47.84 ii Treated Effluent STP 0 0 0 iii Un treated Effluent 0 0 0 Sub-Total 23.96 23.88 47.84 II Ground Water i. Deep Tube well 0 0 0 ii. Shallow Tube well 85 94.41 179.41 Sub-Total 85 94.41 179.41 TOTAL 108.96 118.29 227.25 Block: Pillukhera Source Kharif Rabi Total I. Surface Irrigation I. Canals 32.03 33.7 65.73 ii Treated Effluent STP 0 0 0 iii Un treated Effluent 0 0 0 Sub-Total 32.03 33.7 65.73 II Ground Water i. Deep Tube well 0 0 0 ii. Shallow Tube well 45 49.31 94.31

47

Sub-Total 45 49.31 94.31 TOTAL 77.03 83.01 160.04 Source: District Irrigation Department& Ground Water Department Year 2015-16

3.2 Status of Ground Water Availability

Ground water is the main source of drinking in the district covering 307 nos. of villages. The use of ground water for irrigation purpose in non-command area is maximum. The ground water development in the district is mainly for domestic and irrigation purposes.As per Central Ground Water Board report 2013, the status of ground water is Over-exploited in 3 blocks namely Alewa, Narwana and Safidon; Critical in 1 block namely Jind; and Semi critical in 3 blocks namely Julana, Uchana and PilluKhera. None of the blocks of district falls under safe category. Block wise status of ground water and total draft and recharge details are given in following table.

Table 3-4Status of Ground Water Availability S No. Block Status of block as per CGWB notification Ground water (MCM) 2013 Over- Critical Semi-Critical Safe Draft Recharge Gap exploited 1 Jind Yes 155.44 187.35 -31.91 2 Alewa Yes 70.17 62.88 7.29 3 Julana Yes 71.17 82.97 -11.8 4 Narwana Yes 174.28 145.07 29.21 5 Uchana Yes 84.28 101.79 -17.51 6 Safidon Yes 139.57 138.54 1.03 7 P.Khera Yes 78.72 98.54 -19.82 Source: Central Ground Water Board Report, 2013

Hydrogeology The district is occupied by geological formations of Quaternary age comprising of recent alluvial deposits belonging to the vast Indus alluvial plains. The ground water occurs in a thick zone of saturation in the alluvium both under confined and unconfined conditions. The shallow aquifers, which are unconfined in nature are being tapped chiefly by open dug well and shallow tube well. The deeper aquifers, which are underlain by extensive confining clays, occur under confined conditions. A buried river channel of Ghaggar has been located in the eastern part of the area.

In Safidon -Jind tract tube wells have been constructed within a depth of 80 to 100 m bgl encountering fresh water zones with 25m to 35m of granular material comprising coarse sand, gravel and pebble.The ground water extraction in the district is being done by Tube

48

well and bore wells. The bore wells drilled in the area are 60 to 150 m deep with diameter of 100 to 150 mm.

3.3 Status of Command Area The command area in the district can be categorized as Canal command and other services command, which encompasses command created by ponds, tanks and tube wells.

Table 3-5 Status of Canal Command S. No. Name of the Information of Canal Command (Ha) Block Total Area Developed Area Undeveloped Area 1 Jind 134382 22219 112163 2 PilluKhera 45597 9460 36137 3 Julana 81681 8914 72767 4 Safidon 24008 7079 16929 5 Alewa 23622 6822 16800 6 Narwana 67324 32972 34352 7 Uchana 51639 17038 34601 Total 428253 104504 323749 Source: CADA Jind, Hisar& Kaithal, Irrigation department Jind division, Narwana division & Safidon W/S Division, W/S division Kaithal, Year 2015-16

It can be observed that Jind block has highest canal command in the district followed by Julana block and Narwana block. Total developed canal command of the district is 1,04,504 Ha, undeveloped canal command is 3,23,749 Ha. The developed canal command is highest in Narwana block, followed by Jind block and followed by Uchana block.

Table 3-6 Status of other services command Block Information on the other services Command Total Area (ha) Developed Area (ha) Un-developed Area (ha) Jind 44044 17618 26426 Alewa 23532 9413 14119 Julana 38341 15336 23005 Narwana 65140 26056 39084 Uchana 50922 20369 30553 Safidon 29035 11614 17421 PilluKhera 22586 9034 13552 Total 273600 109440 164160 Source: Ground Water Department, Jind

49

Narwana block has the highest other services command in the district followed by Uchana block and Jind block. Total other services command of the district is 2,73,600 Ha, out of which 1,09,440 Ha is developed and 1,64,160 Ha is undeveloped.

3.4 Existing type of Irrigation

Table 3-7 Existing Type of Irrigation Block Surface irrigation (1) Ground Water (2) Total Govt. Communit Private Water extraction canal y Ponds Tube devices well Electricity Diesel Irrigation Water Pump Pump sources extracting units Jind Nos 28 81 16020 9426 4443 16129 13869 CA 16163 17618 33311 (Ha) Alewa Nos 9 6161 4900 188 6170 5088 CA 7027 9413 30196 (Ha) Julana Nos 18 70 11827 1289 8192 11915 9481 CA 10253 15336 38264 (Ha) Narwana Nos 23 17700 12873 4827 17723 17700 CA 32972 26056 80151 (Ha) Uchana Nos 21 18 16188 4809 10306 16227 15115 CA 17038 20369 48834 (Ha) Safidon Nos 15 11196 7736 2387 11211 10123 CA 8149 11614 45044 (Ha) PilluKher Nos 21 69 11045 4404 4370 11135 8774 a CA 10104 9034 45668 (Ha) Total Nos 135 238 90137 45437 34713 90510 80150 CA 101706 109440 321468 (Ha) Source: District Irrigation Department & Ground Water Department, Year 2015-16

It can be observed that there are 135 nos. of government water courses, 238 nos. of community ponds, 90137 nos. of private tube wells and 80150 nos. of water extracting units in the Jind district.

50

Map 3-3 Index Plan of Canals - CADA

51

N

Map 3-4 Index Plan of Canals, Water resources division

52

Chapter IV

4 Water Requirement / Demand

The earlier Chapters deals with the general profile, water profile and water availability in Jind district. The present chapter deals with the current (2016) and projected (2022) demand for water from various sectors. The demand has been worked out on the basis of data collected from different departments which has already been presented in previous chapters. The unit for volume of water has been chosen as million cubic meters (MCM) instead of Billion cubic meters as suggested in the guidelines.

4.1 Domestic Water Demand

To assess present population (2016) and future population (2022), an annual growth rate of 1.21% is assumed, based on the decadal growth in population from census 2001 to census 2011. To assess water demand, requirement of 100 lpcd for rural and 140 lpcd for urban are assumed.

Table 4-1 Present Domestic Water Demand (2016)

Blocks Present Population (2016) Present Gross Water Demand in (MCM) Rural Urban Total Rural Urban Total Jind 202709 177731 380440 7.4 9.08 16.48 Julana 136984 19890 156874 5 1.02 6.02 Alewa 94958 0 94958 3.47 0 3.47 Uchana 191105 17832 208937 6.98 0.91 7.89 Narwana 238838 65846 304684 8.72 3.36 12.08 Pillukhera 90927 5942 96869 3.32 0.3 3.62 Safidon 135275 36829 172104 4.94 1.88 6.82 Total 1090796 324070 1414866 39.83 16.55 56.38

It can be observed that total present domestic water demand is 56.38 MCM. The share of water demand from rural areas is 39.8 MCM (i.e. 70.64%), and from urban areas is 16.55 MCM (i.e. 29.36%).

53

Table 4-2 Projected Domestic Water Demand (2022)

Blocks Projected Population (2022) Future Gross Water Demand in (MCM) Rural Urban Total Rural Urban Total Jind 216586 189898 406484 7.91 9.7 17.61 Julana 146361 21251 167612 5.34 1.09 6.43 Alewa 101459 0 101459 3.7 0 3.7 Uchana 204188 19053 223241 7.45 0.97 8.42 Narwana 255189 70354 325543 9.31 3.6 12.91 Pillukhera 97152 6349 103501 3.55 0.32 3.87 Safidon 144536 39350 183886 5.28 2.01 7.29 Total 1165471 346255 1511726 42.54 17.69 60.23

It can be observed that projected future domestic water demand (2022) is 60.23 MCM, and will increase by 6.82%, as compared to present domestic water demand (2016).

Figure 4-1Block wise Domestic Water Requirement (MCM)

4.2 Crop Water Requirement Water demand of different crops (agriculture + horticulture) has been worked out based on the area under different crops as discussed in Chapter 2.

54

Table 4-3 Block wise water demand- Agriculture Crops Block Area Irrigated Crop water Existing water Water potential to Sown (ha) Area (ha) demand (MCM) potential (MCM) be created (MCM) Jind 77690 74700 388.89 378.51 10.38 Julana 59298 55112 282.69 269.49 13.2 Alewa 42536 41855 216.54 213.93 2.61 Safidon 52135 52135 280.63 280.63 0 Pilukhera 39075 39002 210.01 209.69 0.32 Uchana 88930 85567 404.82 392.79 12.03 Narwana 113787 109993 564.08 550.23 13.85 Total 473451 458364 2347.66 2295.27 52.39

It can be observed that total water demand of agriculture crops of the district is 2347.66 MCM, and existing potential is 2295.27 MCM. Therefore, water potential of 52.39 MCM needs to be created in the district for meeting the water requirement of agriculture crops. The water potential to be created is highest in Narwana block, followed by Julana block, Uchana block and Jind block. Since the Safidon block is totally irrigated, water potential to be created is Nil.

Figure 4-2 Block Wise Water Potential to be created

55

Table 4-4Total Crop water demand- district summary Crop Type Area Sown Irrigated Crop water Existing water Water potential to (ha) Area (ha) demand (MCM) potential (MCM) be created (MCM) Agriculture 473451 458364 2347.66 2295.28 52.38 Horticulture 12785 12785 39.65 39.65 0 Total 486236 471149 2387.31 2334.93 52.38

It has been assumed that water potential required is equal to the total crop water demand of cultivated area, while the existing water potential is equal to crop water requirement of irrigated area. It can be observed that water potential to be created is to the tune of 52.38 MCM for Jind district.

Figure 4-3Crop water demand & existing water potential

The crop water requirement includes all losses like: a) Transpiration loss through leaves (T), b) Evaporation loss through soil surface in cropped area (E) c) Amount of weather used by plants (WP) for its metabolic activities which is estimated as less than 1% of the total water absorption. d) Other application losses are conveyance loss, percolation loss, runoff loss, etc., (WL). e) The water required for special purposes (WSP) like puddling operation, ploughing operation, land preparation, leaching, requirement, for the purpose of weeding, for dissolving fertilizer and chemical, etc. Hence the water requirement is symbolically represented as: WR = T + E + WP + WL + WSP

The crop wise water requirement has been taken based upon discussion with Krishi Vigyan Kendra (KVK) as per practice prevailing in the State which is as under:

56

Table 4-5Crop wise water requirement Crop Type Name Water Name Water Requirement Requirement (MCM/Ha) (MCM/Ha) Agriculture Paddy 0.0075 Ground nut 0.0015 Wheat 0.0036 Rape seed 0.0015 Barley 0.00075 Musturd seed 0.0015 Bajra 0.0045 Cotton 0.003 Jowar 0.003 Sugar cane 0.0045 Maize 0.003 Gram 0.003 Pulses 0.003 GUAR 0.003 Horticulture Potato 0.007 Cucumber 0.00625 Onion 0.0055 Mulk Melon 0.0025 Tomato 0.008 Water Melon 0.00375 Radish 0.0025 Pumpkin 0.0075 Carrot 0.005 Long Melon (Tar 0.00375 Kakri) Bottle 0.0025 Bitter gourd 0.0025 gourd Ridge 0.0025 Summer Squash 0.0025 gourd Tinda 0.0025 Other (Specify) 0.0025

4.3 Livestock Water Requirement As mentioned in section 1.3,based on livestock census 2007 & 2012 the annual growth in the population of small animals can be considered as: 15.17% (in case of poultry), 1.038% (in case of goats), -6.4% (in case of pigs) and -7.27% (in case of sheep). In case of large animals, annual growth in the population can be considered as: 0.08% (in case of buffalo), -0.32% (in case of cattle), -2.64% (in case of horses & ponies),-1.718% (in case of mules &donkeys) and -14.05% (in case of camels).Accordingly, the present livestock population (2016) and future livestock population (2022) is assessed. The table below represents the animal wise water requirement as well as total water requirement of the district for animals.

Table 4-6Livestock water demand District Total Present Water Existing Water Water potential to be Number water demand in Potential (MCM) created (MCM) of Demand 2022(MCM) livestock (MCM) Jind 12650592 22.32 23.03 22.32 0.71

57

It has been assumed that the existing water potential is equal to present water demand of livestock. Thus, the water potential to be created implies the quantum of water availability to be created to meet livestock water demand in 2022. It can be observed that water potential to be created is to the tune of 0.71 MCM for Jind district.

For calculating the livestock water demand, Water requirement for each of the animal is estimated based on the following assumption as per the secondary data received from Animal husbandry department.

Table 4-7Animal wise water requirement Daily Water Daily Water Demand per animal Demand per animal (Litres) (Litres) Poultry 0.2 Hybrid Cow 70 Ducks 0.5 Buffalo 100 Pigs 60 Draft Animals 100 Goats 12 Indigenous Cow 50 Sheep 15

4.4 Industrial Water Requirement Jind is an industrially backward district and there are no big industrial units in the district. There are 9 shellers, 2 units of hand -made paper, 46 units of cattle feed, 1 solvent extraction plants, 21oil expelling units, 2 big floor (maida) mill, 10 cotton ginning mill, 1 gypsum board factory, 1 cooperative milk plant and 6 units of straw board/ mixed board in the District. One sugar mill in cooperative sector is situated at Jind.

Table 4-8 Industrial Water Requirement Block Type of No of Present No of Water Existing Water Industry Existing Water Proposed Demand Water Potential Industry Demand Industry in 2022 Potential to be (MCM) in 2022 (MCM) (MCM) created (MCM) Jind Surgical 15 0.007 3 0.0143 0.007 0.0073 Bands , Card Board, Ice Cream, Food Product, R.O. Water, Service

58

Block Type of No of Present No of Water Existing Water Industry Existing Water Proposed Demand Water Potential Industry Demand Industry in 2022 Potential to be (MCM) in 2022 (MCM) (MCM) created (MCM) Station , Leather Chemicals & Gypsum Board Alewa Service 1 0.0007 - 0.0007 0.0007 0 Station Julana Service 3 0.003 2 0.00373 0.003 0.00073 Station Narwana Service 3 0.002 1 0.00492 0.002 0.00292 Station and R.O. Water Uchana Inter 2 0.0009 - 0.003455 0.0009 0.002555 Lock Tails and Service Station Safidon Service 3 0.002 2 0.00273 0.002 0.00073 Station P.Khera Service 3 0.0028 2 0.00572 0.0028 0.00292 Station TOTAL 30 0.0184 10 0.035555 0.0184 0.017155

It can be observed from the above table that total water potential to be created by 2022 is 0.017155 MCM.

4.5 Water Demand for Power Generation The district is not having any thermal or nuclear power plant where water may be consumed. Therefore, demand of water for power generation has been taken as nil.

4.6 Total Water Demand of the district for various sectors This section presents the total water demand of the district and has been calculated by summing up all major sectors consuming water.

Table 4-9 Total Water Demand

Components Total MCM

59

Domestic Crop Livestock Industrial Power Present 56.38 2387.31 22.32 0.0184 0 2466.03 (2016) Future 60.23 2387.31 23.03 0.03556 0 2470.61 (2022)

It can be observed that the total present water demand from various sectors is 2466.03 MCM, while future water demand (2022) is 2470.61 MCM.

4.7 Water Budget A total of 380.14 MCM of surface water and 1292.331 MCM of ground water are available in Jind district. It can be observed that based on present and projected water demand (2022), and present water availability (surface & ground), the present water gap is to the tune of 793.559 MCM, and projected water gap (2022) is to the tune of 798.139 MCM.

Table 4-10 Water Budget Existing water Total Water demand (MCM) Water gap (MCM) availability (MCM) (MCM) Surface Ground Present Projected Present Projected water water (2022) (2022) 380.14 1292.331 1672.471 2466.03 2470.61 793.559 798.139

60

CHAPTER V

5 Strategic Action Plan for Irrigation in District under PMKSY

A strategic plan for six years has been prepared starting from 2016-17 to 2021-22. The strategic action plan is broadly prepared under four heads namely: AIBP, Har Khet ko Pani, PMKSY Watershed and Per drop more crop. Various departments which have prepared the strategic action plan include: i. Assistant Soil Conservation Officer (ASCO) ii. Horticulture Department iii. Command Area Development Authority (CADA) iv. Irrigation Department

The major outcomes of strategic action plan shall be as follows: i. Increase in the extent of crop area ii. Shift from annual crop to perennial iii. Reclamation of waste lands iv. More number of surface water bodies in district v. Improvement in the soil moisture availability vi. Increase in the recharge of aquifers vii. Improve on-farm water use efficiency

5.1 Component wise Strategic Action Plan

Total planned outlay for six years works out to be Rs. 537.3665 Crores, including component of Rs 125.421 Crores of state irrigation schemes and Rs 2.695 Crores of other loan projects.Maximum share of Rs. 298.831 Crores (55.60%) is for Har Khet Ko Pani Component, followed by state irrigation schemes of Rs 125.421 Crores (23.3%), followed by AIBP Component of Rs. 109.22 Crores (20.3%), and marginal share of Per Drop More Crop Component of Rs 1.195 Crores (0.20%). There are no proposed activities under PMKSY Watershed component, and therefore budget requirement is nil. Detailed component wise break up of financial outlay can be observed in the following table.

61

Table 5-1Component Wise Budget Requirement (Rs Lakhs)

Component Yr16-17 Yr17-18 Yr18- Yr19- Yr20- Yr21- Total % 19 20 21 22 Budget Share (Rs Lakhs) AIBP 295.8 10476.7 150.0 0.0 0.0 0.0 10922.4 20.30 Har Khet Ko 0.0 14752.4 4543.6 3643.5 3340.7 3603.0 29883.1 55.60 Pani Per Drop More 17.6 18.5 19.3 20.3 21.3 22.4 119.5 0.20 Crop State Irrigation 0.0 4864.1 4678.0 1830.0 900.0 270.0 12542.1 23.30 Schemes Other Loan 0.0 269.5 0.0 0.0 0.0 0.0 269.5 0.50 projects Total 313.4 30381.2 9390.9 5493.8 4262.0 3895.4 53736.6

AIBP component will be implemented by Irrigation Department. Har Khet ko Pani component will be implemented by ASCO, CADA and Irrigation Departments. Per drop more crop component will be executed by Horticulture Department. However, all the stakeholders need to have coordination among themselves to have the maximum irrigation efficiency and to avoid duplicity.

Figure 5-1 Component Wise Budget Allocation

5.2 Department wise allocation of budget

Out of the total planned outlay of Rs. 537.366 Crores, maximum share of Rs.294.194 Crores (54.75%) is for Irrigation Departments, followed by CADA of Rs 241.866 Crores (45.01%) and marginal share of Horticulture Department and ASCO.

62

Table 5-2 Department wise budget requirement (Rs Lakhs)

Department Yr16-17 Yr17-18 Yr18-19 Yr19-20 Yr20-21 Yr21- Total % Share 22 Budget (Rs Lakhs) ASCO 0 2.2 2.2 2.2 2.2 2.2 11.000 0.02 Horticulture 17.64 18.50 19.34 20.31 21.33 22.39 119.534 0.22 Department CADA 0 9065 4541 3641 3338 3601 24186.696 45.01 Irrigation 296 21296 4828 1830 900 270 29419.420 54.75 Departments Total 313.405 30381.15 9390.897 5493.81 4261.98 3895.3 53736.649

5.3 Year wise Strategic Action Plan

Year wise financial outlay for the six years can be observed in following figure. In the first year of implementation, i.e. in financial year 2016-17, a budget of Rs. 3.134 Crores will be required. In the subsequent five years, Rs. 303.811 Crores, Rs 93.908 Crores, Rs 54.938 Crores, Rs 42.619 Crores and Rs. 38.953 Crores is estimated for various departments.

Figure 5-2 Year Wise Budget Requirement

63

5.4 Monitoring and Evaluation The Strategic Action Plan of PMKSY will be monitored by the respective departments through the regular reporting system and component wise progress will be monitored by the District Level Irrigation Committee. Further, the activities, outputs and outcomes will be reported in web based MIS of PMKSY for review at state and national level. Some of the key indicators that will be used to monitor and evaluate the progress of PMKSY include:  Annual irrigation water supply per unit irrigated area measured as the ratio of total volume of irrigation water supplied at intake divided by total area irrigated in all seasons  Potential created and utilized measured as the ratio of total potential utilised (measured crop area) to irrigation potential created  Output (agricultural production) per unit irrigated area measured as the ratio of total value of agriculture production divided by the total irrigated area.  Output (agricultural production) per unit irrigation water supply measured as the ratio of total value of agriculture production divided by the total volume of irrigated water supplied  Total Operations & Maintenance (O&M) cost per unit irrigated area measured as the total Management, Operation and Maintenance (MOM) costs for the system divided by total area irrigated (potential utilised).  Equity performance measured as actual area irrigated in head, middle and tail divided by Command area in head, middle and tail. 5.5 Output & Outcome During the upcoming six financial years, command area of 2,06,335 ha will be covered in Jind district under Pradhan Mantri Krishi Sinachyi Yojna. Out of this area, 1,49,726 hectares will be covered by Irrigation Department, 48,795 hectares will be covered by Command Area Development Authority (CADA), 4,400 hectares will be covered by ASCO and area of 3414 ha by Horticulture Department. Table 5-3 Output & Outcome Department Coverage of Income Generation No of Man-days of Increase in Command Area (Labour Cost) (Rs Lakhs) employment Yield Irrigation 149726 4151 830390 Overall yield Department will increase CADA 48795 5065 1013005 by 10% ASCO 4400 6.0 1200 Horticulture 3414 5.4 1080 Department Total 206335 9227.4 1845675

64

It can be observed that the proposed activities will generate income of Rs 92.274 Crores, employment of 18,45,675 man-days and the overall crop yield will increase by 10%.Accordingly, it is proposed that farmer’s income will increase proportionately. The increase in annual income of farmer’s cultivating agriculture crops is given below.

Table 5-4 Increase in income of farmers Crops Increase in MSP (Rs/Quintal) Increase in Income Production (Rs Lakhs) (in Quintals) Kharif Season Paddy Fine 231000 2250 5197.50 Paddy Course 99000 1450 1435.50 Bajra and maize 22000 1275 280.50 Cotton 36380 4160 1513.41 Sugar Cane 271000 327 886.17 Rabi Season Wheat 799000 1525 12184.75 Maize 2386 1325 31.61 Sarson 3369 4050 136.44 Total 1464135.006 21665.89 5.6 Suggestions For successful implementation of PMKSY plan it is suggested that:  All the stakeholders should convene meeting of Panchayat Samities and then finalise the village plan and prepare DPR.  There should not be any duplicity of project.  The Department should supplement each other so that the maximum irrigation efficiency is achieved.  All the irrigation projects should have a component of water conveyance so that the each drop of water is judiciously utilized.  Where ever feasible, Solar pump sets should be installed.  All the structures planned should be geo tagged and marked on map, so that social monitoring of the projects can be conducted. This will also avoid the duplicity.  Priority should be given to projects to minimize the gap in potential created and potential utilized.  Execution of the scheme should be expeditiously completed.  There should be smooth fund flow for timely completion of the project and to avoid cost escalation.

65

Bibliography (2011). Agriculture Contingency Plan, Jind. Bhuvan.nrsc.gov.in. (n.d.). Retrieved from Bhuvan. (2013). Central Ground Water Board Report,Jind. Comprehensive district agriculture plan (CDAP), Jind. 2012. (2011). District Census Handbook, Jind. Census of India. (2015). District Disaster Management Plan, Jind. (2012). District wise livestock census, Jind. http://www.hpgcl.gov.in/powerplants_rpp.hp. (n.d.). Retrieved from Haryana Power Generation Corporation Limited. http://www.jind.nic.in/. (n.d.). Retrieved from Jind District. (2006-07). Minor Irrigation Census, Haryana . (2015-16). State Industrial Profile of Haryana.

66

Annexure List of Water Use Associations of District Jind

Sr. No Project Department Name of WUS 1 RD 91000-R JD 5 CAD division Jind The Roopgarh W.U.A O/L RD 91000-R JD 5 2 RD 21895-L JD7 CAD division Jind The Bibipur W.U.A O/L RD 21895-L JD7 3 RD 107885-L JD3 CAD division Jind The KhrakRamji W.U.A O/L RD 107885-L JD3 4 RD 5500-TC KhokheriMr. CAD division Jind The Nirjan W.U.A O/L RD 5500-TC KhokheriMr. 5 RD 12500-L NirjanMr. CAD division Jind The Nirjan W.U.A O/L RD 12500-L NirjanMr. 6 RD 1900-R KhokheriMr. CAD division Jind The Khokheri W.U.A O/L RD 1900-R KhokheriMr. 7 RD 15200/15800-L JD 8 CAD division Jind The PonkheriKheri W.U.A O/L RD 15200/15800-L JD 8 8 RD 4950-TR CAD division Jind The BrahKalan W.U.A O/L RD 4950-TR BrahKhurdMr. BrahKhurdMr. 9 RD 12580-R JD 6A CAD division Jind The Jalalpur W.U.A O/L RD 12580-R JD 6A 10 RD 15000-TC CAD division Jind The BrahKalan W.U.A O/L RD 15000-TC BarahKalanMr. BarahKalanMr. 11 RD 5700-TC CAD division Jind The Sunder PurBrahKalan W.U.A O/L RD SunderpurMr. 5700-TC SunderpurMr. 12 RD 7562-R JD 6A CAD division Jind The Jalalpur W.U.A O/L RD 7562-R JD 6A 13 RD 100650-L J D No. 5 CAD division Jind The RoopGarh W.U.A O/L RD 100650-L J D No. 5 14 RD 800-R Sahpur MR. CAD division Jind The DalamWala W.U.A O/L RD 800-R Sahpur MR. 15 RD 8750-L Sahpur MR. CAD division Jind The JiwanPur W.U.A O/L RD 8750-L Sahpur MR. 16 RD 10200-R SahpurMr. CAD division Jind The JiwanPur W.U.A O/L RD 10200-R SahpurMr. 17 RD 63911-R JD 5 CAD division Jind The DalamWala W.U.A O/L RD 63911-R JD 5 18 RD 24000-TC New CAD division Jind The Darya Wala W.U.A O/L RD 24000-TC DaryawalaMr. New DaryawalaMr. 19 RD 19000-L New CAD division Jind The Darya Wala W.U.A O/L RD 19000-L DaryawalaMr. New DaryawalaMr. 20 RD 53620-R RamkaliMr. CAD division Jind The BhabalPur W.U.A O/L RD 53620-R RamkaliMr. 21 RD 53620-L RamkaliMr. CAD division Jind The BhabalPur W.U.A O/L RD 53620-L RamkaliMr.

67

Sr. No Project Department Name of WUS 22 RD 49100-R RamkaliMr. CAD division Jind The BhabalPur W.U.A O/L RD 49100-R RamkaliMr. 23 RD 16005-L CAD division Jind The LizwanaKalan W.U.A O/L RD 16005-L QillazafargarhMr. QillazafargarhMr. 24 RD 17402-L CAD division Jind The LizwanaKalan W.U.A O/L RD 17402-L QillazafargarhMr. QillazafargarhMr. 25 RD 7650-R RamkaliMr. CAD division Jind The Ramkali W.U.A O/L RD 7650-R RamkaliMr. 26 RD 8874-R MSL Channel CAD division Jind The Badchapar W.U.A O/L RD 8874-R MSL Channel 27 RD 13000-R 1-L CAD division Jind The Igrah W.U.A O/L RD 13000-R 1-L BararKheraMr. BararKheraMr. 28 RD 18025-R CAD division Jind The Buana W.U.A O/L RD 18025-R JamniKheraMr. JamniKheraMr. 29 RD 91880-R JD 3 CAD division Jind The Assan W.U.A O/L RD 91880-R JD 3 30 RD 2130-L CAD division Jind The Siwaha W.U.A O/L RD 2130-L BarahKalanMr. BarahKalanMr. 31 RD 47510-L MuanaDisty CAD division Jind The W.U.A O/L RD 47510-L MuanaDisty 32 RD 6070-L ShamloMr. CAD division Jind The Burana W.U.A O/L RD 6070-L ShamloMr. 33 RD 31300-L JD 4 CAD division Jind The Amrawali W.U.A O/L RD 31300-L JD 4 34 RD 27500-R CAD division Jind The Siwaha W.U.A O/L RD 27500-R ShamloSakhMr. ShamloSakhMr. 35 RD 9000-L CAD division Jind The Siwaha W.U.A O/L RD 9000-L BarahKalanMr. BarahKalanMr. 36 RD 23630-R JD4 CAD division Jind The W.U.A O/L RD 23630-R JD4 37 RD 10500-L MorkhiMr. CAD division Jind The W.U.A O/L RD 10500-L MorkhiMr. 38 RD 9842-R Muana Dy. CAD division Jind The Muana W.U.A O/L RD 9842-R Muana Dy. 39 RD 3832-R ShamloMr. CAD division Jind The Bhuran W.U.A O/L RD 3832-R ShamloMr. 40 RD 58500-L MuanaDisty CAD division Jind The Dilluwala W.U.A O/L RD 58500-L MuanaDisty 41 RD 14160-R Siwanamal CAD division Jind The TheBagruKhurd W.U.A O/L RD 14160- Dy. R Siwanamal Dy. 42 RD 15922-R Muana Dy. CAD division Jind The Retoli W.U.A O/L RD 15922-R Muana Dy. 43 RD 20260-L SS Br. CAD division Jind The Nizampur W.U.A O/L RD 20260-L SS Br. Source: CADA Jind

68

Photographs of Irrigation Interventions in Jind District

69

70

71

Strategic Action Plan Abstract Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) AIBP Irrigation Jind Medium Irrigation Berm Cutting, 1934.6 7371 1886.41 295.76 1590.6 0 0 0 0 1886.4 Internal 8 5 1 Clearance, Repair of side lining patches and providing bed lining of Hansi Branch from RD 105525 to 238326 Rehabilitation of 11.4 3265 81.17 0 81.17 0 0 0 0 81.17 Nirjan Minor from RD 0 to 9020 Rehabilitation of 4 1649 94 0 94 0 0 0 0 94 Shamdo Minor from RD 0 to 10250 Rehabilitation of 2.56 604 34.1 0 34.1 0 0 0 0 34.1 Jajwan Minor from RD 0 to 3500 Rehabilitation of 87.8 16978 1800 0 1800 0 0 0 0 1800 Jind Disty. No.4 from RD 18235 to 85000

72

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Rehabilitation of 47.45 5365 470 0 470 0 0 0 0 470 Brar Khera Minor from RD 0 to 33451 Rehabilitation of 11 3531 210 0 210 0 0 0 0 210 I-L Brar Khera Minor from RD 0 to 19000 Rehabilitation of 11.5 3185 210 0 210 0 0 0 0 210 New Dariyawala Minor from RD 0 to 24000 Rehabilitation of 37.5 3467 165 0 165 0 0 0 0 165 Jind Disty. No.6 from RD 0 to 10500 Rehabilitation of 35.11 5946 350 0 350 0 0 0 0 350 Jind Disty. No.6 A from RD 0 to 36000 Julana Medium Irrigation 0 Rehabilitation of 25.5 7443 312 0.00 312.00 0.00 0.00 0.00 0.00 312.00 Jamni Khera Minor from RD 0 to tail including

73

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) shifting of Head from RD 81554/R to 86502/R Sunder Sub Branch Rehabilitation by 42.22 11508 411.82 0.00 411.82 0.00 0.00 0.00 0.00 411.82 widening of Quilazafargarh Minor from RD 0 to RD 49025 tail off taking at RD 33143-L Sunder Sub Branch Rehabilitation of 3.6 1059 52.12 0.00 52.12 0.00 0.00 0.00 0.00 52.12 Buana Sub Minor from RD 0 to RD 12540 (tail) To connect 4971 2510 146.65 0.00 146.65 0.00 0.00 0.00 0.00 146.65 Ramkali Minor to Behbalpur Minor Remodelling of 10 3636 180 0.00 180.00 0.00 0.00 0.00 0.00 180.00 Julana Sub Minor from RD 0 to 20610 Rehabilitation of 5.6 2758 150 0.00 150.00 0.00 0.00 0.00 0.00 150.00 Shadipur Minor

74

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) from RD 0 to 27200 Remodelling of 7.36 2675 95 0.00 95.00 0.00 0.00 0.00 0.00 95.00 Kamash Khera Minor from RD 0 to 10250 Rehabilitation of 17.65 7495 127.83 0.00 127.83 0.00 0.00 0.00 0.00 127.83 Jind Disty. No.7 from RD 0 to 33985 Rehabilitation of 3.97 1096 170 0.00 170.00 0.00 0.00 0.00 0.00 170.00 Padana Sub Minor from RD 0 to 11000 Rehabilitation of 108.57 21415 710 0.00 710.00 0.00 0.00 0.00 0.00 710.00 Karsola Minor from RD 0 to 72854 Rehabilitation of 10.98 3366 310 0.00 310.00 0.00 0.00 0.00 0.00 310.00 Kani Kheri Minor from RD 0 To connect Brar 3.50 1230 1225 0.00 1225.0 0.00 0.00 0.00 0.00 1225.0 Khera Minor to 0 0 Ramkali Minor Pillukhe Medium Irrigation 0

75

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) ra Rehabilitation of 11.6 3623 400 0 250 150 0 0 0 400 Old Shamlo Minor from RD 0 to30750 Rehabilitation of 14.69 44.98 325 0 325 0 0 0 0 325 Bhirtana Minor from RD 0 to 34807 Safidon Medium Irrigation 0 Rehabilitation of 120.80 16628.0 831.32 0.00 831.32 0.00 0.00 0.00 0.00 831.32 Jind Disty. No.3 0 from RD 74800 to 128030 tail Rehabilitation of 5.60 1713.00 175 0.00 175.00 0.00 0.00 0.00 0.00 175.00 New Shamlo Minor from RD 0 to 16380 Sub total 139560. 10922.4 295.76 10476. 150.00 0.00 0.00 0.00 10922. 98 2 66 42 Har Khet Irrigation Jind Lined Field Ko Pani Channels Remodelling of 1.34 226 56.55 0.00 56.55 0.00 0.00 0.00 0.00 56.55 W/C O/L RD 32845/R Jind Disty. No. 6A

76

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Extension of W/C 0.94 159 7.61 0.00 7.61 0.00 0.00 0.00 0.00 7.61 O/L RD 3500/TR Sangatpura Minor Extension of W/C 0.81 137 6.90 0.00 6.90 0.00 0.00 0.00 0.00 6.90 O/L RD 28620/R Jind disty. No. 6 A Extention of W/C 1.13 190 5.27 0.00 5.27 0.00 0.00 0.00 0.00 5.27 outlet RD 4175/L Rajgarh Minor Extenstion for 2.91 492 12.00 0.00 12.00 0.00 0.00 0.00 0.00 12.00 Remodelling of W/C O/L RD 76152/L Sunder Sub Branch Remodelling of 2.05 290 31.73 0.00 31.73 0.00 0.00 0.00 0.00 31.73 W/C outlet RD 27300-L Muana Disty. Remodelling of 0.92 155 24.36 0.00 24.36 0.00 0.00 0.00 0.00 24.36 W/C outlet RD 7562/R Jind Disty. No.6A Remodelling of 0.54 90 23.30 0.00 23.30 0.00 0.00 0.00 0.00 23.30 W/C outlet RD 82470/R Jind

77

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Disty. No.5 Remodelling by 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 widening V.R. Bridge at RD 63000 JD No. 4 Remodelling by 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 widening V.R. Bridge at RD 68000 JD No. 4 Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 116750 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 123000 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 131500 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00

78

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) widening V.R. Bridge at RD 142000 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 153895 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 162000 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 179090 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 173290 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00

79

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) widening V.R. Bridge at RD 176710 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 223750 Hansi Branch Remodelling by 300.00 0.00 300.00 0.00 0.00 0.00 0.00 300.00 widening V.R. Bridge at RD 229750 Hansi Branch Constg. Of V.R. 13.50 0.00 13.50 0.00 0.00 0.00 0.00 13.50 Bridge at RD 11200 on Link Drain Constrution of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 125600 Jind Disty. No.6A Constg. Of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 20100 Jind Disty.

80

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) No.6A Constg. Of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 16500 Jind Disty. No.6A Constg. Of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 13200 Jind Disty. No.6A Constg. Of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 10500 Jind Disty. No.6A Constg. Of V,R 20.00 0.00 20.00 0.00 0.00 0.00 0.00 20.00 Bridge at RD 6520 Jind Disty. No.6A Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 10450 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 17137 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00

81

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Bridge at RD 24890 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 35777 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 49505 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 58010 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 76900 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 85000 Jind Disty. No.5 Constg. Of V,R 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD

82

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) 91000 Jind Disty. No.5 Constg. Of V,R 30.00 0.00 30.00 0.00 0.00 0.00 0.00 30.00 Bridge at RD 5100 Kandela Minor Constg. Of V,R 15.00 0.00 15.00 0.00 0.00 0.00 0.00 15.00 Bridge at RD 4000 Mohan Garh Minor Remodelling of 0.73 123 29.44 0.00 29.44 0.00 0.00 0.00 0.00 29.44 W/C O/L RD 26810-R Brar Khera Minor Remodelling of 0.30 50 14.14 0.00 14.14 0.00 0.00 0.00 0.00 14.14 W/C O/L RD 5600/L Jamni khera minor Remodelling W/C 0.49 82 19.79 0.00 19.79 0.00 0.00 0.00 0.00 19.79 O/L RD 31850/R Jamni Khera Minor Remodelling W/C 0.49 83 18.75 0.00 18.75 0.00 0.00 0.00 0.00 18.75 O/L RD 65100/L JD No.4 Remodelling W/C 0.29 49 12.87 0.00 12.87 0.00 0.00 0.00 0.00 12.87

83

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) O/L RD 62365/L JD No 4 Remodelling W/C 1.40 216 62.88 0.00 62.88 0.00 0.00 0.00 0.00 62.88 O/L RD 90300/L S.S. Branch Remodelling W/C 0.69 117 28.08 0.00 28.08 0.00 0.00 0.00 0.00 28.08 O/L RD 14520/R Bhaklana Minor Remodelling W/C 0.66 112 28.91 0.00 28.91 0.00 0.00 0.00 0.00 28.91 O/L RD 16600/L Bhaklana Minor Remodelling W/C 1.44 243 59.72 0.00 59.72 0.00 0.00 0.00 0.00 59.72 O/L RD 42126-R Karsola Minor Remodelling W/C 1.61 271 60.27 0.00 60.27 0.00 0.00 0.00 0.00 60.27 O/L RD 51850/L Karsola Minor Remodelling W/C 0.79 133 32.18 0.00 32.18 0.00 0.00 0.00 0.00 32.18 O/L RD 53210/L Karsola Minor Remodelling W/C 1.52 268 76.47 0.00 76.47 0.00 0.00 0.00 0.00 76.47 O/L RD 4226 Sunder Sub Branch Remodelling W/C 1.55 262 76.12 0.00 76.12 0.00 0.00 0.00 0.00 76.12

84

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) O/L RD 10150/TC New Shamdo Minor Remodelling W/C 1.11 187 25.15 0.00 25.15 0.00 0.00 0.00 0.00 25.15 O/L RD 24450/R Jamni Khera Minor Remodelling W/C 1.42 240 63.94 0.00 63.94 0.00 0.00 0.00 0.00 63.94 O/L RD 60600/R Jind Disty. No.4 Julana Lined Field 0.00 Channels Remodelling of 1.23 208 35.59 0.00 35.59 0.00 0.00 0.00 0.00 35.59 W/C O/L RD 102231/R Sunder Sub Branch Extension of W/C 1.72 291 7.57 0.00 7.57 0.00 0.00 0.00 0.00 7.57 O/L RD 76222/L Sunder Sub Branch Remodelling of 0.66 112 19.26 0.00 19.26 0.00 0.00 0.00 0.00 19.26 W/C O/L RD 48344/L Sunder Sub Branch Extention of W/C 1.13 190 5.27 0.00 5.27 0.00 0.00 0.00 0.00 5.27

85

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) outlet RD 4175/L Rajgarh Minor Extenstion for 2.91 492 12.00 0.00 12.00 0.00 0.00 0.00 0.00 12.00 Remodelling of W/C O/L RD 76152/L Sunder Sub Branch Extenstion of 0.98 166 3.29 0.00 3.29 0.00 0.00 0.00 0.00 3.29 W/C O/L RD 5100/L Kani Kheri Minor Remodelling of 0.89 151 39.71 0.00 39.71 0.00 0.00 0.00 0.00 39.71 W/C outlet RD 14547/R Q,Z,Garh Minor Remodelling of 0.83 141 25.81 0.00 25.81 0.00 0.00 0.00 0.00 25.81 W/C outlet RD 47022/R Karsola Minor Remodelling of 0.54 91 15.12 0.00 15.12 0.00 0.00 0.00 0.00 15.12 W/C outlet RD 44000/R Karsola Minor Remodelling of 1.83 309 74.87 0.00 74.87 0.00 0.00 0.00 0.00 74.87 W/C outlet RD

86

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) 49025/tail Q.Z.Garh Remodelling of 1.02 171 38.49 0.00 38.49 0.00 0.00 0.00 0.00 38.49 W/C outlet RD 23690/R Bhaklana Minor Extenstion of 1.41 237 3.50 0.00 3.50 0.00 0.00 0.00 0.00 3.50 W/C O/L RD 80950/L Sunder Sub Branch Extenstion of 0.93 156 4.62 0.00 4.62 0.00 0.00 0.00 0.00 4.62 W/C O/L RD 52283/R Sunder Sub Branch Remodelling of 0.79 133 31.50 0.00 31.50 0.00 0.00 0.00 0.00 31.50 W/C outlet RD 15100/L MSL Minor Remodelling of 0.86 146 56.32 0.00 56.32 0.00 0.00 0.00 0.00 56.32 W/C outlet RD 7000/L Q.Z.Garh Minor Remodelling of 0.74 125 33.90 0.00 33.90 0.00 0.00 0.00 0.00 33.90 W/C outlet RD 2050/R Ludana

87

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Minor Remodelling of 2.56 432 136.64 0.00 136.64 0.00 0.00 0.00 0.00 136.64 W/C outlet RD 10260/TC Kamash Khera Minor Pillukhe Lined Field 0.00 ra Channels Constg. of V.R. 18.00 0.00 18.00 0.00 0.00 0.00 0.00 18.00 Bridge at RD 21400 & Ghat on Muana Disty. Constg. of V.R. 10.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 Bridge at RD 40100 & Ghat on Muana Disty. Constg. of V.R. 10.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00 Bridge at RD 42100 & Ghat on Muana Disty. Har Khet Irrigation Saffidon 9000-L Joshy Disty 2440 647.00 0.00 647.00 0.00 0.00 0.00 0.00 647.00 Ko Pani Dept, & 25000-L Joshy Saffidon Pillukhe Disty. div ra 63400-R Jind Disty. No. 3 46380-R Jind

88

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Disty. No. 3 14500-R Sarfabad Minor 43000-R Rojhla Minor 2100-R Morkhi Minor 8700-L Gangoli Minor 25493-R Sarfabad Minor 72172-L Jind Disty. No. 3 8495-L Morkhi Minor 18400-R Gangoli Minor Sub total 10166.0 5685.39 0.00 5685.3 0.00 0.00 0.00 0.00 5685.3 0 9 9 Har Khet CADA Jind Unlined Field 40 5444 2177.60 0.00 1115.2 338.80 276.40 113.60 333.60 2177.6 Ko Pani Jind Channels 0 0 Micro Irrigation 6.00 797 996.25 0.00 296.25 132.50 216.25 88.75 262.50 996.25 Pipe Line 3.00 343 188.65 0.00 130.35 58.30 0.00 0.00 0.00 188.65 Irrigation Julana Unlined Field 34.00 3221 1288.40 0.00 630.80 126.00 123.20 194.40 214.00 1288.4

89

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Channels 0 Micro Irrigation 4.00 434 542.50 0.00 170.00 98.75 97.50 0.00 176.25 542.50 Pipe Line 2.00 257 141.35 0.00 74.80 0.00 0.00 66.55 0.00 141.35 Irrigation Alewa Unlined Field 3.00 293 117.20 0.00 46.80 0.00 0.00 70.40 0.00 117.20 Channels Micro Irrigation 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Pipe Line 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Irrigation Safidon Unlined Field 12.00 912 364.80 0.00 66.00 84.80 96.80 117.20 0.00 364.80 Channels Micro Irrigation 1.00 53.00 66.25 0.00 0.00 0.00 66.25 0.00 0.00 66.25 Pipe Line 1.00 47 25.85 0.00 0.00 0.00 0.00 25.85 0.00 25.85 Irrigation Pillu Unlined Field 16.00 2441 976.40 0.00 138.00 369.20 200.80 117.60 150.80 976.40 khera Channels Micro Irrigation 5.00 273 341.25 0.00 58.75 105.00 78.75 58.75 40.00 341.25 Pipe Line 4 240 132.00 0.00 0.00 46.20 34.65 19.80 31.35 132.00 Irrigation Sub total 131 14755 7358.50 0 2726.9 1359.5 1190.6 872.9 1208.5 7358.5 5 5 CADA Narwan Unlined Field 95.00 13702 4430.83 2044.5 544.95 609.35 617.75 614.25 4430.8 Hisar a Channels 3 3 Micro Irrigation 8.00 1251 1563.75 500.00 243.75 271.25 275 273.75 1563.7 5

90

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Under Ground 8.00 1251 688.05 220.00 107.25 119.35 121 120.45 688.05 Pipe CADA Uchana Unlined Field 111.00 15993 5475.66 1472.0 1391.2 883.75 884.8 843.85 5475.6 Hisar Channels 1 5 6 Micro Irrigation 11.00 1843 2303.75 520 621.25 393.75 393.75 375 2303.7 5 Under Ground 11.00 1843 1013.65 228.8 273.35 173.25 173.25 165 1013.6 Pipe 5 Sub total 244.00 35883.0 15475.7 0.00 4985.3 3181.8 2450.7 2465.5 2392.3 15475. 0 0 5 0 0 5 0 70 CADA Alewa 42000 I Badhana 159 198.750 0.000 198.75 0.000 0.000 0.000 0.000 198.75 Kaithal Minor 0 12500-R Badhana 441 551.250 0.000 551.25 0.000 0.000 0.000 0.000 551.25 Mr. 0 17600-R Hasanpur 250 312.500 0.000 312.5 0.000 0.000 0.000 0.000 312.50 Mr. 0 23500-R Shamdo 232 290.000 0.000 290 0.000 0.000 0.000 0.000 290.00 Mr. 0 Sub total 0.00 1082.00 1352.50 0.00 1352.5 0.00 0.00 0.00 0.00 1352.5 0 0 0 Total 375.00 51720.0 24186.6 0.00 9064.8 4541.3 3641.3 3338.4 3600.8 24186. 0 96 0 5 0 5 0 70 Har Khet ASCO All Installation of 4400 11.000 0 2.2 2.2 2.2 2.2 2.2 11.00 Ko Pani blocks UGPL for efficient conveyance of

91

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) water Sub Total 4400.0 11.000 0.0 2.2 2.2 2.2 2.2 2.2 11.0 Per Drop Horticult Jind Non- DPAP Drip 165 135 25.983 3.820 4.011 4.212 4.422 4.643 4.875 25.983 More ure Dept Non- DPAP 30 20 9.999 1.470 1.544 1.621 1.702 1.787 1.876 9.999 Crop Sprinkler Narwan Non- DPAP Drip 228.4 163.2 34.690 5.100 5.355 5.623 5.904 6.199 6.509 34.690 a Non- DPAP 40.8 27.2 13.054 1.960 2.044 2.100 2.204 2.315 2.431 13.054 Sprinkler Julana Non- DPAP Drip 114.2 81.6 17.345 2.550 2.678 2.811 2.952 3.100 3.255 17.345 Non- DPAP 20.4 13.6 6.527 0.980 1.022 1.050 1.102 1.158 1.215 6.527 Sprinkler Safidon Non- DPAP Drip 57.1 40.8 8.672 1.275 1.339 1.406 1.476 1.550 1.627 8.672 Non- DPAP 10.2 6.8 3.264 0.490 0.511 0.525 0.551 0.579 0.608 3.264 Sprinkler Sub-total 666.1 488.2 119.534 17.645 18.503 19.347 20.313 21.330 22.396 119.53 4 State Irrigation Surface Minor Irrigation 0.000 Irrigatio Dept, n Narwana Schemes div Extension of Fatehpur Mr. 0.51 7496 597.680 0.000 297.68 200.00 100.00 597.68 0 Reh. Of Badhana Mr. 1.77 10170 340.000 0.000 150.00 150.00 40.00 340.00 0 Remodling of Habri S/Br. RD 25.55 23356 1500.00 0.000 600.00 400.00 300.00 200.00 1500.0

92

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) 38000 to 89000 0 00 Laying pipe line in abadi area 1.60 14792 80.000 0.000 40.00 20.00 20.00 80.000 of Tharota Mr. Reh. Of Rajound Dy. 12.62 18774 100.000 0.000 50.00 50.00 100.00 0 Reh. Of Badhana Mr. 1-R 0.16 2220 40.000 0.000 20.00 20.00 40.000 Reh. Of Bir Bangra Mr. 0.64 5532 80.000 0.000 40.00 20.00 20.00 80.000 Reh. Of Bhari S/Mr. 0.22 4390 20.000 0.000 10.00 10.00 20.000 Reh. Of Rohera Mr. 2.11 9584 200.000 0.000 100.00 50.00 50.00 200.00 0 Reh. Of Kichhana Minor 0.52 5349 150.000 0.000 50.00 50.00 50.00 150.00 0 Reh. Of Nissing Mr. 0.73 7757 200.000 0.000 100.00 50.00 50.00 200.00 0 Reh. Of Shamdo Mr. 1.57 15003 200.000 0.000 100.00 50.00 50.00 200.00 0 Reh. Of Mohna Mr. 0.58 8242 150.000 0.000 100.00 50.00 150.00 0 Reh. Of Kheri-Sheru Mr. 0.25 3180 125.000 0.000 100.00 25.00 125.00 0 Reh. Of Harsola Mr. 0.29 3318 70.000 0.000 50.00 20.00 70.000 Reh. Of Kapilmuni Mr. 0.69 5600 60.000 0.000 50.00 10.00 60.000 Reh./remodelling of Sirsa Br. 89.07 2546 1000.00 0.000 300.00 300.00 200.00 200.00 1000.0 RD.88588 to 225950 0 00 Reh. Of Pharal Mr. 0.60 6105 60.000 0.000 50.00 10.00 60.000

93

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Narwana Block 0.000 Laying RCC pipeline and 9000/ 540 134.420 134.42 ------134.42 Remodelling of Ismailpur 0.14 0 S/Minor from RD 0 to 9000 tail Reh. Of Sinsar Minor from 12500/ 1403 80.000 80.00 ------80.000 RD 0 to 12500 tail 0.4 Reh. Of Kaloda Sub Minor 15400/ 1605 122.000 122.00 ------122.00 from RD 0 to 15400 tail 0.32 0 Reh. Of Kalwan Minor from 55000/ 4390 120.000 80.00 40.00 ------120.00 RD 0 to 55000 tail 0.95 0 Reh. Of Kharal Minor from 20808/ 1982 85.000 85.00 ------85.000 RD 0 to 20808 tail 0.43 Reh. Of Lown Minor from RD 17000/ 3262 75.000 75.00 ------75.000 0 to 17000 Tail 0.64 Rehabilitation of Pipaltha 41000/ 3013 300.000 150.00 150.00 ------300.00 Minor from RD 0 to 41000 tail 0.69 0 Reh. Of Dhanouri Disty from 62500/ 3442 400.000 100.00 150.00 150.00 -- -- 400.00 RD 0 to 62500 tail 2.28 0 Reh. Of Dhamtan Disty from 81650/ 3500 1000.00 200.00 300.00 300.00 200 -- 1000.0 RD 57500 to 139150 tail 12.43 0 00 Reh. Of New Sinsar Minor 7000/ 2323 40.000 40.00 ------40.000 from RD 8000 to 15000 0.67 Reh. Of Sirsa Branch from RD 63462/ carriar 350.000 100.00 150.00 100.00 -- -- 350.00 278538 to 342000 60.63 channel 0

94

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) Reh. Of New Sacha Khera 37000/ 3556 125.000 75.00 50.00 ------125.00 Minor from RD 0 to 37000 tail 1.2 0 Constg. RCC Box type barrel 12800/ 3562 2080.00 1040.0 1040.0 ------2080.0 from RD 6700 to 19500 & 1.26 0 0 0 00 Construction of Road on left side from Patiala Road to Narwana Badanpur Road from RD 10500 to 19500 on service road and construction of interwearing structure of Narwana Minor Reh. Of Narwana Minor from 40700/ 3562 150.000 150.00 ------150.00 RD 0 to 6700 & RD 19500 to 1.26 0 53400 Reh. Of Dharamgarh minor 20605/ 662 70.000 70.00 ------70.000 from RD 0 to 20605 tail 0.22 Reh. Gurthali Lift Minor from 8400/ 2025 30.000 30.00 ------30.000 RD 10000 to 18400 0.49 Reh. Of BML Barwala Link 48060/ carriar 450.000 150.00 150.00 150.00 450.00 from RD 37000 to 85060 48.83 channel 0 Uchana Block 0.000 0.000 Reh. Of Tail Branch Shudkan 12000/ 746 90.000 90.00 ------90.000 Feeder from RD 0 to 12000 0.35 Tail Reh. Of Ghasso Feeder from 9275/ 738 80.000 80.00 ------80.000

95

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) RD 0 to 9275 tail 0.11 Reh. Of Kheri Saffa Minor 19100/ 1069 125.000 125.00 ------125.00 from RD 0 to 19100 tail 0.4 0 Reh. Of 1-L Barsola Sub 19000/ 2907 150.000 80.00 70.00 ------150.00 Minor from RD 0 to 19000 tail 0.81 0 Reh. Of Sainthly Disty and 2- 22250/ 2552 150.000 ------80.00 70.00 150.00 L Sainthly Minor from RD 0 0.55 0 to 22250 tail Stg. Of banks and raising of 30000/ 6919 25.000 -- -- 25.00 -- -- 25.000 service road of Barsola Minor 2.45 from RD 0 to 30000 Stg. Of banks and raising of 34000/ 3855 50.000 -- 50.00 ------50.000 service road of Shudkan Disty 5.65 from RD 118000 to 152000 Stg. Of banks & raising of 17150/ 1304 30.000 -- 30.00 ------30.000 service road & Flush Pointing 0.29 of lining of Tarkha Minor from RD 0 to 17150 tail Extension of Chhattar Minor 10412/ 474 551.000 300.00 251.00 ------551.00 from RD 30788 to 41200 tail 0.88 0 Jind Block 0.000 Extension of 4-L Barsola Sub 11900/ 516 707.000 350.00 357.00 ------707.00 Minor from RD 19500 to 0.41 0 31400 Sub total 213321. 12542.1 0.00 4864.1 4678.0 1830.0 900.00 270.00 12542.

96

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) 00 00 0 0 0 10 Other Irrigation Narwana Block 0.000 loan proj Dept, Narwana div Repairing of water course 0.05 255.00 67.200 67.20 ------67.200 outlet at RD 79630-R Dhamtan Disty. Repairing of water course 0.04 200.00 45.910 45.91 ------45.910 outlet at RD 130510-R Dhamtan Disty Repairing of water course 0.01 66.00 18.550 18.55 ------18.550 outlet at RD 4750-R Narwana Minor Repairing of water course 0.02 82.18 22.750 22.75 ------22.750 outlet at RD 18800-L New Sacha Khera Minor Repairing of water course 0.02 127.00 38.500 38.50 ------38.500 outlet at RD 14750-R New Sacha Khera Minor Repairing of water course 0.05 264.00 10.500 10.50 ------10.500 outlet at RD 60200-L Dharodi Minor (balance work) Uchana Block 0.000 Repairing of water course 0.10 63.15 22.350 22.35 ------22.350

97

Compon Departme Name of Activity Total Comma Estimat Fund requirement (in Rs. Lakh) ent nt Blocks No/ nd Area ed Cost Yr 16- Yr 17- Yr 18- Yr 19- Yr 20- Yr 21- Total Covered Capaci (Ha.) (in Rs. 17 18 19 20 21 22 ty lakh) (cum) outlet at RD 12049-L Ghasso Feeder Repairing of water course 0.03 149.00 43.750 43.75 ------43.750 outlet at RD 17493-R Kheri Saffa Minor Sub total 1206.33 269.510 0.00 269.51 0.00 0.00 0.00 0.00 269.51 Grand Total 420862. 53736.6 313.41 30381. 9390.9 5493.8 4261.9 3895.4 53736. 51 50 16 0 1 8 0 65

98