Application for Retail Licence
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Snowy Hydro Fact Sheet
Introduction to Snowy Hydro Snowy Hydro Engineering 1 sheet Fact History Construction of the Snowy Scheme took 25 years from 1949 to 1974. An incredible engineering feat, this complex interconnected hydro-electric scheme uses the power of water to generate clean, renewable energy. Over the past 70 years, Snowy Hydro has evolved from the Snowy Mountains Hydro-electric Authority, to the Snowy Mountains Authority, to the company we know today. Definition Hydro-power - the use of flowing water to power a turbine to produce electrical energy HYDRO-POWER STATIONS NAME CAPACITY NO. OF UNITS (MW) Tumut 3 1,800 6 9 Murray 1 950 10 renewable generator Murray 2 550 4 Tumut 1 330 4 Tumut 2 287 4 Blowering 80 1 Guthega 60 2 Jindabyne Mini Hydro 1 1 Jounama Small Hydro 14 1 APPROX INSTALLED CAPACITY 4,100 MW TH LARGEST 3 RETAIL BRANDS ELECTRICITY RETAILER IN THE RED LUMO DIREC T NATIONAL ELECTRICITY MARKET ENERGY ENERGY CONNECT Definition Megawatt - a unit of power equal to one million watts, a measure of the output of a power station Definition Aqueduct - a pipe constructed to collect and divert water to a larger body of water Snowy Hydro logo 145km 80km INTER-CONNECTED ‘Snowy’ refers to the snow - most of the water TUNNELS we use to generate electricity comes from snow melt. ‘Hydro’ refers to water - Snowy Hydro uses 16 MAJOR DAMS PUMPING STATION water to generate electricity. at Jindabyne and pump storage 1000MW of contracted wind and solar APPROX 4,800GL capability at Tumut 3 AT LAKE EUCUMBENE The blue colour represents the water and the green colour represents nature, sustainability TOTAL STORAGE and renewables. -
BUILDING STRONGER COMMUNITIES Wind's Growing
BUILDING STRONGER COMMUNITIES Wind’s Growing Role in Regional Australia 1 This report has been compiled from research and interviews in respect of select wind farm projects in Australia. Opinions expressed are those of the author. Estimates where given are based on evidence available procured through research and interviews.To the best of our knowledge, the information contained herein is accurate and reliable as of the date PHOTO (COVER): of publication; however, we do not assume any liability whatsoever for Pouring a concrete turbine the accuracy and completeness of the above information. footing. © Sapphire Wind Farm. This report does not purport to give nor contain any advice, including PHOTO (ABOVE): Local farmers discuss wind legal or fnancial advice and is not a substitute for advice, and no person farm projects in NSW Southern may rely on this report without the express consent of the author. Tablelands. © AWA. 2 BUILDING STRONGER COMMUNITIES Wind’s Growing Role in Regional Australia CONTENTS Executive Summary 2 Wind Delivers New Benefits for Regional Australia 4 Sharing Community Benefits 6 Community Enhancement Funds 8 Addressing Community Needs Through Community Enhancement Funds 11 Additional Benefts Beyond Community Enhancement Funds 15 Community Initiated Wind Farms 16 Community Co-ownership and Co-investment Models 19 Payments to Host Landholders 20 Payments to Neighbours 23 Doing Business 24 Local Jobs and Investment 25 Contributions to Councils 26 Appendix A – Community Enhancement Funds 29 Appendix B – Methodology 31 References -
Final Report
The Senate Select Committee on Wind Turbines Final report August 2015 Commonwealth of Australia 2015 ISBN 978-1-76010-260-9 Secretariat Ms Jeanette Radcliffe (Committee Secretary) Ms Jackie Morris (Acting Secretary) Dr Richard Grant (Principal Research Officer) Ms Kate Gauthier (Principal Research Officer) Ms Trish Carling (Senior Research Officer) Mr Tasman Larnach (Senior Research Officer) Dr Joshua Forkert (Senior Research Officer) Ms Carol Stewart (Administrative Officer) Ms Kimberley Balaga (Administrative Officer) Ms Sarah Batts (Administrative Officer) PO Box 6100 Parliament House Canberra ACT 2600 Phone: 02 6277 3241 Fax: 02 6277 5829 E-mail: [email protected] Internet: www.aph.gov.au/select_windturbines This document was produced by the Senate Select Wind Turbines Committee Secretariat and printed by the Senate Printing Unit, Parliament House, Canberra. This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Australia License. The details of this licence are available on the Creative Commons website: http://creativecommons.org/licenses/by-nc-nd/3.0/au/ ii MEMBERSHIP OF THE COMMITTEE 44th Parliament Members Senator John Madigan, Chair Victoria, IND Senator Bob Day AO, Deputy Chair South Australia, FFP Senator Chris Back Western Australia, LP Senator Matthew Canavan Queensland, NATS Senator David Leyonhjelm New South Wales, LDP Senator Anne Urquhart Tasmania, ALP Substitute members Senator Gavin Marshall Victoria, ALP for Senator Anne Urquhart (from 18 May to 18 May 2015) Participating members for this inquiry Senator Nick Xenophon South Australia, IND Senator the Hon Doug Cameron New South Wales, ALP iii iv TABLE OF CONTENTS Membership of the Committee ........................................................................ iii Tables and Figures ............................................................................................ -
Turbine Fact Sheet
Our company SNOWY HYDRO Hydro Snowy 1 Factsheet HISTORY Construction of the Snowy Scheme took 25 years from 1949 - 1974. An engineering feat, this complex interconnected hydro-electric scheme uses the power of water to generate clean, renewable energy. Over the past 70 years Snowy Hydro has evolved from the Snowy Mountains Hydro-electric Authority to the Snowy Mountains Authority (SMA) to the company we know today. Definition Hydropower - the use of flowing water to power a turbine to produce electrical energy HYDRO-POWER STATIONS NAME CAPACITY NO. OF UNITS (MW) Tumut 3 1800 6 9 Murray 1 950 10 renewable generator Murray 2 550 4 Tumut 1 330 4 Tumut 2 287 4 Blowering 80 1 Guthega 60 2 Jindabyne Mini Hydro 11 1 Jounama Small Hydro 14 1 APPROX INSTALLED CAPACITY 4100 MW TH LARGEST 3 RETAIL BRANDS ELECTRICITY RETAILER IN THE RED LUMO DIREC T NATIONAL ELECTRICITY MARKET ENERGY ENERGY CONNECT Definition Megawatt - a unit of power equal to one million watts, a measure of the output of a power station Definition Aqueduct - a pipe constructed to collect and divert water to a larger body of water SNOWY HYDRO LOGO 145km 80km INTER-CONNECTED AQUEDACTS ‘Snowy’ refers to the snow - most of the water TUNNELS we use to generate electricity comes from snow melt. ‘Hydro’ refers to water - Snowy Hydro uses 16 MAJOR DAMS PUMPING STATION water to generate electricity. at Jindabyne and pump storage 1000MW of contracted wind and solar APPROX 4800 GL capability at Tumut 3 AT LAKE EUCUMBENE The blue colour represents the water and the green colour represents nature, sustainability TOTAL STORAGE and renewables. -
Dear Ms Gardner
Select Committee on Wind Turbines Submission 208 - Attachment 1 [Reference No] Ms.Ann Gardner By email to: Dear Ms Gardner, Thank you for your email to the Chair of the Clean Energy Regulator, dated 18 November 2014, making a formal complaint about noise and vibration from the Macarthur Wind Farm. The matters raised by you are more appropriately addressed to the Victorian Department of Transport, Planning and Local Infrastructure (formerly known as the Victorian Department of Planning and Community Development). They are not matters that fall within the powers of the Clean Energy Regulator (the Regulator) under the various Commonwealth legislation administered by the Regulator. The Clean Energy Regulator is an economic regulator. With respect to the Renewable Energy Target, the Regulator regulates both the supply of certificates (by ensuring the integrity of their creation by renewable power stations) and the demand and surrender of those certificates (by ensuring liable electricity retailers surrender the correct number of certificates). The Clean Energy Regulator is only empowered to administer relevant Commonwealth laws (eg to ensure that a wind farm operator complies with its responsibilities under relevant Commonwealth legislation that the Regulator administers). It cannot interfere in state-based activities. If a wind farm is not complying with State/Territory laws (eg as to planning requirements and noise control etc), it is a matter for the relevant State/Territory a.uthority to address. The Macarthur Wind Farm is an accredited power station under the Renewable Energy (Electricity} Act 2000 (the Act) and the Renewable Energy (Electricif:W Regulations 2001 (the Regulations). Once an eligible power station has been accredited, it remains accredited unless the Regulator decides to suspend the accreditation under Division 11 of Part 2 of the Act {being sections 30D and 30E and the circumstances prescribed for the purposes of subsection 30E(5) in regulation 20D of the Regulations). -
AGL Macquarie Generation 4 2 0 12345678910111213141516FY15 FY16 FY17F FY18F FY19F
AGL Energy Limited Locked Bag 1837 Level 24, 200 George St T: +61 2 9921 2999 ABN: 74 115 061 375 St Leonards NSW 2065 Sydney, NSW, 2000 F: +61 2 9921 2552 AUSTRALIA AUSTRALIA www.agl.com.au ASX & Media Release AGL Investor Day 14 November 2016 AGL Energy Limited (AGL) will today host its 2016 Investor Day featuring presentations from members of AGL’s Executive Team and other members of senior management. Copies of the presentations are attached to this release and are available on AGL’s website. The Investor Day will be webcast live from approximately 12.15pm to 3:15pm and approximately 4:10pm to 5pm. You can register to view the webcast via AGL’s website at the following link: http://www.webcasts.com.au/agl141116/. A replay of the webcast will be archived on AGL’s website with the presentation materials and a transcript of the event. Further inquiries: Investors Media Nicole Rizgalla, Investor Relations Manager Kathryn Lamond, Media Manager Direct: +61 2 9921 2691 Direct: +61 2 9921 2170 Mobile: +61 400 488 836 Mobile: +61 424 465 464 email: [email protected] e-mail: [email protected] About AGL AGL is one of Australia’s leading integrated energy companies. It is taking action to responsibly reduce its greenhouse gas emissions while providing secure and affordable energy to its customers. Drawing on over 175 years of experience, AGL serves its customers throughout eastern Australia with meeting their energy requirements, including gas, electricity, solar PV and related products and services. AGL has a diverse power generation portfolio including base, peaking and intermediate generation plants, spread across traditional thermal generation as well as renewable sources including hydro, wind, For personal use only solar, landfill gas and biomass. -
Project Update Snowy 2.0 – Pumped-Hydro Project December 2018 CONTENTS
Project Update Snowy 2.0 – pumped-hydro project December 2018 CONTENTS 4 THE MODERN SNOWY HYDRO 14 WORKFORCE AND BUSINESS OPPORTUNITIES 5 ABOUT SNOWY 2.0 15 ENVIRONMENTAL ASPECTS 6 WHY WE NEED SNOWY 2.0 16 SOCIAL ASPECTS 7 KEY BENEFITS 16 RECREATIONAL USE OF THE PARK 8 PROJECT ACTIVITY TO DATE AND ONGOING 17 TRANSMISSION 10 BUILDING SNOWY 2.0 18 SNOWY 2.0 EXPLORATORY WORKS PROPOSAL 12 PLANNING AND APPROVALS 18 COMMUNITY CONSULTATION 13 WATER AND DAM LEVELS AND PROJECT FEEDBACK Talbingo Reservoir 3 THE MODERN SNOWY HYDRO ABOUT SNOWY 2.0 Snowy Hydro is a dynamic energy company supplying We have a total generation capacity of 5,500 megawatts (MW) Snowy 2.0 is a pumped-hydro expansion of the existing Snowy The ability to store water and generate power on-demand electricity to more than one million homes and businesses. and offer energy insurance and other products that provide supply Scheme which will significantly add to our existing energy means Snowy 2.0 can be ‘switched on’ very quickly. Snowy 2.0 security and price certainty to customers in the energy market. generation and large-scale storage capabilities. will pump water using the excess electricity in the system at Since the days of our pioneering past, Snowy Hydro has grown times of low demand. Then, when energy is needed most, the into the fourth-largest retailer in the energy market. Snowy Hydro also owns the electricity and gas retail Snowy 2.0 will increase the Scheme’s generation capacity by stored water will be used to generate electricity within minutes. -
Work Commences for Snowy 2.0
Autumn 2019 Work commences for Snowy 2.0 In this edition: Snowy 2.0 gets the green light Tailem Bend powers up Mick Edwards wins Apprentice of the Year Tumut's Gadara School gets a new bus WE WELCOME YOUR FEEDBACK: [email protected] 1800 623 776 ISSUE 44 Wallaces Creek Lookout Work commences for Snowy 2.0 CEO Paul Broad provides an update on our key achievements at Snowy Hydro in the last few months... What a few months it has been since our last ageing fleet of thermal power stations. In short, it edition of Snowy Hydro NEWS. Since December will keep our energy system secure. we have named our preferred tenderers for Snowy 2.0, received the NSW Government's Snowy 2.0 is not only a sound business planning approval for the Exploratory Works investment for Snowy Hydro, with more than 8% program, achieved shareholder approval of the return on investment. It also represents the most project and following all of that we commenced cost-effective way to ensure a reliable, clean construction. power system for the future. At Snowy we have a proud history and a strong When it is completed, Snowy 2.0 will be able to vision. Snowy Hydro, supercharged by Snowy 2.0, deliver 2000 megawatts (MW) of on-demand will underpin Australia’s renewable energy future generation, up to 175 hours of storage, and deliver and keep the lights on for generations to come. more competition that will keep downward pressure on prices. It’s an exciting time for our Company. -
Ryan Corner Wind Farm Environment Effects Inquiry Moyne Planning Scheme: Permit Application 20060222 Permit Application Pl07/067
RYAN CORNER WIND FARM ENVIRONMENT EFFECTS INQUIRY MOYNE PLANNING SCHEME: PERMIT APPLICATION 20060222 PERMIT APPLICATION PL07/067 INQUIRY REPORT MARCH 2008 RYAN CORNER WIND FARM ENVIRONMENT EFFECTS INQUIRY MOYNE PLANNING SCHEME: PERMIT APPLICATION 20060222 PERMIT APPLICATION PL07/067 INQUIRY REPORT Nick Wimbush, Chair Chris Banon, Member MARCH 2008 Contents 1. OVERVIEW ............................................................................................................. 1 2. WHAT IS PROPOSED?......................................................................................... 4 2.1 The subject site and surrounds................................................................................ 4 2.2 The proposal............................................................................................................... 6 3. MOYNE PLANNING SCHEME PROVISIONS............................................... 9 3.1 Policy framework ...................................................................................................... 9 3.1.1 State Planning Policy Framework (SPPF) ...................................................... 9 3.1.2 Local Policy Planning Framework (LPPF) ................................................... 10 3.2 Zone provisions ....................................................................................................... 11 3.3 Overlay provisions.................................................................................................. 11 3.4 Particular provisions.............................................................................................. -
Snowy 2.0 Update - Exploratory Works Underway
6/23/2021 All systems go - latest news from Snowy Hydro Snowy 2.0 update - Exploratory Works underway The Snowy 2.0 Exploratory Works are well underway and there has been plenty of progress on the project. Roads contractor Leed Engineering and Construction has forged ahead with upgrades to Lobs Hole Ravine Road, despite some periods of wild winter weather, and these are due to be completed by the end of the year. A temporary pedestrian bridge is also being installed across Wallace Creek to enable our principal contractor Future Generation access to the exploratory tunnel portal site. When access is completed, the first tunnel construction will get underway with drill and blast methodology. This exploratory tunnel will allow further geological investigations to be carried out at the underground cavern location, with horizontal core hole drilling conducted in-situ. This work is very important as it provides us with information needed to finalise the technical design of the power station cavern, which will be located hundreds of metres below ground. Construction of the first workers’ accommodation camp is due to start in coming months and should be finished early next year. Initially, during the Exploratory Works phase, the accommodation units will be home to around 150 people. Each single bedroom unit will contain an ensuite, bed, desk, television, small refrigerator and reverse-cycle air conditioner. The Exploratory Camp will also have a gym, recreational facilities, dining area and kitchen. Given the project’s location in the Snowy Mountains, all of these buildings are built to withstand up to three metres of snow! Snowy Hydro hosted its latest round of community consultations in July and August, with staff from Future Generation also attending. -
Future Generation and Voith Hydro. SNOWY
ISSUE 45 WINTER 2019 ALL SYSTEMS ARE G ! Introducing Future Generation Guthega Station gets an upgrade Celebrating 70 years of Snowy Out and about in the community INSIDE CEO UPDATE 3 CEO UPDATE CEO Paul Broad gives an update on our key 4 SNOWY 2.0: PROJECT UPDATE achievements at Snowy Hydro in the last few months. 6 INTRODUCING FUTURE GENERATION JOINT VENTURE AND VOITH HYDRO 8 SNOWY 2.0: FEEDBACK SURVEY elcome to the 45th edition In April, we appointed the Future Generation of Snowy Hydro NEWS, Joint Venture as principal contractor to 9 DISCOVER THE SNOWY SCHEME which features a fresh new construct Snowy 2.0. Increasingly you will see 10 GUTHEGA CONTINUES TO MAKE HISTORY look and the latest news and Future Generation staff around the region and information about Snowy there is an introductory story about them in this 12 OUR PROUD HISTORY WHydro, especially for the Snowy Mountains newsletter. community. 13 70 YEARS OF SNOWY Later this month, the Snowy team will once It has been 70 years since the first blast marked again be hosting Snowy 2.0 community 14 PART OF THE COMMUNITY the start of the Snowy Scheme. Since then, information sessions across Snowy Mountains investment in and maintenance of our assets towns. We look forward to seeing you there has ensured we can help keep the lights on with the first session on June 25. across the National Electricity Market. On the retail front, Red Energy’s award- Renewal and upgrade works are ongoing on winning service and commitment to delivering the Scheme, with the current works including a additional value for customers is highlighted by major operation at our inaugural power station, passing the one-year mark with our Red Energy Guthega, to replace the generator in Unit 1 after Qantas Frequent Flyer offer. -
Clean Energy Australia 2010 Exit Full Screen Index
exit full screen index Grade 2/3 St John’s Lutheran Primary School, Portland at Pacific Hydro’s Cape Bridgewater Wind Farm Wind Cape Bridgewater Primary School, PortlandHydro’s Lutheran at Pacific John’s 2/3 St Grade Clean Energy Australia 2010 exit full screen index Contents Introduction 4 Australian Renewable Energy Snapshot 5 Renewable Energy Year in Review 7 Household clean energy technologies 7 Large-scale renewable energy projects 8 Major projects under construction 9 Renewable Energy Jobs 10 Investment 14 Electricity Prices 15 State by State Snapshot 16 Federal Government Initiatives 21 Clean Energy Ambassador – Danny Frawley 23 Summary of Clean Energy Technologies 24 Bioenergy 25 Geothermal 28 Hydro Power 30 Photovoltaic Solar Panels 33 Large-scale Solar 39 Solar Water Heating 42 Wave and Tidal Energy 46 Wind Power 49 Energy Efficiency 54 Appendix 57 About the Clean Energy Council 57 The Clean Energy Council is the peak body representing Australia’s clean energy sector. It is a not-for-profit industry association made up of more than 450 member companies operating in the fields of renewable energy and energy efficiency. Clean Energy Australia 2010 2 exit full screen index Contents Figures Figure 1. Estimated annual electricity generation 5 Figure 14. Annual capacity of solar PV installed 35 in Australia (2001–2010) Figure 2. Estimated percentage contribution 6 of each technology to renewable generation Figure 15. Cumulative number of solar PV system 36 installations in Australia Figure 3. Cumulative installed capacity of 7 small-scale solar PV (2001-10) Figure 16. Total number of accredited installers 37 and designers in Australia Figure 4.