BUILDING STRONGER COMMUNITIES Wind's Growing
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Wind Turbine Transportation
Wind Turbine Transportation Temporary delays – Gateway Motorway / Mt Gravatt-Capalaba Road intersection May 2019 – July 2019 Saturday to Thursday nights between 10pm and 12am Saturday to Thursday nights (six nights per week), between 10pm and 12am, the intersection of the Gateway Motorway and Mt Gravatt-Capalaba Road will be closed intermittently, for approximately 15-20 minutes, to allow for the safe movement of oversize vehicles transporting wind turbine blades and large tower sections to the Coopers Gap Wind Farm near Cooranga North. Traffic will be held at the Gateway Motorway / Mt Gravatt-Capalaba Road intersection and on the motorway off-ramp until it is safe to continue. We will try to minimise the disruption to other road users where possible, but some delays are to be expected. These temporary closures will be in place between May and July 2019. Closure times Gateway Motorway / Mt Gravatt-Capalaba Road intersection • Saturday to Thursday nights (six nights per week), intermittent closures between 10pm – 12am, from May to July 2019 Transportation of oversize wind turbine components Between January and November 2019, components for the wind farm’s 123 GE wind turbines will be transported over 300km from the Port of Brisbane to the Coopers Gap Wind Farm site. In total there will be approximately 1200 oversize transport movements to deliver all of the wind turbine components to site – including blades, tower sections, hubs and nacelles. The blades, which are up to 67.2 metres long, are the largest wind turbine blades ever transported in Australia. The movement of such large pieces of equipment requires detailed planning and coordination. -
Report: the Social and Economic Impact of Rural Wind Farms
The Senate Community Affairs References Committee The Social and Economic Impact of Rural Wind Farms June 2011 © Commonwealth of Australia 2011 ISBN 978-1-74229-462-9 Printed by the Senate Printing Unit, Parliament House, Canberra. MEMBERSHIP OF THE COMMITTEE 43rd Parliament Members Senator Rachel Siewert, Chair Western Australia, AG Senator Claire Moore, Deputy Chair Queensland, ALP Senator Judith Adams Western Australia, LP Senator Sue Boyce Queensland, LP Senator Carol Brown Tasmania, ALP Senator the Hon Helen Coonan New South Wales, LP Participating members Senator Steve Fielding Victoria, FFP Secretariat Dr Ian Holland, Committee Secretary Ms Toni Matulick, Committee Secretary Dr Timothy Kendall, Principal Research Officer Mr Terence Brown, Principal Research Officer Ms Sophie Dunstone, Senior Research Officer Ms Janice Webster, Senior Research Officer Ms Tegan Gaha, Administrative Officer Ms Christina Schwarz, Administrative Officer Mr Dylan Harrington, Administrative Officer PO Box 6100 Parliament House Canberra ACT 2600 Ph: 02 6277 3515 Fax: 02 6277 5829 E-mail: [email protected] Internet: http://www.aph.gov.au/Senate/committee/clac_ctte/index.htm iii TABLE OF CONTENTS MEMBERSHIP OF THE COMMITTEE ...................................................................... iii ABBREVIATIONS .......................................................................................................... vii RECOMMENDATIONS ................................................................................................. ix CHAPTER -
Project Updates Further Details Are Available in the Application Week Ending 28 April 2017 for Electricity Generation Authority: AGL Hydro
approximately 50km south-west of Kingaroy and 65km north of Dalby. The Regulator is seeking feedback from interested persons with regards to issuing AGL Hydro Partnership (the operator of the proposed generator) a generation authority for the Coopers Gap Wind Farm. Project Updates Further details are available in the Application Week ending 28 April 2017 for electricity generation authority: AGL Hydro Partnership for the Coopers Gap Wind Farm information paper. Off-Site Renewable Energy EOI 26 April Have your say Monash University (Monash) is inviting Written submissions about the proposed Expressions of Interest (EOI) from suitably Coopers Gap Wind Farm are welcome. Please qualified, experienced and resourced send your submissions to: providers for the long-term contract supply of 45 to 55 GWh of electricity from a renewable Email: energy source. The contract will also include [email protected] the provision of renewable energy certificates, namely Large-scale Generation Mail: Attn: Andrea Wold Certificates (LGC's). Regulation, Governance and Analytics Department of Energy and Water Supply More information available from PO Box 15456 https://www.tenderlink.com/monashuni/ CITY EAST QLD 4002 Source: Monash University Submissions close at 5pm on Monday, 1 May 2017. Source: Queensland Government Coopers Gap Wind Farm Click on project to go to online datasheet: Coopers Gap Wind Farm Under the Electricity Act 1994, the Regulator (i.e. the Director-General of the Department of Energy and Water Supply) issues authorities (licences) for generation, transmission and distribution activities in Queensland’s electricity industry. Storage to strengthen Victoria’s energy system When an applicant applies for a generation 27 April authority to connect generating plant with The Andrews Labor Government is calling for capacity greater than 30 megawatts (MW) to detailed proposals for large scale battery a transmission grid or supply network, the energy storage facilities in western Victoria. -
FINAL REPORT Annual Market Performance Review 2014
ghgh FINAL REPORT Annual Market Performance Review 2014 16 July 2015 Reference: REL0055 Final Report Inquiries Reliability Panel Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E: [email protected] T: (02) 8296 7800 F: (02) 8296 7899 Reference: REL0055 Citation Reliability Panel, Annual Market Performance Review 2014, Final report, 16 July 2015, Sydney About the Reliability Panel The Reliability Panel (Panel) is a specialist body established by the AEMC and comprises industry and consumer representatives. It is responsible for monitoring, reviewing and reporting on reliability, security and safety of the national electricity system and advising the AEMC in respect of such matters. The Panel’s responsibilities are specified in section 38 of the National Electricity Law. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Foreword I am pleased to present this report setting out the findings of the Reliability Panel's annual review of market performance. The Panel carried out this review in accordance with the requirements of the National Electricity Rules where we have reviewed the performance of the National Electricity Market (NEM) in terms of reliability, security and safety over the 2013-14 financial year. The NEM regions experienced the warmest spring on record for Australia in 2013. Temperatures were warmer than average for Australia over summer and autumn with a number of heat waves affecting Victoria, South Australia and Tasmania during January 2014. -
Annual Report 2017/18 Overview Agency Performance Significant Issues Disclosures and Legal Compliance Appendices
OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES ANNUAL REPORT 2017/18 OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES Statement of compliance Hon. Ben Wyatt MLA Treasurer 11th Floor, Dumas House Havelock Street West Perth WA 6005 Dear Treasurer ECONOMIC REGULATION AUTHORITY 2017/18 ANNUAL REPORT In accordance with section 61 of the Financial Management Act 2006, I hereby submit for your information and presentation to Parliament, the annual report of the Economic Regulation Authority for the financial year ended 30 June 2018. The annual report has been prepared in accordance with the provisions of the Financial Management Act 2006, the Public Sector Management Act 1994 and the Treasurer’s Instructions. Yours sincerely, Nicola Cusworth Chair 2 / Economic Regulation Authority Annual Report 2017/18 OVERVIEW AGENCY PERFORMANCE SIGNIFICANT ISSUES DISCLOSURES AND LEGAL COMPLIANCE APPENDICES Contact details Accessing the annual report Office address The 2017/18 annual report and previous reports are Level 4, Albert Facey House available on the ERA’s website: www.erawa.com.au. 469 Wellington Street To make the annual report as accessible as possible, Perth WA 6000 we have provided it in the following formats: Office hours 9:00am to 5:00pm • An interactive PDF version, which has links to other Monday to Friday (except public holidays) sections of the annual report. Postal address • A version with separate chapters to reduce file size PO Box 8469 and download times. Perth WA 6849 • A text version, which is suitable for use with screen Telephone 08 6557 7900 reader software applications. Fax 08 6557 7999 Email [email protected] This report can also be made available in alternative formats upon request. -
White Rock Wind and Solar Farm
WHITE ROCK Solar Farm NEWSLETTER AUGUST 2017 WHITE ROCK WHITE ROCK Wind Farm Solar Farm Turning the first sod at the White Rock Solar Farm project site. From the left: Acting Mayor of Inverell Shire Council - Cr Anthony Michael, Vice President Investment of Goldwind Australia - Mr Ning Chen, Deputy Prime Minister and Member for New England - Mr Barnaby Joyce, Managing Director of Goldwind Australia - Mr John Titchen, Mayor of Glen Innes Severn Council – Cr Steve Toms. Welcome to the second combined White Rock Wind Farm and White Rock What’s happening? Solar Farm newsletter. This newsletter White Rock Wind Farm switches on turbines The first turbines at White Rock Wind Farm have now been provides information and updates connected to TransGrid’s network and are producing electricity. about both projects. Newsletters will NSW transmission network operator and manager TransGrid, continue to be distributed regularly along with sub-contractor Zinfra, designed, constructed and commissioned White Rock Wind Farm’s 33/132 kV substation and as the projects progress and milestones transmission line to connect the project to the NSW transmission are achieved. network and the National Electricity Market. The 175 megawatt (MW) White Rock Wind Farm White Rock Solar Farm Ground-Breaking Ceremony is in the New England Tablelands approximately On Monday 10 July, a Ground-Breaking Ceremony was held 20 km west of Glen Innes and 40 km east of Inverell. on the solar farm project site to celebrate the start of Stage 1 will consist of 70 wind turbines along with the construction. related civil and electrical infrastructure. The project is expected to be fully operational by late-2017. -
Wind Energy in NSW: Myths and Facts
Wind Energy in NSW: Myths and Facts 1 INTRODUCTION Wind farms produce clean energy, generate jobs and income in regional areas and have minimal environmental impacts if appropriately located. Wind farms are now increasingly commonplace and accepted by communities in many parts of the world, but they are quite new to NSW. To increase community understanding and involvement in renewable energy, the NSW Government has established six Renewable Energy Precincts in areas of NSW with the best known wind resources. As part of the Renewable Energy Precincts initiative, the NSW Department of Environment, Climate Change and Water (DECCW) has compiled the following information to increase community understanding about wind energy. The technical information has been reviewed by the Centre for Environmental and Energy Markets, University of NSW. The Wind Energy Fact Sheet is a shorter and less technical brochure based on the Wind Energy in NSW: Myths and Facts. The brochure is available for download at www.environment.nsw.gov.au/resources/climatechange/10923windfacts.pdf. For further renewable energy information resources, please visit the Renewable Energy Precincts Resources webpage at http://www.environment.nsw.gov.au/climatechange/reprecinctresources.htm. 2 CONTENTS CONTENTS ...............................................................................................................3 WIND FARM NOISE ..................................................................................................4 WIND TURBINES AND SHADOW FLICKER...........................................................11 -
Clean Energy Fact Sheet We All Want Affordable, Reliable and Clean Energy So We Can Enjoy a Good Quality of Life
Clean Energy fact sheet We all want affordable, reliable and clean energy so we can enjoy a good quality of life. This fact sheet sets out how we’re leading a transition from fossil fuels to cleaner forms of energy. Background Minimising or, where we can, avoiding financial EnergyAustralia is one of the country’s biggest hardship is part of the challenge as we transition generators of power from fossil fuels. Each to cleaner generation. We need to do this while preserving the reliability of supply. +800 MW year we produce around 20 million tonnes Rights to of greenhouse gases, mostly carbon dioxide Our approach involves supporting the renewable energy or CO₂, from burning coal and gas to supply development of clean energy while helping our electricity to our 2.4 million accounts across customers manage their own consumption so eastern Australia. they use less energy. Because when they do For around a century, coal-fired power plants that, they generate fewer emissions and they ~$3B have provided Australians with reliable and save money. Long term affordable power and supported jobs and renewable Supporting renewable energy agreements economic development. The world is changing with fossil fuel generation being replaced by Right now, EnergyAustralia has the rights to lower emissions technologies. more than 800 MW worth of renewable energy, combining solar and wind farm power purchase The way we generate, deliver and use energy agreements, and we half-own the Cathedral 7.5% has to change. As a big emitter of carbon, it’s Rocks wind farm. Of large-scale up to us to lead the transition to cleaner energy wind and solar in a way that maintains that same reliable and project in the NEM affordable access to energy for everyone. -
National Greenpower Accreditation Program Annual Compliance Audit
National GreenPower Accreditation Program Annual Compliance Audit 1 January 2007 to 31 December 2007 Publisher NSW Department of Water and Energy Level 17, 227 Elizabeth Street GPO Box 3889 Sydney NSW 2001 T 02 8281 7777 F 02 8281 7799 [email protected] www.dwe.nsw.gov.au National GreenPower Accreditation Program Annual Compliance Audit 1 January 2007 to 31 December 2007 December 2008 ISBN 978 0 7347 5501 8 Acknowledgements We would like to thank the National GreenPower Steering Group (NGPSG) for their ongoing support of the GreenPower Program. The NGPSG is made up of representatives from the NSW, VIC, SA, QLD, WA and ACT governments. The Commonwealth, TAS and NT are observer members of the NGPSG. The 2007 GreenPower Compliance Audit was completed by URS Australia Pty Ltd for the NSW Department of Water and Energy, on behalf of the National GreenPower Steering Group. © State of New South Wales through the Department of Water and Energy, 2008 This work may be freely reproduced and distributed for most purposes, however some restrictions apply. Contact the Department of Water and Energy for copyright information. Disclaimer: While every reasonable effort has been made to ensure that this document is correct at the time of publication, the State of New South Wales, its agents and employees, disclaim any and all liability to any person in respect of anything or the consequences of anything done or omitted to be done in reliance upon the whole or any part of this document. DWE 08_258 National GreenPower Accreditation Program Annual Compliance Audit 2007 Contents Section 1 | Introduction....................................................................................................................... -
Infigen Energy Annual Report 2018
Annual Report 2019. Infigen Energy Image: Capital Wind Farm, NSW Front page: Run With The Wind, Woodlawn Wind Farm, NSW Contents. 4 About Infigen Energy 7 2019 Highlights 9 Safety 11 Chairman & Managing Director’s Report Directors’ Report 16 Operating & Financial Review 31 Sustainability Highlights 34 Corporate Structure 35 Directors 38 Executive Directors & Management Team 40 Remuneration Report 54 Other Disclosures 56 Auditor’s Independence Declaration 57 Financial Report 91 Directors’ Declaration 92 Auditor’s Report Additional Information 9 Investor Information 8 10 Glossary 1 10 4 Corporate Directory Infigen Energy Limited ACN 105 051 616 Infigen Energy Trust ARSN 116 244 118 Registered office Level 17, 56 Pitt Street Sydney NSW 2000 Australia +61 2 8031 9900 www.infigenenergy.com 2 Our Strategy. We generate and source renewable energy. We add value by firming. We provide customers with reliable clean energy. 3 About Infigen Energy. Infigen is leading Australia’s transition to a clean energy future. Infigen generates and sources renewable energy, increases the value of intermittent renewables by firming, and provides customers with clean, reliable and competitively priced energy solutions. Infigen generates renewable energy from its owned wind farms in New South Wales (NSW), South Australia (SA) and Western Australia (WA). Infigen also sources renewable energy from third party renewable projects under its ‘Capital Lite’ strategy. Infigen increases the value of intermittent renewables by firming them from the Smithfield Open Cycle Gas Turbine facility in Western Sydney, NSW, and its 25MW/52MWh Battery at Lake Bonney, SA, where commercial operations are expected to commence in H1FY20. Infigen’s energy retailing licences are held in the National Electricity Market (NEM) regions of Queensland, New South Wales (including the Australian Capital Territory), Victoria and South Australia. -
Landscape & Visual Impact Assessment
Collector Wind Farm View toward the proposed Collector Wind Farm LANDSCAPE & VISUAL IMPACT ASSESSMENT Prepared for: January 2012 Prepared by: GREEN BEAN DESIGN l a n d s c a p e a r c h i t e c t s 1 GREEN BEAN DESIGN l a n d s c a p e a r c h I t e c t s PO Box 3178 Austral NSW 2179 - Mobile 0430 599 995 Author: Andrew Homewood, Registered Landscape Architect, AILA BSc. (Dual Hons), DipLM, DipHort Principal Landscape Architect, Green Bean Design Date January 2012 Reference V5 – Final Green Bean Design – Capability Statement Green Bean Design is an experienced landscape architectural consultancy specialising in landscape and visual impact assessment. As an independent consultant Green Bean Design provide professional advice to a range of Clients involved in large infrastructure project development. Green Bean Design Principal Landscape Architect Andrew Homewood is a Registered Landscape Architect and member of the Australian Institute of Landscape Architects. With over 18 years continuous employment in landscape consultancy Andrew has completed numerous landscape and visual impact assessments for a variety of large scale electrical infrastructure and renewable energy projects, including wind energy and solar power developments. Green Bean Design has participated in fourteen wind energy projects across New South Wales and Victoria including assessments for: • Silverton Wind Farm • Boco Rock Wind Farm • Collector Wind Farm • Crookwell 3 Wind Farm • Sapphire Wind Farm • Willatook Wind Farm • Eden Wind Farm • Birrema Wind Farm • White Rock -
Draft Minutes of Meeting 8
Yass Valley Wind Farm & Conroys Gap Wind Farm Level 11, 75 Miller St NORTH SYDNEY, NSW 2060 Phone 02 8456 7400 Draft Minutes of Meeting 8 Yass Valley Wind Farm & Conroys Gap Wind Farm Community Consultation Committee Present: Nic Carmody Chairperson NC Paul Regan Non-involved landowner PR John McGrath Non-involved landowner JM Rowena Weir Non-involved landowner RW Tony Reeves Involved landowner TR Chris Shannon Bookham Ag Bureau CS Peter Crisp Observer PC Barbara Folkard Observer BF Brian Bingley Observer BB Wilma Bingley Observer LB Noeleen Hazell Observer NH Bruce Hazell Observer BH Alan Cole Observer AC Andrew Bray Observer AB Mark Fleming NSW OEH (Observer) MF Andrew Wilson Epuron AW Donna Bolton Epuron DB Julian Kasby Epuron JK Apologies: Sam Weir Bookham Ag Bureau Wendy Tuckerman Administrator Hilltops Council Neil Reid Hilltops Council Stan Waldren Involved landowner YASS VALLEY & CONROYS GAP WIND FARM PTY LTD COMMUNITY CONSULTATION COMMITTEE Page 2 of 7 Absent: Councillor Ann Daniel Yass Valley Council Date: Thursday 23rd June 2016 Venue: Memorial Hall Annex, Comur Street, Yass Purpose: CCC Meeting No 8 Minutes: Item Agenda / Comment / Discussion Action 1 NC opened the Community Consultation Committee (CCC) meeting at 2:00 pm. - Apologies were noted as above. 2 Pecuniary or other interests - No declarations were made. 3 Minutes of Previous meeting No comments were received on the draft minutes of meeting number 7, which had been emailed to committee members. The draft minutes were accepted without changes and the finalised minutes will be posted on the project website. AW 4 Matters arising from the Previous Minutes JM raised that the planned quarterly meetings had not been occurring and that the previous meeting was in March 2014.