Kot Quartz & Feldspar Mining Project | ML No. 785/12
Total Page:16
File Type:pdf, Size:1020Kb
Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) FORM -1M 1 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) (I) Basic Information S.No. Item Details 1. Name of the project/s Kot Quartz & Feldspar ML No. 785/2012 2. S.No. in the schedule 1(a) as per MoEF EIA notification dated 14th Septemeber 2006 and its subsequent amendments thereafter. 3. Proposed capacity/area/length/tonnage to Proposed Capacity - 92134 TPA (ROM) be handled/command area/lease Lease Area - 4.062 Ha area/number of wells to be drilled 4. New/Expansion/Modernization Existing mine 5. Existing Capacity/Area etc. 4.062 Ha 6. Category of Project i.e. ‘A’ or ‘B’ As per MoEF Notification No. [Z- 11013/98/2014-IA-II (M)] dated 1st July 2016. The said project comes under Category B2 because this particular mining lease is registered after Dated - 09.09.2013 therefore it is covered in cluster. Total area of all the mining leases covered under the cluster is not exceeding 25 ha. 7. Does it attract the general condition? If No yes, please specify 8. Does it attract the specific condition? If No yes, please specify. 9. Location Plot/Survey/Khasra No. 525,526,527,531,533, Khasra No. 534,535 Land Status Pvt. Land G.T. Sheet No. 45K/03,45K/04, 45G/16,45G/15 Village Kot Tehsil Raipur District Bhilwara State Rajasthan 10. Nearest railway station/airport along with Nearest railway station:- Lawasardargarh R.S. at distance in Kms. a distance of 16.0 Km S/W Nearest airport: Dabok (Udaipur) at a distance of 85Km SW 11. Nearest Town, city, District Headquarters Nearest Town: alongwith distance in kms. Kot At A Distance Of 1.6 Km NNW Nearest District Headquarter: Bhilwara At A Distance Of 52 Km SE 12. Village Panchayats, Zila Parishad, Village Panchayat: Kot 2 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) S.No. Item Details Municipal Corporation, Local body Municipal Corporation: Raipur (complete postal addresses with telephone Zila Parishad: Bhilwara nos. to be given) (Tel – +91 1482 253277) 13. Name of the Applicant M/s Mahalaxmi Minerals 14. Registered Address Ward No.- 14, Surajpura, Tehsil - Raipur, Distt. - Bhilwara (Raj.) 15. Address of Correspondence Name Shri Girdhari Lal Jat S/o Shri Mangi Lal Jat Designation (Owner/Partner/CEO) Partner Address R/o Ward No. - 14,Surajpura Tehsil - Raipur, Dist. - Bhilwara (Raj.) E-mail [email protected] Telephone No. 9982362021 Fax No. Nil 16. Details of Alternative Sites examined, if Mining is a site specific project which cannot be any Location of these sites should be shifted elsewhere. shown on a Toposheet. 17. Interlinked Projects None 18. Whether separate application of interlined Not applicable Project has been submitted (a) If Yes, Date of submission (b) If no, reason 19. Whether the proposal involves approval/clearance under: (a) The Forest (Conservation) Act, No 1980? (b) The Wildlife (Protection) Act, No 1972? (c) The C.R.Z. Notification, 1991? No If Yes, details of the same and their status to be given. 20. Whether there is any Government No Order/Policy relevant/relating to the site? 21. Forest land involved (Hectares) No 22. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a) Name of the Court Nil (b) Case No. Nil (c) Order/directions of the Court, if Nil any and its relevance with the proposed project 3 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) "I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at own risk and cost. Date: For: - (M/s Mahalaxmi Minerals) Place: Bhilwara Girdhari Lal Jat Partner NOTE: 1. The projects involving clearance under Coastal Regulation Zone Notification, 1991 shall be submitted with the application and C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z. (at the stage of TOR) and the recommendations of the State Coastal Zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in the CRZ. 2. The projects to be located within 10 km. of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by the Chief Wildlife Warden showing these features vis-a-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of EC)". 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarifications, as may be required from time to time, participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project". 4 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) (II) Environmental Sensitivity S.No. Areas Name/ Aerial distance (within 15 km. Proposed Identity project location boundary) 1. Areas protected under international No None conventions, national or local legislation for their ecological, landscape, cultural or other related value 2. Areas which are important or sensitive Yes Pond:- for ecological reasons – Wetlands, (1) Nari Sagar 0.30 Km NW water courses or other water bodies, (2) Padam Sagar 4.4 Km NW coastal zone, biospheres, mountains, (3) Bhilmagra Pond 11.1 Km SW forests (4) jilola Pond 7.2 Km SW (5) Manohar Sagar 12.4 Km SW (6) Jharol Pond 9.1 km SW (7) mokhanda Pond 3.9 Km SE (8) Devariya Pond 9.8 Km SE (9) Galwan pond 8.8 Km SE (10) Kosithal Pond 10.8 Km SE (11) Khemana Pond 5.9 km SE (12) Atawara Pond 10.1 Km SE (13) Nandsa pond 12.6 km East (14) Palra Pond 4.0 Km NE (15) Khemuniya Pond 8.5 km NE (16) Raipur Pond 10.5 Km NE (17) Kavarda Talav 11.5 Km NE (18) Borana Pond 9.5 Km NE (19) Bhinta pond 11.5 Km NE River:- (1.) Chandrabhaga River 12.8 Km SW (2.) Kothari River 6.5 Km. (3.) Koshithal Bala 11.2 Km SE 3. Areas used by protected, important or No None sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground Yes (1.) Kot : - 1.6 km. NNW. waters (2.) Palra:- 5.4 Km NE (3.) Kolikhera:- 1.5 SE 5. State, National boundaries No Not Applicable 6. Routes or facilities used by the public No None within 15 Km aerial distance for access to recreation or other tourist, pilgrim areas 7. Defense installations No Not Applicable 5 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) S.No. Areas Name/ Aerial distance (within 15 km. Proposed Identity project location boundary) 8. Densely populated or built-up area Yes Kot-1.6 km.NNW. 9. Areas occupied by sensitive man-made Yes Kot-1.6 km.NNW. land uses (hospital, schools, places of worship, community facilities) 10. Area containing important, high quality Yes Minerals - Quartz & Feldspar or scarce resources (ground water Water table is observed 25 m to 30 m resources, surface resources, forestry, below the surface during pre - monsoon agriculture, fisheries, tourism, and post-monsoon period respectively. minerals) Ultimate working level is above the water table. Hence water table will not get intersected. 11. Areas already subjected to pollution or No None environmental damage. (those where existing legal environmental standards are exceeded) 12. Area susceptible to natural hazard No Seismic Zone II (Low Damage Risk Zone) which could cause the project to as per IS 1893 (Part-I): 2002. present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions) Proposed Terms of Reference for EIA studies: This is a B2 Category Project, and therefore in the light MoEF Notification No. J- 13012/12/2013-IA-II (I), dated 24.12.2013, it is requested that direct Environmental Clearance may kindly be granted. Date: (M/s Mahalaxmi Minerals) Place: Bhilwara Girdhari Lal Jat Partner 6 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) PRE-FEASIBILITY REPORT 7 Kot Quartz & Feldspar Mining Project | M.L. No. 785/12 | Lease Area 4.062 Ha | Proposed Capacity - 92134 TPA (ROM) 1. Executive Summary: This project is for getting EC for the production of Quartz & Feldspar minerals over the lease area of 4.062 Ha (M.L. No. 785/2012) near Village -Kot, Tehsil- Raipur & District - Bhilwara owned by M/s Mahalaxmi Minerals. Table 1: Salient features of the mine site S.No. Particulars Details A. Project Name Kot Quartz & Feldspar Mine B.