Semi-annual Environmental Monitoring Report

Project No. 42248-013 June 2019

Second Hill Tracts Rural Development Project (CHTRDP II)

This Semi-annual Environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Project No. 42248-013 Second Rural Development Project

J

an

June 2019

Environmental

Monitoring Report

0

Environmental Monitoring Report Jan – June 2019

2763-BAN (SF): Second Chittagong Hill Tracts Rural Development Project CHTRDP II

Project No. 42248-013

Environmental Monitoring Report Jan-June 2019

Prepared by: Md.Maksudul Amin Environmental Engineer (Individual Consultant) Safeguard and Quality Monitoring Cell (SQMC) Project Management Office Second Chittagong Hill Ttracts Rural Development Project, for the Peoples Republic of and The Asian Development Bank

1

Environmental Monitoring Report Jan – June 2019

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2

Environmental Monitoring Report Jan – June 2019

Table of Contents Abbreviations ...... 5 Glossary 6 EXECUTIVE SUMMARY ...... 7 Chapter 1 ...... 10 Introduction ...... 10 Project Background: ...... 10 1.2 Project Objectives: ...... 10 1.3 Project Output: ...... 11 1.4 Context of the Environmental Monitoring Report: ...... 12 1.5 Methodology: ...... 14 1.6 Physical Progress of Project Activities: ...... 15 1.7 Scope of the Monitoring Report: ...... 15 1.8 Change in Project Scope: ...... 16 1.9 Monitoring Requirement: ...... 16 Chapter 2 ...... 21 Environmental Monitoring...... 21 2.1 Quantitative and Qualitative Monitoring Data: ...... 21 2.2 Environmental Safeguard Issues of Rural Road Components: ...... 21 2.3 Environmental Safeguard Issues of Community Infrastructure (CI) and Micro Agribusiness Development (MAD) Component: ...... 23 2.4 Monitoring Parameter: ...... 25 2.5 Monitoring Results and Compliance Status: ...... 26 2.6 Compliance Status with GoB Policy: ...... 31 2.7 Compliance Status of ADB Safeguard Policy Statement: ...... 32 2.8 Compliance status of Environmentally Specific Loan Covenants: ...... 32 2.9 Institutional Arrangement for Implementing EMP: ...... 34 Chapter 3 ...... 37 Tree Plantation ...... 37 3.1 Background: fd ...... 37 3.2 Institutional Framework of Tree Plantation: ...... 38 3.3 Species Selection:...... 39 3.4 Ownership of Planted Trees: ...... 39 3.5 Action Plan: ...... 39 3.6 Plant Nursing: ...... 40 Chapter 4 ...... 41 Result and Corrective Action Plan ...... 41 4.1 Result: ...... 41 4.2 Corrected Action Plan: ...... 43 Chapter 5 ...... 46 Conclusion and Recommendations ...... 46 5.1 Conclusion: ...... 46 5.2 Recommendation: ...... 47

3

Environmental Monitoring Report Jan – June 2019

APPENDIX ...... 49 Appendix 1: Physical Progress of Rural Road Component ...... 49 Appendix 2: Physical Progress of CI Component ...... 58 Appendix 3: Site Specific Environmental safeguard Issues of rural Road Component particularly for Land Slide ...... 104 Appendix 5: Site Specific Environmental Safeguard Issues of Community Infrastructure and MAD Component ...... 114 Appendix 6: EMP implementation Status of Rural Road Component ...... 117 Appendix 7: EMP Implementation Status of CI and MAD Components ...... 122

List of Tables: Table 1: Monitoring Requirement 17 Table 2: Summery of environmental safeguard issues of rural road 21 Table 3: Environmental Safeguard Issues of CI Components 23 Table 4: Summery of the EMP implementation status of rural road component Error! Bookmark not defined. Table 5:Summery of the EMP implementation Status of CI component 30 Table 6: Environmental Compliances Status with Policy of GoB 31 Table 7: Compliance with Environmentally Specific Loan Covenants 32 Table 8: Institutional Responsibility Matrix of EMP 34 Table 9: Subproject Wise for Tree Plantation 37 Table 10: Action Plan for Tree Plantation 39 Table 11: Corrective Action Plan 43

4

Environmental Monitoring Report Jan – June 2019

Abbreviations

ADB : Asian Development Bank CHT : Chittagong Hill Tracts CHTDB : Chittagong Hill Tracts Development Board CHTRC : Chittagong Hill Tracts Regional Council CHTDF : Chittagong Hill Tracts Development Facility CHTRDP-I : Chittagong Hill Tracts Rural Development Project CHTRDP-II : Second Chittagong Hill Tracts Rural Development Project CDC : Community Development Committee CI : Community Infrastructure CPTU : Central Procurement Technical Unit DPD : Deputy Project Director DPMO : Project Management Office DPP : Development Project Proforma GC : Growth Centre GoB : Government of Bangladesh HBB : Herring Bone Bond HDC : Hill District Council HQ : Headquarters IEE : Initial Environmental Examination IP : Indigenous People IPP : Indigenous People Plan LAR : Land Acquisition and Resettlement LARF : Land Acquisition and Resettlement Framework LCS : Labour Contracting Society LGED : Local Government Engineering Department MAD : Micro Agribusiness Development MoCHTA : Ministry of Chittagong Hill Tracts Affairs NGO : Non-Government Organization O&M : Operation and Maintenance PAM : Project Administration Manual PIC : Project Implementation Consultants PD : Project Director PDC : Para Development Committee PMO : Project Management Office RCC : Reinforced Cement Concrete SDS : Survey, Design and Supervision SIEE : Summary Initial Environmental Examination SQMC : Safeguards and Quality Monitoring Cell SPS : Safeguard Policy Statement UNDP : United Nations Development Programme UP : Union Parishad

5

Environmental Monitoring Report Jan – June 2019

Glossary

Chittagong Hill : Chittagong Hill Tracts Regional Council is a statutory apex body Tracts Regional of the Chittagong hill tracts and consist of a chairman, fourteen Council tribal members; seven non-tribal members; chairmen of the three hill district councils (ex-officio).

Circle : Chittagong Hill Tracts are sub-divided into three units based on ethnic domain. Each unit is called circle.

Circle Chief : Circle Chief is an administrative head of a circle responsible for the administration of “tribal” justice and customary laws of the hill people, for revenue administration.

District : Administration unit headed by district commissioner comprising a number of .

Hill District Council : Hill District Council is a statutory body and consist of a chairman, twenty tribal members, and ten non-tribal members.

Headman : Headman is the mouza chief and responsible for the administration of “tribal” justice and customary laws of the hill people, for revenue administration within a Mouza.

Karbari : Karbari is the local level leadership in the Chakma justice system. Karbari assists the headmen in the judicial process.

Mouza : Mouza is composed of several villages. Mouza is officially called as Revenue Village.

Para : Administrative unit (sub-division of union).

Union : Union is an administrative unit and a subdivision of .

Union Parishad : Local government institution at union level. Union parishad consists of an elected members and chairman, and is the oldest government institution in Bangladesh.

Upazila : Upazila is an administrative unit and a sub-division of district (zila).

Upazila Parishad : Local government institution at upazila level. The upazila parishad consists of an elected chairman, two vice-chairmen (one male and one female), and ex-officio members of chairmen of union parishads.

6

Environmental Monitoring Report Jan – June 2019

EXECUTIVE SUMMARY

1. The Government of Bangladesh (GoB) has obtained a loan from Asian Development Bank (ADB) for financing Second Chittagong Hill Tracts Rural Development Project. Total cost of the project is $70.80 million, out of which $55.00 million is financing by ADB, $14.40 million by GoB financing and $1.40 million by the local beneficiaries. The project has been started since January 2012. Though it is expected that it will be accomplished by 30th June 2019 but considering the field difficulties it is decided to extend the completion of the project period up to 30th June 2020.

2. The Project’s impact is to increase rural household incomes in subproject areas in Chittagong Hill Tracts and its outcome is increased income-generating opportunities for people in subproject areas. The Project comprises five main outputs - (i) institutional development and capacity building, (ii) upgraded 166 km of rural roads, (iii) development of community infrastructure in 600 villages, (iv) sustainable micro agribusiness development in 9 upazilas, and (v) efficient project management operationalized. Ministry of Chittagong Hill Tracts Affairs is the executing agency, the Chittagong Hill Tracts Regional Council is the lead implementing agency, and the Local Government Engineering Department is the implementing agency for the rural road component.

3. In compliance with the loan covenant, this semistral environmental report has been prepared. This report describes the status of implementation and compliance of the Environmental Management Plan (EMP) to satisfy the environmental safeguard requirements of ADB and GoB as well as to fulfil the requirements mentioned in the loan document. This report also describes the environmental mitigation related any corrective and preventative actions with respect to each subproject for the period from January to June 2019.

4. The SQMC consultant has visited all the packages of contracts for the upgrading works of roads under rural road component and 32 completed and ongoing development works of community infrastructure subprojects. This report comprise of post monitoring of CI component in most cases and regular monitoring of rural road and micro agree business development

7

Environmental Monitoring Report Jan – June 2019

component. The major environmental concerns for the improvement of rural road and community infrastructure subprojects are – congestion of natural water flow channel due to unstable and improper management of excavated soil along with improper removal of diversion road, threat of hill slide due to steep cut of hill, soil erosion and sedimentation, slope instability, topsoil disturbance, disturbance of vegetation, degradation of surface water, soil induced dust pollution. Besides these, occupational health and safety issues are also very concern factor in all form of work. The slope maintain during cutting of hill is not maintained. The contractors are not very aware regarding the environmental issues. Protection of vegetation, direct loss of trees are considered by the contractors sometimes.

5. The environmental mitigation measures during the pre-construction stage of all sub projects was satisfactory. Checking of environmental mitigating infrastructure design in all rural road improvement subprojects and CI components have been done effectively during design and pre- construction stage. In all subprojects, environmental issues have been identified and EMPs have been prepared as a part of feasibility study report; and incorporated in bidding documents and contracts.

6. Contractor’s obligations in respect of implementation of EMP is partially satisfied with a lot of dissatisfaction. It might be happen that the contractor are not aware or capable to handle the environmental issues. Majority of contractors did not provide personal protective equipment - like face masks, hand gloves, helmets, high visibility clothing etc. to their workers; and first aid box with medicines was not available most of the worksites.

7. Primarily, about 91 hill spot has been identified for hill slide mitigation measures along the road side in which (Kawkhali 18, Kaptai 12, Baghaichori 03) has 33 spots , Bandarban (Sadar 12, Naikhongchari 23, Alikadam 08, Lama 14) has 57 spots and Khagrachori (Guimara 01) has 1 spot. Finally 67 spot has been finalized where mitigation measures is needed. It is found that natural water canal i.g. chara is getting congested by the huge soil dumping in some places of Lama and Alikadam Upazila. It is also found that due to inappropriate remove of diversion road of bridge construction, congestion of natural flow is being critical. Construction debris found on road which is a very risky factor for passenger as well as road longevity. Loose soil found on

8

Environmental Monitoring Report Jan – June 2019

bridge junction which create mud consequently risky factor for people and vehicle. Still no remarkable progress found regarding the soil compaction on road side.

8. Tree plantation is one of the major task in this reporting period. Though it is planned for completion the plantation activity by June but it is not possible due to adequate rainfall. It is now assumed that by July all tree plantation will be accomplished.

9. A corrective action plan and some recommendations have been suggested in this report. It is expected that LGED district offices and DPMOs will implement the corrective action plan and recommended monitoring adjustment measures; and will be able to demonstrate a substantial improvement, which will be focused in the next report.

9

Environmental Monitoring Report Jan – June 2019

Chapter 1 Introduction

1.1 Project Background:

10. The Government of Bangladesh (GoB) has obtained a loan from Asian Development Bank (ADB) for financing Second Chittagong Hill Tracts Rural Development Project. Total cost of the project is $70.80 million, out of which $55.00 million is financing by ADB, $14.40 million by GoB financing and $1.40 million by the local beneficiaries. The project has started its implementation from January 2012. Though it is expected that it will be accomplished by 30th June 2019 but considering the field difficulties it is decided to extend the completion of the project period up to 30th June 2020.

11. Poverty alleviation is the significant activities of RD&I sector. The project aims at reducing incidence of absolute poverty among the rural CHT people through undertaking community infrastructure, rural access development activities, & expanding income through micro agri- business development in the CHT Region. The CHT region lags behind in every aspect compared to other parts of the country. The project has link with ADB assisted recently completed Chittagong Hill Tracts Rural Development Project (CHTRDP). Also the UNDP’s Promotion of Development and Confidence Building in CHT region (referred to as CHT. Development Facility (CHTDF), DANIDA’s Hygiene Promotion, Sanitation & Water Supply (HYSAWA) and other agencies like as the United Children Fund (UNICEF) assisted Integrated Community Development Project (ICDP) are also working in the region on rural & social development and community empowerment.

1.2 Project Objectives:

12. The Project’s impact is to increase rural household incomes in subproject areas in Chittagong Hill Tracts (CHT) and its outcome is increased income-generating opportunities for men and women in subproject areas. The main objectives of the project are as follows:

10

Environmental Monitoring Report Jan – June 2019

(i) To contribute to a reduction in the incidence of poverty among the rural population of the CHT region and provide suitable implementation arrangements to underpin the CHT Accord and strengthen key institutions to help meet their mandated role.

(ii) To increase employment and income generating opportunities for the population through community participatory subproject development.

(iii) To promote and increase of small agri-business opportunities through stimulating agriculture production & facilitating marketing of high value environmentally friendly crops in the Chittagong Hill Tracts region.

(iv) To increase economic opportunities for rural poor, especially women, vulnerable groups and IP communities through community infrastructure development activities &construction of feeder roads including appurtenant structures.

(v) To improve watershed conditions, especially soil erosion and water conservation that will underpin the investments made in water and land improvements; and

(vi) To support institutional strengthening of MOCHTA, CHTRC and HDC to plan implement and monitor sustainable rural development in the three of Chittagong Hill Tracts i.e. Rangamati, Khagrachari and Bandarban).

1.3 Project Output:

13. The Project comprises five main outputs -

(i) Institutional Development and Capacity Building, comprising capacity building and training of executing agency, implementing agencies and relevant NGOs in the areas of indigenous peoples and safeguards issues, village mapping, and project management and organizational enhancement;

(ii) Rural Roads comprising improvement of 105 kilometres union roads and 61 kilometres upazila roads, construction of 3,884 meters bridges and culverts; and the extension of 3 functional buildings for LGED’s district office;

11

Environmental Monitoring Report Jan – June 2019

(iii) Community Infrastructure, comprising construction of 92 kilometres village access roads between and within villages and 100 market sheds, improving small-scale irrigation and water supply in up to 600 villages and participatory watershed management interventions in 6 sample watersheds;

(iv) Micro Agribusiness Development, comprising capacity building in relation to identification and exploitation of potential high-yield commodities, establishment of common interest groups to market commodities and improving cultivation of high-yield commodities in 9 upazilas; and

(v) Project Management, comprising establishment and operation of the PMO, the DPMOs and the PD (Roads) Office, provision of technical and implementation expertise from project implementation consultants, and establishment and operation of a safeguards and quality monitoring cell within the PMO.

1.4 Context of the Environmental Monitoring Report:

14. ADB affirms that environmental and social sustainability is a cornerstone of economic growth and poverty reduction in Asia and the Pacific. ADB’s Strategy 2020 therefore emphasizes assisting DMCs to pursue environmentally sustainable and inclusive economic growth. In addition, ADB is committed to ensuring the social and environmental sustainability of the projects it supports. ADB adheres to the objectives of the safeguards and their delivery. ADB assumes the responsibility for conducting due diligence and for reviewing, monitoring, and supervising projects throughout the ADB’s project cycle in conformity with the principles and requirements embodied in the SPS. The SPS of ADB is comprised of three following key areas:

i. Environmental safeguards,

ii. Involuntary resettlement safeguards,

iii. Indigenous Peoples safeguards.

12

Environmental Monitoring Report Jan – June 2019

The main objective of Environmental Safeguard is to ensure the environmental soundness and sustainability of projects and to support the integration of environmental considerations into the project decision-making process.

15. According ADB’s Safeguard Policy Statement it is clearly mentioned that, the borrower/client will monitor and measure the progress of implementation of the EMP. The extent of monitoring activities will be commensurate with the project’s risks and impacts. In addition to recording information to track performance, the borrower/client will undertake inspections to verify compliance with the EMP and progress toward the expected outcomes. For projects likely to have significant adverse environmental impacts, the borrower/client will retain qualified and experienced external experts or qualified NGOs to verify its monitoring information. The borrower/client will document monitoring results, identify the necessary corrective actions, and reflect them in a corrective action plan. The borrower/client will implement these corrective actions and follow up on these actions to ensure their effectiveness.

16. The borrower/client will prepare periodic monitoring reports that describe progress with implementation of the EMP and compliance issues and corrective actions, if any. The borrower/client will submit at least semiannual monitoring reports during construction for projects likely to have significant adverse environmental impacts, and quarterly monitoring reports for highly complex and sensitive projects. For projects likely to have significant adverse environmental impacts during operation, reporting will continue at the minimum on an annual basis. Such periodic reports will be posted in a location accessible to the public. Project budgets will reflect the costs of monitoring and reporting requirements.

17. In compliance with the loan covenant, semestral environmental monitoring report is essential. This report describes the status of implementation and compliance of the EMP to satisfy the environmental safeguard requirements of ADB and GoB as well as to fulfil the requirements mentioned in the loan document. This report also describes the environmental mitigation related any corrective and preventative actions with respect to each subproject for the period from Jan to June 2019.

13

Environmental Monitoring Report Jan – June 2019

1.5 Methodology:

18. Several type of tools are considered to prepared this semi-annual environmental monitoring report. Field visit with direct observation is the key means to gather information. Several field visit has been made to understand the situation of implementation activities through the lens of environmental safeguard. Beyond the direct field observation, random performance checks, reviewing records and document, meeting minutes, field book and consultation with relevant stakeholders such as affected persons, beneficiaries, Para Development Committee (PDC), local union parishad representative. Focus group discussion with woman group and tea stall consultation were very effective means to get the information. Project Implementation Consultant (PIC), Project Management Office (PMO) and Local Government Engineering Department (LGED) at different levels are also consulted. The following environmental issues have been considered to develop this environmental monitoring report.

 Soil impacts (loss of top soil, soil quality, etc.)  Impact upon landscape and topography;  Dust, air and water pollutions;  Drainage congestions at bridge/culvert/ diversions and other locations;  Removal of trees/vegetation;  Disruption of watersheds and catchments;  Disruption of fish/wildlife habitats;  Loss of land, household and commercial structures;  Impacts upon community and occupational health;  Risks of worker and road accidents;  Disruption of existing infrastructure (water supply, sanitation, power lines, telephone lines, etc.)

19. As a part of the project management support, consultant of the safeguards and quality monitoring cell (SQMC) provides inputs on intermittent basis to monitor compliances with environmental safeguards to ensure that the project is implemented with due concern for environmental safeguards according to the ADB’s Safeguard Policy Statement 2009, specifically to ensure that these issues are adequately addressed to the requirements of ADB.

14

Environmental Monitoring Report Jan – June 2019

1.6 Physical Progress of Project Activities:

20. The most construction work is under the rural roads (RR) component and LGED is the implementer of this component. Three functional building in three hill districts have been completed. LGED has been spilt the total road construction work into 62 packages for effective implementation and management. Among the packages, 20 is under Rangamati district (31.22 km road and 615.50 m bridge), 33 in (37.74 km road and 1210.05 m bridge) and 9 in Khagrachari district (16.74 km road and 337.25 m bridge). Among the 9 packages of Khagrachari district 5 package is done completely, 3 packages have above 95% progress and only one project having the progress of 50% which is under process for rapid completion. The average progress is 83%. In Rangamati, 72% is average progress and 86% average progress is also happened in Bandarban. Out of 9 package in , only one package is under 50% progress. In Bandarban, 220 m bridge on is still very low progress in real ground. Out of 7 packages in Baghaichari Upazila, the progress of 3 packages is only less than 40 % progress. (please see Appendix 1 for detail progress report).

21. Under the community infrastructure (CI) component, all subprojects have been accomplished successfully. (Please see Appendix 2 for detail progress report)

22. In Micro Agree-business Development component, formation of 900 farmer group and 90 agree business group has been established where progress is 100%. The progress of vegetable farming is 100%, Medicinal plant 100%, Fisheries 100%, Orchard fruit garden 100% and orchard nursery is 100%.

1.7 Scope of the Monitoring Report:

23. The scope of this report is to assess the status of implementation and compliance of the EMPs of each subprojects of improvement of rural roads (upazila and union connecting roads) and development of community infrastructures, where the construction works have been started and completed, to satisfy the environmental safeguard requirements of ADB and GoB as well as to

15

Environmental Monitoring Report Jan – June 2019

fulfil the requirements mentioned in the loan document. This report also the environmental mitigation related any corrective and preventative actions with respect to each subproject for the period from January to June 2019 and onward.

1.8 Change in Project Scope:

24. Cost of rural roads improvement including construction of ancillary structures under rural road component, and market sheds under CI component have been increased substantially. Therefore, the target of upgrading 105 km of union and 61 km of upazila (sub-district) roads, construction of 3,884 meters ancillary structures, and 100 market sheds will not be achieved within the available budgetary allocation. So, the Project implementing authorities have proposed to re- fixation project scope as upgrading 54.50 km of union roads, 30.50 km of upazila roads, construction of 2300m ancillary structures, and 24 market sheds.

1.9 Monitoring Requirement:

25. The project falls under “B” category according to ADB Safeguard Policy Statement, 2009 and “Orange B” category in accordance with the Bangladesh Environment Conservation Act 1995 and Environment Conservation Rules 1997. All rural road subprojects require an IEE; but many community infrastructure development subprojects have minimal impacts, where a desk review is adequate. IEE as a part of the subproject feasibility report for each subproject, commensurate with the degree of environmental impacts has been prepared by the implementing agencies including EMP and included in all contracts let. These are consistent with GoB and ADB requirements.

26. Monitoring parameters vary depending upon nature of the project. CHTRDP-II is a rural development project comprising improvement of rural road subprojects from earthen surfacing to brick pavement surfacing and existing damaged brick pavement surfacing to bituminous surfacing, construction of small bridges and culverts, stairs on hill slope, installation of tube/ring wells, supply of small power pumps and power tillers for improved agriculture in the hilly rural area. In each of the subproject feasibility report on rural road improvement and community infrastructure development, an EMP has been included, where mitigation measures have been commensurate

16

Environmental Monitoring Report Jan – June 2019

with the degree of environmental impacts. Environmental monitoring requirements required for this project is presented in Table 1 as follows:

Table 1: Monitoring Requirement

Factor Monitoring Timing Trigger Response Activities Clearing Clearing Following Clearing undertaken Undertake corrective vegetation surveys clearing beyond approved actions extents observed

Tree felling Tree felling and Following Tree felling beyond Record actual number and replantation tree felling approved extents of tree felling for Re-planation surveys and tree and not payment of replantation implemented the compensation to the tree replacement affected persons and project policy implement ten for one observed tree replacement project policy Topsoil Visual During Improvement of Undertake corrective saving observations improvement subproject actions and reuse of disturbed of undertaken without topsoil subproject saving stripped topsoil observed

Drainage Visual During rainy Disposal of debris Built drainage structure congestion observations season and diversion cause to drain out the rain of drainage drainage congestion water . congestion in rainy season and carry out the observed disposal of debris at sites identified for the purpose Soil erosion Visual Following Sedimentation Stack construction and observations rains occur from the materials together, sedimentation of erosion and and floods exposed earth and fence them by brick or deposition of stock piled areas earth walls and keep sedimentation near stream in road away from water bodies improvement works and drainage lines; and observed cover exposed earth surface by turf. Slope Visual During Cutting toe of hill Construct toe walls, stability observations and filling roadsides guide walls, without proper appropriate drainage

17

Environmental Monitoring Report Jan – June 2019

Factor Monitoring Timing Trigger Response Activities of cutting toe of preparation compaction for structures, and maintain hill and filling of road widening the exiting standard hill slopes as roadsides subgrade roadway observed per requirements and without cover with vegetation. compaction for widening the exiting roadway

Surface Visual Twice per Worksites wastes, Determine the contents water. observations year effluents and other of dissolved oxygen of worksite contaminant (DO), acidity (pH), wastes, causing degradation biological oxygen effluents and of surface water demand (BOD), and other observed suspended solids (SS) contaminant standard limit from the surface water causing samples; undertake degradation corrective action if of surface water exceeds national

Ground water Measuring Once per Exceed national Adopt method to purify quality presence tube standard level water for domestic use of arsenic (As), well & ring that is easy and iron well affordable to the (Fe), manganese community (Mn), chlorides (Cl), sulphate (S), acidity (pH), total dissolved solids (TDS) in water of installed tube wells and ring wells Noise: Measuring During Exceed acceptable Undertake corrective shrillness shrillness operation of level action of sound of sound (dBA) construction of equipment construction equipment

18

Environmental Monitoring Report Jan – June 2019

Factor Monitoring Timing Trigger Response Activities Fertility of Visual Twice per Decreasing soil Determine the contents Soil observations year fertility observed of silt, clay, organic of decreasing adjacent to the road carbon, total nitrogen, . soil sides exchangeable fertility magnesium, exchangeable sodium, exchangeable calcium, exchangeable potassium, cation exchange capacity, phosphorus, and soil pH; adopt acceptable method to prevent deceasing the level of soil fertility. Air pollution Visual dust Daily Excessive dust Control dust by observations plumes observed spraying water

Traffic Observation of During Potential risk and Traffic signs/signals management traffic flow construction lack of public safety should be provide; and and safety without and generate from vehicles moving potential risk operation vehicles moving including and observed transportation of lack of public equipment and safety construction materials generate from without causing any vehicles moving potential risk should be ensured. Hazardous / Transportation Weekly Spillage and Ensure to store chemical and leakage of hazardous materials on waste storage of combustible and top of sealed plastic combustible and toxic materials sheets in a secure, toxic materials observed flat enclosed area at such least 20m from any as petrol, diesel, watercourse; and used oil lubricants and oils shall and lubricants be collected and observations disposed of or recycled without causing pollution or a hazard to worker safety Health and Observation of Daily Workers working Ensure to provide Safety for without PPE

19

Environmental Monitoring Report Jan – June 2019

Factor Monitoring Timing Trigger Response Activities workers workers observed necessary PEE to working workers and their use wearing health during working hours safety gear i.e. personal protective equipment (PPE)

The frequency of submission of the Environmental Monitoring Report is defined in the loan agreement that the borrower will prepare environmental semi-annual monitoring reports, which will be described progress with implementation of the EMP and compliance issues including corrective actions, if .

20

Environmental Monitoring Report Jan – June 2019

Chapter 2 Environmental Monitoring

2.1 Quantitative and Qualitative Monitoring Data:

27. The extent of the environmental impacts is determined in qualitative term by field visits and visual inspection. On the other hand, the extent impact of environmental pollution related to surface water, ground water, air quality, noise, and soils is determined in quantitative terms by sampling a range of related parameters as well as visual inspection by field visits.

2.2 Environmental Safeguard Issues of Rural Road Components:

28. During the reporting period I have visited all the packages of rural road component, 32 packages of community infrastructure component and 24sites of micro agriculture business development component. Some of the packages of rural road component have completed and ready for tree plantation. Other packages are comprised of box cutting, earthen road surfacing to brick pavement surfacing and existing damaged brick pavement surfacing to bituminous surfacing, construction of bridges and culverts. Contract wise field visit observations on the environmental safeguard issues rural road component are presented in Appendix 4 and their summary is given in Table 2 as follows:

Table 2: Summery of environmental safeguard issues of rural road Environmental Parameter Environmental Safeguard Issues Recommendation Observed Congestion of natural It is very critical issues observed Contractor must remove the canal in this reporting period as well as diversion road and should considering the end of the project ensure the full width of the period. It is found that, most of canal to allow free movement the diversion road during of water flow. construction of bridge and culvert is not properly removed by the contractor. As a result it congest the natural flow of water and in some places it create obstacle to natural flow. At Baroitoli bazar, diversion road is not remove and

21

Environmental Monitoring Report Jan – June 2019

it work as embankment which permanently store water. As a result down stream canal has no water. On the other hand people are using this stored contaminated water for their daily purposes. Inappropriate slope Hill slope is not maintain as It is suggested to maintain the management recommended in BoQ which will slope mentioned in the BoQ. increase the risk of land slide. Slip and falls due to soil It is found that soil gather on road Contractor should properly dumping on bridge and & bridge and make risk of slip remove the soil from road HBB/BC road. and fall of passenger as well as after completion of very risky for motor cycle. construction work. They should also take measures for prevention of soils come to road surface. Threat of Hill slide It seems to me that the slope Detail site specific slope mentioned in BoQ is not protection/mitigation sufficient to protect the slides measures should be identified considering the rainfall amount and implementation the and intensity along with the type measures as early as possible. of soil. Moreover, due to not It is my observation that one maintain the recommended slope single measures is not the threat of land slide is sufficient to mitigate the risk increased as it is very steep. of land slide. Soil dust pollution There is no water spray found Contractor should follow the during field visit in any safe guard rules and EMP for construction work. Huge amount construction work and spray of soil dust found in road which water to minimize the dust disturb the nearby house hold and pollution. adjacent school/madrasha and community places. Loss/Hamper of Soil dumping due to box cutting It is a matter of awareness vegetation of road construction hampered that the other side of paddy the adjacent paddy field. filed there are sufficient space and contractor should dump the excavated soil in that side. Soil erosion and Loose soil are dumped in the road It is suggested to compact to sedimentation side which have no compaction. soil properly and make During the rainy season all loose vegetation/turfing on slope to soil travel to the down stream and reduce the erosion. cover the top soil of agricultural land. Occupational health and Occupational health and safety It is suggested to maintain safety measures are not followed except minimum safety measures the visitors hours of high official.

22

Environmental Monitoring Report Jan – June 2019

which is very risk for health like safety shoes, gloves etc. Hazardous and chemical It is found that the burnt engine It is need to inform the user to waste oil from power tiller and water recycle it or dumped it pump is not dumped properly. properly according to the guideline. Noise pollution/shrillness No such kind of even found. No action need to take place. of sound Air pollution from Smoke and emission of carbon It is suggested that at least the bitumen burning dioxide is found during melting of smoke does not directly bitumen for road construction. hamper the human being. It is also suggested that no timber is use for burning. Traffic problem due to No traffic congestion found due Water spray is suggested road construction work to construction work but people during dry season and feel disturb due to soil dust of alternative walking way road construction and mud during should introduce in risky rainy season. places of road by providing brick cheap or brick.

2.3 Environmental Safeguard Issues of Community Infrastructure (CI) and Micro Agribusiness Development (MAD) Component:

29. All CI component has been completed according to plan. The CI components are comprised of construction of market shed, installation water supply system (deep tube well, dug well and GFS), production well, water reservoir tank, upgrading of village access roads/footpaths from earthen surface to brick pavement, construction of small footbridge, culverts, stairs on hill slopes, lined irrigation canals, power pumps, power tillers, retaining wall, guide wall, protection wall and staircase for at landing station in river bank . I have visited about 32 completed CI components and 24 MAD components of different categories. I did not visit any ongoing project as all are completed. So it is the post environmental monitoring which is very important of the concept of sustainability and improvement of livelihood. The detail are presented in Appendix 5 and their summary is given in Table 3 as follows:

Table 3: Environmental Safeguard Issues of CI and MAD Components

23

Environmental Monitoring Report Jan – June 2019

Environmental Parameter Environmental Safeguard Issues Recommendation Observed

Sleep and falls Due to improper management of Re-activate the maintenance stair case, it is found that it committee of the structure become very slip trend due to regarding the issue and refresh algal growth and mud their knowledge through accumulation which seems to me training. very dangerous for people movement particularly for pregnant women and elderly people. Hazardous and chemical It is found that the burnt engine It is need to inform the user to waste oil from power tiller and water recycle it or dumped it pump is not dumped properly. properly according to the guideline. Noise pollution/shrillness No such kind of even found. No action need to take place. of sound

Lack of maintenance GFS Due to appropriate maintenance It is suggested to regular lead to different type of the water supply system (GFS) maintenance of the relevant pollution may lead to contamination. structure to avoid risk and pollution. Personal Protection No PPE found during the It is suggested to make them Equipment (PPE) operation of power tiller and aware regarding the pump machine. importance of PPE and make them habituated to use it. Contamination of Water It is found that some tube wells It is suggested to refreshers point are in threat of contamination due training of respective O/M to breakdown of sanitary seal. committee. Pollution of surrounding It is found that the surrounding It is suggested to refreshers area of tube well environment of tube wells are training of respective O/M water logged and make the area committee risky for carrying water due to threat of slipping. Lack of maintenance of It is found that most of the It is suggested to refreshers structures RCC/Brick structures have no training of respective O/M maintenance which may lead to committee major accident and loss of lives. Lack of sanitation It is found that there is no It is suggested to construct a facilities near store house sanitation facilities (Latrine & sanitation facilities near the of medical goods Urinal) near the the store house of store house with adequate medicinal goods at sapcharipara water facilities for both in Rangamati which lead to make drinking and other purposes. environmental pollution from the community people. It is also

24

Environmental Monitoring Report Jan – June 2019

increase the UTI (Urinary Tract Infection) disease particularly for women.

30. Quantitative monitoring data of surface water, noise (shrillness of sound) and soils (fertility of soil) related to environmental pollution for upgrading of rural roads and construction of bridges are equipment based and requires money. Till now the implementing agency (LGED) did not make any provision to monitor these parameters. The monitoring of ground water quality under community infrastructure component has been conducted and its quantitative data of arsenic (As), iron (Fe), manganese (Mn), chlorides (Cl), acidity (pH), and total dissolved solids (TDS) are were included in previous report (EMR: Jan-June, 2017). The field observation and practice of water supply along with maintenance of different technology particularly GFS and dug well have a potential threat of faecal contamination hence need to water quality test.

2.4 Monitoring Parameter:

31. For effective monitoring, environmental parameters have been identified as indicators which are qualitatively and quantitatively measured and compared over a period of time in order to assess the compliance to EMP. The parameters, which are identified as performance indicators, are (a) compliance with environmental management and monitoring plan; (b) compliance to national environment conservation rules; (c) monitoring of ambient surface water quality, ground water, noise levels (shrillness of sound), and soil (fertility of soils) and comparison with baseline environmental quality and national standards. As rural development project has no significant impact on air quality, monitoring of this parameter is dropped.

32. Parameter of shrillness of sound is dBA; parameters for fertility of soils are silt, clay, organic carbon, total nitrogen, exchangeable magnesium, exchangeable sodium, exchangeable calcium, exchangeable potassium, cation exchange capacity, phosphorus, and soil pH have been identified; and parameters for surface water such as dissolved oxygen, acidity, biological oxygen demand, and suspended solids have also been identified for upgrading of rural roads and construction of

25

Environmental Monitoring Report Jan – June 2019

bridges under rural road component. These parameters are not monitor due to lack of money as mentioned in para 30 above.

2.5 Monitoring Results and Compliance Status:

33. The implementation status of the environmental mitigation measures during the pre- construction stage of all sub projects was satisfactory. Checking of environmental mitigating infrastructure design in all rural road improvement subprojects has been done effectively during design and pre-construction stage in association with Survey Design and Supervision (SDS) consultants, and Deputy Team Leader of PIC. In this stage, Executive Engineers of the respective LGED district have checked the present subprojects environmental settings and identified the problems that might be occurred during construction and selected mitigation measures with implementation procedures in consultation with the community.

34. Similarly, checking of environmental mitigating infrastructure design in all community infrastructure subprojects has been done during design and pre-construction stage by the Deputy Team Leader of the PIC. In this stage, Deputy Project Directors of the respective DPMOs have checked the present subprojects environmental settings and identified the problems that might be occurred during construction and selected mitigation measures with implementation procedures in consultation with PDC of the respective para/village and community.

35. In all rural road subproject, probable occupational health and safety issues in relation to development of the subprojects were considered and incorporated into the contract documents; but the extent of the impacts of environmental pollution monitoring related to surface water, noise, and soil were not considered by the implementing agency (LGED).

36. In community infrastructure component, environmental issues have been identified and EMPs have been prepared as a part of feasibility study report; and EMPs were incorporated in the bidding documents and contracts.

26

Environmental Monitoring Report Jan – June 2019

Table 4: Summery of the EMP implementation status of rural road component

Environmental Potential Proposed Actual Compliance Parameter Impacts Mitigation Implementation Recommended Status measures as per Actions EMP Congestion of Soil excavated Contractor should Partially It should take Complied Natural Canal for road carefully handle the followed but necessary partially construction and soil mass to dump most of the sites action by the bridge considering the it is unmet contractor to construction cumulative impact remove the have dumped of the soil. It should congestion to besides the road. immediate remove ensure natural Huge amount of from the area to flow along with soil have make ensure the preventive directly narrow water flow. action avoid re- the water flow congestion. path in various project site and sometimes make obstacle of natural flow. It will be sever during the rainy season. Inappropriate Hill slope is not It is suggested to Though detail Slope Not slope management maintain as maintain the slope designed and protection complied and Threat of Hill recommended in mentioned in the assessment done measures slide BoQ which will BoQ. Detail site but no correction should be increase the risk specific slope taken. implemented as of land slide. It protection/mitigation per designed seems to me that measures should be done by EE the slope identified and mentioned in implementation the BoQ is not measures as early as sufficient to possible. It is my protect the slides observation that one considering the single measures is rainfall amount not sufficient to and intensity mitigate the risk of along with the land slide. type of soil. Moreover, due to not maintain the

27

Environmental Monitoring Report Jan – June 2019

recommended slope the threat of land slide is increased as it is very steep. Soil dust pollution There is no Contractor should Done partially Strongly Partially water spray follow the safe guard suggested to complied found during rules and EMP for minimize the field visit in any construction work dust by construction and spray water to spraying water work. Huge minimize the dust as well as amount of soil pollution. reduce mud dust found in during rainy road which season by disturb the removing it nearby house from road. hold and adjacent school/madrasha and community places. Loss/Hamper of Soil dumping It is a matter of Partially It should be Partially vegetation due to box awareness that the maintained followed complied cutting of road other side of paddy strongly. construction filed there are hampered the sufficient space and adjacent paddy contractor should field. dump the excavated soil in that side. Soil erosion and Loose soil are It is suggested to Only taken It should be Partially sedimentation dumped in the compact to soil measures where followed complied road side which properly and make bridge or culvert strongly both have no vegetation/turfing on is presence. road compaction. slope to reduce the sustainability During the rainy erosion. as well as season all loose environmental soil travel to the sustainability. down stream and cover the top soil of agricultural land. Occupational Occupational It is suggested to Not maintained It should be Not health and safety health and safety maintain minimum strongly complied measures are not safety measures maintained followed except which is very risk for

28

Environmental Monitoring Report Jan – June 2019

the visitors health like safety hours of high shoes, gloves etc. official. Hazardous and It is found that It is need to inform Partially Should Partially chemical waste the burnt engine the user to recycle it followed the carefully complied oil from power or dumped it instruction. follow the tiller and water properly according instruction. pump is not to the guideline. dumped properly. Noise No such kind of No action need to Not applicable Not applicable Not pollution/shrillness even found. take place. applicable of sound Air pollution from Smoke and It is suggested that at No correction Should take Not bitumen burning emission of least the smoke does taken some minimum complied carbon dioxide not directly hamper measures is found during the human being. It is melting of also suggested that bitumen for road no timber is use for construction. burning. Impact on Sacred It is found that a A boundary wall No action taken Should take Not land (temple and sacred land near may provide besides some minimum complied graveyard) Ruma bridge is the sacred land to necessary hampered due to protect it from noise action dust pollution and dust. and noise pollution form vehicle.

37. Construction of retaining walls and toe walls to prevent potential erosion of the road embankment as well as to limit the potential siltation of streams/ water bodies, catch drain to collect run-on from hill, adequate crossroad and road surface drainage to ensure storm runoff for preventing damage to the road and down slope features, cross-fall drains and lined side drains to direct runoff of the road surface have been provided as an environmental impact mitigating measures for upgrading rural roads and included in the BoQ. Re-vegetation/turfing over disturbed soils to prevent soil erosion and compensatory plantation were not included some in some of subprojects. Subproject wise EMP implementation status of upgrading rural road subprojects is presented in Appendix 6 and their summary is presented in Table 4 as follows:

29

Environmental Monitoring Report Jan – June 2019

38. The major activities under the community infrastructure component are construction of irrigation canal, installation of deep tube well, installation of shallow tube well, production well for irrigation, dug well, distribution of power tiller and power pump and installation of gravity flow system. From the perspective of post monitoring view, it is found that most of the stair case covered with soil which have a treat of slipping. Though Shallow tube well, dug well and gravity flow system have a potential risk of faecal contamination, but did not performed any test for it. Engine oil of power tiller and power pump is not dumped following the guide line. Some tube well found water clogging around it. Reuse of tube well water is not found. Implementation status of EMP for community infrastructure development subprojects is presented in Appendix 7 and their summary is presented in Table 5 as follows:

Table 5: Summery of the EMP implementation Status of CI and MAD component

Environmental Potential Proposed Actual Recommended Compliance Parameter Impacts Mitigation Implementation Action Status Measures as per EMP Threat of Faecal In GFS It is No action taken Routine water Not coliform in water (Gravity Flow suggested to regarding the quality test is complied. supply project of System) and water issue. recommended CI component Dug well it quality test at least once in seems to me of a year that there is mentioned particularly for possibility of water faecal contamination supply contamination of faecal technology coliform in and the tube water supply. well where distance between tube well and latrine pit is not maintain the national standard i.e. 30 feet.

30

Environmental Monitoring Report Jan – June 2019

Hazardous and It is found that It is need to Some measures Recommended Partially chemical waste the burnt inform the have been for more complied. engine oil user to placed. awareness on it from power recycle it or tiller and water dumped it pump is not properly dumped according to properly. the guideline. Noise No such kind No action Not applicable Not applicable Not pollution/shrillness of even found. need to take applicable of sound place. Slipping risk Some staircase Community Partially It should be Partially found covered people improved in maintained complied. with mud should make some places. properly and which have a it clean. strongly. potential to slipping. Lack of Due to It is Partially Strongly Partially maintenance GFS appropriate suggested to maintained recommended complied lead to different maintenance regular for regular type of pollution the water maintenance maintenance. supply system of the (GFS) may relevant lead to structure to contamination. avoid risk and pollution.

2.6 Compliance Status with GoB Policy:

39. According to the Bangladesh Environmental Conservation Act 1995 and Bangladesh Environmental Conservation Rules 1997, the project falls under “Orange B” category. The compliance with act and rules is presented in Table 6 as follows:

Table 6: Environmental Compliances Status with Policy of GoB Acts and Rules Compliance requirement Compliance Status Bangladesh Environmental Requires environmental Complied as the Conservation Act 1995 clearance from the environmental clearance for And Department of Environment.

31

Environmental Monitoring Report Jan – June 2019

Bangladesh Environmental the rural road component as Conservation Rules 1997 well as community infrastructure has been obtained from the DoE.

2.7 Compliance Status of ADB Safeguard Policy Statement:

40. The project falls under “B” category according to ADB Safeguard Policy Statement 2009 and hence an IEE is sufficient to meet the environmental requirements. IEE reports for six sample subprojects were prepared by the project preparatory consultants. An EARF also prepared by the ADB’s PPTA team. The CHTRDP-II has adopted the EARF. IEE reports including EMP for other subprojects, which were implement, or are being implemented, were prepared as part of the subproject feasibility report based on this EARF and ADB Safeguard Policy Statement 2009.

2.8 Compliance status of Environmentally Specific Loan Covenants:

41. Schedule 5 of the loan agreement stipulated environmental considerations. The compliance with environmentally specific loan covenants are shown in the Table 7 as below:

Table 7: Compliance with Environmentally Specific Loan Covenants Reference Loan Covenants Compliance Status Environment: The Borrower shall ensure or Preparation and design stage: Schedule 5, Page 20, cause the Implementing Agencies All applicable laws and Para 7 to ensure that the preparation, regulations relating to design, construction, environment, health, and safety, implementation, operation and environmental maintenance of each Subproject safeguards and EARF have been and all Project facilities comply complied for each subproject. with Implementation stage:

32

Environmental Monitoring Report Jan – June 2019

Reference Loan Covenants Compliance Status (a)all applicable laws and All applicable laws and regulations of the Borrower regulations relating to relating to environment, health, environment, the environmental and safety; safeguards; the EARF; and all (b)the Environmental Safeguards; measures and requirements set (c)the EARF; and forth in the respective IEE and (d)all measures and requirements EMP are being implemented for set forth in the respective IEE and each subproject; but health and EMP, and any corrective or safety measures for workers are preventative actions set forth in a not addressed Safeguards Monitoring Report. properly. Human and Financial The Borrower shall make available Being complied the necessary Resources to the necessary budgetary and human budgetary provision and human Implement resources to fully implement the resources for the implementation Safeguards EMPs, the RPs and the IPP. of EMPs, the RPs and the IPP. Requirements: Schedule 5, Pages 21 &11 Safeguards-related The Borrower shall ensure or cause a) Provision has been made in Provisions in the Implementing Agencies to bidding documents and works Bidding Documents ensure that all bidding documents contracts for rural road and Works and contracts for Works contain component. Similar provision has Contracts: provisions that require contractors also been made for community Schedule 5, Page 22, to: infrastructure component; Para 12 (a) comply with the measures and (b) Adequate budgetary provision requirements relevant to the has been made for all contractor set forth in the IEE, the environmental and social EMP, the RP and the IPP (to the safeguard measures except tree extent they concern impacts on Plantation and environmental affected people during pollution related to surface water, construction), and any corrective noise, and fertility of soil. or preventative actions set out in a (c) No such incidence has Safeguards Monitoring Report; appeared till date; (b) make available a budget for all (d) Being complied; such environmental and social (e) Being complied; measures; (c) provide the Borrower with a written notice of any

33

Environmental Monitoring Report Jan – June 2019

Reference Loan Covenants Compliance Status unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, the RP or the IPP; (d) adequately record the condition of roads, agricultural land and other infrastructure prior to starting to transport materials and construction; and (e) fully reinstate pathways, other local infrastructure, and agricultural land to at least their pre-project condition upon the completion of construction.

2.9 Institutional Arrangement for Implementing EMP:

42. Ministry of Chittagong Hill Tracts Affairs is the executing agency. The Chittagong Hill Tracts Regional Council (CHTRC) is the lead implementing agency, where a PMO headed by a Project Director has been established. The PMO is supported by three DPMOs headed by Deputy Project Director at each district and a team of PIC. Respective project DPMO is implementing CI components through PDC/CDC. LGED is the implementing agency for the rural road component headed by another Project Director. The responsibilities of each agencies during the various phases of the project are shown in table 8 as below:

Table 8: Institutional Responsibility Matrix of EMP Stage Agency Contact Responsibility Deliverables Pre- CHTRC/PMO Project Director Preparation of EMP, EMP, bidding construction LGED Project Director incorporation of EMP documents,

34

Environmental Monitoring Report Jan – June 2019

/Design DPMO Deputy Project into subproject monthly reports, Director feasibility report and quarterly reports, PIC Team bidding documents, semestral reports Leader/DTL and to ADB. reporting to ADB. Construction CHTRC/PMO Project Director Monitoring of EMP Monthly report, LGED Project Director implementation and quarterly reports, DPMO Deputy Project reporting to ADB. and semestral Director reports to ADB. PIC Team Leader/DTL SQMC Environmental Engineer Contractors As per signed Implementation of Report contract EMP Operation/Post CHTRC/PMO Project Director Monitoring of EMP Final report operations DPMO Deputy Project implementation Director PIC Team Leader/DTL SQMC Environmental Engineer

43. Safeguards related all measures and requirements set forth in the respective IEE and EMP are integral part of contract documents. During implementation of these works, LGED implements EMP. LGED, PIC and SQMC consultants monitor these activities. Similarly, DPMO implements and monitors EMP under CI component. LGED and DPMO send monthly monitoring report to PD, PMO. After compiling these report PMO prepares semistral report with the assistance of PIC/SQMC consultant and sends this report to ADB, MoCHTA and DoE. SQMC consultant also monitors these activities and reports to PD (PMO) and ADB directly.

35

Environmental Monitoring Report Jan – June 2019

44. A comprehensive grievance redress mechanism has been established for the project under the land acquisition and resettlement framework. The same mechanism is applied for grievances arising due to environmental impacts, with the Project Director deputing a relevant community, project team member or NGO representative to join the process depending on the nature of the grievance.

36

Environmental Monitoring Report Jan – June 2019

Chapter 3 Tree Plantation

3.1 Background:

45. As a suggestive measures from EMP, tree plantation was a very important event. It was decided that after completion of component B (Rural Road) tree plantation will be in placed following the policy 1 for 10. Social Mobilization NGO are the front line key players to implement this activities with the direct supervisor of DPMO. It is planed to accomplish the tree plantation by June 2019 but which is not done in mentioned period. The tree plantation guideline has been revised by the PMO where projected for plantation of 25,000 sapling in both side of road. Local species is selected for plantation. During this reporting period (by 30th June, 2019), though no plantation is made due to scarcity of rainfall but the PMO ensure us to make it happen when the seasonal rainfall start and subsequently will be accomplished by July 2019. The following table 9 of road packages are selected for tree plantation.

Table 9: Subproject Wise for Tree Plantation Sl No Name of Subproject Upazila District Length (km) 1 Betbunia Chairy Bazar- Laxmichari Kawkhali Rangamati 6.01 2 Betbunia Chairy Bazar- Santirhat Kawkhali Rangamati 4.68 3 Raikhali - Rajsthali Kaptai Rangamati 5.74 4 Marishy Bazar- Mayanimuk Baghaichari Rangamati 14 5 Holudia -Vaggakul Sadar Bandarban 10.31 6 Pan Bazar- Chokhyng Tripura para Alikadam Bandarban 4.4 7 Naikhongchari-Tumru Naikhongchari Bandarban 12.81 8 Lama- Rupashi para Lama Bandarban 3.33 9 Baniachara- Gazalia Lama Bandarban 8.79 10 Panchari – Bhaibonchara Panchari Khagrachari 5.61 11 Sinducchari –Dullahtali Guimara Khagrachari 4.75 12 Garitana – Batnatali Manikchari Khagrachari 6.38 Total 86.81

37

Environmental Monitoring Report Jan – June 2019

3.2 Institutional Framework of Tree Plantation:

46. The office of the Deputy Project Director (DPD), established in each of the hill districts is responsible to supervise, guide and monitor the Tree plantation implementation activities at the district level. The DPD will report to the PMO and Hill District Council (HDC) on all aspects of the project. Besides, he is also responsible for liaison and coordination at Upazila and Union Parishad level and will supervise the activities of the NGO contracted for social mobilization of the communities.

The MAD and SM-NGOs will play a vital role in the implementation of the tree plantation. Their key responsibilities are as follows:  Mobilize the affected person/ adjacent communities/ traditional leaders/ UP representatives etc. of along the improved roads.  Responsible for formation of a Tree Plantation Maintenance Committee (TPMC) as well as a procurement evaluation Committee (PEC).  They will update and guidance to TPMC ( Tree Plantation Maintenance Committee) about monitoring, supervision on tree plantation implementation process.

The (TPMC) represents their respective para’s affected person/ adjacent communities/ traditional leaders/ UP representatives etc. of along the improved roads. The Tree Plantation Maintenance Committee (TPMC) is located at Para level will be constituted with 9-11 person. The responsibilities of TPMC are as follows:

 Responsible for coordination and management of implementation of tree plantation in their respective area.  The TPMC will be responsible for Care and Maintenance of the saplings after completion of the tree plantation and  They will be responsible for sustainable O&M

38

Environmental Monitoring Report Jan – June 2019

3.3 Species Selection:

47. The common species of saplings are primarily selected for plantation which are Neem (Azadarachta indica), Mahogany (Swietenia mahagoni), Shishu (Dalbergia sissoo), Shirish (Albizia lebbek), Jam (Syzygium jambolana), Babla (Acacia 12rabica), Arjun (Terminalia arjuna), Jarul (Lagerstroemia flosreginae), Tentul (Tamarindus indica). Also Aam (Mango indica) and Jack Fruit (Artocarpus heterophylus). The saplings will be from above approved list of man-height size(five feet plus). After consultation with the department of forest, department of agriculture and local expert the species will be finalized.

3.4 Ownership of Planted Trees:

48. The representative of local government (UP Member/Chairman) should sign a MoU regarding ownership of the planted trees for all the affected persons in his area. The following parties will obtain shares (of the monetary value) of the planted trees at the time of sale. At consensus, parties may cut and sell trees after 10 years from the time of planting where Local government (Union Parisad) and Owner(s) of affected persons will get the share 45% and 55% respectively.

3.5 Action Plan:

49. It is decided to accomplish the tree plantation by June 2019 in all completed road. The following table 10 show the detail plan for tree plantation.

Table 10: Action Plan for Tree Plantation Month Activities November -December Social mobilization and formation of Tree Plantation committee and Procurement evaluation committee January Site visit, technical feasibility study and Preparation of BOQ February-March Surveying and cleaning of the plantation area April- May Manure collection and pit preparation along with transportation of sapling.

39

Environmental Monitoring Report Jan – June 2019

May- June Plantation (if adequate rainfall)

3.6 Plant Nursing:

50. The TPMC will, with the assistance of the NGO, DPMO & PIC, prepare an Operation and Maintenance (O&M) plan for monitor, nursing and care of the saplings. After plantation, watering, care of soil, weeding, vacancy filling/failed plants re-placement, prop replacement, pruning etc. will be done by the TPMC under close supervision of SM-NGOs and Union Parishad. The concerned issue for tree plantation and nursing to look after the tree. After June 2019 MAD and SM NGO’s contract will be finished. So it is now the question who will take care of the community people for nursing the tree which is not mentioned in the revised guideline of tree plantation.

40

Environmental Monitoring Report Jan – June 2019

Chapter 4 Result and Corrective Action Plan

4.1 Result:

51. The project is in the stage of third time extension which will be up to June 2020. Out of major 3 components MAD (Micro Agribusiness Development) and CI (Community Infrastructure) have been accomplished successfully. The only component which is not complete yet is the rural road component. Due to local context in terms of connectivity, political and resources availability it is happened. The major environmental impact found in the improvement of rural road construction. The previous EMR have dealt with different environmental issues. In this report I have focused on very specific issues but have a very large environmental and social impact. More over these, it is also important to notice that at the ending stage of project it is very difficult to find new environmental impact rather monitoring of previous suggestive measures.

52. Congestion of natural flow system is a very crucial issues for this reporting period. This particular issues is resulted from rural road construction. This is happen for both construction of road where massive amount of earth excavation is placed and obviously at the place of bridge or culvert construction. It is found that most of the site of bridge/culvert construction diversion roads are not properly removed. It is also a matter of bad practice that in some places no removal of diversion road which create water logging in one side and water shortage in downstream. As a result, habitats of both side of the the diversion road (which is acting as embankment) are at danger. Moreover the stagnant water is using for bathing and regular household activities through it is contaminated through nearby soak pit and other polluting agent. In this regard, it is strongly suggested that respective contractor will properly remove the diversion road and its associated materials. It is also suggested to remove or the soil mass from the pathway of natural flow resulted from soil excavation during road construction.

53. Construction debris on road is an important issue to mention here. It is found that after construction of road and bridge the debris and soil mass is not removed properly which make the road risky for passengers and vehicles. Again, during the dry season it make a huge amount of dust which is bad for health particularly for breathing problem. Moreover these, small piece of brick chips is very risky for motorcycle which are found in every bridge construction point. It is suggested to remove all the construction debris from the road to make the way risk free for people and vehicles,

54. Land slide threat for inappropriate slope cutting during road construction is very important issue highlighted in this report. The soil type of this region is very critical. It make

41

Environmental Monitoring Report Jan – June 2019

difference in very short distance even a couple of meters distance. Soil texture and soil profile also differ from its small depth. It is very difficult to find out uniform soil in long depth and distance. The most of the soil is mixture of silt, fine sand and clay along with loamy. Considering along with the soil condition, intensity of rainfall, physical communication, available materials and cost effectiveness, it is decided that one single solution is not enough to mitigate the hill slide threat. As a result 3 step measures have been suggested which are RCC retaining wall supported by RCC pile, providing geotex over the slope of the hill with appropriate nailing and bio engineering on the slope. The propose measures will not directly protect the hill slide during heavy rainfall rather it will safe the loss of live and keep the road communication live. To reduce the disturbance to hill, pile supported RCC retaining wall is suggested. Geotex will absorb the shocks of direct raindrop and protect the top soil. Local verities plants will primarily conserve the soil which will be planted by making hole on geotex wrapping. After settle down of soil it is suggested to plan local varieties of trees for long term protection of hill slide. Most of the location it is suggested for both retaining wall and geotex soil nailing with plantation. The height of retaining wall is depend on the height of hill. The length of the retaining wall is calculated in field considering the most vulnerability along with associated risks. The following table shows the required length of the proposed retaining wall. The maximum height of RCC retaining wall is considered two categories which is 5 meter and 3 meter. This table is also covered with the required area for geotex wrapping with soil nailing.

55. Tree plantation is now a burning issue for this reporting period. Though it is planed to accomplish the tree plantation by June 2019 but not possible due to lack of adequate rainfall. It is now planned to accomplish by July 2019. The tree plantation guideline has been revised by the PMO where projected for plantation of 25,000 sapling in both side of road. Local species is selected for plantation.

56. Dust pollution from soil during construction of road is not found during this reporting period as it is rainy season and most of the road construction is over. The important issue to notify is soil mass is found on road particularly in junction of bridge/culvert which create mud on road and subsequently it has created problem for people and vehicle. It is also projected that after rainy season, this soil mass will transfer to dry dust and make problem for others and children. The contractors should remove all the soil mass from the road immediately. 57. Soil erosion and sedimentation is very critically review in this report. Most of the excavated soil from road improvement are dumped besides the road without any compaction. As

42

Environmental Monitoring Report Jan – June 2019

a result it has a massive potential to erosion during rainfall and sediment over the agricultural land and forest along with congestion of natural flow.

58. Air pollution from bituminous activity of road construction is another environmental concern considering the climate change perspective. It is also found in some places that wood is using as fuel to burn the bitumen which is not a good practice at all. Though it is not very massive in this project but have some impact as carbon dioxide emission occur. The cumulative impact is aggravated if use of wood as fuel. The contractor should take care of it and it is suggested to not use of wood as fuel during road construction.

4.2 Corrective Action Plan:

59. A corrective action plan has been prepared based on the field visits and presented in table 11 as follows:

Table 11: Corrective Action Plan Identified issues Action Responsibilities Timeline Progress New Required Status Timeline Site specific hill slide Identification Environmental By Mid Report protection/mitigation of spot, detail Engineer, SQMC February, submitted measures design of 2019 guide wall, estimation and budgeting Tree plantation Formation of PMO, DPMO 30 June, Just committee, 2019. started, Approval tree will be plantation completed guideline by July, from ADB, 2019. Species Delay due selection, to late plantation. monsoon rain.

43

Environmental Monitoring Report Jan – June 2019

Identified issues Action Responsibilities Timeline Progress New Required Status Timeline Slope maintain Suggested LGED/PIC 30 June, Not according to BoQ slope 2019 followed described in BoQ should maintain properly Faecal Coliform test Collection of DPMO/PMO 30 June Not 30 of all water point sample and followed December, laboratory test 2019 in regional DPHE laboratory. Compaction of soil Immediate LGED/Contractor/PIC Ongoing, up Partially Need to besides roads which action to to done, follow up and have a potential of compact the completion finish by erosion soil and of project December provide component 30, 2019 appropriate turfing i.e. grass/trees etc Remove all the Remove all LGED/Contractor/PIC Ongoing Partially December congestion of natural the congestion done, 30, 2019 water flow. of natural need more water flow in carefull the bridge action construction point along with completely remove all the alternative

44

Environmental Monitoring Report Jan – June 2019

Identified issues Action Responsibilities Timeline Progress New Required Status Timeline road of bridge construction. Management of used Used engine PMO/DPMO/PDC Throughout Follow up engine oil: Used oil drained the life of is weak. engine oil drained from the power tiller from the power power tiller and power tillers and power and power pump pumps release over pump should supplied by land be collected in the Project that may degrade soil a separate and water. container and stored ina safe place for recycling or to use for other purpose. Soil dust pollution Spray water LGED/Contractor/PIC Up to the end Partially from road while this of the done, construction disturb the construction need more people and work. careful nearby action community. Occupational health It is suggested LGED/Contractor/PIC Up the end of Not Whole and safety to maintain the followed construction minimum construction period safety work. measures which is very risk for health like safety shoes, gloves etc.

45

Environmental Monitoring Report Jan – June 2019

Chapter 5 Conclusion and Recommendations

5.1 Conclusion:

60. The implementation status of the environmental mitigation measures during the pre- construction stage of all sub projects was satisfactory. Checking of environmental mitigating infrastructure design in all rural road improvement subprojects and CI components has been done effectively during design and pre-construction stage. In all subprojects, environmental issues have been identified and EMPs have been prepared as a part of feasibility study report; and incorporated in bidding documents and contracts.

61. This report comprise of post monitoring of CI component in most cases and regular monitoring of rural road and micro agree business development component. The major environmental concern are associated with rural road component. The major environment impact are found are , congestion of natural water flow, construction debris on road. land slide treat, erosion of lose soil, loss or disturbance of top soil, , pollution of surface water and dust pollution. Besides these, occupational health and safety issues are also very concern factor. The slope maintain during cutting of hill is not maintained. The contractors are not very aware regarding the environmental issues. Protection of vegetation, direct loss of trees are considered by the contractors carefully.

62. Primarily, about 91 hill spot has been identified for hill slide mitigation measures along the road side in which Rangamati (Kawkhali 18, Kaptai 12, Baghaichori 03) has 33 spots , Bandarban (Sadar 12, Naikhongchari 23, Alikadam 08, Lama 14) has 57 spots and Khagrachori (Guimara 01) has 1 spot. Finally 67 spot has been finalized where mitigation measues is needed. It is found that natural water canal i.g. chara is getting congested by the huge soil dumping in some places of Lama and Alikadam Upazila. It is also found that due to inappropriate remove of diversion road of bridge construction, congestion of natural flow is being critical.

46

Environmental Monitoring Report Jan – June 2019

63. It is found some water point close the latrine pit which did not maintain the safe distance of Bangladesh standard i.g. 30 feet. Though it was suggested to test feacal coliform of all water (tube well, Gravity flow system) source but not maintained.

64. The store room constructed for medicinal plan is very good initiative but there is no sanitation facilities in this premises which lead to further environmental and physical problem of entrepreneur. The drainage facilities of market shade is not found appropriate which may lead to create mud in front of shed.

65. Most of the contractors were not provided personal protective equipment - like face masks, hand gloves, helmets, high visibility clothing etc. to their workers; and first aid box with medicines was not available at worksites.

66. Filled loose earth was observed along the side slopes. This loose earth is vulnerable for soil erosion, which leads to deposition of sedimentation over the adjacent agricultural lands. Side slopes road of the road embankments were not compacted. Moreover, at some sections steep batter slopes were observed.

5.2 Recommendation:

67. It is found from direct observation from field that suggestive environmental mitigation measures are not followed or partially followed by the contractors. In some cases, they were not aware regarding the safeguard policy or issues of ADB. On the other hand implanter i.e. LGED’s concerned person like Upazila engineer, sub-assistant engineer are not very comfort regarding the environmental safeguard issues of this project. From my observation I would like to put some recommendation which could assist to ensure the environmental safeguard compliance of ADB for this project.

47

Environmental Monitoring Report Jan – June 2019

I. Capacity building the field level staff of LGED and contractors (Not the signatory contractors rather than who are in field) regarding the environmental safeguard issues through training. II. Respective environmental officer should have strong stake to clearing the bill of contractor otherwise it is not possible to make the project complied with the policy and guideline. III. Full time Engagement of a person to look after the implication of suggestive mitigation measures day by day in field. IV. Contractors should ensure to provide personal protective equipment - like face masks, hand gloves, helmets, high visibility clothing etc. to their workers; and first aid box with medicines should be available at worksites. V. Immediate action to implement the hill slide mitigation measures in identified specific sites. VI. Contractor should take special attention that natural water canal never be congested and erosion of lose soil which can make a layer on top soil. VII. It would be best fitted if the environment specialist is engaged since finalization of road alignment and other construction project. VIII. It would be great initiative if inclusion of EMP in BoQ is possible from the very beginning of further project design.

48

Environmental Monitoring Report Jan – June 2019

APPENDIX

Appendix 1: Physical Progress of Rural Road Component (Up to 30th June, 2019)

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) 1 2 3 4 5 6 7 8 14

Extension of W-CHT II- 1 Sadar RANGA-F- RCC 1 100% Functional Building BUILD/01 Protection work for W-CHT II- 2 Sadar Boundary Wall of XEN RANGA-F- RCC 1 Office, LGED BUILD/02 Total Sadar 2 2 Improvement of Betbunia Chairy W-CHTII- RANG- 3 Bazar– Laxmichari via HBB 2.39 19.20 100% Kaw- Barmachari road (Ch. UZR/01A 8100-10485m) Improvement of Betbunia Chairy W-CHTII- RANG- 4 Bazar– Laxmichari via HBB 1.62 36.90 100% Kaw- Barmachari road (Ch. UZR/01B 10485-12100m) Improvement of Betbunia Chairy Kawkhali W-CHTII- Bazar– Laxmichari via RANG- 5 HBB 2.01 51.90 100% Barmachari road Kaw- (Ch.12100-14110m) UZR/01C Rangamati Construction of 60m RCC Girder Bridge on Betbunia Chairy Bazar - Laxmichari via W-CHTII- 6 Rang-Kaw- HBB 0.50 60.00 75% Barmachari UZR/01D Connecting Road up to Raujan upazila RHD by HBB (Ch. 0.00- 495m) Sub total 4 6.51 168.00 Betbunia Chairy Bazar- Bara Aoulia-Santirhat W-CHTII- 7 Rang-Kaw- BC 2.14 18.40 100% Road at Ch.3+070- UNR/04A 5+210km Construction of 35m Kawkhali PC Girder Bridge on Betbunia Chairy Bazar- W-CHTII- 8 Rang-Kaw- BC 0.44 36.80 95% Bara Aoulia-Santirhat UNR/04B Road at Ch.5+210- 5+650 km

49

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Betbunia Chairy Bazar- Bara Aoulia-Santirhat W-CHTII- 9 Rang-Kaw- BC 2.10 21.30 95% Road at Ch.5+650- UNR/04C 7+750 km Sub total 3 4.68 76.50 Total Kawkhali 7 11.19 244.50 Construction of 25m RCC Girder Bridge on Raikhali GC Ferry W-CHTll- RANG- BC & 10 Ghat-Rajsthali HQ Via 2.39 42.40 75% Kap- HBB Mitingachari Road at UZR/06A Ch.1+070 - 1+365 & 2+550 - 4+640 km Construction of 60m RCC Girder Bridge on W-CHTll- Raikhali GC Ferry RANG- 11 HBB 1.17 70.90 40% Ghat-Rajsthali HQ Via Kap- Mitingachari Road at UZR/06B Ch.4+640 - 5+810km Rangamati Kaptai Construction of 2 Nos 25m RCC Girder Bridge on Raikhali GC W-CHTll- RANG- 12 Ferry Ghat-Rajsthali HBB 0.95 51.80 60% Kap- HQ Via Mitingachari UZR/06C Road at Ch.5+810 - 6+760km Construction of 42m & 25m RCC Girder Bridge on Raikhali GC W-CHTll- RANG- 13 Ferry Ghat-Rajsthali HBB 1.23 71.30 75% Kap- HQ Via Mitingachari UZR/06D Road at Ch.6+760 - 7+990km Total Kaptai 4 5.74 236.40 Improvement of Marishya Bazar (Upazila sadar)- W-CHTII- Mayanimukh Bazar via RANG- 14 HBB 2.46 10.30 90% Babupara, Battola & Bag- Daskin Saroatoli road UNR/02A at Ch. 10+490- Baghaichar Rangamati 12+950km (T) i Construction of 15m RCC Girder Bridge and Improvement of W-CHTII- 15 Marishya Bazar Rang-Bag- HBB 2.06 18.80 95% (Upazila sadar)- UNR/02B Mayanimukh Bazar via Babupara, Battola &

50

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Daskin Saroatoli road at Ch. 12+950- 15+010km (T)

Improvement of Marishya Bazar (Upazila sadar)- Mayanimukh Bazar via W-CHTII- 16 Rang-Bag- HBB 1.90 60% Babupara, Battola & UNR/02C Daskin Saroatoli road by HBB ( Ch. 15.01 km-16.91Km) Improvement of Marishya Bazar (Upazila sadar)- Mayanimukh Bazar via W-CHTII- 17 Rang-Bag- HBB 1.17 40% Babupara, Battola & UNR/02D Daskin Saroatoli road by HBB( Ch. 16.91km- 18.08 Km) Improvement of Marishya Bazar (Upazila sadar)- Mayanimukh Bazar via Babupara, Battola & W-CHTII- 18 Rang-Bag- BC 2.45 80% Daskin Saroatoli road UNR/02E by BC including 795m link road ( Ch.0.00 - 1.66 Km & 0.00 - 0.795 Km ) Improvement of Marishya Bazar (Upazila sadar)- Mayanimukh Bazar via W-CHTII- 19 Rang-Bag- BC 3.76 35% Babupara, Battola & UNR/02F Daskin Saroatoli road at Ch. 1.66 Km - 5.42 Km) Sub total 6 13.80 29.10 Construction of 69m RCC Girder Bridge at Ugalchari on Baghaichar W-CHTII- 20 Baghaichari Upazila Rang-Bag- BC 0.50 69.00 30% i HQ - Ugalchari via UNR/01A Bottoli Bazar Road at Ch. 4970m. Sub total 1 0.50 69.00 Total Baghaichari 7 14.30 98.10 Total Rangamati 20 31.22 579.00

51

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Extension of W-B-BAN- 21 Sadar F- RCC 1 100% Functional Building BUILD/01 Sub total 1 1 Construction of 220 m Long PSC Girder Bridge over Sangu W-B-BAN- 22 Sadar Sad- RCC 0.10 220.00 60% River on Raicha- UNR/03 Goaliakhola Road at Ch.7+150km Sub total 1 0.10 220.00 Improvement of Holudia-Vaggakul- W-B-BAN- 23 Sad- BC 1.95 1.00 90% Tankbati Road by BC UNR/02A (Ch. 3.35Km-5.30Km). Improvement of Holudia-Vaggakul- W-B-BAN- 24 Sad- BC 2.01 1.80 90% Tankbati Road by BC UNR/02B (Ch. 5.30Km-7.31Km). Improvement of Holudia-Vaggakul- Tankbati Road by BC W-B-BAN- 25 Sad- BC 1.33 36.90 90% (Ch. 7.31Km- Sadar UNR/02C 8.635Km) with 36m RCC Bridge Bandarban Improvement of Holudia-Vaggakul- W-B-BAN- 26 Tankbati Road by BC Sad- BC 2.58 0.75 80% (Ch. 8.635Km - UNR/02D 11.21Km). Improvement of Holudia-Vaggakul- W-B-BAN- 27 Tankbati Road by BC Sad- BC 2.46 0.90 60% (Ch. 11.21Km- UNR/02E 13.67Km). Sub total 5 10.32 41.35 Total Sadar 7 10.42 261.35 Construction of 28.30m long RCC Girder W-B-BAN- 28 Ruma Bridge on Ruma Sadar- RUM- RCC 0.13 28.30 100% Ruma Bazar Road at UZR/01 Ch. 1+177Km Sub total 1 0.13 28.30 Hill Protection at Approach of 28.30m Long RCC Girder W-B-BAN- 29 Ruma Bridge on Ruma Sadar- RCC 100% RUM-UZR Ruma Bazar Road by Brick Gravity Wall, Jute Geo-Textile and

52

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Cladding Clay at ch. 1+177Km

Sub total 1 0.00 0.00 Total Ruma 2 0.13 28.30 Construction of 61.0m (Ch.12+452km) long W-B-BAN- 30 RCC Girder Bridge on Nai- RCC 0.19 61.00 100% Naikhongchari - UZR/03E Tumbru Road Improvement of Naikhongchari- W-B-BAN- 31 Tumbru Road at Nai- HBB 1.85 19.40 90% Ch.13+400 - UZR/03A 15+250km Construction of 15.0m (Ch.14+620km) and 48.0m (15+125km) W-B-BAN- 32 long RCC Girder Nai- RCC 63.00 100% Bridge on UZR/03A1 Naikhongchari- Tumbru Road Construction of 60.0m RCC Bridge on Naikhongchari- W-B-BAN- 33 Nai- HBB 0.57 60.00 100% Tumbru Road at Naikhongc UZR/03B Bandarban Ch.15+250 - hari 15+820km Construction of 57.0m and 15 m RCC Bridge with Road on W-B-BAN- 34 Naikhongchari- Nai- HBB 1.08 76.00 98% Tumbru Road at UZR/03C Ch.15+820 - 16+900km Construction of 25.0m RCC and 35.0m PC Girder Bridge with Road on W-B-BAN- 35 Nai- HBB 0.74 64.30 95% Naikhongchari- UZR/03D Tumbru Road at Ch.16+900 - 17+640km Construction of 30.0m (Ch.25+805km) PC W-B-BAN- 36 Girder Bridge on Nai- RCC 0.09 30.00 75% Naikhongchari- UZR/03G Tumbru Road

53

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Improvement of Naikhongchari- W-B-BAN- 37 Tumbru Road at Nai- BC 2.21 29.90 90% Ch.25+760 - UZR/03F 27+965km Construction of 20.0m and 23.0m RCC Bridge with Road on W-B-BAN- 38 Naikhongchari- Nai- BC 0.99 53.20 97% Tumbru Road at UZR/03H Ch.27+965 - 28+955km Construction of 35.0m (Ch.27+458km) and 30.00m (29+765km) W-B-BAN- 39 Nai- RCC 0.10 65.00 85% long PC Girder Bridge UZR/03G1 on Naikhongchari- Tumbru Road Construction of 30.0m (Ch.30+570km) PC Girder Bridge with W-B-BAN- 40 Nai- BC 1.66 43.70 95% Road on UZR/03I Naikhongchari- Tumbru Road Improvement of Naikhongchari- W-B-BAN- 41 Nai- BC 3.24 17.9 100% Tumbru Road at UZR/03J Ch.30+610- 33+845km Construction of 50.00m (Ch.26+023km) long W-B-BAN- 42 Girder Bridge on Nai- RCC 0.09 50.00 65% Naikhongchari- UZR/03K Tumbru Road Sub total 13 12.81 633.40 Improvement of Pan Bazar - Chokhyng W-B-BAN- 43 Tripura Para (Kalar ALI- BC 1.35 5.40 80% Jiri) Road by BC (Ch. UNR/05A 3.60Km-4.95Km). Alikadam Improvement of Pan Bazar - Chokhyng Tripura Para (Kalar W-B-BAN- 44 ALI- BC 0.86 10.85 80% Jiri) Road by BC (Ch. UNR/05B 4.95 Km-5.81Km). (Union Road) Total Alikadam 2 2.21 16.25 Improvement of Lama- W-B- Rupashipara Road at BAN- 45 Bandarban Lama HBB 1.59 44.70 95% Ch.09+50 - 11+09km Lam- with 35m PC Gider UNR/07A

54

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Bridge at Ch. 10+635km

Improvement of Lama- W-B- Rupashipara Road at BAN- 46 HBB 1.60 16.70 100% Ch.11+225 - Lam- 12+820km UNR/07B Construction of 60m W-B- RCC Girder Bridge on BAN- 47 RCC 0.14 60.00 85% Lama -Rupashipara Lam- Road at Ch.11+150km UNR/07C Construction of 4.0m x W-B- 4.5m (width 20m) Box BAN- 48 Culvert on Lama - RCC 4.00 45% Lam- Rupashipara Road at UNR/07D Ch.10+635km Sub total 4 3.33 125.40 60m RCC Girder Bridge and BC Road on W-B-BAN- 49 Baniarchara-Gazalia Lam- BC 1.74 66.70 80% Raod at Ch.03+760 km UNR/08A - 05+500 km (T) Construction of 25m RCC Girder Bridge and BC Road on W-B-BAN- 50 Lam- BC 1.26 27.00 80% Baniarchara-Gazalia UNR/08B Raod at Ch.05+500 km - 06+760 km (T) Lama Baniarchara-Gazalia W-B-BAN- 51 Raod at Ch.06+760 km Lam- BC 3.05 85% -09+810 km (T) UNR/08C 64m (40m+24m) RCC Girder Bridge on W-B-BAN- 52 Baniarchara-Gazalia Lam- BC 0.56 50.00 60% Raod at Ch.09+810 km UNR/08D - 10+370 km Baniarchara-Gazalia Raod at W-B-BAN- 53 Lam- BC 2.18 0.90 100% Ch.10+370+12+55 km UNR/08E (T) Sub total 5 8.79 144.60 Total Lama 9 12.12 270.00 Total Bandarban 33 37.69 1209.30 Extension of W-KHA-F- 54 Sadar RCC 1 100% Khagrachari Functional Building BUILD/01 Total Sadar 1 1

55

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Improvement of Panchari GC- W-KHA- 55 Baibonchara GC via Pan- BC 2.59 11.85 100% Shantipur Arunya Kutir UZR/01A Road (Ch: 00-2590m) Improvement of Panchari GC- Baibonchara GC via W-KHA- 56 Pan- BC 1.76 4.50 100% Panchari Shantipur Arunya Kutir UZR/01B Road (Ch: 2590- 4350m); Improvement of Panchari GC- Baibonchara GC via W-KHA- 57 Pan- HBB 1.06 6.15 100% Shantipur Arunya Kutir UZR/01C Road (Ch: 8966- 10030m); River Bank Protection work at Panchari GC- Baibonchara GC via W-KHA- 58 Pan- RCC 0.20 50% Shantipur Arunya Kutir UZR/01D Road (Ch: 1420m - 1620m) Total Panchari 4 5.61 22.50 Improvement of Sinduckchari union H/Q-Dullahtali GC via W-KHA- 59 Moh- BC 1.95 93.10 95% Chailyatali Road by BC UNR/05A Ch.0+763 to 2+713 (Km+M) Improvement of Guimara Sinduckchari union H/Q-Dullahtali GC via Chailyatali Road by BC W-KHA- 60 Moh- BC 2.80 84.70 95% Ch.2+713to 5+513 UNR/05B (Km+M) with 36.00m and 25.00m span RCC Girder Bridge Total Guimara 2 4.75 177.80 Construction of Garitana GC-Batnatoli W-KHA- 61 H/Q via Jogyachola Man- BC 2.87 19.70 100% Road at Ch.09+172- UNR/04A 12+037km Manikchari Construction of Garitana GC-Batnatoli W-KHA- 62 H/Q via Jogyachola Man- BC 3.51 4.75 95% Road at Ch.12+037- UNR/04B 15+545km Total Manikchari 2 6.38 24.45

56

Environmental Monitoring Report Jan – June 2019

Quantity Physic al Sl. Package District Upazila Scheme name Type Progr No. No. Km/No. M ess (%) Total Khagrachari 9 16.74 224.75 Grand Total Rangamati, Bandarban & 62 85.65 2013.05 Khagrachari

57

Environmental Monitoring Report Jan – June 2019

Appendix 2: Physical Progress of CI Component

Khagrachari District

Status of Sl.№ Name of subprojects works Village Access Road: 1. Dharmapur-Dharmaghar Subproject (Comprises improvement of 5.21km 100% earthen Village Access Road (VAR) to brick pavement including construction of 880 m road side drains, 202 m. Guide Walls and 7 Culvers) under Sadar Upazila. 2. Akhoy Chandra Karbari Para-Monatek Para Subproject (Comprises 100% improvement of 2.08 km village access road to brick pavement including construction of 720m road side drains and 325m guide walls) under Mahalchari Upazila. 3. Mirzatila to Gaganchandra Para Road Subproject (Comprises development 100% of 2.5 km earthen village access road with brick pavement including construction of 1155 m road side drains, 5 Culverts and 360 m. Guide Wall) under Panchari Upazila. 4. Nittya Gan Para Road Subproject (Comprises improvement of 1050 m. 100% earthen village access to brick pavement including construction of 65m guide wall, one box-culvert (3 m) and 230 m road side drain) under . 5. Karallyachari Para HBB Road Construction Subproject (Comprises 100% Construction of HBB Road from Karallyachari Muk Para to Karallyachari Headman Para (from 0 m. to 1900 m.), Construction of Box Culvert, U- Drain, L-Drain & Guide Wall at Different Chainage at Karallyachari Muk Para to Karallyachari Headman Para HBB Road (from 0 m. to 1900 m.) under Mohalchari Upazila 6. Pulinpur to Vije Kijing HBB Road Subproject (Comprises Construction of 100% HBB Road- 1400 m., L-Drain- 302 m. and Guide Wall- 55 m.) under Panchari Upazila. Market Shed: 1. Mejar Para Subproject (Comprises construction of 178 sqm of market 100% shed, 4 toilets, installation of one tube, and improvement of earthen access road with brick pavement) under Laxmichari Upazila. 2. Chitta Ranjan Karbari Para Subproject (Comprises Construction of 178 100% sqm. of market shed including 4 toilets, installation of one tube well and improvement of 15 m earthen access road to brick pavement) under Mahalchari Upazila. 3. Hudukchari Para Marketshed Subproject (Comprises Comprises Physically Construction of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Completed Tube Well- 1 No.) under Laxmichari Upazila.

58

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 4. Tabida Para Marketshed Subproject (Comprises Comprises Construction 90% of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Tube Well- 1 No.) under Panchari Upazila. 5. Dudhukchara Para Marketshed Subproject (Comprises Comprises 100% Construction of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Tube Well- 1 No.) under Panchari Upzaila. 6. Itchari Mukh Para Marketshed Subproject (Comprises Comprises Physically Construction of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Completed Tube Well- 1 No.) under Khagrachari Sadar Upazila. 7. Rabidhan Para Marketshed Subproject (Comprises Comprises Physically Construction of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Completed Tube Well- 1 No.) under Khagrachari Sadar Upazila. 8. Purba Chailyatalli Para Marketshed Subproject (Comprises Construction Physically of Marketshed- 1 No, Toilet- 1 No. and Installation of Deep Tube Well- 1 Completed No.) under Laxmichari Upazila. CI Pilot Subproject : 1. Joggyachala Headman Para Subproject (Comprises installation of 12 Tube 100% Wells, Construction of 480 m. Irrigation Canal and Supply of 2 Power Pump) under Mahalchari Upazila. 2. Chitta Member Para Subproject (Comprises Installation of 3 Tube Wells, 100% Construction of 295 m. Irrigation Canal and Construction of 70 m. stair, Supply of one Power Pump) under Dhiginala Upazila. Watershed: 1. Godachara watershed management Subproject under Dighinala Upazila. 100% 2. Tarabonchara watershed management Subproject under Panchari Upazila. 100% Community Infrastructure: 1. Ugolchari Para Subproject (Comprises Construction of 760 m Irrigation 100% Canal, and Supply of one Power Pump including construction of Pump shed for irrigation) under Panchari Upazila 2. Harubil Para Subproject (Comprises Construction of 150 m. Irrigation 100% Canal, Supply of one Power Tiller and one Power Pump, Installation of 4 Tube Wells, improvement of 500 m. earthen village access road to brick pavement including construction of 160 m. road side drains, and one culvert) under Panchari Upazila. 3. Dakkin Babuchara Para Subproject (Comprises Construction of 570 m. 100% Irrigation Canal, Supply of one Power Tiller and one Power Pump, Installation 6 Tube Wells and re-excavation of one pond) under Dighinala Upazila.

59

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 4. Jowtha Khamar Para Subproject (Comprises Installation of 6 Tube Wells, 100% Re-excavation of one Pond and Construction of 2 Culverts) under Dighinala Upazila. 5. Tapita Para Subproject (Comprises Construction of 628 m. Irrigation 100% Canal) under Panchari Upazila. 6. Durung Para Subproject (Comprises Construction of 6 Culverts, 100% Installation of 5 Tube Wells and Supply of one Power Tiller) under Mohalchari Upazila. 7. Uttar Champaghat Subproject (Comprises improvement of 500 m. earthen 100% village access road to brick pavement, Installation of 8 Tube Wells, Construction of 250 m. Irrigation Canal and Supply of 1 Power Pump) under Sadar Upazila. 8. Jalbanda Para Subproject (Comprises Installation of 8 Tube Wells and 100% development of 4 infiltration gallery systems for drinking water supply) under Dighinala Upazila. 9. Paisi Mohajan Para Subproject (Comprises Construction of 900 m. 100% Irrigation Canal, Installation of 6 Tube Wells, and Supply one Power Pump) under Mahalchari Upazila. 10. Hazachara Para Subproject (Comprises Construction of one Foot Bridge 100% and Installation of 6 Tube Wells) under Mahalchari Upazila. 11. Bagra Para Subproject (Comprises Construction of 170 m Irrigation Canal, 100% 20 m. Foot Bridge, Installation of 5 Tube Wells and Supply of 2 Power Pump) under Sadar Upazila. 12. Dewan Para Subproject (Comprises Construction of 366 m. Irrigation 100% Canal and one Box Culvert, Installation of 20 Shallow Tube Wells and Supply of one Power Pump) under . 13. Lakyochi Para Subproject (Comprises Installation of 6 Tube Wells and 100% Supply of 2 Power Tillers) under Ramghar Upazila. 14. Jaghat Mohan Para Subproject (Comprises Supply of 2 Power Tillers and 100% 3 Power Pumps, installation of 7 Tube Wells and construction of 300 m. Irrigation Canal) under Panchari Upazila. 15. Abinash Para Subproject (Comprises Construction of 500 m. Irrigation 100% Canal, Installation of 5 Tube Wells, Supply of one Power Pump and 2 Power Tillers) under Panchari Upazila. 16. AK Para Subproject (Comprises Construction of 380 m. Irrigation Canal, 100% 7m Foot Bridge and Installation of 5 Tube Wells) under Khagrachari Sadar Upazila. 17. Akshay Para Subproject (Comprises Installation of 6 Tube Wells for 100% drinking water, 2 Tube Wells with Pumps for irrigation and Supply of one Power Tiller) under Panchari Upazila.

60

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 18. Dakkin Golabari Para Subproject (Comprises Construction of 700 m. 100% Irrigation Canal and Supply of one Power Pump) under Khagrachari Sadar Upazila. 19. Pablakhali Shantipur Para Subproject (Comprises Installation of 3 Tube 100% Wells, Supply of 3 Power Tillers and one Power Pump) under Dighinala Upazila. 20. Gaganchandra Para Subproject (Comprises Installation of 7 Tube Wells, 100% Construction of 200 mIrrigation Canal, Supply of 2 Power Tillers and one Power Pump) under Panchari Upazila. 21. Sukanta Mohajan Para Subproject (Comprises Installation of 5 Tube Well, 100% Supply of one Power Tiller and one Power Pump Machine) under Mohalchari Upazila. 22. Sajek Para Subproject (Comprises Construction of 420 m. Irrigation Canal, 100% Installation of 4 Tube Wells and Supply of 2 Electric Submersible Pumps) under Khagrachari Sadar Upazila. 23. Madhya Adam Para Subproject (Comprises Installation of 9 Tube Wells, 100% Supply of one Power Pump and 3 Power Tillers) under Mahalchari Upazila. 24. Noa Para Subproject (Comprises Installation of Shallow Tube Well- 3 100% Nos., Deep Tube Wells- 1 and Supply of one Power Tiller) under Khagrachari Sadar Upazila. 25. Juddha Kumar Para Subproject (Comprises Construction of one Culvert, 100% Installation of 13 Tube Wells, Supply of 3 Power Tillers and 3 Power Pumps) under Matiranga Upazila. 26. Kukichara Para Subproject (Comprises Construction of 752 m. Irrigation 100% Canal and Supply of one Power Pump) under Khagrachari Sadar Upazila. 27. Lachari Para Subproject (Comprises Construction of 520 m. Irrigation 100% Canal, one drainage Culvert and Installation of 7 Tube Wells) under . 28. Dataram Para Subproject (Comprises Construction of 185 m. Irrigation 100% Canal, Installation of 10 Tube Wells, Supply of 2 Power Tillers and 2 Power Pumps) under Ramgarh Upazila. 29. Karalyachari Para Subproject (Comprises Supply of 2 Power Pumps and 100% Installation of 8 Tube Wells) under Mahalchari Upazila. 30. Dewan Para Subproject (Comprises Construction of 12 m. Foot Bridge and 100% Installation of 3 Tube Wells) under Mahalchari Upazila. 31. Washu Gakul Para Subproject (Comprises Installation of 4 Tube Wells and 100% Construction of 2 Culverts) under Matiranga Upazila.

61

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 32. Gudambari Para Subproject (Comprises Construction of 100 m. RCC 100% Stair, Installation of 3 Tube Wells, Supply of 2 Power Pumps and one Power Tiller) under Ramgarh Upazila. 33. Monatek Para Subproject (Comprises Installation of 10 Tube Wells, 100% Construction of 430 m. Irrigation Canal, Supply of 2 Power Tillers and 2 Power Pumps) under Mahalchari Upazila. 34. Thali Para Subproject (Comprises Supply of 3 Power Pumps) under 100% Ramgarh Upazila. 35. Tebangchara Para Subproject (Comprises Construction of 700 m. 100% Irrigation Canal and Installation of 8 Tube Wells) under Dighingala Upazila. 36. Dudukchara Para Subproject (Comprises Construction of 510 m. Irrigation 100% Canal, Installation of 250 m. underground Irrigation pipe, 7 Tube Wells and Supply of 2 Power Pumps) under Panchari Upazila. 37. Chowdhagram Para Subproject (Comprises Construction of 380 m. 100% Irrigation Canal, installation of 14 Tube Wells and Supply of 2 Power Tillers) under Matiranga Upazila. 38. Rabijoy Para Subproject (Comprises Installation of one Tube Well with 100% submersible Pump and Supply of one Power Tiller) under Khagrachari Sadar Upazila. 39. Baura Para Subproject (Comprises Construction of 500 m. Irrigation 100% Canal, Supplying of 2 Power Pumps, one Power Tiller and Installation of one Tube Well) under Panchari Upazila. 40. Maratila Para Subproject (Comprises Installation of 4 Tube Well, Supply 100% of Power Tiller one and 2 Power Pumps) under Panchari Upazila. 41. Karga Para Subproject (Comprises Installation of 4 Tube Wells, Supply of 100% 2 Power Tillers and 2 Power Pumps) under Panchari Upazila. 42. Harigopal Para Subproject (Comprises Construction of 300 m. Irrigation 100% Canal, Installation of 4 Tube Wells, Supply of one Power Pump and one Power Tiller) under Panchari Upazila. 43. Jharjari Para Subproject (Comprises Installation of Tube Well- 5 Nos. and 100% Supply of 1 No. Power Tiller) under Dighinala Upazila. 44. Dalu Chailaprue Para Subproject (Comprises Installation of 5 Tube Well, 100% Construction of 515 m. Irrigation Canal, one Foot Bridge, Supply of 2 Power Tillers and 2 Power Pumps) under Manikchari Upazila. 45. Chaila Karbari Para Subproject (Comprises Installation of 6 Tube Wells, 100% re-excavation of one Pond, Construction of one Culvert, Supply of one Power Tiller and one Power Pump) under Manikchari Upazila.

62

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 46. Pidiya Para Subproject (Comprises Construction of 500 m. Irrigation 100% Canal, Supply of 2 Power Tillers and one Power Pump) under Khagrachari Sadar Upazila. 47. Pakujjyachari Para Subproject (Comprises Construction of 600 m. 100% Irrigation Canal and supply 2 Power Pumps) under Khagrachari Sadar Upazila. 48. No. 2 Prakalpa Para Subproject (Comprises construction of 250 m. 100% Irrigation Canal, Supply of 3 Power Tillers and 3 Power Pumps) under Khagrachari Sadar Upazila. 49. Dewan Para Subproject (Comprises Construction of 560 m. Irrigation 100% Canal, Supply of one Power Tiller and 2 Power Pumps) under Khagrachari Sadar Upazila. 50. Jamini Mohan Para Subproject (Comprises Construction of 345 m. 100% Irrigation Canal, Installation of 12 Tube Wells, Supplying of 2 Power Tillers and 2 Power Pumps) under Dighinala Upazila. 51. Jora Bridge Para Subproject (Comprises Installation of 5 Tube Wells, 100% Supplying of 2 Power Tillers and 2 Power Pumps) under Dighinala Upazila. 52. Haladar Para Subproject (Comprises Installation of 6 Tube Wells, 100% Supplying of 2 Power Tillers and 3 Power Pumps) under Panchari Upazila. 53. Durga Moni Para Subproject (Comprises Installation of 5 Tube Wells, 100% Supplying of 3 Power Tillers and 4 Power Pumps) under Panchari Upazila. 54. Puratan Headman Para Subproject (Comprises Construction of 460 m. 100% Irrigation Canal, Supplying of 2 Power Tillers and 2 Power Pumps) under Khagrachari Sadar Upazila. 55. Narendra Karbari Para Subproject (Comprises Installation of 8 Tube 100% Wells, Supplying of one Power Tiller and 2 Power Pumps) under Mohalchari Upazila. 56. Jagat Sen Para Subproject (Comprises Installation of 5 Tube Wells, 100% Supplying of 2 Power Tillers and 2 Power Pumps) under Panchari Upazila. 57. Buddha Ram Para Subproject (Comprises development of 600 m. Village 100% Footpath with brick pavement and installation of 6 Tube Wells) under Panchari Upazila. 58. Badanala Para Subproject (Comprises Installation of 8 Tube Wells, 100% Supplying of 2 Power Tillers and 2 Power Pumps) under Mohalchari Upazila. 59. Headman Para subproject (comprises construction of 500m lined irrigation 100% canal and installation of 13 tubewells) under Matiranga Upazila.

63

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 60. Mejar Para Subproject (Comprises Construction of 300 m. Irrigation 100% Canal, Installation of 6 Tube Wells, Supplying of one Power Tiller and one Power Pump) under Laxmichari Upazila. 61. Ultachari Chairman Para Subproject (Comprises Construction of 500 m. 100% Irrigation Canal, Installation of 10 Tube Wells, Supplying of 2 Power Tillers and 2 Power Pumps) under Mohalchari Upazila. 62. Prabal Tripura Para Subproject (Comprises Construction of 300 m. 100% Irrigation Canal, Installation of 6 Tube Wells and Supplying of 2 Power Tillers) under Manikchari Upazila. 63. Shilachari Para Subproject (Comprises Construction of 350 m. Irrigation 100% Canal, Installation of 3 Tube Wells, Supplying of one Power Tiller and one Power Pump) under Laxmichari Upazila. 64. Shuknachari (Laifu) Para Subproject (Comprises Installation of 24 Tube 100% Well and Construction of 5 U-drains) under Matiranga Upazila 65. Mongla Karbari Para Subproject (Comprises Installation of 9 Tube Wells) 100% under Laxmichari Upazila 66. Ranjan Moni Para Subproject (Comprises Installation of 15 Tube Wells 100% and Supplying of 3 Power Tillers and 2 Power Pumps) under Dighinala Upazila 67. Sushil Headman Para Subproject (Comprises Construction of 300 m. 100% Irrigation Canal, Installation of 2 Tube Wells, Shallow Tube Well- 5 and Supplying of 2 Power Tillers and 3 Power Pumps) under Dighinala Upazila 68. Rangapanichara Para Subproject (Comprises Construction of 450 m. 100% Irrigation Canal, Installation of 7 Tube Wells, Supplying of 2 Power Tillers and Construction of 2 U-drain) under Dighinala Upazila. 69. Changrachari Headman Para Subproject (Comprises Construction of 450 100% m. Irrigation Canal, installation of one Tube Well and Supplying of one Power Pump) under Mohalchari Upazila. 70. Gabamara Para Subproject (Comprises Construction of 510 m. Irrigation 100% Canal, Installation of 4 Tube Wells including one Deep Tube Well with one Power Pump for Irrigation, and Supplying of one Power Tiller) under Manikchari Upazila 71. Pashim Hazachara Para Subproject (Comprises Construction of 320 m. 100% Irrigation Canal, installation of 4 Tube Wells, Supply of one Power Tiller and one Power Pump) under Laxmichari Upazila. 72. Thali Para Subproject (Comprises Installation of 5 Tube Wells, Supply of 100% 2 Power Tillers and 2 Power Pumps) under Khagrachari Sadar Upazila. 73. Baura Para Subproject (Comprises Construction of 645 m. Irrigation 100% Canal, and Supplying of 2 Power Tillers) under Khagrachari Sadar Upazila

64

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 74. Thali Para Subproject (Comprises Installation of 5 Tube Wells, Supply of 100% 2 Power Tillers and 3 Power Pumps) under Manikchari Upazila. 75. Kejoy Para Subproject (Comprises Installation of 3 Tube Wells with 100% Submersible Pump and one Water Tank, Supply of one Power Tiller and 2 Power Pumps) under Manikchari Upazila. 76. Jarulchari Para Subproject (Comprises Installation of 6 Tube Wells, and 100% Supply of 2 Power Tiller) under Dighinala Upazila. 77. Ghat Para Subproject (Comprises Construction of 650 m. Irrigation Canal, 100% Supplying of one Power Tiller and 01 Power Pump) under Khagrachari Sadar Upazila. 78. Achai Para Subproject (Comprises Installation of one Tube Well) under 100% khagrachari Sadar Upazila. 79. Kalabuniya Para Subproject (Comprises Construction of GFS- 1 No., Physically Supplying of Power Tiller- 1 No. and Power Pump- 2 Nos.) under Completed Mohalchari Upazila 80. Adufa Para Subproject (Comprises Installation of 9 Tube Wells and 100% Supply 3 Power Tillers and 2 Power Pumps) under Mohalchari Upazila. 81. Chelachara Para Subproject (Comprises Construction of 520 m. Irrigation 100% Canal, 520 m., Installation of one Tube Well with submersible pump & water tank, Supply of one Power Tiller and one Power Pump) under Khagrachari Sadar Upazila 82. Golabari Headman Para Subproject (comprises Construction of Irrigation 100% Canal- 450 m., Installation of 1 No. Deep Tube Well with Submersible Pump, 1 No. Deep Tube Well for Drinking Water and Construction of Water Tank, Supplying of 1 No. Power Tiller and 2 Nos. Power Pump) under Khagrachari Sadar Upazila 83. Barnal Board Office Para Subproject (Comprises Installation of 3 Nos. 100% Shallow Tube Well and 16 Nos. Deep Tube Well) under Matiranga Upazila 84. Mangal Bikash Para Subproject (Comprises Installation of Deep Tube 100% Well- 7 Nos., Supplying of Power Tiller 2 Nos. and Power Pump 2 Nos. with Delivery Pipe) under Dighinala Upazila 85. Aprusi Para Subproject (Comprises Construction of Irrigation Canal- 765 100% m. with PVC Pipe and Supplying of Power Pump 1 No) under Khagrachari Sadar Upazila 86. Anil Para Subproject (Comprises Construction of Irrigation Canal- 430 m., 100% Installation of Deep Tube Well- 2 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Panchari Upazila

65

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 87. Choto Kheda Jhouta Khamar Para Subproject (Comprises Installation of 100% Deep Tube Well- 5 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Ramghar Upazila 88. Sonai Aga Para Subproject (Comprises Construction of Irrigation Canal- 100% 415 m., Installation of Shallow Tube Well- 8 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos. with Delivery Pipe) under Ramghar Upazila 89. Boddyo Para Subproject (Comprises Construction of Irrigation Canal- 440 100% m., Installation of Shallow Tube Well- 7 Nos., Supplying of Power Tiller 2 Nos. and Power Pump 2 Nos. with Delivery Pipe) under Ramghar Upazila 90. Porsuramghat Para Subproject (Comprises Construction of Irrigation 100% Canal- 230 m., Installation of Shallow Tube Well- 10 Nos., Supplying of Power Tiller- 3 Nos. and Power Pump- 4 Nos. with Delivery Pipe) under Ramghar Upazila 91. Natun Para Subproject (Comprises Construction of Irrigation Canal- 415 100% m. with Cross Drain, Installation of Shallow Tube Well- 08 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos. with Delivery Pipe) under Ramghar Upazila 92. Headman Para Subproject (Comprises Construction of RCC Stair 30 m., 100% Construction of Irrigation Canal- 445 m. Installation of Shallow Tube Well- 3 No., Supplying of Power Tiller- 1 No. and Power Pump- 2 Nos. with Delivery Pipe) under Ramghar Upazila 93. Chairman Tila Subproject (Comprises Construction of Irrigation Canal- 100% 590 m. Installation of Shallow Tube Well- 3 Nos., Supplying of Power Tiller 01 No. and Power Pump 02 Nos. with Delivery Pipe) under Ramghar Upazila 94. Jamini Para Subproject (Comprises Installation of Deep Tube Well- 6 100% Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos. with Delivery Pipe) under Matiranga Upazila 95. Galamoni Para Subproject (Comprises Construction of Irrigation Canal- 100% 380 m., Installation of Deep Tube Well- 4 Nos., Supplying of Power Tiller 1 No. and Power Pump 1 No. with Delivery Pipe) under Matiranga Upazila 96. Raikhong Mog Para Subproject (Comprises Installation of Deep Tube 100% Well- 5 Nos., Supplying of Power Tiller 2 Nos. and Power Pump- 4 Nos. with Delivery Pipe) under Matiranga Upazila. 97. Saday Para Subproject (Comprises Installation of Deep Tube Well- 3 Nos., 100% Supplying of Power Tiller 1 No. and Power Pump- 2 Nos. with Delivery Pipe) under Matiranga Upazila

66

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 98. Mathu Mog Para Subproject (Comprises Construction of Irrigation Canal- 100% 475 m., Installation of Shallow Tube Well- 5 Nos., Supplying of Power Tiller 2 Nos. and Power Pump 2 Nos. with Delivery Pipe) under Matiranga Upazila 99. Dajar Para Subproject (Comprises Installation of Deep Set Tube Well- 5 100% Nos., Supplying of Power Tiller 2 Nos. and Power Pump- 2 Nos. with Delivery Pipe) under Dighinala Upazila 100. Nunchari Para Subproject (Comprises Construction of Irrigation Canal- 100% 300 m., Installation of Deep Tube Well- 2 Nos., Shallow Tube Well- 1 No., Supplying of Power Tiller 2 Nos. and Power Pump 1 No. with Delivery Pipe) under Dighinala Upazila 101. Katarung Para Subproject (Comprises Construction of Irrigation Canal- 100% 470 m., Installation of Shallow Tube Well- 4 Nos., Supplying of Power Tiller 2 Nos. and Power Pump 2 No. with Delivery Pipe) under Dighinala Upazila 102. Khullayang Para Subproject (Comprises Installation of Deep Tube Well- 100% 1 No. with 4 HP Submersible Pump for Irrigation, Shallow Tube Well- 10 Nos., Supplying of Power Tiller 2 Nos. and Power Pump 1 No. with Delivery Pipe) under Mohalchari Upazila. 103. Edohulo Para Subproject (Comprises Installation of Deep Tube Well- 5 100% Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Mohalachari Upazila 104. Jowtha Khamar Para (Comprises Installation of Deep Tube Well- 4 Nos., 100% Construction of RCC Stair- 40 m. for Water Collection, Supplying of Power Tiller 1 No. and Power Pump 2 Nos. with Delivery Pipe) under Mohalchari Upazila 105. Lambar Para Subproject (Comprises Installation of Deep Tube Well- 6 100% Nos., Supplying of Power Tiller 2 Nos. and Power Pump- 2 Nos. with Delivery Pipe) under Mohalchari Upazila 106. Sapmara Tripura Para Subproject (Comprises Installation of Deep Tube 100% Well- 5 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 3 Nos.) under Manikchari Upazila 107. Cheprue Para Subproject (Comprises Installation of Deep Tube Well- 2 100% Nos. with 4 HP Submersible Pump for Irrigation and Shallow Tube Well- 6 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Manikchari Upazila 108. Kalapani Para Subproject (Comprises Installation of Shallow Tube Well- 100% 3 Nos., Deep Tube Well- 3 Nos. for Drinking and Deep Tube Well- 2 Nos. with 4 HP Submersible Pump for Irrigation and Supplying of Power Tiller 2 Nos.) under Manikchari Upazila

67

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 109. Kumari Para Subproject (Comprises Construction of Irrigation Canal- 340 100% m., Installation of Shallow Tube Well- 8 Nos., Supplying of Power Tiller 3 Nos. and Power Pump 3 Nos.) under Manikchari Upazila 110. Koilash Mohajan Para (Comprises Construction of Irrigation Canal-680 100% m., Installation of Shallow Tube Well- 3 Nos., Supplying of Power Tiller 1 No. and Power Pump 1 No.) under Laxmichari Upazila 111. Dewan Para Subproject (Comprises Construction of Irrigation Canal- 490 100% m. with Cross Drain, Installation of Deep Tube Well- 1 No. & Shallow Tube Well- 3 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 2 Nos. with Delivery Pipe) under Laxmichari Upazila 112. Binajuri Para Subproject (Comprises Installation of Deep Tube Well- 5 100% Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 1 No. with Delivery Pipe) under Laxmichari Upazila 113. Mura Para Subproject (Comprises Construction of Foot Bridge- 1 No., 100% Installation of Deep Tube Well- 4 Nos. Supplying of Power Tiller- 2 Nos. (12 HP) and Power Pump- 3 Nos. 10 HP) under Mohalchari Upazila. 114. Barathali Para Subproject (Comprises Construction of Foot Bride- 7 m., 100% Irrigation Canal- 300 m., Installation of Shallow Tube Well- 20 Nos. Supplying of Power Tiller- 1 No. and Pump Machine- 1 No) under Matiranga Upazila. 115. Ultachari Bhihar Para Subproject (Comprises Construction of Irrigation 100% Canal- 400 m., Installation of Deep Tube Well- 3 Nos., Shallow Tube Well- 4 Nos., Supplying of Power Tiller- 2 Nos. and Pump Machine- 1 No.) under Mohalchari Upazila. 116. School Para Subproject (Comprises Installation of Deep Tube Well- 5 100% Nos) under Khagrachari Sadar Upazila 117. Dewan Para Subproject (Comprises Installation of Deep Tube Well-6 Nos. 100% (2 Nos. for Irrigation and 4 Nos. for Drinking), Supplying of Power Tiller- 1 No. 12 HP and Power Pump Machine- 1 No. 12 HP) under Matirnaga (Tabalchari) Upazila 118. Agya Karbari Para Subproject (Comprises Installation of Deep Tube Well- 100% 4 Nos., Shallow Tube Well- 4 Nos., Supplying of Power Tiller- 2 Nos. (12 HP) and Power Pump- 2 Nos. (6 HP) under Manikchari Upazila 119. Mangal Chan Para Subproject (Comprises Construction of Irrigation 100% Canal- 400 m., Installation of Deep Tube Well- 2 Nos., Shallow Tube Well- 1 No., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos.) under Khagrachari Sadar Upazila 120. Rannyama Chara Para Subproject (Comprises Construction of Stair- 80 100% m., Installation of Deep Tube Well- 4 Nos. and Shallow Tube Well- 1 No.) under Laxmichari Upazila.

68

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 121. Sumanta Para Subproject (Comprises Construction of Irrigation Canal- 100% 380 m., Installation of Deep Tube Well- 3 Nos., Supplying of Power Tiller- 1 No. (12 HP) and Power Pump Machine- 1 No. 8 HP) under Laxmichari Upazila. 122. Tindukchari Para Subproject (Comprises Installation of Deep Tube Well- 80% 5 Nos., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump Machine- 2 Nos. 12 HP) under Mohalchari Upazila. 123. Bhuinya Para Subproject(Comprises Construction of Irrigation Canal- 300 100% m., Installation of Deep Tube Well- 8 Nos., Supplying of Power Tiller- 1 No. 12 HP and Power Pump Machine- 1 No. 12 HP) under Matiranga Upazila. 124. Gulakana Para Subproject (Comprises Installation of Deep Tube Well- 5 100 % Nos., Supplying of Power Tiller- 3 Nos. 12 HP and Power Pump Machine- 1 No. 12 HP) under Khagrachari Sadar Upazila. 125. Madhya Betchari Para Subproject (Comprises Construction of Irrigation 100% Canal- 610 m., Installation of Shallow Tube Well- 2 Nos., Supplying of Power Tiller- 1 No. 12 HP and Power Pump Machine- 2 Nos.) under Khagrachari Sadar Upazila. 126. Dogyo Karbari Para Subproject (Comprises Installation of Shallow Tube 100% Well- 6 Nos., Supplying of Power Tiller- 3 Nos. 12 HP and Power Pump Machine- 1 No. 12 HP) under Manikchari Upazila. 127. Ananda Mohan Para Subproject (Comprises Installation of 8 (Eight) Nos. 100% Shallow Tube Well, Supplying of Power Tiller- 4 Nos. and Power Pump- 4 Nos.) under Panchari Upazila 128. Uttar Tarabunia Subproject (Comprises Construction of Irrigation Canal- 100% 340 m., Installation of 4 Nos. Deep Tube Well, Supply of 2 Nos. Power Tiller and 2 Nos. 12 HP Power Pump Machine) under Dighinala Upazila 129. Kala Para Subproject (Comprises Construction of Foot Bridge- 1 No. and 100% Installation of Deep Tube well- 5 Nos.) under Khagrachari Sadar Upazila. 130. Battali Para Subproject (Comprises Construction of Irrigation Canal- 450 100% m., Installation of Shallow Tube Well- 5 Nos., Supplying of Power Tiller- 2 Nos., and Power Pump- 2 Nos. with Delivery Pipe) under Laxmichari Upazila 131. Akbari Para Subproject (Comprises Installation of Deep Tube Well- 5 100% Nos., Supplying of Power Tiller- 1 No. and Power Tiller- 2 Nos. with Delivery Pipe) under Mohalchari Upazila 132. Achalong Para Subproject (Comprises Construction of Irrigation Canal- 100% 545 m., Installation of Shallow Tube Well- 7 Nos., Supplying of Power Tiller 1 No. and Power Pump 2 Nos.) under Matiranga Upazila

69

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 133. Kukichara Marma Para Subproject (Comprises Construction of Irrigation Physically Canal- 230 m., Installation of 2 Nos. Deep Tube Well (152 m.) with 4 HP Completed Power Pump and 08 Nos. Shallow Tube Wells, Supplying of Power Tiller 01 No. and Power Pump 01 No. (12 HP) with 4´´ Centrifugal Pump) under Ramghar Upazila 134. Surendra Master Para Subproject (Comprises Construction of Irrigation 100% Canal- 450 m., Installation of Deep Tube Well- 3 Nos., Supplying of 1 No. Power Tiller (12 HP) and 1 No. Power Pump 12 HP) under Khagrachari Sadar Upazila 135. Thoaichai Karbari Para Subproject (Comprised Installation of Deep Tube 100% Well-5 Nos. for Drinking, Installation of Deep Tube Well- 1 No. with 4 HP Water Pump for Irrigation, Supplying of Power Tiller-2 Nos. 2 HP and Power Pump- 3 Nos. 6 HP) under Manikchari Para 136. Bandarchara Para Subproject (Comprises Construction of Irrigation Canal- 90% 450 m., Installation of Deep Tube Well- 1 No., Shallow Tube Well- 15 Nos., Supplying of Power Pump- 1 No. 16 HP with Delivery Pipe) under Matiranga Upazila 137. Dayal Kumar Para Subproject (Comprises Construction of Irrigation 100% Canal- 115 m., Installation of Deep Tube Well-1 No., Shallow Tube Well- 1 No. for Drinking, Deep Tube Tube Well- 3 Nos. with 4 HP Power Pump for Irrigation and Supplying of Power Tiller- 1 No. 12 HP) under Manikchari 138. Malongi Para Subproject (Comprises Installation of Deep Tube Well- 2 100% Nos. with 4 HP Power Pump, Shallow Tube Well- 10 Nos., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 1 No. 12 HP) under Manikchari Upazila 129. Uttar Suknachari Para Subproject (Comprises Installation of Deep Tube 100% Well- 4 Nos. for Drinking, Deep Tube Well- 1 No. for Irrigation with 4 HP Water Pump, Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 8 HP with Delivery Pipe.) under Laxmichari Upazila 140. Natun Bagan Para Subproject (Comprises Installation of Deep Tube Well- 100% 7 Nos). under Khagrachari Sadar Upazila 141. Indrajoy Karbari Para Subproject (Comprises Installation of Deep Tube 100% Well- 2 Nos. 152 m. with 4 HP Power Pump for Irrigation, Deep Tube Well- 1 No., Shallow Tube Well- 8 Nos, Supplying of Power Tiller 02 Nos. 12 HP and Power Pump 2 Nos. 6 HP) under Dighinala Upazila 142. Danga Bazar Para Subproject (Comprises Construction of Irrigation 100% Canal- 350 m., Installation of Shallow Tube Well- 7 Nos., Supplying of Power Tiller- 03 Nos. 12 HP and Power Pump- 2 Nos. 12 HP) under Dighinala Upazila.

70

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 143. Madhya Banchara Para Subproject (Comprises Installation of Shallow 100% Tube Well- 9 Nos., Supplying of Power Tiller 04 Nos. 12 HP and Power Pump 2 Nos. 6 HP) under Dighinala Upazila. 144. Baghya Para Subproject (Comprises Construction of Irrigation Canal- 185 70% m., Installation of Deep Tube Well- 4 Nos. for Drinking, Deep Tube Well- 1 No. for Irrigation, Supplying of Power Tiller- 1 No. 12 HP and Power Pump- 2 Nos. 6 HP) under Laxmichari Upazila. 145. Jaduganala Para Subproject (Comprises Installation of Shallow Tube 100% Well- 4 Nos., Deep Tube Well- 2 Nos. with 4 HP Power Pump for Irrigation, Supplying of Power Tiller- 03 Nos. 12 HP and Power Pump- 3 Nos. 6 HP) under Mohalchari Upazila. 146. Jarichandra Para Subproject (Comprises Construction of Irrigation Canal- 100% 550 m., Installation of Shallow Tube Well- 4 Nos., Supplying of Power Tiller- 01 No. 12 HP and Power Pump- 01 No. 12 HP) under Matiranga Upazila. 147. Indramuni Karbari Para Subproject (Comprises Construction of Irrigation 100% Canal- 330 m., Installation of Shallow Tube Well- 8 Nos., Supplying of Power Tiller 03 Nos. 12 HP and Power Pump 2 Nos. 4 HP-1 & 12 HP-1) under Dighinala Upazila. 148. Dhonya Chandra Karbari Para (Comprises Construction of Irrigation 100% Canal- 465 m., Installation of Shallow Tube Well- 1 No., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 12 HP) under Panchari Upazila. 149. Padmini Para Subproject (Comprises Installation of Deep Set Tube Well- 100% 6 Nos. with Stone Cutting, Supplying of Power Tiller 01 No. 12 HP and Power Pump 2 Nos. 4 HP) under Panchari Upazila 150. Dhani Karbari Para Subproject (Comprises Construction of Irrigation 100% Canal- 590 m., Installation of Shallow Tube Well- 6 Nos., Supplying of Power Tiller- 01 No. 12 HP and Power Pump- 01 No. 12 HP) under Matiranga Upazila. 151. Noa Para Subproject (Comprises Installation of Shallow Tube Well- 12 100% Nos., Deep Tube Well- 3 Nos., Supplying of Power Tiller- 01 No. 12 HP and Power Pump- 01 No. 12 HP) under Matiranga Upazila. 152. Bacha Morong Para Subproject (Comprises Construction of Irrigation 100% Canal- 415 m., Installation of Shallow Tube Well- 7 Nos., Supplying of Power Tiller- 03 Nos. 12 HP and Power Pump- 2 Nos. 12 HP) under Dighinala Upazila. 153. Samburai Para Subproject (Comprises Construction of Irrigation Canal- 100% 465 m., Installation of Shallow Tube Well- 1 No., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 12 HP) under Panchari Upazila.

71

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 154. Karalyachari Vitar Para Subproject (Comprises Construction of Stair- 60 Physically m., Installation of Deep Tube Well- 2 Nos., Shallow Tube Well- 5 Nos., Completed Supplying of Power Tiller- 2 Nos. and Power Tiller- 2 Nos.) under Mohalchari Upazila 155. Kanungo Para Subproject (Comprises Construction of HBB Footpath- 750 100% m., Irrigation Canal-600 m., Supplying of Power Tiller-1 No. and Power Tiller- 1 No.) under Panchari Upazila. 156. Prarthana Para Subproject (Comprises Construction of Irrigation Canal- 100% 218 m., Stair-45 m., Installation of Deep Tube Well- 5 Nos., Supplying of Power Tiller-1 No. and Power Pump-1 No.) under Matiranga Upazila. 157. Baradona Para Subproject (Comprises Construction of Irrigation Canal-42 QER under m., Installation of Shallow Tube Well- 5 Nos., Supplying of Power Tiller- Process 2 Nos. and Power Pump- 3 Nos.) under Laxmichari Upazila. 158. Sarba Siddhi Para Subproject (Comprises Construction of Stair- 20 m., Physically Installation of Ring Well- 6 Nos. Supplying of Power Tiller- 2 Nos.) under Completed Matiranga Upazila 159. Jamindhan Para Subproject (Comprises Construction of Irrigation Canal- 90% 538 m., Installation of Deep Tube Well- 1 No., Shallow Tube Well-2 Nos. and Supplying of Power Tiller- 2 Nos.) under Panchari Upazila. 160. Rabishing Para Subproject (Comprises Construction of Irrigation Canal- 100% 542 m., Installation of Shallow Tube Well- 3 Nos. Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos. 4 HP) under Panchari Upazila. 161. Badi Para Subproject (Comprises Construction of Irrigation Canal- 470 m. 100% and Installation of Deep Tube Well- 4 Nos. under Laxmichari Upazila. 162. Birendra Karbari Para (Comprises Construction of Irrigation Canal- 485 100% m., Installation of Shallow Tube Well- 4 Nos., Supplying of Power Tiller- 2 Nos. 12 HP, Power Pump- 2 Nos. 12 HP) under Panchari Upazila. 163. Kalinga Para Subproject (Comprises Construction of Irrigation Canal- 240 100% m., Installation of Deep Tube Well- 6 Nos., Supplying of Power Tiller- 1 No. 12 HP and Power Pump- 1 No. 6 HP) under Matiranga Upazila. 164. Reyong Mrong Para Subproject (Comprises Construction of Irrigation 100% Canal- 590 m., Installation of Shallow Tube Well- 3 Nos., Supplying of Power Tiller-1 No. 12 HP and Power Pump-3 Nos.) under Rangarh Upazila. 165. Badhya Para Subproject (Comprises Installation of Deep Tube Well- 4 100% Nos. for Drinking and Deep Tube Well- 1 No. for Irrigation with 4 HP Water Pump, Supplying of Power Tiller- 1 No. 12 HP and Power Pump- 2 Nos. 4 HP-1 & 6 HP-1) under Laxmichari Upazila. 166. Katubchari Para Subproject (Comprises Construction of Irrigation Canal- 90% 600 m, Installation of Shallow Tube Well- 4 Nos., Supplying of Power

72

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works Tiller- 1 No. 12 HP and Power Pump- 1 No. 12 HP) under Laxmichari Upazila. 167. Shuknachari Baura Para Subproject (Comprises Installation of Deep Tube 100% Well- 1 No, Deep Tube Well- 4 Nos., Supplying of Power Tiller- 2 Nos., Power Pump- 2 Nos. 6 HP) under Panchari Upazila. 168. Rahindra Para Subproject (Comprises Installation of Deep Tube Well- 5 100% Nos.) under Panchari Upazila. 169. Abani Karbari Para Subproject (Comprises Construction of Irrigation 100% Canal- 450 m. Installation of Shallow Tube Well- 5 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Panchari Upazila. 170. Shilaban Para Subproject (Comprises Installation of Deep Tube Well- 4 100% Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Mohalchari Upazila. 171. Kalapani Mansur Para Subproject (Comprises Installation of Deep Tube 100% Well- 8 Nos., Shallow Tube Well- 8 Nos. and Supplying of Power Tiller- 1 No. under Matiranga Upazila. 172. Kalapanichara Para Subproject (Comprises Installation of Deep Tube 100% Well- 4 Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Khagrachari Sadar Upazila. 173. Kalabuniya Para Subproject (Comprises Construction of GFS- 1 No., 100% Supplying of Power Tiller- 1 No. and Power Pump- 2 Nos.) under Mohalchari Upazila 174. Senguli Para Subproject (Comprises Construction of Irrigation Canal- 615 Physically m., Installation of Shallow Tube Well- 4 Nos., Supplying of Power Tiller- Completed 1 No. 12 HP and Power Pump- 1 No. 12 HP) under Ramgarh Upazila. 175. Dewan Para Subproject (Comprises Construction of Irrigation Canal- 250 100% m., Installation of Deep Tube Well- 8 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 1 No.) under Laxmichari Upazila. 176. Kangchairi Para Subproject (Comprises Construction of Irrigation Canal- QER under 230 m., Installation of Deep Tube Well- 8 Nos., Supplying of Power Tiller- Process 1 No. and Power Pump- 1 No.) under Panchari Upazila. 177. Dhananjoy Dewan Para Subproject (Comprises Construction of Irrigation 100% Canal- 440 m., Installation of Deep Tube Well- 1 No., Shallow Tube Well- 2 Nos. and Supplying of Power Tiller- 1 No.) under Khagrachari Sadar Upazila. 178. Rangapanichara Para Subproject (Comprises Installation of Deep Tube 100% Well- 1 No., Shallow Tube Well- 5 Nos. Supplying of Power Tiller- 2 Nos. and Power Pump- 2 Nos.) under Khagrachari Sadar Upazila. 179. Chadurkhil Para Subproject (Comprises Construction of Irrigation Canal- 70% 330 m., Installation of Deep Tube Well- 2 Nos., Shallow Tube Well- 4

73

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works Nos., Supplying of Power Tiller- 2 Nos. and Power Pump- 1 No.) under Manikchari Upazila. 180. Nilakumar Karbari Para Subproject (Comprises Construction of Stair- 6 Physically m., Box Culvert- 1 No., Supplying of Power Tiller- 2 Nos. 12 HP and Completed Power Pump- 1 No. 6 HP) under Laxmichari Upazila 181. Kista Mohan & Baghya Mojahan Para Subproject (Comprises Installation 100% of Deep Tube Well- 2 Nos., Shallow Tube Well- 3 Nos., Supplying of Power Tiller- 2 Nos. 12 HP, and Power Tiller- 2 Nos. 6 HP) under Panchari Upazila. 182. Uttar Mohalchara Para Subproject (Comprises Installation of Deep Tube 100% Well- 2 Nos. with Submersible Pump and Deep Tube Well- 1 No.) under Khagrachari Sadar Upazila. 183. Sudha Aung Member Para Subproject (Comprises Installation of Deep On Going Tube Well- 2 Nos., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 6 HP) under Khagrachari Sadar Upazila. 184. Toi Chakma Para Subproject (Comprises Installation of Deep Tube Well- Physically 2 Nos., Shallow Tube Well- 8 Nos., Supplying of Power Tiller- 3 Nos. 12 Completed HP and Power Pump- 4 Nos. 8 HP- 1 & 4 HP-3) under Ramgarh Upazila. 185. Bara Para (Comprises Installation of Deep Tube Well- 7 Nos.) under 100% Khagrachari Sadar Upazila. 186. Pong Para Subproject (Comprises Construction of U-Culvert- 2 Nos., 100% Installation of Deep Tube Well-1 No., Shallow Tube Well- 15 Nos., Supplying of Power Tiller- 2 Nos. 12 HP) under Matiranga Upazila. 187. Tabalchari Para Subproject (Comprises Installation of Deep Tube Well-2 Physically No., Shallow Tube Well- 5 Nos., Supplying of Power Tiller- 3 Nos. 12 HP Completed and Power Pump- 1 No. 12 HP) under Mohalchari Upazila. 188. Apurna Para Subproject (Comprises Installation of Deep Tube Well- 4 On Going Nos. with Stone Cutting, Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 12 HP-1 & 6 HP-1) under Matiranga Upazila. 189. Pradip Para Subproject (Comprises Installation of Deep Tube Well- 2 Nos. Physically for Irrigation, Deep Tube Well- 4 Nos. Supplying of Power Tiller- 2 Nos. Completed 12 HP and Power Pump- 2 Nos. 6 HP) under Panchari Upazila. 190. Nabinchandra Para Subproject (Comprises Construction of Irrigation 100% Canal- 425 m., Installation of Deep Tube Well- 5 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 1 No. 12 HP) under Panchari Upazila. 191. Ningchai Karbari Para Subproject (Comprises Construction of Stair- 25 On Going m., Installation of Deep Tube Well- 2 and Supplying of Power Pump- 1 No. 15 HP) under Manikchari Upazila.

74

Environmental Monitoring Report Jan – June 2019

Status of Sl.№ Name of subprojects works 192. Takal Moni Para Subproject (Comprises Construction of Box Culvert- 1 100% No., Foot Bridge- 12 m., Installation of Deep Tube Well- 3 Nos. with Stone Cutting, Shallow Tube Well- 8 Nos., and Supplying of Power Tiller- 1 No. 12 HP and Power Pump- 1 No. 6 HP with Delivery Pipe) under Matiranga Upazila. 193. Battala Para Subproject (Comprises Construction of Box Culvert- 1 No., 100% Installation of Deep Tube Well- 2 Nos., Shallow Tube Well- 5 Nos., Supplying of Power Tiller- 2 Nos. 12 HP and Power Pump- 2 Nos. 12 HP) under Ramgarh Upazila 194 Laba Para Subproject (Comprises Supplying of Power Tiller- 2 Nos, and 50% Power Pump 1 No. 12 HP) under Mohalchari Upazila 195. Keshab Mohajan Para Subproject (Comprises Construction Water Tank 100% with Submersible Pump (1 HP), Installation of Ring Well-6 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 2 Nos.) under Matiranga Upazila. 196 Antu Para (Comprises Construction of Stair- 30 m. and Installation of On Going Deep Tube Well- 6 Nos.) under Ramgarh Upazila 197. Mongcheu Karbari Para (Comprises Construction of Irrigation Canal- 630 On Going m., Installation of Shallow Tube Well- 5 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 1 No.) under Manikchari Upazila 198. Jatindra Karbari Para (Comprises Installation of Deep Tube Well- 6 Nos., On Going Supplying of Power Tiller- 1 No. and Power Pump- 1 No.) under Laxmichri Upazila. 199. Chandranath Chairman Para (Comprises Construction of Irrigation Canal- On Going 560 m., Installation of Shallow Tube Well- 2 Nos., Supplying of Power Tiller- 1 No. and Power Pump- 1 No.) under Panchari Upazila. 200. Ramshing Dewan Para (Comprises Construction of GFS- 1 No., Supplying On Going of Power Tiller-1 No. and Power Pump- 1 No.) under Panchari Upazila 201 Mathai Pukur Para (Comprises Construction of GFS- 1 No.) under QER under Khagrachari Sadar Upazila. Process

Rangamati District

Status of S/N Name of sub-projects works 1 Sapchari Wagga Para Subproject (comprises construction of 117 sqm 100% market shed, improvement of 1.53 km earthen road to rigid pavement,

75

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works construction of one foot bridge, and infiltration gallery including water distribution system for supply of drinking water) under 2 PurbaKodala Sub-project (comprises installation of 2 tubewells, supply of 100% 4 power tillers and 6 power pumps) under KaptaiUpazila 3 Muralipara Sub-project (comprises installation of 4 tubewells, 2 Water 100% Reservoirs & water distribution) under KaptaiUpazila 4 Sacrachari sub-project (comprises 2 Water Reservoirs & water 100% distribution for irrigation , 1 Power tiller & 2 Power pumps) under Kaptai Upazila 5 MitingachariMarma Para Subproject (comprises development of water 100% reservoir ,distribution water supply and installation of tube wells) under Kaptai Upazila 6 Vazzyatuli Para Subproject (Comprise construction of HBB Road) under 100% Kaptai Upazila 7 Valukkya Tinchari para subproject (comprises installation 5nos Tube well, 100% 2nos power tiller 4nos pump machine) under Kaptai upazila 8 Balamchari para subproject (comprises installation 5nos Tube well, 3nos 100% power tiller 2nos pump machine) under Kaptai upazila 9 Hapchari para subproject (comprises installation 5nos Tube well, 2nos 100% power tiller 4nos pump machine) under Kaptai upazila 10 Lokkidhan Karbari para subproject (comprises installation 4nos Tube 100% well, 2nos power tiller 4nos pump machine) under Kaptai upazila 11 Chongrachari mukh para subproject (comprises installation 4nos Tube 100% well, 3nos power tiller 5nos pump machine) under Kaptai upazila 12 Chakua para subproject (comprises installation 4nos Tube well, 3nos 50% power tiller 4nos pump machine) under Kaptai upazila 13 Chitmaram Ahga para subproject (comprises 3nos power tiller 4nos pump 100% machine) under Kaptai upazila 14 Becharam Karbari para subproject (comprises installation 4nos Tube well, 100% 2nos power tiller 4nos pump machine) under Kaptai upazila 15 Karigar para Marketshed subproject 100% 16 Jibtali Headman Para Subproject (comprises improvement of 1km HBB 100% village access road , construction of market shed, and installation of 5 tube wells installation) under Sadar Upazila 17 BodhipurPara Subproject (comprises construction of marketshed,supply 100% of 3 power tillers and 6 pumps 3 Ring wells) under Sadar Upazila

76

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 18 Mubachari Para Subproject(comprises construction of 94m stairs, 100% installation of 2 tubewells, and supply of 2 power tillers and 4 power pumps) under Sadar Upazila. 19 Morongchari Para Subproject (comprises construction of 15m long 100% footbridge, two box culverts, one stair, installation of two tube wells for drinking water, and supply of 3 power tillers and 6 power pumps for improvement of agriculture) under Sadar Upazila 20 Kuramara Para Subproject (comprises construction of 15m foot bridge, 100% installation of 1 tube well 2 Ring wells, supply of 3 power tillers and 6 power pumps) under SadarUpazila 21 Karetkaba Sub-project(comprises supply of 4 power tillers and 8 power 100% pumps) under Sadar Upazila 22 KaindaDozorPara Sub-project (comprises supply of 4 power tillers and 6 100% power pumps, installation of 2 tube wells and construction of one foot bridge) under SadarUpazila 23 Goboghona Para Sub-project (comprises supply of 2 power tillers and 4 100% power pumps , 5 Tube wells ) under Sadar Upazila 24 Devachari to Bangchari Para Subproject (comprises improvement of 100% 2.5km earthen village access road to brick pavement, construction of 200m road side drains, 45m guide walls, and 2 cross drains) under Sadar Upazila ( CDC) 25 Devachari Para Subproject (comprises development of watershed) under 100% Sadar Upazila 26 Chegeychari Subproject (comprises improvement of 3km HBB village 100% access road ,installation of 6 tube wells and Water Reservoir) under SadarUpazila 27 Kharikyong para subproject (comprises installation 5nos Tube well, 2nos 100% power tiller 4nos pump machine) under Sadar upazila 28 Badalchari para subproject (comprises installation 6nos Tube well, 2nos 100% power tiller 2nos pump machine) under Sadar upazila 29 Navanga para subproject (comprises installation 4nos Tube well, 2nos 100% power tiller 5nos pump machine) under Sadar upazila 30 Kamilachari para subproject (comprises construction 1.5 HBB Road) 100% under Sadar upazila 31 Mashya para subproject (comprises installation 5nos Tube well, 2nos 100% power tiller 4nos pump machine) under Sadar upazila 32 Jibtali Chairman para subproject (comprises installation 1no Tube well, 100% Water Reservoir and Footbridge) under Sadar upazila

77

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 33 Kaindya dozori para subproject (comprises Construction 1.5 HBB Road) 100% under Sadar upazila 34 Kaindya dozor para subproject (comprises WMC activities) under Sadar 100% upazila 35 Putichari para subproject (comprises installation 5nos Tube well, 3nos 100% power tiller 1nos pump machine) under Sadar upazila 36 Aguzzyachari para subproject (comprises Installation 3nos power tiller 100% 4nos pump machine) under Sadar upazila 37 Sukorchari para subproject (comprises installation 9nos Tube well) under 100% Sadar upazila 38 Basanta Pangkuya para subproject (comprises Construction of GFS) under 100% Sadar upazila 39 Khamar para subproject (comprises installation 3nos Tube well, 3nos 100% power tiller 4nos pump machine) under Sadar upazila 40 Amtali Para Sub-project (comprises installation of 5 tube wells, supply of 100% 2 power tillers and 4 power pumps) under RajsthaliUpazila 41 Kuturia Para Subproject (comprises improvement of 1km earthen village 100% access road to brick pavement, construction of 100m road side drains and one cross drain, installation of 5 tubewells, supply of 2 power tillers and 4 power pumps ) underRajsthaliUpazila 42 Naraichari Sub-project (comprises installation of 4 tube wells, supply of 2 100% power tillers and 4 power pumps) under RajsthaliUpazila 43 BimaChara Para Subproject (comprises improvement of 1km earthen 100% village access road to brick pavement, construction of 100m road side drains and 25m guide wall, 250 irrigation canals, supply of 2 Power Tillers,4 Pump pumps, and installation of 2 tubewells) under RajsthaliUpazila 44 MobboiPara Subproject (comprises installation of 5 tubewells, supply of 100% 2 power tillers and 4 power pumps) under RajsthaliUpazila 45 Noyajiri Para Subproject (comprises improvement of 670m earthen road 100% to brick pavement including construction of 105m guide wall, one cross drain and 28m road side drain,130m long RCC stair, supply of 1 power tiller and 2 power pumps) under RajasthaliUpazila 46 Taitong Para Subproject (comprises development of water reservoir and 100% installation of tube wells) under RajsthaliUpazila 47 RamatiaPara Subproject (comprises installation of 1production tubewell, 100% supply of 2 power tillers,4power pumps and construction of irrigation drain-100m) underRajsthaliUpazila

78

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 48 KakrachariUpar Para Sub-project (comprises supply of 4 power tillers and 100% 6 power pumps) underRajsthaliUpazila 49 Buri Para Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps ,5 tube wells) underRajsthaliUpazila 50 Kamalchari Para Sub-project (comprises Installation of 4 nos tubewell, 100% supply of 3 power tillers and 3 power pumps) underRajsthaliUpazila 51 Bangalhalia Bihar Para Sub-project (comprises supply of 5 power tillers 100% and 6 power pumps) underRajsthaliUpazila 52 Kakrachari Bihar Para Sub-project (comprises Instllation of 4 no’s 100% Tubewell, supply of 3 power tillers and 4 power pumps) underRajsthaliUpazila 53 Kola Para Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps , 5 tube wells) under KawkhaliUpazila 54 Poapara Subproject (comprises construction of marketshed and supply of 100% 5 power tillers and 8 power pumps) under KawkhaliUpazila 55 Samukchari Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps) under KawkhaliUpazila 56 Bagkhaiyaghona Para Sub-project (comprises supply of 2 power tillers and 100% 4 power pumps) under KawkhaliUpazila 57 Dupchari Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps) under KawkhaliUpazila 58 Lungi Para Sub-project (comprises supply of 2 power tillers and 5 power 100% pumps , 5 tube wells) under KawkhaliUpazila 59 Harangi Para Sub-project (comprises installation of 6 tube wells, supply 100% of 2 power tillers and 4 power pumps) under KawkhaliUpazila 60 Boga Para Sub-project (comprises installation of 5 tube wells, supply of 2 100% power tillers and 7 power pumps) under KawkhaliUpazila 61 Harincharamukh Sub-project (comprises installation of 5 tube wells, 100% supply of 3 power tillers and 5 power pumps) under KaukhaliUpazila 62 Baradulu Para Sub-project (comprises construction of 300m 100% irrigation,installation of 3 tube wells, supply of 2 power tillers and 4 power pumps) under Kaukhali Upazila 63 Mitingyachari Subproject (comprises improvement of 1.85 km earthen 100% village access road to brick pavement (HBB) including construction of 66m guide walls, 200m road side drains and 85m causeway , installation of 4 tube wells, supply of 4 power tillers and 4 power pumps) under KawkhaliUpazila 64 Chotodulu Para -Triratnankur Uttar Para Subproject (comprises 100% improvement of 1.0 km earthen village access road to brick pavement

79

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works (HBB) including construction of 20m guide walls, and 100m road side drains) under KawkhaliUpazila 65 Chelachara to Haranggi High School Para Subproject (comprises 100% improvement of 2.5km earthen village access road to brick pavement, construction of 200m road side drains, 45m guidewalls, and 2 cross drains) under Kawkhali Upazila 66 Nich Para Sub-project (comprises supply of 2 power tillers 4 power pumps 100% installation of 5 tube well, 12.2m foot bridge) under Kawkhali Upazila 67 Headman Para Sub-project (comprises supply of 2 power tillers 4 power 100% pumps installation of 5 tube well) under Kawkhali Upazila 68 Manikchara Para Sub-project (comprises supply of 2 power tillers 4 power 100% pumps installation of 5 tube well) under Kawkhali Upazila 69 Boroichari Para Sub-project (comprises supply of 2 power tillers 5 power 100% pumps installation of 5 tube well) under Kawkhali Upazila 70 Garichara Para Sub-project (comprises supply of 2 power tillers 5 power 100% pumps installation of 5 tube well, 13.72m foot bridge) under Kawkhali Upazila 71 Chawdury Para Sub-project (comprises supply of 3 power tillers 4 power 100% pumps installation of 4 tube well) under Kawkhali Upazila 72 Dabuabakur Para Sub-project (comprises supply of 2 power tillers 3 power 100% pumps) under Kawkhali Upazila 73 Chelachara para Sub-project(comprises supply of 2 power tillers 4 power 100% pumps installation of 4 tube well) under Kawkhali Upazila 74 Hatimara para Sub-project(comprises supply of 2 power tillers 5 power 100% pumps installation of 5 tube well) under Kawkhali Upazila 75 Pankhoa Para Subproject (comprises construction of 238m stairs, supply 100% of 3 power tillers and 6 power pumps) under BelaichariUpazila 76 Devachari Para Subproject (comprises supply of 4 power tillers and 6 100% power pumps) under BelaichariUpazila 77 DigalchariDebamatha Para Subproject (comprises installation of 3 100% tubewells, supply of 3 power tillers and 6 power pumps) under BilaichariUpazila 78 Bhalachari Para Subproject (comprises installation of 2ring wells, supply 100% of 4 power tillers and 6 power pumps) under BilaichariUpazila 79 Taktanala SW Subproject (comprises installation of 5tubewells and supply 100% of 3 power tillers and 4 power pumps , construction1 footbridge & 20 m stair ) under BilaichariUpazila

80

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 80 TaktanalaNE Subproject (comprises installation of tubewells, supply of 2 100% power tillers and 4 power pumps, construction of foot 1bridge and 20 m stair) under BilaichariUpazila 81 Jamunachari Subproject (comprises development of GFS water storage 100% system and supply of 2 power tillers and 4 power pump , 01 footbridge 90 m stair) under BilaichariUpazila 82 Naraichari Sub-project (comprises supply of 3 power tillers and 6 power 100% pumps and 3 Wing wells) under BilaichariUpazila 83 Bahaltali Sub-project (comprises installation of 4 tube wells, supply of 2 100% power tillers and 4 power pumps) under BilaichariUpazila 84 Downpara Sub-project (comprises supply of 6 power tillers and 8 power 100% pumps) under Bilaichari Upazila 85 Amthali para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 5 power pumps) under Bilaichari Upazila 86 Uluchari para Sub-project (comprises installation of 5 tube wells, supply 100% of 3 power tillers and 3 power pumps) under Bilaichari Upazila 87 Chaindya para Sub-project (comprises installation of 4 tube wells, supply 100% of 3 power tillers and 3 power pumps) under Bilaichari Upazila 88 Digalchari para Sub-project (comprises supply of 6 power tillers and 6 100% power pumps) under Bilaichari Upazila 89 Aguzzyachari para Sub-project (comprises construction of 80m RCC 100% footsteps, supply of 2 power tillers and 5 power pumps) under Bilaichari Upazila 90 Hizachari para Sub-project (comprises installation of 6 tube wells, supply 100% of 8 power pumps) under Bilaichari Upazila 91 Tinkuniya para Sub-project (comprises installation of 2 tube wells, supply 100% of 4 power tillers and 6 power pumps) under Bilaichari Upazila 92 Sakrachari para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 5 power pumps) under Bilaichari Upazila 93 Dupshil para Sub-project (comprises construction of GFS (gravity flow 100% system) under Bilaichari Upazila 94 Shalbagan para Sub-project (comprises construction of GFS (gravity flow 100% system) under Bilaichari Upazila 95 Aimacharamukh Subproject (comprises construction of stair 80m, supply 100% of 2 power tillers and 4 power pumps , 3 tube wells) under BarkalUpazila 96 Bagamukh Subproject (comprises construction of 40 m stair, supply of 2 100% power tillers and 6 power pumps, ) under BarkalUpazila

81

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 97 Latibashchara Subproject (comprises development GFS ( Gravity Flow 100% Supply of Water) of water storage system and construction of stair 55m) under BarkalUpazila 98 Taibang Sub-project (comprises installation of tube wells, supply of 2 100% power tillers and 4 power pumps, 4 Tube wells ( Infiltration Gallery System) under BarkalUpazila 99 Khubbang Sub-project (comprises installation of tube wells, supply of 3 100% power tillers and 6 power pumps, 3 Tube wells ,2 footbridge ( Infiltration Gallery System) under BarkalUpazila 100 Bogachari Sub-project (comprises supply of 3 power tillers and 4 power 100% pumps, 2 IFG ( Infiltration Gallery System) under BarkalUpazila 101 Dozori Sub-project (comprises installation of tube wells, supply of 2 100% power tillers and 4 power pumps, 3 Tube wells ( Infiltration Gallery System) under BarkalUpazila 102 Bagchari Sub-project (comprises supply of 4 power tillers and 5 power 100% pumps, 2 IFG ( Infiltration Gallery System) under BarkalUpazila 103 Tomobag Sub-project (comprises supply of 3 power tillers and 4 power 100% pumps) under 104 Chapkhaiyachara Sub-project (comprises installation of 4 tube wells, 100% supply of 2 power tillers and 4 power pumps) under Barkal Upazila 105 Shilchari para Sub-project (comprises installation of 4 tube wells, supply 100% of 3 power tillers and 4 power pumps) under BarkalUpazila 106 Koitor Hill para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 6 power pumps) under Barkal Upazila 107 Sukorchari para Sub-project (comprises construction of GFS (gravity flow 100% system) under Barkal Upazila 108 Bilchara para Sub-project (comprises installation of 3 tube wells) under 100% Barkal Upazila 109 Boda para Sub-project (comprises installation of 3 tube wells, supply of 2 100% power tillers and 5 power pumps) under Barkal Upazila 110 Thegamukh para Sub-project (comprises installation of 1 ring well, 3 tube 100% wells, supply of 3 power tillers and 3 power pumps) under Barkal Upazila 111 Ramchara para Sub-project (comprises supply of 3 power tillers and 6 100% power pumps) under Barkal Upazila 112 Rodongkaba para Sub-project (comprises supply of 6 power tillers and 5 100% power pumps) under Barkal Upazila 113 Baraharina mukh para Sub-project (comprises supply of 2 power tillers 100% and 3 power pumps) under Barkal Upazila

82

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 114 Purba Kadamtuli para Sub-project (comprises construction of GFS 100% (gravity flow system) under Barkal Upazila 115 Ukchari para Sub-project (comprises construction of GFS (gravity flow 100% system) under Barkal Upazila 116 TalukderPara - Rangi Para Subproject under (comprises improvement of 100% 4.5 km earthen village access road to brick pavement including construction of construction 150m guidewalls, and 550m road side drains) NaniarchariUpazla 117 Dupchari Para Sub-project (comprises installation of 5 tube wells, supply 100% of 5 power tillers and 9 power pumps) under NaniarcharUpazila 118 Maischari Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps) under NaniarcharUpazila 119 Vitor Para Sub-project (comprises supply of 2 power tillers and 5 power 100% pumps) under NaniarcharUpazila 120 Dewanparra Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps) under NaniarcharUpazila 121 T&T Bazar Sub-project (comprises supply of 2 power tillers and 4 power 100% pumps) under NaniarcharUpazila 122 Morachengimukh Sub-project (comprises installation of 5 tube wells, 100% supply of 2 power tillers and 8 power pumps) under NaniarcharUpazila 123 Patachari Sub-project (comprises installation of 4 tube wells, supply of 3 100% power tillers and 6 power pumps) under NaniarcharUpazila 124 Barapul Sub-project (comprises installation of 4 tube wells, supply of 3 100% power tillers and 6 power pumps) under NaniarcharUpazila 125 Khullang Para Sub-project (comprises installation of 5 tube wells, supply 100% of 5 power tillers and 9 power pumps) underNaniarcharUpazila 126 Subolchari Para Sub-project (comprises installation of 4 tube wells, supply 100% of 3 power tillers and 5 power pumps) underNaniarchar Upazila 127 Jogonatuli Para Sub-project (comprises supply of 6 power tillers and 6 100% power pumps) underNaniarchar Upazila 128 Bakchari Para Sub-project (comprises installation of 7 shallow tube wells, 100% supply of 3 power tillers and 5 power pumps) underNaniarchar Upazila 129 Krisnamachara Para Sub-project (comprises installation of 3 tube well, 100% construction of 15m RCC foot bridge, supply of 3 power tillers and 5 power pumps ) under 130 Keretkaba Para Sub-project (comprises construction of 26m RCC foot 100% bridge, supply of 5 power tillers and 6 power pumps ) under Naniarchar Upazila

83

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 131 Koilash Para Sub-project (comprises installation of 3 tube well, supply of 100% 4 power tillers and 4 power pumps ) under Naniarchar Upazila 132 Tripurachara Para Sub-project (comprises construction of GFS gravity 100% flow system, supply of 1 power tillers and 2 power pumps ) under Naniarchar Upazila 133 Rijibil Para Sub-project (comprises installation of 3 tube well, supply of 3 100% power tillers and 5 power pumps ) under Naniarchar Upazila 134 Ramhari Para Sub-project (comprises installation of 4 tube well, supply of 100% 2 power tillers and 5 power pumps ) under Naniarchar Upazila 135 PanchariMukh Sub-project (comprises installation of 2 tube well, 100% construction of 250m irrigation drain, 18m foot bridge, supply of 2 power tillers and 2 power pumps) under JuraichariUpazila 136 Jamerchari Sub-project (comprises installation of 3 tube well, 2 ring well, 100% supply of 2 power tillers and 4 power pumps) under JuraichariUpazila 137 Mondirachara Sub-project (comprises installation of 2 tube well, 100% construction of 250m irrigation drain supply of 2 power tillers and 2 power pumps) under JuraichariUpazila 138 Samukchari Sub-project (comprises installation of tube wells, supply of 2 100% power tillers and 4 power pumps, 5 Tube wells , under JurachariUpazila 139 Bamechumachumi Sub-project (comprises installation of 5 tube wells, 100% supply of 2 power tillers and 4 power pumps, under JurachariUpazila 140 Boherachari Para Subproject (comprises installation of five tubewells for 100% drinking water, supply of two power tillers and four power pumps for improvement of agriculture) under JurachariUpazial 141 BalukhaliMukh Para Subproject (comprises installation of four tubewells 100% for drinking water, supply of three power tillers and six power pumps for improvement of agriculture) under JurachariUpazial 142 Devachara Sub-project (comprises installation of 4 tube wells, supply of 3 100% power tillers and 4 power pumps, under JurachariUpazila 143 Kusumchari Sub-project (comprises installation of 4 tube wells, supply of 100% 3 power tillers and 4 power pumps, under JurachariUpazila 145 Talukder para Sub-project (comprises installation of 4 tube wells, supply 100% of 2 power tillers and 6 power pumps, under JurachariUpazila 146 Suknachari para Sub-project (comprises installation of 3 tube wells, 100% supply of 3 power tillers and 6 power pumps, under Jurachari Upazila 147 Bamechumochumi para Sub-project (comprises installation of 5 tube 100% wells, supply of 2 power tillers and 4 power pumps, under Jurachari Upazila

84

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 148 Hazachari para Sub-project (comprises installation of 3 tube wells, 1 ring 100% well, supply of 3 power tillers and 4 power pumps, under Jurachari Upazila 149 Barabanny para Sub-project (comprises installation of 2 tube wells, 200m 100% irrigation drain, supply of 2 power tillers and 2 power pumps, under Jurachari Upazila 150 Shilchari para Sub-project (comprises construction of GFS gravity flow 100% system) under Jurachari Upazila 151 Bosti para Sub-project (comprises installation of 4 tube wells, supply of 2 100% power tillers and 4 power pumps, under Jurachari Upazila 152 Borkalok para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 6 power pumps, under Jurachari Upazila 153 Modonmuni para Sub-project (comprises supply of 2 power tillers and 2 100% power pumps, under Jurachari Upazila 154 Gobachari para Sub-project (comprises supply of 3 power tillers and 4 100% power pumps, under Jurachari Upazila 155 Sapchari para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 4 power pumps, under Jurachari Upazila 156 Balosh para Sub-project (comprises construction of GFS gravity flow 100% system, under Jurachari Upazila 157 Nabaperachara para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 158 Sijok collage para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 159 Lalon para Sub-project (comprises construction of 1km HBB road, supply 100% of 4 power tillers and 4 power pumps, under Baghaichari Upazila 160 Jogorabil para Sub-project (comprises supply of 3 power tillers and 2 100% power pumps, under Baghaichari Upazila 161 Baramallya para Sub-project (comprises installation of 5 tube well, supply 100% of 2 power tillers and 4 power pumps, under Baghaichari Upazila 162 Shonkoladam para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 163 Kattali para Sub-project (comprises supply of 6 power tillers and 4 power 100% pumps, under Baghaichari Upazila 164 Suvoronjon karbari para Sub-project (comprises installation of 4 tube 100% wells, supply of 3 power tillers and 2 power pumps, under Baghaichari Upazila

85

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 165 Nalkatachara para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 166 Jotokhamar para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 167 Hazachari para Sub-project (comprises supply of 2 power tillers and 4 100% power pumps, under Baghaichari Upazila 168 Rangadurchari para Sub-project (comprises installation of 5 tube wells, 100% supply of 3 power tillers and 1 power pumps, under Baghaichari Upazila 169 Dakkin baradurchari para Sub-project (comprises installation of 5 tube 100% wells, 150m irrigation drain, supply of 1 power tillers and 1 power pumps, under Baghaichari Upazila 170 Ugalchari para Sub-project (comprises installation of 5 tube wells, supply 100% of 3 power tillers and 4 power pumps, under Baghaichari Upazila 171 Dulubonny para Sub-project (comprises supply of 6 power tillers and 5 100% power pumps, under Baghaichari Upazila 172 Kozoichari para Sub-project (comprises installation of 5 tube wells, supply 100% of 2 power tillers and 4 power pumps, under Baghaichari Upazila 173 New Lalyaghona para Sub-project (comprises installation of 5 tube wells, 100% supply of 3 power tillers and 2 power pumps, under Baghaichari Upazila 174 Kodamtuli godamatha para Sub-project (comprises installation of 4 tube 100% wells, supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 175 Samoitre para Sub-project (comprises installation of 3 tube wells, supply 100% of 3 power tillers and 4 power pumps, under Baghaichari Upazila 176 Voiyachara para Sub-project (comprises supply of 3 power tillers and 4 100% power pumps, under Baghaichari Upazila 177 Ranjan para Sub-project (comprises installation of 4 tube wells, supply of 100% 3 power tillers and 2 power pumps, under Baghaichari Upazila 178 Ugalchari Mukh para Sub-project (comprises installation of 5 tube wells, 100% supply of 2 power tillers and 1 power pumps, under Baghaichari Upazila 179 Ajjengchari para Sub-project (comprises installation of 4 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Baghaichari Upazila 180 Jumbi Adam para Sub-project (comprises Water reservoir and distribution, 100% under Baghaichari Upazila 181 Durchari Markeshed subproject 100% 182 Manikya para Sub-project (comprises installation of 4 tube wells, supply 100% of 2 power tillers and 4 power pumps, under Longado Upazila

86

Environmental Monitoring Report Jan – June 2019

Status of S/N Name of sub-projects works 183 Jatramuro para Sub-project (comprises installation of 4 tube wells, supply 100% of 2 power tillers and 4 power pumps, under Longado Upazila 184 Hemochandra para Sub-project (comprises installation of 3 tube wells, 100% supply of 3 power tillers and 4 power pumps, under Longado Upazila 185 Uttor Manoshya para Sub-project (comprises supply of 2 power tillers and 100% 4 power pumps, under Longado Upazila 186 Ranga panichara para Sub-project (comprises installation of 8 tube wells, 100% under Longado Upazila 187 Boradam para Sub-project (comprises installation of 2 tube wells and 100% water tank under Longado Upazila 188 Jornatila para Sub-project (comprises installation of 8 tube wells, under 100% Longado Upazila 189 Purba Teka para Sub-project (comprises supply of 2 power tillers and 4 100% power pumps, Installation of tubewells under Longado Upazila 190 Ghonomor para Sub-project (comprises installation of 5 tube well, supply 100% of 2 power tillers and 3 power pumps, under Longado Upazila 191 Islamabad para Sub-project (comprises supply of 2 power tillers and 4 100% power pumps, Installation of tubewells under Longado Upazila 192 Purba Chailatuli para Sub-project (comprises installation of 4tube well, 100% supply of 2 power tillers and 4 power pumps, under Longado Upazila 193 Dozorpara Sub-project (comprises construction of 3km HBB road under 100% Longado Upazila 194 Korengatuli Markeshed subproject under Baghaichari Upaziila 100% 195 Chaiory bazar Markeshed subproject under Kaukhali upazilla 100%

Bandarban District:

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status

Bandarban Sadar Upazila, Union: Kuhalong 627 m VAR with 149m guide wall, 5m Road 1 Bagmara Para side drain,01 Culvert,02 DTWs & 01 PT 100% completed

87

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status 2 Khebuk Para 03 Deep Tube wells,02 PTs 100% completed 03 DeepTube wells,07m Spill weir for 3 Minjiri para irrigation,41m Stair & 02 PTs 100% completed Gungru mukh 4 Para 02 Deep Tube wells, 110m Stair 100% completed Chemidulu VFP-500m, 6 DTWs for drinking water, Stair- 5 Para(Pilot 3(72m), Irrigation canal-800m, 01 DTW for Project) irrigation 100% completed 6 Ubasoi Para 54m Stair,02 DTWs & 03 PTs 100% completed Chasoimong 7 Para 62m Stairs,03 DTWs,02 PTs 100% completed Natun Choroi 8 para 57m RCC Stair,02 DTWs,02 PTs & 01 WPM 100% completed

9 Khaiya Para VAR-544m, VFP-463m, L-Drain-241m, Pipe culvert-1(3.5m), RCC Stair-114m, DTWs-3 100% completed Comprises of RCC Stair & Long Steps-72m, 10 Bakichara Para DTWs-2, PTs-2, WPMs-2. 100% completed 11 Dolbaniya Para RCC Stair-83m, DTWs-3, PT-1 100% completed Bhanga Mura 12 RCC Stair-78m, DTWs-2, PT-1, PMs-2 Para 100% completed Thowai Aungya 13 RCC Stair-34m, DTWs-5, PTs-2 Para 100% completed Gunguru 14 Madhyam Para RCC Stair-83m, DTWs-2, PT-1, PM-1 100% completed Bandaraban Sadar Upazila, Union:Bandaraban Sadar

Hlapai Ujani 664 VAR, 3m culvert, Road side protection wall 15 100% completed para 11.15m, 15m long steps & 30m Long Stair,02 DTWs,01 PT Lulain 16 Punarbashan 65m Stair,01 Ring Well para 100% completed 17 Datvanga para 112m Stair,7m brick wall & 15m bitumins drum sheet 100% completed

88

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status 18 Kattoli Para 132m Stair 100% completed Lemujhiri Aga 19 Comprises of RCC Stair-92m, Brick protection Para wall(in RCC Stair)-10m, DTWs-3,PT-1. 100% completed

20 Talukder Para Comprises of RCC Stair-98m, Long Stair-63m, DTW with submersible Pump-1,WRT-1. 100% completed Bandaraban Sadar Upazila, Union:Sowalok 21 Majher Para Comprises of DTWs-4, PTs-3, WPM-1.

22 Basanta Para 1.5km VAR with 60m Road side Drain,01 Pipe culvert -1m & 11m slope protection wall 100% completed Faruk Nicher 23 Para WRT-1 & 109m Stair 100% completed Amtoli Marma 24 650m VAR,75m Stair,14m brick wall,02 Para DTWs,01 PT & 01 PM 100% completed Comprises of HBB village access Road & RCC village access Road-(694+60)=754m,L-Drain- 25 Getshimani Para 100% completed 474m, U-Drain-57m, Protection wall-30m, Pipe culvert-01(3.5m), GFS water supply system. Bandaraban Sadar Upazila, Union:Tankabati Punarbashan 26 1.39km VAR with 262m Road side Drain & Tripura Para Protection wall 100% completed Purnachandra 27 Para 01 Deep Ring Well,1 WRT & 123m Stair 100% completed Chimbuk Pabla 28 510m VAR with 100m L-Drain,75m RCC Headman para Stair,15m Dam, 10.5m Pipe culvert 100% completed 819 VAR with 100m road side drain,78m 29 Baittya Pata Stair,12m U-Drain,20m Pipe culvert & 02 RCC Tanks 100% completed

30 Ranju para 576m VFP,75m L-Drain ,88m RCC Stair, 2 DTWs 100% completed Bandaraban Sadar Upazila, Union:Rajbila Jamchari Vitor RCC Stair 90m,Drain-12m,WRT-1,DTW-1 with 31 Para submersible pump water supply system 100% completed

89

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Jamchari Mukh 93m Stair(70m RCC+ 23m long steps), DTWs-2, 32 Para U-Drain-70m 100% completed Jogesh Karbari 33 1.15km VAR with 3 Pipe culverts,5m road side para drain,02 DTWs,02 PTs, 15m Stair 100% completed 1005m VAR with 160m Road side Drain,154m 34 Zanka Para Stair,02 RWs,WRT-1, 01 DTW with 100% completed submersible motor pump & water supply system 583m VAR with 60m L-Drain,3.5m Pipe Bagmara culvert,5m U-Drain,24m P.wall,60m RCC 35 100% completed Madyam Para Stair,64m Long Steps,2.5m Canal,03 DTWs,02 PTs RCC Stair-67m, Long steps-123m,DTWs-2, PT- 36 Wabrei Para 1. 100% completed 1No.150mm dia Submersible Deep tube well upto depth 168m to be lifted water by Submersible pump, supplying of Plastic water 37 Ramatiya Para tank with capacity 2000 Litre with Brick work 100% completed stand, Construction of 3Nos Tap stand, HDP pipe fitting, electric cable fitting, PTs-2(12HP power), PMs-2(4-5 HP)

38 Galachipa Para RW-1,RCC Stair 100% completed 39 Khamadong Para Stair-72m, DTWs-2, 100% completed Tainkhali Upor 40 RCC Stair-120m, DTWs-2,STWs-2 Para 100% completed Rowangchari Upazila, Union:Taracha Taracha 41 2100m VAR with 10m road side drain & 1.2km 100% completed Headman Para guide wall

42 Tongprue Para 03 Deep Tube wells for drinking water 100% completed 703m VAR,45m Stair,03 DTWs, 02 PTs & 01 43 Talukder Para PM 100% completed 44 Faikhyong Para 68m Stair,03 DTWs 100% completed

90

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status VFP-684m, Road side surface run off drainage- 45 Dornido Para 150m,2 Slab culverts(5m), GFS water supply 100% completed with 3 nos 1000 ltr WRTs Nowapatong 46 Mukh RCC Stair & Long steps-108m, DTWs-3, PT-1. 100% completed (Nicher)Para Rowangchari Upazila, Union:Alekhyang

47 Wagoi Para 718m VAR with 102m road side drain, 18m long stair,01 DTW, 3.5m culvert 100% completed 48 Wabraing Para 100% completed 120m Stair,45m long Steps & 01 Ring Well

49 Kacchaptali Para 59m RCC Stair,82m long steps,wooden post 100% completed palisading-18.5m, 02 PTs & 01 WPM Laxmi Chandra 50 100% completed Para Supply of 01 PT, Earthen Dam-2(36m)

51 Chahla Para 100% completed RCC Stair-55m, Long steps-50m,PTs-2, PMs-2 VFP-767m with Pipe culvert-1, Brick protection wall-36m, U-Drain(Drainage system)-13m, 52 Battali Para 100% completed DTW with submersible Pump-1, DTWs-2, WRT(RCC)-1,PTs-3,PM-1. Rowangchari Upazila, Union:Nowapatong Sonai Seprue 53 2.19km VAR with 150m guide wall,550m Road 100% completed Para side drain & 8.6m long bridge, DTWs-4 Gungkhyong 54 100% completed para 812m VAR,01 Deep Tube well,01 PT Khayamrong 55 100% completed para 134m Stair,01 deep ring well

56 Nasalong Para 801m VAR with 10.5m pipe culvert,104m 100% completed Stair,35m long steps,01 PT Antaha Tripura 57 679m VAR with 100m road side drain(U),14m 100% completed Para pipe culvert,85m Stair,02 DTWs,01 PT

58 Kanaizu Para 100% completed 47.5m Stair,03 DTWs,02 PTs

91

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Bagmara Purba RCC Stair & Long steps (108+62)-170m, DTW- 59 100% completed Para 1

Rowangchari Upazila, Union:Rowangchari Sadar Comprises of Stair/sreps-71m, DTWs-3, PTs-2, 60 Bengchari Para PMs-2. 100% completed Rowangchari 61 450m VAR with 90m Protection wall,03 Pipe 100% completed Sadar Para culvert 746m VAR with 5m road side drain,3.5m pipe 62 Paglachara Para culvert,330m irrigation canal,73m cc long 100% completed steps,02 DTWs,01 PT Kaintermukh 63 Para 66m Stair,02 PT, 02 DTWs 100% completed 64 Paikhyong Para 100% completed GFS water supply with 1 Reservoir Tank 1301m VAR with 180 L-Drain,6m brick 65 Aungya Para wall,12m U-Drain,42m Pipe culvert,8.5m RCC 100% completed Box culvert, 20m stair,02 DTWs,02 PTs,01 PM, 66 Baroshila Para 100% completed RCC & CC Stair-171m, Ghera U Vitor 67 100% completed Para RCC Stair & CC Steps-140m, , Union: Ruma Sadar Comprises of RCC Stair-120m with U-Drain- 68 Mayor Para 100% completed 10m.

69 Thana Para 51m RCC Stair,38m long steps,03 DTWs 100% completed 70 Bethel Para 85m RCC Stair,90m long steps 100% completed 71 619m VAR with 133m Drain,60m palisading Hati Matha Para work,45m RCC Stair,RW-1, RT-1 100% completed 72 Happy Hill Para 521m VAR, Steps & Stair-180m, RW-1 100% completed 73 Lunjhiri Para RCC Stair & steps-105m, Protection wall-24m, 100% completed

74 Polika Para RCC Stair-127m, RW-1, RT-1 100% completed

92

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status GFS water supply system(660m pipe line including source/intake structure, reservoir tank 75 Lairumpi Para 100% completed construction , setting & installation of 1No 1500 Lit capacity Plastic tank and tape stand) Mong Lai Graw 76 Comprises construction of GFS(1 Nos) Water 100% completed Para supply system with RT-1

77 Rumachar Para RCC Stair-60m, Long steps- 100% completed 35m(Total=95m),RW-1, PTs-02.-, RT-1 Ruma Upazila, Union: Paindu 612m VFP with 12m Drain,20m protection 78 Chairagraw Para wall,03 Pipe culverts,10m brick protection 100% completed wall,107m RCC Stair,30m Long steps, 01 WRT, Mong Swe Prue 79 120m Stair for river ghat 100% completed Para

80 Bagan Para Comprises of RCC Stair -228 100% completed Ruma Upazila, Union: Galengya

81 Raifu Para RCC Stair-68m, GFS water supply system with WRT 100% completed

82 85m RCC Stair/Steps,GFS-1 with RT,20m Mongoha Para Earthen Dam/Cross Dam 100% completed Lama Upazila, Union: Lama Sadar Boilyachar Comprises of RCC Stair, Long Steps & RCC 83 Chionimukh Ghat Stair-67m, Pond Excavation-1, DTWs-2, 100% completed marma Para PTs-2. 237m VAR /VFP, RCC Stair-187m,01 PT,01 84 Merakola Para 100% completed DTW

Lama Upazila, Union: Fashiakhali Comprises of VAR-742m with U-Drain- 85 Borh Para 142m,Protection wall-53m, RCC Stair-87m with Protection wall-10m,DTWs-2,PT-1. 100% completed Eyangsha 86 Headman Para 03 DTWs,02 PTs & 02 PMs 100% completed 87 Choto Para RCC Stair-57m, DTWs-3, PTs-2. 100% completed

93

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status 88 Kathal Para RCC Stair-80m, RW-1,PT-1, PM1. 100% completed Lama Upazila, Union: Saroi 89 Gajan Para 90m Stair,01 DTW,01 PT & 01 WPM 100% completed

90 Tangoziri Para 50m RCC Stair & 60m Long Steps,02 RWs,02 PTs 100% completed 382 meter VAR with 109m Protection wall cum Kafru Para(Pilot 91 drainage,Box culvert-3nos,102m short Stair,71m 100% completed Project) long stair Lama Upazila, Union: Gajalia Comprises of RCC Stair & Long Steps(51+36)- 92 Rangsango Para 87m, U-Drain-12m, DTWs-2, PT-1, WPMs-2. 100% completed Comprises of RCC Stair-38m, DTWs-2, PTs-2, 93 Badhujhiri Para PMs-2. 100% completed Comprises of RCC Stair & long 94 Najiram Para steps(86+54)140m, DTW-1,PT-1. 100% completed

95 Manikjan Para 892m VAR/FP,U-Drain-150m, 03 Pipe culverts,RCC Stair-85,,02 DTWs, 02 PTs,01 PM 100% completed Gozalia 96 Headman para 88m Stair,02 DTWs 100% completed

97 Gaindya Para 03 DTWs,04 PTs,02 WPMs 100% completed

98 Akiram Para 496m VFP,03 Pipe culverts,15m Protection wall,97m RCC Stair,02 DTWs,01 PT 100% completed 641m VAR & VFP with 2 Pipe culverts,Slab culvert-1(5m),Wooden post palisading - 16m, 99 Remong Para Road side drain-12m, L-Drain-30m, protection 100% completed wall-20m,73m RCC Stair,02 DTWs,02 PTs,02 WPMs 100 Gotiram Para 100% completed RCC Stair & long steps-120m, 3 DTWs, 1 PT 101 Minjiri para 100% completed RCC Stair-71m, Long steps-30m,DTWs-2,PT-1 VAR-877, U-Drain-225m, L-Drain-334,Pipe culverts-2(3.5m),Protectio wall-33m,Slab 102 Durjyodhan Para 100% completed culvert-1(6.9m),RCC Stair-41m, ,DTWs-2,PTs- 2,PM-1

94

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status

103 Denkichara Para VAR-618m, Slab culvert-1, P.Culverts-3, 100% completed DTWs-2, PTs-3,PMs-2 104 Baishpari Para 100% completed RCC Stair-33m, DTWs-3, PTs-2, PMs-2

105 Ujiram Para Stair-82m, DTWs-2, PT-1, PMs-2 100% completed

Lama Upazila, Union: Faiton 38m Stair & Steps with 38m drainage system,03 106 Vanja Para DTWs,02 PTs & 01 WPM 100% completed Faiton Headman 107 50m RCC Stair/Steps,03 DTWs,01 PT,01 PM Para 100% completed Sonaichari Naya 108 Marma Para RCC Stair & long steps-63m, RW-1, 2 PTs,PT-1 100% completed Mong Fo 109 Thowain Para RCC Stair/Steps-80m, 2 DTWs,2 PTs & 1 PM 100% completed 110 Kamajyajiri Para RCC Stair-73.5m, DTWs-2,PTs-2 100% completed Lama Upazila, Union: Aziznagar Telonia Marma Comprises of Pond Re-exacavation-1, RCC ghat 111 Para Stair-8m, DTWs-2, PTs-2, PMs-2. 100% completed 38m Stair,01 DTW with water supply system ,02 112 Chioni Para PTs,01 WPM 100% completed

113 Sonaram Para RCC Stair-59m, U-Drain-5m, RCC Ghat stair- 100% completed 8m, DTWs-2, PTs-2. Chambi 114 Comprises of RCC Stair/Steps-55m with 100% completed Headman Para protection wall-9m, DTWs-2, PT-1,PM-1. Lama Upazila, Union: Ruapshi

115 Dordori Para 130m Stair & Steps,01 DTW,01 PT 100% completed 48m RCC Stair/Steps, 03 DTWs,02 PTs & 01 116 Aung Hla Para PM 100% completed 117 Chingkom Para RCC Stair-94m, DTWs-2, PT-1. 100% completed Shilartowa Naya Comprises of RCC Stair-51m, DTWs-2, PTs-2, 118 Para PM-1. 100% completed RCC Stair & Long steps-109m,DTWs-2,PT- 119 Boidyavita Para 100% completed 1,PM-1.

95

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Alikadam Upazila, Union: Alikadam Sadar Amtoli Ashothu 120 133m RCC Stair,41m long steps,02 Ring Wells 100% completed Tripura Para 957m VAR with culvert & Drain,127m Stair & 121 Jabiram Para Steps,Palisading works-46m, 02 RWs,01 PT, PM-1 100% completed 593m VAR with 2 slab culvert-6m & drain-66m, 122 Langri Para 111m stair,02 RWs,01 PT 100% completed Amtoli RCC Stair & Landing Ghat Stair-60m,04 123 100% completed Tanchangya Para RWs,01 PT 1800m VAR & VFP with slab culvert,Pipe Varot Mohan culvert,Protection wall,U-Drain, L-Drain ,RT- 124 100% completed Para 1,Pond renovation ,2 PTs, 01 RW with water supply system Mong Swe Prue 125 RCC Stair-48m,DTWs-2,PTs-2, PMs-2 100% completed Para Alikadam Upazila, Union: Choikhyang Thowaiching 126 115m Stair,01 DTW,01 PT 100% completed Headman para

127 Padoi Para 45m Stair,02 DTWs,02 PTs, PMs-2 100% completed

128 Kairing Para 57m RCC Stair/Steps,02 DTWs,1 PT,10m Dam 100% completed

129 Shibatali Para Comprises of RCC Stair-102m, Long steps- 57m,DTWs-2,PT-1. 100% completed Baghherjhiri 130 Para Dam-55m, 1 Deep RW, PTs-2, PM-1 100% completed RCC Stair & Steps-112m (RCC Stair-43m, Long 131 Nyo Aung Para Steps-60m, RCC Stair for Pond landing ghat- 9m) ,DTW-1, PT-1,PM-1. 100% completed Alikadam Upazila, Union: Nowapara Chahlaching Comprises of RCC Stair & Long steps-133m, 132 100% Completed Para PT-1. Rohini Mohan 133 120m Stair,02 RWs,01 PT Para 100% completed

96

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status

134 Chai Aung Para 141m RCC Stair/Steps,02 RWs,01 PT 100% completed 1613m VAR with 02 Nos(5m) Pipe culvert,20m 135 Jugendra Para Protection wall,02 Slab culvert,100m L-Drain, 65m RCC Stair/Steps,03 RWs,02 PTs,02 PMs 100% completed RCC Stair & CC Stair-93m, RWs-2, PTs-2, 136 Regra Para PMs-2 100% completed

137 Basudeb Para Ring Wells-3, PTs-3, PMs-2 100% completed Naikhyangchari Upazila, Union: Baishari 998m HBB Footpath with Pipe culverts-3(3.5m), Headman Chak 138 slab culverts-3(5m), Preotection wall, 4 RWs, 2 100% completed Para PTs, Stair/steps-41m, 978m VAR & VFP,U-Drain-140m, 112m 139 Upar Chak Para 100% completed Stair,01 RW,01 PT Madhyam Chak 140 RCC Steps-50m, DTWs-2,PTs-2, 100% completed Para

Naikhyangchari Upazila, Union: Gundhum Comprises of VAR-748m with L-Drain-260m, 141 Fatrajhiri Para Pipe Culvert-3.5m(3 Nos), Protection wall- 100% completed 80.5m,Slab Culvert-6.9m(1 Nos), RCC Stair- 16m, RWs-4, PTs-3,PM-1. Comprises of VAR-788m, Drain- 142 Garjanbunia Para 373m,Protection wall-02 nos(80.5m), Pipe 100% completed culvert-04 Nos(3.5m), RCC Stair & Long steps- 64m,RWs-4, Baishpari Comprises of RCC Stair(28+8)-36m,RWs- 143 100% completed Tanchangya Para 4,PTs-2,PM-1.

144 Baroitali Para RCC Stair-27m, RWs-4,PTs-2, PM_1 100% completed Tombrue 145 RCC Stair & Long Steps-70m, DTWs-2,PTs- Headman para 2,Pump Machine-1. 100% completed

97

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status

146 Valukya Para Pond re-excavation-1, RCC Stair-16m, DTWS- 3, PTs-2 100% completed Niakhyangchari

Upazila, Union: Sonaichari Jaruliachari 147 Comprises of RCC Steps & Long steps-105m, 100% completed Marma Para PT-1, RW-1, Pond-1. VFP-756m,U-Drain-65m, Protection wall- Sonaichari 148 36m,RCC Ghat Stair-16m,RWs-3, PTs-2, 100% completed Headman Para WPMs-2 Comprises of HBB Access-687m, Road side protection wall cum surface run off drainage 149 Boidyo Para system-70m, Road side bricks protection wall- 100% completed 20m, RCC Short steps-55m, PTs-2,PM-1, RWs- 3.

150 Natun para RCC Stair/steps-100m, 100% completed

Comprises of HBB Access & Footpath-887m, Road side Protection Wall(Drainage system)- 151 Maragya Para 70m,Road side brick protection wall-8m,Pipe 100% completed culvert, RCC Short Steps-24m,PTs-3, PMs- 2,RWs-3. Naikhyangchari Upazila, Union:

Dochari Krokhyang(Hari 152 Comprises of RCC Stair-54m, DTW-1, PTs-2 100% completed ngkhyong) Para , Union: Boli Para

153 Bagan Para 59m Stair & 15m L-Drain,02 DTWs,02 PTs 100% completed

154 Bali Para 20m Earthen Dam,02 WRTs, 04 DTWs & GFS 100% completed with RTs-2 Hoitan Khumi 155 RCC Stair-90m, Earthen Dam-16m 100% completed Para Comprises of HBB Footpath-441m with Road 156 Ail Mara Para side drain-20m, Pipe Culvert-02 nos(3.5m), RCC 100% completed Stair-66m, 157 Bidyamoni Para RCC Stair-130m, 100% completed

98

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status RCC Stair & Long steps-40m, Slab culvert-1, 158 Sakoi Para 100% completed RCC RT-1 159 Manwai Para RCC Stair-75m, GFS with RT-1 100% completed

Upazila: Thanchi, Union: Thanchi Sadar Bonyok RCC Stair-105m, 160 100% completed Headman Para RCC Stair-110m, 161 Waksaku Para 100% completed Thanchi 162 RCC Stair-90m, Deep Ring Wells-4 100% completed Headman Para

163 Anil Chakma Stair-102 with Drain-150m,RW-1,PT-1 100% completed Para Antaha Tripura VFP-679 meter, U-Drain-100m,RCC Stair- 164 100% completed Para 85,DTWs-2,PT-1, 165 RCC Stair-42m, Earthen Dam-16m, RW-1 100% completed Subrai Para Water Shed Management

Upazila: Bandarban Sadar, Union: Kuhalong

Peemrongchara, Comprises of Check Dam, Agro-forestry, Bio- 166 100% completed WM site engineering and vegetable gully plugging Upazila: Bandarban Sadar, Union: Sowalok

Mazrachara , Comprises of Check Dam, vegetable gully 167 100% completed WM site plugging and Water source protection

Upazila: Rowangchari, Union: Alekhyang

168 Grokhyang Para DTWs-2, RCC Stair-85m,01 PT & 01 PM 100% completed

Upazila: Rowangchari, Union: Nayapatong Antaha DTW-1,RCC Stair-69 m, HBB Road-627m, RT- 169 Tanchangya Para 1 100% completed Upazila: Naikhyangchari, Union: Naikhyangchari Sadar

99

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Chak Headman DTW-1,RCC Stair-32 m, HBB Road-448m, RT- 170 Para 1 100% completed Madhyam Chak DTW-1 with supply, RCC Stair-118m 171 Para Partially completed Dhungri RCC Stair-36m, DTW-1 with water supply 172 headman Para 100% completed Upazila: Naikhyangchari, Union: Baishari Natun Chak RWs-2,Pond-1, Stair(Revised) 173 Para 100% completed Dhabangkhali 174 Para DTWs-2, RCC Stair-88m, PTs-2 & 01 PM 100% completed Upazila: Naikhyangchari, Union: Ghundhum Jamirtali Para DTW-1,RWs-3, RCC Stair-81m 175 100% completed Raiju Marma RW-1,RCC Stair-9m, Pond-1 176 Para 100% completed

177 Mongjoy Para RWs-3, RCC Stair-9m, Pond-1 100% completed Upazila: Lama, Union: Gajalia 178 Re-Aungshe Para RCC Stair-60m, DTWs-2 100% completed Upazila: Lama, Union: Aziznagar 179 Kantholi Para RCC Stair-30m, DTW with water supply 100% completed Upazila: Bandarban Sadar, Union:

Bandarban Sadar 180 Tongprue Para RCC Stair-55m, DTWs-2, RW-1, 100% completed Upazila: Bandarban Sadar, Union: Kuhalong Kuhalong Stair-55 meter, 1DTW with water supply, Pts-2 181 Headman Para 100% completed Upazila: Lama, Union: Rupashi Mong Swe Prue Stair-85m, DTW-1, PT-1, PM-1 182 Para 100% completed RCC Stair 68 meter, CC Stair-90 meter, DTWs- Baluchar Para 183 2 100% completed Upazila: Lama, Union: Saroi Union 184 Kyazu Para RCC Stair-57meter & Culvert, DTWs-2 100% completed Upazila: Alikadam, Union: Alikadam Sadar

100

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status RCC Stair-12m, CC long steps-47m, Pond Aongbai Para 185 excavation-1, RWs-2. 100% completed 186 Cheoni Para Stair-70 meter & RWs-2 100% completed Upazila: Alikadam, Union: Nayapara Union 187 Mongcha Para Stair-109 meter, DTWs-3 100% completed Upazila: Ruma, Union: Paindu Chanda headman GFS water supply system with 04 nos Plastic 188 para Reservoir tank. 100% completed Upazila: Thanchi, Union: Thanchi Sadar 189 Noktoha Para Stair-96 meter 100% completed Upazila: Thanchi, Union: Balipara 190 Dingte Para Stair-102 meter 100% completed 191 Monai Para 1 Deep Ring Well, 04 Plastic Reservoir Tanks 100% completed 192 Naikhyong Para RCC Stair/Steps-102m, U-Drain-35m 100% completed Upazila: Naikhyangchari , Union: Baishari 193 Mui Aong Para RCC Stair-76m, CC Stair-33m,DTWs-2 100% completed Thui Hla Aung RCC Stair & CC Stair-102m, DTWs-2, PTs-2. 194 Para, 100% completed Upazila: Rowangchari , Union: Rowangchari

Sadar RCC Stair-90 meter, with rataining wall, RCC Mongbai Para 195 WRT-1. 100% completed Upazila: Sadar Upazila , Union: Rajbila Tainkhali Market Tinshed Market Shed including sanitary Toilet & 196 Shed DTW-1 100% completed Upazila: Sadar Upazila , Union: Tankabati Tankabati Tinshed Market Shed including sanitary Toilet & 197 Market Shed DTW-1 100% completed Upazila: Ruma , Union: Ruma Sadar Battali Para Tinshed Market Shed including sanitary Toilet & 198 Market Shed DTW-1 100% completed Upazila: Sadar Upazila , Union: Bandarban

Sadar Union 199 Laimi Para GFS + RT, Footbridge-13meter, Stair-66 meter. 100% completed Lulain Headman RCC Stair-39.5m, Long steps-18m, Brick 100% completed 200 Para protection wall-5.5m, U-Drain-25m, RW-1,

101

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Renovation work of existing Dug Well, PTs-2, PM-1. Upazila: Sadar Upazila , Union: Kuhalong

Union 201 Jardan Para RCC Stair-105m, RW-1. 100% completed Upazila: Alikadam Upazila , Union:

Alikadam Sadar Union Augustin Tripura RCC Stair cum landing Ghat -10m, 4 Ring 202 Para Wells, 3 PTs, 3 PMs. Upazila: Alikadam Upazila , Union:

Nowapara Union RCC Stair & CC Stair-107m, U-Drain-47m, Wai Hla Para 203 DTWs-3. Upazila: Ruma Upazila , Union: Ruma Sadar

Union 204 Ashrom Para GFS water supply system with RT 100% completed 205 Battali Para GFS water supply system with RT 100% completed Upazila: Ruma Upazila , Union: Paindu

Union Chanda GFS water supply system + RT 206 Purnabasan Para 100% completed Upazila: Naikhyangchari Upazila , Union:

Naikhyangchari Sadar Union Sathojai Chak 100% completed RCC Stair-25m, DTWs-2, PTs-2, PMs-2. 207 Para Mracha Aung RCC Stair & Steps-25.5m, DTWs-2, PTs-2, PM- 100% completed 208 Chak Para 1. Upazila: Naikhyangchari Upazila , Union:

Sonaichari Union 209 Kyok Prok Para GFS water supply system with RT 100% completed 210 Khudi Para DTWs-6, PTs-2, PMs-2 100% completed Upazila: Sadar Upazila , Union: Kuhalong

Union Khoiya Para Tinshed Market Shed including sanitary Toilet & 211 Market Shed, DTW-1 100% completed Upazila: Ruma Upazila , Union: Ruma Sadar

Union Bethel Para Tinshed Market Shed including sanitary Toilet & 212 Market shed DTW-1 100% completed

102

Environmental Monitoring Report Jan – June 2019

Name of Sub- Intervention Present Pregress Sl no. Project/PDC Status Upazila: Ruma Upazila , Union: Galenga

Union Korang Bazar Tinshed Market Shed including sanitary Toilet & 213 Market Shed DTW-1 100% completed Upazila: Rowangchari Upazila , Union:

Alekhyang Union Tinshed Market Shed including sanitary Toilet & Battali Para MS 214 DTW-1 100% completed Upazila: Lama, Union: Gajalia 215 Ting Hla Para RCC Stair & long steps,02 DTWs 100% completed

103

Environmental Monitoring Report Jan – June 2019

Appendix 3: Site Specific Environmental safeguard Issues of rural Road Component particularly for Land Slide

Issue Observed: It seems to me that the slope mentioned in BoQ is not sufficient to protect the land slides considering the rainfall amount and intensity along with the type of soil. Moreover, due to not maintain the recommended slope the threat of land slide is increased as it is very steep.

Proposed Mitigation Measures: The soil type of this region is very critical. It make difference in very short distance even a couple of meters distance. Soil texture and soil profile also differ from its small depth. It is very difficult to find out uniform soil in long depth and distance. The most of the soil is mixture of silt, fine sand and clay along with loamy. Considering along with the soil condition, intensity of rainfall, physical communication, available materials and cost effectiveness, it is decided that one single solution is not enough to mitigate the hill slide threat. As a result 3 step measures have been suggested which are RCC retaining wall supported by RCC pile, providing geotex over the slope of the hill with appropriate nailing and bio engineering on the slope. The propose measures will not directly protect the hill slide during heavy rainfall rather it will safe the loss of live and keep the road communication live. To reduce the disturbance to hill, pile supported RCC retaining wall is suggested. Geotex will absorb the shocks of direct raindrop and protect the top soil. Local verities plants will primarily conserve the soil which will be planted by making hole on geotex wrapping. After settle down of soil it is suggested to plan local varieties of trees for long term protection of hill slide. Most of the location it is suggested for both retaining wall and geotex soil nailing with plantation. The height of retaining wall is depend on the height of hill. The length of the retaining wall is calculated in field considering the most vulnerability along with associated risks. The following table shows the required length of the proposed retaining wall. The maximum height of RCC retaining wall is considered two categories which is 5 meter and 3 meter. This table is also covered with the required area for geotex wrapping with soil nailing.

Measurement of RCC retaining wall and geotex wrapping area

Remarks Surface area Sl Length Hight Upazila Code Latitude Longitude for Goetex No (M) (M) (sqm)

104

Environmental Monitoring Report Jan – June 2019

1 A 70 8 21.21944 92.20707 1253

2 B 80 20 21.22123 92.20826 3579

3 C2 50 10 1119

4 C2 30 25 21.22258 92.20907 1678 Slope must be maintained 5 C3 30 25 1678

6 D 30 7 21.23581 92.20606 470

7 E 32 18 21.23697 92.20508 1289

8 F1 35 15 1174

21.24088 92.20343 9 F2 120 15 4027

10 F3 20 10 21.24228 92.20229 447

11 F4 70 15 2349

12 F5 12 15 21.24302 92.20919 403

13 F6 15 10 336

14 G1 20 10 447 21.24641 92.19984 House on top 15 G2 15 10 336

16 H1 30 15 1007

17 H2 40 20 1790

21.25135 92.19641 18 H3 50 20 2237

19 H4 60 20 2685

20 I 40 20 21.25541 92.19115 1790

21 J1 20 8 358 21.31621 92.16049 House on top 22 J2 20 8 358

Naikkhonchari 23 A1 25 10 22.10762 92.17256 559

Band

Sadar

arban

105

Environmental Monitoring Report Jan – June 2019

24 A2 35 3 235

25 B 50 7 22.10521 92.17381 783 Geotext only

26 C1 85 17 3233 Geotext only 22.10324 92.17379 27 C2 65 3 436 Geotext only

28 D 45 5 503 22.09928 92.16492 Geotext only 29 E 180 7 2819

30 F 140 12 22.09691 92.16367 3758

31 G 60 15 22.09124 92.16156 2013

32 H 70 25 22.08737 92.16385 3915

33 A 55 8 984

34 B 42 7 658

35 C 38 10 850 Alikadam 36 D 35 10 783

37 A 75 12 2013

38 B 47 10 1051

39 C 35 9 705

40 D 30 10 671

Lama 41 E 65 15 2181

42 F 25 12 671

43 G 85 12 2282

44 A 50 15 22.51944 92.00211 1678 No space between road and Hill

45 B 40 15 22.51467 92.99824 1342 No space between

Kawkhali road and Hill 46 C 50 8 22.50871 92.99777 895

106

Environmental Monitoring Report Jan – June 2019

47 D 30 10 22.50694 92.99764 671

48 E1 40 15 1342

49 E2 60 15 22.50493 92.99798 2013

50 E3 20 10 447

51 F 70 10 22.58191 92.99751 1566

52 G 70 15 22.58191 91.95892 2349

53 H 30 15 22.58315 91.95838 1007

54 I1 30 15 1007 Slope is must 55 I2 20 15 22.85453 91.95779 671

56 I3 20 15 671

57 J1 25 15 839 Slope is must 22.58742 91.95628 58 J2 20 15 671 Slope is must 59 K 70 15 22.60506 91.94902 2349

60 A 80 12 4295 Both side of road 61 B 40 13 1163

62 C 50 9 1007

63 Kaptai D 35 10 783

64 E 30 8 537

65 F 55 15 1846

66 A 45 6 604 GEOtex only 67 B 37 8 662 Baghaichari 3, 193 Total 92,329 sq m m

107

Environmental Monitoring Report Jan – June 2019

Appendix 4: Site Specific Environmental safeguard Issues of rural Road Component

Environmental Suggestive Mitigation Scheme Name Package No Physical Safeguard Issues Measures Progress Observed Environmental Parameter: Congestion of Natural Canal Rangamati Most of the diversion Costractor should Construction of 35m PC W-CHTII-Rang- 95% road for bridge/culvert remove the properly the Girder Bridge on Kaw-UNR/04B construction is not materials of diversion Betbunia Chairy Bazar- removed properly road. Contractor should Bara Aoulia-Santirhat which make also carefully handle Road congestion for natural the soil mass to dump water flow whose considering the cumulative impact on cumulative impact of environment is severe the soil. It should in some places as well. immediate remove from Moreover these, Soil the area to make ensure excavated for road the water flow. construction and Compaction of soil of bridge construction slope is must to avoid have dumped besides erosion. the road. Huge amount of soil have directly narrow the water flow path in some places and sometime make obstacle of natural flow. It will be sever during the rainy season. Construction of 60m W-CHTll-RANG- 40% RCC Girder Bridge on Kap-UZR/06B Raikhali GC Ferry Ghat- Rajsthali HQ Via Mitingachari Road Construction of 2 Nos W-CHTll-RANG- 60% 25m RCC Girder Bridge Kap-UZR/06C on Raikhali GC Ferry Ghat-Rajsthali HQ Via Mitingachari Road Construction of 25m W-CHTll-RANG- 75% RCC Girder Bridge on Kap-UZR/06A Raikhali GC Ferry Ghat-

108

Environmental Monitoring Report Jan – June 2019

Environmental Suggestive Mitigation Scheme Name Package No Physical Safeguard Issues Measures Progress Observed Rajsthali HQ Via Mitingachari Road Bandarban Improvement of W-B-BAN-Sad- 90% Holudia-Vaggakul- UNR/02A Tankbati Road W-B-BAN-Sad- 90% UNR/02B W-B-BAN-Sad- 90% UNR/02C W-B-BAN-Sad- 80% UNR/02D W-B-BAN-Sad- 60% UNR/02E Construction of 60.0m W-B-BAN-Nai- 100% RCC Bridge on UZR/03B Naikhongchari- Tumbru Road Construction of 60m W-B-BAN-Lam- 85% RCC Girder Bridge on UNR/07C Lama -Rupashipara Road Improvement of W-B-BAN-Sad- 80% Holudia-Vaggakul- UNR/02B, 2C, 2D, Tankbati Road by BC 2E (Ch. 5.30Km-7.31Km). Construction of 61.0m W-B-BAN-Nai- 100% (Ch.12+452km) long UZR/03E RCC Girder Bridge on Naikhongchari - Tumbru Road Construction of 60.0m W-B-BAN-Nai- 100% RCC Bridge on UZR/03B Naikhongchari- Tumbru Road Construction of 60m W-B-BAN-Lam- 85% RCC Girder Bridge on UNR/07C Lama -Rupashipara Road Khargrachari Improvement of W-KHA-Moh- 95% Sinduckchari union UNR/05B H/Q-Dullahtali GC via Chailyatali Road by BC

109

Environmental Monitoring Report Jan – June 2019

Environmental Suggestive Mitigation Scheme Name Package No Physical Safeguard Issues Measures Progress Observed Ch.2+713to 5+513 (Km+M) with 36.00m and 25.00m span RCC Girder Bridge Photo View of Relevant Issues

Environmental Suggestive Scheme Name Package No Physical Safeguard Issues Mitigation Progress Observed Measures

Environmental Suggestive Mitigation Scheme Name Package No Physical Safeguard Issues Measures Progress Observed Environmental Parameter: Soil erosion and sedimentation Bandarban Loose soil are dumped It is suggested to compact to Improvement of Pan W-B-BAN- 80% in the road side which soil properly and make Bazar - Chokhyng ALI- have no compaction. UNR/05A

110

Environmental Monitoring Report Jan – June 2019

During the rainy vegetation to reduce the Tripura Para (Kalar W-B-BAN- 80% season all loose soil erosion. Jiri) Road ALI- travel to the down UNR/05B stream and cover the Improvement of W-B-BAN- top soil of agricultural Lama-Rupashipara Lam- land. Road UNR/07A 95% W-B-BAN- 100% Lam- UNR/07B Construction of 60m W-B-BAN- 85% RCC Girder Bridge Lam- on Lama - UNR/07C Rupashipara Road Construction of 25m W-B-BAN- 80% RCC Girder Bridge Lam- and BC Road on UNR/08B Baniarchara-Gazalia Raod Photo View of Relevant Issues

Environmental Environmental Suggestive Comments Parameters Safeguard Issues Mitigation Observed Measures Occupational Occupational health It is suggested to Personal protective equipment is not health and and safety measures maintain minimum found in the field. Though it is not very safety are not followed safety measures familiar in small construction project but except the visitors which is very risk at least we can start from very basic PPE. hours of high official. for health like safety shoes, gloves etc.

111

Environmental Monitoring Report Jan – June 2019

Photo View of Relevant Issues

Residula It is found that residual It is suggested to It is found most of the BC road which are Burning burning materials remove the residual spread on road and creat risk for the materials of during construction of burining materials peopoe and vehicle particularly for road road are not revoved (coal, bricks, half motorcycle. construction properly which make burn wood and the road risky for cotton prieces) people and creating dust. Photo View of Relevant Issues

Air pollution Smoke and emission of It is suggested that Though it is not very massive in this from bitumen carbon dioxide is at least the smoke project but have some impact as carbon burning found during melting does not directly of bitumen for road hamper the human dioxide emission occur. The cumulative construction. being. It is also impact is aggravated if use of wood as suggested that no fire. timber is use for burning. Photo View of Relevant Issues

112

Environmental Monitoring Report Jan – June 2019

Traffic problem No traffic congestion Water spray is It is found very severe in field among all due to road found due to suggested during visible impact and contractor should take construction construction work but dry season and it very seriously. work people feel disturb due alternative walking to soil dust of road way should construction and mud introduce in risky during rainy season. places of road by providing brick cheap or brick. In before starting rainy season it is suggested to remove soild dust from the road to avoid traffic problem and human injury. Photo View of Relevant Issues

113

Environmental Monitoring Report Jan – June 2019

Personal Open electric It is strongly Contractor should take this issue seriously Protective connection is found on suggested to use to prevent accident immediately. Equipment road which may occur safe electric injury or even death to connection the worker as well as protection by passersby. insulator in all cases. Photo View of Relevant Issues

Appendix 5: Site Specific Environmental Safeguard Issues of Community Infrastructure and MAD Component

Enviro Environmental Suggestive Comments nment Safeguard Issues Mitigation al Observed Measures Param eters Conta It is found that some It is suggested to minatio tube wells are in threat refreshers training n of of contamination due of respective O/M Water to breakdown of committee. point sanitary seal. It is also and found that the polluti surrounding on of environment of tube surroun wells are water logged ding and make the area area of risky for carrying

114

Environmental Monitoring Report Jan – June 2019

tube water due to threat of well slipping Photo View of Relevant Issues

Slippin Some staircase found Community people There is lac of maintenance of stair g risk covered with mud should make it case in most of the structure which lead which have a potential clean. to accumulate soil on it and make a risk to slipping. of slipping. Photo View of Relevant Issues

Surface water Latrine construction It is suggested to contamination from in close to natural maintain the soak pit Latrine water flow have a and septic tank threat of water properly to prevent contamination the surface water contamination

115

Environmental Monitoring Report Jan – June 2019

Bad smell and It is found that It is suggested to pollution from market marked shade are not construct proper shade properly designed for drainage system in drainage facilitey market shade to which lead to bad minimize the smell in market with problem. producing mud and ultimately create pollution for all.

116

Environmental Monitoring Report Jan – June 2019

Appendix 6: EMP implementation Status of Rural Road Component

Potential Concern Proposed Actual Recommended Compli Impacts Subprojects Mitigation Implementatio Actions ance measures as n Status per EMP Air Pollution Improvement of Earth No water spray Truck carrying Not due Marishya Bazar excavation to reduce dust. earth, sand, complie to dust generates (Upazila sadar)- and No use of brick chips and d. during Mayanimukh Bazar construction tarpaulins or stone chips construction and via Babupara, sites will cover to should be carrying Battola & Daskin be water minimize the covered with construction Saroatoli road sprayed to spillage and tarpaulins or materials minimize dust pollution other materials. Improvement of dust. Trucks Holudia-Vaggakul- carrying Tankbati Road construction materials (such as earth, sand or stone) will be covered with tarpaulins to avoid spillage Congestion the Construction of Compaction No compaction Immediate Not path of natural 35m PC Girder of soil to found and no action should complie water flow by Bridge on Betbunia protect turfing work is take to remove d. dumping of soil Chairy Bazar-Bara erosion. progressed. the congestion besides the road Aoulia-Santirhat Maintain the along with Road Road side provide turfing slope and to prevent Construction of provide the erosion. 60m RCC Girder appropriate Bridge on Raikhali turfing. GC Ferry Ghat- Rajsthali HQ Via Mitingachari Road

Construction of 2 Nos 25m RCC Girder Bridge on

117

Environmental Monitoring Report Jan – June 2019

Raikhali GC Ferry Ghat-Rajsthali HQ Via Mitingachari Road

Improvement of Holudia-Vaggakul- Tankbati Road

Construction of 61.0m (Ch.12+452km) long RCC Girder Bridge on Naikhongchari - Tumbru Road

Construction of 60.0m RCC Bridge on Naikhongchari- Tumbru Road

Construction of 60m RCC Girder Bridge on Lama - Rupashipara Road

Improvement of Sinduckchari union H/Q-Dullahtali GC via Chailyatali Road by BC Ch.2+713to 5+513 (Km+M) with 36.00m and 25.00m span RCC Girder Bridge Potential threat Improvement of Hill cutting Slope is not Detail site Not of hill slide due Betbunia Chairy slope is maintained specific slope complie to abrupt Bazar– Laxmichari mentioned in properly. protection/mitig d manner of via Barmachari road the BoQ ation measures cutting. (1:1.5) to should be Construction of protect the identified and 35m PC Girder land slide. implementation Bridge on Betbunia the measures as Chairy Bazar-Bara early as possible.

118

Environmental Monitoring Report Jan – June 2019

Aoulia-Santirhat It is my Road observation that one single Construction of measures is not 25m RCC Girder sufficient to Bridge on Raikhali mitigate the risk GC Ferry Ghat- of land slide. Rajsthali HQ Via Mitingachari Road

Construction of 60m RCC Girder Bridge on Raikhali GC Ferry Ghat- Rajsthali HQ Via Mitingachari Road

Construction of 2 Nos 25m RCC Girder Bridge on Raikhali GC Ferry Ghat-Rajsthali HQ Via Mitingachari Road

Construction of 42m & 25m RCC Girder Bridge on Raikhali GC Ferry Ghat-Rajsthali HQ Via Mitingachari Road

Improvement of Marishya Bazar (Upazila sadar)- Mayanimukh Bazar via Babupara, Battola & Daskin Saroatoli road

Improvement of Holudia-Vaggakul- Tankbati Road

119

Environmental Monitoring Report Jan – June 2019

Construction of 20.0m and 23.0m RCC Bridge with Road on Naikhongchari- Tumbru Road

Construction of 35.0m (Ch.27+458km) and 30.00m (29+765km) long PC Girder Bridge on Naikhongchari- Tumbru Road

Construction of 30.0m (Ch.30+570km) PC Girder Bridge with Road on Naikhongchari- Tumbru Road

Improvement of Naikhongchari- Tumbru Road

Improvement of Pan Bazar - Chokhyng Tripura Para (Kalar Jiri) Road

Improvement of Lama-Rupashipara Road at Ch.09+50 - 11+09km with 35m PC Gider Bridge

60m RCC Girder Bridge and BC Road on Baniarchara- Gazalia Raod

120

Environmental Monitoring Report Jan – June 2019

Construction of 25m RCC Girder Bridge and BC Road on Baniarchara- Gazalia Raod

Improvement of Sinduckchari union H/Q-Dullahtali GC via Chailyatali Road by BC Ch.2+713to 5+513 (Km+M) with 36.00m and 25.00m span RCC Girder Bridge Inappropriate It is implied for all Appropriate Not found in It is suggested to Not implication of sub project and occupational field. maintain Compli occupational where construction health and minimum safety ed health and work involved. safety measures which safety may measures are is very risk for injury the suggested to health like safety workers. use. shoes, gloves etc. Air pollution This is implied for No use of Wood fuel is If possible use, Partiall from bitumen road work where wood fuel not used. No electric burner, y burning bituminous with control control burning. use of control complie surfacing is burning Did not remove burning system d involved. maintain a the wastes with a chimney. standard properly the Must remove the height of place after wastes after chimney burning. burning.

121

Environmental Monitoring Report Jan – June 2019

Appendix 7: EMP Implementation Status of CI and MAD Components

Potential Concern Proposed Actual Recommended Compliance Impacts Subprojects Mitigation Implementation Actions Status measures as per EMP Construction This is Minimum Some tube well Water quality Partially of tube well implied for distance did not test for faecal complied. close of the should be 30 maintain the coliform and latrine pit mentioned feet as per safe distance. routine test have a situation Bangladesh No effective once in year. potential and for all standard. treatment plant Effective threat of GFS Potable is placed. water faecal system. water supply treatment contamination for drinking. system with along with establish GFS system chlorination as well. . system. Accumulation This is Regular Some found Immediate Partially of soil on stair implied cleaning and with huge soil removing the complied. case have a most of the maintenance accumulation. accumulated potential of components is suggested. soil and wash slipping risk. out. Inappropriate This is Recycle or It is dumped It is need to Partially management implied for proper here and there inform the complied. of engine oil most of the management and some times user to recycle may cause of engines. or burnout. burn out. it or dumped it soil pollution properly according to the guideline. Improper This is Clear slope Appropriate If possible, Partially management implied for should slope is not correction the complied of slop of all market maintain for maintained. slope and market shed sheds proper maintain the will cause of drainage drainage water logging system. system to in avoid water logging.

122

Environmental Monitoring Report Jan – June 2019

surrounding area. Some noise Machine It was reported No action is Well may generate will operate that power required Complied during in daytime pumps and operation of only. power tillers power tiller operate at day and pump time only. machine which is local and not much significant.

123