Library Vestibule Addition

Total Page:16

File Type:pdf, Size:1020Kb

Library Vestibule Addition 116 King St, Suite 202 Madison, WI 53703 (608) 204-7464 Sonja Kruesel – City Planner and Economic Development Director City of Monona 5211 Schluter Road Monona, WI 53716 January 31st, 2018 PROJECT DESCRIPTION Aro Eberle Architects was hired by the Monona Public Library to develop plan for the addition of new vestibules to the Monona Library Building. The main driver behind the project is to improve energy efficiency by limiting the amount of infiltration in to the building cause by ingress and egress of library patrons. Originally, we investigated both the Nichols Rd. and Schluter Rd. entrances for new vestibules, however, after verifying that the cost to build both vestibules exceeded the original budget and expectations, we revised the project to include a vestibule at only the Schluter Rd entrance. The Nichols Rd. entrance has a lower frequency of use and it was deemed that its lower use did not justify the cost of a complete vestibule. The Nichols Rd. entry will receive new, high-efficiency doors and glazing in place of the existing doors and glazing in the same configuration. The Schluter Rd. entrance is a better candidate for the addition of a vestibule because of the higher traffic levels, and because there is an existing basement space beneath the entire front stoop. Adding the vestibule solves long term moisture and insulation issues in this area. The vestibule can also rest on the existing concrete basement and foundation wall, eliminating the need to excavate for foundations. This project addresses two other areas of concern at the Schluter Rd entrance. There is an underground vault located beneath the sidewalk approach to the building with two metal grates at each corner. This vault does not currently house any infrastructure and can be filled in as part of this project. This eliminates any safety concerns surrounding this concealed underground space covered by a concrete slab. There are also storm water issues causing problems at the front entrance that will be addressed with the project. The vestibule walls and roof will be framed with cold-formed steel studs. The roof infill will be rather flat, requiring a rubber membrane roof in lieu of shingles. The glazing will be thermally broken anodized aluminum with clear insulated glazing units. The new vestibule cladding material is planned as a concealed fastener composite material with the look and texture of wood siding. It was chosen to complement the existing material pallet of white stucco or white painted concrete and red brick. It is a very durable and low maintenance material. It won’t require any special detailing of the existing foundation walls to install. The new roof edge will be a straight line across the front of the building. A new gutter will connect to the existing gutters and new downspouts will help direct run-off away from the building. A missing downspout near the Northeast corner will be put back into place and connected to the storm sewer. MONONA PUBLIC LIBRARY 116 King St, Suite 202 (608) 204-7464 Madison, WI 53703 AroEberle.com VESTIBULE RENOVATION OWNER: MONONA PUBLIC LIBRARY CODE SUMMARY: GENERAL NOTES: ELECTRICAL GENERAL NOTES: HVAC GENERAL NOTES: 1. APPLICABLE CODES: WISCONSIN COMMERCIAL 1. APPLICABLE CODES: WISCONSIN COMMERCIAL APPLICABLE CODES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE WISCONSIN COMMERCIAL BUILDING CODE 2011 - (BASED ON BUILDING CODE 2011 - EFFECTIVE SEPTEMBER 1, BUILDING CODE 2011 - EFFECTIVE SEPTEMBER 1, DIRECTOR: RYAN CLARINGBOLE LOCAL, FEDERAL, AND STATE REGULATIONS, AND ALL 2011 (BASED ON 2009 INTERNATIONAL BUILDING 2011 (BASED ON 2009 INTERNATIONAL BUILDING 2009 INTERNATIONAL BUILDING CODE WITH WISCONSIN OF THE REQUIREMENTS OF THE LOCAL AUTHORITIES AMENDMENTS - SPS 361 AND 362) CODE WITH WISCONSIN AMENDMENTS - SPS 361 & CODE WITH WISCONSIN AMENDMENTS - SPS 361 & HAVING JURISDICTION. 362) 362) 1000 NICHOLS ROAD, MONONA, WI 53716 2. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL 2. FINAL ELECTRICAL SCOPE TO BE DETERMINED 2. FINAL HVAC SCOPE TO BE DETERMINED THROUGH 2009 INTERNATIONAL ENERGY CONSERVATION CODE WITH PERMITS, INSPECTION FEES, AND TAXES AS WISCONSIN AMENDMENTS (SPS 363) THROUGH DESIGN-BUILD PROCESS BY PLUMBING DESIGN-BUILD PROCESS BY HVAC CONTRACTOR. NO 608-222-6127 REQUIRED FOR THEIR PORTION OF THE WORK. CONTRACTOR. NO ENGINEERING SERVICES ARE TO ENGINEERING SERVICES ARE TO BE PROVIDED BY 3. THE CONTRACTOR SHALL VISIT THE SITE TO BE PROVIDED BY ARO EBERELE ARCHITECTS. ARO EBERELE ARCHITECTS. ADDITIONAL HVAC 2006 INTERNATIONAL MECHANICAL CODE WITH WISCONSIN DETERMINE THE FULL EXTENT OF THE WORK AND AMENDMENTS (SPS 364) ADDITIONAL HVAC SCOPE BEYOND WHAT IS SCOPE BEYOND WHAT IS DESCRIBED BY THESE BECOME FAMILIAR WITH THE LOCAL CONDITIONS DESCRIBED BY THESE DOCUMENTS MAY BE DOCUMENTS MAY BE REQUIRED FOR PROPER AND CODES RELATING TO THE WORK BEFORE 2006 INTERNATION FUEL GAS CODE WITH WISCONSIN REQUIRED FOR PROPER COMFORT AND CODE COMFORT AND CODE COMPLIANCE. ARCHITECT: ARO EBERLE SUBMITTING A PROPOSAL. FAILURE TO DO SO WILL COMPLIANCE. 3. SCOPE TO INCLUDE ONE NEW CABINET UNIT HEATER AMENDMENTS (SPS 365) NOT RELIEVE THE CONTRACTOR OF THE 3. PROVIDE EMERGENCY LIGHTING AS REQUIRED BY IN THE NEW VESTIBULE AND CONNECTIONS TO OBLIGATIONS OF THE CONTRACT. 2008 WISCONSIN PLUMBING CODE - SPS 381-387 CODE EXISTING HYDRONIC LINES AND THERMOSTAT 4. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF 4. PROVIDE ILLUMINATED EXIT SIGNS AS REQUIRED BY 4. SCOPE TO INCLUDE RE-ROUTE OF COMBUSTION AIR ARCHITECTS ANY DISCPREPANCIES IN THE CONTRACT WISCONSIN STATE ELECTRICAL CODE - COMM 316 CODE INTAKE FROM EXISTING SUB-TERRANIAN VAULT TO DOCUMENTS, IN WRITING, AND ALLOW SUFFICIENT 5. ALL LAMPING TO BE LED; MATCH EXISTING COLOR NEW VERTICAL LOUVER ON FACE OF NEW TIME FROM THE RECEIPT OF NOTIFICATION BY THE TEMPERATURE IN ADJACENT INTERIOR AREAS VESTIBULE CONSTRUCTION 116 KING STREET, SUITE 202, MADISON, WI 53703 CLASS OF CONSTRUCTION: ARCHITECT TO FURNISH A CLARIFICATION BEFORE TYPE IIB 6. PROVIDE FINAL LIGHTING LAYOUT; INCLUDING PROCEEDING WITH THE WORK IN QUESTION. EMERGENCY LIGHTING, EXIT SIGNS AND GENERAL 608-204-7464 5. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT, IN ILLUMINATION TO ARCHITECT FOR REVIEW PRIOR TO OCCUPANCY: WRITING, OF ANY DEFICIENCIES RELATED TO LOCAL ASSEMBLY 3 COMMENCEMENT CODES AND REGULATIONS OR UTILITIES, AND ALLOW 7. RETAIN EXISTING POWER RECEPTACLES ALONG SUFFICIENT TIME FROM THE RECEIPT OF EXTERIOR WALLS PROFESSIONAL SEAL BUILDING AREA: NOTIFICATION BY THE ARCHITECT TO FURNISH A PLUMBING GENERAL NOTES: GROUND FLOOR: 9,728 S.F. (19,000 ALLOWABLE) REVISION OR CLARIFICATION. FIRST FLOOR: 17,160 S.F. (19,000 ALLOWABLE) 6. THE CONTRACTOR WILL ALLOW 7 CALENDAR DAYS Sheet List FROM THE DATE OF RECEIPT BY THE ARCHITECT FOR 1. APPLICABLE CODES: WISCONSIN COMMERCIAL RESPONSES TO REQUESTS FOR INFORMATION BUILDING CODE 2011 - EFFECTIVE SEPTEMBER 1, Sheet 7. THE CONTRACTOR SHALL FURNISH SUBMITTALS FOR 2011 (BASED ON 2009 INTERNATIONAL BUILDING Number ALL BUILDING COMPONENTS AND ACCESSORIES CODE WITH WISCONSIN AMENDMENTS - SPS 361 & Sheet Name NECESSARY FOR THE INTALLATION OF EACH FIRE PROTECTION NOTES: 362) BUILDING COMPONENT DESCRIBED OR LISTED IN THE 2. FINAL PLUMBING SCOPE TO BE DETERMINED DRAWINGS 1. APPLICABLE CODES: WISCONSIN COMMERCIAL THROUGH DESIGN-BUILD PROCESS BY PLUMBING A000 COVER SHEET 8. THE CONTRACTOR SHALL FURNISH SHOP DRAWINGS BUILDING CODE 2011 - EFFECTIVE SEPTEMBER 1, CONTRACTOR. NO ENGINEERING SERVICES ARE TO A101 DEMOLITION AND NEW FLOOR PLANS FOR WORK REQUIRING SHOP FABRICATION FOR THE 2011 (BASED ON 2009 INTERNATIONAL BUILDING BE PROVIDED BY ARO EBERELE ARCHITECTS. ARCHITECT TO REVIEW. THE CONTRACTOR SHALL CODE WITH WISCONSIN AMENDMENTS - SPS 361 & ADDITIONAL HVAC SCOPE BEYOND WHAT IS A102 ROOF PLAN ALLOW 10 CALENDAR DAYS FROM THE DATE OF 362) DESCRIBED BY THESE DOCUMENTS MAY BE A111 REFLECTED CEILING AND FINISH PLANS RECEIPT BY THE ARCHITECT FOR REVIEW OF THE 2. EXTEND EXISTING SPRINKLER SYSTEM REQUIRED FOR PROPER COMFORT AND CODE SHOP DRAWINGS. THROUGHOUT ENTIRE WORK AREA; EXISTING DRY COMPLIANCE. A201 ELEVATIONS 9. CONTRACTOR SHALL APPLY, INSTALL, CONNECT, SPRINKLER HEADS ARE LOCATED ALONG EXTERIOR ERECT, USE, CLEAN AND CONDITION BENEATH OVERHANGS SURROUNDING SCHLUTER A301 WALL SECTION AND DETAILS MANUFACTURED ARTICLES, MATERIALS, AND ROAD ENTRY A302 CONCRETE REPAIR IMAGES EQUIPMENT AS RECOMMENDED BY THE MANUFACTURER, UNLESS SPECIFIED TO THE A900 RENDERING CONTRARY. THE MANUFACTURER'S LATEST A901 COLORED ELEVATION RECOMMENDATIONS AT THE TIME OF BIDDING SHALL BE USED. 10. CONTRACTOR TO PROVIDE SUBMITTALS FOR ALL DOOR HARDWARE 11. KEYNOTE NUMBERS ARE SHEET SPECIFIC - SEE KEYNOTE LEGEND ON EACH SHEET FOR DEFINITION OF EACH NUMER 12. ALL GIVEN DIMENSIONS ARE TO BE FIELD VERIFIED 13. ALL MATERIALS RESULTING FROM CONSTRUCTION AND OR DEMOLITION THAT QUALIFY SHALL BE RECYCLED OR OTHERWISE DIVERTED FROM A LANDFILL - CONTRACTOR SHALL PROVIDE A REPORT DOOR AND HARDWARE SCHEDULE WHEN THE PROJECT IS COMPLETE TRACKING THE WASTE MATERIAL GENERATED BY THE PROJECT AND DOOR FRAME MISCELLANEOUS HOW IT WAS HANDLED DOOR LEAF SIZE GLAZING DETAILS NUMBER QTY. WIDTH HEIGHTTYPE MAT'L TYPE FINISH TYPE MAT'L HEAD JAMB FINISH LABEL HDWR SET REMARKS 105A (1) 3' - 0" 7' - 0" MS AL 1/4" TEMPERED CLEAR F1 AL CLEAR -- 2 No. Description Date ANODIZED ANODIZED 1 FOR REVIEW 07/07/2017 105B (1) 3' - 0" 7' - 0" MS AL 1/4" TEMPERED CLEAR F1 AL CLEAR -- 2 ANODIZED ANODIZED 226A (1) 3' - 0" 7' - 0" NS 1 PRODUCT SPECIFICATIONS: 226B (1) 3' - 0" 7' - 0" NS 11,2 226C (1) 3' - 0" 7' - 0" MS AL 1" INSULATED CLEAR F2 AL CLEAR -- 2 ANODIZED ANODIZED 07 42 43 - SIDING PANEL: NICHIHA 226D (1) 3' - 0" 7' - 0" MS AL 1" INSULATED CLEAR F2 AL CLEAR -- 1 2 ANODIZED ANODIZED COMPOSITE WALL VINTAGEWOOD; COLOR: PANELS CEDAR; USE WITH MANUFACTURER PROVIDED ALUMINUM CORNER TRIM AND HARDWARE GROUPS: MATCHING MANUFACTURED DOOR NOTES: CORNERS HARDWARE SET 1 1. EXISTING DOOR TO REMAIN 07 47 47- FIBER FIBER-CEMENT TRIM: NICHIHA 2. ADD ELECTRIC AUTO-OPERATOR AND ASSOCIATED 1 EA CONTINUOUS HINGE 112HD 313AN IVE MONONA PUBLIC CONTROL DEVICES 1 EA PANIC HARDWARE 3349A-EO 643E VON CEMENT SIDING NICHIBOARD; COLOR: FACTORY 1 EA 90 DEG OFFSET PULL 8190HD 10" O 613 IVES PRIMED, FIELD PAINT TO 1 EA RIM CYLINDER 20-057 643E SCH LIBRARY 1 EA SURF.
Recommended publications
  • Village of Pittsford Settled 1789 • Incorporated 1827
    VILLAGE OF PITTSFORD SETTLED 1789 • INCORPORATED 1827 Members: Maria Huot Scott Latshaw Liaison: Robert Corby William McBride Attorney: Jeff Turner Lisa Cove Building Inspector: Kelly Cline Ken Morrow Recording Sec: Linda Habeeb Alternate: Ron Johnson Architectural and Preservation Review Board Regular Meeting Monday May 7, 2018 at 7:00 pm This agenda is subject to change both in number of applications, order of applications, and/or at the discretion of the Chairperson. Conflict of interest disclosure . Ken Samarra, 6 South Main Street ~ Sign . Jason Crane, 7 Stonegate Lane ~ Overhang . Jason Crane, 27 Lincoln Ave ~ Siding . Tom Dakin, 38 Rand Place ~ Lights . Robert Huot, 21 Church Street ~ Windows . Del Monte Hotel Group, 41 N. Main Street ~ Porte Cochere Member Items: Minutes: 4/2/18 Village of Pittsford documents are controlled, maintained, and available for official use on the Village of Pittsford Website, located at http://www.VillageofPittsford.org. Printed versions of this document are considered uncontrolled. Copyright © (2010) Village of Pittsford. TRANSMITTAL TRANSMITTED TO: Village of Pittsford 21 North Main Street Pittsford, New York 14534 ATTENTION: Ms. Kelly Cline VIA: Delivery DATE: April 18, 2018 RE: Architectural & Preservation Review Board Application for Exterior Renovations to the Del Monte Lodge Kelly, Attached please find the Architectural & Preservation Review Board Application and Supporting Documents for the Proposed Exterior Renovations at the Del Monte Lodge (41 North Main Street). Respectfully, Andrew Van
    [Show full text]
  • Air Curtains As Alternatives to Vestibules
    Air Curtains as Alternatives to Vestibules his article describes the function and benefits of air curtains. It presents results from a recent study on the energy performance of air curtains relative to vesti- T bules and provides useful information for engineers and code officials. HOW AIR CURTAINS WORK An air curtain installed on the interior of a building creates a coherent sheet of air composed of the air curtain discharge and the surrounding entrained air. This sheet of air stabilizes when it meets a return grill or splits at a surface, such as a floor or another opposing air stream. When this stability combines with the building’s interior pressure, it resists and reduces thermal exchange over an opening in the building envelope. The air curtain is not intended to replace a physical door, but may be used as a low-cost, low-maintenance alternative to a vestibule, when appropriate. This would save valuable floor space and create an invisible, energy-saving barrier that reduces infiltra- tion when the door is open. The most common types of controls are switches triggered by the door, or motion sensors that are triggered by people approaching the door. BENEFITS OF AIR CURTAINS Approved as an alternative to vestibules in the 2015 International Energy Conser- vation Code (IECC) and the 2015 International Green Construction Code ® (IgCC), air curtains make egress in an emergency exit situation safer and faster by providing clear, By David A. Johnson, Berner International Corp.; Frank R. Cuaderno, Mars Air Systems, LLC; and Brian Jones, Powered Aire Inc. JUNE 2015 | 34 Air Curtains as Alternatives to Vestibules continued uninhibited flow to the traffic passing through it, while still saving energy during heating and cooling seasons.
    [Show full text]
  • First Impression : the Study of Entry in Architecture
    Copyright Warning & Restrictions The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Under certain conditions specified in the law, libraries and archives are authorized to furnish a photocopy or other reproduction. One of these specified conditions is that the photocopy or reproduction is not to be “used for any purpose other than private study, scholarship, or research.” If a, user makes a request for, or later uses, a photocopy or reproduction for purposes in excess of “fair use” that user may be liable for copyright infringement, This institution reserves the right to refuse to accept a copying order if, in its judgment, fulfillment of the order would involve violation of copyright law. Please Note: The author retains the copyright while the New Jersey Institute of Technology reserves the right to distribute this thesis or dissertation Printing note: If you do not wish to print this page, then select “Pages from: first page # to: last page #” on the print dialog screen The Van Houten library has removed some of the personal information and all signatures from the approval page and biographical sketches of theses and dissertations in order to protect the identity of NJIT graduates and faculty. FIRST IMPRESSION: THE STUDY OF ENTRY IN ARCHITECTURE by Siriwan Polpuech Thesis submitted to the Faculty of the Graduate School of the New Jersey Institute of Technology in partial fulfilment of the requirement for the degree of Master of Science in Architectural Studies 1989 APPROVAL SHEET Title of Thesis: First Impression: The Study of Entry in Architecture Name of Candidate: Siriwan Polpuech Master of Science in Architectural Studies, 1989 Thesis and Abstract Approved: Prof.
    [Show full text]
  • The District Wide Problem
    Appendices APPENDIX A: SIMPLE FLOOR DIAGRAMS OF CARDOZO SENIOR HIGH SCHOOL and MCKINLEY TECH HIGH SCHOOL 15 Cardozo Senior High: Basement Floor 16 Cardozo Senior High: Ground Floor 17 Cardozo Senior High: First Floor 18 Cardozo Senior High: Second Floor 19 Cardozo Senior High: Third Floor 20 Building Capacity Review Space Inventory BUILDING: Cardozo ADDRESS: 13th & Clifton Streets, N.W. CLASSIFICATION: Senior High WARD: 1 POPULATION HOUSED: 9-12 SQUARE FOOTAGE: 355,400 CAPACITY: 1563 CONSTRUCTION: 1916 CLUSTER: 10 EXTENDED USE: SPACE SPACE SPACE SPACE NO. TYPE SPACE NO. TYPE SPACE NO. TYPE SPACE NO. TYPE SPACE 1 Pipe Tunnel 48 Computer Lab 95 Classroom 142 Storage Room 2 Water Meter Room 49 Wood Shop 96 Storage Room 143 Vestibule 3 Vestibule 50 Storage Room 97 Vestibule 144 Book Room 4 Stairwell 51 Storage Room 98 Stairwell 145 Computer Lab 5 In School Suspension 52 Wood Shop 99 TANIFF 146 Computer Lab 6 In School Suspension 53 Electronics Lab 100 Office 147 Computer Lab 7 In School Suspension 54 Locker Room (Boys) 101 Business Mgr 148 Computer Lab 8 In School Suspension 55 Toilet (Boys) 102 Stairwell 149 Storage Room 9 In School Suspension 56 Storage Room (Towels) 103 Custodians Closet 150 Office (P.E) 10 In School Suspension 57 Shower Room (Boys) 104 Toilet (Boys) 151 Stairwell 11 In School Suspension 58 Closet 105 Office (Custodians) 152 Shower Room (Girls) 12 Vestibule 59 Passage 106 Stairwell 153 Stairs 13 Stairwell 60 Weightlifting Room 107 Office 154 Toilet/Lockers (Girls) 14 Fan Room 61 Stairwell 108 Office (Dietician) 155 Stairwell
    [Show full text]
  • Vestibule Requirements in Commercial Buildings Vestibule Requirements in Commercial Buildings
    CODE NOTES CODE BUILDING TECHNOLOGIES PROGRAM 2009 and 2012 IECC; ASHRAE 90.1-2007 and 2010 Vestibule Requirements in Commercial Buildings The intent of the vestibule requirement is to reduce infiltration of air into a space, thereby addressing energy conservation and comfort issues for occupants located near primary entrance doors. The majority of infiltration comes through primary entrance doors that are typically used to access public areas, and have higher usage rates than doors classified for personnel use. Vestibules can reduce the infiltration losses (or gains) from wind and stack effects by creating an air lock entry. Commercial building designers are required to install vestibules on primary entrance doors leading to and from spaces greater than or equal to 3,000 Oces square feet (298 m2), with some 2600 Ft2 Floor Area exceptions. Many designers are unclear on 2 what is included in determining the 3,000 500 Ft Floor Area ft2 that defines a space. For example, if an entrance door leading from a lobby is attached to a corridor with a combined Oces total area of 3,000 ft2, must the door meet the vestibule requirement? Similarly, which doors must have vestibules when Figure 1. several doors leave a space greater than or equal to 3,000 ft2? from the entrance door are included when determining if a vestibule is required. The 2009 and 2012 IECC require that (See Figure 1). primary entrance doors accessing spaces 3,000 ft2 or greater have vestibules. This ASHRAE 90.1-2007 and 2010 also require requirement typically applies to large vestibules for entrance doors accessing “box” stores where the building entrance spaces 3,000 ft2 or greater but with opens directly to a resale area, or to some added requirements not present other occupancies with large lobbies in the IECC.
    [Show full text]
  • Guastavino Structural Tile Vaulting in Pittsburgh Spring Semester 2021
    The Osher Lifelong Learning Institute University of Pittsburgh, College of General Studies Guastavino Structural Tile Vaulting in Pittsburgh Spring Semester 2021 Instructor: Matthew Schlueb Program Format: Five week course, 90 minute academic lectures and guided tour, with time for questions. Course Objective: To offer a master level survey of the Pittsburgh architectural works by Rafael Guastavino and his son, drawn from their Catalan traditions in masonry vaulting, as interpreted by a practicing architect and author of architecture. Course Description: Architect Rafael Guastavino and his son Rafael Jr. emigrated to the United States in 1881, bringing the traditional construction method of structural tile vaulting from their Catalan homeland, thereby transforming the architectural landscape from Boston to San Francisco. This course will examine their works in Pittsburgh, illustrating the vaults and domes made with structural tiles, innovations in thin shell construction, fire-proofing, metal reinforcing, herringbone patterns, skylighting, acoustical and polychromatic tiles. Lectures supplemented with a guided tour of these local structures, provided logistics and health safety measures permit. Course Outline: Lecture 1: From Valencia to New York [Tuesday, March 16, 2021 3pm-4:30pm] Convent of Santo Domingo Refectory (arches and vaults; Mudéjar style; Zaragoza, Spain; 1283) Monastery of Santo Domingo Refectory (bóveda tabicadas / maó de pla; Juan Franch; Valencia, Spain; 1382) Batlló Textile Factory (vaulted arcade atop metal columns; Rafael Guastavino; Barcelona, Spain; 1868) La Massa Theater (shallow dome vault; Rafael Guastavino; Vilassar de Dalt, Spain; 1880) Boston Public Library (structural tile vaults; Charles McKim; Boston, Massachusetts; 1889-1895) St. Paul’s Chapel (dome; Isaac Newton Phelps Stokes; Columbia University, New York; 1907) Lecture 2: Material Innovations in Building Science [Tuesday, March 23, 2021 3pm-4:30pm] Cathedral of St.
    [Show full text]
  • Emergency Evacuation and Stairwell Signage: E-02 July 1, 2020
    Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6100 Emergency Evacuation and Stairwell Signage Guideline E-02 Serving the Cities of Aliso Viejo • Buena Park • Cypress • Dana Point • Garden Grove • Irvine • Laguna Hills • Laguna Niguel • Laguna Woods Lake Forest • La Palma • Los Alamitos • Mission Viejo • Rancho Santa Margarita • San Clemente • San Juan Capistrano • Seal Beach Santa Ana • Stanton • Tustin • Villa Park • Westminster • Yorba Linda and Unincorporated Areas of Orange County Emergency Evacuation and Stairwell Signage: E-02 July 1, 2020 Emergency Evacuation and Stairwell Signage PURPOSE Emergency evacuation and stairwell signage is evaluated by Orange County Fire Authority (OCFA) staff to ensure that the location and information depicted, facilitates safe evacuation of the building and proper firefighter orientation in the stairwells during an emergency. This information is verified with the OCFA’s review of architectural drawings. SCOPE This guideline provides the specifications for emergency evacuation and stairwell signage to meet the requirements of Title 19 of the California Code of Regulations (CCR) and the 2019 California Building Code (CBC). The information provided herein is intended to facilitate approval and installation of required signage primarily in the building core (elevator lobby, stairwells, and corridors connecting these). Additional emergency signage may also be required by the CBC, California Fire Code (CFC), or other adopted codes or standards in other areas of the building. SUBMITTAL REQUIREMENTS 1. General Requirements: All new plan submittals and revisions will consist of two hardcopy plans and one electronic copy in .pdf format. All electronic formats will be accepted and may be submitted on CD, DVD or flash drive.
    [Show full text]
  • Seattle Building Code, Chapter 10, Means of Egress
    CHAPTER 10 MEANS OF EGRESS (including 2017 errata) User note: Code change proposals to sections preceded by the designation [F] will be considered by the International Fire Code Development Committee during the 2016 (Group B) Code Development Cycle. See explanation on page iv. SECTION 1001 EXIT ACCESS STAIRWAY. ADMINISTRATION EXIT DISCHARGE. 1001.1 General. Buildings or portions thereof shall be pro- EXIT DISCHARGE, LEVEL OF. vided with a means of egress system as required by this chap- ter. The provisions of this chapter shall control the design, EXIT, HORIZONTAL. construction and arrangement of means of egress components EXIT PASSAGEWAY. required to provide an approved means of egress from struc- EXTERIOR EXIT RAMP. tures and portions thereof. EXTERIOR EXIT STAIRWAY. 1001.2 Minimum requirements. It shall be unlawful to alter a building or structure in a manner that will reduce the num- FIRE EXIT HARDWARE. ber of exits or the minimum width or required capacity of the FIXED SEATING. means of egress to less than required by this code. FLIGHT. [F] 1001.3 Maintenance. Means of egress shall be main- tained in accordance with the International Fire Code. FLOOR AREA, GROSS. [F] 1001.4 Fire safety and evacuation plans. Fire safety and FLOOR AREA, NET. evacuation plans shall be provided for all occupancies and FOLDING AND TELESCOPIC SEATING. buildings where required by the International Fire Code. GRANDSTAND. Such fire safety and evacuation plans shall comply with the applicable provisions of Sections 401.2 and 404 of the Inter- GUARD. national Fire Code. HANDRAIL. INTERIOR EXIT RAMP. SECTION 1002 INTERIOR EXIT STAIRWAY.
    [Show full text]
  • Life Safety - Means of Egress/Exits – NFPA 101
    Life Safety - Means of Egress/Exits – NFPA 101 Properly designed exits provide a safe path of escape from a fire or other emergency environment. The means of egress (exits) should be arranged to permit all occupants to reach a safe place before they are endangered by fire, smoke, or heat. The goal is for everyone to leave the hazardous areas in the shortest time possible. The National Fire Protection Association (NFPA) developed model codes for fire protection and life safety. These model codes were adopted by federal, state, and local organizations and are included in their various building codes. NFPA 101 is the code that addresses life safety. This code includes minimum life safety requirements and requirements for specific building occupancy. The “authority having jurisdiction” (AHJ) (fire marshal, etc.) can modify these requirements under certain circumstances. NFPA 101 is a performance code and uses an “equivalent protection” concept by permitting alternatives, such as credits in case of a fully sprinklered occupancy. The code makes a distinction between a new and an existing occupancy. In most cases, adequate consideration is given to life safety in new construction. Changes in occupancy, growth, or modernization of operations require a periodic life safety review. This bulletin is intended only as a general overview of the basic requirements. Please refer to the most current edition of Life Safety Code NFPA 101 for specific details for each type of occupancy. Definitions Means of Egress: A continuous and unobstructed path of travel from any point in a building or structure to a public way that consists of the following three separate and distinct parts: • Exit access: The travel path or area that leads from where a person is located to the entrance to an exit.
    [Show full text]
  • Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration Through Door Openings
    PNNL-20026 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration through Door Openings H Cho K Gowri B Liu November 2010 PNNL-20026 Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration through Door Openings H Cho K Gowri B Liu November 2010 Prepared for U.S. Department of Energy under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 Summary This report presents a methodology for modeling air infiltration through door openings. This report shows that the estimation of air infiltration rate using the proposed method can be readily used in EnergyPlus whole building energy simulations. The purpose of this study is two-fold: 1. Develop a modeling strategy to capture the energy saving impacts of ASHRAE 90.1 vestibule requirements (i.e., addendum ‘c’ to ASHRAE Standard 90.1-2004 and addendum ‘q’ to ASHRAE Standard 90.1-2007). 2. Provide a guideline to model air infiltration through door openings calculated for the whole building simulations to determine its impact for various types of buildings. Pacific Northwest National Laboratory’s (PNNL) prototypical commercial building models were used in the analysis to determine energy savings from the vestibule requirements. The national construction- weighted average savings for each building prototype from ASHRAE 90.1 vestibule requirements have been determined, and the results are presented in the table below.
    [Show full text]
  • A Graded Approach to Repairing the Stenotic Nasal Vestibule
    ORIGINAL ARTICLE A Graded Approach to Repairing the Stenotic Nasal Vestibule Steven Marc Daines, MD; Grant S. Hamilton III, MD; Steven Ross Mobley, MD Objective: To describe a graded approach to repairing Results: Two patients had their nostrils repaired in a vestibular stenosis that involves restoring structural sup- single stage and the others required 2 stages. In all pa- port to the ala. tients, significant improvement in nostril diameter was maintained. The patients were satisfied with the func- Methods: Retrospective review of 5 nostrils in 4 pa- tional and aesthetic results. Stenting averaged 13 days af- tients who presented to the senior author with vestibu- ter surgery and was well tolerated. No wound compli- lar stenosis. The cause was burn injury in 3 patients and cations occurred. congenital in 1 patient. The cornerstone is a batten graft to restore strength to the ala. A short-term thermoplas- Conclusions: In patients with vestibular stenosis, we use tic stent helps the nostril assume its natural shape. When a graded approach that addresses the inherent weakness an obstructing cicatrix is present, it is excised in a sec- of the nasal ala to achieve long-term vestibular patency. ond stage followed by full-thickness skin grafting. The This technique restores form and function to the ste- patients were evaluated up to 16 months postopera- notic vestibule while avoiding long-term stenting. tively. Vestibular patency was documented using high- resolution photographs, and medical records were re- viewed for complications. Arch
    [Show full text]
  • Stairwell Pressurization Systems
    Stairwell Pressurization Systems Course No: M05-022 Credit: 5 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 [email protected] Stairwell Pressurization Systems STAIRWELL PRESSURIZATION SYSTEMS Introduction In a high-rise building, the stairs typically represent the sole means of egress during a fire. It is imperative for the exit stairs to be free of smoke and to incorporate design features that improve the speed of occupant egress. Most building codes require the fire stairwells in a high-rise building to be pressurized to keep smoke out. The stairwell pressurization serves several purposes: • Inhibit migration of smoke to stairwells, areas of refuge, elevator shafts, or similar areas. • Maintain a tenable environment in areas of refuge and means of egress during the time required for evacuation. • Facilitate the fire and rescue operation by improving visibility in the building for the firefighting crew. • Protect life and reduce damage to property. The International Building Code (IBC) enforced much throughout the United States, recognizes three specific means for providing smoke proof enclosures: 1. Naturally ventilated stair balconies 2. Mechanical ventilation of a stair 1 66 Stairwell Pressurization Systems 3. Stair pressurization Due to the relative cost of the associated mechanical systems, and architectural space issues related to providing exterior balconies and stair vestibules, the stair pressurization system is the most widely selected design option. This course discusses the smoke control systems and examines the design considerations associated with stairwell pressurization systems. A.Bhatia 2 Stairwell Pressurization Systems Table of Contents CHAPTER -1 ..................................................................................................
    [Show full text]