Village of Pittsford Settled 1789 • Incorporated 1827

Total Page:16

File Type:pdf, Size:1020Kb

Village of Pittsford Settled 1789 • Incorporated 1827 VILLAGE OF PITTSFORD SETTLED 1789 • INCORPORATED 1827 Members: Maria Huot Scott Latshaw Liaison: Robert Corby William McBride Attorney: Jeff Turner Lisa Cove Building Inspector: Kelly Cline Ken Morrow Recording Sec: Linda Habeeb Alternate: Ron Johnson Architectural and Preservation Review Board Regular Meeting Monday May 7, 2018 at 7:00 pm This agenda is subject to change both in number of applications, order of applications, and/or at the discretion of the Chairperson. Conflict of interest disclosure . Ken Samarra, 6 South Main Street ~ Sign . Jason Crane, 7 Stonegate Lane ~ Overhang . Jason Crane, 27 Lincoln Ave ~ Siding . Tom Dakin, 38 Rand Place ~ Lights . Robert Huot, 21 Church Street ~ Windows . Del Monte Hotel Group, 41 N. Main Street ~ Porte Cochere Member Items: Minutes: 4/2/18 Village of Pittsford documents are controlled, maintained, and available for official use on the Village of Pittsford Website, located at http://www.VillageofPittsford.org. Printed versions of this document are considered uncontrolled. Copyright © (2010) Village of Pittsford. TRANSMITTAL TRANSMITTED TO: Village of Pittsford 21 North Main Street Pittsford, New York 14534 ATTENTION: Ms. Kelly Cline VIA: Delivery DATE: April 18, 2018 RE: Architectural & Preservation Review Board Application for Exterior Renovations to the Del Monte Lodge Kelly, Attached please find the Architectural & Preservation Review Board Application and Supporting Documents for the Proposed Exterior Renovations at the Del Monte Lodge (41 North Main Street). Respectfully, Andrew Van Roo Attachments: ❖ Architectural & Preservation Review Board Application ❖ Architectural & Preservation Review Board Checklist ❖ Conceptual Architectural Site Plan ❖ Photo of Existing Porte Cochere & Entrance ❖ Rendering of Proposed Porte Cochere & Entrance ❖ Elevation Drawings of Proposed Porte Cochere & Entrance ❖ Photo of Existing Rear Entrance Canopy ❖ Rendering of Proposed Rear Entrance Canopy ❖ Elevation Drawings of Proposed Rear Entrance Canopy ❖ Digital Copy (CD-ROM) of Planning Board Application & Supporting Documents PLAN Architectural Studio, P.C 250 South Avenue, Suite 100 Rochester, New York 14604 t.585.454.4230 f.585.454.4237 VILLAGE OF PITTSFORD ARCHITECTURAL & PRESERVATION REVIEW BOARD APPLICATION FOR A CERTIFICATE OF APPROVAL **All Applications Must Be Complete And Legible For Acceptance Including All Required To Scale Drawing (In Addition To Digital Copies For Projects Over $20,000), Photos, And Other Supporting Documents.** Today’s Date: _______________ Received Date: _______________ Address of Proposed Work: _________________________________ Owner Name: _____________________________________________ Address: _________________________________________________ Day Phone ________________ Evening Phone _________________ Applicant Name: __________________________________________ Address: _________________________________________________ Day Phone ________________ Evening Phone _________________ Fax No _______________ E-mail Address _____________________ Agent/Contractor: ____________________________________________________________ Agent/Contractor Address: ____________________________________________________ Agent/Contractor Phone: _________________________ Fax: _______________________ TYPE OF STRUCTURE: ____ Residential _____ Commercial _____ Garage/Outbuildings _____ Fence _____ Sign TYPE OF WORK PROPOSED: ____ Restoration ____New Construction ____ Addition/Alteration ___Repair ____ Demolition/Removal ____ Lighting ___ Awnings _____ Signs _____ Fence _____ Window/Door Replacement _____ Siding AREA TO BE AFFECTED: ____Siding _____Windows ____ Doors ____ Chimney ____ Porch/Railings ____ Sign ______ Other SUPPORTING DOCUMENTATION: _____ Project Description ____Photos ____ Drawings ____ Digital Drawings (For Large Projects) ____ Size/Style _____ Tape location map ____ Instrument survey map _____ Year of original construction _____Year of addition _____ Colors Used _____ Materials list VILLAGE OFFICE USE: _____ Plan conforms to zoning _____ Pre-existing Nonconforming Use _____Variance required ____Variance granted _____ SEQR required _____ National Register District Building Inspector signature: _________________________________________ Date: Form 2001, APRB Application Form, Version 4, Revised 12/13/2017 1 PLEASE DESCRIBE PROJECT IN DETAIL: ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ ____________________________________________________________________________________________________________ *** PLEASE NOTE THE FOLLOWING*** 1. This application can not be processed for APRB review unless all of the required items set forth on the requirements form are submitted to the Village Office by the deadline date (see attached schedule). 2. All zoning requirements, including variances, must be met prior to APRB approval. 3. All required State Environmental Quality Review Act (SEQR) forms must be attached. 4. Decisions are based on the Secretary of the Interior Standards for Historic Rehabilitation and the Village of Pittsford Code Article XIV, Section 210-57 – 210-65. 5. The applicant or his agent must appear at the scheduled meeting when the completed application will be reviewed by the APRB. An agenda with an approximate time for review will be sent to all parties prior to the meeting. A letter stating the APRB decision will follow the meeting. 6. Work on projects shall not be started unless the applicant has received APRB approval and all the necessary permits have been obtained from the Building Inspector. To obtain the necessary permits, please contact the Building Inspector at 586- 4332. 7. Changes to the approved plan can not be made without additional APRB review. A written request for a change in application including the revised proposed plans must be received by the deadline date. 8. Approvals are valid for one (1) year from the date of APRB approval. Owner Signature: ________________________________________ Date: __________________________ Applicant Signature: ______________________________________ Date: __________________________ Agent/Contractor Signature: _______________________________ Date: __________________________ NOTE: If any additional information is required by the Board, during the meeting, it is the responsibility of the applicant to provide such information, prior to the deadline of the subsequent meeting or it will not be heard. FOR ARCHITECTURAL & PRESERVATION REVIEW BOARD USE: Decisions are noted by date reviewed: Approved: ____________________________ Approved with Conditions: ______________________ Left Open: ____________________Tabled: _______________________ Denied: ________________ Chairperson’s Signature: ____________________________________ Certificate No. ________ Village of Pittsford 21 North Main Street Pittsford, NY 14534 Form 2001, APRB Application Form, Version 4, Revised 12/13/2017 2 REQUIREMENTS FOR SUBMISSION OF APRB APPLICATION Use Application Forms - Be sure to list this information on the back of the application if you have attachments. SIGNS ____ A detailed drawing or blueprint of the sign drawn to scale, including dimensions, letter style, and pictorial matter (Seven sets required; digital copies for projects over $20,000). ____ Linear measurement of the front of the building that faces the public street or waterway. ____ Placement of sign. ____ Colors, materials and any lighting to be used. ____ Photographs of existing building where sign is to be placed. FENCE ____ Tape location map indicating where fence will be placed. ____ Style (picket, board on board, etc.) ____ Drawing (to scale) or picture of proposed style. (Seven sets required; digital copies for projects over $20,000) ____ Height, material, color of fence. ____ Photographs of area where fence will be located. REPLACEMENT OF WINDOWS/DOORS ____ Size and style of existing and proposed window/door - width and height. ____ Drawings (to scale) of elevations affected (Seven sets required; digital copies for projects over $20,000). ____ Photographs of affected elevations. ____ Materials, colors. ADDITION TO A STRUCTURE ____ Instrument survey map. ____ Drawings, to scale, of addition including the existing building (Seven sets required; digital copies for projects over $20,000). ____ Photographs of affected elevations. ____ Sizes and styles of windows and doors must be shown on the drawings; indicate which are new, existing, or replacement. ____ Materials to be used must be listed on drawings; also colors to be used Form 2002, APRB Application Requirements Form, Version 2, Revised 12/13/17 1 NEW CONSTRUCTION _____ Instrument survey map. _____ Drawings, to scale, of all elevations; sizes and styles of windows and doors must be indicated on drawings. (Seven sets required; digital
Recommended publications
  • Air Curtains As Alternatives to Vestibules
    Air Curtains as Alternatives to Vestibules his article describes the function and benefits of air curtains. It presents results from a recent study on the energy performance of air curtains relative to vesti- T bules and provides useful information for engineers and code officials. HOW AIR CURTAINS WORK An air curtain installed on the interior of a building creates a coherent sheet of air composed of the air curtain discharge and the surrounding entrained air. This sheet of air stabilizes when it meets a return grill or splits at a surface, such as a floor or another opposing air stream. When this stability combines with the building’s interior pressure, it resists and reduces thermal exchange over an opening in the building envelope. The air curtain is not intended to replace a physical door, but may be used as a low-cost, low-maintenance alternative to a vestibule, when appropriate. This would save valuable floor space and create an invisible, energy-saving barrier that reduces infiltra- tion when the door is open. The most common types of controls are switches triggered by the door, or motion sensors that are triggered by people approaching the door. BENEFITS OF AIR CURTAINS Approved as an alternative to vestibules in the 2015 International Energy Conser- vation Code (IECC) and the 2015 International Green Construction Code ® (IgCC), air curtains make egress in an emergency exit situation safer and faster by providing clear, By David A. Johnson, Berner International Corp.; Frank R. Cuaderno, Mars Air Systems, LLC; and Brian Jones, Powered Aire Inc. JUNE 2015 | 34 Air Curtains as Alternatives to Vestibules continued uninhibited flow to the traffic passing through it, while still saving energy during heating and cooling seasons.
    [Show full text]
  • First Impression : the Study of Entry in Architecture
    Copyright Warning & Restrictions The copyright law of the United States (Title 17, United States Code) governs the making of photocopies or other reproductions of copyrighted material. Under certain conditions specified in the law, libraries and archives are authorized to furnish a photocopy or other reproduction. One of these specified conditions is that the photocopy or reproduction is not to be “used for any purpose other than private study, scholarship, or research.” If a, user makes a request for, or later uses, a photocopy or reproduction for purposes in excess of “fair use” that user may be liable for copyright infringement, This institution reserves the right to refuse to accept a copying order if, in its judgment, fulfillment of the order would involve violation of copyright law. Please Note: The author retains the copyright while the New Jersey Institute of Technology reserves the right to distribute this thesis or dissertation Printing note: If you do not wish to print this page, then select “Pages from: first page # to: last page #” on the print dialog screen The Van Houten library has removed some of the personal information and all signatures from the approval page and biographical sketches of theses and dissertations in order to protect the identity of NJIT graduates and faculty. FIRST IMPRESSION: THE STUDY OF ENTRY IN ARCHITECTURE by Siriwan Polpuech Thesis submitted to the Faculty of the Graduate School of the New Jersey Institute of Technology in partial fulfilment of the requirement for the degree of Master of Science in Architectural Studies 1989 APPROVAL SHEET Title of Thesis: First Impression: The Study of Entry in Architecture Name of Candidate: Siriwan Polpuech Master of Science in Architectural Studies, 1989 Thesis and Abstract Approved: Prof.
    [Show full text]
  • The District Wide Problem
    Appendices APPENDIX A: SIMPLE FLOOR DIAGRAMS OF CARDOZO SENIOR HIGH SCHOOL and MCKINLEY TECH HIGH SCHOOL 15 Cardozo Senior High: Basement Floor 16 Cardozo Senior High: Ground Floor 17 Cardozo Senior High: First Floor 18 Cardozo Senior High: Second Floor 19 Cardozo Senior High: Third Floor 20 Building Capacity Review Space Inventory BUILDING: Cardozo ADDRESS: 13th & Clifton Streets, N.W. CLASSIFICATION: Senior High WARD: 1 POPULATION HOUSED: 9-12 SQUARE FOOTAGE: 355,400 CAPACITY: 1563 CONSTRUCTION: 1916 CLUSTER: 10 EXTENDED USE: SPACE SPACE SPACE SPACE NO. TYPE SPACE NO. TYPE SPACE NO. TYPE SPACE NO. TYPE SPACE 1 Pipe Tunnel 48 Computer Lab 95 Classroom 142 Storage Room 2 Water Meter Room 49 Wood Shop 96 Storage Room 143 Vestibule 3 Vestibule 50 Storage Room 97 Vestibule 144 Book Room 4 Stairwell 51 Storage Room 98 Stairwell 145 Computer Lab 5 In School Suspension 52 Wood Shop 99 TANIFF 146 Computer Lab 6 In School Suspension 53 Electronics Lab 100 Office 147 Computer Lab 7 In School Suspension 54 Locker Room (Boys) 101 Business Mgr 148 Computer Lab 8 In School Suspension 55 Toilet (Boys) 102 Stairwell 149 Storage Room 9 In School Suspension 56 Storage Room (Towels) 103 Custodians Closet 150 Office (P.E) 10 In School Suspension 57 Shower Room (Boys) 104 Toilet (Boys) 151 Stairwell 11 In School Suspension 58 Closet 105 Office (Custodians) 152 Shower Room (Girls) 12 Vestibule 59 Passage 106 Stairwell 153 Stairs 13 Stairwell 60 Weightlifting Room 107 Office 154 Toilet/Lockers (Girls) 14 Fan Room 61 Stairwell 108 Office (Dietician) 155 Stairwell
    [Show full text]
  • Vestibule Requirements in Commercial Buildings Vestibule Requirements in Commercial Buildings
    CODE NOTES CODE BUILDING TECHNOLOGIES PROGRAM 2009 and 2012 IECC; ASHRAE 90.1-2007 and 2010 Vestibule Requirements in Commercial Buildings The intent of the vestibule requirement is to reduce infiltration of air into a space, thereby addressing energy conservation and comfort issues for occupants located near primary entrance doors. The majority of infiltration comes through primary entrance doors that are typically used to access public areas, and have higher usage rates than doors classified for personnel use. Vestibules can reduce the infiltration losses (or gains) from wind and stack effects by creating an air lock entry. Commercial building designers are required to install vestibules on primary entrance doors leading to and from spaces greater than or equal to 3,000 Oces square feet (298 m2), with some 2600 Ft2 Floor Area exceptions. Many designers are unclear on 2 what is included in determining the 3,000 500 Ft Floor Area ft2 that defines a space. For example, if an entrance door leading from a lobby is attached to a corridor with a combined Oces total area of 3,000 ft2, must the door meet the vestibule requirement? Similarly, which doors must have vestibules when Figure 1. several doors leave a space greater than or equal to 3,000 ft2? from the entrance door are included when determining if a vestibule is required. The 2009 and 2012 IECC require that (See Figure 1). primary entrance doors accessing spaces 3,000 ft2 or greater have vestibules. This ASHRAE 90.1-2007 and 2010 also require requirement typically applies to large vestibules for entrance doors accessing “box” stores where the building entrance spaces 3,000 ft2 or greater but with opens directly to a resale area, or to some added requirements not present other occupancies with large lobbies in the IECC.
    [Show full text]
  • Guastavino Structural Tile Vaulting in Pittsburgh Spring Semester 2021
    The Osher Lifelong Learning Institute University of Pittsburgh, College of General Studies Guastavino Structural Tile Vaulting in Pittsburgh Spring Semester 2021 Instructor: Matthew Schlueb Program Format: Five week course, 90 minute academic lectures and guided tour, with time for questions. Course Objective: To offer a master level survey of the Pittsburgh architectural works by Rafael Guastavino and his son, drawn from their Catalan traditions in masonry vaulting, as interpreted by a practicing architect and author of architecture. Course Description: Architect Rafael Guastavino and his son Rafael Jr. emigrated to the United States in 1881, bringing the traditional construction method of structural tile vaulting from their Catalan homeland, thereby transforming the architectural landscape from Boston to San Francisco. This course will examine their works in Pittsburgh, illustrating the vaults and domes made with structural tiles, innovations in thin shell construction, fire-proofing, metal reinforcing, herringbone patterns, skylighting, acoustical and polychromatic tiles. Lectures supplemented with a guided tour of these local structures, provided logistics and health safety measures permit. Course Outline: Lecture 1: From Valencia to New York [Tuesday, March 16, 2021 3pm-4:30pm] Convent of Santo Domingo Refectory (arches and vaults; Mudéjar style; Zaragoza, Spain; 1283) Monastery of Santo Domingo Refectory (bóveda tabicadas / maó de pla; Juan Franch; Valencia, Spain; 1382) Batlló Textile Factory (vaulted arcade atop metal columns; Rafael Guastavino; Barcelona, Spain; 1868) La Massa Theater (shallow dome vault; Rafael Guastavino; Vilassar de Dalt, Spain; 1880) Boston Public Library (structural tile vaults; Charles McKim; Boston, Massachusetts; 1889-1895) St. Paul’s Chapel (dome; Isaac Newton Phelps Stokes; Columbia University, New York; 1907) Lecture 2: Material Innovations in Building Science [Tuesday, March 23, 2021 3pm-4:30pm] Cathedral of St.
    [Show full text]
  • Emergency Evacuation and Stairwell Signage: E-02 July 1, 2020
    Orange County Fire Authority Community Risk Reduction 1 Fire Authority Road, Building A, Irvine, CA. 92602 www.ocfa.org 714-573-6100 Emergency Evacuation and Stairwell Signage Guideline E-02 Serving the Cities of Aliso Viejo • Buena Park • Cypress • Dana Point • Garden Grove • Irvine • Laguna Hills • Laguna Niguel • Laguna Woods Lake Forest • La Palma • Los Alamitos • Mission Viejo • Rancho Santa Margarita • San Clemente • San Juan Capistrano • Seal Beach Santa Ana • Stanton • Tustin • Villa Park • Westminster • Yorba Linda and Unincorporated Areas of Orange County Emergency Evacuation and Stairwell Signage: E-02 July 1, 2020 Emergency Evacuation and Stairwell Signage PURPOSE Emergency evacuation and stairwell signage is evaluated by Orange County Fire Authority (OCFA) staff to ensure that the location and information depicted, facilitates safe evacuation of the building and proper firefighter orientation in the stairwells during an emergency. This information is verified with the OCFA’s review of architectural drawings. SCOPE This guideline provides the specifications for emergency evacuation and stairwell signage to meet the requirements of Title 19 of the California Code of Regulations (CCR) and the 2019 California Building Code (CBC). The information provided herein is intended to facilitate approval and installation of required signage primarily in the building core (elevator lobby, stairwells, and corridors connecting these). Additional emergency signage may also be required by the CBC, California Fire Code (CFC), or other adopted codes or standards in other areas of the building. SUBMITTAL REQUIREMENTS 1. General Requirements: All new plan submittals and revisions will consist of two hardcopy plans and one electronic copy in .pdf format. All electronic formats will be accepted and may be submitted on CD, DVD or flash drive.
    [Show full text]
  • Seattle Building Code, Chapter 10, Means of Egress
    CHAPTER 10 MEANS OF EGRESS (including 2017 errata) User note: Code change proposals to sections preceded by the designation [F] will be considered by the International Fire Code Development Committee during the 2016 (Group B) Code Development Cycle. See explanation on page iv. SECTION 1001 EXIT ACCESS STAIRWAY. ADMINISTRATION EXIT DISCHARGE. 1001.1 General. Buildings or portions thereof shall be pro- EXIT DISCHARGE, LEVEL OF. vided with a means of egress system as required by this chap- ter. The provisions of this chapter shall control the design, EXIT, HORIZONTAL. construction and arrangement of means of egress components EXIT PASSAGEWAY. required to provide an approved means of egress from struc- EXTERIOR EXIT RAMP. tures and portions thereof. EXTERIOR EXIT STAIRWAY. 1001.2 Minimum requirements. It shall be unlawful to alter a building or structure in a manner that will reduce the num- FIRE EXIT HARDWARE. ber of exits or the minimum width or required capacity of the FIXED SEATING. means of egress to less than required by this code. FLIGHT. [F] 1001.3 Maintenance. Means of egress shall be main- tained in accordance with the International Fire Code. FLOOR AREA, GROSS. [F] 1001.4 Fire safety and evacuation plans. Fire safety and FLOOR AREA, NET. evacuation plans shall be provided for all occupancies and FOLDING AND TELESCOPIC SEATING. buildings where required by the International Fire Code. GRANDSTAND. Such fire safety and evacuation plans shall comply with the applicable provisions of Sections 401.2 and 404 of the Inter- GUARD. national Fire Code. HANDRAIL. INTERIOR EXIT RAMP. SECTION 1002 INTERIOR EXIT STAIRWAY.
    [Show full text]
  • Life Safety - Means of Egress/Exits – NFPA 101
    Life Safety - Means of Egress/Exits – NFPA 101 Properly designed exits provide a safe path of escape from a fire or other emergency environment. The means of egress (exits) should be arranged to permit all occupants to reach a safe place before they are endangered by fire, smoke, or heat. The goal is for everyone to leave the hazardous areas in the shortest time possible. The National Fire Protection Association (NFPA) developed model codes for fire protection and life safety. These model codes were adopted by federal, state, and local organizations and are included in their various building codes. NFPA 101 is the code that addresses life safety. This code includes minimum life safety requirements and requirements for specific building occupancy. The “authority having jurisdiction” (AHJ) (fire marshal, etc.) can modify these requirements under certain circumstances. NFPA 101 is a performance code and uses an “equivalent protection” concept by permitting alternatives, such as credits in case of a fully sprinklered occupancy. The code makes a distinction between a new and an existing occupancy. In most cases, adequate consideration is given to life safety in new construction. Changes in occupancy, growth, or modernization of operations require a periodic life safety review. This bulletin is intended only as a general overview of the basic requirements. Please refer to the most current edition of Life Safety Code NFPA 101 for specific details for each type of occupancy. Definitions Means of Egress: A continuous and unobstructed path of travel from any point in a building or structure to a public way that consists of the following three separate and distinct parts: • Exit access: The travel path or area that leads from where a person is located to the entrance to an exit.
    [Show full text]
  • Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration Through Door Openings
    PNNL-20026 Prepared for the U.S. Department of Energy under Contract DE-AC05-76RL01830 Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration through Door Openings H Cho K Gowri B Liu November 2010 PNNL-20026 Energy Saving Impact of ASHRAE 90.1 Vestibule Requirements: Modeling of Air Infiltration through Door Openings H Cho K Gowri B Liu November 2010 Prepared for U.S. Department of Energy under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 Summary This report presents a methodology for modeling air infiltration through door openings. This report shows that the estimation of air infiltration rate using the proposed method can be readily used in EnergyPlus whole building energy simulations. The purpose of this study is two-fold: 1. Develop a modeling strategy to capture the energy saving impacts of ASHRAE 90.1 vestibule requirements (i.e., addendum ‘c’ to ASHRAE Standard 90.1-2004 and addendum ‘q’ to ASHRAE Standard 90.1-2007). 2. Provide a guideline to model air infiltration through door openings calculated for the whole building simulations to determine its impact for various types of buildings. Pacific Northwest National Laboratory’s (PNNL) prototypical commercial building models were used in the analysis to determine energy savings from the vestibule requirements. The national construction- weighted average savings for each building prototype from ASHRAE 90.1 vestibule requirements have been determined, and the results are presented in the table below.
    [Show full text]
  • A Graded Approach to Repairing the Stenotic Nasal Vestibule
    ORIGINAL ARTICLE A Graded Approach to Repairing the Stenotic Nasal Vestibule Steven Marc Daines, MD; Grant S. Hamilton III, MD; Steven Ross Mobley, MD Objective: To describe a graded approach to repairing Results: Two patients had their nostrils repaired in a vestibular stenosis that involves restoring structural sup- single stage and the others required 2 stages. In all pa- port to the ala. tients, significant improvement in nostril diameter was maintained. The patients were satisfied with the func- Methods: Retrospective review of 5 nostrils in 4 pa- tional and aesthetic results. Stenting averaged 13 days af- tients who presented to the senior author with vestibu- ter surgery and was well tolerated. No wound compli- lar stenosis. The cause was burn injury in 3 patients and cations occurred. congenital in 1 patient. The cornerstone is a batten graft to restore strength to the ala. A short-term thermoplas- Conclusions: In patients with vestibular stenosis, we use tic stent helps the nostril assume its natural shape. When a graded approach that addresses the inherent weakness an obstructing cicatrix is present, it is excised in a sec- of the nasal ala to achieve long-term vestibular patency. ond stage followed by full-thickness skin grafting. The This technique restores form and function to the ste- patients were evaluated up to 16 months postopera- notic vestibule while avoiding long-term stenting. tively. Vestibular patency was documented using high- resolution photographs, and medical records were re- viewed for complications. Arch
    [Show full text]
  • Stairwell Pressurization Systems
    Stairwell Pressurization Systems Course No: M05-022 Credit: 5 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774 [email protected] Stairwell Pressurization Systems STAIRWELL PRESSURIZATION SYSTEMS Introduction In a high-rise building, the stairs typically represent the sole means of egress during a fire. It is imperative for the exit stairs to be free of smoke and to incorporate design features that improve the speed of occupant egress. Most building codes require the fire stairwells in a high-rise building to be pressurized to keep smoke out. The stairwell pressurization serves several purposes: • Inhibit migration of smoke to stairwells, areas of refuge, elevator shafts, or similar areas. • Maintain a tenable environment in areas of refuge and means of egress during the time required for evacuation. • Facilitate the fire and rescue operation by improving visibility in the building for the firefighting crew. • Protect life and reduce damage to property. The International Building Code (IBC) enforced much throughout the United States, recognizes three specific means for providing smoke proof enclosures: 1. Naturally ventilated stair balconies 2. Mechanical ventilation of a stair 1 66 Stairwell Pressurization Systems 3. Stair pressurization Due to the relative cost of the associated mechanical systems, and architectural space issues related to providing exterior balconies and stair vestibules, the stair pressurization system is the most widely selected design option. This course discusses the smoke control systems and examines the design considerations associated with stairwell pressurization systems. A.Bhatia 2 Stairwell Pressurization Systems Table of Contents CHAPTER -1 ..................................................................................................
    [Show full text]
  • Entry Spaces Standard Cornell Standard : Entry Spaces 013015 Process
    Entry Spaces Standard Cornell Standard : Entry Spaces 013015 Process 2015 2016 2017 2018 2019 • Series of projects with entry space deficiencies _ Duffield Slate Flooring, Malott Hall Storefront, Olin Library Storefront and Paving • Formation of Entry Space Standards Committee _ 2018 Fall/Winter • Cross functional nature of Team, representation from Energy & Sustainability Mark Howe Grounds Dan Scheid UA’s office J. Shermeta Engineering & Project Management Matt Reiter, Rob Murray, Jason Coolbaugh, Steve Byers, Erik Eshelman and Ram Venkat • Draft Standard, Circulation, Review & Approval _ 2019 Spring • Publish Entry Spaces Standard _ 2019 December • New projects following Entry Spaces standard _ 2020 Observations • Impact of de -icing salts • Storefront corrosion • Walk off mats and lack of drainage • Stormwater infiltration • Air and wind infiltration • Durability of finishes Questions Entry Spaces 1.03 ENTRY SPACES – Design Principles • Design solutions for entry spaces in new construction and renovation of existing buildings on the Cornell University Ithaca campus need to address the Central New York winter climate of snow, wind, and below freezing temperatures . • Entry way exterior drainage shall also be designed for minimum 100 -year historic rain event and include a design analysis based on increasing storm and flood intensity, to prevent storm water from entering vestibule. • Building entry spaces – considered a sequence of spaces designated as “zones” – should be designed to mediate the snow, wind and temperature differential between the exterior and interior through careful planning of the exterior hardscape through to the interior lobby of the building. Entry Spaces 1.03 ENTRY SPACES – Design Principles • Guide consultants to design entry spaces to reduce fall risks, improve longevity of material finishes, and reduced environmental impact caused by repeated renovations and limits on the embodied energy of materials.
    [Show full text]