2425 MATHESON BOULEVARD EAST MISSISSAUGA, on Building Specifications

Total Page:16

File Type:pdf, Size:1020Kb

2425 MATHESON BOULEVARD EAST MISSISSAUGA, on Building Specifications 2425 MATHESON BOULEVARD EAST MISSISSAUGA, ON Building Specifications Size • Building: 187,837 sf • Typical Floor: 23,095 sf • Floors: 8 Sustainability • LEED Gold Certified Parking • 4/1000 sf outdoor, indoor and EV parking available Telecommunications • Full fibre optics and satellite reception capabilities (Bell & Rogers) Electrical/Lighting • 347/600 volts, 3 phase, 4 wire Security • Card access afterhours and for elevators. • Cameras in parking lot and 2425 Matheson Boulevard East, Mississauga, Ontario is an entryways. 8-storey, 187,837 sf, LEED Gold Certified office building anchored by global communications firm Ericsson. HVAC Located in the Airport Corporate Centre and within close • Three gas fired boilers proximity to Highways 401, 427 and the 407, the building provides provide heating to the tenants with ease of access to the surrounding area and the building. entire GTA. • Compartmental air handling units provide cooling to the building. 2425 Matheson Boulevard has two immediate vacancies of • Hours of Operation: 4,041 sf and 8,727 sf of office space available for lease. Monday to Friday from 7:00 a.m. to 7:00 p.m. Amenities RENFORTH DR PEARSON INTERNATIONAL HWY 401 AIRPORT LONDON GATE PUB MCDONALDS 1 PORTA VIA CIBC THE BULL PUB & GRILL ORBITOR DR MATHESON BLVD E EGLINTON AVE W LA SCALA SKYMARK DELI SKYMARK AVE BRAVO BISTRO PLAKA SATELLITE DR 2425 MATHESON 2 TOWNE PLAZA SUITES CENTENNIAL PARK BLVDCENTENNIAL PARK LA PREP PETRO CANADA CHASKA BEST WESTERN PLUS SUBWAY HOMEWOOD SUITES TERIYAKI EXPERIENCE HAMPTON INN ANYTIME FITNESS THE GREAT WOK THE IRISH SHEBEEN FLAMMA RISTORANTE SPECTRUM WAY STARBUCKS TIM HORTONS 3 PRINCE JAPANESE STEAKHOUSE CENTENNIAL PARK GOLF COURSE TRANSIT ROUTES 1 3 Only 10 minutes from Toronto’s Pearson Renforth Station Spectrum Station International Airport, 2425 Matheson’s MiWay: 7, 21, 24, 35, 35A, 39, 43, 87, 107, 109 (MiWay - 35, 35A, 87, 107, 10) TTC: 32A, 112B location puts it in a convenient position GO Transit: Pearson Airport - Richmond Hill for business travelers as well as Square One/North York Finch Terminal BRT 107/109, 35, 112 - every 8 minutes the area’s great amenities such as 23 minutes to Square One restaurants, shopping, fitness centres, 15 minutes to Kipling Station 2 golf courses, hotels and banks. Orbitor Station Route 7 - every 12 minutes MiWay: 35, 35A, 87, 107, 109 15 minutes to Pearson International Airport Availabilities Suite 120 Suite 601 4,041 SF 8,727 SF Available January 1, 2020 For more information about the property or to arrange a tour, please contact: Ryan McAskile* Director, Leasing crownrealtypartners.com | @CrownCRP 647-727-4544 [email protected] © 2019 CPMI Realty Inc. Location, buildout and features are subject to change without notice. Renderings are artist’s concept and are subject to change. All dimensions are approximate and actual usable area may differ from that stated herein. *Broker of Record **Sales Representative E.&O.E..
Recommended publications
  • Peel Sustainable Transportation Strategy
    Background Documents Sustainable Transportation Strategy February 2018 Region of Peel Sustainable Transportation Strategy Online Consultation Survey Summary Shaping the Vision for Sustainable Transportation in the Region of Peel Prepared for Region of Peel by IBI Group May 19, 2017 IBI GROUP REGION OF PEEL SUSTAINABLE TRANSPORTATION STRATEGY ONLINE CONSULTATION SURVEY SUMMARY Prepared for Region of Peel Table of Contents List of Exhibits .............................................................................................................................. 1 1 Survey Objective and Design ............................................................................................ 2 1.1 Objectives ................................................................................................................ 2 1.2 Design ...................................................................................................................... 2 1.3 Promotion ................................................................................................................. 3 2 Survey Responses .............................................................................................................. 3 3 Respondent Demographics ............................................................................................... 4 3.1 Priority Ranking ........................................................................................................ 8 4 Strategy Rating ..................................................................................................................
    [Show full text]
  • 2018 ONTARIO Budget for General Inquiries Regarding 2018 Ontario Budget: Budget Papers, Please Call
    2018 ONTARIO BUDGE 2018 ONTARIO A PLAN FOR CARE AND OPPORTUNITY RX C. Lee RX T THE HONOURABLE CHARLES SOUSA MINISTER OF FINANCE 2018 ONTARIO BUDGET BUDGET PAPERS For general inquiries regarding 2018 Ontario Budget: Budget Papers, please call: Toll-free English and French inquiries: 1-800-337-7222 Teletypewriter (TTY): 1-800-263-7776 For electronic copies of this document, visit our website at www.ontario.ca/budget A printed copy of this publication can be ordered: Online: www.serviceontario.ca/publications By phone: ServiceOntario Contact Centre (Monday to Friday, 8:30 AM to 5:00 PM) Telephone: 416-326-5300 TTY: 416-325-3408 Toll-free across Canada: 1-800-668-9938 TTY Toll-free across Ontario: 1-800-268-7095 © Queen’s Printer for Ontario, 2018 ISBN 978-1-4868-1883-9 (Print) ISBN 978-1-4868-1884-6 (HTML) ISBN 978-1-4868-1885-3 (PDF) Ce document est disponible en français sous le titre : Budget de l’Ontario 2018 – Documents budgétaires Foreword A Plan for Care and Opportunity Ontario’s economy is performing well. This is largely due to the businesses and entrepreneurs who create jobs and to the women and men who get up each morning to go to the plant, or the office, or another place of work to make Ontario a more prosperous province. At the same time, the government has made strategic investments to support growth. Enhanced education, skills and training, new infrastructure, a competitive business environment and support for startups and small businesses are helping create good jobs. On the surface, the numbers tell a positive story: Our economy has outperformed those of all G7 nations since 2014; Our unemployment rate, at 5.5 per cent, is the lowest it has been in almost 20 years; and Last year alone, 500 net new jobs were created, on average, each day in Ontario, and they were mostly full‐time.
    [Show full text]
  • The Evolution of the Workplace
    The Evolution of the Workplace spectrumsquare.ca SPECTRUM SQ Discover a spectacular master-planned corporate community in GTA West’s highly desirable Airport Corporate Centre. Spectrum SQ is a 1.3 million square foot LEED Gold office complex that draws on the decades of past experience of HOOPP, JLL and Sweeny &Co Architects to introduce the evolution of the office building. Sustainable design features such as raised floor HVAC, floor-to-ceiling windows, daylight harvesting and flexible floor plates make Spectrum SQ the ultimate in employee productivity, performance and comfort. Spectrum SQ features a mix of business and social space with offices for enterprising organizations, a central collaborative square and over 60,000 square feet of trendy restaurants at The Eatery. Just minutes from every major highway and with the highly anticipated BRT (Bus Rapid Transit) station connected to the site, Spectrum SQ allows today’s leading edge companies to attract and retain the best of the best. Spectrum SQ is the evolution of the workplace. Now Open. SPECTRUM SQ // Phase 1 Now Open Phase 1: 134,000 sf A new generation of high performance office space increases employee productivity. Leveraging its rich history of successful sustainable projects, HOOPP has designed Spectrum SQ to exceed all previous benchmarks for environmental, sustainable and building performance standards for LEED Gold status while elevating tenants’ brands and satisfaction. Spectrum SQ will enable companies to attract and retain the best of the best, and increase productivity of their most valuable asset - their people! SPECTRUM SQ // Collaborative Campus SPECTRUM SQ // Corporate Campus Site Plan Phase 2: 250,000 SF Coming Soon The Eatery: Over 60,000 SF Now Open Phase 1: 134,000 SF Now Open Offices The Eatery Spectrum BRT SPECTRUM SQ // The Eatery A merger of business and social space with trendy restaurants, a central collaborative square and offices for enterprising organizations.
    [Show full text]
  • Authority to Waive the City's Right to a Hearing of Necessity in Connection
    12.12 Date: July 16, 2020 Originator’s files: To: Chair and Members of Council From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works July 22, 2020 Subject Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5) Recommendations 1. That the Corporate Report titled “Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5)” dated July 16, 2020 from the Commissioner of Transportation and Works, be received. 2. That the Legal Services Section of the City Manager’s Office be given authority to waive the City’s right to a Hearing of Necessity as provided pursuant to Section 6 (2) of the Expropriations Act, RSO. Background Under cover of letters dated April 21, 2020, the City of Mississauga received four (4) Notices of Application for Approval to Expropriate (the “Notices”) from Metrolinx for the following interests in property required in connection with Metrolinx’s Eglinton Crosstown West Extension Project: 1. City’s easement interest in PIN132970628 2. City’s easement interest in PIN132970627 3. Fee simple interest in the City-owned lands identified as PIN74240245 4. Fee simple interest in the City-owned lands identified as PIN132970624. The location of these properties is illustrated in Appendix 1. 12.12 Council
    [Show full text]
  • 5280 SOLAR DRIVE Orbitor
    AVA ILABLE 5280 FOR LEA SE SOLAR DRIVE MISSISSAUGA, ONTARIO PRIME AIRPORT CORPORATE CENTRE LOCATION! • 8,881 sq. ft. of divisible, ground floor office space. • Move-in ready space that has lobby exposure. • Suite is divisible. • Easily accessible from Highways 401,409 and 427. • Mississauga Transit bus stops within walking distance, with connections to the TTC. • In close proximity to the new Mississauga Bus Rapid Transit Spectrum Station stop. • Minutes from Toronto Pearson International Airport. FOR MORE John Potter* David Potter* INFORMATION Associate Vice President Executive Vice President PLEASE CONTACT 416.798.6242 416.798.6239 *Sales Representative [email protected] [email protected] AVA ILABLE 5280 FOR LEA SE SOLAR DRIVE MISSISSAUGA, ONTARIO DETAILS: NET RENTABLE AREA: Suite 100: 8,881 sq. ft. (Divisible) ASKING NET RENT: $16.00 per sq. ft. ADDITIONAL RENT: $14.34 per sq. ft. (2014 Estimate) POSSESSION: Immediate PARKING: 4.0 per 1,000 sq. ft. leased FLOOR PLAN: Suite 102 Management Office Suite 100: Not 8,881 sq. ft. Included FOR MORE John Potter* David Potter* INFORMATION Associate Vice President Executive Vice President PLEASE CONTACT 416.798.6242 416.798.6239 *Sales Representative [email protected] [email protected] AVA ILABLE 5280 FOR LEA SE SOLAR DRIVE MISSISSAUGA, ONTARIO Location Map: TORONTO PEARSON INTERNATIONAL AIRPORT SKYMARK TRANSIT HUB Renforth 5280 SOLAR DRIVE Orbitor Spectrum Etobicoke Creek Tahoe Dixie Future Mississauga Bus Rapid Transit Route Skymark/Renforth Transit Hub- with connections
    [Show full text]
  • 5700 Cancross Court Mississauga, Ontario
    5700 CANCROSS COURT MISSISSAUGA, ONTARIO FOR LEASE Parking Ratio: OFFICE & WAREHOUSE SPACE 4.0 per 1,000 sq. ft. For More Information, Please Contact: Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca 5700 CANCROSS COURT MISSISSAUGA, ONTARIO OFFICE & WAREHOUSE SPACE FOR LEASE AVAILABILITY (AVAILABLE MAY 2020) SUITE 1 3,305 sq. ft. SUITE 2 3,580 sq. ft. WAREHOUSE 3,574 sq. ft. SUITE 1 & WAREHOUSE 6,879 sq. ft. SUITE 2 & WAREHOUSE 7,154 sq. ft. SUITES 1 & 2 & WAREHOUSE 10,459 sq. ft. PROPERTY DETAILS NET RENT $11.00 per sq. ft. per annum ADDITIONAL RENT $13.11 per sq. ft. per annum (2020 estimate)1 Warehouse Space Has 1 Dock Door Bell, Rogers, Telus Available in Building 1Taxes are estimated based on 2020 assessment and 2020 Mississauga CT rates FLOOR PLAN SUITE 1 WAREHOUSE SUITE 2 3,305 sq. ft. 3,574 sq. ft. 3,3580 sq. ft. 5700 CANCROSS COURT MISSISSAUGA, ONTARIO PROPERTYPROPERTY LOCATION LOCATION Route 19: Hurontario & 407 Park & Ride Platform (NB) to Port Credit Go Station Platform (SB) Route 43: Commerce Blvd at Renforth Station (EB) to Meadowvale Town Centre Drop Off (WB) Route 70: Islington Subway Bus Terminal Platform (EB) to Matheson Blvd W of Hurontario St (WB) Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca *Sales Representative February 2020.This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”).
    [Show full text]
  • Eglinton Crosstown West Extension Initial Business Case February 2020
    Eglinton Crosstown West Extension Initial Business Case February 2020 Eglinton Crosstown West Extension Initial Business Case February 2020 Contents Executive Summary 1 Scope 1 Method of Analysis 1 Findings 3 Strategic Case 3 Economic Case 3 Financial Case 4 Deliverability and Operations Case 4 Summary 4 Introduction 7 Background 8 Business Case Overview 10 Problem Statement 13 Case for Change 14 Problem Statement 14 Opportunity for Change 15 Key Drivers 16 Strategic Value 18 iv Investment Options 24 Introduction 25 Study Area 25 Options Development 25 Options for Analysis 27 Assumptions for Analysis and Travel Demand Modelling 33 Strategic Case 34 Introduction 35 Strategic Objective 1 – Connect More Places with Better Frequent Rapid Transit 38 Criterion 1: To provide high quality transit to more people in more places 38 Criterion 2: To address the connectivity gap between Eglinton Crosstown LRT and Transitway BRT 40 Strategic Objective 2 – Improve Transit’s Convenience and Attractiveness 42 Criterion 2: To provide more reliable, safe and enjoyable travel experience 42 Criterion 2: To boost transit use and attractiveness among local residents and workers 45 Strategic Objective 3 – Promote Healthier and More Sustainable Travel Behaviours 52 Criterion 1: To improve liveability through reduction in traffic delays, auto dependency and air pollution 52 Criterion 2: To encourage use of active modes to access stations 53 v Strategic Objective 4 – Encourage Transit-Supportive Development 57 Criterion 1: Compatibility with Existing Neighbourhood
    [Show full text]
  • Minutes of Meeting
    Minutes of Meeting GEOMETRIC DESIGN STANDING COMMITTEE Fall 2013 Technical Meeting Date: September 22, 2013 Place/Time: Winnipeg Convention Centre, Room 3, Ground Floor Next Meeting: April 11 and 12, 2014, Ottawa Attendees: Attached Distribution: Committee Members Item Action 1. Review and Approval of Agenda Aziz Merali reviewed the proposed agenda and solicited comments. No additions or deletions were noted. It was agreed by motion (Biglow/ Christiansen) to adopt the agenda as presented. 2. Review and approval of the previous Minutes of Meeting Gregg Cooke provided an overview of the minutes from the Spring 2013 meeting held in Ottawa. No revisions were noted. It was agreed by motion (Koziol/Buch) to adopt the minutes as presented. Gregg Cooke will submit the meeting minutes to the TAC Gregg Cooke Secretariat to be posted on the TAC website. 3. Updates to GDSC Membership Self-introduction of members in attendance was completed. Aziz reminded everyone to update the GDSC roster, which was circulated to the committee members in attendance. There were no new members in attendance. Adam Laughlin has resigned from the committee due to a change in role at the City of Edmonton. The following guests attended the meeting: o Loris Piccin, City of Ottawa o Karmin Abbany, AMEC o John Bolger, City of Calgary o Scott Suderman, City of Winnipeg o Neil Myska, City of Winnipeg o Kristen Poff, Genivar o Derek Durrant, Manitoba Infrastructure and Transportation September 22, 2013 GEOMETRIC DESIGN STANDING COMMITTEE Page 2 of 9 Item Action 4. 2013 Fall Conference Overview The theme of the 2013 TAC Annual Conference is Transportation: Better – Faster – Safer.
    [Show full text]
  • Relief Line South Environmental Project Report, Section 5 Existing and Future Conditions
    Relief Line South Environmental Project Report Section 5 - Existing and Future Conditions The study area is unique in that it is served by most transit modes that make up the Greater 5 Existing and Future Conditions Toronto Area’s (GTA’s) transit network, including: The description of the existing and future environment within the study area is presented in this • TTC Subway – High-speed, high-capacity rapid transit serving both long distance and local section to establish an inventory of the baseline conditions against which the potential impacts travel. of the project are being considered as part of the Transit Project Assessment Process (TPAP). • TTC Streetcar – Low-speed surface routes operating on fixed rail in mixed traffic lanes (with Existing transportation, natural, social-economic, cultural, and utility conditions are outlined some exceptions), mostly serving shorter-distance trips into the downtown core and feeding within this section. More detailed findings for each of the disciplines have been documented in to / from the subway system. the corresponding memoranda provided in the appendices. • TTC Conventional Bus – Low-speed surface routes operating in mixed traffic, mostly 5.1 Transportation serving local travel and feeding subway and GO stations. • TTC Express Bus – Higher-speed surface routes with less-frequent stops operating in An inventory of the existing local and regional transit, vehicular, cycling and pedestrian mixed traffic on high-capacity arterial roads, connecting neighbourhoods with poor access transportation networks in the study area is outlined below. to rapid transit to downtown. 5.1.1 Existing Transit Network • GO Rail - Interregional rapid transit primarily serving long-distance commuter travel to the downtown core (converging at Union Station).
    [Show full text]
  • Airport Express 100 Service: Monday to Friday Revised: 25 Feb 2019
    AIRPORT EXPRESS 100 SERVICE: MONDAY TO FRIDAY REVISED: 25 FEB 2019 EAST [1007]: WEST [1008]: DEPART WINSTON CHURCHILL STATION PLATFORM 6 DEPART TERMINAL 3 CONTINUE ON TRANSITWAY TO ERIN MILLS STATION WESTBOUND DOES NOT SERVICE TERMINAL 1 PLATFORM 6 KEEP RIGHT; FOLLOW SIGNS FOR AIRPORT ROAD DEPART STOP AND MOVE AHEAD ON TRANSITWAY L~ SILVER DART DR L~ ACCESS RD TO EXIT STATION R~ RENFORTH DR R~ ACCESS RD TO ERIN M ILLS PKY R~ ON ACCESS RAMP TO TRANSITWAY R~ ERIN MILLS PKY KEEP R~ IN ROUNDABOUT L~ ACCESS TO HWY 403 EB R~ ON TRANSITWAY TO SERVICE RENFORTH STATION CONTINUE ON HWY 403 EAST AND ONTO BUS BYPASS PLATFORM 1 LANES IF HIGHWAY CONDITIONS WARRANT THEIR USE (GO CONTINUE AHEAD ON TRANSITWAY WITH THE FLOW OF TRAFFIC ON REGULAR OR HOV LANES) SERVICE ALL STATIONS TO ACCESS RAMP BEFORE AND EXIT AT MAVIS RD/CENTRE VIEW DR HURONTARIO ST TAKE CENTRE VIEW DR TO DUKE OF YORK BLVD R~ RATHBURN RD TO BUS STOP 3390 ACROSS FROM THE R~ DUKE OF YORK BLVD CITY CENTRE TRANSIT TERMINAL L~ RATHBURN TO BUS STOP 1406 ON RATHBURN RD AT DEPART STOP AND CONTINUE ON RATHBURN RD THE CITY CENTRE TRANSIT TERMINAL R~ DUKE OF YORK BLVD DEPART STOP L~ CENTRE VIEW DR CONTINUE ON RATHBURN RD ACROSS HURONTARIO ST USE ‘BUS ONLY’ LANE L~ ONTO TRANSITWAY ACCESS RD SERVICE ALL R~ MAVIS RD STATIONS TO RENFORTH PLATFORM 7 EXIT ONTO HWY 403 WEST RAMP AND ONTO BUS BYPASS DEPART STOP AND EXIT STATION LANES IF HIGHWAY CONDITIONS WARRANT THEIR USE CONTINUE AHEAD ON TRANSITWAY (OTHERWISE GO WITH THE FLOW OF TRAFFIC ON L~ ACCESS TO RENFORTH DR REGULAR OR HOV LANES) R~ RENFORTH DR
    [Show full text]
  • PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | AUGUST 2020 Sajecki Planning Inc
    PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | AUGUST 2020 Sajecki Planning Inc. TABLE OF CONTENTS 1.0 INTRODUCTION 4 2.0 SITE AND SURROUNDINGS 6 2.1 SUBJECT PROPERTY 7 2.2 PLANNING HISTORY 7 2.3 SURROUNDING LAND USES 9 2.4 SURROUNDING DEVELOPMENT APPLICATIONS 11 2.5 TRANSPORTATION NETWORK 11 3.0 PROPOSAL 16 3.1 DEVELOPMENT OVERVIEW 17 3.2 REQUIRED APPROVALS 27 3.3 PUBLIC CONSULTATION 27 4.0 POLICY AND REGULATORY CONTEXT 28 4.1 OVERVIEW 29 4.2 PLANNING ACT 29 4.3 PROVINCIAL POLICY STATEMENT 29 4.4 GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE 31 4.5 REGION OF PEEL OFFICIAL PLAN 34 4.6 CITY OF MISSISSAUGA OFFICIAL PLAN 37 4.7 CITY OF MISSISSAUGA ZONING BY-LAW 46 4.8 ADDITIONAL CONSIDERATION 46 5.0 SUPPORTING STUDIES AND REPORTS 50 5.1 TRAFFIC IMPACT STUDY 51 5.2 URBAN DESIGN STUDY 51 5.3 WIND STUDY 52 5.4 NOISE AND VIBRATION IMPACT STUDY 53 5.5 SHADOW STUDY 53 5.6 TREE INVENTORY AND PRESERVATION PLAN / ARBORIST REPORT 54 5.7 FUNCTIONAL SERVICING AND STORMWATER REPORT 54 5.8 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT 55 5.9 HERITAGE IMPACT ASSESSMENT 55 5.10 HOUSING REPORT 56 6.0 PLANNING ANALYSIS 58 6.1 COMPLETE COMMUNITY 59 6.2 BUILT FORM AND DESIGN 59 6.3 HEIGHT AND DENSITY 60 7.0 CONCLUSION 62 APPENDICES APPENDIX A - SUBMISSION CHECKLIST APPENDIX B - ZONING BY-LAW AMENDMENT 1.0 INTRODUCTION Planning Justification Report: 30 Eglinton Avenue West Plaza Partners and Crown Realty Partners have On October 23, 2019 a pre-consultation meeting with retained Sajecki Planning Inc.
    [Show full text]
  • Meadowvale Express 109 Service: Daily Revised: 22 Nov 2017
    MEADOWVALE EXPRESS 109 SERVICE: DAILY REVISED: 22 NOV 2017 NORTH NORTH: NORTH STOPS: STOP 0804 - PLATFORM 7 ISLINGTON SUBWAY STATION EXIT ISLINGTON SUBWAY STATION BLOOR ST/GREEN LANES R~ BLOOR ST DUNDAS ST/AUKLAND RD CONTINUE ONTO DUNDAS ST DUNDAS ST/BILLINGHAM RD R~ EXIT RAMP TO HWY 427 NORTHBOUND RENFORTH STATION STAY IN COLLECTOR LANES ORBITOR STATION CONTINUE ONTO HWY 27 SPECTRUM STATION FOLLOW HWY27-EGLINTON SIGNS ETOBICOKE CREEK STATION EXIT AT EGLINTON AVE WESTBOUND TAHOE STATION KEEP RIGHT FOR ACCESS TO TRANSITWAY DIXIE STATION AND RENFORTH STATION TOMKEN STATION SERVICE RENFORTH STATION CAWTHRA STATION CONTINUE AHEAD ON TRANSITWAY CENTRAL PKY STATION SERVICE ALL STATIONS TO ACCESS RAMP CITY CENTRE TRANSIT TERMINAL BEFORE HURONTARIO ST ERIN MILLS STATION R~ RATHBURN RD TO BUS STOP 3390 WINSTON CHURCHILL STATION ACROSS FROM THE CITY CENTRE TRANSIT WINSTON CHURCHILL BLVD/EGLINTON AVE TERMINAL WINSTON CHURCHILL BLVD/ERIN CENTRE DEPART STOP AND CONTINUE ON BLVD RATHBURN RD WINSTON CHURCHILL BLVD/THOMAS ST R~ DUKE OF YORK BLVD WINSTON CHURCHILL BLVD/BRITANNIA RD L~ CENTRE VIEW DR WINSTON CHURCHILL BLVD/BATTLEFORD RD USE ‘BUS ONLY’ LANE MEADOWVALE TOWN CENTRE TERMINAL R~ MAVIS RD EXIT ONTO HWY 403 WESTBOUND RAMP AND ONTO THE BUS BYPASS LANES IF HIGHWAY CONDITIONS WARRANT THEIR USE (OTHERWISE GO WITH THE FLOW OF TRAFFIC ON REGULAR OR HOV LANES) POSITION TO EXIT AT ERIN MILLS PKY STAY ON CENTRE LANE OF EXIT RAMP CONTINUE ACROSS ERIN MILLS PKY ONTO ACCESS RD TO ERIN MILLS STATION L~ ACCESS RD TO STATION R~ TO SERVICE STATION PLATFORM 4
    [Show full text]