Montario Quarter Lot 37

Total Page:16

File Type:pdf, Size:1020Kb

Montario Quarter Lot 37 Appendix B Subject Site 25 Lot 37 Montario Quarter Development Application 26 Subject Site Property Description and Tenure The subject site is described as Lot 37 Montario Quarter, Shenton Park (a formalised street address for the site is yet to be provided). The site has a total land area of 10,098m2 and is bound by the heritage listed Victoria House and public open space to the west, Seymour Street to the north, Selby Street to the east and Victoria Avenue to the south. The site and broader Montario Quarter Estate is currently vacant, having recently been subdivided to enable development. The site is subject to sloping topography, falling from a high point of 17.3m AHD on Victoria Avenue to the south to a low point of 11.6m AHD on Seymour Street to the north based on surveyed site levels. The Certificate of Title details for the subject site are summarised in the following table, with duplicate copies of these documents provided at Appendix E. Table 4 – Subject Site Certificate of Title Details. Lot Plan Volume/Folio Street Address Registered Proprietor 37 413758 2949/74 TBC Iris – PW NO 1 2017 Pty Ltd Refer Appendix G – Certificate of Title. Refer Figure 1 – Location Plan. Refer Figure 2 – Aerial Plan. Refer Figure 3 – Site Plan. Site Context and Surrounding Development The site is situated in the central eastern portion of LandCorp’s Shenton Park Rehabilitation Hospital redevelopment area, known as Montario Quarter. Montario Quarter is a 15.8ha parcel of land broadly comprising the former Shenton Park Rehabilitation Hospital, which is to be redevelopment by the State Government for the purposes of commercial, retail and residential development, with associated public open space and amenities. The site is located approximately 5km west of the Perth Central Business District, 2.2km south-east of the Floreat Town Centre, 2.2km south-west of the Subiaco Town Centre and 1.82km south-west of the Wembley Town Centre. The site is also aforded a high level of amenity owing to its location within a well-established area that allows for convenient access to services, shops, community facilities and recreation areas, including the University of Western Australia, Nedlands Medical Precinct, HBF Stadium, Swan River, Kings Park, Bold Park, Indian Ocean, Wembley Sports Park and Lake Monger Reserve. The site is serviced by an eficient local and district road network based primarily around Selby Street and Lemnos Street, providing road connections to the broader metropolitan area. Public transportation options are also abundant due to the sites location within 400m of the Shenton Park Train Station and 970m of the Daglish Train Station, which form part of the Perth to Fremantle railway line. The site is also within walking distance to the No. 27, 998 and 999 high frequency bus services traversing Selby Street along the eastern boundary of the site. 23 Lot 37 Montario Quarter Development Application Subject Site source: googlemaps Figure 1. Location Plan. Location Plan Lot 37 Montario Quarter, Shenton Park Date: 8 Aug 2018Scale: NTS @ A4 Staf: BA_GW Checked: BA File: 18-076 PS montario quarter.ai The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. All parties associated with the proposed property development disclaim all Level 18, 191 St Georges Terrace, Perth Western Australia 6000 responsibility for any errors or omissions. The right is reserved to change the plan at any time. Liability is expressly disclaimed by Element Advisory WA Pty Ltd for any loss or damage which may PO Box 7375 Cloisters Square, Perth Western Australia 6850 be sustained by any person acting on any visual impression gained from this drawing. © element T. +61 8 9289 8300 | E. [email protected] elementwa.com.au 24 SELBY STREET SELBY NASH STREET THO RBURN WAY LEMNOS STREET Subject Site source: nearmaps Figure 2. Aerial Plan. 25 Lot 37 Montario Quarter Development Application Lot 384 Lot 9000 27.8 47.9 17.8 24.7 85.2 P413758 Lot 430 Lot 37 1.0098ha 76.5 Lot 431 SELBY STREETSELBY 10.7 Lot 38 12.8 81.1 7.6 THO RBURN WAY Lot 9000 R38824 Lot 10494 Subject Site source: landgate Figure 3. Site Plan. Site Plan Lot 37 Montario Quarter, Shenton Park Date: 8 Aug 2018Scale: NTS @ A4 Staf: BA_GW Checked: BA File: 18-076 PS montario quarter.ai The drawing does not constitute an invitation, agreement or contract (or any part thereof) of any kind whatsoever. All parties associated with the proposed property development disclaim all Level 18, 191 St Georges Terrace, Perth Western Australia 6000 responsibility for any errors or omissions. The right is reserved to change the plan at any time. Liability is expressly disclaimed by Element Advisory WA Pty Ltd for any loss or damage which may PO Box 7375 Cloisters Square, Perth Western Australia 6850 be sustained by any person acting on any visual impression gained from this drawing. © element T. +61 8 9289 8300 | E. [email protected] elementwa.com.au 26 European Heritage A desktop search of the State Heritage Ofice’s inHerit Inquiry System indicates that the site itself is not directly afected by any statutory heritage listings, however, sits adjacent to the curtilage of State Registered Heritage Place ‘Shenton Park Rehabilitation Hospital’ which encompasses Victoria House and an avenue of Queensland Box Trees (Further commentary in relation to the avenue of Queensland Box Trees on Victoria Avenue is provided in Appendix H -Arboriculturist Report). While the subject site is not itself included within the heritage curtilage of State Registered Heritage Place ‘Shenton Park Rehabilitation Hospital’, it is included within the related zone of archaeological potential. An Archaeological Management Plan (AMP) was prepared by Archea-aus in 2016. Within that report it identifies a portion of Lot 37 as having archaeological potential. Page 16 of that report sets out the appropriate protocols for excavation within that area under the heading ‘PORTION OF AREA B OUTSIDE HERITAGE REGISTERED AREA’. On this basis, preliminary investigations are being undertaken prior to future development. If any archaeological discoveries are uncovered these will be managed in accordance with the protocols established in the AMP. Indigenous Heritage A desktop search of the Department of Planning, Lands and Heritage’s Aboriginal Heritage Inquiry System indicates that the subject site itself has no known Aboriginal heritage significance. Bushfire A desktop search of the Department of Fire and Emergency Services’ Map of Bush Fire Prone Areas identifies that the subject site does not fall within a bush fire prone area. Contamination A desktop search of the Department of Water and Environment Regulation’s Contaminated Sites Database indicates that the site is not included on the register of contaminated sites. Acid Sulfate Soils A desktop search of Landgate’s Shared Land Information Portal indicates the subject site is identified as having a low risk of Acid Sulfate Soils (ASS) occurring within three metres of the ground level surface. 27 .
Recommended publications
  • Willingness to Pay for Revegetating the City of Subiaco's Railway Reserve
    Willingness to Pay for Revegetating the City of Subiaco’s Railway Reserve A Choice Experiment to Determine Public Preferences Gunther de Vos a, Marit E. Kragt a* , and Ram Pandit a aSchool of Agricultural and Resource Economics, The University of Western Australia, Crawley, WA 6009, Australia *E-mail address: [email protected] This work was undertaken to fulfil the requirements for Mr. de Vos’ Master degree in Environmental Science (Environmental Management) at the University of Western Australia. His supervisors were Dr Marit Kragt (UWA) and Dr Ram Pandit (UWA) 25 August 2016 Working Paper 1611 School of Agricultural and Resource Economics http://www.are.uwa.edu.au Citation: de Vos, G., Kragt, M.E. and Pandit, R. (2016) Willingness to Pay for Revegetating the City of Subiaco’s Railway Reserve , Working Paper 1611, School of Agricultural and Resource Economics, University of Western Australia, Crawley, Australia. © Copyright remains with the authors of this document. i Willingness to Pay for Revegetating the City of Subiaco’s Railway Reserve A Choice Experiment to Determine Public Preferences Gunther de Vos, Marit E. Kragt, and Ram Pandit Abstract Residents of the City of Subiaco (Western Australia) demonstrate a willingness to pay for revegetating the Railway Reserve. The Railway Reserve is the area of land immediately along both sides of the Fremantle Railway Line. The City of Subiaco aims to revegetate all available land in the Reserve with native plants to create a green link between Kings Park, Bold Park and other parks in the area. This study used a choice experiment to determine public preferences and to estimate willingness to pay for different ways of managing the Railway Reserve.
    [Show full text]
  • Shenton Park Rehabilitation Hospital
    DilFHOVEfilEMT FLAM MOn 43 SHEWTON PARK REHABILITATION HOSPITAL Western ^;y\ Australian ^M/f Planning ; ™ Commission WESTERN AUSTRALIAN PLANNING COMMISSION APRIL 2016 Page 1 of 6 IMPROVEMENT PLAN NO. 43 SHENTON PARK REHABILITATION HOSPITAL Introduction 1. Under Section 119 of the Planning and Development Act 2005, the Western Australian Planning Commission (WAPC) is authorised to certify and recommend to the Minister for Planning that an Improvement Plan should be prepared for the purpose of advancing the planning, development and use of any land within the State of Western Australia. 2. The Improvement Plan provisions of the Planning and Development Act 2005 provides for the WAPC, with the approval of the Governor, to; D Plan, replan, design, redesign, consolidate, re-subdivide, clear, develop, reconstruct or rehabilitate land held by it under the Act or enter into agreement with any owner of land not held by it within the Improvement Plan area. ¦ Provide for the land to be used for such purposes as may be appropriate or necessary. H Make necessary changes to land acquired or held by it under the Act. B Manage the tenure or ownership of the land or any improvements to that land held by it under the Act or enter into agreement with other owners of land within the Improvement Plan area for the same purpose. ¦ Enter into agreement for the purpose, surrender, exchange, vesting, allocation or other disposal of land, including the adjustment of boundaries. H Recover costs in implementing the agreement with any owner of land within the Improvement Plan area. b Do any act, matter or thing for the purpose of carrying out any agreement entered into with other land owners.
    [Show full text]
  • Urban Design Research & Recommendations
    COTTESLOE VILLAGE URBAN DESIGN RESEARCH & RECOMMENDATIONS Melanie Bradley Landplan Associates COTTESLOE VILLAGE URBAN DESIGN RESEARCH & RECOMMENDATIONS INTRODUCTION The urban design research has been undertaken with a designscape approach…in other words, the historic existing urban form of the precinct and surrounds will have a very real effect on the outcome of this study and subsequent statutory documents. Taking into account the 2009 Cottesloe Enquiry by Design (in partnership with the Department of Planning and Infrastructure), this research will also address the railway lands between Railway Street and Curtin Avenue, yet includes the Stirling Highway Corridor, the Grove Library and Cottesloe Central located in Peppermint Grove. The research will result in an Urban Design Framework which will include: • A community vision for the future of Cottesloe Village (including the Peppermint Grove Library, Cottesloe Central, and adjacent residential areas to the north and south). • An overall urban design framework plan to guide future investment and development • Concept plans for future streetscape design and works • Access and movement plans for pedestrians, cyclists and vehicles • Planning requirements for new developments within and around the centre to enhance the village character This research will inform the Integrated Local Area Plan (Precinct Plan), a Local Planning Policy and subsequent scheme amendments for the Town of Cottesloe and the Shire of Peppermint Grove. Purpose – to place emphasis on design thinking to understand the District Activity Centre context (physical, social, economic) and develop an Integrated Local Area Plan with an accompanying local planning policy that addresses triple bottom line issues to ensure the success of the Cottesloe Village both now and in the future.
    [Show full text]
  • Tttiativt Tbouii September 2Nd, 1979
    2294 2294[COUNCIL] implement this decision on Sunday. tttiativt Tbouii September 2nd, 1979. Wednesday, the 29th August, 1979 In my opinion we need to debate the proposed closure because the Legislative Council has not done so in this Session. It The PRESIDENT (the Hon. Clive Griffiths) may well be that following the debate the took the Chair at 4.30 p.m., and read prayers. Government will reverse its decision to QUESTIONS proceed with the closure. Questions were taken at this stage. Furthermore, there is a rising tide of public opinion which is opposed to the RAILWAYS closure despite the Government having had ample opportunity to state its case. A recent Closure: Urgency Mfotion McNair Anderson Gallup Poll indicated that THE PRESIDENT (the Hon. Clive Griffiths): 82 per cent of those interviewed wanted the Honourable members, I have received the rail passenger service to continue. Another following letter from the Hon. F. E. McKenzie Poll, commissioned by the Sunday addressed to me as President. I I reads- Independent produced a similar result. Dear Mr. President, The issue has teen debated in almost every forum except the Legislative Council. It is of Re: Systematic Dismantling of the W.A. paramount importance to the people of -Railway System with Particular Reference Western Australia and, therefore, it is to the Proposed Cessation of Passenger essential that the opinions of the Members of Services on the Perth-Fremantle Railway the Legislative Council should be known to on the 2nd September, 1979. the Government prior to the 2nd of In accordance with Standing Order No.
    [Show full text]
  • Walking Subiaco – the City Centre
    Walking Subiaco The City Centre Approximately 4 kms - allow 2 hours Subiaco SALVADO ROAD St John of God Hospital RAILWAY PARADE HARBOURNE STR Subiaco CASHEL LA ROYDHOUSE STREET CE Station Y T UPHAM ST EDENBERR Subiaco SUBIACO SQUARE RD Oval DUBLIN CL Market Square CENTRO AVE 10 BRIGID ROAD HOOD STREET Park METTERS LA STREET STATION VICKERS LA SUBIACO SQUARE RD CLARE LA 12 DARBON CARTER LANE ROBERTS ROAD CRES 11 ATKINSON RD RD 9 EAKINS LA MONTEATH RD SEDDON ST YORK STREET AGNEW W OUTRIDGE RD AXON ST CATHERINE ST CATHERINE ALVAN ST ALVAN AY RAILWAY ROKEBY ROAD 17 13 HAY STREET 16 HAY STREET 8 15 14 Forrest CHURCHILL AVE FORREST ST Walk DENIS STREET AXON ST ROWLAND ST 19 BARKER ROAD BARKER ROAD 7 18 Richard Diggins ST 20 TOWNSHEND ROAD Park King Edward PARK STREET Memorial 21 Hospital LORETTO ST RAPHAEL ST DENIS STREET ROWLAND ST ROKEBY ROAD 6 5 22 AXON BAGOT ROAD BAGOT ROAD Subiaco 23 24 Primary School Library Museum 25 LAWLER ST Council 26 Chambers ROBINSON ST 1 SALISBURY ST SALISBURY HENSMAN ROAD Arts Centre 4 ST RUPERT PROCLAMATION ST PROCLAMATION 3 2 HAMERSLEY ROAD HAMERSLEY ROAD The Subiaco Story The City of Subiaco is part of the Swan River and Swan Coastal Plains area that has been the home ground of the Nyungah people since the beginning of time. The wetland systems were created by the movements of the Rainbow Serpent through Nyungah spiritual dreaming and are of religious significance to the Nyungah people of this area, as are other places of worship to non-Aboriginal people.
    [Show full text]
  • Major State Government Achievements 2013-15 (26 June 2015)
    Version as of 26 June 2015 CABINET IN CONFIDENCE As at June 2015 GOVERNMENT OF WESTERN AUSTRALIA – Achievements from March 2013 to June 2015 CONTENTS TRAINING AND WORKFORCE DEVELOPMENT ABORIGINAL AFFAIRS ...................................... 3 ...................................................................... 64 AGRICULTURE AND FOOD ............................... 5 TRANSPORT ................................................... 66 ATTORNEY GENERAL ....................................... 6 TREASURER ................................................... 71 CHILD PROTECTION ......................................... 8 VETERANS ..................................................... 72 COMMERCE ..................................................... 9 WATER .......................................................... 73 WOMEN’S INTERESTS ................................... 75 COMMUNITY SERVICES ................................. 11 CORRECTIVE SERVICES .................................. 11 YOUTH ........................................................... 76 CULTURE AND THE ARTS ............................... 12 DISABILITY SERVICES ..................................... 13 EDUCATION ................................................... 15 EMERGENCY SERVICES .................................. 19 ENERGY ......................................................... 20 ENVIRONMENT ............................................. 21 FINANCE ........................................................ 25 FISHERIES .....................................................
    [Show full text]
  • Australia South West Corridor Railway
    Australia South West Corridor Railway This report was compiled by the University of Melbourne, Melbourne, Australia. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Appraisal methods Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main and intermediate travel nodes Introduction Planning context
    [Show full text]
  • Road Safety Audit
    CONTENTS EXECUTIVE SUMMARY ........................................................................................................... 1 1.0 INTRODUCTION ............................................................................................................ 2 1.1 Previous Traffic Assessments .......................................................................... 2 2.0 SITE AND SURROUNDING ROAD NETWORK ........................................................... 3 2.1 Location .............................................................................................................. 3 2.2 College Access .................................................................................................. 3 2.3 Vehicle Access ................................................................................................... 4 2.4 Traffic Volumes and Flows ................................................................................. 4 2.5 Road Hierarchy ................................................................................................... 5 2.6 Road Network ..................................................................................................... 6 2.7 Road Speed Zones .......................................................................................... 10 2.8 Pedestrian and Cycle Movements ................................................................... 10 2.9 Public Transport ............................................................................................... 10 3.0 FUTURE DEVELOPMENT
    [Show full text]
  • City of Subiaco Thematic History and Framework
    CITY OF SUBIACO THEMATIC HISTORY AND FRAMEWORK Prepared for the City of Subiaco KRISTY BIZZACA February 2014 THEMATIC HISTORY & FRAMEWORK OF SUBIACO ii EXECUTIVE SUMMARY In 2012, the City of Subiaco determined to undertake a Thematic History that would become the guiding document used to provide a Framework for understanding the evolution of the City’s cultural landscape in order to review the City’s Local Government Inventory. The consultant, Kristy Bizzaca, was commissioned in March 2012 to undertake this work. This Thematic History examines Subiaco's growth from pre-history, through to the foundation of the Swan River Colony in 1829 and up to the present day (2014) for the purposes of creating an overview of the main periods of development in the City. The history has been divided into eight periods with each chapter/section marking an important stage in the progress of Subiaco. In addition to providing a summary of local events and activities during these years, key factors, stories, themes and characteristics have been determined for each context. The first section identifies Aboriginal Histories of the area such as the water ways and gathering places of pre-history through to the dispossession, assimilation, institutionalisation and, more recently, reconciliation of the Post European History Period. The Colonial Period (1829 - 1870s) is the basis of the second section. It traces the early history of the place following the foundation of the Swan River Colony in 1829, encompassing the original land grants, the roads and railway routes that stimulated settlement and the establishment of the Benedictine Community at 'New Subiaco' in the 1850s.
    [Show full text]
  • A Case Study in Urban Revitalisation
    subi A cAse study in centro urbAn revitAlisAtion this retrospect on subi centro is the culmination of many people’s time and effort. the srA wishes to acknowledge the generosity and time of all who participated and to thank them, most sincerely, for their involvement. in particular independent interviews were held with key stakeholders namely government figures, industry experts, project consultants, community groups and key personnel of the redevelopment Authority (past and present). All were unfailingly expansive in their responses, patient in their explanations and very generous with their time. views expressed throughout this document are those of the key stakeholders who participated in the independent interviews. 3 subi centro A cAse study in urbAn revitAlisAtion To transform a disconnected railway and industrial area into a liveable and vibrant community while maintaining the heritage feel and enhancing connectivity. 4 subi centro A cAse study in urbAn revitAlisAtion Area (ha) 80 New Homes 800-900 Social / Affordable Homes 33 New population 1,500 Commercial / Retail Space (m2) 90,000 New Workers 3,200 Government Investment $130 million Investment Attraction $500 million Source: Subi Centro Concept Planning 1994 5 purpose This case study follows the evolution of the built environment Most importantly the pages that follow identify the overall in Subiaco, on the back of a major State infrastructure project project learnings from the redevelopment of industrial to create Subi Centro. Subiaco into an urban village. Recognising and documenting these lessons is vital to the continued betterment of the Reflecting back on sinking Subiaco Train Station and Redevelopment Authority model. subsequent redevelopment of the area provides a unique opportunity for experience-based learning.
    [Show full text]
  • Our Major Achievements Building a Better State Our Major Achievements Building a Better State 2013-2016
    WESTERN AUSTRALIA OUR MAJOR ACHIEVEMENTS OUR MAJOR ACHIEVEMENTS OUR MAJOR ACHIEVEMENTS BUILDING A BETTER STATE BUILDING A BETTER STATE BUILDING A BETTER STATE 2013-2016 2013-2016 book cover.indd 3 10/10/2016 11:23 AM GOVERNMENT OF WESTERN AUSTRALIA – Achievements from March 2013 to August 2016 CONTENTS ABORIGINAL AFFAIRS ...................................... 3 MINES AND PETROLEUM .............................. 44 AGRICULTURE AND FOOD ............................... 6 PLANNING ..................................................... 46 ATTORNEY GENERAL ....................................... 9 POLICE ........................................................... 50 CHILD PROTECTION AND FAMILY SUPPORT . 10 PREMIER AND CABINET ................................ 52 CITIZENSHIP AND MULTICULTURAL INTERESTS PUBLIC SECTOR ............................................. 57 …………………………………………………………………. 12 RACING AND GAMING .................................. 58 COMMERCE ................................................... 12 REGIONAL DEVELOPMENT ............................ 59 COMMUNITY SERVICES ............................... ..14 ROAD SAFETY ................................................ 65 CORRECTIVE SERVICES .................................. 14 SCIENCE ......................................................... 66 CULTURE AND THE ARTS ............................... 15 SENIORS AND VOLUNTEERING ..................... 67 DISABILITY SERVICES ..................................... 16 SMALL BUSINESS ........................................... 68 EDUCATION ..................................................
    [Show full text]
  • Western Australian Bicycle Network Plan 2014-2031 MINISTER’S FOREWORD
    Western Australian Bicycle Network Plan 2014-2031 MINISTER’S FOREWORD It gives me great pleasure to release the Western Australian Bicycle Network Plan 2014-2031, to guide the expansion of metropolitan and regional cycling facilities in this State. The number of Perth people cycling to work, or The WABN Plan includes a number of new for pleasure, has increased more than fivefold initiatives. The initiatives include a Connecting over the past 15 years and this trend is expected Schools program and a Connecting Stations to continue as more Western Australians reap the program, which both target regular short trips and environmental, social and health benefits offered are expected to deliver strong community benefits by choosing bicycles for business or leisure trips. by improving the health of our community while In 2012/13 alone, the number of cycling trips to also reducing congestion at key locations during and from the Perth Central Business District peak drop-off and pick-up periods. (CBD) increased by 16.4 per cent. For the Perth area there will be a continued focus In meeting Western Australia’s rising demand for on building Principal Shared Paths along freeways paths and on-road facilities for cyclists, the WABN and railway lines, prioritising those within a 15 km Plan will guide the continued delivery of cycling radius of the Perth CBD. The aim is to provide infrastructure to better meet the growing need commuters with a viable alternative transport for convenient, safe cycling routes and end-of- mode which is safe and reduces reliance on trip facilities, whilst aligning with the current State motorised transport in areas carrying high volumes Government urban planning policy and directions.
    [Show full text]