Biogas Market Study in Bhutan

Total Page:16

File Type:pdf, Size:1020Kb

Biogas Market Study in Bhutan Biogas Market Study in Bhutan Final Report Submitted to Asian Development Bank Submitted by Prakash C. Ghimire Sr. Regional Advisor, SNV/Asia Biogas Programme Saroj K. Nepal Consultant, Gonefel Options Consult, Bhutan December, 2009 Executive Summary o A feasibility study conducted in Bhutan in 2008 by SNV concluded that a small scale domestic biogas programme is possible with a technical potential of about 20,000 biogas plants especially in the southern belt and inner mountain valleys. The key question for the development of a substantial biogas programme in Bhutan is whether the households having enough number of cattle to install biogas plant are willing and able to invest in it and to feed the plant with the required amount of manure on a daily basis. Asian Development Bank (ADB) under the framework of Energy for All Partnership Programme proposed to undertake a specific market study to provide realistic answers to various questions related to technical and socio-economic feasibility of a biogas programme in Bhutan and contracted Netherlands Development Organisation (SNV) to carry out an in-depth market study. o The objective of the biogas market study was to assess the willingness and affordability of livestock keeping households to invest in biogas technology. The key question of the study was, therefore, ‘can biogas plant be ‘sold’ in Bhutan and if yes, to how many households and at what cost’? o The main methods used were cluster meetings, household survey and market survey using a structured questionnaire as the instrument of the study as well as open-ended unstructured interviews with respondents from the selected households under study. Additional investigation tools included observations, especially of cattle-sheds, manure management practice, water sources, household kitchen and conventional fuel sources being used in the sampled households, and informal discussions with people in the survey clusters. Seventy eight households from nine districts representing all three ecological zones as well as four administrative regions in the country were sampled for the study. Given the total number of households in each cluster, the sample size is not representative for the entire country. Hence, the findings of the study should be considered as indicative rather than representative. o The demographic attributes of the sample population showed that there were more male members than female. On an average there were 5.65 members in the household. Although 55% of the population were in the productive population group (between 17 and 61 years); the dependency ratio is relatively high with 71 young and elderly population being supported by 100 productive persons. However, given that the labour requirements for biogas plant operation are low, the present productive population are sufficient to take up operation. o Half the population depended on agriculture and are therefore based in the village implying that the biogas plants (which are home-based) can be managed since people will generally be around their farms. Farmers have sufficient land to install biogas plants and slurry pits although location of the cowsheds may not always be near the houses and kitchens in some of the households. The crops produced from the land are in most of the cases consumed by the family. Farmers however grow cash crops and derive most of their income from the sale of such crops. There were substantial differences in income among sampled households. Thirteen households earned less than Nu.13,164 a year implying that they lived in poverty. Another four did not earn any income. Those at the lower rung of the income ladder may not be able to afford to invest in biogas plants unless some financing incentives are provided. o Education attainment levels were relatively low with 44% of the family members being illiterate among which majority were women. Any information and communication materials developed for awareness- raising and training on biogas will have to take this into consideration. o The outcome of the study revealed that the main source of energy for cooking was firewood collected from the nearby forest. Eighty six percent of the HHs collected firewood from nearby forest or their own land whereas the remaining 14% of the HHs purchased it from market/vendors. Sixty two percent of the HHs cut the whole tree and the other 38% cut twigs and dried branches from the tree. Fifty two ii percent out of those who cut whole tree to supply firewood, were reported to cut 2 trees in a year followed by 33% cutting 3 trees and the remaining 15% cut only one tree. One household on an average burns 388.2 kilograms of firewood per month for cooking and 32.1 kg for space heating. The average firewood consumption in electrified households (13.88 kg/hh/day) is less than that in non- electrified households (20.67 kg/hh/day) which indicated that electricity was also used for cooking and space heating purposes. Electricity and kerosene were used for lighting purposes in urban and rural areas respectively. An average of 3.35 litres of kerosene per household per month was consumed for lighting. The field findings also revealed that out of the 78 households under study, 12 HHs used batteries, 2 HHs used solar PV and 1 HH used pine resin for lighting. o In general farmers owned cattle and other smaller livestock. Most farmers qualify to install biogas since the majority own more than 3 cattle with the average cattle holding being 6 cattle, most of which are night stalled cattle. The cultural practices of keeping cattle in sheds also vary with some villages having cattle sheds quite distant from the houses. In such situations, providing biogas and conveying the gas to the households can be expensive. Based upon field observation and information from the respondents, 2 adult zero grazed cattle or 3 adult open-grazed (night-stabled) cattle would be sufficient to produce at least 20 kg of dung, which is minimum requirement for a household to qualify for the installation of a smallest sized biogas plant (4 m3). The findings suggested that 95% of the total households have enough cattle dung to install a domestic biogas plant. o Eighty one percent of the respondents replied that they are often encountering smoke-borne diseases where as 19% think smoke has never been a big problem. The main reason for incidence of such diseases is the smoke-filled cooking environment due to poor ventilation in the kitchen. o The respondents reported that there are negligible major social and cultural taboos associated with the use of biogas and bioslurry. However, some people during informal discussions raised the issue of impurity of biogas produced with the digestion of night soil from toilets. Hence some of the farmers might resist the attachment of toilets to a biogas plant. There are no cultural inhibitions to the handling of dung. o The exposure of communities to biogas technology is limited. Thirty one percent of the respondents were familiar about biogas technology where as 40% of them had never heard about it. The remaining 29% had heard a little about it but do not know anything about it. The level of knowledge on biogas technology was relatively better in Samtse, Thimphu and Trashigang whereas people in Bumthang, Mongar and Trongsa had limited knowledge on it. However, ninety percent of the HHs are interested/willing to get substitutions for the conventional sources of fuel because they are expensive and difficult to obtain and 72% of the total HHs think biogas is best suited to fulfil their domestic demand for cooking fuel. This information indicates the necessity of effective awareness raising initiative as one of the main components of a national biogas programme. o Biogas plant is perceived as an expensive undertaking by 25 households whereas two of them think it is cheap. Ten respondents were unable to comment on the cost of installation. The remaining 41 respondents were of the view that the cost is reasonable. Out of the 14 households who think the investment cost will be an inhibiting factor for them to install biogas plant, 12 of them expressed that they will install biogas plant if more than 40% subsidy is provided by the government. One of them thinks biogas plant is cumbersome to operate and the remaining one respondent believes that the family does not have enough capital to invest. Sixty two percent of the HHs felt that they have enough saving per year to invest in biogas plant. o It was revealed that taking a loan or credit for agricultural activities is not a common practice in Bhutan at the household level although 50% of the respondents said that they have taken loan at least once to overcome a financial difficulty. Out of those who have taken a loan, very few persons (8%) were iii reported to have obtained it more than once. When asked if they need loans to install biogas plants, more than half replied affirmatively. The anticipated interest rates on biogas loan were reported to be in between 6 to 12% per annum. Seventy seven percent of the respondents believe that biogas plants will result in substantial financial saving which could be used to repay the loan on time; whereas 19% assume biogas will not help in financial saving considerably. The remaining 4% claimed that they are not in a position to give their opinion whether biogas plant generates financial saving or not. o The data suggested that the average burning hours of conventional cook stove in the sampled households was 3.84 hours per household per day. The maximum and minimum burning hours were reported to be 7 hours and 1.5 hours respectively.
Recommended publications
  • Strategy for 100% Renewable Energy Supply in Bhutan
    CORE Metadata, citation and similar papers at core.ac.uk Provided by Ritsumeikan Research Repository Strategy for 100% Renewable Energy supply in Bhutan A research report submitted in partial fulfillment of the requirements for the Award of the degree Master of Science: International Corporation Policy From Ritsumeikan Asia Pacific University Graduate School of Asia Pacific Studies Beppu, Japan By Suberi Hari Kumar Under the supervision of Prof. Dr. Faezeh MAHICHI and Prof. Dr. Peter Heck April 2014 Abstract Bhutan's ambitious vision of 100% renewable energy (RE) supply is based on hydropower as the main source of electrical energy supply and it is inevitably linked to the adverse impacts of climate change. As of now, only 5% of the total hydro potential is utilized for electricity generation where 75% of generation is exported to India. Despite the enormous potentials, as Bhutan’s transport fuel requirement is 100% import-dependent, the national renewable energy share currently remains at 60%. In addressing this challenge, this study aimed to identify alternative renewable energy supplies and their potentials for Bhutan’s 100% RE vision. The qualitative analysis carried out on the available RE sources indicates that Bhutan has about 50 GW of solar energy potential and 4 GW of wind potential in addition to the existing untapped 30 GW hydro energy potential for electrical energy generation. Additionally, biomass from cattle waste is also suitable for rural cooking energy demand. Combined potential of these RE sources have the capacity to mitigate adverse impact of climate change. While Bhutan has achieved 34% renewable electricity supply, this study aimed to find substitutes for transport fuel and coal employing clean renewable electricity leading to a 100% renewable energy supply.
    [Show full text]
  • Department of Energy Royal Government of Bhutan
    Department of Energy Royal Government of Bhutan Dagachhu Hydropower Project Environmental Assessment (EA) Report July 2006 Section I - Main Report Bhutan Consultants & Research (BHUCORE) Consultants in Engineering, Natural Resources and Environmental Management Changlam Plaza, Room No 56, Chang Lam, P.O. Box 955 Thimphu, Bhutan Telephone: +975 1760 - 1111, Fax: +975 2 326594 E-Mail: [email protected], [email protected] Table of Content ACRONYMS................................................................................................................................................................I BHUTANESE TERMS..............................................................................................................................................II EXECUTIVE SUMMARY...................................................................................................................................... III 1 INTRODUCTION............................................................................................................................................... 2 1.1 PROJECT BACKGROUND ................................................................................................................................. 2 1.2 PROJECT DESCRIPTION................................................................................................................................... 2 1.2.1 Objectives of the Project .............................................................................................................................. 2
    [Show full text]
  • Cover 14-2 Edit.Indd
    2 POWER SECTOR PROSPECTS AND POLICIES OF RURAL ELECTRIFICATION IN BHUTAN Received: 2 April 2019 Kezang Lhazom1 and Prapita Thanarak1* Revised: 22 April 2019 1 Accepted: 4 September 2019 School of Renewable Energy and Smart Grid Technology, Naresuan University, Phitsanulok 65000, Thailand *Corresponding author e-mail: [email protected] Abstract Bhutan’s electricity access rate has increased from 61 percent in 2006 to 100 percent in 2016, ahead of the country’s initial 2020 goal. On-grid hydropower is Bhutan’s main energy source and the main driver behind its rapid expansion of electricity access. The country’s mountainous terrain makes grid extension difficult in the remote rural areas where around 4,000 households are located. In order to explore the prospects and policies of the power sector in Bhutan, this paper discusses the responsibility organizations, electricity demand, and supply, laws, and policies as well as the power sector development strategy in Bhutan. The interview data was from related organizations. The secondary was collected from relevant government and public agencies and published reports. As a result, the government has made off-grid renewable energy projects a significant development effort under the nation’s five-year plans, providing around 2,000 rural households with solar home systems and repairing an additional 1,000. Related donor-assisted grant projects have filled the rest of the country’s electricity gap. Although the government of Bhutan achieved the remarkable feat of 100 percent electricity access, it lacks the resources and workforce to sustain these projects on its own. The country’s mountainous terrain makes remote areas difficult for government workers to access.
    [Show full text]
  • SOLAR THERMAL ENERGY in THIMPHU, BHUTAN a Feasibility Study Using TRNSYS Modeling Peter Bennewitz & Johan Persson
    SOLAR THERMAL ENERGY IN THIMPHU, BHUTAN A feasibility study using TRNSYS modeling Peter Bennewitz & Johan Persson Master Thesis in Energy and Building Design Faculty of Engineering | Lund University Abstract Bhutan is one of the highest per capita users of firewood in the world. Firewood and electricity are the most common methods for heating in Bhutan and both methods suffer from drawbacks. Bhutan’s capitol, Thimphu, lies some 2500 meters above sea level and has cold winters with clear skies. These facts are the base for this report’s investigation of the potential to use solar thermal energy to mitigate the use of firewood and electricity for heating. Fieldwork and interviews were carried out in areas in and around Thimphu. Two models were made; one for a typical rural house, heated with firewood, and one for a typical urban apartment complex, heated with electricity. The rural house was modeled as a two story building with one family living on each floor. The urban apartment complex was modeled as a four story building with four apartments on each floor for a total of 16 families living in the building. These models were input into the simulation program TRNSYS. A solar thermal system was optimized for each house based on performance while trying to keep the system as small as possible. The effects of this system on the comfort and energy consumption in the rural and urban model were noted. In the rural case a solar thermal system with a solar collector area of 15 m2 and a tank volume of 0.65 m3 decreased the firewood usage over a year with 50 % while increasing the comfort level.
    [Show full text]
  • Bioenergy Needs Assessment Study in Bhutan
    Bioenergy Needs Assessment Stu d y in Bh u ta n – Sta tu s, Issues, Concerns and Opportunities Fe b ru a ry 04, 2011 Report submitted to Policy and Planning Division, Ministry of Agriculture and Forests, Royal Government of Bhutan, Th i m p h u , Bh u t a n . Prepared by Sonam Tobgay Founder/ Principal Consultant Thimphu Consultants International Ltd. Tel.975-02-324949/17119900 Email: [email protected] ii ExecutiveSummary The report outlines a need assessment re se a rc h st u d y o n t h e st a t u s, issu e s, priorities, constraints and opportunities of bioenergy development prospects in Bhutan. The study is funded as part of th e regional research initiative under the Technical Cooperation Program Facility undertaken by United Nation’s Food and Agriculture Organization Regional Office for Asia and Pacific in Bangkok, Thailand. Similar research studies are ca rried out in Bangladesh, India, Nepal and Sri Lanka. The research describes the potentials of bioenergy sources, policies, gaps, and utilization options by strengthening the technical understanding and interrelationship between bioenergy usage and food se c u rit y o b je c t iv e s in Bh u t a n . Su b se q uently, the study provides baseline informa tion on existing b ioenerg y sc ena rio in terms of p olic ies, institutions, availability of bioenergy resources and investment viability options for enterprise development in the country. Chapter 1 offers a quick overview on the definition and rationale of bioenergy research study in Bhutan and also presents a brief country profile highlighting its development philosophy of Gross National Happiness.
    [Show full text]
  • Strategic Environmental Assessment for the Thimphu Structure Plan
    Ministry of Works and Human Settlements Royal Government of Bhutan Strategic Environmental Assessment for the Thimphu Structure Plan June 2018 Acronyms and Abbreviations ADB Asian Development Bank APIC Agency for Promotion of Indigenous Craft BBR Bhutan Building Rules BLSS Bhutan Living Standard Survey BoD Bhutan Oil Distribution BOC Bhutan Olympic Committee BRT Bus Rapid Transit CBS City Bus Service CCM Council of Cabinet Ministers Chhu River or Stream CoP Conference of Parties CPLC Cash Payment in Lieu of Land Compensation CSO Civil Society Organisations DCR Development Control Regulation DDM Department of Disaster Management DITT Department of Information Technology and Telecom DNP Department of National Properties EA Environment Assessment Act 2000 E.coli Escherichia coli EV Electric Vehicle FYP Five-Year Plan GCF Global Climate Fund GEF Global Environment Facility GNHC Gross National Happiness Commission GHG Green House Gas IFC International Finance Corporation IT Park Information Technology Park PEI Poverty Environment Initiative PPP Policy, Plans and Programmes Kgpcd Kilogram Per Capita Per Day LAP Local Area Plan LGA Local Government Act Lpcd Litre Per Capita Per Day MoF Ministry of Finance MoHCA Ministry of Works and Human Settlement MoWHS Ministry of Works and Human Settlement MoEA Ministry of Economic Affairs MLCP Multi-Level Car Park MSW Municipal Solid Waste MSWM Municipal Solid Waste Management MLD Million-Litre Per Day MRG Mainstreaming Reference Group MT Metric Tonnes NECS National Environment Commission Secretariat NES
    [Show full text]
  • November 2007
    NOVEMBER 2007 Statistical Yearbook of Bhutan 2007 National Statistics Bureau Royal Government of Bhutan TABLE OF CONTENTS Foreword….......................................………………………………………..…………............................................... i Notes for users………………………………………………………………............................................................... ii Key Facts about Bhutan ………………………………………………..……...…………………................................ iv Bhutan……………………………………………………………..………………………………………………….. v CHAPTER 1: POPULATION 1-2 TABLE 1.1: Projected population (numbers) by sex, Bhutan 2005-2030…………………………………………… 3 1.2: Projected population (numbers) by age group and sex,Bhutan 2005 - 2006………………………… 4 1.3: Projected population (numbers) by age group and sex, Bhutan 2007 - 2008………………………… 4 1.4: Projected population (numbers) by age group and sex, Bhutan 2009 - 2010………………………… 5 1.5: Projected population (numbers) by age group and sex, Bhutan 2011 - 2012………………………… 5 1.6: Projected population (numbers) by age group and sex, Bhutan 2013 - 2014………………………… 6 1.7: Projected population (numbers) by age group and sex,Bhutan 2015 - 2016………………………… 6 1.8: Projected populatin (numbers) by age group and sex, Bhutan 2017 - 2018…………………………… 7 1.9: Projected population (numbers) by age group and sex, Bhutan 2019 - 2020………………………… 7 1.10: Projected population (numbers) by age group and sex, Bhutan2021 - 2022………………………… 8 1.11: Projected population (numbers) by age group and sex,Bhutan 2023 - 2024………………………… 8 1.12: Projected population (numbers) by age group and sex, Bhutan 2025
    [Show full text]
  • Sustainable Energy in Bhutan: Opportunities for Energy Efficiency
    ARTICLE Sustainable Energy in Bhutan: Opportunities for Energy Efficiency SHERAB JAMTSHO1 Abstract: In terms of Bhutan’s energy trade, while the country exports clean energy, the country imports fossil fuels. On the demand side, transport and industry sectors are the major consumers of energy in Bhutan constituting together more than 80 per cent of the total energy consumed in the country. On a seasonal basis, power generation in the summer months is more than four times the winter generation, whereas the power demanded is the maximum during the winter. There is also a gradual increase in annual domestic power demand in the recent years, necessitating import of power from India during the lean season. The paper first presents the gaps in the energy situation of Bhutan and then identifies the energy efficiency saving potentials in the transport, industry, and buildings sector. The objective is to identify areas and suggests measures where energy savings can be achieved through regulatory, financial, and technical approaches. Introduction Bhutan’s climate is distinguished by warm and wet summers, and dry and cold winters. Most of the precipitation in Bhutan is received during the summer months. With no peaking power plants or reservoirs, power generation in Bhutan is mostly dependent on the seasonality of the river flow. Although Bhutan’s electricity generation capacity is to the tune of 1,500 MW, the generation in winter drops down to as low as 300 MW due to low flow in all of the rivers (DGPC 2013). Winter is also the time during which most parts of Bhutan need more power for heating purposes.
    [Show full text]
  • Gender Review of National Energy Policies and Programmes in Bhutan Improving Gender-Inclusive Access to Clean and Renewable Energy in Bhutan, Nepal and Sri Lanka
    Gender review of national energy policies and programmes in Bhutan Improving gender-inclusive access to clean and renewable energy in Bhutan, Nepal and Sri Lanka Gender review of national energy policies and programmes in Bhutan ADB GRANT-9158 REG ETC project number 129019 June 2015 ii Gender review of national energy policies and programmes in Bhutan Gender review of national energy policies and programmes in Bhutan Improving gender-inclusive access to clean and renewable energy in Bhutan, Nepal and Sri Lanka iii Gender review of national energy policies and programmes in Bhutan iv Gender review of national energy policies and programmes in Bhutan Preface The Improving Gender-Inclusive Access to Clean and Renewable Energy in Bhutan, Nepal and Sri Lanka is Asian Development Bank (ADB) supported project (JFPR Grant-9158 REG). The project aims to increase rural poor women's access to affordable and reliable clean energy sources and technologies in selected project sites in Bhutan, Nepal and Sri Lanka. This is a report of a gender review of the energy sector policies and programmes undertaken in Bhutan, as part of the Project. It assesses the gender inclusiveness of the energy sector at three levels: policy, programmes and organizations. The gender review in Bhutan was undertaken by Tshering Choden, supported by Soma Dutta and Tshering Phuntsho. The report was reviewed by Sheila Oparaocha, Govind Kelkar and the Department of Renewable Energy, Ministry of Economic Affairs. The team acknowledges the support from the Department of Renewable Energy, Ministry of Economic Affairs, the Bhutan Power Corporation, the community of Zhemgang and other organizations and individuals consulted.
    [Show full text]
  • Energy Efficiency in Transport Sector
    Energy Efficiency in Transport Sector Department of Renewable Energy Ministry of Economic Affairs Royal Government of Bhutan December 2015 Energy Efficiency in Transport Sector This report is a part of the studies conducted for the formulation of the draft Energy Efficiency and Conservation Policy of the Royal Government of Bhutan. The studies were conducted by Ernst and Young LLP, India as part of the Energy Plus Program:Promoting Clean Energy Development in Bhutan. This project was funded by the Government of Norway and administered by the Asian Development Bank under ADB TA- 8630 BHU: F-003 Energy Efficiency. Disclaimer: This report is intended solely for the purpose of drafting the Bhutan Energy Efficiency and Conservation Policy. It provides an outline of energy consumption in the Transport Sector. Relevant agencies may use this report as a source of information on Energy Efficiency in Transport Sector in Bhutan. However, professional advice must be sought for making decisions or implementing the recommendations. The Department of Renewable Energy and Ernst & Young LLP accepts no responsibility for any loss arising from any action taken or not taken by anyone using this report. 1 Energy Efficiency in Transport Sector Acknowledgement This report on Energy Efficiency in Transport Sector for Bhutan was initiated by Department of Renewable Energy (DRE), Ministry of Economic Affairs (MoEA), Royal Government of Bhutan (RGoB) with assistance from Government of Norway and Asian Development Bank (ADB) under the Energy Plus Programme. DRE and Ernst & Young LLP (EY) are thankful to ADB for providing the opportunity to conduct this study. DRE, EY and iTrans team express their sincere gratitude to all representatives of Department of Roads under Ministry of Works and Human Settlement, Phuentsholing Thromde, Policy and Planning Division under Ministry of Information and Communications, Road Safety & Transport Authority, and Thimphu Thromde for their valuable inputs and support.
    [Show full text]
  • Education in Emergency ADAPTED CURRICULUM & PRIORITIZED CURRICULUM KEY STAGE 4: Classes IX - X May 2020
    Education in Emergency ADAPTED CURRICULUM & PRIORITIZED CURRICULUM KEY STAGE 4: Classes IX - X May 2020 Ministry of Education Royal Education Council Bhutan Council for School Examinations and Assessment 1 Published by @MoE, REC & BCSEA 2020 Acknowledgment This curriculum resource is a joint effort of the Ministry of Education (MoE), Royal Education Council (REC) and the Bhutan Council for School Examinations and Assessment (BCSEA) towards facilitating the continuity of learning of our students under the emergency of COVID 19 virus pandemic. This venture would not have materialized without the participation and contribution of various key players in the field of education. We commend the voluntary contribution of teachers from different schools in terms of their professional input in outlining and sequencing of curriculum content and learning objectives. In this hour of emergency, we are thankful to our development partners like UNICEF, HELVETES, Save the Children for their continued support both professionally and financially. The education fraternity remains hopeful that our students gain the optimum benefit from the generous gesture and help us take education to greater heights in realising the national purpose of education. Above all, the wisdom and blessing of the Government has been the impetus, which proved vital in rolling out numerous EiE programs and activities. Without the full support of policy makers and professionals in the country, there is little hope that the EiE outcomes are translated and materialized to fruition. ISBN: …………………….. 2 FOREWORD The detection of the first COVID-19 case on 5th March 2020 resulted in closure of schools and institutes in the proximal zone of Paro, Thimphu and Punakha.
    [Show full text]
  • Bhutan Energy Sector
    Evaluation Study Reference Number: SAP BHU 2010-21 Sector Assistance Program Evaluation August 2010 Bhutan: Energy Sector Independent Evaluation Department CURRENCY EQUIVALENTS (as of July 2010) Currency Unit – ngultrum (Nu) Nu1.00 = $0.02126 $1.00 = Nu47.0300 ABBREVIATIONS ADB – Asian Development Bank ADF – Asian Development Fund BEA – Bhutan Electricity Authority BPC – Bhutan Power Corporation CAPE – country assistance program evaluation CDM – Clean Development Mechanism CDTA – capacity development technical assistance CHPC – Chhukha Hydro Power Corporation COS – country operational strategy CSP – country strategy and program DGPC – Druk Green Power Corporation DoP – Department of Power EIRR – economic internal rate of return FIRR – financial internal rate of return GDP – gross domestic product HPP – hydropower plant IED – Independent Evaluation Department IEM – independent evaluation mission JFPR – Japan Fund for Poverty Reduction JICA – Japan International Cooperation Agency NEC – National Environment Commission OCR – ordinary capital resources PCR – project completion report PPAR – project performance audit report PPMS – project performance and monitoring system PPP – public–private partnership RIE – rigorous impact evaluation RRP – report and recommendation of the President SAPE – sector assistance program evaluation SCADA – supervisory control and data acquisition TPAR – technical assistance performance audit report WEIGHTS AND MEASURES GWh – gigawatt-hour km – kilometer kV – kilovolt kVA – kilovolt-ampere kW – kilowatt kWh – kilowatt-hour MW – megawatt NOTES (i) The fiscal year (FY) of the government and its agencies ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2000 ends on 30 June 2000. (ii) In this report, “$” refers to US dollars. (iii) For an explanation of rating descriptions used in ADB evaluation reports, see: ADB.
    [Show full text]