From Farmland to Parkland

Total Page:16

File Type:pdf, Size:1020Kb

From Farmland to Parkland FROM FARMLAND TO PARKLAND Florence Fields Recreation Area Request for Proposals Design, Specifications, Estimates & Contract Documents Submitted to: Submitted by: City of Northampton Office of Planning & Development October 21, 2010 October 21, 2010 Mr. Wayne Feiden, FAICP Director of Planning and Development City of Northampton 210 Main Street, Room 11 Northampton, MA 01060 Re: “An opportunity to enhance our community” Florence Fields Recreation Area Dear Mr. Feiden and Members of the Selection Committee: It is with great excitement that The Berkshire Design Group, Inc. submits this proposal for site design services for the City’s newest park - The Florence Fields Recreation Area. Creating a recreational place of this importance that will enhance the Northampton community represents an opportunity that The Berkshire Design Group feels particularly well suited. Our parks and recreational experience is very diverse covering New England for over 26 years. The City has the opportunity to choose a local, experienced firm that has designed, engineered, permitted and overseen construction on over 500 recreational facilities for 50 municipalities throughout the Commonwealth. Landscape Architecture Park and Recreation Design is what we do best! Civil Engineering Partial List of Local Recreational Projects: Planning • School Street Park, Agawam • Williams Park, Chicopee Land Surveying • Arcanum Field, Northampton • Dana Park, Chicopee • Maines Field, Northampton • Szot Park, Chicopee • Groff Park, Amherst • Elm Park, Worcester • Ray Ellerbrook Park, • Plum Brook Recreation Area, Northampton Amherst • Unity Park, Turners Falls • Holyoke Heritage State Park • Kiwanis Park, Amherst • Mackenzie Field, Holyoke • Rohan Park, Holyoke • Kennedy Park, Holyoke • Veteran’s Field, Northampton • Wisniowski Park, Chicopee • Nonotuck Park, Easthampton • Springdale Park, Holyoke 4 Allen Place Northampton, Massachusetts 01060 Telephone (413) 582-7000 Facsimile (413) 582-7005 E-mail [email protected] Florence Fields Recreational Area October 21, 2010 Request for Proposal Our professional reputation and experience has earned The Berkshire Design Group, Inc. 28 design awards. As you are wading through the proposals and selecting your consultant – remember that most, if not all, consultants are technically qualified to do the “standard” work. And, as stated in the enclosed reference letters, our standard for services are set quite high. It’s a rare opportunity that a project of this importance is proposed in the City we call home. And when we are selected for projects in Northampton, you can be assured of our constant commitment, communications and creativity. We can’t let you down…we live here! In the spirit of service, Peter H. Wells, Principal 4 Allen Place Northampton, Massachusetts 01060 Telephone (413) 582-7000 Facsimile (413) 582-7005 E-mail [email protected] We Design For Communities Table of Contents Existing Farmland……………………………………………….Proposed Parkland YOUR PROJECT TEAM FLORENCE FIELDS RECREATION AREA………………….……..………..2 ENSURING QUALITY PROJECTS EXTENSIVE LOCAL EXPERIENCE……………………………………........3 CREATIVE APPROACH & DELIVERABLES………………………………10 PROJECT SCHEDULE……………………………………………..………...17 FEE STRUCTURE……..……………………………………………..………..17 OUR GURANTEE……..……………………………………………..………...18 WHAT OUR CLIENTS SAY APPENDIX – ADDITIONAL QUALIFICATIONS: BDG Firm Description Design Techniques Awards and Honors Relevant Projects Resumes The Berkshire Design Group – Florence Fields Recreation Area Proposal 1 Your Project Team for Florence Fields Recreation Area “I highly recommend The Berkshire Design Group, Inc to effectively create, plan, and oversee construction of municipal parks and playgrounds. Their expertise in Landscape Architecture cannot be surpassed by even the largest of firms anywhere in New England. Their proximity to my project made them readily available and they were on site sometimes within the hour of an emergency.” Christopher M. Sparks, Director of Parks & Recreation Town of Agawam, MA The bottom line for successful planning-client relationships is delivering results, particularly when it counts. Experience, education, qualifications and organization are vital for quality work – but it’s the project team that performs on-time, on-budget and on-target that keeps its clients and excels. Our successful project team consists of the following Berkshire Design Group members: 1. 2. 3. 4. 1. Peter Wells, Principal Landscape Architect 2. Mike Liu, Project Landscape Architect 3. Mark Darnold, Principal Civil Engineer 4. Marc S. D’Urso, Project Civil Engineer This group of talented and dedicated professionals is one of BDG’s most talented and successful park and recreational design teams. Their award winning projects have been creatively designed, community generated, completed on-time and within budget. They are looking forward to providing you with the energy and enthusiasm necessary to design and engineer a successful recreational complex. Please visit their resumes for a detailed history of each team members’ experience. The Berkshire Design Group – Florence Fields Recreation Area Proposal 2 Ensuring Quality Projects Extensive Local Experience “From the design phase, implementation, construction oversight and finished product, Peter Wells has been dependable and always willing to go the extra mile to ensure a successful project. The public meetings with neighbors and constituents were always professional and well put together. It is a pleasure to recommend Berkshire Design Group, and think your project would benefit from their involvement.” Ann-Marie Moggio, Director of Recreation Northampton, MA Our office has operated out of Northampton for 26 years, and in that time we have completed in excess of 500 recreational projects and have worked for over 50 municipalities throughout the Commonwealth. We have 6 registered landscape architects (and 7 total) and 2 professional engineers (4 total) on our staff of fifteen. The majority of the park projects are public projects that our office has taken from conception through construction. Our in- depth project experience includes everything from state parks to skateboard parks, playgrounds to passive recreation areas. We know parks and recreation! The Berkshire Design Group – Florence Fields Recreation Area Proposal 3 Budget Awareness The reason for the continued success of Berkshire Design Group is the firm’s policy and practice of not compromising the design of a project because of budget constraints. Instead we find innovative ways to construct the most attractive and feasible design within the given budget. We further insure working within our given budget by producing plans and specifications that are done thoroughly and in detail. This allows the contractors to give accurate and competitive bids for the project, while assuring the highest quality of materials and workmanship. The key personnel of our project team have extensive experience in construction cost estimating and also in construction project management, assuring the following: • Cost estimates will be accurate because we maintain and continually update our estimated construction costs using figures from contractors working on similar projects within similar regions. • The final material selected for construction will be easy to maintain, thus minimizing maintenance costs and helping assure the long-term success of this important public playground. Westford Recreation Area Master Plan The Berkshire Design Group – Florence Fields Recreation Area Proposal 4 Just in the past few years…. Town of Amherst Parks and Recreational Areas Over the past five years we have worked on 4 separate park and recreational projects within the Town of Amherst. We developed design and construction plans for a new playground at Groff Park. The playground structure was installed by the community during a two weekend time frame. Using CPA funding, the Plum Brook Recreation Area was completed in 2009 and consist of 3.5 regulation soccer/multi-purpose fields including on-site irrigation, walking trails, picnic areas, and a 100 car parking area. The site design includes (5) five different field layouts in order to rotate the goal mouths thus allowing proper regeneration of the turf. If you have any questions regarding our design, engineering and dedication to this project please contact Linda Chalfant, Director of Leisure Services at (413) 259-3103. Plum Brook Recreation Area Grand Opening – September 2009 The Berkshire Design Group – Florence Fields Recreation Area Proposal 5 City of Northampton Parks We have designed and provided construction administration services for 5 recent parks for the City of Northampton Parks and Recreation Department, Ann Marie Moggio, Director, (413) 587-1040 and Ray Ellerbrook, Director – Look Park (413)584-5457. These parks include Arcanum Field, Veterans Field, Ray Ellerbrook Park, Maines Field and Sheldon Field. Facilities in these parks include softball and baseball fields, soccer and multi-use fields, playgrounds, skateparks, basketball courts, lighting, irrigation, and parking. Ray Ellerbrook Park – Northampton, MA Veteran’s Field– Northampton, MA Maines Field, Northampton, MA The Berkshire Design Group – Florence Fields Recreation Area Proposal 6 City of Chicopee Parks Over the last fourteen years we have master planned and designed 6 parks in Chicopee, MA. We have provided full services for the construction of many of these recreation areas. The contact person is Mr. Stanley J. Walczak, Superintendent, Department of Parks and
Recommended publications
  • The Nayigation of the Connecticut River
    1903.] The Navigation of the Connecticut River. 385 THE NAYIGATION OF THE CONNECTICUT RIVER. BY W. DELOSS LOVE. THE discovery of the Connecticut river has been generally attributed hy histoi'ians to Adriaen Block. If Giovanni da Verrazano in 1524 or Estovan Gomez in 1525 sailed by its mouth, we have no record of the fact ; and it is very doubtful whether a river, whose semicircle of sand bars must have proclaimed it such, would have attracted much attention from any navigator seeking a northwest passage. In 1614, Block, having completed his yacht the Onrust [Restless], set sail from Manhattan to explore the bays and rivers to the. eastward. His vessel was well adapted to his purpose, being of sixteen tons burden, forty-four and a half feet long and eleven and a half feefc wide. He was able thus to obtain a more exact knowledge of the coast, as may be seen by the "Figurative Map," which is sup- posed to exhibit the results of his explorations.^ At the mouth of the Connecticut river he found the water quite shallow, but the draught of his yacht enabled him to cross the bar Avithout danger and the white man was soon for the first time folloAving northward the course of New Eng- land's longest river. There were few inhabitants to be seen near the mouth, but at a point which is thought to have been just above the bend near Middletown, he came upon the lodges of. the Sequins, located on both banks of thé river. Still farther up he saw an Indian village "resembling a fort for protection against the attacks of their enemies." This was in latitude 41° 48', and was, > De Laet's " Description of the New Netherlands," x: Y:,met.
    [Show full text]
  • Town of South Hadley Annual Town Report July 1, 2008
    TOWN OF SOUTH HADLEY ANNUAL TOWN REPORT JULY 1, 2008 – JUNE 30, 2009 1 TABLE OF CONTENTS Ambulance Service ............................................................................................................................................................................................. 12 Animal Control Department ................................................................................................................................................................................ 13 Appointed Officials for Fiscal Year 2009 ............................................................................................................................................................. 8 Assessors ............................................................................................................................................................................................................ 13 Board of Appeals ................................................................................................................................................................................................ 14 Board of Health .................................................................................................................................................................................................. 14 Building Commissioner ....................................................................................................................................................................................... 15
    [Show full text]
  • Annual Town Report
    ANNUANNUALAL TOWNTOWN REPORTREPORT JJULYULY 1,1, 20182017 –– JUNEJUNE 30,30, 20192018 TOWN OF SOUTH HADLEY ANNUAL TOWN REPORT JULY 1, 2018 – JUNE 30, 2019 1 TABLE OF CONTENTS Annual Town Meeting Warrant 50 Appointed Officials for Fiscal Year 2019 6 Assessors 11 Bike/Walk Committee 12 Boards & Committees 8-9 Cable Studio 12 Canal Park Committee 13 Conservation Commission 14 Council on Aging 14 Directory and Calendar – Board Meetings, Officials, Services 4 Elected Officials – April 9, 2019 5 Emergency Management 18 Employee Gross Wages – Calendar Year 2019 31-39 Facts of Interest about South Hadley 3 Golf Commission 19 GROSouth Hadley (Community Garden) 19 Health Department 19 Human Resources 21 Inspection Services 21 Libraries 22 Master Plan Implementation Committee 23 Memoriam 9 National, State and County Officials 3 Planning Board 23 Police Department 24 Public Health Nurse 20 Public Works 15-18 Recreation Commission 25 Redevelopment Authority 25 Retirements 9 School Committee 28 School Superintendent 26 Selectboard 10 Special Town Meeting Warrant – May 8, 2019 79 Special Town Meeting Warrant – Nov. 20, 2019 82 Sustainability & Energy Commission 29 Town Accountant (Change in Fund Balance/Combined Balance Sheet) 40-44 Town Clerk 28 Town Election – April 9, 2019 45-49 Town Meeting Members – April 9, 2019 7 Treasurer / Collector 30 Zoning Board of Appeals 29 2 Population Facts of Interest about South Hadley Federal Census 2010-17,514 Federal Census 2000-17,196 South Hadley area was first part of Old Hadley. 2017 Local Census – 17,682 1675-1719 Individual grants of land were made by Hadley for Form of Government settlement south of the Mt.
    [Show full text]
  • 2016 Hazard Mitigation Plan Update
    The Town of South Hadley, Massachusetts 2016 Hazard Mitigation Plan Update Mission To reduce or eliminate the loss of life, property and government disruption to all natural hazards. Draft March 9, 2016 2 2016 Hazard Mitigation Plan Update Prepared by: South Hadley Hazard Mitigation Planning Committee The Pioneer Valley Planning Commission 60 Congress Street First Floor Springfield MA 01104 (413) 781-6045 www.pvpc.org Jamie Caplan Consulting LLC 351 Pleasant Street, Suite B #208 Northampton, MA 01060 (413) 586-0867 www.jamiecaplan.com This project was funded by a grant received from the Massachusetts Emergency Management Agency (MEMA) and the Massachusetts Department of Conservation Services (formerly the Department of Environmental Management) 2016 Hazard Mitigation Plan Update Draft March 9, 2016 3 ACKNOWLEDGEMENTS SOUTH HADLEY HAZARD MITIGATION COMMITTEE Mark Aiken, Water Superintendent, District 2 Scott Brady, Fire Captain, District 2 Todd Calkins, Assistant Chief, Fire District 2 Jeff Cyr, Water Superintendent, District 1 Erica Faginski, Director of Curriculum & Grants, School Department Richard Harris, Town Planner Sharon Hart, Emergency Management Director Jason Houle, Lieutenant, Fire District 1 David Keefe, Fire Chief, Fire District 2 David LaBrie, Police Chief Bruce Mailhott, Facilities Director, School Department Andy Orr, Engineer, South Hadley Electric Light Department Alec Plotnikiewicz, Intern, Fire District 1 Jim Reidy, Supervisor, Department of Public Works Janice Stone, Conservation Commission The South Hadley Selectboard
    [Show full text]
  • Pre Application Document Adequacy Review Checklist
    Pre-Application Document (PAD) Turners Falls Hydro Project Project No: 2622 Applicant: Turners Falls Hydro LLC Date: February 28, 2016 PRE-APPLICATION DOCUMENT Applicants must file a Pre-Application Document (PAD) (18 C.F.R. § 5.6) that provides existing information relevant to the project that is in the applicant's possession or that the applicant can obtain with the exercise of due diligence. This existing, relevant, and reasonably available information is distributed in the form of the PAD to the Commission and interested stakeholders to enable these entities to identify issues and related information needs, develop study requests and study plans, and prepare documents analyzing any license application that may be filed with the Commission. In summary, the PAD must contain the following information: A description of the project's facilities and operation; A description of the existing environment and any known and potential project effects on specific resources including: geology and soils; water resources; fish and aquatic resources; wildlife and botanical resources; wetlands, riparian, and littoral habitats; rare, threatened, and endangered species; recreation and land use; aesthetic resources; cultural resources; socioeconomic resources; tribal resources; and a description of the river basin; A list of preliminary issues and studies that may be needed at the project; An appendix summarizing contacts with stakeholders sufficient to enable the Commission to determine if due diligence has been exercised in obtaining relevant information; A process plan and schedule for consulting stakeholders, gathering information, developing and conducting studies, obtaining permits and completing all pre-filing licensing activities; and If applicable, a statement of whether or not the applicant will seek benefits under section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA).
    [Show full text]
  • Ocm03633500.Pdf (5.630Mb)
    t7. 7 GEOGRAPHICAL and STATISTICAL VIEW or MASSACHUSETTS PROPER. »Y RODOLPHUS DICKINSON, Eso. GREENFIELD, PR.IHTED BY DENIO AND PHELPS. 1813. : GREENriELD, MasS. MAUCH, 1813. THE following view comprises the principal part of a work, for the pubK- cation of which a subscription was attempted, that proved unsuccessful.* For the more convenient insertion of the tables, it is offered to the public in the present it interesting, and found to something form ; with a hope that may be add to the means of geographical and statistical information. Several states have been minutely and philosophically described ; but were some gentleman to furnish even as limited a sketch as this, of every other section of the union, it would not per- haps be deemed vain to presume, that with such aids, and the materials already in possession, a native or foreign geographer would be enabled to prepare a more extensive and satisfactory description of our country, thap any that has hith- erto been published. The author aspires at least to the merit of impartiality. The citizens of Massachusetts will here find no ungenerous discriminations to ex- effort cite their regret ; and to them, this humble is respectfully inscribed. R. D. * The writer sincerely thanks his friends and fellow citizens, Who encourag- ed his proposals, and informs them that they are discharged from all responsibili- ty as subscribers. Their patronage of this work, however, will be gratefully accepted. DISTRICT OF MASSACHUSETTS, to wit : DISTRICT clerk's OFFICE. Be it remembered, That on the twentieth day of October, A. D. 1812, year of the the States t.
    [Show full text]
  • 7:00 PM AGENDA Note: Not All the Topics Listed in This
    SELECTBOARD MEETING TUESDAY JUNE 7, 2016 SELECTBOARD MEETING ROOM – 7:00 P.M. AGENDA Note: Not all the topics listed in this notice may actually be reached for discussion. In addition, the topics listed are those which the chair reasonably expects will be discussed as of the date of this notice. 1. CALL TO ORDER/ROLL CALL 2. APPROVAL OF MINUTES Minutes of May 17, 2016 Regular Selectboard Meeting 3. ANNOUNCEMENTS/OPEN FORUM Recognition of Girl Scout Silver Award Recipient – Kylie Biron Recognition of Boy Scout Eagle Scout Award Recipient – Joshua Virgil McKeever Introduction of Council on Aging Director Leslie Hennessey 4. CONSENT AGENDA A. ONE DAY BEER AND WINE LICENSE REQUEST: Marilyn Ishler for Lion’s Club 70th Anniversary – June 18, 2016 – Buttery Brook Park 5. NEW BUSINESS A. Annual Appointments B. Applicants: Jeremy Ramondetta – Application for Appointment to Municipal Golf Commission (There are two openings for alternates with term expirations of 2018 and 2019.) Richard Matteson – Application for Appointment to Council on Aging (As of 7/1/16, there will be two openings for full members with terms expiring 6/30/2019.) Chris Collins – Application for Appointment to Municipal Golf Commission (See above.) Dave Baldwin – Application for Appointment to Agricultural Commission (seat with term expiring 6/30/2017) Denise Presley – Application for Appointment to Cable TV Advisory Committee (One-year appointment, so term expires 6/30/2017) A.J. Provost – Application for Appointment to Recreation Commission (One vacancy as of 7/1/16 with term expiring 6/30/2019) David Mendoza – Application for Appointment to Recreation Commission (See above.) C.
    [Show full text]
  • Thinking Like a Floodplain: Water, Work, and Time in the Connecticut River Valley, 1790-1870 by (C) 2016 Jared S
    Thinking Like a Floodplain: Water, Work, and Time in the Connecticut River Valley, 1790-1870 By (c) 2016 Jared S. Taber Submitted to the graduate degree program in History and the Graduate Faculty of the University of Kansas in partial fulfillment of the requirements for the degree of Doctor of Philosophy. ________________________________ Chairperson Sara M. Gregg ________________________________ Gregory T. Cushman ________________________________ Edmund P. Russell ________________________________ Robert J. Gamble ________________________________ Peggy A. Schultz ________________________________ Dorothy M. Daley Date Defended: 28 April 2016 The Dissertation Committee for Jared S. Taber certifies that this is the approved version of the following dissertation: Thinking Like a Floodplain: Water, Work, and Time in the Nineteenth Century Connecticut River Valley ________________________________ Chairperson Sara M. Gregg Date approved: 28 April 2016 ii Abstract Residents of the nineteenth-century Connecticut River Valley learned the character of the river, and water more broadly, through their labor. Whether they encountered water in the process of farming, shipping, industrial production, or land reclamation, it challenged them to understand its power as both an object outside their control and a tool that facilitated their work. This awareness of water's autonomy and agency necessitated attention to how water's flow varied across timescales ranging from seasons, through historical precedents in working with water, and into the geological processes whereby the river shaped the contours of the Connecticut River floodplain and the valley as a whole. Communities mobilized this knowledge when explaining the limitations that ought to circumscribe novel water uses and trying to maintain the river's status as a common tool shared among diverse bodies of users.
    [Show full text]
  • Holyoke Gas & Electric Department Hydroelectric System Lihi Application
    HOLYOKE GAS & ELECTRIC DEPARTMENT HYDROELECTRIC SYSTEM LIHI APPLICATION VOLUME 1 Prepared for: LOW IMPACT HYDROPOWER INSTITUTE Portland, Maine Prepared by: CITY OF HOLYOKE GAS & ELECTRIC DEPARTMENT Holyoke, Massachusetts APRIL 2010 HOLYOKE GAS & ELECTRIC HYDROELECTRIC SYSTEM LIHI APPLICATION TABLE OF CONTENTS Section Title Page No. VOLUME 1 1 LOW IMPACT HYDRO QUESTIONNAIRE ............................................................ 1-1 2 PROJECT DESCRIPTIONS AND MAPS ................................................................. 2-1 2.1 Hadley Falls Station .................................................................................................. 2-2 2.1.1 Hadley Falls Dam ......................................................................................... 2-2 2.1.2 Hadley Falls Station Units ............................................................................ 2-2 2.1.3 Impoundment ................................................................................................ 2-3 2.1.4 Bypass Reach ................................................................................................ 2-3 2.2 Holyoke Canal System Stations ................................................................................ 2-3 2.2.1 Boatlock Station (FERC No. 2004) .............................................................. 2-5 2.2.2 Beebe-Holbrook Station (FERC No. 2004) .................................................. 2-5 2.2.3 Skinner Station (FERC No. 2004) ...............................................................
    [Show full text]
  • 31 Section 4
    SECTION 4 - ENVIRONMENTAL INVENTORY AND ANALYSIS 4.1 GEOLOGY & SOILS The geological history of South Hadley is both dramatic and significant. Continental drift, the formation of the Appalachian Mountain chain, volcanoes and glacial scouring, have all played a role in the physical development of the Connecticut River Valley. These factors have influenced the topography and soils which, in turn, have determined surface and ground-water characteristics, forest cover and finally land use. During the Triassic Period (220 to 180 million years ago), two faults formed on either side of what is now the Connecticut Valley. The forces of continental drift pulled these faults apart causing the land between to drop and form the Triassic basin (the Connecticut Valley). The subsequent geological activity formed the topography, rocks and soils of the Valley have given present day South Hadley its landscape characteristics . Figure 2 shows a cross section of the sedimentary and igneous rocks in the Range and Valley and is to be used as a reference for the following discussion. Sugarloaf Arkose Sugarloaf arkose was the first deposit in the Triassic basin. It arrived from streams in the east which first deposited larger rocks in the eastern portion of the Valley and then dropped smaller rocks gradually westward as the streams slowed. It is a buff to pale red arkose (a sandstone with a high percentage of feldspar fragments) that gets its color from both iron found throughout the cement of this sediment and the pinkish to orange grains of orthoclase feldspar. Hitchcock Volcanics The Triassic era was unusually active with volcanism.
    [Show full text]
  • Environmental Assessment for Hydropower Licenses
    ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER LICENSES Holyoke Number 1 Hydro Project, FERC Project No. 2386-004 Holyoke Number 2 Hydro Project, FERC Project No. 2387-003 Holyoke Number 3 Hydro Project, FERC Project No. 2388-004 Massachusetts Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, D.C. 20426 November 2019 TABLE OF CONTENTS LIST OF TABLES ............................................................................................................. xii ACRONYMS AND ABBREVIATIONS ......................................................................... xiii 1.0 INTRODUCTION .................................................................................................... 1 1.1 Applications ................................................................................................... 1 1.2 Purpose of Action and Need For Power ........................................................ 5 1.2.1 Purpose of Action ............................................................................ 5 1.2.2 Need for Power ................................................................................ 5 1.3 Statutory and Regulatory Requirements ....................................................... 6 1.3.1 Federal Power Act ........................................................................... 6 1.3.2 Clean Water Act .............................................................................. 7 1.3.3 Endangered Species Act .................................................................
    [Show full text]
  • 20142014 Annual Report
    20142014 ANNUAL REPORT To the Honorable Mayor, Members of the City Council, and our Valued Customers: Submitted herewith is the One Hundred and Twelfth Annual Report of the City of Holyoke Gas & Electric Department (HG&E) for the year ending December 31, 2014. 2014 was a challenging year as constrained natural gas supplies resulted in increased costs for both natural gas and electricity in New England. A colder than normal winter, coupled with increased reliance on natural gas for electric generation and residential heating, resulted in increased demand for already constrained natural gas supplies. With no significant increase to the natural gas pipeline capacity in the region in many years, the supply-demand imbalance has resulted in very high energy prices at peak periods. In spite of these challenges, HG&E continued to offer some of the lowest utility rates in the region in 2014 and delivered strong financial performance, maintaining its A1 credit rating. 2014 was also a busy year for capital improvements as we continued to invest in our plant in order to continue delivering reliable services at reasonable prices. The Electric Division continued to upgrade the distribution system with intelligent devices. These upgrades will help improve reliability and reduce costs by minimizing the impact of and restoration time for certain power outages. HG&E also completed the replacement of all City streetlights with new light emitting diode (LED) streetlights, which provide more direct light, reduced maintenance costs, and significant savings for the City through improved efficiency. The Gas Division continued adding new services, as customers increasingly convert to natural gas.
    [Show full text]