Achievements of Commercial Deptt.During Last Two Years 2017-18
Total Page:16
File Type:pdf, Size:1020Kb
Achievements of Commercial Deptt.during last two years 2017-18 1. PF Shelters : PF shelters have been provided at 01 bay each at JNP, SKND, BGPL,KRIH,NGMP,KDRP,NRG,CBT,RBA,BRAG,PTAB,MCS,LGTR,BNBH,RTN,K UU,HMA, MWQ,KASR, BRST,SUDV,MMS,JPI,GTA & MLT and 02 bays each at RHMA, SQQ, HCNR, JNP, SLRD,HDS, & BAV, 04 bays at PURI , 05 bays at CTC and 06 bays at BBS(on PF No.4 & 5), 04 bays at JJKR, 03 bays at BYY & DNM stations during the period. 2. (A). New Station & PH : Bolgarh Road & Nayagarh Town stations and Bolgarh Town Passenger Halt in KUR-Bolangir section have been commissioned during the period . (B) New Station Building: At Bhubaneswar railway station new Station Building with 2nd Entry, New Booking Office (both PRS & UTS) at Platform-6 side has been dedicated to the public on 30th December, 2017 . New Booking Office with Reserved & Unreserved Ticketing System at Sakhigopal Railway Station has also been dedicated to the public. 3. New Train & Extension of Train: Two new weekly trains Bhubaneswar- Krishnarajpuram-Bhubaneswar, Humsafar Express and Bhubaneswar -New Delhi- Bhubaneswar Rajdhani Express (via- Sambalpur) have been introduced during the period. Rourkela-Bhubaneswar Rajyarani Express extended up to Gunpur and Passenger Train service was extended from Bolagarh to Nayagarh Town station in KUR-Bolangir section during the period. 4. FOB: Foot Over Bridge have been commissioned at NANR, NQR, TMKA, BRAG, PTAB & HCNR stations . 5. Raising of Platform: Platform No. 1&2 and 3&4 have been raised from Low level to High Level at Khalikote & Bhusandpur stations. 6. Seating Arrangements: Total 32 nos. of stainless steel benches – 03 seater have been provided in 2nd class waiting hall gents and ladies and 20 nos. of Single Sofa Chairs have been provided at Bhubaneswar Railway station. 24 nos of stainless steel benches-03 seater have been provided at Cuttack Railway station under MPLADS of Sri Bhartruhari Mahtab,Hon’ble MP/Cuttack. 7. Transportation: Lifts at Platform No. 2&3, Platform -6 and Escalator at Platform No. 6 of Bhubaneswar and Lifts at Platform No. 1, 2&3 and 4&5 at Cuttack station have been provided for easy inter-platform movement of passengers especially Senior citizens and DIVYANG. 8. Parking: Two Wheeler Parking stand at IPM, DNKL, CTC, BDBA & BHC have been awarded during the period. 9. Parcel Contracts: Agreement have been executed for Parcel Contracts (SLR) for Train No.15643 (PURI-KYQ Express), 15639 (PURI-GHY Express), 22805 (BBS-ANVT Express),18410 (PURI-HWH, Sri Jagannath Express) , 18463 ( BBS-SBS, Prasanti Express), 12898 (BBS-PDY Express), 12815 ( PURi-NDLS, Nandankanan Express), 12281 (BBS-NDLS, Duranto Express) & 22811 ( BBS-NDLS, Rajdhani Express) during the year 2017-18. 10. POS machines : As a part of ‘Digital India’ and to promote cashless transactions 50 machines at 40 PRS locations, 54 machines at 48 UTS locations & 15 machines at 09 Parcel offices have been installed during the period. 11. STBA: STBAs have been appointed at Malatipatpur,Nilakantheswar, Sadashivpur, Hindol Road, Kalupadaghat, Baghuapal, Sitabinj, Baudpur, Motari, Dhanmandal, Mancheswar, Delanga, Nirakarpur, Gurudijhatia, Bolgarh Road, Baranga, Nirgundi, Golantha, Surla Road, Nayagarh, Tangriapal and Sakhigopal stations (total-22stations) during the period.. 12. Drinking Water Facility : Purified Drinking Water KIOSK have been provided at Talcher Road and Jajpur-Keonjhar Road stations during the period by NGOs. Beside this,water vending machines have been provided at major stations by IRCTC. 13. Wi Fi : Free Wi-Fi has been provided at PSA, BHC, JJKR, KUR & BAM stations during the period. 14. CIB &TIB : Coach Indication Board (CIB) at DNKL, ANGL & IPM stations and Train Indication Board (TIB) at ANGL, IPM, CAP, TLHR , DNKL & KIT have been provided during the period. 15. India Post PRS : New PRS at Athgarh Head Post Office has been inaugurated by Sri Bhartuhari Mahatab , Hon’ble MP, Cuttack on 04.12.2017. 16. Digital Initiatives: Bhubaneswar Railway station became 100% fully Digital Payment Enabled station and 1st station over KUR Division during the month of January’2018. 17. Outsourcing of Manpower: Work order has been issued towards outsourcing of Manpower for operation of CIB, TIB, PAS, Face to Face Enquiry, Telephonic Enquiry & other allied works pertaining to Passenger Announcement & Information in favour of M/s A&S Outsourcing Solutions, Mumbai for BHC, JJKR, CTC, BBS, KUR, PURI, BAM, PSA, BALU & DNKL stations towards offer price @ Rs. 1,41,95,025/- for one year on 21.03.2018. 18. Battery Operated Vehicle (BOV) : National Aluminum Company(NALCO) has provided 02 nos of Battery Operated Vehicle (BOV) service at Puri railway station for senior citizens, differently- abled passengers (DIVYANG) and sick people on 22nd March’18. 2018-19 1. New Station : Bhubaneswar New Railway station commissioned on 07.07.2018. New Station Building: Bhadrak Railway station having facilities of Booking Office (both PRS & UTS) , Passenger Waiting Halls, circulating area with barricade etc. and 2nd FOB (6 mtrs. wide) have been inaugurated by Union Minister for Tribal Affairs, Shri Jual Oram on 23.09.2018. 2. New Train & Extension of Train: MEMU Train services between ANGL-PURI, TLHR-PURI & BAM –BHC (via CTC) have been introduced. 3. FOB: 3rd FOB at BBS (6 mtrs wide), 2nd FOB at BHC ( 6 mtrs wide) have been commissioned. New FOB at BAM (2nd) station have also been commissioned. 4. Transportation: Escalator has been provided at Cuttack railway station (2nd entry) for easy inter-platform movement of passengers especially Senior citizens and DIVYANG. 5. Battery Operated Vehicle (BOV) : National Aluminum Company(NALCO) has provided Battery Operated Vehicle (BOV) service at Bhubaneswar & Cuttack railway station for senior citizens, differently-abled passengers (DIVYANG). ACHIEVEMNTS OF ELECTRICAL (OP) DEPARTMENT: Promotions: Promotions carried out during last 2 years is as under: Promotion to the post of 2017-18 2018-19 (upto Sep) LP(M/Exp.) 15 9 Loco Pilot (Pass) - - Loco Pilot (Goods) 181 133 Loco Pilot (S) - - Sr.Asst. Loco Pilot - - Ch.Loco Inspector - - TRAINING: LP ALP LP(S) 17-18 18-19 17-18 18-19 17-18 18-19 (upto (upto (upto Sep) Sep) Sep) REFE 389 154 332 14 7 4 REFD 94 79 59 16 6 6 REFT 367 180 158 8 5 13 3-Ph. Loco training 389 154 332 14 7 4 Safety Camp 422 188 337 16 9 6 Family counseling, train speed checking through Speedo meter down loading and speed gun, Seminars, Mobile checking etc. 17-18 17-18 18-19 (upto Sep) (upto Sep) Speedometer 525 251 347 Seminars 270 125 179 Family Counseling 1889 801 931 Surprise Mobile Checking 15980 8788 6660 Ambush Cheking 2207 1071 1157 Crew Counseling by CLIs 33976 16098 17662 * This figure includes repetition of LP/ALP. In order to improve skill of the staff, the following crew have been imparted skill improvement training under Project Sakham started w.e.f. 11.12.2018. CLI TRS Ministerial Location Running staff Maintenance No. of Staff trained 2916 68 92 34 Actual staff strength 2916 69 96 34 % of Staff trained 100.0 98.6 95.8 100.0 SYSTEM IMPROVEMENTAL WORKS: Safety seminars are being conducted on every Monday at PSA & PRDP, on Tuesday at JKKR & KDJR, on Wednesday at BHC, on Thursday at BBS & CTC on Friday at PUI & DNKL and on Saturday at KUR & TLHR crew lobbies and surprise checks of LC gates are also being carried out by officers and all CLIs during every month. In order to minimize the detention of train on account of loading/unloading of Loco Pilot’s line box, 360 Nos. of common line boxes with OTL & universal lock have been provided in both Coaching & Freight locatives In lieu of trolly type travel bags 1440 Nos. of Travellers bags have been provided to all Loco Pilots of KUR division. In order to improve the fetch crew as per rule, it was being closely monitored and as a result of which it could be improved from 26.32% in Jan’18 to 93.4 % in Jul’18. In order to send data The system of displaying the Caution Order Boards in electronic display at all crew lobbies has been implemented. In view of problems faced by the division to impart training to the large number of running staff, the Electrical refresher training course has been started at DMTC/KUR w.e.f. 27.07.2016 after obtaining approval of the competent authority. A booklet containing 24 nos. of Case studies on account of Bad engineman- ship and a booklet containing 25 nos. of case studies of Good work done by Crew/Staff/Supervisor has been prepared by this department and circulated to all crew lobbies for counselling of Crew. Crew Management System (CMS): 1301 Nos. of routes created in CMS minimising manual singing on/off, which also lead to generation of correct mileage/ OT etc. Payment of mileage/OT/NDA/NHA etc. of all CMS based crew lobbies of Khurda Road division is being made through CMS generated reports minimizing clerical error & a step towards saving of manpower. For Quick compliance of Abnormality experienced by the Crew during train operation, a software called Driver’s Unsatisfactory Management system (DRUMS) has been installed at all Crew lobbies through which unusual reporting to the immediate supervisor of the concerned section/department is being done as soon as the Crew controller Logins the unusual occurrence. If no remedial action has been taken by the concerned departmental supervisor within 24 hours, then a message will automatically be sent to the next higher level. Again, if no remedial action will be taken within 48 hours, then a message will be forwarded to the concerned branch officer & so on, which is a very quick & effective unsatisfactory monitoring system.