Achievements of Commercial Deptt.During Last Two Years

Total Page:16

File Type:pdf, Size:1020Kb

Achievements of Commercial Deptt.During Last Two Years Achievements of Commercial Deptt.during last two years 2017-18 1. PF Shelters : PF shelters have been provided at 01 bay each at JNP, SKND, BGPL,KRIH,NGMP,KDRP,NRG,CBT,RBA,BRAG,PTAB,MCS,LGTR,BNBH,RTN,KUU,H MA, MWQ,KASR, BRST,SUDV,MMS,JPI,GTA & MLT and 02 bays each at RHMA, SQQ, HCNR, JNP, SLRD,HDS, & BAV, 04 bays at PURI , 05 bays at CTC and 06 bays at BBS(on PF No.4 & 5), 04 bays at JJKR, 03 bays at BYY & DNM stations during the period. 2. (A). New Station & PH : Bolgarh Road & Nayagarh Town stations and Bolgarh Town Passenger Halt in KUR-Bolangir section have been commissioned during the period . (B) New Station Building: At Bhubaneswar railway station new Station Building with 2nd Entry, New Booking Office (both PRS & UTS) at Platform-6 side has been dedicated to the public on 30th December, 2017 . New Booking Office with Reserved & Unreserved Ticketing System at Sakhigopal Railway Station has also been dedicated to the public. 3. New Train & Extension of Train: Two new weekly trains Bhubaneswar-Krishnarajpuram- Bhubaneswar, Humsafar Express and Bhubaneswar -New Delhi-Bhubaneswar Rajdhani Express (via- Sambalpur) have been introduced during the period. Rourkela-Bhubaneswar Rajyarani Express extended up to Gunpur and Passenger Train service was extended from Bolagarh to Nayagarh Town station in KUR-Bolangir section during the period. 4. FOB: Foot Over Bridge have been commissioned at NANR, NQR, TMKA, BRAG, PTAB & HCNR stations . 5. Raising of Platform: Platform No. 1&2 and 3&4 have been raised from Low level to High Level at Khalikote & Bhusandpur stations. 6. Seating Arrangements: Total 32 nos. of stainless steel benches – 03 seater have been provided in 2nd class waiting hall gents and ladies and 20 nos. of Single Sofa Chairs have been provided at Bhubaneswar Railway station. 24 nos of stainless steel benches-03 seater have been provided at Cuttack Railway station under MPLADS of Sri Bhartruhari Mahtab,Hon’ble MP/Cuttack. 7. Transportation: Lifts at Platform No. 2&3, Platform -6 and Escalator at Platform No. 6 of Bhubaneswar and Lifts at Platform No. 1, 2&3 and 4&5 at Cuttack station have been provided for easy inter-platform movement of passengers especially Senior citizens and DIVYANG. 8. Parking: Two Wheeler Parking stand at IPM, DNKL, CTC, BDBA & BHC have been awarded during the period. 9. Parcel Contracts: Agreement have been executed for Parcel Contracts (SLR) for Train No.15643 (PURI-KYQ Express), 15639 (PURI-GHY Express), 22805 (BBS-ANVT Express),18410 (PURI-HWH, Sri Jagannath Express) , 18463 ( BBS-SBS, Prasanti Express), 12898 (BBS-PDY Express), 12815 ( PURi-NDLS, Nandankanan Express), 12281 (BBS- NDLS, Duranto Express) & 22811 ( BBS-NDLS, Rajdhani Express) during the year 2017-18. 10. POS machines : As a part of ‘Digital India’ and to promote cashless transactions 50 machines at 40 PRS locations, 54 machines at 48 UTS locations & 15 machines at 09 Parcel offices have been installed during the period. 11. STBA: STBAs have been appointed at Malatipatpur,Nilakantheswar, Sadashivpur, Hindol Road, Kalupadaghat, Baghuapal, Sitabinj, Baudpur, Motari, Dhanmandal, Mancheswar, Delanga, Nirakarpur, Gurudijhatia, Bolgarh Road, Baranga, Nirgundi, Golantha, Surla Road, Nayagarh, Tangriapal and Sakhigopal stations (total-22stations) during the period.. 12. Drinking Water Facility : Purified Drinking Water KIOSK have been provided at Talcher Road and Jajpur-Keonjhar Road stations during the period by NGOs. Beside this,water vending machines have been provided at major stations by IRCTC. 13. Wi Fi : Free Wi-Fi has been provided at PSA, BHC, JJKR, KUR & BAM stations during the period. 14. CIB &TIB : Coach Indication Board (CIB) at DNKL, ANGL & IPM stations and Train Indication Board (TIB) at ANGL, IPM, CAP, TLHR , DNKL & KIT have been provided during the period. 15. India Post PRS : New PRS at Athgarh Head Post Office has been inaugurated by Sri Bhartuhari Mahatab , Hon’ble MP, Cuttack on 04.12.2017. 16. Digital Initiatives: Bhubaneswar Railway station became 100% fully Digital Payment Enabled station and 1st station over KUR Division during the month of January’2018. 17. Outsourcing of Manpower: Work order has been issued towards outsourcing of Manpower for operation of CIB, TIB, PAS, Face to Face Enquiry, Telephonic Enquiry & other allied works pertaining to Passenger Announcement & Information in favour of M/s A&S Outsourcing Solutions, Mumbai for BHC, JJKR, CTC, BBS, KUR, PURI, BAM, PSA, BALU & DNKL stations towards offer price @ Rs. 1,41,95,025/- for one year on 21.03.2018. 18. Battery Operated Vehicle (BOV) : National Aluminum Company(NALCO) has provided 02 nos of Battery Operated Vehicle (BOV) service at Puri railway station for senior citizens, differently- abled passengers (DIVYANG) and sick people on 22nd March’18. 2018-19 1. New Station : Bhubaneswar New Railway station commissioned on 07.07.2018. New Station Building: Bhadrak Railway station having facilities of Booking Office (both PRS & UTS) , Passenger Waiting Halls, circulating area with barricade etc. and 2nd FOB (6 mtrs. wide) have been inaugurated by Union Minister for Tribal Affairs, Shri Jual Oram on 23.09.2018. 2. New Train & Extension of Train: MEMU Train services between ANGL-PURI, TLHR- PURI & BAM –BHC (via CTC) have been introduced. 3. FOB: 3rd FOB at BBS (6 mtrs wide), 2nd FOB at BHC ( 6 mtrs wide) have been commissioned. New FOB at BAM (2nd) station have also been commissioned. 4. Transportation: Escalator has been provided at Cuttack railway station (2nd entry) for easy inter-platform movement of passengers especially Senior citizens and DIVYANG. 5. Battery Operated Vehicle (BOV) : National Aluminum Company(NALCO) has provided Battery Operated Vehicle (BOV) service at Bhubaneswar & Cuttack railway station for senior citizens, differently-abled passengers (DIVYANG). ACHIEVEMENTS WITH RELEVANT PHOTOS A. Opening of New Station Building – BBSN & BHC B. Raising of Platform at Khalikote station C. Commissioning of 3rd FOB at BBS (6 mtrs.wide) & BHC (6 mtrs wide) D. Battery Operated Vehicle for Senior Citizens, Patients & Divyangjans at Puri , Bhubaneswar & Cuttack Railway station. E. Unreserved Ticketing System (UTS) on Mobile . F. Amenities through MPLAD ( 24 nos. of Stainless steel benches funded by Hon;ble MP (Lok Sabha)/ Cuttack has been installed at Cuttack Railway station . G. Bhubaneswar, Puri & Cuttack Railway stations became 100% fully Digital Payment Enabled station over KUR Division . .
Recommended publications
  • Sri Ramakrishna & His Disciples in Orissa
    Preface Pilgrimage places like Varanasi, Prayag, Haridwar and Vrindavan have always got prominent place in any pilgrimage of the devotees and its importance is well known. Many mythological stories are associated to these places. Though Orissa had many temples, historical places and natural scenic beauty spot, but it did not get so much prominence. This may be due to the lack of connectivity. Buddhism and Jainism flourished there followed by Shaivaism and Vainavism. After reading the lives of Sri Chaitanya, Sri Ramakrishna, Holy Mother and direct disciples we come to know the importance and spiritual significance of these places. Holy Mother and many disciples of Sri Ramakrishna had great time in Orissa. Many are blessed here by the vision of Lord Jagannath or the Master. The lives of these great souls had shown us a way to visit these places with spiritual consciousness and devotion. Unless we read the life of Sri Chaitanya we will not understand the life of Sri Ramakrishna properly. Similarly unless we study the chapter in the lives of these great souls in Orissa we will not be able to understand and appreciate the significance of these places. If we go on pilgrimage to Orissa with same spirit and devotion as shown by these great souls, we are sure to be benefited spiritually. This collection will put the light on the Orissa chapter in the lives of these great souls and will inspire the devotees to read more about their lives in details. This will also help the devotees to go to pilgrimage in Orissa and strengthen their devotion.
    [Show full text]
  • Achievements of Commercial Deptt.During Last Two Years 2017-18
    Achievements of Commercial Deptt.during last two years 2017-18 1. PF Shelters : PF shelters have been provided at 01 bay each at JNP, SKND, BGPL,KRIH,NGMP,KDRP,NRG,CBT,RBA,BRAG,PTAB,MCS,LGTR,BNBH,RTN,K UU,HMA, MWQ,KASR, BRST,SUDV,MMS,JPI,GTA & MLT and 02 bays each at RHMA, SQQ, HCNR, JNP, SLRD,HDS, & BAV, 04 bays at PURI , 05 bays at CTC and 06 bays at BBS(on PF No.4 & 5), 04 bays at JJKR, 03 bays at BYY & DNM stations during the period. 2. (A). New Station & PH : Bolgarh Road & Nayagarh Town stations and Bolgarh Town Passenger Halt in KUR-Bolangir section have been commissioned during the period . (B) New Station Building: At Bhubaneswar railway station new Station Building with 2nd Entry, New Booking Office (both PRS & UTS) at Platform-6 side has been dedicated to the public on 30th December, 2017 . New Booking Office with Reserved & Unreserved Ticketing System at Sakhigopal Railway Station has also been dedicated to the public. 3. New Train & Extension of Train: Two new weekly trains Bhubaneswar- Krishnarajpuram-Bhubaneswar, Humsafar Express and Bhubaneswar -New Delhi- Bhubaneswar Rajdhani Express (via- Sambalpur) have been introduced during the period. Rourkela-Bhubaneswar Rajyarani Express extended up to Gunpur and Passenger Train service was extended from Bolagarh to Nayagarh Town station in KUR-Bolangir section during the period. 4. FOB: Foot Over Bridge have been commissioned at NANR, NQR, TMKA, BRAG, PTAB & HCNR stations . 5. Raising of Platform: Platform No. 1&2 and 3&4 have been raised from Low level to High Level at Khalikote & Bhusandpur stations.
    [Show full text]
  • Good Work Done by Rpf/Ecor for the Period from 16-03-2021 to 31-03-2021
    GOOD WORK DONE BY RPF/ECOR FOR THE PERIOD FROM 16-03-2021 TO 31-03-2021 1. On 18.03.2021 at about 09.10 hrs one passenger namely Sunil Kumar Behera, aged 20 yrs, S/O- Bijaya Kumar Nayak, R/O- Udayapur, PS- Bari, Dist- Jajpur, Odisha having PNR No-6810710249 ex BBS to SC in T/No- 07015 (BBS-SC) Visakha Exp reported at RPF/Post/Bhubaneswar that he has boarded and occupied his allotted berth No- 64, coach B/4 in T/No-07015 (BBS-SC) Visakha Exp and kept his luggage under the berth. After that he got down from the train to purchase snakes & water bottle but in the mean time train started so he unable to boarded & his black color bag containing clothes & some personal documents total valued Rs. 2000/- over carried in the said train. Accordingly the matter was informed to RPF Post KUR/BALU to recover the same. Subsequently, the said bag was retrieved by CT- D.N. Sahoo of RPF Post BALU and the bag was send by T/No-07016 exp to RPF/Post/Bhubaneswar and the same was collected and handed over to the victim/passenger with proper acknowledgement. (Value Rs- 2000/- approx). 2. On dated 18.03.2021 at about 13.50 hrs on duty luggage scanner staff namely L/C RPSF M. Jena noticed one mobile phone REDMI MI-2) was laying near luggage scanner machine. Immediately she made frequent announcement through Railway PA system. After sometime one person namely Karuna Barnwal, aged-24 yrs, D/o- Ranjit Kumar Barnwal, R/o- MH street, PS-South Asansol, Dist-Bardhaman (WB) attended at enquiry counter and claimed her mobile.
    [Show full text]
  • PROCEEDINGS of the MEETING of STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA HELD on 02Nd AUGUST, 2021
    PROCEEDINGS OF THE MEETING OF STATE LEVEL EXPERT APPRAISAL COMMITTEE, ODISHA HELD ON 02nd AUGUST, 2021 The SEAC met on 02nd August, 2021 at 11:00 AM through Video Conferencing in Google Meet under the Chairmanship of Sri. B. P Singh. The following members were present in the meeting. 1. Sri. B. P. Singh - Chairman (through VC) 2. Dr. K. Murugesan - Secretary (through VC) 3. Dr. D. Swain - Member (through VC) 4. Prof. (Dr.) H.B. Sahu - Member (through VC) 5. Sri. J. K. Mahapatra - Member (through VC) 6. Sri. K. R. Acharya - Member (through VC) 7. Prof. (Dr.) B.K. Satpathy - Member (through VC) 8. Dr. K.C.S Panigrahi - Member (through VC) 9. Dr. Sailabala Padhi - Member (through VC) The agenda-wise proceedings and recommendations of the committee are detailed below. ITEM NO. 01 PROPOSAL FOR ENVIRONMENTAL CLEARANCE FOR GREENFIELD TEXTILE PROJECT UNIT ESTABLISHMENT OVER AN AREA 60 ACRES LOCATED IN VILLAGES - PAHIMAHURA & HELPUR, TAHASIL - BHANDARIPOKHARI, DIST – BHADRAK, ODISHA OF M/S. PARADEEP REFINERY INDIAN OIL CORPORATION LTD – EC. 1. This is a proposal for Environmental Clearance of M/s Paradeep Refinery Indian Oil Corporation Ltd. for Greenfield Textile project unit Establishment over an area 60 acres located in villages - Pahimahura & Helpur, Tahasil - Bhandaripokhari, Dist – Bhadrak, Odisha. 2. The project falls under category “B” or activity Category - 5(d) Man-made fibres manufacturing in the „Project or Activities‟ projects under EIA Notification dated 14th September 2006 as amended from time to time. 3. IOCL is proposing the Greenfield Textile project unit establishment in Villages Pahimahura & Helpur, Tahasil Bhandaripokhari, Dist.
    [Show full text]