International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Development of a legal information service, "Law-data System” for the Assembly in order to provide a free Financial Management INSTITUTIONAL online service containing basic information such as laws and bylaws and solution on how to manage with 581 Kosovo Sep-19 2019 Norway 30M Legal Information System for Kosovo Assembly Project and Administrative IMG ONGOING € 2,387,511.00 CAPACITY BUILDING discrepancies between the different language versions of the laws which are currently in practice in Kosovo’s Support legislation. Conception and implementation of a study visit on European Affairs in Brussels for the students of the Mandel Social 580 Israel Nov-18 2018 Israel 12M University Partnership Project II CIVIL SOCIETY Project Managament IMG Leadership MBA Program of the Ben-Gurion University of the Negev as well as promotion of cooperation for COMPLETED € 23,350.00 research activities. Kosovo Judicial Implementation of the project will significantly increase the availability of data on court cases, improve ability to Council in manage case flows and increase efficiency of the judiciary through abandoning the slow and inaccurate manual Financial Management INSTITUTIONAL cooperation with procedures which are currently used in the Kosovo judiciary 579 Kosovo Jul-15 2015 Norway 78M Case Management Information System and Administrative ONGOING € 8,832,031.26 CAPACITY BUILDING Kosovo Support Prosecutorial Council The overall objective of the Programme is to to support Serbia in its EU-accession process, focusing on police reform. One of the Programme components encompasses support to criminal investigation procedures and seeks to strengthen the capacity of the Serbian police when it comes to crime scene investiga-tions. Connected to this, Procurement of Equipmenet and renovation services INSTITUTIONAL reception areas for victims of gender based violence will be renovated. Another part seeks to strengthen crime 578 Serbia Jan-18 2018 Sweden 12M Project Managament Ministry of Interior COMPLETED € 37,070.00 for the Ministry of Interior of the Republic of Serbia CAPACITY BUILDING analysis and intelligence gathering. For this purpose, equipment necessary for qualitative crime scene investigations and crime analysis, renovation services for selected police stations and IT-hardware will be procured within the Programme. The objective of the project is to provide a forensic equipment, renovation services and IT-hardware.

The Program aims to support the Serbian Ministry of Interior (henceforth: MoI) in the development of in-depth organizational management capacities in two key areas of forthcoming policy focus, namely strategic management INSTITUTIONAL Facilitation of implementation of the project Support to and EU integration, with the aim to contribute to increasing cost-efficiency, thus directly enhancing public safety, STRENGTHENING 577 Serbia Dec-15 2015 Sweden 52M Strategic Management and EU Integration Cap. Dev. Project Managament IMG transparency and most importantly EU accession efforts. The primary goal of the Program primary goal is to assist ONGOING € 7,119,481.56 AND/OR CAPACITY of the Serbian Ministry of Interior the MOI in two key policy priority areas: strategic management on one hand and a comprehensive management of BUILDING EU accession processes on the other.

Consultancy services in closing old projects supported INSTITUTIONAL Activities on closing services of 12 old projects supported by the Norwegian Embassy to various local NGO’s in 576 Kosovo Jan-18 2018 Norway 3M Project Managament IMG COMPLETED € 9,680.00 by the Norwegian Embassy in Prishthina CAPACITY BUILDING Kosovo. Conception and implementation of a study visit on European Affairs in Brussels for the students of the Mandel Social 575 Israel Nov-17 2017 Israel 13M University Partnership Project CIVIL SOCIETY Project Managament IMG Leadership MBA Program of the Ben-Gurion University of the Negev as well as promotion of cooperation for COMPLETED € 28,800.00 research activities. The local governments will improve dialogue with citizens on the use of property tax revenue. In close cooperation INSTITUTIONAL with line ministries and the Standing Conference of Towns and , the Program will facilitate policy 574 Serbia Jun-17 2017 Switzerland 16M Property Tax Reform Project Managament IMG COMPLETED € 5,526,155.00 CAPACITY BUILDING debates on property taxation and other related local public finance management issues sensitive to the development needs of Serbian local self-governments. INSTITUTIONAL The general objective of the project is to enhance the parliament’s efficiency in carrying out its functions and STRENGTHENING responsibilities. This can be attained by supporting the Lebanese Parliament in its endeavours for modernization and 573 Lebanon Jan-14 2014 EC 45M Support to Parliamentary Development in Lebanon Project Managament IMG COMPLETED € 1,984,875.00 AND/OR CAPACITY increasing the efficiency, credibility and capacity of the legislative procedure in Lebanon by proving continuous BUILDING support to the professionalization processes of the legislative system in the Lebanese Parliament. The programme aims to support the Ministry of Interior and the Ministry of Justice to meet the commitments of the Libyan government as expressed in the London and Paris conferences of December 2012 and February 2013 respectively. Using some leverage effect on key issues, the programme intends to give the relevant Libyan Strengthening democracy, good governance and INSTITUTIONAL Project Management 572 Libya Dec-12 2012 EC 4Y IMG authorities the necessary resources to define and implement the process of change that will transform the SUSPENDED € 10,000,000.00 civilian culture in the security and justice sectors CAPACITY BUILDING and Implementation Security and Justice sectors. It will especially help to move the relevant institutions - mainly the police and the judiciary - away from the model they inherited from the former regime to newer systems that cope with democratic principles and the rule of law. The objective of the mission is to clearly describe and analyse the context within which agribusiness processing and services are operating, including a detailed mapping of significant activities within the sector (national as well as West Bank and Economic Development - Agro-bussiness Processing doner supported), their achievements and shortcomings. Further, all major risks within the economic development's 571 Feb-14 2014 Denmark 2M ECONOMIC Project Managament IMG COMPLETED € 31,762.00 Gaza Strip and Services 3 areas (described above) shall be clearly identified and assessed. Findings must be presented such as to support the identification and formulation ef the Country Programme 2016- 2018, as well as the completion of the Transition programme 2014-2015. The objectives of the assignment are:1) To draw out a clear and comprehensive context analysis, and 2) To map the West Bank and INSTITUTIONAL 570 Feb-14 2014 Denmark 2M The Palestinian state-building and citizens right pillar Project Managament IMG sector development initiatives with regards to the first pillar "State-building and citizen's rights" of the transitional COMPLETED € 30,210.00 Gaza Strip CAPACITY BUILDING programme 2014-2015. Overall objective is to improve the capacity of the beneficiary (Ministry of Finance, Ministry of Public Works and West Bank and Technical Assistance for the implementation and INSTITUTIONAL 569 Feb-14 2014 EC 7M Project Managament IMG Housing, Palestinian Water Authority and Ministry of Justice) in the implementation and monitoring of EU funded COMPLETED € 1,029,025.00 Gaza Strip monitoring of projects CAPACITY BUILDING projects in Palestine. West Bank and Support to the Management and Maintenance of the INSTITUTIONAL 568 Feb-14 2014 EC 18M Project Managament IMG The main project objective is to provide IT services in support of PEGASE DFS programmes/windows COMPLETED € 996,336.00 Gaza Strip Pegase Information System CAPACITY BUILDING Main objective of this project is to improve the capacity of the beneficiary in the implementation and monitoring of EU funded projects in West Bank, the Gaza Strip and East Jerusalem as well as support to PEGASE Direct West Bank and Technical assistance for the implementation and INSTITUTIONAL 567 Jun-13 2013 EC 9M Project Managament IMG Financial Support programmes COMPLETED € 1,904,025.00 Gaza Strip monitoring of projects and support to PDFS CAPACITY BUILDING

West Bank and INSTITUTIONAL Overall objective of the project is to develop a private sector development programme that falls within the Palestinian 566 Dec-13 2013 France 1M Assessment of the Private sector in the OpT Project Managament IMG COMPLETED € 50,000.00 Gaza Strip CAPACITY BUILDING National Export Strategy (NES) and the Palestinian National Development Plan (PNDP) 2014-2016. Kosovo Judicial Council in Financial Management Implementation of the project will significantly increase the availability of data on court cases, improve ability to INSTITUTIONAL cooperation with 565 Kosovo Jan-14 2014 Norway 13M Case Management Information System and Administrative manage case flows and increase efficiency of the judiciary through abandoning the slow and inaccurate manual COMPLETED € 1,134,917.54 CAPACITY BUILDING Kosovo Support procedures which are currently used in the Kosovo judiciary Prosecutorial Council Sector for The main project objective is to support strategic development within the Justice and Home Affairs sector for fighting Analytics, against corruption and organized crime, to support the development of a strategic framework for the future Financial Management Telecommunication Support to the strategic development of the IT system INSTITUTIONAL modernization of the overall IT system within the Ministry of Interior of the Republic of Serbia (MoI) and to enable a 564 Serbia Dec-13 2013 Sweden 45M and Administrative s and Information COMPLETED € 1,833,567.00 within the Serbian Ministry of Interior CAPACITY BUILDING more efficient and effective provision of police services by securing the integration of IT services between the MoI Support Technology, and other relevant government bodies. Serbian Ministry of the Interior

1/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Ministry of The project objective is for the Ministry of Energy, Development and Environmental Protection (MEDEP) to be well INSTITUTIONAL Agriculture and prepared for the upcoming EU accession negotiations, considering the needs identified in the Environment 563 Serbia Nov-13 2013 Sweden 3Y Project Support to ENVAP 2 Financial Management COMPLETED € 330,459.93 CAPACITY BUILDING Environmental Approximation Strategy. MEDEP’s awareness as a coordinator of Sub-group 27 is increased regarding both its Protection strengths and weaknesses in EU matters. The overall objective of the project is to contribute to preventing and reducing communal, inter-religious and protest related violence in Myanmar/Burma by helping to ensure a preventive, balanced and professional approach by the Support to reform of the Myanmar Police Force in the INSTITUTIONAL Project Management Myanmar Police Force in the areas of crowd management and community policing, based on best international 562 Myanmar Sep-13 2013 EC 18M IMG COMPLETED € 9,500,000.00 areas of crowd management and community policing CAPACITY BUILDING and Implementation practice and respect of human and fundamental rights, thus contributing to stability and helping to preserve the conditions essential to the country’s development and to delivery of EU assistance, in line with article 1(2)(a) of the IfS Regulation. The overall objective of the Programme is to contribute to the transformation of the Ministry of the Interior of the Republic of Serbia into a civilian Police Service in line with the best of European standards in regard to core values, structure and working methods. Development of a System for Crime Scene and As a part of the Programme, the purpose of the project is to enable the Serbian Ministry of the Interior to uphold a Forensic Training and Establishment of a Forensic INSTITUTIONAL Project Management 561 Serbia Aug-13 2013 Sweden 12M Ministry of Interior high level of knowledge in the field of forensics in order to continue improving quality and efficiency of pre-trial and COMPLETED € 29,992.10 Training Centre within the Ministry of Interior of the CAPACITY BUILDING and Implementation criminal proceedings and to ensure fair legal proceedings based on material evidence. Republic of Serbia The objective of the project is to provide high standard equipment and introduce professional methods in the Training Centre, which will be accomplished through procurement of equipment needed for daily operations of the Centre.

Support to the Infrastructure Development of the INSTITUTIONAL Project Management The overall project objective is to support the rule of law and to contribute to the improvement of the justice sector in 560 South Sudan Jun-13 2013 EC 30M IMG COMPLETED € 4,227,258.00 Ministry of Justice and Judiciary of South Sudan CAPACITY BUILDING and Implementation the Republic of South Sudan by increasing the number of skilled legal practitioners practicing law. Ministry of The overall objective of the project is to enable the Government of Macedonia to structure the tasks required to meet Environment and INSTITUTIONAL Project Management EU Environmental Acquis (‘Chapter 27’). It will do this by building the capabilities of the EU Department of the 559 Macedonia Jun-13 2013 UK 20M Governance for the Environmental Accession Physcal Planning COMPLETED € 154,087.50 CAPACITY BUILDING and Implementation Ministry of Environment and Physical Planning to assess, then structure and then act on the requirements in line with of the Republic of good governance principles. FYROM In response to political and economic reforms promulgated by the Government of Burma/Myanmar, the European Union (EU) has suspended restrictive measures in late 2012 and is offering assistance to support the reform process. These reforms being undertaken by government are the result of the leadership’s decision to undertake a three-pronged transformation: from up to 60 years of conflict and war to peace in ethnic states; an authoritarian, military system to a more democratic form of governance; and from a centrally planned to market-oriented INSTITUTIONAL Project Management 558 Myanmar Apr-13 2013 EC 18M Mid-Term Support to the Myanmar Peace Centre IMG economy. Central to the overall reform process have been peace initiatives, under which the government has COMPLETED € 6,600,000.00 CAPACITY BUILDING and Implementation brokered 13 ceasefire agreements with armed ethnic groups since late 2011. These agreements, each individually negotiated, must now be consolidated into lasting political settlements, as well as arrangements established for development in former conflict areas. The “Mid-Term Support to the Myanmar Peace Centre” Project builds on the reforms to support key stages of the peace process launched in late 2011. It aims to support reforms, reinforce the democratisation process, and most importantly, help prevent a resurgence of armed conflict.

The overall objective of this project is to contribute to the development of an effective, efficient and accountable Ministry of Foreign public administration. This project proposes to encourage and support the start of the reform process in two INSTITUTIONAL Project Management 557 Myanmar Apr-13 2013 Norway 9M Capacity Enhancement for Asean Chairmanship Affairs; Union Civil components: firstly, by helping the Civil Service leadership to collate and structure information on their needs that will COMPLETED € 553,665.00 CAPACITY BUILDING and Implementation Service Board be essential for the subsequent development of national policy and strategy; and, secondly, to develop the skills of a core of active and influential staff to be ready chair the ASEAN Summit, and related responsibilities, in 2014. SDC entrusts to IMG the execution of Monitoring Rehabilitation works in the Municipalities which expressed interest to implement the project and to participate in a reconstruction budget. IMG participates with the necessary experts in SDC (Swiss evaluating both technical and financial aspects of received proposals, and gives SDC the necessary information for Monitoring Rehabilitation works on RC in Kanjiza, TECHNICAL Development Co- 556 Serbia Mar-13 2013 Switzerland 16M Technical Assistance further considerations. During the contracting and construction period, IMG participates with technical expertise to COMPLETED € 49,770.00 Kragujevac, Knjazevac and Novi Pazar ASSISTANCE operation ensure that the buildings are erected/rehabilitated in accordance with standards accepted by both SDC and the Belgrade) beneficiaries. IMG approves payments in accordance to contracts and progress of works, and follow up “at site” for progress reporting to SDC. The Ministry of Programme of Support to the Implementation of Labour, Overall objective of the programme is to strengthen democracy and promote sustainable development that improves Priority Activities in the Plan of Action for the 555 Serbia Jan-13 2013 Sweden 3Y GENDER EQUALITY Financial Management Employment and Serbia's prospects of EU membership.The programme will contribute to socio-economic development through COMPLETED € 4,105,447.50 Implementation of the National Strategy for Improving Social Policy of the effective application and promotion of EU and international standards and practices in the sphere of gender equality. and Promoting Gender Equality Republic of Serbia Construction of a new management building and reconstruction and adaptation of the existing facilities in the Valjevo Ministry of Justice, Institute will enable the implementation of the new concept of execution of juvenile detention and prison sentences INFRASTRUCTURE AND Project Management Administration for for the convicted juveniles, improve living, work and security conditions of both inmates and staff. Through the 554 Serbia Jan-13 2013 Norway 3Y Valjevo Prison Reconstruction COMPLETED € 3,219,039.00 CAPACITY BUILDING and Implementation Enforcement of introduction of this completely new concept, existing mixture of juvenile and adult prison population would be Criminal Sanctions avoided. Moreover, another considerable achievement would be the improvement of the organization of daily activities in accordance with the needs of the convicts. Kosovo is moving towards fulfilling the standards complying with the conditions set by the Schengen treaty to allow Kosovo’s citizens to travel visa free into the Schengen zone. According to internationally recognised migration Kosovo standards, visa issuance is considered the first protection line against international movement of persons who might Development and deployment of the Visa Centre in INSTITUTIONAL Project Management Kosovo Ministry of 553 Kosovo Jan-13 2013 Ministry of 2Y represent a security risk as well as are dealing with e.g. trafficking of humans or drugs. Therefore a mainframe for COMPLETED € 2,748,790.80 Kosovo CAPACITY BUILDING and Implementation Foreign Affairs Foreign Affairs keeping track of and handling the entries needs to be further developed and implemented. The KMFA and the NMFA have designated IMG to implement the Project while providing support with technical, financial and administrative assistance as well throughout the process to monitor the work. The Norwegian Embassy has decided to, through a grant scheme, support various projects within the Civil Society Administrative Support to the Norwegian Embassy in sector in Kosovo. The Projects will typically relate to democracy, human rights, socio-political issues; enterprise Norwegian 552 Kosovo Jan-13 2013 Norway 24M Implementing the Grant Scheme for a “Civil Society CIVIL SOCIETY Technical Assistance development, gender, education, youth, minorities, reconciliation and dialogue and matters of justice. IMG has been COMPLETED € 90,184.50 Embassy Pristina Fund”, in Kosovo requested by the Norwegian Embassy to provide Technical Support to the Embassy while monitoring the Grantees during the Implementation of the Projects.

2/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Myanmar had been under authoritarian military rule for over 50 years. During most of that period, the country has been largely isolated from regional and global economic, social and political trends. In 2012 the change has been rapid and wide–ranging in the different areas (diplomatic, economic, political, social and peace-building) but the capacity of the Myanmar’s public sector is still limited. This projects, in according with MDG principles, will work in synergy with the IfS initiatives and will build on and develop what has been already achieved: (1) environmental and INSTITUTIONAL Project Management land component, (2) national planning and strengthening the statistics system to promotion of stable reform, and (3) 551 Myanmar Dec-12 2012 EU Delegation 3Y Strengthening Policy Development to Meet MDGs IMG COMPLETED € 5,500,000.00 CAPACITY BUILDING and Implementation targeted assistance in two key areas including the trade and the migration. General Objective is to contribute to the faster meeting of MDG targets in Myanmar and thereby contribute to improve MDG performance. Specific Objective is to address key policy and capacity bottlenecks to improve MDG performance through sharing of technical knowledge and best practice, as well as mentoring and institutional support.

The purpose of this project is to facilitate stability and continue providing capacity building and technical support to key Kosovo institutions after ending supervised independence (ESI). The Project will support the appointees, EU, FIN, KOS, Continued Support to Appointees of the International consultants and their associated support staff in four key Kosovo institutions: Office of the Auditor General, Kosovo NOR, SW, TECHNICAL 549 Kosovo Oct-12 2012 2Y Civilian Representative Whose Appointments Extend Project Management IMG Property Agency, Privatization Agency of Kosovo, and the Constitutional Court of Kosovo. IMG is providing for COMPLETED € 3,050,920.00 CH, TR, UK, ASSISTANCE Past the End of Supervised Independence continued oversight and administrative support of the appointees, consultants, and their associated support staff . USA The project is supported by 8 different donors; the US, EC, UK, Finland, Sweden, Norway, Switzerland, Turkey and Kosovo. General objective is to increase the flow of goods to and from the Gaza Strip by providing support to the upgrading Technical support related to the upgrading of Kerem INFRASTRUCTURE AND 548 Palestine Aug-12 2012 EC 19M Project Management IMG of the Kerem Shalom crossing point and related infrastructure works in order to foster stability and help re-establish COMPLETED € 457,200.00 Shalom border crossing CAPACITY BUILDING the conditions essential for economic development reconstruction and rehabilitation. The responsible The objective of the project is to enhance the efficiency, effectiveness, and transparency of the judicial systems in Regional Cooperation on use of ICT in Judiciaries in INSTITUTIONAL institutions for IT in 547 Montenegro Jun-12 2012 Norway 3Y Implementation the region through encouraging and facilitating regional cooperation in finding and sharing solutions to regional COMPLETED € 183,000.00 the Western Balkans CAPACITY BUILDING the judiciaries in problems and in so doing to avoid duplication of activities and costs in the field of ICT in each individual country. Western Balkans Since early 2011, the Government of the Republic of the Union of Myanmar has committed itself to a reform process and significant steps have already been undertaken at the highest levels of government in order to advance these economic reforms further. This project is designed as a facility to respond quickly to the rapidly changing INSTITUTIONAL Project Management environment, aiming to improve data-driven analysis and policy formulation, as well as skills in these areas for 546 Myanmar Jun-12 2012 EC 18M Support to the promotion of reform in Burma/Myanmar IMG COMPLETED € 1,496,000.00 CAPACITY BUILDING and Implementation government staff and advisors. General Objective is to contribute to a stable and sustainable transition to reform and good governance in Myanmar. Specific Objective is to assist the Myanmar government in the formulation and implementation of reform policies through the provision of urgently needed policy advisory support and capacity building, and material support where indispensable. The overall objective of this project is to contribute to the development of an effective, efficient and accountable Support to Improvement of Civil Servants' Professional Ministry of Foreign public administration. This project proposes to encourage and support the start of the reform process in two INSTITUTIONAL Project Management 545 Myanmar Jun-12 2012 Norway 6M Training Process and Quick Impact Training for ASEAN Affairs; Union Civil components: firstly, by helping the Civil Service leadership to collate and structure information on their needs that will COMPLETED € 407,442.62 CAPACITY BUILDING and Implementation 2014 Chairmanship Service Board be essential for the subsequent development of national policy and strategy; and, secondly, to develop the skills of a core of active and influential staff to be ready chair the ASEAN Summit, and related responsibilities, in 2014. Technical assistance action for the identification, The general objective of this project is to contribute to the identification, preparation, appraisal, supervision and implementation and monitoring of development implementation of potential projects which will, by their execution, contribute to the stabilisation and development of TECHNICAL Palestinian 544 Palestine Mar-12 2012 EC 15M projects in West Bank, Gaza and East Jerusalem as Technical Assistance West Bank, Gaza and East Jerusalem. The main sectors involved cover: infrastructure and utilities, transportation, COMPLETED € 2,947,000.00 ASSISTANCE Authority, ECTAO well as support to PEGASE Direct Financial Support communications, security, justice, agriculture, solid waste management, SMEs, social services, community (PDFS) development, aid mechanisms and planning. SDC (Swiss Monitoring of Rehabilitation Works on Regional Centres for Professional Development of Educators: A) Additional Monitoring Rehabilitation works in RC Krusevac and TECHNICAL Development Co- 543 Serbia Mar-12 2012 Switzerland 22M Technical Assistance works in Regional Centre in Krusevac on the replacement of old windows and B) Reconstruction works and COMPLETED € 20,400.00 RC Smederevo ASSISTANCE operation equipping the accommodation capacities in the same building where Regional Centre in Smederevo operates Belgrade) Procurement, Civil Society, Communication and Media TECHNICAL IMG/EC member 541 Libya Jan-12 2012 EC 18M Assessment COMPLETED € 1,093,186.00 support to Libya ASSISTANCE states Identification and Formulation Mission for the Justice INSTITUTIONAL Project Management 540 Tunisia Feb-12 2012 EC 6M IMG Identification and Formulation Mission for the Justice Programme in Tunisia COMPLETED € 159,929.00 Programme in Tunisia CAPACITY BUILDING and Implementation The media campaign "Equally Towards Europe" and the serial of six episodes to be produced under this project will Gender Equality cover all six areas of the National Strategy for Improving Position of Women and Promoting Gender Equality: (1) Directorate, Improving economic position of women, (2) Increase in decision-making, (3) Achieving gender equality in education, Ministry of Labour 539 Serbia Jan-12 2012 Norway 6M Equaly Towards Europe GENDER EQUALITY Financial Management (4) Improving health of women and promoting gender equality in health policy, (5) Preventing and combating COMPLETED € 46,230.00 and Social Policy violence against women and promoting protection of victims, and (6) Elimination of gender stereotypes in media and of the Republic of promotion of gender equality. It is expected that in this way the Strategy will reach a wider circle of people and that Serbia the awareness of general public of gender equality issues will be raised. Strengthening of Laboratory Examinations and Crime The main objective of the project is to provide high standard equipment and introduce professional methods in the INSTITUTIONAL 538 Serbia Jan-12 2012 Norway 12M Scene Investigations in the Serbian Ministry of Interior's Procurement Ministry of Interior Criminal Technical Centre, in order to make available all possible technical means for effective and accurate COMPLETED € 561,101.32 CAPACITY BUILDING Criminal Technical Centre in Uzice investigation as a part of the overall effort to enhance the fight against crime This is the third phase of the Management Improvement Information Project, with Phases 1 and 2 completed over Financial the last 6 years at the Serbian Ministry of Interior. This is one of the largest and most complex ministries in the Management Information Improvement, Phase 3 INSTITUTIONAL Management, Project Serbian Government, and Phase 3 will put emphasis on thre major components of their activities: Procurement, 537 Serbia Dec-11 2011 Norway 36M TBD COMPLETED € 4,279,585.50 (MIIP3) CAPACITY BUILDING Management Support Human Resources and Document Management. In addition, the Project will provide and implement a separate and Overview group for Business Process Management, to improve future business planning activities. IMG is currently performing a tender for acquisition of implementing partner for this project/ The European Union is offering its assistance to facilitate the democratic transition and help rebuild state institutions. As part of the assistance, a contribution Agreement has been signed on December 24th 2011 between EU and IMG for the implementation of the Capacity Building Public Administration Facility (also called “Public Administration / Public Governance Facility” – PAF/PGF). The PAF/PGF is designed to be flexible and to meet, on a demand-driven basis, the requests of assistance emanating from the Libyan Institutions. For the implementation of the activities, a strong "ownership" perspective is adopted, ensuring Libyan leadership in all the activities, and a peer-to-peer TECHNICAL Project Management 536 Libya Dec-11 2011 EC 39M Public Administration Capacity Building Facility Libya IMG approach, through the provision of experiences and best practices carried out by EU Member States and other COMPLETED € 4,500,000.00 ASSISTANCE and Implementation Transition Countries.Overall objective: - to contribute to the stabilisation and functioning of the Public Administration after the revolution Specific Objectives: - to respond to the immediate needs expressed by Libyan Institutions during the transition process - to provide assistance for initiating cross-cutting governance reforms

3/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Improvement of the usage of Twinning, TAIEX and SIGMA instruments in Azerbaijan, both in quality and quantity; Implementation of Twinning, TAIEX and SIGMA support to the Programme Administration Office (PAO) - to line ministries and other public bodies to acquire the INSTITUTIONAL 535 Azerbaijan Oct-11 2011 EC 2Y Operations (ITTSO) II in Azerbaijan done in Baku, Technical Assistance IMG capacity to manage Twinning, TAIEX and SIGMA instruments on their own; increasement of awareness within the COMPLETED € 1,116,600.00 CAPACITY BUILDING Azerbaijan Government of Azerbaijan on EU assistance in the form of Twinning, TAIEX and SIGMA instruments in the framework of the PCA and future AA; and the support to long-term sustainability of the PAO. General objective is to to support the modernization process of civil police by providing new district headquarter building in Jericho and by preparing a staff needs analysis, enhancing the capacity of the Finance Department of the PCP for an effective management of their resources. Construction of the District Headquarters in Jericho and Expected results: INFRASTRUCTURE & PCP / 534 Palestine Aug-11 2011 Spain 3Y Technical Assistance to Department of Finance of the Project Management − Substantial improvement in operational capacity of Jericho Governorate police forces. COMPLETED € 2,000,000.00 CAPACITY BUILDING EUPOLCOPPS Palestinian Civil Police (PCP) − Improvement of the overall management of the organisation, impact on the staff of the organisation and quality of the service to the public. − Human resources capacity building within the police

Gender Equality Directorate, A One-year Programme for Implementation of Priority The main objective of the Programme is to implement the priority activities in the three areas of the NAP (Decision Project Management Ministry of Labour 533 Serbia Jul-11 2011 Sweden 15M Activities for the Three Areas of the NAP (Decision GENDER EQUALITY making, Economic empowerment and Media), and thus support the efforts of the Serbian authorities in achieving de COMPLETED € 1,467,083.98 and Implementation and Social Policy Making, Economic Empowerment and Media) facto gender equality. of the Republic of Serbia The overall objective is to improve the standard of environmental protection in Serbia and further the country’s Ministry of progress towards European integration. The Programme specific objective is to develop capacity, capability and SIDA Environmental Infrastructure Support Programme INSTITUTIONAL Project Management Agriculture and 532 Serbia Jul-11 2011 Sweden 48M tools of the Department for Project Management of the Ministry responsible environment to oversee the COMPLETED € 4,274,078.55 - Main phase CAPACITY BUILDING and Implementation Environmental programming and implementation of at least €40m of environmental infrastructure projects each year of Protection accreditation and be ready for EU structural funds on accession. The main project objective was to provide the National Fund (NF) with hands-on support in preparing and Technical Support to National Fund of the Ministry of INSTITUTIONAL Project Management National Fund 531 Serbia Mar-11 2011 Sweden 1Y implementing all the activities required to ensure the National Authorising Officer (NAO) and the NF compliance with COMPLETED € 135,587.00 Finance in Preparation for IPARD CAPACITY BUILDING and Implementation MoFA the accreditation criteria in the context of IPARD Technical assistance action for the identification, The general objective of this project is to contribute to the identification, preparation, appraisal, supervision and implementation and monitoring of development implementation of potential projects which will, by their execution, contribute to the stabilisation and development of TECHNICAL Palestinian 530 Palestine May-11 2011 EC 10M projects in West Bank, Gaza and East Jerusalem as Technical Assistance West Bank, Gaza and East Jerusalem. The main sectors involved cover: infrastructure and utilities, transportation, COMPLETED € 2,500,000.00 ASSISTANCE Authority, ECTAO well as support to PEGASE Direct Financial Support communications, security, justice, agriculture, solid waste management, SMEs, social services, community (PDFS) development, aid mechanisms and planning. The focus of this Project was on the implementation of the Document Management System within the MoFA of , what included the Ministry’s Headquarter in , BiH and 52 Diplomatic - Consular Document Management System and System of INFRASTRUCTURE & Project Management Missions worldwide. 529 Bosnia Herzegovina Dec-10 2010 Norway 22M Integral Protection for MoFA of Bosnia and MoFA COMPLETED € 534,386.85 CAPACITY BUILDING and Implementation Herzegovina The second component of the Project was the Integral Protection System - the main goal was the improvement of the physical protection of Ministry’s Headquarter building in Sarajevo, BiH. Institutional and Administrative Capacity Building of Serbian Customs Administration through the The project seeks to assist the Serbian Customs Administration in developing an efficient Business Intelligence INSTITUTIONAL Serbian Customs 528 Serbia Dec-10 2010 Norway 18M Development of Business Intelligence System and Financial Management System which supports the business stragegy of the Customs through facilitation of cooperation with the public COMPLETED € 401,824.50 CAPACITY BUILDING Administration Approximation to Modern European Standards of administration and trade and acceleration of customs procedures. Customs Business The specific objectives of this project are to reduce the negative environmental impact on the generation of Construction of a Solid Waste Treatment Facility in Project Management 527 Lebanon Dec-10 2010 Spain 1Y ENVIRONMENT IMG household waste in the area of Marjeyoun and to contribute to the implementation of the National Solid Waste TERMINATED € 1,289,841.00 Marjeyoun and Implementation Treatment Master Plan Ministry of Environment, SIDA Environmental Infrastructure Support - Inception INSTITUTIONAL The overall objective of the Project is to improve the standard of environmental protection in Serbia and further the 526 Serbia Dec-10 2010 Sweden 5M Financial Management Mining and Spatial COMPLETED € 177,368.88 phase CAPACITY BUILDING country’s progress towards European integration Planning of the Republic of Serbia

Ministry of Justice, The overall goal of the programme is to improve access to justice and restore public confidence in the judiciary. This High Judicial is an institutional support programme that will provide a combination of physical infrastructure support and provision Council, Juvenile for increased administrative capabilities. INFRASTRUCTURE AND Project Management 525 Serbia Nov-10 2010 Norway 49M Improvement of the Delivery of Justice in Serbia Justice Council, The programme is comprised of three project components; COMPLETED € 5,497,791.60 CAPACITY BUILDING and Implementation Higher and Basic 1. Improving Court Performance and Access to Justice Courts in Serbia, 2. Supporting the reform of the Juvenile Justice System Judicial Academy 3. Strengthening the High Judicial Council Development of Basic Police Training Centre in Project Management Ministry of the The overall objective is to assist the Ministry in enhancing the development of professional and accountable police 524 Serbia Nov-10 2010 Norway 1Y POLICING COMPLETED € 329,408.00 Sremska Kamenica Phase II and Implementation Interior force that is be able to respond to the needs of a society in transition striving towards EU accession. The project contributes to the improvement of occupational safety and health (OSH) conditions in Serbia. In the first Improvement of Occupational Safety and Health in INSTITUTIONAL Ministry of Labour year, the focus was on building the capacities of OSH representatives from construction, wood-processing and 523 Serbia Nov-10 2010 Norway 2Y Financial Management COMPLETED 737.553,48 Serbia CAPACITY BUILDING and Social Policy chemical industries in risk assessment and in application of the EU and national OSH standards. The second year focus is on enhancing work conditions in 10 factories from textile, leather and footwear industries. Strengthening the Haitian system of risks and natural The overall objective of the programme is to strengthen the capacity of the Government of the Republic of Haiti in disasters management Civil Protection) TECHNICAL Project Management 522 Haiti Oct-10 2010 EC 20M IMG preventing, managing and overcoming crisis situations arising from natural disasters to which the island is particularly COMPLETED € 13,250,000.00 in the framework of the instrument for stability of the ASSISTANCE and Implementation exposed EU Planning a Retention Center in Lebanon in Line with Project Management The aim of this project is to prepare a final design for building a new retention centre in line with International 521 Lebanon 2010 1905 EC 12M JUSTICE IMG TERMINATED € 189,000.00 International Standards & Implementation standards. The aim of the project is to provide regular water supply to 500 inhabitants of Donji Jasenovnik village in Zubin Potok Municipality, Kosovo, and in the same time improve water supply of in the higher zones of Zubin Potok. The direct Improvement of Water Supply in Municipality of Zubin Project Management Municipality of beneficiaries are inhabitants of the village of Donji Jasenovnik and higher zone of Zubin Potok, as well as the water 520 Kosovo/Serbia Nov-09 2009 Norway 1Y INFRASTRUCTURE COMPLETED € 122,465.00 Potok & Implementation Zubin Potok utility company and the Municipality of Zubin Potok who is the implementation partner to IMG. The main activities comprises preparation of technical documentation and construction of the new water supply network including the new pump station.

4/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Sector for planning, programming, monitoring and Support to the Sector for planning, programming, reporting on EU The overall objective of this project is to support implementaion of Government's Aid Effectivness Startegy and monitoring and reporting on EU funds and development INSTITUTIONAL funds and introduction of programme based approaches at sector level. The project objective is to build capacities of DACU 519 Serbia Oct-10 2010 Sweden 3Y Financial Management COMPLETED € 929,637.39 assistance (DACU) for effective partnership for CAPACITY BUILDING development and with this support contribute to more effective use of ODA, to achieve the Governmnet of Serbia (GoS) policy improved aid assistance (DACU) objectives, particularly those relating to EU integration and Serbia's accession to the Eurpoean Union. of the Serbian European integration office General objective is to support the modernization process of civil police on regional level by providing 3 operational warehouses and 3 IT/communication facilities in order to assist the PCP in logistics and to build up capacity at Extension of the workshops for maintenance and repair central level in the Police for an effective management of their procurement and improve efficiency in INFRASTRUCTURE & PCP / 518 Palestine Jul-10 2010 Spain 2Y of vehicles and electronic equipment for the Palestinian Project Management communication. COMPLETED € 2,500,000.00 CAPACITY BUILDING EUPOLCOPPS Civil Police Expected results: − Substantial improvement in management of police goods and resources − Capacity building with in the police to manage the Warehouses and the IT/communication devices Support to the Section for Agriculture, Food, Forestry and Rural Development of the MoFTER (Ministry of Foreign Support to the Bosnia and Herzegovina Institutions in INSTITUTIONAL Project Management 517 Bosnia Herzegovina Oct-09 2009 Spain 1Y IMG Trade and Economic Relation of B&H) through enhancing the capacity the bodies in charge of management and COMPLETED € 118,000.00 Management and Payment of Agrarian Subsidies CAPACITY BUILDING & Implementation payment of agrarian subsidies. Supply of Equipment and Furniture for 2 VET schools The overall Project objective is to establish 2 modern VET school facilities, fully eqquiped with ICT , VET equipment in Malishevo and Skenderaj, and provision of technical INFRASTRUCTURE & Project Management Ministry of and teaching means in line with the ongoing Educational Reforms and in order to support Kosovo's economy and its 516 Kosovo May-10 2010 Norway 30 M COMPLETED € 3,489,391.95 backstopping to the Managements of the 2 schools in CAPACITY BUILDING and Implementation Education long term objective towards EU integration. As well providing technical support and training of the 2 Managments maintenance and sustainability and school staff in capacity building in sustainability of the facilities and maintanance. Gender Equality Directorate, The overall project objective is to support the current dynamics in the area of gender equality in Serbia, with regards Sida Support to the Gender Equality Directorate of Ministry of Labour to the National Strategy for Improving the Position of Women and Promoting Gender Equality, Gender Equality Law 515 Serbia Apr-10 2010 Sweden 15 M GENDER EQUALITY Financial Management COMPLETED € 394,285.00 Serbia during the Inception Programme and Social Policy and National Action Plan for Gender Equality, by strenghtening the capacity of mandatory actors in order to promote of the Republic of equality between women and men. Serbia The project aims to support the Ministry of Agriculture, Food and Consumer Protection of Albania (MoAFCP) in consolidating the development and regulation of agriculture associations and cooperatives and therefore support the Albanian agricultural (there is no such thing as a rural sector!!!) sector to get closer to European standards through the following activities: INSTITUTIONAL Support to the development of agricultural associations Project Management - Assistance to the MoAFCP in the establishment of a Unit of Agricultural Cooperatives within its structure in charge 514 Albania Feb-10 2010 Spain 1Y CAPACITY BUILDING/ IMG COMPLETED € 120,000.00 and cooperatives (Phase II) & Implementation of promoting agricultural cooperatives Agriculture - Training of technicians and experts of the Unit of Agricultural Cooperatives - Provision of Technical Assistance in the drafting of an Action Plan - Exchange of experience and experts of MoAFCP and Spanish Ministry of Environmental and Rural and Marine Affairs Technical assistance action for the identification, The general objective of this project is to contribute to the identification, preparation, appraisal, supervision and implementation and monitoring of development implementation of potential projects which will, by their execution, contribute to the stabilisation and development of TECHNICAL Palestinian 513 Palestine Sep-10 2010 EC 8M projects in West Bank, Gaza and East Jerusalem as Technical Assistance West Bank, Gaza and East Jerusalem. The main sectors involved cover: infrastructure and utilities, transportation, COMPLETED € 2,000,000.00 ASSISTANCE Authority, ECTAO well as support to PEGASE Direct Financial Support communications, security, justice, agriculture, solid waste management, SMEs, social services, community (PDFS) development, aid mechanisms and planning. The project aims to support candidates and potential candidate countries by presenting the Spanish experience on Support to Candidate and Potential Candidate REGIONAL Project Management the Common Agricultural Policy (CAP) and Rural Development (RD) through the following activities: - organization 512 Bosnia Herzegovina Feb-10 2010 Spain 1Y Countries about Spanish experience in CAP and Rural IMG COMPLETED € 120,000.00 DEVELOPMENT & Implementation of a regional seminar on CAP and RD for EU candidate and potential candidate countries in Madrid - Drafting and Development editing of a Manual for local civil servants In addition to training of the schools’ staff, namely teachers and school directors, the project supported capacity building of the educational advisors from the Regional School Administrations, as they may as well considerably contribute to the development of entrepreneurial education once they are adequately trained. Teachers were trained Development of Entrepreneurship as the Key INSTITUTIONAL Financial management Ministry of 511 Serbia Dec-09 2009 Norway 25M for new teaching methods aimed at development of students’ key competences and entrepreneurship, and for COMPLETED € 395,526.78 Competence in General Secondary Education CAPACITY BUILDING and implementation Education transfer of knowledge and skills in the field of business and economy. In the first year of the project, local trainers provided the expertise, whereas the second year of the project enabled trainings by a Norwegian non-governmental organisation specialised in entrepreneurship trainings in education.

The project represents yet another attempt to contribute to creation of a professional, accountable and efficient public administration. The main output shall be a comprehensive Strategy Paper prepared in a broad-based Ministry of Public consultation process, with active participation of all line ministries as well as the European Integrations Office and Support to Further Improvement of Civil Servants' INSTITUTIONAL Financial management Administration and 510 Serbia Nov-09 2009 Norway 1Y Human Resource Management Agency. The designated civil servant operational team and the five-member local COMPLETED € 353,148.91 Professional Training Process CAPACITY BUILDING & implementation Local Self- consultant team work in close cooperation with Norwegian governmental agency Difi on preparation of the strategic Government document that shall be presented to the Serbian Government. Once officially adopted, this document shall provide a systemic approach to civil servants' training along with clear guidelines, strategic objectives, and training modules.

Strengthen the Rule of Law in Bosnia and Herzegovina by strengthening the police capacities in fighting organized crime through the following activities: - support to the creation of the Strengthening the Rule of Law in Bosnia and Laboratory for Acoustic Forensics within the Forensic Examinations and Expertise Agency of Bosnia and INSTITUTIONAL Project Management 509 Bosnia Herzegovina Nov-09 2009 Spain 1Y Herzegovina by Strengthening of Police Capacities in IMG Herzegovina. - provision of equipment necessary for the COMPLETED € 118,000.00 CAPACITY BUILDING & Implementation the Fight against Organized Crime Border Police to detect evidence of human trafficking and illegal immigration at border crossings - provision of software necessary for extraction of information from digital devices to improve the operational support ca[pacityof the State Investigation and Protection Agency (SIPA) will be acquired. General objective is to support the modernization process of civil police on regional level by providing 3 operational warehouses and 3 IT/communication facilities in order to assist the PCP in logistics and to build up capacity at Construction of Three Palestinian Civil Police central level in the Police for an effective management of their procurement and improve efficiency in Project Management 508 Palestine Nov-09 2009 Spain 30M Warehouse and IT/Communication Facilities in CONSTRUCTION IMG communication. COMPLETED € 2,000,000.00 & Implementation Municipalities of Ramallah, Hebron and Nablus Expected results: − Substantial improvement in management of police goods and resources − Capacity building with in the police to manage the Warehouses and the IT/communication devices

5/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Based on national action plans and drawing from previou regional experinces with specific cooperation with HJPC in Sarajevo, the Project envisages that Montenegro will have a comprehensive system for adjudicating misdemeanours that complies with the requirements of the ECHR and which handles cases in an efficient and cost-effective manner. INSTITUTIONAL It further will ensure that a new Information & Communication Technology (ICT) system is introduced in the judiciary 507 Montenegro Sep-09 2009 Norway 64M Strenghtening the Judiciary in Montenegro Implementation Ministry of Justice COMPLETED € 1,896,691.00 CAPACITY BUILDING of Montenegro to make it more efficient, user friendly and transparent, all with the additional effect of increased public trust. The Project is aiming at reorganisation of the judicial network which should ensure more evenly distributed workload among judges and courts, better organization of work, higher degree of flexibility in the work of the courts and cost-efficiency. The project will be the first in a series of activity phases, each aimed at developing and strengthening DACI's DACI - Directorate strategic operational capability. This first phase will practically deal with data management as a part of strategic INSTITUTIONAL 506 Montenegro Aug-09 2009 Norway 20M Strengthening Strategic Operational Capability of DACI Implementation for Anti-corruption management process (SMP). For this purpose the project has two main components that will run in paralell: one COMPLETED € 89,370.00 CAPACITY BUILDING Initiative related to the production and rollout of software providing for systemic data handling, and the other aimed at building DACI’s capacities for strategic management processes. This project is formulated with the aim to set the basis for the introduction of a comprehensive and efficient system throughout the Serbian administration related to monitoring and evaluation of foreign aid, based on the principles of management for results and coherence with national monitoring and budgeting processes and systems and the Introduction of Result Oriented Monitoring and INSTITUTIONAL 505 Serbia Aug-09 2009 Norway 17M Financial management Ministry of Finance international standards. The main expected output of the project is a study for introduction of an effective M&E COMPLETED € 452,080.92 Evaluation System for External Aid CAPACITY BUILDING system. The project’s outcome should be the establishment of the preconditions to the start the activities on the introduction of the monitoring and evaluation system for external aid within the Serbian governmental authorities, whereas the overall result will be improved effectiveness of external aid provided to the Republic of Serbia.

Creation of Sustainable Management Plan of the INSTITUTIONAL Project Management The project aims to create a sustainable Management Plan for the Neretva basin through hydraulic modelling for 504 Bosnia Herzegovina May-09 2009 Spain 22 M IMG COMPLETED € 450,000.00 Neretva River Basin CAPACITY BUILDING & Implementation prevention of flooding and improvement of existing hydro meteorological network of the Trebisnjica River. The project concept provided by EUPOL COPPS comprises three main elements: constructions of 3 work shops for Construction of Three PCP Vehicle Maintenance maintenance of cars of the civil police fleet, comprising sedan and minibuses (from car manufactures Volkswagen, Project Management 503 Palestine Mar-09 2009 Spain 38M Workshops in Municipalities of Ramallah, Hebron and CONSTRUCTION IMG Ford, Mitsubishi, Peugeot), supply of equipment to be used at the work shops, training of auto mechanics and fleet COMPLETED € 1,500,000.00 & Implementation Nablus manager advisor.The objective of the project as described by EUPOL COOPS is “to guarantee the maintenance of the PCP vehicle fleet. Technical assistance action for the identification, The main aim of the project was to contribute to the identification, preparation, appraisal, supervision and implementation and monitoring of development implementation of potential projects which will, by their execution, contribute to the stabilisation and development of TECHNICAL Palestinian 502 Palestine May-09 2009 EC 16M projects in West Bank, Gaza and East Jerusalem as Technical Assistance West Bank, Gaza and East Jerusalem. The main sectors involved cover infrastructure and utilities, transportation, COMPLETED € 3,963,590.00 ASSISTANCE Authority, ECTAO well as support to PEGASE Direct Financial Support communications, agriculture, small and medium-sized enterprises (SMEs), social services, community development, (PDFS) aid mechanisms and planning. In the process of its approaching the European Union, the countries with the candidate status (Turkey, Croatia, Macedonia) and potential candidates (Albania, Bosnia and Herzegovina, Montenegro and Serbia) are being subject Strengthening Capacities of Civil Servants in Local to significant reforms in the institutional sector. The Administration reform represents one of the first steps to be Administration of Candidate and Potential Candidate REGIONAL Project Management 501 Bosnia Herzegovina Mar-09 2009 Spain 1Y IMG taken in the process of adopting the European regulations, which includes strengthening of local administration COMPLETED € 160,000.00 Countries in the Area of Municipal Decentralization and DEVELOPMENT & Implementation having in mind the process of local decentralization they’ve already initiated. This project aims to transfer Spanish its Tasks in the European Context. experience in this area to the civil servants whose administrations are going through a process of decentralization in favor of minor territorial entities. The present Project is proponed in order to provide the adequate skills and technology, in accordance with the international standards regarding chemical analysis, for the Toxicology Laboratory of the National Criminalistics Technical Center. This will result with the improvement of security and citizen’s rights in Serbia, as well as with the Support to the Scientific Police of the Republic of reliability of the justice system of the country. INSTITUTIONAL Project Management 500 Serbia Mar-09 2009 Spain 18 M Serbia through capacity building of the Toxicology IMG The Project will be focused on the urgent needs of the Toxicology Laboratory, concerning the determination of drugs, COMPLETED € 191,663.31 CAPACITY BUILDING & Implementation Laboratory. pesticides, medicaments and biological samples, having in mind that in the present moment this laboratory only has the equipment for the analysis and measurement of the heavy metals and blood alcohol level. The object of this Project is strengthening of the bonds between Spanish and Serbian authorities, in order to guarantee stable relations regarding scientific police cooperation.

Support to the Competent Institutions in the Area of As part of the reconstruction process of the Balkan countries, Spain has been offering support to the electric energy Energy of Bosnia and Herzegovina with sector of Bosnia and Herzegovina through reconstruction projects and trainings for professionals and managers Project Management 499 Bosnia Herzegovina 2009 2009 Spain 1Y the purpose of Transposition of the European Directive ENERGY IMG within the sector. The second phase of the works has been centered on the support to the strengthening of the COMPLETED € 102,000.00 & Implementation concerning the Promotion of Green Electricity. Ministries of Energy of both entities and the Electricity Companies in gaining knowledge on renewable energies and promotion of their use for the generation of electricity. Strengthening of police and judicial structures of Bosnia and Herzegovina in fighting the organized crime. Increasing Support to the Police and Judicial Structures of Bosnia INSTITUTIONAL Project Management the capacity of surveilance and control of the border passes of B&H and increasing capacities of B&H prosecutors 498 Bosnia Herzegovina 2009 2009 Spain 1Y IMG COMPLETED € 192,000.00 and Herzegovina in fighting the organized crime CAPACITY BUILDING & Implementation and police inspectors to fight the organized crime through an effective use of new technologies of interception of telecommunications Building capacities for the Use and the Promotion of Project Management Promotion of use of solar energy in Serbia. Institutional strengthening of the Renewable Energy Department of the 497 Serbia 2008 2008 Spain 2 Y ENERGY IMG COMPLETED € 229,500.00 Solar Energy in Serbia & Implementation AEES. INSTITUTIONAL Training of specialists of Agrarian Extension Services (AES) on application of new techniques and systems of Strengthening the Agrarian Extension Services in the Project Management 496 Albania 2008 2008 Spain 1Y CAPACITY BUILDING/ IMG agrarian production and management, as well as the methods of support and advising the farmers and cattle- COMPLETED € 120,000.00 region of Diber. & Implementation AGRICULTURE breeders.Equipping information centres in communes of Agrarian Extension Services in Diber. Support to the Armed Forces of Bosnia and INSTITUTIONAL Project Management Reduction of mined areas in Bosnia and Herzegovina.Support to the Armed Forces of Bosnia and Herzegovina in 495 Bosnia Herzegovina 2008 2008 Spain 1Y IMG COMPLETED € 120,000.00 Herzegovina in its Minesweeping Efforts CAPACITY BUILDING & Implementation demining of its territory Strengthening of the Independent System Operator of In Bosnia and Herzegovina, production of electric power out of renewable sources is 38% of the total produced Bosnia and Herzegovina (ISO B&H) in management of electric power. This relates to the energy from hydro power plants. There is no energy obtained from other Project Management 494 Bosnia Herzegovina Nov-08 2008 Spain 18 M electricity generated by renewable energies ENERGY IMG renewable sources. COMPLETED € 100,000.00 & Implementation At the moment there is a huge interest for construction of small hydro power plants (MHE) and authorized ministries have already given certain number of concessions. Strengthening of the Criminalistics Centers of Bosnia INSTITUTIONAL Project Management 493 Bosnia Herzegovina 2008 2008 Spain 2 Y and Herzegovina IMG Strengthening of criminalistic centres of Bosnia and Herzegovina COMPLETED € 136,000.00 CAPACITY BUILDING & Implementation Establishment of the new Norwegian Embassy in Prishtina; preparation of the Project Design and Follow up of the Establishmen tof the Royal Norwegian Representation 492 Serbia/Kosovo 2008 2008 Norway 1 Y CONSTRUCTION Implementation NMFA Fit out works of the new Chancellery, with 260m2 placed in the central area of Prishtina in the ground floor of an COMPLETED € 215,000.00 Office in Pristina apartment Building. Project objectives are to comprehensively update, develop, and operationalise the SMDP for East Jerusalem and to Technical Assistance Action in Favour of the Office of OFFICE OF THE 491 Palestine 2008 2008 EC 24M CAPACITY BUILDING Technical Assistance establish a Monitoring and Coordination Section within the Jerusalem Unit of the President, capable of developing COMPLETED € 300,000.00 the President of the Palestinian Authority PRESIDENT and overseeing implementation of the SMDP for East Jerusalem

6/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Technical assistance action for the identification, To contribute to the identification, preparation, appraisal, supervision and implementation of potential projects. To implementation and monitoring of development TECHNICAL Palestinian continue monitoring support to new and ongoing infrastructure projects and other projects financed by the EC in 490 Palestine Apr-08 2008 EC 13M projects in West Bank, Gaza and East Jerusalem as Technical Assistance COMPLETED € 2,800,000.00 ASSISTANCE Authority, ECTAO West Bank, Gaza and East Jerusalem. To provide technical assistance and institutional building to PA. To support well as support to PEGASE Direct Financial Support any other activities related to the provision of services of PEGASE Direct Financial Support (PDFS) operations. (PDFS) High Level Review of Infrastructure and Construction Elements of the OSCE Economic Rehabilitation Programme in South Ossetia prepared for thr Office of Internal Oversight (OIO), based on site visits in South Ossetia and analysis REGIONAL 489 Georgia 2008 2008 OSCE 2M Georgia OSCE's programme assessment Evaluation OSCE of project documentation in OSCE office in Tbilisi. COMPLETED € 47,434.00 DEVELOPMENT Total value of Economic Rehabilitation Programme in South Ossetia was 10,000,000€

High Business IMG is implementer of the project in regards to constructing, furnishing and equipping the centre in Leskovac , as Project Management 488 Serbia 2008 2008 Norway 2Y High business School in Leskovac EDUCATION School, Ministry of well as administrative support to the twinning component between Higher Business School in Leskovac and the COMPLETED € 2,254,008.00 & Implementation Education Norwegian counterpart (Nordland Fylkeskommune and Bodo Graduate School of Business). This project should improve social activity and progress of all sectors in the community, improve cooperation of all Ministry of Sport, stakeholders in the local community, school, hospital, school clubs, school sport organisations and youth Football 487 Serbia 2008 2008 Norway 1Y Mini Pitches Intended for Young People CONSTRUCTION Implementation organisations. Schools and local initiatives should promote sport as an agent of health and healthy life and make COMPLETED € 500,000.00 Association of possible massive practicing of sport, as well as make promotion and provide condition and scheme for women’s Serbia sport. Construction of Two Vocational Education Secondary Schools in Kosovo, financed jointly by Norway and Kosovo. One of the schools is located in the Municipality of Skenderaj with profiles for Construction and the school in Ministry of 486 Kosovo 2008 2008 Norway 3Y Construction of Two Vocational Secondary Schools EDUCATION Implementation Malishevo for Commerce, Administration and Trade profiles. Both schools are built with capacity of 1000 students COMPLETED € 11,021,705.39 Education and Nett surface of cca 9600m2 each. The two buildings have become model schools for the region regarding their architectural features, functionality, and sustainability in energy efficiency/ renewable energy systems.

Reconstruction of the distribution network in Local communities Ratkovici and Skenderovici located on the territory of Srebrenica municipality in order to provide better power supply and enable return of refugees. Through rehabilitation Reconstruction of Electrical Power Supply System in 485 Bosnia Herzegovina 2008 2008 Norway 1Y RECONSTRUCTION Implementation NTE of the electricity distribution system this Power Distribution Project will result in improved living conditions for the local COMPLETED € 1,158,125.00 Srebrenica Municipality population and an improved business environment for the private sector. This will create further conditions for economic development and return of refugees and displaced persons.

Development of Civil Society as a Vehicle to Preserve Strengthening the Kosovo Serb community through building a sustainable and operative civil society in Kosovo Serb REGIONAL Centre for 484 Serbia 2008 2008 Sweden 9M Kosovo Serb Community in the Status Decision Monitoring municipalities. The main goal is to fasciliate the integration of Kosovo Serb communities in Kosovo structures by COMPLETED € 33,000.00 DEVELOPMENT Migration Studies Aftermath establishing functioning local NGOs to represent and promote interesests and needs of the local communities.

The project represents support in efficient incorporation and implementation of international anticorruption conventions into national legislative and institutional framework, in accordance with the measures set by the Action DACI - Directorate Support for the Implementation of International Anti- Plan for implementation of Programme of Combating Corruption and Organized Crime, as well as by the Action Plan 483 Montenegro 2008 2008 Norway 1Y CAPACITY BUILDING Implementation for Anti-corruption COMPLETED € 195,297.43 corruption Standards and Instruments in Montenegro for implementation of European Partnership for Montenegro. Activities to be carried out comprise expert assistance Initiative for appropriate authorities (police, prosecution, courts, etc.) in order to provide efficient implementation of provisions of the UN Convention against corruption, related to the recovery of assets. Centre for Liberal Democratic The main goal of the project is to strengthen mechanisms for combating poverty and social exclusion in the under Monitoring and Studies, Standing capacitated municipalities in Serbia. The project will contribute to a more balanced regional development, giving the 482 Serbia 2008 2008 Norway 2Y Local Mechanisms for Social Inclusion SOCIAL SECTOR COMPLETED € 621,686.10 advisory services Conference of small communities an opportunity to progress equally with the larger and more developed municipalities and towns Towns and towards sustainable social inclusion programmes Municipalities Centre for Liberal Democratic The goal of the project is to effectively implement PRSP at the local level, and to assist the SCTM and local Monitoring and Studies, Standing 481 Serbia 2008 2008 Norway 1Y Tools and Mechanisms for local development - Phase 2 SOCIAL SECTOR governments in 15 selected under-capacitated municipalities in building their capacity to become efficient and COMPLETED € 427,620.00 advisory services Conference of responsible in planning and implementing local development plans including the vulnerable groups aspect Towns and Municipalities The overall goal of the project proposed by the Serbian authorities is establishing an institutional and organizational Monitoring the Reconstruction Works on Regional framework for in-service training of educators from the Nis region. A part of the project is directed towards 480 Serbia 2008 2008 Switzerland Indefinite Centres for Professional Development of Educators in EDUCATION Monitoring SDC establishing a centre for professional development of educators for the Nis region by constructing and equipping the COMPLETED € 30,020.00 Serbia necessary facilities. In addition, the project will comprise specific expert training and development of strategic documents. Ministry of Juctice, higher and basic The project is based on the findings and recommendations from the first phase of the project “Improving the delivery courts, Judicial of justice in courts in Serbia” funded by the Royal Norwegian Ministry of foreign Affairs.The overall goal of this Improving the Delivery of Justice in the Courts in Serbia- INFRASTRUCTURE & Project Management Academy, 479 Serbia 2008 2008 Norway 2Y project is to improve access to justice to all citizens in Serbia, in line with Governmental priorities such as the COMPLETED € 1,414,278.03 Phase 2 CAPACITY BUILDING & Implementation Supreme Court, National Judicial Reform Strategy and the PRSP and international standards and requirements such as the Mediation centre, requirements for EU Accession. High Judicial Council The project is being implemented as a continuance of JuNo III and JuNo IV projects, targeting a new number of police stations and districts. On a larger scale, JuNo projects will have a clear impact on inhabitants and civil society JUNO V - Development of Community Policing through Norwegian Police as a whole, as the general population and the international community will benefit from the standpoint of presence of 478 Serbia 2008 2008 Norway 1Y CAPACITY BUILDING Technical Assistance COMPLETED € 246,703.36 Facilitating Training and POP Directorate another professional and competent police service in the region. Mutual co-operation between police forces of Serbia and other European Countries will aid EU integration and fight against corruption, organized crime, human trafficking and terrorism A second judicial reform project that focused primarily on the Judicial Council commenced in August. The aim of the project was to strengthen the institutional capacity of the Judicial Council. This project also was based on a Ministry of Justice Reform Programme - Regional Cooperation in cooperative arrangement between Montenegro and BiH and included an exchange of experts from both countries. Juctice/Judicial 477 Montenegro 2008 2008 Norway 2Y Support of an Independent and Efficient Judiciary in CAPACITY BUILDING Implementation Project activities include procurement of equipment and furniture for the Judicial Council, preparation of a design COMPLETED € 428,598.26 Council of Montenegro II for permanent premises of the Judicial Council and a study visit to Norway for key persons within the Ministry of Montenegro Justice and the Judicial Council. Project activities from the first project were also expanded and given an additional 6 months in which to be completed.

Technical services to UNRWA in relation to the The overall objective of the project is to assist UNRWA in the implementation of the Programme Rehabilitation of 476 Lebanon 2008 2008 EC 1Y Rehabilitation of Nahr El Bared Camp in Northern TECHNICAL SUPPORT Implementation IMG the Nahr El-Bared Camp (NBC) and to provide technical expertise in accordance with requests and needs of COMPLETED € 288,225.00 Lebanon UNRWA and within the framework of the Rehabilitation of Nahr El Bared Camp Programme.

7/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration IMG provides Technical Assistance (TA) to the Lebanese Government for the identification, implementation and monitoring of development, reconstruction and economic recovery projects in Lebanon. These projects are funded Technical Assistance in favour of Lebanon in the TECHNICAL Project Management through two Financing Agreements signed between the European Commission and the Council of Development and 475 Lebanon 2007 2007 EC 6Y framework of support to reconstruction and economic CDR and OMSAR COMPLETED € 6,295,903.00 ASSISTANCE & Implementation Reconstruction (CDR) and Office of the Minister of State for Administrative Reform (OMSAR). These two recovery Government Institutions are the main beneficiaries, but not the only ones, of the IMG TA. CDR and OMSAR are managing the implementation of the projects financed under the two Financing Agreements. IT and technical support to the implementation of the TIM contribution to the monthly payments of salaries and Further Technical Assistance Action in the West Bank pensions to the civil servants and pensioners of the Palestinian Authority; allowances to vulnerable Palestinian 474 Palestine 2007 2007 EC 5M and Gaza Strip to Support Temporary International TECHNICAL SUPPORT Technical Assistance EC COMPLETED € 700,000.00 families; payments of the Palestinian Authority’s arrears to the private sector businesses; maintenance of the Mechanism database on the fuel delivered through the TIM to the Gaza Power Plant. Technical Assistance for Urgent projects in the West TECHNICAL Technical assistance for the identification, implementation and monitoring of development projects in the West Bank 473 Palestine Jul-07 2007 EC 16M Bank and Gaza strip and reinforce monitoring of on- Technical Assistance EC COMPLETED € 2,352,000.00 ASSISTANCE and Gaza. going projects PNA IT and technical support to the implementation of the TIM contribution to the monthly payments of salaries and Further Technical Assistance Action in the West Bank pensions to the civil servants and pensioners of the Palestinian Authority; allowances to vulnerable Palestinian TECHNICAL 472 Palestine Jul-07 2007 EC 4M and Gaza Strip to Support Temporary International Technical Assistance EC families; payments of the Palestinian Authority’s arrears to the private sector businesses; maintenance of the COMPLETED € 562,000.00 ASSISTANCE Mechanism database on the fuel delivered through the TIM to the Gaza Power Plant. Monitoring of fuel distribution in the Gaza Strip. The project objectives are to design, procure and implement new processes and systems in the areas of vehicle Management Information Improvement Project, management and building management, to review and design an overall IT architecture and the improvement of the 471 Serbia 2007 2007 Norway 1 Y Financial Management of the Ministry of Interior - MIP IT Monitoring Ministry of Interior MoI capacity to identify policy priorities and plan and budget at strategic and operational levels for the COMPLETED € 412,214.00 Phase 2-Step 3,4 and 5 implementation of these priorities

The project addresses 2 main priorities in the Strategy for Reform of judiciary in Montenegro adopted in July 2007; 1) Reform of the misdemeanour system and 2) Support to the Judicial Council. The judicial reform project is based on a cooperative arrangement between Bosnia and Herzegovina and Montenegro. The idea of the project is to 470 Montenegro 2007 2007 Norway 1Y Justice Reform Programme CAPACITY BUILDING Implementation Ministry of Juctice transfer lessons learned in BiH in the area of judicial reform to Montenegro and to strengthen cooperation between COMPLETED € 373,785.20 two countries in the judicial arena. The project provides for experts from HJPC and from the judiciary at large in BiH to participate in project activities together with Montenegrin experts in the judiciary to achieve the project objectives and for study visits to the HJPC. Strengthening Capacity of the National Criminal The main objective of the project is to provide high standard equipment and introduce professional methods in the 469 Serbia 2007 2007 Norway 1Y Technical Centre in Belgrade to Conduct Crime Scene CAPACITY BUILDING Procurement OSCE Criminal Technical Centre, in order to make available all possible technical means for effective and accurate COMPLETED € 690,410.00 and Forensic Investigations investigation as a part of the overall effort to enhance the fight against crime The project,implemented jointly by the Norwegian municipality of Lillehammer and IMG, sought to support Establishment of City Manager in Bujanovac Municipality of Bujanovac municipality in its sustainable development through establishment of a professional city manager. A 468 Serbia 2007 2007 Norway 1Y CAPACITY BUILDING Implementation COMPLETED € 176,577.00 Municipality Bujanovac crucial element was enabling the local authorities to implement future investments on their own and with little or no external support, with the focus on continuous community involvement. Technical Municipality of Construction of a pedestrian pathway for school children outside the centre of Maliseve. The implemementation was 467 Serbia/Kosovo 2007 2007 Norway 1Y Support to Municipality of Maleseve RECONSTRUCTION COMPLETED € 70,000.00 Assistance/Monitoring Maleseve carried out by the technicla department of the Municipality.

Technical Municipality of Construction of sports facilities for the youth in Zubin Potok Municipality. The implemementation was carried out by 466 Serbia/Kosovo 2007 2007 Norway 1Y Support to Municipality of Zubin potok RECONSTRUCTION COMPLETED € 72,000.00 Assistance/Monitoring Zubin potok the technicla department of the Municipality.

Technical Municipality of Rehabilitiation and improvement of recreation area inside the town boarder of Zvecan. The implemementation was 465 Serbia/Kosovo 2007 2007 Norway 1Y Support to Municipality of Zvecan RECONSTRUCTION COMPLETED € 42,000.00 Assistance/Monitoring Zvecan carried out by the technicla department of the Municipality.

Ministry of Juctice, Supreme Court, Association of The overall goal of this project is to improve access to justice to all citizens in Serbia, in line with Governmental INFRASTRUCTURE & Project Management 464 Serbia 2007 2007 Norway 1Y Improving the Delivery of Justice in the Courts in Serbia Judges, Judicial priorities such as the National Judicial Reform Strategy and the PRSP and international standards and requirements COMPLETED € 1,111,215.89 CAPACITY BUILDING & Implementation Training Centre, such as the requirements for EU Accession. municipal courts in Serbia The expected project outputs are: completed Bosnia River watershed monitoring system, elaborated data banks Support to the elaboration of hydrology plan for Bosnia Project Management necessary for comprehensive management of the watershed, designed and calibrated hydrodynamic and advection- 463 Bosnia Herzegovina 2007 2007 Spain 30 M ENVIRONMENT IMG COMPLETED € 470,000.00 river basin & Implementation dispresion models of accidental spills, elaborated flood risk maps, completed proposal for the Action Plan for the future comprehensive management of Bosnia River watershed Support to the Creation of a Governing Judicial INSTITUTIONAL Institution in Serbia and to Enabling a System for Project Management Support to the Creation of a governing organ of Judicial Power in Serbia to Protect Its Independency and Guarantee 462 Serbia 2007. 2007 Spain 2 Y CAPACITY BUILDING/ IMG COMPLETED € 170,000.00 Objective and Efficient Selection and Training of & Implementation a System for Objective and Efficient Selection and Training of Judges. Judicial Judges INSTITUTIONAL Support to Development of Agrarian Associacionism Project Management The Spanish government financed the project aimed at support to the development of agrarian associations and 461 Albania 2007. 2007 Spain 2 Y CAPACITY BUILDING/ IMG COMPLETED € 250,000.00 and Cooperativism in Albania & Implementation cooperatives in Albania. Adaptation of the existing Albanian legislation regarding agrarian cooperatives Agriculture The project bore considerable similarities to JuNo III project implemented in the Autonomous Province of Vojvodina, JUNO IV - Capacity Building in Strategic Management, CAPACITY BUILDING- Norwegian Police with a scope covering the remaining police departments in Serbia. The newly procured equipment should lead to 460 Serbia 2007 2007 Norway 1Y Technical Assistance COMPLETED € 223,000.00 Analysis and POP POLICE Directorate advancement of the capacities of the Serbian police with regard to community policing, in line with the ongoing transformation of the Serbian policing system. Study of possibility of usage and promotion of Project Management 459 Bosnia Herzegovina 2007 2007 Spain ENERGY IMG Study of Possibilities of Use and Promotion of Development of Solar Energy in Bosnia and Herzegovina COMPLETED € 204,000.00 development of solar energy in B&H & Implementation IT and technical support to the implementation of the TIM contribution to the monthly payments of salaries and Further Technical Assistance action in the West Bank pensions to the civil servants and pensioners of the Palestinian Authority; allowances to vulnerable Palestinian 458 Palestine 2007 2007 EC 4M and Gaza Strip to Support Temporary International TECHNICAL SUPPORT Technical Assistance EC families; payments of the Palestinian Authority’s arrears to the private sector businesses; maintenance of the COMPLETED € 725,000.00 Mechanism database on the fuel delivered through the TIM to the Gaza Power Plant. Monitoring of fuel distribution in the Gaza Strip. Once construction of facilities was completed, this project focus shifted to procurement of equipment for a total of six Implementation and OSCE; Ministry of classrooms (two in each of the Police Departments) and three offices (one per Department). This was seen as a 457 Serbia 2007 2007 Norway 1 Y South Serbia Police Equipment LAW ENFORCEMENT COMPLETED € 250,000.00 advisory services the Interior major step toward meeting the international standards to provide the optimum learning environment for short, medium and long-term professional development of all police officers, and potentially the public in this region.

The purpose of this project is to support the return and reestablishment of normality in Kosovo, through micro Serbia and Support for the return of the minority refugees to Project Management 456 2007 2007 Spain 1 Y RECONSTRUCTION IMG projects of basic infrastructure: reparation of electrical network, school reconstruction, health centers, equipping of COMPLETED € 40,000.00 Montenegro Kosovo executed by Spanish troops of KFOR 2006 & Implementation primary and secondary schools, rehabilitation of public spaces and roads, executed by Spanish troops of KFOR. 455 Somalia 2007 2007 Italy 1 Y Somalia Water Projects Study WATER Implementation COMPLETED € 76,666.00

8/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Rehabilitation of State Secondary School "Pero Nakov" Rehabilitation of State Secondary School "Pero Nakov" in Kumanovo and Establishment of Secondary Educational 454 Macedonia 2006/2007 2006 Italy 1Y in Kumanovo and Establishment of Secondary RECONSTRUCTION Implementation IMG COMPLETED € 580,000.00 Centre in Educational Centre in Lipkovo Municipality HOUSING & PUBLIC Design and construction of provincial ofices for the Ministry of Justice Departments of "Huquq"and "Government Construction and rehabilitation of judicial facilities in the 453 Afghanistan 2006 2006 Italy 14 M BUILDING/ LOW Implementation MoJ/AGO Cases"in six provinces of Parwan, Jawzjan, Daikundi, Nuristan, Ghor, Faryab, Takhar, Samangan and Badghis; COMPLETED € 5,000,000.00 targeted provinces ENFORCEMENT provision of 50 vehicles for the Attorney General's Office Completion of Hospital "Our Lady of Good Council", RECONSTRUCTION/ As a part of the overall programme of support to the health care sector in Albania, the Italian Ministry of Foreign 452 Albania 2006 2006 Italy 3 Y Technical Assistance IMG COMPLETED € 10,000,000.00 civil works, supervision, 1st phase HEALTH Affairs made a contribution available, targeting the completion of the hospital "Our Lady of Good Council" The aim of said subvention is to capacitate farmers and livestock farmers in the development of agrarian and Strengthening of Sustainable Agricultural Production INSTITUTIONAL livestock techniques of low input for sustainable agricultural production and to make small farmers aware of the 451 Albania 2006 2006 Spain 14 M and Association in the Districts of Malesi, Madhe and CAPACITY BUILDING/ Technical Assistance IMG COMPLETED € 70,000.00 importance of creating peasant networks and farmer associations for the commercialisation and stocking of Shkoder Agriculture products. 450 Any 2006 2006 Italy 11 M Post Emergency Centre (PEC) INFRASTRUCTURE Coordination COMPLETED € 317,856.00 The general objectives: - to contribute to the identification, design and implementation of EC funded projects - to support new and ongoing infrastructure projects and other projects financed by the EC Damage and Needs Assessment in favour of Lebanon - to assist the relevant authorities and organizations in Lebanon in the planning, management and coordination of the INFRASTRUCTURE & 449 Lebanon 2006 2006 EC 2M in the framework of support to reconstruction and Implementation IMG reconstruction and reform processes as requested COMPLETED € 5,499,270.00 HOUSING economic recovery - to contribute to technical assistance and institution building support, including human resource development through relevant training activities - to assist approved authorities, institutions and entities in tasks that would require IMG technical expertise - to provide ad-hoc technical assistance as further needs are identified Main project objective is to provide reliable water supply to the consumers of the second consumption zone, which is REGIONAL Monitoring and not included into SECO three-year water supply improvement program. 448 Bosnia Herzegovina 2006 2006 Norway 1 Y Expansion of the existing well source in Prijedorcanka PUC Vodovod COMPLETED € 270,500.00 DEVELOPMENT advisory services Specific objective of the project is expansion of existing well-source Prijedorcanka by construction of a new well that will be connected to the existing second zone distribution network. The aim of subvention was to support the “Public Water Company for the Region of the Adriatic Basins” in its Project Management objective of completely and integrally administering the Neretva river basin, one of the most important ones of the 447 Bosnia Herzegovina 2006 2006 Spain Integral management of Neretva basin ENVIRONMENT IMG COMPLETED € 175,000.00 & Implementation country. The implementation of this project represented a fundamental support in the start-up of the new order and administration system of water in Bosnia and Herzegovina. Support to the establishment and strengthening of the The main projec objective was to support the strengthening of police and judicial institutions on a state level in INSTITUTIONAL Project Management 446 Bosnia Herzegovina 2006 2006 Spain 2Y Financial Intelligence Department (FID) of SIPA in B&H IMG Bosnia and Herzegovina, with the objective of strengthening the State of Law and the fight against organised crime, COMPLETED € 190,000.00 CAPACITY BUILDING & Implementation / Phase II and in order to do so, the consolidation of the Financial Inteligence Department was supported. Support to creation of judicial documentation centre of Project Management Objective of the project was to offer support to the consolidation of a State of Law through the strengthening of the 445 Bosnia Herzegovina 2006 2006 Spain MULTI SECTOR IMG COMPLETED € 175,000.00 B&H & Implementation judicial power, supporting and efficient administration of Justice. General project objectives Institutional Support to the Formulation of Laws and 1.development of a legislation on employment integration 444 China 2006 2006 Italy 3 Y Regulations aimed at the Social Integration of Persons LAW ENFORCEMENT Implementation CDPF 2. elaboration of provisions regarding rehabilitation COMPLETED € 481,635.00 with Disabilities 3. adaptation of existing norms in the field of instruction and education 4. adaptation of the General Law The specific project activities in this field are study and investigation of comparative Italian and Chinese laws, innovation or re-elaboration of Chinese laws, study trips to Italy and the training of ministerial technicians in charge of 443 China 2006 2006 Italy 3 Y Study and Activity LAW ENFORCEMENT Implementation CDPF COMPLETED € 518,365.00 dealing with the issue of architectonical, sensorial and cultural barriers, as well as the training of CDPF managers in the field of rehabilitation. The project was aimed at: Euro-Mediterranean Promoting the Euro-Mediterranean Dialogue - INTERNATIONAL •Increasing the public awareness regarding the Italian Cooperation in the Mediterranean region in order to promote 442 2006 2006 Italy 18 M Project Management Movimondo COMPLETED € 598,500.00 Region MOVIMONDO COOPERATION the relationship between various stakeholders involved in the same sectors •Enhancing the development of processes on both economic and intercultural level of the Euro-Mediterranean INTERNATIONAL 441 Europe 2006 2006 Italy 2 Y Miscellaneous Technical Assistance COMPLETED € 19,916.00 COOPERATION Technical support to the Ministry of Health in the 440 Honduras 2006 2006 Italy 18 M HEALTH Technical Assistance Equipment for the Hospital Maria Especialidades Pediátricas (HMEP) in Tegucigalpa COMPLETED € 386,545.00 Republic of Honduras INTERNATIONAL 439 International 2006 2006 Italy 10 M Event support Ad Hoc Media Training Facility EMP Technical Assistance COMPLETED € 1,328,250.00 COOPERATION Una via Europea al Microcredito nella lotta alla poverty - INTERNATIONAL 438 International 2006 2006 Italy 1 M Technical Assistance COMPLETED € 92,400.00 IPALMO COOPERATION The European Commission assistance programme to Iraq for 2007 provided a total additional budget of €55 million. This assistance programme supports clear, strategic aims for the European Commission technical assistance activities in Iraq, which support the National Development Strategy and the International Compact for Iraq 437 Iraq 2006 2006 EC 4 Y Technical Assistance Global Facility COMPLETED € 6,000,000.00 benchmarks. IMG provides technical assistance which supports the development of priority, bilateral projects to be financially supported by the EC. The Technical Assistance Facility assists in the identification and development of assistance projects which support the Commission's overall ovjectives in Iraq. The project envisages building one Maternity Waiting Home (MWH) – i.e. the “Silk Home”, in each of the 17 districts of the Provinces of Saravan, Sekong and Attapeu, located in the South of Lao PDR, where Maternal and Infant Mortality Rates (MMR & IMR) and poverty are particularly high. Lao People's The “Silk Homes” - multi-function centres for The main objective of the project of the “Silk Home” is the reduction of Maternal Mortality Rate (MMR) & Infant SOCIAL SECTOR/ 436 Democratic 2006 2006 Italy 2 Y information, education and safe delivery for remote Implementation IMG Mortality Rate (IMR) by providing easy access to adequate medical services during the most critical period of the COMPLETED € 2,000,000.00 HEALTH Republic areas in Laos- Silk homes equipment reproductive process. However the more general objective is the improvement of health in communities and ethnic minorities living in remote and isolated mountains, by integrating various health programmes with economic interventions and small income generating activities, granting micro credits, facilitating marketing of local products and by organizing training and health education courses for mothers. General project objective was contribute to the reconstruction process of the country by undertaking a complete and INFRASTRUCTURE & 435 Lebanon 2006 2006 EC 1 M War Damage and Needs Assessment in Lebanon Implementation IMG comprehensive damage assessment – public infrastructure, energy, water and sewage and transport - in COMPLETED € 208,000.00 HOUSING cooperation with the Lebanese authorities IMG contributed to the rapid damage assessment in the public infrastructure sector: • Transport infrastructure – roads, bridges, dams and ports; INFRASTRUCTURE & • Water network and sewerage infrastructure; 434 Lebanon 2006 2006 EC 1 M Needs Assessment in Lebanon Implementation IMG COMPLETED € 280,000.00 HOUSING • Energy sector; • Public buildings

The implementation of the programme targeting the recovery of the cemetery area "El Hammangi"in Tripoli focuses Environmental recovery and rehabilitation of Italian ENVIRONMENT & 433 Libya 2006 2006 Italy 18 M Implementation IMG on two main components: rehabilitation of the Italian Cemetery located within the overall cemetery area and the COMPLETED € 3,800,000.00 Cemetery in Tripoli- works 2nd phase RECOVERY environmental recovery of all surrounding area.

9/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration The general objectives of the project are: • To contribute to the identification and appraisal of potential projects in the West Bank, Gaza Strip and East Jerusalem. • To continue assisting in the implementation of the EC-Funded Technical Assistance acction in favour of P. A. a. The projects • To continue monitoring support • To continue to provide IT support. • To contribute to technical assistance 432 Palestine 2006 2006 EC 12M identification of urgent projects in the Gaza Strip b. The CAPACITY BUILDING Technical Assistance ECTAO COMPLETED € 1,562,505.00 and institutional building support The above mentioned activities are carried out in accordance with the overall reinforced monitoring of WBGS on-going projects strategy of the European Commission, in agreement with and under the supervision of the European Commission Technical Assistance Office. IT and technical support to the implementation of the TIM contribution to the monthly payments of salaries and pensions to the civil servants and pensioners of the Palestinian Authority; allowances to vulnerable Palestinian Support to EC Payment Mechanism in West Bank and 431 Palestine 2006 2006 EC 8M TECHNICAL SUPPORT Technical Assistance families; payments of the Palestinian Authority’s arrears to the private sector businesses; maintenance of the COMPLETED € 1,515,000.00 Gaza Strip database on the fuel delivered through the TIM to the Gaza Power Plant. Monitoring of fuel distribution in the Gaza Strip. The current IMG project "Pilot Activities for Education and Culture"financed by the Italian Ministry of Foreign Affairs, aims to assist the Macedonian Government in the administrative decentralization of the Institutional activities of the EDUCATION AND Ministry of Culture, the Ministry of Education and Science and Ministry of Local and Self-Goverment.It also aims to 430 Macedonia 2006 2006 Italy 18 M Pilot Activities for Education and Culture Implementation IMG COMPLETED € 3,000,000.00 CULTURE assist the Government of Macedonia in the recording, preservation and valorisation of the national cultural heritage of the country, with a view to making it fully accessible to the public and to protect and engance its potential withing the framework of the sustainable development of the territory.

The Norwegian schools programme, which has contributed via IMG to the rehabilitation of more than 30 school buildings since 2005, has supported the Government of Macedonia in its efforts to improve the educational Emergency Rehabilitation of 4 Schools in 4 standards withing the school system of the country. With the completion of this programme, functional buildings were 429 Macedonia 2006 2006 Norway 8 M EDUCATION Implementation IMG COMPLETED € 247,300.00 Municipalities provided to the pupils and schools staff operating in these facilities, improving the working and teaching environment. During the period April 2007 to March 2008, IMg has completed the project of rehabilitation of four schools in the municipalities of Krivogashtani, Negotino, Bosilovo and Bogdanci. Evaluation of Water Supply and Sanitation Projects 428 Macedonia 2006 2006 Norway 2 M WATER Evaluation IMG IMG evaluation of NMFA funded projects in Macedonia, implemented by NCA on behalf of the NMFA as donor. COMPLETED € 41,538.00 Carried Out by NCA in Cooperation with MCIC The Norwegian schools programme, which has contributed via IMG to the rehabilitation of more than 30 school Emergency Rehabilitation of 13 Schools in 7 buildings since 2005, has supported the Government of Macedonia in its efforts to improve the educational 427 Macedonia 2006 2006 Norway 8 M EDUCATION Implementation IMG COMPLETED € 530,000.00 Municipalities standards withing the school system of the country. With the completion of this programme, functional buildings were provided to the pupils and schools staff operating in these facilities, improving the working and teaching environment.

Management Information Improvement Project, Design, procurement and implementation of new processes and systems in the areas of vehicle management and 426 Serbia 2006 2006 Norway 30 M Financial Management of the Ministry of Interior - MIP IT Monitoring Ministry of Interior building management, review and design an overall IT architecture,improvement of the MoI capacity to identify policy COMPLETED € 972,316.00 Phase 2 priorities and plan and budget at strategic and operational levels for the implementation of these priorities Reformation of the police service in South Serbia, transforming it from a police “force” to a police “service” through South Serbia Community Policing - Phase 1 OSCE; Ministry of full integration of the former multi-ethnic police element, via a comprehensive training package; 425 Serbia 2006 2006 Norway 1 Y LAW ENFORCEMENT Implementation COMPLETED € 404,000.00 (construction part) the Interior Construction of classrooms and offices in the three participating police stations, providing optimum learning environment and conditions for professional development for police officers. Based on the comprehensive Feasibility Study prepared by IMG, the project was designed to ensure fulfillment of the Establishment of Basic Police Training Centre in OSCE; Ministry of 424 Serbia 2006 2006 Norway 1 Y LAW ENFORCEMENT Implementation basic infrastructure requirements essential for transformation of the school into a basic entry-level Police Training COMPLETED € 720,000.00 Sremska Kamenica - Phase 1 the Interior Centre, in line with accepted international police practices Foreign Aid Management System - Support to INSTITUTIONAL Ministries of the Strengthening of the Government’s capacities in order that it may better co-ordinate, plan and interface with 423 Serbia 2006 2006 Sweden 9 M Implementation COMPLETED € 505,000.00 ISDACON - Hand-over phase CAPACITY BUILDING / IT Republic of Serbia counterparts, on activities of reconstruction, reform and re-structure leading to sustainable economic development.

The project was initiated as a result of the NDC Serbia’s multiethnic dialogue activities in the Sandzak region over the last three years. The project comprised five sub-projects, including reconstruction of schoolyards in and sports courts in three elementary schools in Novi Pazar, Rozaje and Bijelo Polje, adaptation of cookery profile cabinet in a Reconstruction of Educational and cultural Facilities in Monitoring and Schools and 422 Serbia 2006 2006 Norway 1 Y EDUCATION vocational secondary school in Prijepolje, and reconstruction of a theater hall in the Cultural Center Pljevlja. At the COMPLETED € 103,445.50 Sandzak advisory services Cultural Institutions same time, a “project management” capacity component for the Project teams (composed of school employees) was also carried out, with the aim to follow the entire implementation procedure and participate in all decision- making activities, financial planning and follow-up. PUC "Vodovod I The activities on construction of water treatment plant in Herceg Novi through a two year project, financed out of Extension and Upgrading Filter station Moidez in Monitoring and kanalizacija" and 421 Serbia 2006 2006 Norway 2Y WATER funds donated by the Kingdom of Norway are being carried out and monitored by IMG in cooperation with COMPLETED € 2,000,000.00 Herceg Novi Municipality advisory services Municipality Herceg NORPLAN. Novi The project sought to improve the capacity and efficiency of the utility companies through procurement of several essential pieces of machinery, including a multipurpose excavation machine, leak detection equipment, a Improvement of Public Utility Service in the Municipality REGIONAL Monitoring and Public Utility multipurpose channel jet machine and a garbage disposal vehicle with superstructure, and to provide the staff with 420 Serbia 2006 2006 Norway 1 Y COMPLETED € 224,000.00 of Lebane DEVELOPMENT advisory services Company relevant training. The main objectives were improvement of management and maintenance performance as well as of the working conditions, increase of know-how and expertise, and introduction of an awareness campaign and citizens training process. The project comprised three main components: equipping the school with CNC technologies and robotics, including machines, tools, hardware, and software; relevant teacher training for proper use of the procured equipment; refurbishment of premises. At the same time, a “project management” capacity component for the Project team Technical High (composed of employees of Technical High School) was also carried out, aiming at following the entire Refurbishing and Equipping the Technical High School 419 Serbia 2006 2006 Norway 1 Y EDUCATION implementation School in Novi implementation procedure and participating in all decision-making activities, financial planning and follow-up. While COMPLETED € 183,312.25 in Novi Beograd Beograd the primary beneficiaries were the Ministry of Education and Sports and the Technical High School in Novi Beograd, the project is expected to have a clear impact on students of the junior year as well as faculty of the Technical High School, employees of various industries requiring re-qualification, and a large number of unemployed workers in the field of mechanical engineering and metal processing. The Spanish Government financed the project was aimed at the Support to the renewable energy department of the Serbia and Strengthening of the Renewable Energy Department of Project Management Energy Efficiency Agency of Serbia (SEEA) in the field of wind energy. The project also covered a promotion of the 418 2006 2006 Spain 2 Y ENERGY IMG COMPLETED € 204,000.00 Montenegro Energy Efficiency Agency & Implementation wind energy source, analysis of the institutional and regulatory framework and definition of training program of the employees of the SEEA and the relevant Ministry. A technical assistance programme aimed at sustaining the Somali Ministry of Information, considered as an essential INSTITUTIONAL Ministry of 417 Somalia 2006 2006 Italy 16 M Somalia, Technical Assistance Technical Assistance bridge between the Transitional Federal Government and the public opinion and media. The project also integrated a COMPLETED € 496,694.00 CAPACITY BUILDING Information legal framework support for the development of the new Media Law. 416 Somalia 2006 2006 Italy 6 M Somalia Miscellaneous Humanitarian Supply SOCIAL SECTOR Technical Assistance COMPLETED € 52,500.00 The project "Terra Madre Event"was aimed at creation of global network of food communities, cooks and INTERNATIONAL universities, enabling communities to discuss problems, share experiences and joint the efforts to address 415 World 2006 2006 Italy 9 M Terra Madre Event Technical Assistance COMPLETED € 1,690,500.00 COOPERATION governments about their concerns, creation of network able to support food communities in finding solutions to their problems. The Terra Madre Event took place in Turin from October 26 to October 30, 2006.

10/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration National Library Montenegro 2005 2005 Norway 30M Restoration of the Central National Library in Cetinje CULTURE Implementation and the Ministry of COMPLETED € 450,000.00 Culture National Museum Montenegro 2005 2005 Norway 18M Restoration of the Blue Palace in Cetinje CULTURE Implementation and the Ministry of COMPLETED € 390,000.00 Culture Police Academy in Sremska Kamenica (Feasibility 414 Macedonia 2005 2005 Norway 1Y CONSULTANCY Consultancy IMG Preparation of the feasibilty study COMPLETED € 997,860.00 Study for Project Proposal) 413 Macedonia 2005 2005 Italy 1Y Revitalization of the Former Crisis Area INFRASTRUCTURE Implementation IMG COMPLETED € 1,000,000.00 General objective is to assist the Islamic Republic of Afghanistan through the activities of strengthening the technical 412 Afghanistan 2005 2005 Italy 14 M Technical Assistance to Targeted Afghan Ministries CAPACITY BUILDING Implementation IMG COMPLETED € 121,695.00 capacities of staff that operates within the target Ministries Completion of Hospital "Our Lady of Good Council", RECONSTRUCTION/ 411 Albania 2005 2005 Italy 3 Y Implementation COMPLETED € 200,000.00 project design HEALTH 410 Any 2005 2005 Italy 2 Y Post Emergency Centre (PEC) INFRASTRUCTURE Coordination COMPLETED € 190,189.00 409 Balkans 2005 2005 Italy 18 M Stability Pact Gender Task force CAPACITY BUILDING COMPLETED € 180,000.00 408 Balkans 2005 2005 Italy 14 M Study and researches CAPACITY BUILDING COMPLETED € 682,681.00 Project Management 407 Bosnia Herzegovina 2005 2005 Italy Micro credits in Bosnia and Herzegovina ECONOMIC IMG COMPLETED € 73,180.00 & Implementation Power Distribution in Srebrenica, Bratunac and Milici Project Management 406 Bosnia Herzegovina 2005 2005 Norway 10 M ENERGY IMG, UNDP COMPLETED € 134,169.00 municipalities (PDP II) & Implementation INTERNATIONAL 405 Europe 2005 2005 Italy 2 M Event support Cooperation Days Technical Assistance COMPLETED € 201,779.00 COOPERATION INTERNATIONAL 404 Europe 2005 2005 Italy 9 M Cooperation Day Supporto dei progetti di sviluppo Technical Assistance COMPLETED € 3,152,162.00 COOPERATION 403 Europe 2005 2005 Italy 9 M Multimedia training BCD CAPACITY BUILDING COMPLETED € 1,000,000.00 Research - projects - 402 Italy 2005 2005 Italy 28 Anno del Microcredito Implementation COMPLETED € 41,538.00 publication Environmental recovery and rehabilitation of Italian 401 Libya 2005 2005 Italy 2 Y ENVIRONMENT Implementation COMPLETED € 410,000.00 Cemetery in Tripoli- project design, works 1st phase Evaluation of Water Supply and Sanitation projects 400 Macedonia 2005 2005 Norway 1 Y WATER Project Evaluation COMPLETED € 77,000.00 carried out by NCA in cooperation with MCIC Emergency rehabilitation of 8 schools in 6 Secretariat for 399 Macedonia 2005 2005 Norway 1 Y EDUCATION Implementation COMPLETED € 390,000.00 municipalities European Affair Water supply and sanitation projects for communities in REGIONAL 398 Macedonia 2005 2005 Norway 1 Y Monitoring COMPLETED € 450,000.00 Macedonia DEVELOPMENT National Museum 397 Montenegro 2005 2005 Norway 1 Y Restoration of the Blue Palace in Cetinje CULTURE Implementation and the Ministry of COMPLETED € 375,000.00 Culture National Library 396 Montenegro 2005 2005 Norway 1 Y Restoration of the Central National Library in Cetinje CULTURE Implementation and the Ministry of COMPLETED € 100,000.00 Culture OSCE; Republic Ministry of the Capacity Building of the Forensic Laboratory in the Implementation and 395 Montenegro 2005 2005 Norway 1 Y LAW ENFORCEMENT Interior, Criminal COMPLETED € 3,000,000.00 Republic of Montenegro advisory services Technical Centre in Podgorica 394 Mozambique 2005 2005 Italy 1Y Studies in economic and infrastructure sectors INFRASTRUCTURE/ SME Implementation COMPLETED € 100,000.00

Technical assistance action in favour of the P.A. for: a. 393 Palestine 2005 2005 EC 18M The identification of urgent projects in the Gaza Strip b. CAPACITY BUILDING Technical Assistance COMPLETED € 3,000,000.00 The reinforced monitoring of WBGS on-going projects Creation of three Farmers Support Centres in Mindao Project Management 392 Philippine 2005 2005 Italy 4 M SOCIAL SECTOR COMPLETED € 100,000.00 Island & Monitoring Supervision and 391 Macedonia 2005 2005 Italy 18 M Micro credit Pilot Project SME IMG COMPLETED € 289,041.00 Monitoring Finalization Technical Sectoral Assistance to Serbian 390 Serbia 2005 2005 Italy 8 M CAPACITY BUILDING Project Management COMPLETED € 17,942.00 Government/ Procurement Intersectoral Development and Aid Coordination INSTITUTIONAL 389 Serbia 2005 2005 Italy 4 M COMPLETED € 540,000.00 Network - Bridging Period CAPACITY BUILDING / IT Finalization of the Technical Sectoral Assistance to the INSTITUTIONAL 388 Serbia 2005 2005 Italy 9 M Serbian Government - Publication of the tender Implementation COMPLETED € 25,000.00 CAPACITY BUILDING/ IT forecast Republic Ministry of Strengthening of Laboratory Examinations and Crime the Interior, 387 Serbia 2005 2005 Norway 1 Y Scene Investigations in the Serbian Ministry of the LAW ENFORCEMENT Implementation COMPLETED € 10,000.00 Criminal Technical Interior’s Criminal Technical Centre in Nis Centre in Nis Enhancing the War Crime Investigation Capacities of Republic Ministry of 386 Serbia 2005 2005 Norway 1 Y LAW ENFORCEMENT Implementation COMPLETED € 150,000.00 the Serbian Ministry of the Interior the Interior Refurbishment and Transition of Infrastructure and Republic Ministry of 385 Serbia 2005 2005 Norway 1 Y Equipment at the Serbian Police High School in LAW ENFORCEMENT Implementation COMPLETED € 200,000.00 the Interior Sremska Kamenica Capacity Building on Problem-oriented Policing, Strategic Analyses and Planning of the Police of the Republic Ministry of 384 Serbia 2005 2005 Norway 1 Y LAW ENFORCEMENT Implementation COMPLETED € 380,000.00 Republic of Serbia in the Autonomous Province of the Interior Vojvodina Rehabilitation Project for Bogojevo Bridge on the Serbian Ministry of 383 Serbia 2005 2005 Norway 1 Y TRANSPORT Implementation COMPLETED € 50,000.00 Vinkovci – Erdut – Bogojevo – Subotica Railway Line Capital Investment Intersectoral Development and Aid Coordination 382 Serbia 2005 2005 Sweden 6 M CAPACITY BUILDING Implementation COMPLETED € 20,000.00 Network - Bridging Period Project of Support for the Return of Minority Refugees Serbia and Project Management 381 2005 2005 Spain 1 Y to Kosovo and reestablishment of normality, executed RECONSTRUCTION IMG COMPLETED € 60,154.00 Montenegro & Implementation by Spanish troops of KFOR Serbia and Ministry of the 380 2005 2005 Liechtenstein 1 Y Basic Hostage Negotiation Equipment LAW ENFORCEMENT Implementation COMPLETED € 20,733.00 Montenegro Interior

11/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Connection of Health Centre Pirot and Health Serbia and Protection Institute of Pirot to the District Heating Public Communal 379 2005 2005 Norway 1 Y ENERGY Monitoring COMPLETED € 1,250,000.00 Montenegro System of the Public Communal Enterprise - Gradska Enterprise Toplana Pirot Evaluation of Business Innovation Program's Projects Serbia and Implementation - 378 2005 2005 Norway 1 Y in Serbia and Montenegro, Bosnia and Herzegovina COMPLETED € 314,042.00 Montenegro evaluation and Croatia Serbia and Monitoring and 377 2005 2005 Norway 1 Y Regional Sewer Collector Kula-Vrbas ENVIRONMENT COMPLETED € 1,341,019.00 Montenegro advisory services Centre for Liberal Democratic Serbia and monitoring and Studies, Standing 376 2005 2005 Norway 1 Y Tools and Mechanisms for local development SOCIAL SECTOR COMPLETED € 498,000.00 Montenegro advisory services Conference of Towns and Municipalities Ministry of Serbia and Reconstruction and Equipping of Schools in Zajecar Implementation and 375 2005 2005 Norway 1 Y EDUCATION Education and COMPLETED € 450,000.00 Montenegro Region advisory services Sports Public Utility Companies Serbia and REGIONAL Implementation and 374 2005 2005 Norway 1 Y South Serbia Municipal Utility Development Program Presevo, COMPLETED € 87,915.00 Montenegro DEVELOPMENT advisory services Bujanovac and Medvedja Controlled Disposal of Waste Materials and Development of Ecological Awareness of Citizens of Municipality of Serbia and Monitoring and 373 2005 2005 Norway 1 Y Municipalities Smederevska Palanka, Smederevo and ENVIRONMENT Smederevska COMPLETED € 4,750.00 Montenegro advisory services Raca through building of a Sanitary Landfill in Palanka Smederevska Palanka Ministry of Serbia and Monitoring and 372 2005 2005 Norway 1 Y Healthy Start Leads to Healthy Life Style EDUCATION Education and COMPLETED € 15,000.00 Montenegro advisory services Sports Monitoring the Reconstruction Works on Regional Serbia and 371 2005 2005 Switzerland 1Y Centres for Professional Development of Educators in EDUCATION Monitoring SDC COMPLETED € 91,500.00 Montenegro Uzice and Cacak Serbia and United Implementation and 370 2005 2005 1 Y "Safe Community" Program in Vojvodina LAW ENFORCEMENT Ramesses group COMPLETED € 961,573.00 Montenegro Kingdom advisory services Serbia and United Development of Criminal Intelligence Analysis for the Implementation and Ministry of the 369 2005 2005 1 Y LAW ENFORCEMENT COMPLETED € 940,436.00 Montenegro Kingdom Border Police Service in Serbia and Montenegro advisory services Interior INSTITUTIONAL 368 Somalia 2005 2005 Italy 9 M Institutional Support Technical Assistance COMPLETED € 71,131.00 CAPACITY BUILDING 367 Somalia 2005 2005 Italy 9 M Institutional support project CAPACITY BUILDING Technical Assistance COMPLETED € 63,000.00 366 Somalia 2005 2005 Italy 5 M Somalia Hospital and civil works HEALTH Implementation COMPLETED € 1,348,251.00 EMERGENCY 365 Sri Lanka 2005 2005 Italy 3 M Tsunami COMPLETED € 2,292,681.00 INTERVENTION 364 Sudan 2005 2005 Italy 17 M Sudan, Darfur Hospital TECHNICAL SUPPORT Implementation COMPLETED € 13,004.00

The general objectives of this project are to contribute to the reduction of the poverty in Tanzania, to improve the alimentary and sanitary conditions of the local communities, and to promote the recovery, the valorisation and the Conservation and Valorisation of the Local scientific acknowledgment of the practices and knowledge in the traditional medicine. In accordance with the general 363 Tanzania 2005 2005 Italy 2 Y Psychogenetic Resources and Traditional Knowledge ENVIRONMENT Project Management CINS objective, the Project is implemented through activities of reinforcement of the Tanzanian technical and scientific COMPLETED € 402,000.00 in Tanzania capacity, by establishing the Centre for microbiological, botanical and pharmacological research and providing training for the Tanzanian scientists and researchers. In this manner, the tools and advanced technologies that will guarantee an efficient use of the natural resources and sustainable utilization of biodiversity will be made available.

362 Tunisia 2005 2005 Italy 3 M TAU Support UTC/UTL Technical Assistance COMPLETED € 2,100,000.00 Credit Lines in support of Public Health in Uruguay 361 Uruguay 2005 2005 Italy 2 Y HEALTH Technical Assistance COMPLETED € 139,859.00 Overall budget for the credit lines is 15 M€ Communication Campaign on Technical Cooperation INTERNATIONAL 360 World 2005 2005 Italy 2 Y Technical Assistance COMPLETED € 300,000.00 projects - EMP COOPERATION INTERNATIONAL 359 2005 2005 Italy 5 M Support Info and Media Cooperation Technical Assistance COMPLETED € 62,000.00 COOPERATION Consultancy Services - Un mondo insieme- Event 358 Africa 2004 2004 Italy 3 M CAPACITY BUILDING Technical Assistance COMPLETED € 148,326.00 support 357 Africa 2004 2004 Italy 3 M Consultancy Services - Un mondo iniseme- Darfur CAPACITY BUILDING Technical Assistance € 300,000.00 Completion of Hospital "Our Lady of Good Council", 356 Albania 2004 2004 Italy 3 M HEALTH Implementation COMPLETED € 877,976.00 feasibility study INTERNATIONAL 355 Any 2004 2004 Italy 2 Y Technical Support to the Italian Cooperation Technical Assistance COMPLETED € 263,500.00 COOPERATION Rehabilitation of the Institutes for Physiotherapy HOUSING & PUBLIC Project Management 354 Bosnia Herzegovina 2004 2004 Italy 18 M IMG COMPLETED € 261,000.00 (Sarajevo, Banja Luka) BUILD. & Implementation Support to the establishment and strengthening of the Project Management 353 Bosnia Herzegovina 2004 2004 Spain 2 Y MULTI SECTOR IMG CANCELLED € 340,000.00 Financial Intelligence Department (FID) of SIPA in BiH & Implementation Pre Feasibility Study for the programme Integrated 352 Honduras 2004 2004 Italy 6 M projects for the sustainable development of the region HEALTH COMPLETED € 97,029.00 of Bahia de Tela - Honduras Ministry of Culture and Media of Monitoring and 351 Montenegro 2004 2004 Norway 1 Y Repair and Restoration of Zetski Dom in Cetinje CULTURE Montenegro; COMPLETED € 179,877.00 advisory services Institute of Cultural Heritage REGIONAL 350 Philippine 2004 2004 Italy 4 M Review of Tender Documentation COMPLETED € 210,000.00 DEVELOPMENT 349 Macedonia 2004 2004 Italy 6 M Economic Revitalization SME Implementation IMG COMPLETED € 42,000.00 Reconstruction and Refugee Return Project - 348 Macedonia 2004 2004 Germany 3 M RECONSTRUCTION Implementation IMG COMPLETED € 385,000.00 Tanushevci Village, Chucher Sandevo Municipality 347 Macedonia 2004 2004 Netherlands 4 M Education Modernization Project EDUCATION Evaluation IMG COMPLETED € 417,000.00

12/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Construction of One Police Station in Former 2001 CONSTRUCTION AND 346 Macedonia 2004 2004 Norway 10 M Implementation IMG COMPLETED € 640,700.00 Crisis Areas in Municipality CAPACITY BUILDING Emergency Rehabilitation of 5 Schools in 2 345 Macedonia 2004 2004 Norway 10 M REHABILITATION Implementation IMG COMPLETED € 72,576.00 Municipalities Norwegian Contribution to Rehabilitation of the 344 Macedonia 2004 2004 Norway 12 M ENERGY Implementation IMG COMPLETED € 650,000.00 Electrical Power Supply System 343 Serbia 2004 2004 Italy 6 M TAU Serbia CAPACITY BUILDING Technical Assistance COMPLETED € 75,000.00 Intersectoral Development and Aid Coordination 342 Serbia 2004 2004 Sweden 8 M CAPACITY BUILDING Implementation COMPLETED € 135,000.00 Network (EMIS) Project of Support for the Return of Minority Refugees Serbia and Project Management 341 2004 2004 Spain 1 Y to Kosovo and reestablishment of normality, executed RECONSTRUCTION IMG COMPLETED € 244,000.00 Montenegro & Implementation by Spanish troops of KFOR Serbia and Strengthening of Police Institutions of Serbia through Project Management 340 2004 2004 Spain 1 Y LAW ENFORCEMENT IMG COMPLETED € 10,000.00 Montenegro rehabilitation of facilities for the DNA laboratory & Implementation Serbia and 339 2004 2004 Norway 1 Y Norwegian-funded Scholarship Program 2004 EDUCATION Implementation None COMPLETED € 1,125,000.00 Montenegro Serbia and Procurement of Computer Equipment for the Ministry 338 2004 2004 Norway 1 Y LAW ENFORCEMENT Implementation None COMPLETED € 1,690,000.00 Montenegro of Defence, Serbia and Montenegro Public Utility Support of the Government of the Kingdom of Norway Serbia and Monitoring and Company "17. 337 2004 2004 Norway 1 Y to the Second Phase of the Project of Communal ENVIRONMENT COMPLETED € 1,190,000.00 Montenegro advisory services septembar" Gornji Waste Management in Gornji Milanovac Milanovac Ministry of the Management Information Improvement Project (MIIP), Serbia and Interior; Ministry of 336 2004 2004 Norway 1 Y Financial Management System of the Ministry of the IT Monitoring COMPLETED € 605,000.00 Montenegro Finance and Interior Economy Serbia and Sirogojno Infrastructure / Municipal Development REGIONAL Monitoring and Municipality of 335 2004 2004 Norway 1 Y COMPLETED € 3,100,000.00 Montenegro Project DEVELOPMENT advisory services Cajetina Municipalities of Serbia and Norwegian South Serbia Infrastructure / Municipal REGIONAL Monitoring and 334 2004 2004 Norway 2 Y Bujanovac and COMPLETED € 71,500.00 Montenegro Development Projects DEVELOPMENT advisory services Presevo SIDA; EPS; ED Serbia and Improvement of Electricity Distribution System in South Implementation and 333 2004 2004 Sweden 3 Y ENERGY Companies Vranje, COMPLETED € 800,000.00 Montenegro Serbia advisory services Nis, and Leskovac SIDA; Ministry of Serbia and Monitoring and 332 2004 2004 Sweden 1 Y Establishing Re-Admission Centre Project SOCIAL SECTOR Human and COMPLETED € 115,500.00 Montenegro advisory services Minority Rights Improvement of the Security and Health conditions in 331 Sudan 2004 2004 Italy HEALTH Implementation COMPLETED € 592,904.00 Darfur - Sudan 330 Sudan 2004 2004 Italy 6 M First technical assistance TECHNICAL SUPPORT Implementation COMPLETED € 698,615.00 Monitoring of a Credit Line in support of the Uruguayan 329 Uruguay 2004 2004 Italy 5Y Small and Medium - sized enterprises SME Technical Assistance COMPLETED € 895,795.00 Overall budget for the credit lines is 25 M€ Power Distribution in Srebrenica, Bratunac and Milici Project Management 328 Bosnia Herzegovina 2003 2003 Norway 10 M ENERGY IMG, UNDP COMPLETED € 708,300.00 municipalities (PDP I) & Implementation Project Management 327 Bosnia Herzegovina 2003 2003 Spain 3 Y Program of rural Development of Valley Popovo ENERGY IMG COMPLETED € 580,000.00 & Implementation Analysis of possible usage of renewable energies for Project Management 326 Bosnia Herzegovina 2003 2003 Spain 3 Y ENERGY IMG COMPLETED € 6,900,000.00 the power supply in Bosnia and Herzegovina & Implementation Support to Recuperation of Ecosystem of Bosna River Project Management 325 Bosnia Herzegovina 2003 2003 Spain 3 Y ENVIRONMENT IMG COMPLETED € 785,000.00 and its Tributaries & Implementation Development of the private sector by means of Bosnia technical and financial support scheme for the Balkan 324 Herzegovina, 2003 2003 Italy 3 Y SME Implementation COMPLETED € 1,260,000.00 SME-s (BiH, FYRoM and Serbia) FYRoM, Serbia Overall budget for the credit lines is 74 M€ Implementation, Improvement of Water Supply System in Municipality of 323 FRY 2003 2003 Norway 1 Y WATER monitoring, and COMPLETED € 920,000.00 Aleksandrovac Municipality Aleksandrovac advisory services Public Utility Implementation, Norwegian Contribution to Construction of Sanitary Company "17. 322 FRY 2003 2003 Norway 1 Y ENVIRONMENT monitoring, and COMPLETED € 530,000.00 Landfill in Gornji Milanovac, Serbia septembar" Gornji advisory services Milanovac Implementation, Norwegian Support to Equipping Hygiene Maintenance Public Utility 321 FRY 2003 2003 Norway 1 Y ENVIRONMENT monitoring, and COMPLETED € 1,922,018.00 in the Municipality of Raska Company Raska advisory services Norwegian Police Directorate Assistance to Monitoring and Republic Ministry of 320 FRY 2003 2003 Norway 1 Y Improvement of Backa Palanka Police District LAW ENFORCEMENT COMPLETED € 1,941,705.00 advisory services the Interior Infrastructure EMERGENCY Project Management 319 Palestine 2003 2003 EC 13M Monitoring of projects in West Bank and Gaza Strip MEDCO COMPLETED € 1,922,018.00 INTERVENTION & Monitoring IMG Technical Assistance and Monitoring of INSTITUTIONAL Project Management 318 Palestine 2003 2003 EC 11 M Reconstruction projects in the West Bank and Gaza CAPACITY BUILDING/ AIDCO COMPLETED € 1,941,705.00 & Monitoring Strip INFRASTRUCTURE 317 Macedonia 2003 2003 Italy 1 M Feasibility Study Health Centre HEALTH Implementation IMG COMPLETED € 30,000.00 Preparation of Project Documentation for Regional 316 Macedonia 2003 2003 IOM / CBI 3 M WATER Consultancy IMG COMPLETED € 1,388,575.00 Water Supply - Zajas Rehabilitation of 3 Dialysis Wards: , Kriva Palanka and Shtip, 1 Intensive Care Ward and 315 Macedonia 2003 2003 Italy 3 M HEALTH Consultancy IMG COMPLETED € 36,842.00 Laboratory in the “General Hospital” in Tetovo and a Primary Health Centre in Lipkovo / Project Preparation Procurement of Heating Fuel for Public Schools and 314 Macedonia 2003 2003 Norway 1Y EDUCATION Implementation IMG COMPLETED € 480,000.00 Kindergardens Rehabilitation of Conflict Damaged Mosque in HOUSING & PUBLIC 313 Macedonia 2003 2003 Netherlands 4 M Implementation IMG COMPLETED € 2,641.00 Matejche Village - Lipkovo Municipality BUILDING

13/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Co financing (Netherlands, Construction of 2 Police Stations in Former 2001 Crisis CONSTRUCTION AND 312 Macedonia 2003 2003 10 M Implementation IMG COMPLETED € 16,461,422.00 Switzerland, Regions in 2 Municipalities CAPACITY BUILDING Hungary) 311 Serbia 2003 2003 Italy 1 M Consultancy UTL Belgrade rooster of building COMPLETED € 140,800.00 Technical Sectoral Assistance to the Serbian Implementer 215000 310 Serbia 2003 2003 Italy 1 Y CAPACITY BUILDING COMPLETED € 800,000.00 Government Eur 309 Serbia 2003 2003 Sweden 3 M Finalization of the EMIS 1st phase CAPACITY BUILDING COMPLETED € 73,000.00 Municipalities of Presevo, Serbia and REGIONAL Implementation and Bujanovac, 308 2003 2003 Norway 1 Y Norwegian South Serbia Infrastructure Project COMPLETED € 460,000.00 Montenegro DEVELOPMENT monitoring Medvedja; ED Vranje and ED Leskovac Enhancing the Capacity of the Serbian Ministry of the Serbia and Implementation and Ministry of the 307 2003 2003 Norway 1 Y Interior to Deal with Human Trafficking - Equipment LAW ENFORCEMENT COMPLETED € 73,000.00 Montenegro advisory services Interior Start-up Package Norwegian Police Directorate Assistance to Ministry of the Serbia and Monitoring and 306 2003 2003 Norway 1 Y Improvement of the Infrastructure of Novi Sad LAW ENFORCEMENT Interior - Novi Sad COMPLETED € 1,420,000.00 Montenegro advisory services Secretariat of the Interior Secretariat Municipality of Serbia and REGIONAL Implementation and 305 2003 2003 Norway 1 Y Additional Bujanovac Infrastructure Project 2003 Bujanovac; ED COMPLETED € 1,220,000.00 Montenegro DEVELOPMENT monitoring Company Vranje Implementation, Ministry of Serbia and Norwegian Support to Establishing a Regional Centre 304 2003 2003 Norway 3 Y EDUCATION monitoring, and Education and COMPLETED € 160,000.00 Montenegro for Professional Development of Educators in Nis advisory services Sports Serbia and 303 2003 2003 Norway 1 Y Srebrenica Regional Recovery Program ENERGY Implementation UNDP; NTE COMPLETED € 750,000.00 Montenegro Reparation of the el. distribution network in the Travnik Project Management 302 Bosnia Herzegovina 2002 2002 Spain 12 M ENERGY IMG COMPLETED € 2,630,000.00 region & Implementation Support to return of displaced people in BiH, through Project Management IMG, SFOR 301 Bosnia Herzegovina 2002 2002 Spain 4 Y MULTI SECTOR COMPLETED € 317,000.00 the activities of Spanish troops of SFOR & Implementation (Spanish Division) 300 FRY 2002 2002 Norway 1 Y Energy for Democracy ENERGY Implementation None COMPLETED € 350,000.00 Norwegian Contribution to Rehabilitation of Power Monitoring and 299 FRY 2002 2002 Norway 1 Y ENERGY KEK; NTE COMPLETED € 30,000.00 Supply in Kosovo advisory services Institute "Srbija", Norwegian Contribution to Construction of a Potato Monitoring and 298 FRY 2002 2002 Norway 1 Y AGRICULTURE Centre for Potato, COMPLETED € 404,000.00 Seed Warehouse in Guca advisory services Guca Construction of Two Playgrounds in High School "25. Monitoring and Municipality of 297 FRY 2002 2002 Norway 1 Y EDUCATION COMPLETED € 117,000.00 maj" and Technical School in Presevo advisory services Presevo Kosovo Trust Norwegian Contribution to KTA and Battlava Regional REGIONAL Monitoring and Agency and 296 FRY 2002 2002 Norway 1 Y COMPLETED € 1,500,000.00 Water Supply - Pristina DEVELOPMENT Advisory Services Battlava Public Utility Company Ministry of the 295 FRY 2002 2002 Norway 1 Y Police College Refurbishment Project LAW ENFORCEMENT Implementation COMPLETED € 1,000,000.00 Interior SIDEA; EPS Department for Distribution; ED Monitoring and 294 FRY 2002 2002 Sweden 1 Y SIDA South Serbia Project ENERGY Companies Vranje, COMPLETED € 1,390,000.00 advisory services Leskovac, Nis; Elektromorava Pozarevac Norwegian Contribution to Rehabilitation of Electric Monitoring and 293 FYROM 2002 2002 Norway 1 Y ENERGY ECM; NTE COMPLETED € 1,931,150.00 Power Supply in FYROM advisory services Ministry of Education and Science of the Norwegian Assistance for Procurement of Heating Republic of Implementation and 292 FYROM 2002 2002 Norway 1 Y Fuels for Public Schools and Kindergartens in EDUCATION Macedonia; COMPLETED € 3,000,000.00 monitoring Macedonia Ministry of Labour and Social Affairs of the Republic of Macedonia Damage Assessment and Reconstruction Management 291 Palestine 2002 2002 EC 8M in the West Bank and the Gaza Strip TECHNICAL SUPPORT Implementation AIDCO COMPLETED € 1,931,150.00 Infrastructural project assessments Rehabilitation of Conflict Damaged Residential Houses EMERGENCY 290 R Macedonia 2002 2002 Italy 4 Y Implementation IMG COMPLETED € 38,000.00 in 3 Municipalities - Category III and IV RECONSTRUCTION Rehabilitation of Conflict Damaged Residential Houses - HOUSING & AND PUBLIC 289 R Macedonia 2002 2002 Austria 6 M Implementation IMG COMPLETED € 14,000.00 Category III BUILDING 288 R Macedonia 2002 2002 EC 2 M Energizing in the Conflict Affected Area - Arachinovo ENERGY Implementation IMG COMPLETED € 500,000.00 INFRASTRUCTURE & 287 R Macedonia 2002 2002 EC 3 M Damage Assessment Update HOUSING AND PUBLIC Implementation IMG COMPLETED € 500,000.00 BUILDINGS HOUSING & PUBLIC 286 R Macedonia 2002 2002 EC 9 M Housing Reconstruction Coordination Coordination IMG COMPLETED € 35,000.00 BUILDING Rehabilitation of Conflict Damaged Residential Houses EMERGENCY 285 R Macedonia 2002 2002 Germany 8 M Implementation IMG COMPLETED € 230,000.00 in 2 Municipalities - Category II, III, IV RECONSTRUCTION HOUSING & PUBLIC 284 R Macedonia 2002 2002 IOM / CBI 2 M Project Documentation Commercial Buildings - Bitola Consultancy IMG COMPLETED € 4,580,000.00 BUILDING Rehabilitation of 3 Conflict Damaged Schools and 1 HOUSING & PUBLIC 283 R Macedonia 2002 2002 Italy 5 M Implementation IMG COMPLETED € 297,600.00 Water Supply System in 3 Municipalities BUILDING/ WATER Total Projects value 600 M€€ Rehabilitation of Conflict Damaged Residential Houses - HOUSING & PUBLIC 282 R Macedonia 2002 2002 Netherlands 9 M Implementation IMG COMPLETED € 68,000.00 Category I, II, III, IV BUILDING

14/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Rehabilitation of Electric Distribution Network in the 281 R Macedonia 2002 2002 Netherlands 8 M ENERGY Implementation IMG COMPLETED € 30,000.00 Villages Tanushevci, Malina Maala and Brest TotalTotal Projects Projects value value 250 73 MM€€ Housing and Public Buildings DamageDamage assessments assessmentsTotalTotalTotal - Projects HousingProjects Projectsin areas value value Value 73900affectedand 515 M €M M€ €Public by Buildingsconflict - - Project Management 280 R Macedonia 2002 2002 Norway 5 M Monitoring Energy Project Macedonia ENERGY IMG COMPLETED € 1,620,000.00 & Monitoring Project Management 279 R Macedonia 2002 2002 Norway 5 M Monitoring Energy Project in Kosovo ENERGY IMG COMPLETED € 1,200,000.00 & Monitoring National Bank of Yugoslavia - Norwegian Contribution to Child Allowance Project in Monitoring and 278 Serbia 2002 2002 Norway 1 Y SOCIAL SECTOR Bureau for COMPLETED € 530,110.00 Serbia advisory services Payments and Settlements Norwegian Government Assistance for Procurement of Thirteen Implementation and 277 Serbia 2002 2002 Norway 1 Y Heating Oil to Social Institutions in Cities in Central ENERGY municipalities in COMPLETED € 376,000.00 monitoring Serbia Central Serbia Serbia and Support for the Electrical Coordination on the Balkans Project Management 276 2002 2002 Spain 3 Y ENERGY IMG COMPLETED € 150,000.00 Montenegro and with the rest of Europe & Implementation Serbia and Improvement of the Electrical Distribution in the Region Project Management 275 2002 2002 Spain 1 Y ENERGY IMG COMPLETED € 9,000.00 Montenegro of Beloljin (Serbia) & Implementation Serbia and Support for the return of the minority refugees to Project Management 274 2002 2002 Spain 1 Y RECONSTRUCTION IMG COMPLETED € 865,000.00 Montenegro Kosovo executed by Spanish troops of KFOR 2006 & Implementation Kosovo Trust Serbia and Monitoring of Norwegian Contribution to KTA and REGIONAL Monitoring and Agency and 273 2002 2002 Norway 1 Y COMPLETED € 1,800,000.00 Montenegro Battlava Regional Water Supply - Pristina DEVELOPMENT advisory services Battlava Public Utility Company Municipalities of Presevo, Serbia and REGIONAL Implementation and Bujanovac, 272 2002 2002 Norway 1 Y Norwegian South Serbia Project COMPLETED € 1,850,000.00 Montenegro DEVELOPMENT monitoring Medvedja; ED Vranje and ED Leskovac Norwegian Contribution to Fertilizer Production in Republic Ministry of 271 FRY 2001 2001 Norway 1 Y AGRICULTURE Monitoring COMPLETED € 467,000.00 Federal Republic of Yugoslavia Agriculture Municipalities of Presevo, REGIONAL Implementation and Bujanovac, 270 FRY 2001 2001 Norway 1 Y Norwegian South Serbia Project COMPLETED € 1,000,000.00 DEVELOPMENT monitoring Medvedja; ED Vranje and ED Leskovac Institute "Srbija", Norwegian Contribution to Production of Viraless Monitoring and 269 FRY 2001 2001 Norway 1 Y AGRICULTURE Center for Potato, COMPLETED € 5,000,000.00 Potato Planting Material in a Protected Area advisory services Guca Federal Ministry for Foreign Economic Norwegian Contribution to Reconstruction of Irrigation Monitoring and 268 FRY 2001 2001 Norway 1 Y AGRICULTURE Relations; Federal COMPLETED € 1,530,000.00 Systems in Serbia advisory services Ministry of Agriculture ABB Norway; Monitoring and 267 FRY 2001 2001 Norway 1 Y Reconstruction of TS 110/5.25 kV Bor 3 ENERGY Elektroistok; COMPLETED € 550,000.00 advisory services UNEP; E-CO Monitoring and EPCG 266 FRY 2001 2001 Norway 1 Y Extension of TS 110/35 kV Cetinje ENERGY COMPLETED € 800,000.00 advisory services Montenegro; NTE Norwegian Government Support for Improvement of Monitoring and Pharmaceutical 265 FRY 2001 2001 Norway 1 Y Computer/Communication System of the HEALTH COMPLETED € 20,000.00 Advisory Services Institution Belgrade Pharmaceutical Institution Belgrade Co financing 264 FRY 2001 2001 (Norway, 1 Y Roads for Democracy TRANSPORT Implementation None COMPLETED € 7,500,000.00 Germany) Public Enterprise Swedish Support to the Opening of the Post Office in REGIONAL Monitoring and 263 FRY 2001 2001 Sweden 1 Y PTT Srbija; RJ COMPLETED € 38,000.00 Local Community Veliki Trnovac, South Serbia DEVELOPMENT advisory services PTT Vranje DFID; Ministry of United The UK Contribution to Payments of the Family 262 FRY 2001 2001 2 M SOCIAL SECTOR Monitoring Social and COMPLETED € 500,000.00 Kingdom Material Support in Serbia Veterans' Affairs Energizing in the Conflict Affected Area - Lipkovo & EMERGENCY 261 R Macedonia 2001 2001 EC 3 M Implementation IMG COMPLETED € 7,780,000.00 Arachinovo RECONSTRUCTION Damage assessments in areas affected by conflict - INFRASTRUCTURE & 260 R Macedonia 2001 2001 EC 3 M Housing and Public Buildings - Database management - Implementation IMG COMPLETED € 24,768,722.79 HOUSING Projects evaluation Rehabilitation of Conflict Damaged Residential Houses EMERGENCY 259 R Macedonia 2001 2001 Netherlands 12.5 M Implementation IMG COMPLETED € 573,800.00 in 4 Municipalities - Category II, III, IV RECONSTRUCTION 258 Serbia 2001 2001 EAR 15 M Towns and Schools for Democracy - TSfD EDUCATION Technical Assistance COMPLETED € 300,518.01 Enhancement of MIER and Governmental Institutions INSTITUTIONAL Project Management 257 Serbia 2001 2001 Sweden 19 M COMPLETED € 601,012.01 Information System EMIS - 1st Phase CAPACITY BUILDING / IT & Implementation Serbia and Training Programme for Managing Staff of F.R. Project Management 256 2001 2001 Spain 2 Y ENERGY IMG COMPLETED € 44,102.56 Montenegro Yugoslavia Power Utility Companies & Implementation Serbia and Equipment and spare parts needed for the Project Management 255 2001 2001 Spain 1 Y ENERGY IMG COMPLETED € 500,000.00 Montenegro regeneration of the Power Distribution system of EPS & Implementation Project coordination support (PCT) for the EC- water Project Management 254 Bosnia Herzegovina 2000 2000 EC 10 M WATER & SOLID WASTE IMG COMPLETED € 411,560.00 project in RS, & Implementation

15/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Capacity Building and Institutional Strengthening / Training and Transfer of technologies and responsibilities to local authorities in five sectors: - Energy Project Management 253 Bosnia Herzegovina 2000 2000 EC 6 M MULTI SECTOR IMG COMPLETED € 42,051.28 - Housing and Public Buildings & Implementation - Telecommunications - Transport - Water & Solid waste Software development, training and transfer of sectoral project databases (PIMS & PRISM) to the local INSTITUTIONAL 252 Bosnia Herzegovina 2000 2000 EC 6 M governmental bodies, within the frame of Capacity Implementation IMG COMPLETED € 154,740.00 CAPACITY BUILDING/ IT Building and Institutional Strengthening Programme financed by EC Repair of High Voltage Transmission Line and Low 251 Bosnia Herzegovina 2000 2000 ECHO 7 M ENERGY Implementation IMG COMPLETED € 153,846.15 Voltage Distribution Network, Pale_S Reconstruction of the RS Statistic Institutes, Banja HOUSING & PUBLIC 250 Bosnia Herzegovina 2000 2000 Italy 8 M Implementation IMG COMPLETED € 666,666.67 Luka BUILD. Construction of distribution network in Trebinje 249 Bosnia Herzegovina 2000 2000 Spain 18 M WATER & SOLID WASTE Implementation IMG COMPLETED € 825,641.03 Municipality - Zubci and Trebinjska Brda, Trebinje_S Construction of 35/10(20) kV, 8 MVA "Mehurici" TS, 248 Bosnia Herzegovina 2000 2000 Spain 14 M ENERGY Implementation IMG COMPLETED € 224,102.56 Travnik Construction of 35/10(20) kV, 8 MVA "Nemila" TS, 247 Bosnia Herzegovina 2000 2000 Spain 16 M ENERGY Implementation IMG COMPLETED € 26,153.85 Zenica 246 Bosnia Herzegovina 2000 2000 Spain 10 M Construction of 35 kV "Travnik 1 - Mehurici" TL, Travnik ENERGY Implementation IMG COMPLETED € 104,615.38

245 Bosnia Herzegovina 2000 2000 Spain 8 M Rehabilitation of distribution network in Sisava, Travnik ENERGY Implementation IMG COMPLETED € 61,025.64 Construction of 20 kV "Mehurici - Rudnik Bila" TL, 244 Bosnia Herzegovina 2000 2000 Spain 11 M ENERGY Implementation IMG COMPLETED € 37,435.90 Travnik Reconstruction of 35 kV "Turbe - Harambasina Voda" 243 Bosnia Herzegovina 2000 2000 Spain 11 M ENERGY Implementation IMG COMPLETED € 98,461.54 TL, Travnik Reconstruction of 20 kV "Harambasina Voda - 242 Bosnia Herzegovina 2000 2000 Spain 12 M ENERGY Implementation IMG COMPLETED € 512,820.51 Babanovac" TL, Travnik 241 Bosnia Herzegovina 2000 2000 Spain 11 M Reconstruction of "Harambasina Voda" TS, Travnik ENERGY Implementation IMG COMPLETED € 241,025.64 Project Management 240 Bosnia Herzegovina 2000 2000 Spain 12 M Training for managing staff of B&H Elektroprivreda ENERGY IMG COMPLETED € 210,000.00 & Implementation Program for the Establishment and Strengthening of Project Management 239 Bosnia Herzegovina 2000 2000 Spain 2 Y ENERGY IMG COMPLETED € 80,000.00 the B&H Joint Power Co-ordination Centre functions, & Implementation Micro rehabilitation projects in the Eastern RS and Project Management IMG, SFOR 238 Bosnia Herzegovina 2000 2000 Spain 10 M MULTI SECTOR COMPLETED € 83,725.00 Herzegovina Neretva Canton & Implementation (Spanish Division) Technical Support from IMG Housing and IT Units / Project Management 237 Bosnia Herzegovina 2000 2000 UNHCR 6 M Assessments and elaboration on housing and MULTI SECTOR IMG COMPLETED € 10,000,000.00 & Implementation infrastructure needs Feasibility Study for Solid Waste Management District, Project Management 236 Bosnia Herzegovina 2000 2000 WB 6 M WATER & SOLID WASTE IMG COMPLETED € 5,050,000.00 Tesanj and Tuzla municipalities & Implementation Ministry for Social Monitoring and Affairs and Bureau 235 FRY 2000 2000 Norway 1 Y Norwegian Contribution to Child Allowances in Serbia SOCIAL SECTOR COMPLETED € 3,750,000.00 Advisory Services for Payments and Settlements DFID; Ministry of United United Kingdom Donation to the Serbian Family 234 FRY 2000 2000 2 M SOCIAL SECTOR Monitoring Social and COMPLETED € 51,794.87 Kingdom Material Support Welfare Scheme Veterans' Affairs Project Management 233 Serbia 2000 2000 EC 6 M Schools for Democratic Serbia EDUCATION COMPLETED € 61,538.46 & Monitoring Repair of High Voltage Transmission Line and Low 232 Bosnia Herzegovina 1999 1999 ECHO 7 M ENERGY Implementation IMG COMPLETED € 76,923.08 Voltage Distribution Network, Sokolac Construction of regional sanitary landfill Krivodol- final 231 Bosnia Herzegovina 1999 1999 ECHO 5 M WATER & SOLID WASTE Implementation IMG COMPLETED € 30,153.85 works, BosanskaKrupa_S_F Reconstruction of the Federal Statistic Institutes, HOUSING & PUBLIC 230 Bosnia Herzegovina 1999 1999 Italy 10 M Implementation IMG COMPLETED € 256,410.26 Mostar & Sarajevo BUILD. Supply and installation of 10(20) kV underground cable 229 Bosnia Herzegovina 1999 1999 Spain 6 M ENERGY Implementation IMG COMPLETED € 112,484.00 in Nevesinje, Nevesinje Rehabilitation of 20 kV switchgear in 110/20 kV 228 Bosnia Herzegovina 1999 1999 Spain 16 M ENERGY Implementation IMG COMPLETED € 153,387.00 "Laktasi" TS, Laktasi 227 Bosnia Herzegovina 1999 1999 Spain 20 M Power supply network for villages in Zenica area ENERGY Implementation IMG COMPLETED € 411,000.00 Establishment of the Business Development Centre in Project Management 226 Bosnia Herzegovina 1999 1999 Spain 14 M MULTI SECTOR IMG COMPLETED € 52,000,000.00 the University in Banja Luka & Implementation Co financing 225 FRY 1999 1999 (Norway, 1Y Energy for Democracy ENERGY Implementation None COMPLETED € 3,500,000.00 Canada) Project Management 224 Serbia 1999 1999 EC 18 M Energy for Democracy ENERGY COMPLETED € 184,820.00 & Monitoring Kosovo Damages Assessment Damage assessments - INFRASTRUCTURE & 223 Serbia/Kosovo 1999 1999 EC Housing and Public Buildings - Database management - Implementation COMPLETED € 105,500.00 HOUSING Projects evaluation IMG, BH Flight Reconstruction of Banja Luka Airport - Rehabilitation of Project Management 222 Bosnia Herzegovina 1998 1998 EC 12 M TRANSPORT Directorate, Airport COMPLETED € 115,080.00 Runway & Monitoring authorities IMG, BH Flight Reconstruction of Banja Luka Airport - De-icing Project Management 221 Bosnia Herzegovina 1998 1998 EC 14 M TRANSPORT Directorate, Airport COMPLETED € 1,277,440.00 equipment and new roof cover for the equipment & Monitoring authorities

16/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration IMG, BH Flight Reconstruction of Banja Luka Airport - Security Project Management 220 Bosnia Herzegovina 1998 1998 EC 14 M TRANSPORT Directorate, Airport COMPLETED € 130,788,720.00 systems & Monitoring authorities IMG, BH Flight Reconstruction of Mostar airport - Construction of new Project Management 219 Bosnia Herzegovina 1998 1998 EC 30 M TRANSPORT Directorate, Airport COMPLETED € 3,440,438.50 Control Tower & Monitoring authorities EC (RELEX/ Monitoring and coordinating on behalf of EC the EC HOUSING & PUBLIC Project Management IMG, NGO's, local 218 Bosnia Herzegovina 1998 1998 2 Y COMPLETED € 199,179.49 ECHO) Return Programme app. value 130 M€ BUILD. & Monitoring PIU Capacity Building / Institutional Strengthening - Support Co financing Project Management 217 Bosnia Herzegovina 1998 1998 3 Y to the State and entity Ministries (PIDs, PIUs, Public MULTI SECTOR IMG COMPLETED € 22,564.10 (EC, Italy) & Implementation Corporations etc) 216 Bosnia Herzegovina 1998 1998 ECHO 8 M Reconstruction of HV and LV network, Sipovo ENERGY Implementation IMG COMPLETED € 2,051,282.00 Reconstruction of water pumps for wells & electrical 215 Bosnia Herzegovina 1998 1998 Italy 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 207,000.00 generator, Mostar_S_F Reconstruction of Health Centre and City Bath in HOUSING & PUBLIC Project Management IMG, Local 214 Bosnia Herzegovina 1998 1998 Italy 18 M COMPLETED € 25,641.03 Mostar BUILD. & Implementation partners Project Management 213 Bosnia Herzegovina 1998 1998 Italy 1 Y Capacity Building / Support to Republika Srpska MULTI SECTOR IMG COMPLETED € 34,358.97 & Implementation 212 Bosnia Herzegovina 1998 1998 Netherlands 5 M Repair of 110 kV "Ilijas" TS, Ilijas ENERGY Implementation IMG COMPLETED € 500,000.00

211 Bosnia Herzegovina 1998 1998 Netherlands 5 M Repair of 110 kV "Donji Vakuf" TS, DonjiVakuf ENERGY Implementation IMG COMPLETED € 226,871.79 HOUSING & PUBLIC Project Management 210 Bosnia Herzegovina 1998 1998 Netherlands 14 M Open Cities Project / housing PIU COMPLETED € 76,205.13 BUILD. & Monitoring 209 Bosnia Herzegovina 1998 1998 Spain 14 M Repair of distribution network - Bileca, Bileca ENERGY Implementation IMG COMPLETED € 47,025.64 Rehabilitation of 35/10 kV TS with 10 kV connections - 208 Bosnia Herzegovina 1998 1998 Spain 10 M ENERGY Implementation IMG COMPLETED € 1,794,871.79 Volujac, Trebinje_S Repair of distribution network in Ljubinje - 35/10 kV TS, 207 Bosnia Herzegovina 1998 1998 Spain 9 M ENERGY Implementation IMG COMPLETED € 1,476,323.00 Ljubinje Water treatment system reconstruction/construction in 206 Bosnia Herzegovina 1998 1998 Spain 20 M WATER & SOLID WASTE Implementation IMG COMPLETED € 169,333.33 Ravna Rijeka and Ograina, Zepce Water treatment system reconstruction/construction in 205 Bosnia Herzegovina 1998 1998 Spain 26 M WATER & SOLID WASTE Implementation IMG COMPLETED € 128,923.08 Banovici Repair of power distribution network in Gacko 204 Bosnia Herzegovina 1998 1998 Spain 12 M ENERGY Implementation IMG COMPLETED € 202,205.13 Municipality, Gacko Repair of power distribution network in Nevesinje 203 Bosnia Herzegovina 1998 1998 Spain 11 M ENERGY Implementation IMG COMPLETED € 84,360.00 Municipality, Nevesinje Repair of power distribution network in Berkovici - 202 Bosnia Herzegovina 1998 1998 Spain 14 M ENERGY Implementation IMG COMPLETED € 28,000.00 supply of mobile 35/10 kV TS, Stolac_S Procurement of the equipment for Laboratories of Project Management 201 Bosnia Herzegovina 1998 1998 Spain 14 M Agricultural Investigation Institute in the University of MULTI SECTOR IMG COMPLETED € 4,400,000.00 & Monitoring Bihac Project Management PTT BiH, Telekom 200 Bosnia Herzegovina 1998 1998 Sweden 4 M Radio-relay link Sanski Most-Prijedor TELECOMMUNICATIONS COMPLETED € 2,740,512.00 & Monitoring Srpska HOUSING & PUBLIC 199 Serbia/Kosovo 1998 1998 EC Rehabilitation of Pristina University Implementation COMPLETED € 3,052,000.00 BUILDING Project Management, Reconstruction of Sarajevo Airport Terminal Building 198 Bosnia Herzegovina 1997 1997 EC 23 M TRANSPORT Supervision & IMG, EC, PID COMPLETED € 725,417.00 (phase I), Ilidza_F Monitoring Project Management, Road rehabilitation: Crkvina - Slatina - Obudovac 197 Bosnia Herzegovina 1997 1997 EC 22 M TRANSPORT Supervision & IMG, EC, PID COMPLETED € 1,380,730.00 (regional road R462/463) Monitoring Project Management, 196 Bosnia Herzegovina 1997 1997 EC 17 M Road rehabilitation: Visoko - Lasva (state road M17) TRANSPORT Supervision & IMG, EC, PID COMPLETED € 1,327,262.00 Monitoring Project Management, Road rehabilitation: Prnjavor - Derventa (state road 195 Bosnia Herzegovina 1997 1997 EC 24 M TRANSPORT Supervision & IMG, EC, PID COMPLETED € 2,053,891.00 M16.1) Monitoring Project Management, Road rehabilitation: Prijedor - Banja Luka (state road 194 Bosnia Herzegovina 1997 1997 EC 24 M TRANSPORT Supervision & IMG, EC, PID COMPLETED € 401,025.00 M4) Monitoring Project Management, Road rehabilitation: Bihac - Petrovac - Kljuc (state road 193 Bosnia Herzegovina 1997 1997 EC 24 M TRANSPORT Supervision & IMG, EC, PID COMPLETED € 393,340.00 M5) Monitoring IMG, BH Flight Reconstruction of Banja Luka Airport - Construction of Project Management 192 Bosnia Herzegovina 1997 1997 EC 18 M TRANSPORT Directorate, Airport COMPLETED € 27,692.31 Technical Building & Monitoring authorities IMG, BH Flight Reconstruction of Mostar airport - Provision of Meteo Project Management 191 Bosnia Herzegovina 1997 1997 EC 14 M TRANSPORT Directorate, Airport COMPLETED € 43,589.74 station & Fire fighting vehicle & Monitoring authorities Rehabilitation (partial): Hospital Water leak repairs, HOUSING & PUBLIC 190 Bosnia Herzegovina 1997 1997 ECHO 4 M Implementation IMG COMPLETED € 43,589.74 Zenica BUILD. Rehabilitation (partial): Hospital Sanitation works, HOUSING & PUBLIC 189 Bosnia Herzegovina 1997 1997 ECHO 4 M Implementation IMG COMPLETED € 23,076.92 Zenica BUILD. HOUSING & PUBLIC 188 Bosnia Herzegovina 1997 1997 ECHO 4 M Rehabilitation (partial) Hospital Water repairs, Zenica Implementation IMG COMPLETED € 41,025.64 BUILD. Rehabilitation of Water Supply System: Repair of 187 Bosnia Herzegovina 1997 1997 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 18,974.36 Company Premises "Visocica", Visoko Rehabilitation of Solid Waste: Repair of Refuse Site 186 Bosnia Herzegovina 1997 1997 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 6,666.67 access, Zepce 185 Bosnia Herzegovina 1997 1997 ECHO 4 M Rehabilitation of Waste Water Improvement, Zenica WATER & SOLID WASTE Implementation IMG COMPLETED € 4,615.38 Rehabilitation of Waste Water: Repair of Talami 184 Bosnia Herzegovina 1997 1997 ECHO 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 17,435.90 Sewage System, Zenica

17/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Rehabilitation of Waste Water: Repair of Goraždanska 183 Bosnia Herzegovina 1997 1997 ECHO 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 1,983,520.00 Street Sewage, Zenica 182 Bosnia Herzegovina 1997 1997 ECHO 4 M Rehabilitation of Waste Water: Sewage works, Zepce WATER & SOLID WASTE Implementation IMG COMPLETED € 1,046,150.00 IMG, BH Flight Sarajevo Airport - Procurement and installation of Project Management 181 Bosnia Herzegovina 1997 1997 Italy 20 M TRANSPORT Directorate, Airport COMPLETED € 450,000.00 airfield lighting & Monitoring authorities IMG, BH Flight Sarajevo Airport - Procurement and installation of Project Management 180 Bosnia Herzegovina 1997 1997 Italy 20 M TRANSPORT Directorate, Airport COMPLETED € 500,000.00 equipment for meteorological support and ATS & Monitoring authorities Rehabilitation of 28 houses and water supply network in Project Management 179 Bosnia Herzegovina 1997 1997 Italy 10 M MULTI SECTOR Gvc, Cisp COMPLETED € 600,000.00 Zenica & Monitoring HOUSING & PUBLIC Project Management 178 Bosnia Herzegovina 1997 1997 Italy 14 M Rehabilitation of 55 houses in Tuzla region Cisp COMPLETED € 28,718.00 BUILD. & Monitoring Rehabilitation of 67 houses and textile factory in Mostar HOUSING & PUBLIC Project Management 177 Bosnia Herzegovina 1997 1997 Italy 16 M Molisv COMPLETED € 28,718.00 region BUILD. & Monitoring Capacity Building in Zenica - Doboj Canton / Project Management 176 Bosnia Herzegovina 1997 1997 Italy 2 Y MULTI SECTOR IMG COMPLETED € 4,000,000.00 Establishment of IMG/Canton Joint Office & Implementation Capacity Building in Middle Bosnia - Travnik / Project Management 175 Bosnia Herzegovina 1997 1997 Italy 2 Y MULTI SECTOR IMG COMPLETED € 358,615.38 Establishment of IMG/Canton Joint Office & Implementation Construction of 150 houses for displaced persons in HOUSING & PUBLIC Project Management 174 Bosnia Herzegovina 1997 1997 Netherlands 14 M PIU, NGO's COMPLETED € 285,128.21 Tuzla region BUILD. & Monitoring Rehabilitation of 10 kV TLs, 10/0,4 kV TSs and LV 173 Bosnia Herzegovina 1997 1997 Spain 15 M ENERGY Implementation IMG COMPLETED € 353,692.31 network in the Popovo Polje Area, Trebinje_S Rehabilitation of 110(35) kV "Trebinje - Velicani" TL, 172 Bosnia Herzegovina 1997 1997 Spain 14 M ENERGY Implementation IMG COMPLETED € 247,846.15 Trebinje_S 171 Bosnia Herzegovina 1997 1997 Spain 15 M Rehabilitation of 35/10 kV "Velicani" TS, Trebinje_S ENERGY Implementation IMG COMPLETED € 486,632.00

170 Bosnia Herzegovina 1997 1997 Spain 18 M Repair of distribution network - Trebinje, Trebinje_S ENERGY Implementation IMG COMPLETED € 342,849.00 Supply of vehicles, equipment and tools for ED 169 Bosnia Herzegovina 1997 1997 Spain 16 M ENERGY Implementation IMG COMPLETED € 13,333.33 Trebinje, Reconstruction of telecommunication services in Project Management 168 Bosnia Herzegovina 1997 1997 Spain 10 M TELECOMMUNICATIONS Ericsson, PTT BiH COMPLETED € 10,256.41 Busovaca municipality & Monitoring United Rehabilitation of Solid Waste: Protection of Zenica 167 Bosnia Herzegovina 1997 1997 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 49,743.59 Kingdom Hospital refuse site, Zenica United 166 Bosnia Herzegovina 1997 1997 3 M Repair of TS and LV network, NoviTravnik ENERGY Implementation IMG COMPLETED € 10,256.41 Kingdom United 165 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, TS and LV network, Tesanj_N_F ENERGY Implementation IMG COMPLETED € 22,564.10 Kingdom United 164 Bosnia Herzegovina 1997 1997 4 M Repair of 20kV TL, DonjiVakuf ENERGY Implementation IMG COMPLETED € 10,256.41 Kingdom United 163 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 7,692.31 Kingdom United 162 Bosnia Herzegovina 1997 1997 4 M Repair of 20 kV TL, DonjiVakuf ENERGY Implementation IMG COMPLETED € 66,666.67 Kingdom United 161 Bosnia Herzegovina 1997 1997 3 M Repair 10 kV TL, Busovaca ENERGY Implementation IMG COMPLETED € 21,538.46 Kingdom United 160 Bosnia Herzegovina 1997 1997 5 M Repair of 35/10&20/10,4 MVA TSs, DonjiVakuf ENERGY Implementation IMG COMPLETED € 34,871.79 Kingdom United 159 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 29,743.59 Kingdom United 158 Bosnia Herzegovina 1997 1997 4 M Repair of 10/0,4 kV TS and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 4,102.56 Kingdom United 157 Bosnia Herzegovina 1997 1997 4 M Repair of 10/0,4 kV TS and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 23,076.92 Kingdom United 156 Bosnia Herzegovina 1997 1997 3 M Repair 10 kV TL, NoviTravnik ENERGY Implementation IMG COMPLETED € 4,615.38 Kingdom United 155 Bosnia Herzegovina 1997 1997 4 M Repair of MV TL and TS, Bugojno ENERGY Implementation IMG COMPLETED € 20,512.82 Kingdom United 154 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, NoviTravnik ENERGY Implementation IMG COMPLETED € 16,410.26 Kingdom United 153 Bosnia Herzegovina 1997 1997 4 M Repair of TS and LV network, Vitez ENERGY Implementation IMG COMPLETED € 15,384.62 Kingdom United 152 Bosnia Herzegovina 1997 1997 4 M Repair of LV network, Bugojno ENERGY Implementation IMG COMPLETED € 26,666.67 Kingdom United 151 Bosnia Herzegovina 1997 1997 4 M Repair of 10/0,4 kV TS and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 150 Bosnia Herzegovina 1997 1997 4 M Repair of MV TL and TS, Bugojno ENERGY Implementation IMG COMPLETED € 35,897.44 Kingdom United 149 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, Busovaca ENERGY Implementation IMG COMPLETED € 34,871.79 Kingdom United 148 Bosnia Herzegovina 1997 1997 4 M Repair of MV TL and TS, Bugojno ENERGY Implementation IMG COMPLETED € 25,128.21 Kingdom United 147 Bosnia Herzegovina 1997 1997 4 M Repair of 10/0,4 kV TS and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 4,102.56 Kingdom United 146 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 23,076.92 Kingdom United 145 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, Busovaca ENERGY Implementation IMG COMPLETED € 9,230.77 Kingdom United 144 Bosnia Herzegovina 1997 1997 4 M Repair of 10/0,4 kV TS and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 22,564.10 Kingdom United 143 Bosnia Herzegovina 1997 1997 3 M Repair of 10kV TL, Busovaca ENERGY Implementation IMG COMPLETED € 14,871.79 Kingdom United 142 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL and LV network, Busovaca ENERGY Implementation IMG COMPLETED € 20,512.82 Kingdom United 141 Bosnia Herzegovina 1997 1997 4 M Repair of LV network, Bugojno ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom

18/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration United 140 Bosnia Herzegovina 1997 1997 4 M Repair of TS and LV network, Vitez ENERGY Implementation IMG COMPLETED € 7,692.31 Kingdom United 139 Bosnia Herzegovina 1997 1997 3 M Repair of TS and LV network, Vitez ENERGY Implementation IMG COMPLETED € 12,820.51 Kingdom United 138 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, Vitez ENERGY Implementation IMG COMPLETED € 41,025.64 Kingdom United 137 Bosnia Herzegovina 1997 1997 4 M Repair or LV network, Vitez ENERGY Implementation IMG COMPLETED € 20,512.82 Kingdom United 136 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL, TS and LV network, Zavidovici ENERGY Implementation IMG COMPLETED € 15,384.62 Kingdom United 135 Bosnia Herzegovina 1997 1997 4 M Repair of 10 kV TL, TS and LV network, Zavidovici ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 134 Bosnia Herzegovina 1997 1997 4 M Repair of TS and LV network, Vitez ENERGY Implementation IMG COMPLETED € 10,256.41 Kingdom United Supply of pumps and accessories for pump station 133 Bosnia Herzegovina 1997 1997 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 5,128.21 Kingdom "Kromolj", StariGrad_F United 132 Bosnia Herzegovina 1997 1997 3 M Repair of TS and LV network, NoviTravnik ENERGY Implementation IMG COMPLETED € 12,820.51 Kingdom United 131 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, NoviTravnik ENERGY Implementation IMG COMPLETED € 7,692.31 Kingdom United 130 Bosnia Herzegovina 1997 1997 4 M Repair of TS and LV network, NoviTravnik ENERGY Implementation IMG COMPLETED € 15,384.62 Kingdom United 129 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Vitez ENERGY Implementation IMG COMPLETED € 38,974.36 Kingdom United 128 Bosnia Herzegovina 1997 1997 3 M Repair of TS and LV network, NoviTravnik ENERGY Implementation IMG COMPLETED € 68,717.95 Kingdom United Repair of 10(20)/0,4 kV TS and LV network, 127 Bosnia Herzegovina 1997 1997 4 M ENERGY Implementation IMG COMPLETED € 4,102.56 Kingdom Tesanj_S_F United 126 Bosnia Herzegovina 1997 1997 5 M Repair of 10 kV TS and LV network, Tesanj_S_F ENERGY Implementation IMG COMPLETED € 10,256.41 Kingdom United 125 Bosnia Herzegovina 1997 1997 3 M Repair 10 kV TL, NoviTravnik ENERGY Implementation IMG COMPLETED € 10,256.41 Kingdom United 124 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 123 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 2,564.10 Kingdom United 122 Bosnia Herzegovina 1997 1997 3M Repair of 10 kV TL, Travnik ENERGY Implementation IMG COMPLETED € 2,564.10 Kingdom United 121 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 120 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 119 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Busovaca ENERGY Implementation IMG COMPLETED € 5,128.21 Kingdom United 118 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 2,564.10 Kingdom United 117 Bosnia Herzegovina 1997 1997 3 M Repair of 10 kV TL, Vitez ENERGY Implementation IMG COMPLETED € 15,384.62 Kingdom United 116 Bosnia Herzegovina 1997 1997 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 200,000.00 Kingdom United 115 Bosnia Herzegovina 1997 1997 3 M Repair of TS and LV network, Vitez ENERGY Implementation IMG COMPLETED € 30,769.23 Kingdom Co financing Railways / Institutional Strengthening - Support to BH INSTITUTIONAL Project Management 114 Bosnia Herzegovina 1997 1997 3 Y IMG COMPLETED € 10,200.00 (UK, Sweden) Railway Corporation CAPACITY BUILDING & Implementation Supply of materials for distribution network 113 Bosnia Herzegovina 1996 1996 Austria 4 M ENERGY Implementation IMG COMPLETED € 512,820.51 maintenance, Tesanj_S_F Supply of equipment and material Specification of 112 Bosnia Herzegovina 1996 1996 Austria 4 M needs for water supply utility of Jajce, Travnik, Tesanj, WATER & SOLID WASTE Implementation IMG COMPLETED € 3,589.74 Zepce, 111 Bosnia Herzegovina 1996 1996 Austria 10 M Rehabilitation of water treatment plant, Jajce_F WATER & SOLID WASTE Implementation ACO COMPLETED € 1,692,310.00 United HOUSING & PUBLIC 110 Bosnia Herzegovina 1996 1996 3 M Rehabilitation (partial): Orphanage Boiler Room, Centre Implementation IMG COMPLETED € 12,007,600.00 Kingdom BUILD. Procurement of the equipment and rehabilitation of the Project Management IMG,EC, railway 109 Bosnia Herzegovina 1996 1996 EC 11 M TRANSPORT COMPLETED € 1,855,165.00 Rajlovac railway workshop / 2 projects & Monitoring authorities Procurement of the construction equipment, equipment IMG, Road Project Management 108 Bosnia Herzegovina 1996 1996 EC 12 M for quarries & asphalt plans and vehicles for Federation TRANSPORT Directorate, COMPLETED € 7,179.49 & Monitoring Road Directorate Federal PID Procurement of the construction equipment, equipment IMG, RS Road Project Management 107 Bosnia Herzegovina 1996 1996 EC 12 M for quarries & asphalt plans and vehicles for RS Road TRANSPORT Directorate, RS COMPLETED € 12,820.51 & Monitoring Directorate PID 106 Bosnia Herzegovina 1996 1996 ECHO 4 M Boiler Corrosion Reduction, Sarajevo Centre ENERGY Implementation IMG COMPLETED € 112,820.51 Rehabilitation (partial): Children's Rehabilitation Centre HOUSING & PUBLIC 105 Bosnia Herzegovina 1996 1996 ECHO 4 M Implementation IMG COMPLETED € 30,769.23 Provide Physiotherapeutic Equipment and Specialists, BUILD. NoviGrad Rehabilitation (partial): Health Centre Roof, glazing, HOUSING & PUBLIC 104 Bosnia Herzegovina 1996 1996 ECHO 6 M Implementation IMG COMPLETED € 5,128.21 Ilidza_F BUILD. Supply of 10kV distribution equipment for 35/10 103 Bosnia Herzegovina 1996 1996 ECHO 4 M ENERGY Implementation IMG COMPLETED € 5,128.21 "" TS, NovoSarajevo_F 102 Bosnia Herzegovina 1996 1996 ECHO 3 M Rehabilitation (partial): Hospital Canton Heating, Zenica ENERGY Implementation IMG COMPLETED € 15,384.62

101 Bosnia Herzegovina 1996 1996 ECHO 1 M Žepce District Heating - Winter 95/96, Zepce ENERGY Implementation IMG COMPLETED € 25,641.03 Rehabilitation (partial): Orphanage Safety equipment, HOUSING & PUBLIC 100 Bosnia Herzegovina 1996 1996 ECHO 3 M Implementation IMG COMPLETED € 5,128.21 Centre BUILD.

19/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Emergency Communications Equipment for Fire 99 Bosnia Herzegovina 1996 1996 ECHO 3 M TELECOMMUNICATIONS Implementation IMG COMPLETED € 3,589.74 Brigade, Centre 98 Bosnia Herzegovina 1996 1996 ECHO 3 M Repair Road Bridge, StariGrad_F TRANSPORT Implementation IMG COMPLETED € 37,948.72 Rehabilitation (partial): Clinical Centre, Psychiatric HOUSING & PUBLIC 97 Bosnia Herzegovina 1996 1996 ECHO 3 M Implementation IMG COMPLETED € 42,051.28 Department Sanitary repairs, Centre BUILD. 96 Bosnia Herzegovina 1996 1996 ECHO 3 M Repair of LV network, Breza ENERGY Implementation IMG COMPLETED € 82,051.28

95 Bosnia Herzegovina 1996 1996 ECHO 4 M Repair of 10 kV TL and LV network, Zepce ENERGY Implementation Elektro Zenica COMPLETED € 106,666.67

94 Bosnia Herzegovina 1996 1996 ECHO 4 M Repair of 10 kV TL and LV network, Breza ENERGY Implementation IMG COMPLETED € 20,512.82

93 Bosnia Herzegovina 1996 1996 ECHO 5 M Repair of 10 kV TL and LV network, Breza ENERGY Implementation IMG COMPLETED € 48,717.95

92 Bosnia Herzegovina 1996 1996 ECHO 1 M Kakanj District Heating - Winter 95/96, Kakanj ENERGY Implementation IMG COMPLETED € 30,769.23

91 Bosnia Herzegovina 1996 1996 ECHO 1 M Travnik District Heating - Winter 95/96, Travnik ENERGY Implementation IMG COMPLETED € 71,794.87

90 Bosnia Herzegovina 1996 1996 ECHO 1 M Vitez District Heating - Winter 95/96, Vitez ENERGY Implementation IMG COMPLETED € 46,153.85

89 Bosnia Herzegovina 1996 1996 ECHO 1 M Zenica District Heating - Winter 95/96, Zenica ENERGY Implementation IMG COMPLETED € 15,384.62 Supply of materials for three Distribution Substations, 88 Bosnia Herzegovina 1996 1996 ECHO 4 M ENERGY Implementation IMG COMPLETED € 128,205.13 Ilidza_F 87 Bosnia Herzegovina 1996 1996 ECHO 3 M Repair Bakery Ventilation System, NovoSarajevo_F ENERGY Implementation IMG COMPLETED € 133,333.33

86 Bosnia Herzegovina 1996 1996 ECHO 5 M Repair of 10 kV TL and LV network, Breza ENERGY Implementation IMG COMPLETED € 10,256.41 Supply of materials for water and sewer system 85 Bosnia Herzegovina 1996 1996 ECHO 5 M WATER & SOLID WASTE Implementation IMG COMPLETED € 8,717.95 repairs, Koševo Hospital, Centre Rehabilitation of water supply system: 84 Bosnia Herzegovina 1996 1996 ECHO 4 M Repair of chlorinating system in "Nahorevo" reservoir, WATER & SOLID WASTE Implementation IMG COMPLETED € 15,384.62 Centre Supply of materials for repair of water system in Ilijaš, 83 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 15,384.62 Ilijas Rehabilitation of water supply system: Provision and 82 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 9,230.77 installation of chlorinating system in Ilijaš, Ilijas Reconstruction of water supply system: Installation of 81 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 15,384.62 Chlorinating System, Ilidza_F Rehabilitation of water supply system: J389Repair of 80 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 29,487.18 corrosion damages to water treatment plant, Ilijas

Reconstruction of water supply system: Repair of 79 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 95,384.62 booster system in high rise buildings, NovoSarajevo_F

78 Bosnia Herzegovina 1996 1996 ECHO 4 M Supply of equipment: Garbage Containers, Bihac WATER & SOLID WASTE Implementation IMG COMPLETED € 6,153.85 Rehabilitation (partial): Mental Hospital "Kreka" Boiler HOUSING & PUBLIC 77 Bosnia Herzegovina 1996 1996 ECHO 5 M Implementation IMG, MSF/B COMPLETED € 102,564.10 overhaul, Tuzla BUILD. Rehabilitation of Waste Water: Repair of IV Street 76 Bosnia Herzegovina 1996 1996 ECHO 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 8,717.95 Sewage, Maglaj Rehabilitation (partial): Secondary School Additional HOUSING & PUBLIC 75 Bosnia Herzegovina 1996 1996 ECHO 7 M Implementation IMG COMPLETED € 30,769.23 Classrooms, Heating, Training tools, Pale_S BUILD.

74 Bosnia Herzegovina 1996 1996 ECHO 3 M Construction of Investigation well, Gorazde_F WATER & SOLID WASTE Implementation IMG COMPLETED € 21,538.46 Supply of equipment: Trench Digger, 73 Bosnia Herzegovina 1996 1996 ECHO 5 M WATER & SOLID WASTE Implementation IMG COMPLETED € 18,974.36 BosanskaKrupa_S_F 72 Bosnia Herzegovina 1996 1996 ECHO 3 M Rehabilitation of Water Supply System: Breza WATER & SOLID WASTE Implementation IMG COMPLETED € 45,128.21 Rehabilitation of Solid Waste: Repair of Landfill site, 71 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 51,282.05 Tesanj_S_F Supply of tools and materials for house connections, 70 Bosnia Herzegovina 1996 1996 ECHO 4 M ENERGY Implementation IMG COMPLETED € 29,230.77 Glamoc 69 Bosnia Herzegovina 1996 1996 ECHO 5 M Supply of Waste Disposal Skips, Bratunac WATER & SOLID WASTE Implementation IMG COMPLETED € 131,794.87 Supply of equipment: Garbage Containers, 68 Bosnia Herzegovina 1996 1996 ECHO 5 M WATER & SOLID WASTE Implementation IMG COMPLETED € 10,256.41 BosanskaKrupa_S_F 67 Bosnia Herzegovina 1996 1996 ECHO 5 M Rehabilitation of MV and LV networks, Konjic ENERGY Implementation IMG COMPLETED € 20,512.82 Rehabilitation of water supply system: Repair of pump 66 Bosnia Herzegovina 1996 1996 ECHO 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 30,769.23 station, Centre Reconstruction of water supply system: Repair of pump 65 Bosnia Herzegovina 1996 1996 ECHO 4 M WATER & SOLID WASTE Implementation IMG COMPLETED € 23,076.92 station "Lukavac" and reservoir, NovoSarajevo_F Construction of water supply system: Installation of the 64 Bosnia Herzegovina 1996 1996 ECHO 5 M WATER & SOLID WASTE Implementation IMG COMPLETED € 109,487.18 pipe line, Jablanica 63 Bosnia Herzegovina 1996 1996 ECHO 4 M Rehabilitation: Water supply system, Prozor WATER & SOLID WASTE Implementation IMG COMPLETED € 114,871.79 Repairs of distribution network - Stabandza, 62 Bosnia Herzegovina 1996 1996 ECHO 6 M ENERGY Implementation IMG COMPLETED € 114,358.97 VelikaKladusa 61 Bosnia Herzegovina 1996 1996 ECHO 7 M Repairs of Power distribution network - Bihac, Bihac ENERGY Implementation IMG COMPLETED € 128,205.13 Repairs of 35 kV TL and transformer station - Ripac, 60 Bosnia Herzegovina 1996 1996 ECHO 6 M ENERGY Implementation IMG COMPLETED € 57,948.72 Bihac 59 Bosnia Herzegovina 1996 1996 ECHO 7 M Repair of 10 kV TL and LV network, Visoko ENERGY Implementation IMG COMPLETED € 61,538.46

20/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration Reconstruction of water supply system: Construct 58 Bosnia Herzegovina 1996 1996 ECHO 6 M WATER & SOLID WASTE Implementation IMG COMPLETED € 106,666.67 pumping station, Mostar_SE_F 57 Bosnia Herzegovina 1996 1996 ECHO 5 M Repair of 10 kV TL and LV network, Visoko ENERGY Implementation IMG COMPLETED € 200,000.00

56 Bosnia Herzegovina 1996 1996 ECHO 6 M Repair of 10 kV TL and LV network, Visoko ENERGY Implementation IMG COMPLETED € 200,000.00 Rehabilitation of 23 houses and el. network in Zenica Project Management 55 Bosnia Herzegovina 1996 1996 Italy 12 M MULTI SECTOR Ics/CDB COMPLETED € 380,000.00 region & Monitoring HOUSING & PUBLIC Project Management 54 Bosnia Herzegovina 1996 1996 Italy 12 M Rehabilitation of primary school in Gorazde Iscos COMPLETED € 230,000.00 BUILD. & Monitoring Rehabilitation of 24 houses, school, and water supply Project Management 53 Bosnia Herzegovina 1996 1996 Italy 14 M MULTI SECTOR Arcs, Caritas COMPLETED € 100,000.00 network in Mostar region & Monitoring HOUSING & PUBLIC Project Management 52 Bosnia Herzegovina 1996 1996 Italy 15 M Rehabilitation of 60 houses in Banja Luka region Cesvi COMPLETED € 200,000.00 BUILD. & Monitoring Project Management 51 Bosnia Herzegovina 1996 1996 Italy 12 M Rehabilitation of water supply network in Zenica WATER & SOLID WASTE Gvc COMPLETED € 150,000.00 & Monitoring HOUSING & PUBLIC Project Management 50 Bosnia Herzegovina 1996 1996 Italy 12 M Rehabilitation of houses in Ilidza / IV Intersos COMPLETED € 480,000.00 BUILD. & Monitoring Rehabilitation of houses and collective centre in HOUSING & PUBLIC Project Management 49 Bosnia Herzegovina 1996 1996 Italy 12 M Iscos COMPLETED € 300,000.00 Gorazde BUILD. & Monitoring Rehabilitation of 56 houses, school, water network in Project Management 48 Bosnia Herzegovina 1996 1996 Italy 16 M MULTI SECTOR Molisv, Cisp COMPLETED € 307,692.31 Tuzla region & Monitoring Rehabilitation of 15 houses, health centre, el. Network Project Management 47 Bosnia Herzegovina 1996 1996 Italy 14 M MULTI SECTOR Ipsia COMPLETED € 276,923.08 and local road in Bihac region & Monitoring 46 Bosnia Herzegovina 1996 1996 Netherlands 7 M Supply of equipment: material, BosanskaKrupa_S_F ENERGY Implementation IMG COMPLETED € 155,900.00 Repair of 110 kV "Banja Luka 1 - Bocac HPP - Jajce 45 Bosnia Herzegovina 1996 1996 Netherlands 14 M ENERGY Implementation IMG COMPLETED € 371,794.87 2" TL, 44 Bosnia Herzegovina 1996 1996 Netherlands 10 M Repair of 110 kV "Donji Vakuf - Jajce 2- BL" TL ENERGY Implementation IMG COMPLETED € 92,307.69

43 Bosnia Herzegovina 1996 1996 Netherlands 18 Repair of 110 kV "Banja Luka 1" TS, BanjaLuka ENERGY Implementation IMG COMPLETED € 26,666.67

42 Bosnia Herzegovina 1996 1996 Netherlands 16 M Repair of 110 kV "Jajce 1" TS, Jajce_F ENERGY Implementation IMG COMPLETED € 512,820.51 Rehabilitation (partial): Hospital Backup power supply, 41 Bosnia Herzegovina 1996 1996 Norway 3 M ENERGY Implementation Elektrokrajina COMPLETED € 80,000.00 Generator, Derventa Reconstruction of Water Supply System: Improvement, 40 Bosnia Herzegovina 1996 1996 Norway 10 M WATER & SOLID WASTE Implementation IMG COMPLETED € 4,600,000.00 Vitez 39 Bosnia Herzegovina 1996 1996 Norway 4 M Supply of backup generators, MrkonjicGrad ENERGY Implementation Elektrokrajina COMPLETED € 3,948.72 New switchboard for telecommunication centre, Project Management 38 Bosnia Herzegovina 1996 1996 Sweden 12 M TELECOMMUNICATIONS Ericsson, PTT BiH COMPLETED € 5,128.21 Sarajevo & Monitoring United INSTITUTIONAL 37 Bosnia Herzegovina 1996 1996 3 M Equipment Supply: Computers, Bihac Implementation IMG COMPLETED € 7,692.31 Kingdom CAPACITY BUILDING/ IT United Rehabilitation: Hospital "Irfan Ljubljankic" Equipment, HOUSING & PUBLIC 36 Bosnia Herzegovina 1996 1996 3 M Implementation IMG COMPLETED € 6,153.85 Kingdom Bihac BUILD. United Supply of electrical materials for urgent repairs, 35 Bosnia Herzegovina 1996 1996 3 M ENERGY Implementation IMG COMPLETED € 128,205.13 Kingdom Mostar_N_F United Reconstruction of water supply system: Construction of 34 Bosnia Herzegovina 1996 1996 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 6,461.54 Kingdom water storage cover, Mostar_SE_F United 33 Bosnia Herzegovina 1996 1996 7 M Rehabilitation: Water supply system, Mostar_SE_F WATER & SOLID WASTE Implementation IMG COMPLETED € 8,717.95 Kingdom United 32 Bosnia Herzegovina 1996 1996 3 M Supply of District Heating Pumps, Pale_S ENERGY Implementation IMG COMPLETED € 7,692.31 Kingdom United HOUSING & PUBLIC 31 Bosnia Herzegovina 1996 1996 3 M Rehabilitation (partial): Health Centre Sokolac, Sokolac Implementation IMG COMPLETED € 76,410.26 Kingdom BUILD. United 30 Bosnia Herzegovina 1996 1996 3 M Repair of LV network, Travnik ENERGY Implementation IMG COMPLETED € 51,282.05 Kingdom United 29 Bosnia Herzegovina 1996 1996 4 M Repair of 10 kV TL, TS and LV network, Doboj_W_F ENERGY Implementation IMG COMPLETED € 9,230.77 Kingdom United Repair of 10(20)/0,4 kV TS and LV network, 28 Bosnia Herzegovina 1996 1996 4 M ENERGY Implementation IMG COMPLETED € 60,307.69 Kingdom Doboj_W_F United 27 Bosnia Herzegovina 1996 1996 3 M Repair of 10(20)/0,4 kV, 160 kVA TS, Doboj_W_F ENERGY Implementation IMG COMPLETED € 3,897.44 Kingdom United Rehabilitation (partial): Primary School "V.Karadzic", HOUSING & PUBLIC 26 Bosnia Herzegovina 1996 1996 5 M Implementation IMG, ODA COMPLETED € 102,564.10 Kingdom Kalesija_S BUILD. United 25 Bosnia Herzegovina 1996 1996 1 M Supply of 8000 Heating Oil, Pale_S ENERGY Implementation IMG COMPLETED € 520.00 Kingdom United Rehabilitation of 35 kV "Bratunac-Srebrenica/Potocari" 24 Bosnia Herzegovina 1996 1996 5 M ENERGY Implementation IMG COMPLETED € 1,051.28 Kingdom TL, Srebrenica_N_S United Supply of cables for bakery safety equipment, 23 Bosnia Herzegovina 1996 1996 3 M ENERGY Implementation IMG COMPLETED € 2,564.10 Kingdom NovoSarajevo_F United Emergency Heating for Rehabilitation Centre for 22 Bosnia Herzegovina 1996 1996 1 M ENERGY Implementation IMG COMPLETED € 1,538.46 Kingdom Children, NoviGrad United 21 Bosnia Herzegovina 1996 1996 3 M Provide 4 Flame Controllers, NoviGrad ENERGY Implementation IMG COMPLETED € 2,666.67 Kingdom United Supply of handsets for leak detection and repair, 20 Bosnia Herzegovina 1996 1996 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 35,897.44 Kingdom StariGrad_F United Supply of spare parts for excavator for JKP 19 Bosnia Herzegovina 1996 1996 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 1,025.64 Kingdom "Komunalac", Hadzici United 18 Bosnia Herzegovina 1996 1996 5 M Supply of Trencher, Maglaj WATER & SOLID WASTE Implementation IMG COMPLETED € 2,051.28 Kingdom United Reconstruction of Water Supply System: Repair of 17 Bosnia Herzegovina 1996 1996 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 3,846.15 Kingdom pump, Maglaj United Reconstruction of Water Supply System: Repair of 16 Bosnia Herzegovina 1996 1996 3 M WATER & SOLID WASTE Implementation IMG COMPLETED € 112,820.51 Kingdom Water pump, Tesanj_S_F United 15 Bosnia Herzegovina 1996 1996 3 M Supply of tools to JKP "Komunalac", Hadzici WATER & SOLID WASTE Implementation IMG COMPLETED € 53,846.15 Kingdom

21/22 Project Reference Data July 2020 International Management Group - Project Reference Data

ProjectDu Rbr BenefCountry Begin ImplYear Donor ProjectTitle Sector IMGRole ImpPartner Project Description Status Project Value ration United 14 Bosnia Herzegovina 1996 1996 5 M Repair of 35 kV "Stolac-Ljubinje" TL, Ljubinje ENERGY Implementation IMG, ODA COMPLETED € 102,564.10 Kingdom United Construction of the New Pump Station and Repairs of 13 Bosnia Herzegovina 1996 1996 6 M WATER & SOLID WASTE Implementation IMG COMPLETED € 155,897.44 Kingdom Distribution Network, Srebrenica_N_S United 12 Bosnia Herzegovina 1996 1996 5 M Repair 10kV TL and LV network, Maglaj ENERGY Implementation IMG COMPLETED € 760,000.00 Kingdom United 11 Bosnia Herzegovina 1996 1996 7 M Repair of 10 kV TL, TS and LV network, Tesanj_S_F ENERGY Implementation IMG COMPLETED € 820,520.00 Kingdom HOUSING & PUBLIC 10 Bosnia Herzegovina 1995 1995 EC 10 M Rehabilitation of 6 schools in Tuzla region Implementation IMG COMPLETED € 43,100.00 BUILD. HOUSING & PUBLIC 9 Bosnia Herzegovina 1995 1995 Italy 10 M Rehabilitation 23 apartment buildings Implementation Canton/IMG COMPLETED € 1,060,000.00 BUILD. 8 Bosnia Herzegovina 1995 1995 Italy 4 M Rehabilitation 10 KV power supply ENERGY Implementation IMG COMPLETED € 2,708,190.00 HOUSING & PUBLIC Project Management 7 Bosnia Herzegovina 1995 1995 Italy 14 M Rehabilitation of 105 houses in Tuzla region Molisv, Intersos COMPLETED € 0.00 BUILD. & Monitoring Rehabilitation of the railway line: Zenica - Sarajevo - Project Management IMG, UN, railway 6 Bosnia Herzegovina 1995 1995 UN SCS TF 10 M TRANSPORT COMPLETED € 0.00 Capljina (seaport Ploce) / 10 projects & Monitoring authorities Task Force War damages assessments - Database management - (EC, UNHCR, IMG, NGO's, Projects evaluation - Taskforce Management - Identification, appraisal EU Member Governmental Aid 5 Bosnia Herzegovina 1994-2000 1994-2000 6Y Reconstruction Monitoring (Housing and Public MULTI SECTOR and proposal, COMPLETED € 24,000,000.00 Countries, Organisations, local Buildings , Energy, Telecomm, Transport, Water and monitoring WORLD PIU solid waste) BANK..)

22/22 Project Reference Data July 2020