Network Capability and Performance
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
MEWF – Newsletter
Community Newsletter April 2017 1 Mount Emerald Wind Farm Update Local companies participate in construction of Mount Emerald Wind Farm Blasting notice Construction has commenced on the $360 million Mount Emerald Wind Farm with several businesses With the start of major from the wider Cairns region already engaged to conduct preliminary works ahead of more expansive construction works, works after the wet season. there is a possibility for small scale blasting. Cairns-based Koppens Developments completed the construction of a concrete protection structure over SunWaters irrigation works before Christmas while Mareeba’s Gregg Construction has provided Such activities will plant and equipment this month for the establishment of a laydown area at the entrance to the occur between 9 am project. and 3pm, Monday to Friday. In between times, Mbarbarram Aboriginal Corporation has undertaken Cultural Heritage surveys and assisted 4 Elements Consulting with environmental surveys. These surveys are completed prior to All blasting activities any areas of the site being opened up for construction work. will be conducted in Local companies looking to participate in the project are encouraged to register their interest via a accordance with all new dedicated Industry Capability Network (ICN) webpage. applicable laws. www.gateway.icn.org.au/project/3884/mount-emerald-wind-farm ICN is a federal government-funded local participation agency. Construction contractors Vestas, CPP and Catcon are using ICN’s Gateway to advertise a long list of work packages and supply opportunities including plant and equipment hire and servicing, concrete pumping, quarry product supply, cranage, hardware, accommodation, cleaning, fuel supply, liquid waste disposal, and potable water supply. -
ATK2-1 Wivenhoe Power Station Geological Inspection Report by 19
QUEENSLAND FLOODS COMMISSION OF INQUIRY STATEMENT OF ANDREW KROTEWICZ TABLE OF EXHIBITS ATK2-1 Wivenhoe Power Station Geological Inspection Report by 19 January 2011 SunWater On 3 November 20111, Andrew Krotewicz of ci Level 2, HQ North Tower, 540 Wickham Street, Fortitude Valley in the State of Queensland, say on oath: I am the former General Manager Generation Operations of Tarong Energy Corporation. I held this position between 1 September 2007 and 30 June 2011. 2. On 1 July 2011, I was appointed the Executive General Manager Asset Strategy of CS Energy at the same time as CS Energy became the successor in law to Tarong Energy Corporation of the Wivenhoe Business Unit as defined in the Government Owned Corporations Act 1993 (QId) (Generator Restructure) Regulation 2011 which includes the Wivenhoe Power Station and rights to move water in and out of Splityard Creek Dam. 3. This statement is supplementary to the two prior statements dated 13 September 2011. For the period 1 October 2010 to 31 March 2011: 4.0 1(a) a description of whether and how the communication requirements set out in the following documents were complied with and 1(b) to the extent that either of these documents were not complied with, and explanation as to why compliance did not occur: Deed of Practice between Seqwater and Tarong Energy Corporation (Tarong Energy) for Wiven hoe Dam and Wivenhoe Power Station. Wivenhoe Power Station Business Procedure for Wivenhoe - High Rainfall, High Dam Water Levels (WI V-OPS-1 5). Deed of Practice 4.1 On 4 October 2010 Seqwater requested under the terms of the Deed of Practice that a notification protocol be initiated to allow Seqwater to receive notice of impending water releases to/ extraction from Lake Wivenhoe by Wivenhoe Power Station. -
Energy 2020 (Report 11: 2020–21)
FINANCIAL AUDIT REPORT 4 February 2021 Energy 2020 Report 11: 2020–21 • Queensland • • Audit Office Better public services As the independent auditor of the Queensland public sector, including local governments, the Queensland Audit Office: • provides professional audit services, which include our audit opinions on the accuracy and reliability of the financial statements of public sector entities • provides entities with insights on their financial performance, risk, and internal controls; and on the efficiency, effectiveness, and economy of public service delivery • produces reports to parliament on the results of our audit work, and on our insights, advice, and recommendations for improvement • conducts investigations into claims of financial waste and mismanagement raised by elected members, state and local government employees, and the public • shares wider learnings and best practice from our work with state and local government entities, our professional networks, industry, and peers. We conduct all our audits and reports to parliament under the Auditor-General Act 2009 (the Act). Our work complies with the Auditor-General Auditing Standards and the Australian standards relevant to assurance engagements. • Financial audit reports summarise the results of our audits of over 400 state and local government entities. • Performance audit reports cover our evaluation of some, or all, of the entities’ efficiency, effectiveness, and economy in providing public services. Depending on the level of assurance we can provide, these reports may also take the form of: • Audit insights, which provide some evaluation and share our insights or learnings from our audit work across government • Audit briefs, which set out key facts, involve some evaluation, and may include findings and recommendations • Audit overviews, which help clients and stakeholders understand complex issues and subjects. -
Wivenhoe Power Station Noise Control
Wivenhoe Power Station Noise Control PROJECT: Wivenhoe Power Station INDUSTRY TYPE: Power Generation CLIENT: CS Energy LOCATION: Wivenhoe Initial project requirements: Wivenhoe Power Station, operated by CS Energy, is a hydropower generating system. Wivenhoe is approximately 50 km west of Brisbane and is the only pumped hydroelectric storage plant in Queensland. Not only is the power station the only pumped storage hydroelectric plant in Queensland, but it also has two of the largest hydro machines in Australia – 285 MW generators. The power station cycles water between Splityard Creek Dam and Wivenhoe Dam. The power station turbine room generates high noise levels, creating an uncomfortable working environment for the adjacent offices. Flexshield solution: Flexshield has an existing working relationship with CS Energy, having also worked with CS Energy at Kogan Creek Power Station. The Flexshield Group has a long experience working on Power Station noise control solutions across Australia - the full list is at the end of the case study. For our current project with CS Energy, our AcousTech senior acoustic project engineer visited the site to conduct an acoustic assessment and design the solution. The solution included treating the existing office with high-density V100 Sonic System modular acoustic panel facing the perforations into the room. We also replaced the current non-acoustic cold room doors with Flexshield high- performance Sonic Access Rw46 acoustic doors. Noise levels were further reduced by adding Calando Nude White panels to the ceiling. We sourced the Calando Panel from our Commercial Acoustics Company – Avenue Interior Systems. The solution Flexshield provided made a more comfortable working environment - allowing workers to communicate better and improve the number of sick days due to noise fatigue. -
Surat Basin Non-Resident Population Projections, 2021 to 2025
Queensland Government Statistician’s Office Surat Basin non–resident population projections, 2021 to 2025 Introduction The resource sector in regional Queensland utilises fly-in/fly-out Figure 1 Surat Basin region and drive-in/drive-out (FIFO/DIDO) workers as a source of labour supply. These non-resident workers live in the regions only while on-shift (refer to Notes, page 9). The Australian Bureau of Statistics’ (ABS) official population estimates and the Queensland Government’s population projections for these areas only include residents. To support planning for population change, the Queensland Government Statistician’s Office (QGSO) publishes annual non–resident population estimates and projections for selected resource regions. This report provides a range of non–resident population projections for local government areas (LGAs) in the Surat Basin region (Figure 1), from 2021 to 2025. The projection series represent the projected non-resident populations associated with existing resource operations and future projects in the region. Projects are categorised according to their standing in the approvals pipeline, including stages of In this publication, the Surat Basin region is defined as the environmental impact statement (EIS) process, and the local government areas (LGAs) of Maranoa (R), progress towards achieving financial close. Series A is based Western Downs (R) and Toowoomba (R). on existing operations, projects under construction and approved projects that have reached financial close. Series B, C and D projections are based on projects that are at earlier stages of the approvals process. Projections in this report are derived from surveys conducted by QGSO and other sources. Data tables to supplement the report are available on the QGSO website (www.qgso.qld.gov.au). -
ERM Power's Neerabup
PROSPECTUS for the offer of 57,142,858 Shares at $1.75 per Share in ERM Power For personal use only Global Co-ordinator Joint Lead Managers ERMERR M POWERPOWEPOWP OWE R PROSPECTUSPROSPEOSP CTUCTUSTU 1 Important Information Offer Information. Proportionate consolidation is not consistent with Australian The Offer contained in this Prospectus is an invitation to acquire fully Accounting Standards as set out in Sections 1.2 and 8.2. paid ordinary shares in ERM Power Limited (‘ERM Power’ or the All fi nancial amounts contained in this Prospectus are expressed in ‘Company’) (‘Shares’). Australian currency unless otherwise stated. Any discrepancies between Lodgement and listing totals and sums and components in tables and fi gures contained in this This Prospectus is dated 17 November 2010 and a copy was lodged with Prospectus are due to rounding. ASIC on that date. No Shares will be issued on the basis of this Prospectus Disclaimer after the date that is 13 months after 17 November 2010. No person is authorised to give any information or to make any ERM Power will, within seven days after the date of this Prospectus, apply representation in connection with the Offer which is not contained in this to ASX for admission to the offi cial list of ASX and quotation of Shares on Prospectus. Any information not so contained may not be relied upon ASX. Neither ASIC nor ASX takes any responsibility for the contents of this as having been authorised by ERM Power, the Joint Lead Managers or Prospectus or the merits of the investment to which this Prospectus relates. -
Gas Wind Towards Queensland's Clean Energy Future
Towards Queensland’s Clean Energy Future wind gas A plan to cut Queensland’s greenhouse gas emissions from electricity by 2010 A Report for the Clean Energy Future Group in collaboration with Queensland Conservation Council By Dr Mark Diesendorf April 2005 This Clean Energy Future Group Report is an initiative of: In collaboration with: The Clean Energy Future Group came together in 2003 to commission a study investigating how to meet deep emission cuts in Australia’s stationary energy sector. The Group published a Clean Energy Future for Australia Study in March 2004. The Clean Energy Future Group comprises: • Australasian Energy Performance Contracting Association – www.aepca.asn.au • Australian Business Council for Sustainable Energy – www.bcse.org.au • Australian Gas Association • Australian Wind Energy Association – www.auswea.com.au • Bioenergy Australia – www.bioenergyaustralia.org • Renewable Energy Generators of Australia – www.rega.com.au • WWF Australia – www.wwf.org.au First published in April 2005 by WWF Australia © WWF Australia 2005. All Rights Reserved. ISBN: 1 875 941 916 The opinions expressed in this publication are those of the author & do not necessarily reflect the views of WWF. Author: Dr Mark Diesendorf Sustainability Centre Pty Ltd, P O Box 521, Epping NSW 1710 www.sustainabilitycentre.com.au Liability - Neither Sustainability Centre Pty Ltd nor its employees accepts any responsibility or liability for the accuracy of or inferences from the material contained in this report, or for any actions as a result of any person's or group's interpretations, deductions, conclusions or actions in reliance on this material. The Renewable Energy Generators of Australia Ltd (REGA) support the endeavour to investigate alternative opportunities for the long term sustainable supply of power generation in NSW, particularly through the increased penetration of renewable energy sources and energy efficiency measures. -
Maintaining Reliability of Supply in the Tarong and Chinchilla Local Areas
Powerlink Queensland Project Specification Consultation Report: Maintaining reliability of supply in the Tarong and Chinchilla local areas Powerlink Queensland Project Specification Consultation Report 24 August 2021 Maintaining reliability of supply in the Tarong and Chinchilla local areas Disclaimer While care was taken in preparation of the information in this document, and it is provided in good faith, Powerlink accepts no responsibility or liability (including without limitation, liability to any person by reason of negligence or negligent misstatement) for any loss or damage that may be incurred by any person acting in reliance on this information or assumptions drawn from it, except to the extent that liability under any applicable Queensland or Commonwealth of Australia statute cannot be excluded. Powerlink makes no representation or warranty as to the accuracy, reliability, completeness or suitability for particular purposes, of the information in this document. Page 0 Powerlink Queensland Project Specification Consultation Report: Maintaining reliability of supply in the Tarong and Chinchilla local areas Document purpose For the benefit of those not familiar with the National Electricity Rules (the Rules) and the National Electricity Market (NEM), Powerlink offers the following clarifications on the purpose and intent of this document: 1. The Rules require Powerlink to carry out forward planning to identify future reliability of supply requirements1 and consult with interested parties on the proposed solution as part of the Regulatory Investment Test for Transmission (RIT-T). This includes replacement of network assets in addition to augmentations of the transmission network. More information on the RIT-T process and how it is applied to ensure that safe, reliable and cost effective solutions are implemented to deliver better outcomes to customers is available on Powerlink’s website. -
Flicking the Switch on Peak Days Could It Really Change Australia’S Energy Future?
ISSUE 105 | APRIL 18 OFFICIALLY ENDORSED BY THE CLEAN ENERGY COUNCIL Flicking the switch on peak days Could it really change Australia’s energy future? Solar radiation kWh/m2/day LEGEND Place name 6.50 - 6.75 5.50 - 5.75 4.25 - 4.50 Solar Storage 6.25 - 6.50 5.25 - 5.50 4.00 - 4.25 1 Commissioned 1 Commissioned 241 6.00 - 6.25 5.00 - 5.25 3.75 - 4.00 1 Under construction 1 Under construction 5.75 - 6.00 4.50 - 5.00 2.75 - 3.75 1 Project 1 Project DARWIN 19 16 23 47 24 FRONIUS ENERGY PACKAGE 24 HOURS OF SUN Solar Map of www.fronius.com.au Australia 2018 22 239 The Solar Map 2018 represents major solar projects across Australia of 1MW or greater that are planned, under construction or were commissioned 45 before February 2018. 243 104 The New CBI Source data courtesy of Sustainable Energy Research Analytics, Sydney | ph: (02) 8067 8468, email: [email protected] Battery Storage Compiled and published by Paragon Media Pty Ltd | ph: (02) 9439 1955, email: [email protected] Visit ecogeneration.com.au for the latest news on Australian solar projects. MCB Range. For additional copies of this map, visit the EcoGeneration online shop at ecogeneration.com.au/shop and for advertising enquiries email [email protected] 109 106 This map is a schematic representation only. It does not show exact project locations. Cairns Up to 250 A 80 Vdc Circuit Breakers & Enclosure 65 » 1800 770 870 » www.cbi-electric.com.au Broome 244 74 57 91 NORTHERN TERRITORY 116 49 Townsville Commissioned: 12MW solar 50 86 Under construction: zero 70 52 -
Queensland Commission of Audit's Final
Queensland Commission of Audit Final Report - February 2013 Volume 2 Queensland Commission of Audit Final Report February 2013 - Volume 2 Final Report February 2013 - Volume © Crown copyright All rights reserved Queensland Government 2013 Excerpts from this publication may be reproduced, with appropriate achnowledgement, as permitted under the Copyright Act Queensland Commission of Audit Final Report - February 2013 Volume 2 TABLE OF CONTENTS FINAL REPORT VOLUME 1 Transmittal Letter ...................................................................................................... i Acknowledgements .................................................................................................. iii Explanatory Notes .................................................................................................... iv Terms of Reference .................................................................................................. v Report Linkages to Terms of Reference .................................................................. vii Table of Contents ..................................................................................................... ix EXECUTIVE SUMMARY AND RECOMMENDATIONS Executive Summary .............................................................................................. 1-3 List of Recommendations .................................................................................... 1-27 Glossary ............................................................................................................. -
Powerlink Queensland Revenue Proposal
2023-27 POWERLINK QUEENSLAND REVENUE PROPOSAL Appendix 5.02 – PUBLIC 2020 Transmission Annual Planning Report © Copyright Powerlink Queensland 2021 Transmission Annual Planning Report 2020 Transmission Annual Planning Report Please direct Transmission Annual Planning Report (TAPR) enquiries to: Stewart Bell A/Executive General Manager Strategy and Business Development Division Powerlink Queensland Telephone: (07) 3860 2801 Email: [email protected] Disclaimer: While care is taken in the preparation of the information in this report, and it is provided in good faith, Powerlink Queensland accepts no responsibility or liability for any loss or damage that may be incurred by persons acting in reliance on this information or assumptions drawn from it. 2020 TRANSMISSION ANNUAL PLANNING REPORT Table of contents Executive summary __________________________________________________________________________________________________ 7 1. Introduction ________________________________________________________________________________________________ 15 1.1 Introduction ___________________________________________________________________________________________ 16 1.2 Context of the TAPR _________________________________________________________________________________ 16 1.3 Purpose of the TAPR _________________________________________________________________________________ 17 1.4 Role of Powerlink Queensland _______________________________________________________________________ 17 1.5 Meeting the challenges of a transitioning energy system ___________________________________________ -
2014-15 Annual Report
ANNUAL REPORT 2014/15 DIVERSIFIED ENERGY ABOUT ABOUT THIS REPORT STANWELL This report provides an overview of the major initiatives Stanwell is a diversified energy business. and achievements of Stanwell Corporation Limited We own coal, gas and water assets, which we (Stanwell) as well as the business’ financial and use to generate electricity; we sell electricity non-financial performance for the 12 months ended directly to business customers; and we trade 30 June 2015. gas, coal and electricity products. Each year, we document the nature and scope of our strategies, objectives and actions in our Statement of With a generating capacity of more than 4,000 megawatts (MW), Stanwell is the largest Corporate Intent. The Statement of Corporate Intent electricity generator in Queensland. We have the represents our performance agreement with our capacity to supply approximately 45 per cent of shareholding Ministers. Our performance against our the State’s peak electricity requirements through 2014/15 Statement of Corporate Intent is summarised our coal, gas and hydro generation assets. on pages 3 to 19. We are a proud generator of environmentally- Electronic versions of this and previous years’ reports responsible energy. Through our portfolio of hydro are available online at www.stanwell.com or from power stations, we generate more than 150 MW Stanwell’s Stakeholder Engagement team on of clean energy. We also operate two of Australia’s 1800 300 351. most efficient coal-fired power stations: the supercritical 443 MW Tarong North Power Station and the sub-critical 1,460 MW Stanwell Power Station. We have undertaken a number of initiatives to optimise the efficiency of our coal-fired plant and reduce emissions.