Detailed Project Report for Connecting Lakshadweep Islands on Submarine

Total Page:16

File Type:pdf, Size:1020Kb

Detailed Project Report for Connecting Lakshadweep Islands on Submarine DETAILED PROJECT REPORT FOR CONNECTING LAKSHADWEEP ISLANDS ON SUBMARINE OFC Contents 1.0 EXECUTIVE SUMMARY 11 1.1 BACKGROUND 11 1.2 METHODOLOGY TO PREPARE THE DPR 11 1.3 BROAD FINDINGS 12 1.3.1 SUBMARINE CABLE LENGTH AND TYPE 12 1.3.2. SITE SURVEY 12 1.3.3. SUBMARINE SYSTEM DESIGN 12 1.3.4. PROPOSED TOPOLOGIES 14 1.3.5 PROJECT TIMELINES 16 2.0 INTRODUCTION 17 2.1 ABOUT LAKSHADWEEP 17 2.2 PRESENT TELECOM SCENARIO 18 2.3 ISSUES IN PRESENT TELECOM CONNECTIVITY 19 2.4 CHALLENGES IN DEVELOPING RELIABLE TELECOM CONNECTIVITY 19 2.5 TCIL SCOPE OF WORK 19 3.0 ASSESMENT OF TELECOM CONNECTIVITY REQUIREMENTS 22 3.1 IDENTIFY THE FACTORS REQUIRING RELIABLE TELECOM CONNECTIVITY 22 3.2 ESTIMATION OF TELECOM BANDWDITH REQUIREMENT IN LAKSHADWEEP 23 4.1 ABOUT SUBMARINE OFC SYSTEM 26 4.1.1 WET PLANT COMPONENTS 27 4.1.2 DRY PLANT 32 4.2 CAPACITY OF SUBMARINE OFC LINKS 33 4.3. MARINE SERVICES 43 4.4. WORLDWIDE CABLE NETWORKS 48 5.0 DESKTOP STUDY 52 5.1. SITE VISIT FINDINGS 53 5.2. CABLE TYPES 55 5.3. CABLE BURIAL 56 6. LAKSHADWEEP NETWORK ARCHITECTURE 72 6.1. BACKGROUND 72 6.1.1. TRAI REPORT 72 6.2. ROUTE SELECTION 73 6.3. TOPOLOGY 73 6.4. SYSTEM DESIGN 79 6.4.1. NUMBER OF FIBER IN LAKSHADWEEP SUBMARINE OPTICAL FIBER CABLE 79 6.4.2. SUBMARINE EQUIPMENT CONFIGURATION IN LAKSHADWEEP 81 6.5. KEY DESIGN PARAMETERS 84 6.6. REDUNDANCY 85 7. PROJECT COST 87 7.1. CAPEX (CAPITAL EXPENDITURE) 87 7.2. OPEX 92 8. TECHNICAL SPECIFICATIONS OF SUBMARINE COMPONENTS 95 9. EXECUTION METHODOLOGY & TIMELINES 101 9.1. IMPLEMENTATION METHODOLOGY 101 9.1.1. DESKTOP SURVEY 101 9.1.2. MARINE SURVEY 102 9.1.3. EXECUTION OF WORKS 102 9.2. SCOPE OF WORK 103 9.3. TIMELINE CHART 108 9.3.1. TIME TO AWARD THE PROJECT 108 9.3.2. SUBMARINE EXECUTION OF PROJECT 109 10. PERMITS & LICENSES 111 10.1. INTRODUCTION 111 10.2. GENERAL PERMITTING REQUIREMENTS 112 10.3. INDIA PERMITTING 114 10.3.1. PERMIT IN PRINCIPLE (PIP) 114 10.3.2. OPERATIONAL PERMITS 115 10.4. LAKSHADWEEP AND MINICOY ISLANDS 116 10.5. PERMITTING PROCEDURE & LEAD-TIME SUMMARY 116 11. RISKS & HAZARDS 119 12. PROJECT MANAGEMENT CONSULTANT 126 12.1. PROJECT MANAGEMENT ASPECTS 126 12.2. STRUCTURE - PROJECT MANAGEMENT UNIT 131 12.3. OWNERSHIP ISSUES 131 12.4. COMMERCIAL ISSUES 132 Figure 1: Evolution of Submarine Equipment Technology ...................................................................... 14 Figure 2: Inter-island Ring Connectivity .................................................................................................. 15 Figure 3: Submarine System Components .............................................................................................. 26 Figure 4: Types of submarine cable (different levels of protective layers) .............................................. 27 Figure 5: Details of Armouring in Submarine OFC................................................................................... 28 Figure 6: Repeater v/s Repeater Less ..................................................................................................... 29 Figure 7: Equalizer ................................................................................................................................. 31 Figure 8: Point to point Submarine Cable Link ........................................................................................ 32 Figure 9: Land Joint installed in Beach manhole (Courtesy: ASN) ........................................................... 33 Figure 10: Evolution of Submarine Equipment Technology .................................................................... 34 Figure 11: Channel Spacing in a Submarine System ................................................................................ 34 Figure 12: A cable laying ship at sea ....................................................................................................... 43 Figure 13: OTDR .................................................................................................................................... 47 Figure 14: COTDR .................................................................................................................................. 47 Figure 15: Maintenance Zone ................................................................................................................ 48 Figure 16: Submarine cable network worldwide .................................................................................... 48 Figure 17: BMH at Kalpeni Island ........................................................................................................... 57 Figure 18: Route Position List Kochi to Kalpeni ....................................................................................... 62 Figure 19: Straight Line Diagram (Kochi to Kalpeni) ................................................................................ 63 Figure 20 Straight Line Diagram (Kalpeni to Androth) ............................................................................ 64 Figure 21: Androth to Amini .................................................................................................................. 65 Figure 22: Kadmat to Amini ................................................................................................................... 65 Figure 23: Kadmat to Kiltan ................................................................................................................... 66 Figure 24: Kiltan to Chetlat .................................................................................................................... 66 Figure 25: Chetlat to Bitra ...................................................................................................................... 67 Figure 26: Bitra to Bangaram ................................................................................................................. 68 Figure 27: Bangaram to Agatti ............................................................................................................... 68 Figure 28: Agatti to AMini ...................................................................................................................... 69 Figure 29 Agatti to Kavaratti .................................................................................................................. 69 Figure 30 Kavaratti to Kalpeni ................................................................................................................ 70 Figure 31: Kalpeni to Minicoy ................................................................................................................ 71 Figure 32: TRAI Report ........................................................................................................................... 72 Figure 33: Linear Connectivity................................................................................................................ 74 Figure 34: Ring Connectivity (Option 1) .................................................................................................. 74 Figure 35 Ring Connectivity (Option 2) .................................................................................................. 75 Figure 36Ring Connectivity (Option 3) ................................................................................................... 75 Figure 37: Ring Connectivity (Option 4) .................................................................................................. 76 Figure 38: Option 5 ................................................................................................................................ 76 Figure 39: Connectivity using BU ........................................................................................................... 78 Figure 40: Fiber Routing Diagram........................................................................................................... 83 Figure 41: Implementation Process...................................................................................................... 101 Figure 42: Activities In a Submarine Project ......................................................................................... 103 Figure 43: Gantt Chart for Project Execution ........................................................................................ 110 Figure 44: Maritime claims .................................................................................................................. 112 Tables: Cases Table 1: Segment –wise Route Length and Cable Length ........................................................................ 10 Table 2: Segment –wise Route Length and Cable Length (As per TRAI recommended topology)............. 11 Table 23: Submarine Physiography and Geology Risk Assessment........................................................ 131 Table 24: Environmental Factors Risk Assessment ............................................................................... 132 Table 25: Offshore Activities and Hazards Risk Assessment .................................................................. 134 Table 3: Segment –wise Route Length and Cable Length (topology 3) .................................................... 12 Table 5: Submarine Project Cost ............................................................................................................ 16 Table 6: Present telecom Bandwidth in Lakshadweep ............................................................................ 19 Table 7: Segments as per scope of work .........................................................................................
Recommended publications
  • Submarine Cable Protection) Bill 2013 [Provisions]
    The Senate Environment and Communications Legislation Committee Telecommunications Legislation Amendment (Submarine Cable Protection) Bill 2013 [Provisions] March 2014 © Commonwealth of Australia 2014 ISBN 978-1-74229-980-8 Committee address PO Box 6100 Parliament House Canberra ACT 2600 Tel: 02 6277 3526 Fax: 02 6277 5818 Email: [email protected] Internet: http://www.aph.gov.au/Parliamentary_Business/Committees/Senate/Environment_and_Com munications This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Australia License. The details of this licence are available on the Creative Commons website: http://creativecommons.org/licenses/by-nc-nd/3.0/au/. This document was printed by the Senate Printing Unit, Parliament House, Canberra Committee membership Committee members Senator John Williams, Chair NATS, New South Wales Senator Anne Urquhart, Deputy Chair ALP, Tasmania Senator David Fawcett LP, South Australia Senator Louise Pratt ALP, Western Australia Senator Anne Ruston LP, South Australia Senator Larissa Waters AG, Queensland Substitute member for this inquiry Senator Scott Ludlam (AG, WA) to replace Senator Larissa Waters (AG, QLD) for this inquiry. Committee secretariat Ms Christine McDonald, Committee Secretary Mr Chris Lawley, Senior Research Officer Mrs Dianne Warhurst, Administration Officer iii iv Table of Contents Committee membership ................................................................................... iii Chapter 1 - Introduction ...................................................................................
    [Show full text]
  • Offshore Wind Submarine Cabling Overview Fisheries Technical Working Group
    OFFSHOREoverview WIND SUBMARINE CABLING Fisheries Technical Working Group Final Report | Report Number 21-14 | April 2021 NYSERDA’s Promise to New Yorkers: NYSERDA provides resources, expertise, and objective information so New Yorkers can make confident, informed energy decisions. Our Vision: New York is a global climate leader building a healthier future with thriving communities; homes and businesses powered by clean energy; and economic opportunities accessible to all New Yorkers. Our Mission: Advance clean energy innovation and investments to combat climate change, improving the health, resiliency, and prosperity of New Yorkers and delivering benefits equitably to all. Courtesy, Equinor, Dudgeon Offshore Wind Farm Offshore Wind Submarine Cabling Overview Fisheries Technical Working Group Final Report Prepared for: New York State Energy Research and Development Authority Albany, NY Morgan Brunbauer Offshore Wind Marine Fisheries Manager Prepared by: Tetra Tech, Inc. Boston, MA Brian Dresser Director of Fisheries Programs NYSERDA Report 21-14 NYSERDA Contract 111608A April 2021 Notice This report was prepared by Tetra Tech, Inc. in the course of performing work contracted for and sponsored by the New York State Energy Research and Development Authority (hereafter “NYSERDA”). The opinions expressed in this report do not necessarily reflect those of NYSERDA or the State of New York, and reference to any specific product, service, process, or method does not constitute an implied or expressed recommendation or endorsement of it. Further, NYSERDA, the State of New York, and the contractor make no warranties or representations, expressed or implied, as to the fitness for particular purpose or merchantability of any product, apparatus, or service, or the usefulness, completeness, or accuracy of any processes, methods, or other information contained, described, disclosed, or referred to in this report.
    [Show full text]
  • Study on International Internet Connectivity in Sub-Saharan Africa March 2013
    REGULATORY AND MARKET ENVIRONMENT International Telecommunication Union Telecommunication Development Bureau Place des Nations STUDY ON INTERNATIONAL CH-1211 Geneva 20 Switzerland INTERNET CONNECTIVITY www.itu.int IN SUB-SAHARAN AFRICA MARCH 2013 Printed in Switzerland Telecommunication Development Sector Geneva, 2013 /2013 03 Study on international Internet connectivity in sub-Saharan Africa March 2013 This report has been prepared by Mr Abossé Akue-Kpakpo, under the direction of the Regulatory and Market Environment Division (RME) of the Telecommunication Development Bureau (BDT), in close coordination with ITU-T Study Group 3. The content of this report was presented during the seminars and meetings of the regional groups of the ITU Study Group 3 for Africa (SG3RG-AFR) in May 2012 and for Latin America and the Caribbean (LAC SG3RG) in March 2012. Please consider the environment before printing this report. © ITU 2013 All rights reserved. No part of this publication may be reproduced, by any means whatsoever, in part or in full, without the prior written permission of ITU. Study on international Internet connectivity in sub-Saharan Africa Foreword It is my pleasure to introduce this report on International Internet Connectivity (IIC) in sub-Saharan Africa; this is part of a series of regional reports that address the present situation of Internet connection as well as future developments and challenges. These reports have been developed through collaboration between the ITU Telecommunication Development Bureau (BDT) the Telecommunication Standardization Bureau (TSB) in view of supporting policy makers, national regulatory authorities and operators in understanding the many aspects of international Internet connectivity. The digital revolution of the 21st century is being underpinned and in many cases driven by the growth, access and use of the Internet, but it has also led us to a modern indicator of division and poverty: exclusion from this revolution, from access to the Internet or telephone, and from the benefits of today's information society.
    [Show full text]
  • SUPPLY RECORD - REPEATERED SYSTEM ( 1 ) 1St Generation (Regenerator System Using 1.31 Micron Wavelength)
    SUPPLY RECORD - REPEATERED SYSTEM ( 1 ) 1st Generation (Regenerator System using 1.31 micron wavelength) System Landing Countries Capacity Route Length Delivery Japan, U.S.A. (Guam, TPC-3 (Note 1) 560Mbps (280Mbps x 2fp) 3,760km Dec. 88 Hawaii) Hong Kong, Japan, Hong Kong-Japan-Korea 560Mbps (280Mbps x 2fp) 4,700km Apr. 90 Korea Kuantan-Kota Kinabaru Malaysia 840Mbps (420Mbps x 2fp) 1,570km Dec. 90 Japan, U.S.A. North Pacific Cable (NPC) 1680Mbps (420Mbps x 4fp) 9,400km Apr. 91 (Mainland) Surabaya-Banjarmasin Indonesia 280Mbps (280Mbps x 1fp) 410km Dec. 91 N. ote 1:The very first Branching Units deployed in the Pacific 1 SUPPLY RECORD - REPEATERED SYSTEM ( 2 ) 2nd Generation (Regenerator System using 1.55 micron wavelength) System Landing Sites Capacity Route Length Delivery UK-Germany No.5 (Note 2) UK, Germany 3.6Gbps (1.8Gbps x 2fp) 500km Oct. 91 Brunei-Singapore Brunei, Singapore 1120Mbps (560Mbps x 2fp) 1500km Nov. 91 Brunei, Malaysia, Brunei-Malaysia-Philippines (BMP) 1120Mbps (560Mbps x 2fp) 1500km Jan. 92 Philippines Japan, U.S.A. TPC-4 1680Mbps (560Mbps x 3fp) 5000km Oct. 92 (Mainland) Japan, Hong Kong, APC Taiwan, Malaysia, 1680Mbps (560Mbps x 3fp) 7600km Aug. 93 Singapore Malaysia-Thailand Malaysia, Thailand 1120Mbps (560Mbps x 2fp) 1500km Aug. 94 (incl. Petchaburi-Sri Racha) Russia-Japan-Korea (RJK) Russia, Japan, Korea 1120Mbps (560Mbps x 2fp) 1700km Nov. 94 Thailand, Vietnam, Thailand-Vietnam-Hong Kong (T-V-H) 1120Mbps (560Mbps x 2fp) 3400km Nov. 95 Hong Kong N. ote 2: The very first giga bit submarine cable system in the world 2 SUPPLY RECORD - REPEATERED SYSTEM ( 3 ) 3rd Generation (Optical Amplifier System) System Landing Sites Capacity Route Length Delivery Malaysia Domestic (Southern Link) Malaysia 10Gbps (5Gbps x 2fp) 2,300km Jul.
    [Show full text]
  • The Socio-Economic Impact of Broadband in Sub-Saharan Africa: the Satellite Advantage
    The Socio-Economic Impact of Broadband in sub-Saharan Africa: The Satellite Advantage The Socio-Economic Impact of Broadband in sub-Saharan Africa: The Satellite Advantage By the Commonwealth Telecommunications Organisation Page 1 The Socio-Economic Impact of Broadband in sub-Saharan Africa: The Satellite Advantage Executive Summary Broadband is not just a consequence of economic growth, it is also a cause. Sub-Saharan Africa has succeeded in the last decade in bringing voice services within the reach of some three quarters of the population, but the vast majority of the region is falling further behind the rest of the world in terms of broadband connectivity. There are two main reasons for this: supply is limited, and prices have been very high.1 Broadband is the delivery of Internet IP bandwidth (at speeds of 256 Kbps or more), and all of the content, services and applications which consume this bandwidth. The essential underpinning of broadband therefore is the need for a high capacity transmission backbone network capable of delivering this bandwidth. Providing an entry level 256 Kbps broadband service to hundreds, thousands or millions of customers requires a backbone transmission network with sufficient capacity to do so. And each time an operator increases its broadband service from 256 Kbps to 512 Kbps, 2 Mbps, or even 100 Mbps, this in turn escalates the capacity requirements of the transmission backbone network. The evolving broadband geography of sub-Saharan Africa reflects changes in the underlying level and pattern of supply of this trunk transmission capacity, and the pricing of that capacity. All of Africa’s international Internet bandwidth is supplied by satellite, submarine cables or terrestrial networks connected to submarine cables.
    [Show full text]
  • Afrique Africa
    CAF 3 2021 Cover_Layout 1 17/08/2021 05:53 Page 1 Special Anniversary Issue Africa Afrique www.communicationsafrica.com THIRTY YEARS THAT CHANGED A CONTINENT Africa’s communications revolution Subsea cable Morocco deployment Why e-commerce is Innovation under the here to stay ocean Fixed wireless VSATs access Intelligent approaches Is 5G FWA a way to remote education forward for Africa? features: ● Analogue TV on the way out ● SDN on the way in ● Data centres on the way to everywhere regular reports: ● Agenda ● Solutions S01 CAF 3 2021 Start_Layout 1 17/08/2021 05:59 Page 2 S01 CAF 3 2021 Start_Layout 1 18/08/2021 08:39 Page 3 CONTENTS Agenda 4 Quotes 6 Events 8 Solutions 32 Cover photographs supplied by Malawi Administration / Adobe Stock FEATURES / Alain Charles Publishing A note from the Editor Communications Africa: thirtieth anniversary 10 The past thirty years have seen many major developments in the African telecommunications market. We asked THIRTY YEARS AGO, when this magazine some of the companies that have helped to bring connectivity to the continent to choose the ones they feel have was first published, communications been the most significant. technology in Africa was unreliable and, often, unavailable. Then mobile networks arrived. Data centres 12 It has undoubtedly been the mobile A new era for data centres in Zimbabwe. Plus a look at more efficient data centre design and a round-up of recent phone that has done the most to developments. transform African communications since 1991 – but today satellite Subsea cable deployment 15 communications and subsea fibre are helping to continue the transformation.
    [Show full text]
  • 2013 Submarine Cable Market Industry Report
    submarine telecoms INDUSTRY REPORT 2013 Authored by Submarine Cable Industry Report Issue 2 March 2013 Copyright © 2013 by Submarine Telecoms Forum, Inc. All rights reserved. No part of this book may be used or reproduced by any means, graphic, electronic, or mechanical, including photocopying, recording, taping or by any information storage retrieval system without the written permission of the publisher except in the case of brief quotations embodied in critical articles and reviews. Submarine Telecoms Forum, Inc. 21495 Ridgetop Circle Suite 201 Sterling, Virginia 20166 USA www.subtelforum.com ISSN: pending 2 Disclaimer: While every care is taken in preparation of this publication, the publishers cannot be held responsible for the accuracy of the information herein, or any errors which may occur in advertising or editorial content, or any consequence arising from any errors or omissions, and the editor reserves the right to edit any advertising or editorial material submitted for publication. If you have a suggestion, please let us know by emailing [email protected]. 3 Table of Contents 1. Foreword 10 2. Introduction 11 3. Executive Summary 13 4. Worldwide Market Analysis and Outlook 18 4.1 Overview of Historical System Investment 20 4.2 2008 – 2012 Systems in Review 20 4.3 Systems Investment in 2013 and Beyond 21 5. Supplier Analysis 25 5.1 System Suppliers 25 5.2 Upgrade Suppliers 26 6. Ownership Analysis 28 6.1 Financing of Current Submarine Systems 28 7. Regional Market Analysis and Capacity Outlook 31 7.1 Transatlantic
    [Show full text]
  • IPTP Networks 2 Contents
    1 www.iptp.net IPTP Networks 2 Contents CONTENTS Our history ........................................................................ 4 About us ............................................................................... 6 Global partnership .............................................................. 10 1-Stop-IT-Shop .................................................................... 12 A-Z Infrastructure ................................................................13 Managed services ..............................................................14 Managed Security Services .................................................................................. 15 IPTP Pentest ........................................................................................................... 15 Global Network and Points of Presence Map ....................................................... 16 Managed Connectivity Services ............................................................................... 17 Internet Exchanges and peering facilities .................................................................. 19 Low Latency Routes Map ......................................................................................... 20 Map of Cable Systems ........................................................................................... 21 Data Centers ....................................................................... 24 Managed Datacenter Services ...................................................................................24
    [Show full text]
  • PPC-1 Sydney-Guam PIPE Pacific Cable: New Internet Gateway for PNG Via Madang
    Contemporary PNG Studies: DWU Research Journal Volume 15, November 2011 1 PPC-1 Sydney-Guam PIPE Pacific Cable: New Internet Gateway for PNG via Madang Peter K. Anderson Joseph Kim Suwamaru Abstract PPC-1 Sydney Guam PIPE Pacific Cable (PPC1) provides a third Internet gateway for Australia. A branching unit to Madang will be an initial connection for PNG to connect to the Internet via this pathway. The PPC- 1 undersea submarine cable which runs from Guam to Sydney provides a third high speed international gateway to Australia. A branching unit to Madang will be an initial connection for PNG providing a total bandwidth capacity of 10Gbps enabling high speed telecommunication traffic within PNG and also between PNG and the world. This paper presents the technical characteristics of the PPC-1 including the earlier submarine cable facilities. Key words: submarine cable , fiber optic, attenuation, signal amplification, dense wave division multiplexing (DWDM), optical add/drop multiplexing (OADM), branching unit. Introduction The evolving digital revolution is making a seemingly insatiable demand on bandwidth 1. Simultaneous paradigm shifts in telecommunications technology leading to enormous growth of transmission and switching capacity make more digital services available which further fuels the demand for bandwidth. Well known digital online services which drive demands on bandwidth include instant messaging (email) and Web access with file downloads, online shopping or electronic commerce (e.g. purchasing from Amazon.com), Internet banking and video conferencing 2. Emerging bandwidth demanding services include movie and video downloads, real time audio and video streaming, video on demand, free long distance telephone calls (VOIP 3), digital TV, and social networking sites such as Face Book, Twitter and Youtube which provides low definition TV.
    [Show full text]
  • Maximising Availability of International Connectivity in the Pacific
    Thematic reports ITUPublications Regulatory & market environment Maximising availability of international connectivity in the Pacific International Telecommunication Union Telecommunication Development Bureau Place des Nations CH-1211 Geneva 20 Switzerland ISBN: 978-92-61-27451-1 9 7 8 9 2 6 1 2 7 4 5 1 1 Published in Switzerland Geneva, 2018 Maximising availability of connectivity in the Pacific international Photo credits: Shutterstock Maximising availability of international connectivity in the Pacific Acknowledgements This report was prepared by International Telecommunication Union (ITU) expert Matthew O’Rourke and produced by ITU Telecommunication Development Bureau (BDT) in partnership with the Pacific Islands Telecommunications Association and with support from the Government of Australia through Department of Communications and the Arts. ITU would like to acknowledge the information contributed by John Hibbard, Paul McCann, Maui Sanford and delegates from the Pacific island telecommunication ministries, regulators and operators for their contributions to the content of this report. The designations employed and presentation of material in this publication, including maps, do not imply the expression of any opinion whatsoever on the part of ITU concerning the legal status of any country, territory, city or area, or concerning the delimitations of its frontiers or boundaries. ISBN 978-92-61-27441-2 (Paper version) 978-92-61-27451-1 (Electronic version) 978-92-61-27461-0 (EPUB version) 978-92-61-27471-9 (Mobi version) Please consider
    [Show full text]
  • 2019 Circuit Capacity Data for US-International Submarine Cables
    2019 Circuit Capacity Data For U.S.-International Submarine Cables Table 1 Section 43.82 Circuit Capacity Filers (2019) – Entities that filed a cable operator and/or capacity holder report. Table 2 Number of Reports Filed By Submarine Cable Operators (2019) Table 3 Submarine Cable Operator Reports (in Gbps) (2019/2021) – Information on available and planned capacity data for each U.S.-international submarine cable on an individual and regional basis. Table 4 Submarine Cable Operator Capacity Trend Data (in Gbps) – Detailed capacity trend data for each U.S.-international submarine cable. Table 5 Submarine Cable Capacity Holder Reports by Region (2019) – Information regarding capacity holder data (i.e., cable capacity leased or owned) on a regional basis. Table 6 Percentage of Total Available Capacity Reported (2019) – Information regarding the capacity reported in the cable operator reports and owned capacity in the capacity holder reports on a regional basis. Attachment A U.S.-International Submarine Cables – Landing Points by Region, Cable, and Foreign Landing Point as of December 31, 2019 Attachment B U.S.-International Submarine Cables – Landing Points by Region, Foreign Landing Point, and Cable as of December 31, 2019 Attachment C U.S.-International Submarine Cables – Landing Points by Number of Landing Points Per Country and Region and a Frequency Table Summarizing Foreign Landing Points Per Country as of December 31, 2019 Source: International Bureau, Federal Communications Commission For definitions of terms and instructions on filing procedures, please refer to the Filing Manual (Feb. 2020) For further information on current and past reports, see https://www.fcc.gov/circuit-capacity-data-us-international-submarine-cables Table 1 Section 43.82 Circuit Capacity Filers (2019) Submarine Submarine Cable Cable Capacity No.
    [Show full text]
  • Spark New Zealand and Optus, the Two Largest Shareholders in the Southern Cross Cable Network, Have Jointly Begun Industry Discu
    Spark New Zealand and Optus, the two largest shareholders in the Southern Cross Cable Network, have jointly begun industry discussions about future international cable connectivity across the South Pacific. The major shareholders in Southern Cross have agreed to work with the cable network’s largest customers and other industry participants to explore options for ensuring the future stability of International sub-sea capacity supply between Australia, New Zealand, and across the South Pacific to North America. Southern Cross CEO Anthony Briscoe said. “This is not about short term supply or capacity – that is more than accommodated by the current Southern Cross cable. Rather, it is about future-proofing the whole region well beyond 2030, and ensuring there is a reliable and resilient supply of international bandwidth for the region to keep us connected to the world.” Mr. Briscoe said advances in technology over the last decade means Southern Cross has already increased the capacity on the current cable many fold, and has already extended the life of its existing cable system to at least 2030. “However given the lengthy lead times, and the importance of a strong business and investment case for such a long-dated asset, it’s now time to start considering how we can ensure the connectivity needs of future generations will be met,” Mr. Briscoe said. Spark New Zealand Managing Director Simon Moutter said: “We have already taken the first steps towards ensuring that there is a long term supply strategy in place by partnering with Vodafone and Telstra on the Tasman Global Access (TGA) Cable.
    [Show full text]