AAC (Longlist)
Total Page:16
File Type:pdf, Size:1020Kb
2021-2022 Forecast Capital Construction - AAC (Long List) The list below shows a selection of capital construction projects for 2021/2022 in which the City of Ottawa Accessibility Design Standards will be applied to the greatest extent possible. Many of these projects contain exterior paths of travel for which the potention provision and placement of a rest area will be decided in the upcoming design phase of the project based on numerous factors, such as the results of the consultation, available space, property requirements, location of transit stops, and volume of pedestrian traffic. If a rest area is to be provided on an individual project, its design would follow the Accessibility Design Standards. Many of the projects listed have existing on-street parking areas which are available to Accessible Parking Permit holders. Any adjustments to those areas would be determined during the upcoming design phase of the project. April 30, 2021 Location Description From Street To Street Type of Work Ward Description Item Year Construction Construction 1 2021 MULTI-USE PATHWAY LINK CHAMPLAIN STREET ALPINE STREET Multi-Use Pathways Matthew Luloff - 1 2 2021 EASTERN LIGHT RAIL TRANSIT BLAIR ROAD EAST OF TRIM New Transit Matthew Luloff - 1, Laura Dudas - 2 , 3 2021 LACOLLE WAY TAYLOR CREEK DRIVE TAYLOR CREEK DRIVE Road - Crack Sealing Matthew Luloff - 1 EAST 4 2021 TRIM ROAD TAYLOR CREEK DRIVE INNES ROAD Road - Crack Sealing Matthew Luloff - 1, Catherine Kitts -19 , 5 2021 ST. GEORGES STREET DES EPINETTES AVENUE GALLOWAY DRIVE Road - Resurfacing Matthew Luloff - 1, Catherine Kitts -19 , 6 2022 RAY FRIEL RECREATION COMPLEX, TENTH LINE ROAD - REPLACE NOT APPLICABLE NOT APPLICABLE Buildings & Facilities Renewal Matthew Luloff - 1 CONCOURSE MARMOLEUM FLOORING 7 2022 BOB MACQUARRIE - EAST END DISTRICT SKATE PARK NOT APPLICABLE NOT APPLICABLE Park Renewal Matthew Luloff - 1 8 2022 JEANNE D'ARC BOULEVARD NORTH EAST BOUND LANE BILBERRY DRIVE (WEST) WEST OF BILBERRY DRIVE Road - Resurfacing Matthew Luloff - 1 (WEST) 9 2021 BEARBROOK PARK SENATORS RINK- 99 BEARBROOK ROAD NOT APPLICABLE NOT APPLICABLE Buildings & Facilities Renewal Laura Dudas - 2 10 2021 INNES ROAD BLAIR ROAD HIGHWAY 417 Cycling Routes Laura Dudas - 2, Tim Tierney - 11 , 11 2021 INNES ROAD AND DE LAMARACHE NOT APPLICABLE NOT APPLICABLE Intersection Modifications Laura Dudas - 2 12 2021 CHAPEL HILL PARK - PICNIC FACILITIES NOT APPLICABLE NOT APPLICABLE Park Renewal Laura Dudas - 2 13 2021 INNES ROAD EAST LIMIT HIGHWAY 417 BLACKBURN HAMLET BY- Road - Resurfacing Laura Dudas - 2, Tim Tierney - 11 , OVERPASS PASS 14 2021 JEANNE D'ARC BOULEVARD BOYER ROAD CHAMPNEUF DRIVE Road - Resurfacing Laura Dudas - 2 Page 1 2021-2022 Forecast Capital Construction - AAC (Long List) The list below shows a selection of capital construction projects for 2021/2022 in which the City of Ottawa Accessibility Design Standards will be applied to the greatest extent possible. Many of these projects contain exterior paths of travel for which the potention provision and placement of a rest area will be decided in the upcoming design phase of the project based on numerous factors, such as the results of the consultation, available space, property requirements, location of transit stops, and volume of pedestrian traffic. If a rest area is to be provided on an individual project, its design would follow the Accessibility Design Standards. Many of the projects listed have existing on-street parking areas which are available to Accessible Parking Permit holders. Any adjustments to those areas would be determined during the upcoming design phase of the project. April 30, 2021 Location Description From Street To Street Type of Work Ward Description Item Year Construction Construction 15 2021 DES EPINETTES AVENUE AT RAVINE EAST OF 1816 NOT APPLICABLE Sewer Renewal Laura Dudas - 2 DES EPINETTES 16 2021 CARRIERE STREET AT GARNEAU SCHOOL NOT APPLICABLE NOT APPLICABLE Traffic Signals Laura Dudas - 2 17 2022 FERN CASEY ROAD AND RENAUD ROAD NOT APPLICABLE NOT APPLICABLE Intersection Modifications Laura Dudas - 2 18 2022 MER BLEU ROAD AND DECOEUR DRIVE NOT APPLICABLE NOT APPLICABLE Intersection Modifications Laura Dudas - 2 , Catherine Kitts -19 19 2022 MER BLEUE ROAD NAVAN ROAD SOUTH OF RENAUD ROAD Road - Resurfacing Laura Dudas - 2, Catherine Kitts -19 , 20 2021 HIGHBURY PARK DRIVE AND LONGFIELDS DRIVE NOT APPLICABLE NOT APPLICABLE Intersection Modifications Jan Harder - 3 21 2021 AURA PARK - 60 AURA AVENUE NOT APPLICABLE NOT APPLICABLE New Parks Jan Harder - 3 22 2021 CELESTIAL PARK - 140 CELESTIAL GROVE NOT APPLICABLE NOT APPLICABLE New Parks Jan Harder - 3 23 2021 CLARITY PARK - 825 CLARITY AVENUE NOT APPLICABLE NOT APPLICABLE New Parks Jan Harder - 3 24 2021 TOM SCHOENBERG PARK- 1 CEDARVIEW ROAD NOT APPLICABLE NOT APPLICABLE New Parks Jan Harder - 3 25 2021 COBBLE HILL PARK - 200 COBBLE HILL DRIVE - NEW PLAY EQUIPMENT NOT APPLICABLE NOT APPLICABLE Park Renewal Jan Harder - 3 26 2021 HALF MOON BAY PARK - PICNIC FACILITIES NOT APPLICABLE NOT APPLICABLE Park Renewal Jan Harder - 3 27 2021 KEN ROSS PARK: BOB STEPHEN FOOTBALL FIELD - LONGFIELD DRIVE - NOT APPLICABLE NOT APPLICABLE Park Renewal Jan Harder - 3 SPORTFIELD LIGHTING 28 2021 BERRIGAN DRIVE CLARIDGE DRIVE LONGFIELDS DRIVE Road - Crack Sealing Jan Harder - 3 Page 2 2021-2022 Forecast Capital Construction - AAC (Long List) The list below shows a selection of capital construction projects for 2021/2022 in which the City of Ottawa Accessibility Design Standards will be applied to the greatest extent possible. Many of these projects contain exterior paths of travel for which the potention provision and placement of a rest area will be decided in the upcoming design phase of the project based on numerous factors, such as the results of the consultation, available space, property requirements, location of transit stops, and volume of pedestrian traffic. If a rest area is to be provided on an individual project, its design would follow the Accessibility Design Standards. Many of the projects listed have existing on-street parking areas which are available to Accessible Parking Permit holders. Any adjustments to those areas would be determined during the upcoming design phase of the project. April 30, 2021 Location Description From Street To Street Type of Work Ward Description Item Year Construction Construction 29 2021 TARTAN DRIVE BIRKETT STREET JOCKVALE ROAD Road - Sidewalk Renewal Jan Harder - 3 30 2021 TARTAN DRIVE WEST OF HALLEY STREET HALLEY STREET EAST Road - Sidewalk Renewal Jan Harder - 3 EAST 31 2021 MALVERN BETWEEN SHERWAY AND CHALICE COURT NOT APPLICABLE NOT APPLICABLE Traffic Signals Jan Harder - 3 32 2021 MOUNTSHANNON DRIVE AT ORISKA WAY NOT APPLICABLE NOT APPLICABLE Traffic Signals Jan Harder - 3 33 2021 PXO BERRIGAN DRIVE AT CROXLEY WAY NOT APPLICABLE NOT APPLICABLE Traffic Signals Jan Harder - 3 34 2022 BORRISOKANE ROAD AND STREET 31 NOT APPLICABLE NOT APPLICABLE Intersection Modifications Jan Harder - 3 35 2022 CAMBRIAN ROAD AND BORRISOKANE ROAD NOT APPLICABLE NOT APPLICABLE Intersection Modifications Jan Harder - 3 36 2022 FALLOWFIELD ROAD AND OKEEFE COURT NOT APPLICABLE NOT APPLICABLE Intersection Modifications Jan Harder - 3 37 2022 DARJEELING PARK NOT APPLICABLE NOT APPLICABLE New Parks Jan Harder - 3 38 2022 TARTAN DRIVE HARTHILL WAY REUTER STREET, EAST Road - Resurfacing Jan Harder - 3 LEG 39 2021 MARCH ROAD AND STREET A/G NOT APPLICABLE NOT APPLICABLE Intersection Modifications Jenna Sudds - 4 40 2021 HERZBERG ROAD LEGGET DRIVE TERRY FOX DRIVE AND Road - Resurfacing Jenna Sudds - 4 HERZBERG ROAD 41 2021 BRADY AVENUE BETWEEN FORESTBROOK STREET AND NEWCASTLE NOT APPLICABLE NOT APPLICABLE Traffic Signals Jenna Sudds - 4 AVENUE 42 2022 TERRY FOX DRIVE NORTH OF HIGHWAY 417 CAMPEAU DRIVE Cycling Routes Jenna Sudds - 4 Page 3 2021-2022 Forecast Capital Construction - AAC (Long List) The list below shows a selection of capital construction projects for 2021/2022 in which the City of Ottawa Accessibility Design Standards will be applied to the greatest extent possible. Many of these projects contain exterior paths of travel for which the potention provision and placement of a rest area will be decided in the upcoming design phase of the project based on numerous factors, such as the results of the consultation, available space, property requirements, location of transit stops, and volume of pedestrian traffic. If a rest area is to be provided on an individual project, its design would follow the Accessibility Design Standards. Many of the projects listed have existing on-street parking areas which are available to Accessible Parking Permit holders. Any adjustments to those areas would be determined during the upcoming design phase of the project. April 30, 2021 Location Description From Street To Street Type of Work Ward Description Item Year Construction Construction 43 2022 TERRY FOX DRIVE HIGHWAY 417 NORTHEAST SOUTH OF DIDSBURY ROAD Road - Reconstruction Jenna Sudds - 4, Allan Hubley - 23 , RAMP 25 44 2021 FIRE STATION 61/PARAMEDIC POST - KINBURN NOT APPLICABLE NOT APPLICABLE Buildings & Facilities Renewal Eli El-Chantiry - 5 45 2021 EGBERT REITSMA PARKETTE: PLAYGROUND - CLIFFORD CAMPBELL NOT APPLICABLE NOT APPLICABLE Park Renewal Eli El-Chantiry - 5 STREET - REPLACE SENIOR PLAYSTRUCTURE AND PLAY EQUIPMENT 46 2021 KINBURN COMMUNITY CENTRE - PICNIC FACILITIES NOT APPLICABLE NOT APPLICABLE Park Renewal Eli El-Chantiry - 5 47 2021 GALETTA SIDE ROAD OLD HIGHWAY 17 TYNDALE STREET Road - Crack Sealing Eli El-Chantiry - 5 48 2021 GALETTA SIDE ROAD MORNING