14 13 12 11 10 9 8 7 6 5 4 3 2 1 phase of the project.thephase of Manyhave listed areason-street existing holders.projects Anyparkingthe those would to of areas which Permit Parking bedetermined aredesign duringadjustments available upcoming the Accessible to designwould followDesignAccessibilitytheStandards. beprovidedto area a rest is If onavailablean individualproperty pedestrianconsultation, theits and of space, of traffic. volume project, results thestops, as transit of such location requirements, factors, Manyexteriorcontain travel projects these of whichpaths forof areapotention the a rest provisionwillof designprojectbasedthebephaseand ondecidednumerous of upcoming the placement in 2021/2022forbelow projects construction in whichlist capital of showsCityThe the a selection Ottawaof Design AccessibilityStandards will beapplied extentgreatest thepossible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2021 2022 2022 2022

Construction Year JEANNE D'ARC BOULEVARD D'ARC JEANNE ROAD INNES HILL- PARK PICNIC FACILITIES CHAPEL LAMARACHE DE ROAD AND INNES RINK- 99 ROAD BEARBROOK SENATORS PARK BEARBROOK LANE BOUND EAST NORTH BOULEVARD D'ARC JEANNE PARK SKATE BOBDISTRICT - END MACQUARRIE EAST MARMOLEUM FLOORINGCONCOURSE COMPLEX, RAY LINE FRIEL RECREATION ROAD - TENTH REPLACE ST. GEORGES STREET WAY LACOLLE LIGHT RAIL TRANSIT EASTERN LINK MULTI-USE PATHWAY Location DescriptionLocation BOYER ROAD OVERPASS 417 LIMITEAST HIGHWAY NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE BILBERRY (WEST) DRIVE NOT APPLICABLE NOT APPLICABLE AVENUE EPINETTES DES DRIVE TAYLOR CREEK DRIVE TAYLOR CREEK BLAIR ROAD STREET CHAMPLAIN From Street From Page 1 Page CHAMPNEUF DRIVE CHAMPNEUF PASS BY- HAMLET BLACKBURN NOT APPLICABLE NOT APPLICABLE 417 HIGHWAY NOT APPLICABLE (WEST) OF BILBERRY DRIVE WEST NOT APPLICABLE NOT APPLICABLE DRIVE GALLOWAY ROAD INNES EAST DRIVE TAYLOR CREEK OFEAST TRIM STREET ALPINE To Street To Road -Road Resurfacing -Road Resurfacing Renewal Park Intersection Modifications Cycling Routes Renewal & Facilities Buildings -Road Resurfacing Renewal Park Renewal & Facilities Buildings -Road Resurfacing -Road Sealing Crack -Road Sealing Crack New Transit Multi-Use Pathways Type ofWork Laura -Dudas 2 Laura -Dudas 2,Tierney Tim - 11 , Laura -Dudas 2 Laura -Dudas 2 Laura -Dudas 2,Tierney Tim - 11 , Laura -Dudas 2 Matthew - 1 Luloff Matthew - 1 Luloff Matthew - 1 Luloff Matthew - 1,Luloff -19 , Matthew - 1,Luloff Catherine Kitts -19 , Matthew - 1 Luloff Matthew - 1,Luloff Laura -Dudas 2 , Matthew - 1 Luloff WardDescription 28 27 26 25 24 23 22 21 20 19 18 17 16 15 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2022 2022 2022 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2021 2021 2021 2021

Construction Year BERRIGAN DRIVE BERRIGAN LIGHTINGSPORTFIELD FOOTBALL -FIELD ROSS PARK: BOBKEN LONGFIELD STEPHEN -DRIVE MOONHALF BAY - PARK PICNIC FACILITIES PLAY EQUIPMENT HILL-COBBLE PARK HILL200 COBBLE -DRIVE NEW ROAD TOM1 PARK- CEDARVIEW SCHOENBERG -CLARITY PARK 825 CLARITY AVENUE - GROVE PARK 140 CELESTIAL CELESTIAL - PARK AVENUE 60 AURA LONGFIELDS DRIVE AND HIGHBURY DRIVE PARK ROAD MER BLEUE DRIVE DECOEUR ROAD AND MER BLEU ROAD RENAUD CASEY ROAD AND FERN SCHOOL AT GARNEAU STREET CARRIERE AVENUE EPINETTES DES Location DescriptionLocation CLARIDGE DRIVE CLARIDGE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD NAVAN NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE EPINETTES DES OF EAST 1816 RAVINE AT From Street From Page 2 Page LONGFIELDS LONGFIELDS DRIVE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD OFSOUTH RENAUD NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Road - Crack -Road Sealing Crack Renewal Park Renewal Park Renewal Park New Parks New Parks New Parks New Parks Intersection Modifications -Road Resurfacing Intersection Modifications Intersection Modifications Signals Traffic Sewer Renewal Type ofWork - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Laura -Dudas 2, Catherine Kitts -19 , Laura -Dudas 2 , Catherine Kitts -19 Laura -Dudas 2 Laura -Dudas 2 Laura -Dudas 2 WardDescription 42 41 40 39 38 37 36 35 34 33 32 31 30 29 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2021 2021 2021 2022 2022 2022 2022 2022

Construction Year TERRY AVENUE NEWCASTLE AND STREET FORESTBROOK BETWEEN BRADY AVENUE ROAD HERZBERG A/G STREET ROAD AND MARCH DRIVE TARTAN PARK DARJEELING COURT OKEEFE ROAD AND FALLOWFIELD ROAD BORRISOKANE ROAD AND CAMBRIAN 31 STREET ROAD AND BORRISOKANE PXO CROXLEY AT DRIVE BERRIGAN WAY ORISKAAT DRIVE WAY MOUNTSHANNON COURT CHALICE AND SHERWAY BETWEEN MALVERN DRIVE TARTAN DRIVE TARTAN Location DescriptionLocation NORTH OF HIGHWAY 417 OFNORTH HIGHWAY NOT APPLICABLE LEGGET DRIVE NOT APPLICABLE WAY HARTHILL NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE EAST OF HALLEY STREET WEST STREET BIRKETT From Street From Page 3 Page CAMPEAU DRIVE CAMPEAU NOT APPLICABLE ROAD HERZBERG TERRY FOX AND DRIVE NOT APPLICABLE LEG EAST STREET, REUTER NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE EAST HALLEY STREET ROAD JOCKVALE To Street To Cycling Cycling Routes Signals Traffic -Road Resurfacing Intersection Modifications -Road Resurfacing New Parks Intersection Modifications Intersection Modifications Intersection Modifications Signals Traffic Signals Traffic Signals Traffic Renewal -Road Sidewalk Renewal -Road Sidewalk Type ofWork Jenna Jenna -Sudds 4 Jenna -Sudds 4 Jenna -Sudds 4 Jenna -Sudds 4 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 Jan Harder - 3 WardDescription 56 55 54 53 52 51 50 49 48 47 46 45 44 43 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2022 April 30, 2021 2021 2021 2021 2021 2021 2021 2021 2021 2021

Construction Year JOHN SHAW ROAD JOHN SHAW ROAD MANCHESTER DAVID SMITH CANON DRIVE TERRY FOX DRIVE THOMAS A PARKWAY DOLAN ROAD PANMURE ROAD MARCH SIDE GALETTA ROAD SIDE GALETTA ROAD SIDE GALETTA ROAD COMMUNITY- PICNIC FACILITIES KINBURN CENTRE PLAY AND EQUIPMENT SENIOR -PLAYSTRUCTURE REPLACE STREET PLAYGROUND - REITSMA PARKETTE: CAMPBELL CLIFFORD EGBERT POSTFIRE STATION -61/PARAMEDIC KINBURN TERRY FOX DRIVE Location DescriptionLocation RABBIT RABBIT PATH SIDE ROAD RICHARDSON ROAD BEACH WILLOLA SIDE ROAD RICHARDSON ROAD JOHN SHAW HILL ROAD DWYER SHIRLEY'S BROOK DRIVE STREET OFEAST HARBOUR DRIVE MORNING DEW 17 OLD HIGHWAY NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE RAMP 25 417 NORTHEAST HIGHWAY From Street From Page 4 Page KINBURN SIDE ROAD KINBURN ROAD NORTHSHIRE ROAD TIMBER LANE LINE OLD ROAD SECOND ROAD CARP B. DONALD MUNRO ROAD ROAD OLD CARP FERRY ROAD ROAD CARP STREET TYNDALE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE OFSOUTH ROAD DIDSBURY To Street To Road -Road Slurry Seal -Road Slurry Seal -Road Slurry Seal -Road Resurfacing -Road Sealing Crack -Road Sealing Crack -Road Sealing Crack -Road Sealing Crack -Road Sealing Crack -Road Sealing Crack Renewal Park Renewal Park Renewal & Facilities Buildings -Road Reconstruction Type ofWork Eli El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 4 , - El-ChantiryEli - 5, Marianne Wilkinson El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5, Jenna -Sudds 4 , El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 Jenna -Sudds 4,Hubley Allan - 23 , WardDescription 70 69 68 67 66 65 64 63 62 61 60 59 58 57 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2022 2022 2022 2021 2021 2021 2021 2021

Construction Year LOGGERS WAY (EASTSIDEWALK) STREET HARBOUR (BOTHFITZROY SIDEWALKS) STREET 9 (CORKERY PARK COMMMUNITYHOMESTEAD CAROL CENTRE) SIDE ROAD & RICHARDSON HUNTMAR (POPLAR STREET) STREET DUNSTER COURT CURRIE CRESCENT ACORN TORBOLTON RIDGE ROAD RIDGE ROAD SPRUCE RIDGE ROAD SPRUCE OPEONGO ROAD MURPHY COURT McGEE SIDE ROAD Location DescriptionLocation RABBIT PATH RABBIT NICHOLSON STREET STREET HARBOUR NOT APPLICABLE NOT APPLICABLE ROAD WOODS ROAD HUNTER ROAD ALLBIRCH SIDE ROAD MACLARENS SIDE ROAD RICHARDSON PINE BROOK LANE POINT ROAD CROWN ROAD MARCH RIDGE ROAD SPRUCE From Street From Page 5 Page RIDDLEDALE ROAD RIDDLEDALE DRIVE CROSSLAND OLD SHIP ROAD NOT APPLICABLE NOT APPLICABLE DRIVE BAYVIEW END DEAD AVENUE RESTHAVEN OLD QUARRY ROAD PINE BROOK LANE MCGEE SIDE ROAD ROAD DUNROBIN END DEAD ROAD MANCHESTER OF DAVID WEST To Street To Road -Road Slurry Seal Renewal -Road Sidewalk Renewal -Road Sidewalk Renewal Park Roundabouts -Road Surface Treatment -Road Surface Treatment -Road Surface Treatment -Road Slurry Seal -Road Slurry Seal -Road Slurry Seal -Road Slurry Seal -Road Slurry Seal -Road Slurry Seal Type ofWork Eli El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 El-ChantiryEli - 5 WardDescription 84 83 82 81 80 79 78 77 76 75 74 73 72 71 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2022 2022 April 30, 2021 2021 2021 2021 2021 2022 2022 2021 2021 2021

Construction Year SENIOR PLAYSTRUCTURE AND PLAY AND EQUIPMENT SENIOR PLAYSTRUCTURE PARK: PLAYGROUND,- DRIVE 62 REPLACE HORNER LAKEVIEW LIGHT RAIL TRANSIT WESTERN HOUSE, 3080 ROAD RICHMOND FAIRFIELDS PUMPING MODERNIZATIONSTATION- ELEVATOR WATER BRITANNIA SIDEWALK) (NORTH AVENUE RENSHAW DRIVE TERRY FOX MICHAEL COWPLAND AND DRIVE AT ORVILLE MAIN STREET STREET DRIVE OFSOUTH BRIGHTSIDE BAYWOOD STREET HOPETOWN AND AVENUE BRIGHTSIDE -VILLAGE PARK 6000 SQUARE ABBOTT STREET - PIONEER PARK PLAINS PICNIC FACILITIES AVENUE GRANT ROBERT OLD ALMONTE ROAD OLD ALMONTE ROAD Location DescriptionLocation NOT APPLICABLE LINCOLN FIELDS NOT APPLICABLE NOT APPLICABLE DRIVE DELAMERE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROUNDABOUT WITH REALIGNED PALLADIUM ROAD MANCHESTER DAVID DRIVE NORTHSHIRE From Street From Page 6 Page NOT APPLICABLE BAYSHORE NOT APPLICABLE NOT APPLICABLE HOBIN STREET NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE DRIVE NORTHSHIRE RIDGE ROAD SPRUCE To Street To Park Renewal Park New Transit Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal -Road Sidewalk Intersection Modifications Signals Traffic Signals Traffic Signals Traffic Renewal Park Renewal Park New Roads -Road Surface Treatment -Road Surface Treatment Type ofWork Theresa - 7 Theresa Kavanagh- 8 -, Chiarelli 7, Rick Theresa Kavanagh - 7 Theresa Kavanagh - 7 - 6 Glen Gower - 6,Hubley Allan - 23 Glen Gower - 6 Glen Gower - 6 Glen Gower - 6 Glen Gower - 6 Glen Gower - 6 Glen Gower - 6 El-ChantiryEli - 5 El-ChantiryEli - 5 WardDescription 98 97 96 95 94 93 92 91 90 89 88 87 86 85 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2022 2021 2021 2021

Construction Year EQUIPMENT AND SENIOR PLAY - PARK STRUCTURE REPLACE BRIARGREEN LINK MULTI-USE PATHWAY DRIVE YARD: OFFICE/GARAGE, 1683 WOODWARD WOODWARD COMPLEX, RECREATION TORQUAY PINECREST AVENUE AVENUE FIRE STATION 21 1300 -WOODROFFE CENTREPOINTE, IN PARKING LOT PAVERS LIBRARY PERMEABLE CARLINGWOOD - WORKS LIGHT AVENUE RAIL TRANSIT CONNAUGHT WORKS LIGHT RAIL - TRANSIT ROAD RIDGE REPLACEMENT TRI-TOWNSHIP/MARCH SHIRLEY BOULEVARD DRIVE RIVERDOWN LOIS AVENUE LANE) CURB (EASTBOUND CARLING AVENUE CARLING AVENUE Location DescriptionLocation NOT APPLICABLE HIGHGATE ROAD NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE TRUNK DRIVE RIVERDOWN ROAD HILDA RIFLE ROAD AVENUE ALPINE ROAD CORKSTOWN From Street From Page 7 Page NOT APPLICABLE DRIVE RUSTIC NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE TRACKS RAILROAD RIFLE ROAD (RANGE ROAD) STREET CRICHLOW SHIRLEY BOULVARD SOUTH STREET FOREST BAYSHORE DRIVE To Street To Park Renewal Park Multi-Use Pathways Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Management Storm Water Renewal Watermain Renewal Watermain Sewer Renewal -Road Surface Treatment -Road Surface Treatment -Road Surface Treatment -Road Resurfacing -Road Sealing Crack Type ofWork - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 Theresa Kavanagh - 7 WardDescription 112 111 110 109 108 107 106 105 104 103 102 101 100 99 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2021 2021 2021 2021

Construction Year ST RITA SCHOOL - INVERNESS AT BENSON STREET RITA BENSON ST SCHOOL AT - INVERNESS MEADOWLANDS AND FAMILY BROWN BEWTEEN CARMAN GRANT AVENUE WOODROFFE COURT - DRIVE -BASKETBALL PARK 72 MEDHURST MEDHURST RENEWAL PATHWAY - DRIVE -ACCESSIBLE PARK 72 MEDHURST MEDHURST PLAY AND EQUIPMENT PLAYSTRUCTURE SENIOR ROAD -PARK: PLAYGROUND, REPLACE 90 BANNER BANNER OFFICE GARAGE AND - MERIVALE - ROAD) (COLONNADE OC TRANSPO - WORKS LIGHT RAIL TRANIST WOODROFFE LANE BUS NORTHBOUND AVENUE WOODROFFE LINK PATHWAY ROAD RICHMOND RIDGE - PARK PICNIC FACILITIES QUEENSWOOD FIELDHOUSE HOUSE, FIELD 2095 KINGSLEY ROAD - DEMOLISH PARKWAY Location DescriptionLocation NOT APPLICABLE NOT APPLICABLE ROAD SLACK NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NORICE STREET ROAD SOUTHWOOD SEYTON ROAD ROAD RICHMOND NOT APPLICABLE NOT APPLICABLE From Street From Page 8 Page NOT APPLICABLE NOT APPLICABLE DRIVE MEDHURST NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE OFDRIVE NORTH DAVID AVENUE SUDBURY ROAD RICHMOND MOODIE AND DRIVE ROAD ROBERTSON NOT APPLICABLE NOT APPLICABLE To Street To Traffic Signals Traffic Signals Traffic -Road Sealing Crack Renewal Park Renewal Park Renewal Park Renewal & Facilities Buildings Renewal Watermain Renewal Renewal -Road Sidewalk -Road Resurfacing -Road Resurfacing Renewal Park Renewal Park Type ofWork - Keith Egli 9 - Keith Egli 9 - Keith Egli 9 - Keith Egli 9 - Keith Egli 9 - Keith Egli 9 - Keith Egli 9 - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick - 8 Chiarelli Rick WardDescription 126 125 124 123 122 121 120 119 118 117 116 115 114 113 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2022 2022 April 30, 2021 2021 2022 2022 2021 2021 2021 2021 2021 2021

Construction Year BEACON HILL BEACON COURT COMMUNITY- 2130 RADFORD CENTRE LINK MULTI-USE PATHWAY - MAJOR PATHWAY PUMP STATION WORKS SOUTH AND LRT PUMP STATION WORKS SOUTH OTTAWA AND LRT PRIVATE SILVERLACE GLEN AND HUNTER'S LORRYBETWEEN DRIVE GREENBERG LINK PATHWAY ROAD HAWTHORNE LEITRIM ROAD ROAD HAWTHORNE LIGHTING MORALITY/ -GREENBORO PARK REPLACE PATHWAY O-TRAIN EXPANSION LANE BUS SOUTHBOUND AVENUE WOODROFFE DRIVE MAJESTIC Location DescriptionLocation NOT APPLICABLE AVENUE ALLANFORD ROAD CLUB HUNT NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE CRESCENT SHADOWHILL OFSOUTH LEITRIM ROAD OFSTREET EAST BANK BLAIS ROAD NOT APPLICABLE GREENBORO STATION DRIVE MAJESTIC LANE SHERRY From Street From Page 9 Page NOT APPLICABLE CONROY ROAD ROAD JOHNSTON NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE STREET BANK OFNORTH LEITRIM ROAD ROAD OF HAWTHORNE WEST ROAD DAVIDSON NOT APPLICABLE LIMEBANK STATION OFSOUTH MAJESTICDRIVE STREET HAVEN NEW To Street To Buildings & Facilities Renewal & Facilities Buildings Renewal -Road Multi-Use Pathway Renewal -Road Multi-Use Pathway Renewal Watermain Renewal Watermain Signals Traffic Renewal -Road Sidewalk -Road Resurfacing -Road Sealing Crack -Road Sealing Crack Renewal Park New Transit Transitway Renewal -Road Resurfacing Type ofWork Tim - 11 Deans - Diane 10 Deans - Diane 10 Deans - Diane 10 Deans - Diane 10 Deans - Diane 10 Deans - Diane 10 Deans - Diane 10, - 20 , Deans - Diane 10, George Darouze - 20 , Deans - Diane 10, George Darouze - 20 , Deans - Diane 10 MeehanAnne Carol - 22 Deans - Diane 10, George Darouze - 20, - Keith Egli 9 - Keith Egli 9 WardDescription 140 139 138 137 136 135 134 133 132 131 130 129 128 127 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2022 2021 2021 2021

Construction Year PATHWAY LIGHTING PATHWAY AVENUE- PERES-BLANCS 300 DES PARK- VANIER RICHELIEU- COURTS TENNIS THE ON ASPHALT - -REPLACE STREET PARK 349 BRUYERE BORDELEAU SIDE MAYFIELDEAST STREET- AVENUE 275 PERRIER CHAMPLAIN, D'ACCUEIL CENTRE BUILDING MARKET BYWARD COURT KINDLE STATION (INTERSECTION) BLAIR TRANSIT LINK PATHWAY EQUIPMENT AND SENIOR PLAY - PARK STRUCTURE REPLACE WHITEROCK - PARK PICNIC FACILITIES MEADOWBROOK BOARD BULLETIN -JASMINE PARK 2040 JASMINE CRESCENT SPRAY PAD SINGLE - SPRAY PARK POST WITH REPLACE COURTS TENNIS THE AT FENCING AND ASPHALT GROVE - CARSON PARK REPLACE POOL, OGILVIE -ROAD SPLASH WAVE Location DescriptionLocation NOT APPLICABLE NOT APPLICABLE MONTGOMERY STREET NOT APPLICABLE NOT APPLICABLE COURT REBECCA TRANSITWAY EAST CYRVILLE ROAD NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE From Street From Page 10 Page NOT APPLICABLE NOT APPLICABLE AVENUE MCARTHUR NOT APPLICABLE NOT APPLICABLE DRIVE BRIARCLIFFE LAY-BY BUS AT SAXONY CRECENT NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Park Renewal Park Renewal Park New Sidewalks Renewal & Facilities Buildings Renewal & Facilities Buildings -Road Resurfacing Transitway Renewal Renewal -Road Sidewalk Renewal Park Renewal Park Renewal Park Renewal Park Renewal Park Renewal & Facilities Buildings Type ofWork - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 Tierney Tim - 11 WardDescription 154 153 152 151 150 149 148 147 146 145 144 143 142 141 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2022 2022 2022 2022 2022 2021 2021

Construction Year FIRE FIRE STATION 56 - OVERBROOK, ROAD 275 COVENTRY FIRE STATION 56 - OVERBROOK - WINDOWS PARKWAY VANIER PLAY EQUIPMENT REPLACE PARK STRATHCONA BLANCS PERES DES - 300 AVENUE SUGARSHACK VANIER -2 PARK - RIVERAIN PHASE ROAD RIVER 400 NORTH AVENUE MACKENZIE WESTBOUND STREET PATRICK SAINT LANE LEFT WESTBOUND STREET PATRICK SAINT STREET PATRICK SAINT AVENUE KING EDWARD STREET DALHOUSIE ASPHALT REPLACE - - STREET COURTS TEMPLETON TENNIS GERMAINSAINT PARK: THREE -1 PARK - RIVERAIN PHASE ROAD RIVER 400 NORTH Location DescriptionLocation

NOT APPLICABLE NOT APPLICABLE ROAD OF NORTH MONTREAL NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE STREET RIDEAU AVENUE OFEAST KING EDWARD AVENUE OF KING EDWARD WEST STREET CUMBERLAND STREET ST.AT ANDREW STREET ST.PATRICK NOT APPLICABLE NOT APPLICABLE From Street From Page 11 Page NOT APPLICABLE NOT APPLICABLE AVENUE MCARTHUR NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE DALY AVENUE AVENUE\ KING EDWARD STREET CUMBERLAND STREET DALHOUSIE NOT APPLICABLE GUIGUES STREET NOT APPLICABLE NOT APPLICABLE To Street To Buildings & Facilities Renewal & Facilities Buildings Renewal & Facilities Buildings -Road Resurfacing Renewal Park New Parks New Parks Cycling Routes -Road Resurfacing -Road Resurfacing -Road Resurfacing -Road Resurfacing -Road Resurfacing Renewal Park Renewal Park Type ofWork -Rawlson King 13 -Rawlson King 13 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 Mathieu Fleury - 12 WardDescription 168 167 166 165 164 163 162 161 160 159 158 157 156 155 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2022 2022 2022 2022 2021 2021 2021 2021

Construction Year LEMIEUX STREET (WESTBOUND) LEMIEUX STREET STREET DONALD POOL - REPLACE AIR UNIT COTE STREET HANDLING DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 - EXTERIORCOTE STREET CLADDING DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 PUMPS - WATE CHILLED COTE STREET DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 ROAD MONTREAL LINK PATHWAY ROOF GYM -AT AREA REPLACE COTE STREET DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 ROOF - REPLACE COTE STREET DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 -SYSTEM CHILLER COTE STREET DONGAMBLE COMPLEX LAURENT SAINT PARK: PLAYGROUND, 525 GIL O -JULIEN - 201 DONALD SCOREBOARD 8 - PARK WATERDIGE BARKER WILLIAM PARK VILLAGE, COMMUNITY 2, PARK MARTINEAU EUGENE WATERIDGE - PARK 145 HEMLOCK ROAD VETERANS Location DescriptionLocation BOULEVARD ST.AT LAURENT PARKWAY VANIER NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE EGLISE AVENUE CRESCENT WOLFFDALE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE From Street From Page 12 Page NOT APPLICABLE STREET ALESTHER NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE BOULEVARD ST. LAURENT CRESCENT WOLFFDALE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Road -Road Resurfacing -Road Resurfacing Renewal Park Renewal Park Renewal Park Renewal Watermain Renewal -Road Sidewalk Renewal Park Renewal Park Renewal Park Renewal Park New Parks New Parks New Parks Type ofWork Rawlson King -Rawlson King 13,Tierney Tim - 11 , -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 WardDescription 182 181 180 179 178 177 176 175 174 173 172 171 170 169 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2022 2022 2022 April 30, 2021 2022 2022 2021 2021 2021 2021 2021 2021 2021

Construction Year WELLINGTON STREET WELLINGTON LIGHTING SPORTFIELD - PARK PLOUFFE REPLACE (DISCONTINUOUS) LANES BUS STREET ALBERT STREET METCALFE AVENUE BRONSON GAZEBO - PARK REPLACE MCANBB STREET 400 ALBERT BOOTH STREET CITY - HALL BUILDING HERITAGE -AVENUE LAURIER OTTAWA CITY -HALL AVENUE 110 LAURIER OTTAWA ISLAND - SOUTH TO AND QUEBEC LEMIEUXNORTH RIVER OVER OTTAWA [POTENTIAL BRIDGE LIGHTNORTH RAIL TRANSIT OF WALES PRINCE SIDEWALK) HAAG (NORTH DRIVE DEN AVENUE STANLEY AVENUE STANLEY Location DescriptionLocation PARKWAY SIR JOHN A MACDONALD NOT APPLICABLE STATION ROAD BAYVIEW STREET SLATER AVENUE ARLINGTON NOT APPLICABLE NOT APPLICABLE STREET WELLINGTON NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD CARSON'S STREET OFEAST KEEFER From Street From Page 13 Page O'CONNOR O'CONNOR STREET NOT APPLICABLE AVENUE EMPRESS AVENUE LAURIER NOT APPLICABLE NOT APPLICABLE PATHWAY RIVER OTTAWA NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD OFEAST CARSON'S STREET CRICHTON UNION STREET To Street To Road -Road Resurfacing Renewal Park Transitway Renewal Sewer Renewal -Road Sealing Crack Renewal Park & Facilities New Buildings Cycling Routes Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal Bridge Renewal -Road Sidewalk -Road Resurfacing -Road Resurfacing Type ofWork Catherine Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 Catherine McKenney - 14 15 Catherine McKenney - 14,Leiper - Jeff -Rawlson King 13 -Rawlson King 13 -Rawlson King 13 WardDescription 196 195 194 193 192 191 190 189 188 187 186 185 184 183 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2021 2021 2021 2021

Construction Year RICHMOND LIGHT RAIL TRANSIT WESTERN AT SMIRLE AVENUE SCOTT STREET AVENUE AT PARKDALE SCOTT STREET AVENUE AT LANARK SCOTT STREET DRIVE AT PARK ISLAND SCOTT STREET AVENUE AT CHURCHILL SCOTT STREET AVENUE CARRUTHERS AND SCOTT STREET ROAD RICHMOND WEST STREET 1137 WELLINGTON SENIORS CENTRE, STREET WELLINGTON WALL COMMUNITYCURTAIN HINTONBURG CENTRE- FIRE ADMINISTRATION BUILDING COMPLEX, AVE-00411 RECREATION DOVERCOURT DOVERCOURT RIVER OVR OTTAWA LIGHT BRIDGE RAIL SOUTH-POTENTIAL TRANSIT OF WALES PRINCE Location DescriptionLocation ROWANWOOD AVENUE ROWANWOOD PASTURE TUNNEYS NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE AVENUE ROWANWOOD NOT APPLICABLE NOT APPLICABLE DEVICES ELEVATING NOT APPLICABLE NOT APPLICABLE From Street From Page 14 Page BROADVIEW AVENUE BROADVIEW ROAD BASELINE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE AVENUE BROADVIEW NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Road -Road Resurfacing New Transit Intersection Modifications Intersection Modifications Intersection Modifications Intersection Modifications Intersection Modifications Intersection Modifications Cycling Routes Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal Bridge Type ofWork Leiper - Jeff 15 - 8 Chiarelli Rick Leiper - Jeff 15, Theresa Kavanagh - 7, Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 14 Leiper - Jeff 15, Catherine McKenney - WardDescription 210 209 208 207 206 205 204 203 202 201 200 199 198 197 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2022 2021 2021 2021 2021 2021 2022 2022

Construction Year REPLACEMENT ON TENNIS ON COURTS TENNIS REPLACEMENT - ASPHALT CRESCENT - COURTS 691 HARTMAN PARK: TENNIS ARNOTT DRIVE RIVERSIDE CRESCENT NORBERRY HOBSON ROAD AND BETWEEN DRIVE SPRINGLAND ROAD CLUB WESTBOUND HUNT AVENUE FISHER CARLING AVENUE INTERSECTION DRIVE ROAD AND MEADOWLANDS FISHER AVENUE ATHLONE AVENUE - PARK 1445 WELLINGTON ROCKHURST WORKS ROAD LIGHT RICHMOND RAIL AND TRANSIT CLEARY AVENUE (DISCONTINUOUS) LANES BUS SCOTT STREET AVENUE WAVELL ROAD AT RICHMOND HICKORYAT SOUTH STREET AVENUE CHAMPAGNE STREET LAUREL Location DescriptionLocation NOT APPLICABLE CRESCENT OFSOUTH KIMBERWICK NOT APPLICABLE DRIVE ANKA PAUL DRIVE OF WALES PRINCE NOT APPLICABLE BYRON AVENUE NOT APPLICABLE NOT APPLICABLE SMIRLE AVENUE NOT APPLICABLE NOT APPLICABLE NORTH LORETTA AVENUE From Street From Page 15 Page NOT APPLICABLE CRESCENT OFSOUTH KIMBERWICK NOT APPLICABLE PARKWAY AIRPORT DRIVE OFSOUTH MEADOWLANDS MELROSE AVENUE NOT APPLICABLE ROAD RICHMOND NOT APPLICABLE NOT APPLICABLE STATION ROAD BAYVIEW NOT APPLICABLE NOT APPLICABLE NORTH AVENUE BREEZEHILL To Street To Park Renewal Park New Sidewalks Signals Traffic -Road Resurfacing -Road Resurfacing -Road Resurfacing Intersection Modifications -Road Resurfacing New Parks Renewal Watermain Transitway Renewal Signals Traffic Signals Traffic Road, Sewer, Water Type ofWork - Riley Brockington 16 - Riley Brockington 16 - Riley Brockington 16 - Riley Brockington 16 - Riley Brockington 16 - Riley Brockington 16,Leiper - Jeff 15 , - Riley Brockington 16 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 Leiper - Jeff 15 WardDescription 224 223 222 221 220 219 218 217 216 215 214 213 212 211 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2022 April 30, 2021 2021 2021 2021 2021 2022 2022 2022 2022 2021

Construction Year INDUSTRIAL BUS GARAGE BUS FACILITY INDUSTRIAL AVENUE - INDUSTRIAL ROAD 1480 HERON CENTRE, ROAD MULTI-SERVICE HERON VISTA ALTA LIBRARY - 2516 VISTA ALTA DRIVE LAURENT ADMINISTRATION BUILDING - ST- OC 1500 TRANSPO, BOULEVARD SOIL GLEBE AVENUE CELLS SOIL STREET CELLS 953-983 BANK LANE FROBISHER AVENUE CECIL BILLINGS LAY-BYSTATION BUS COLONEL BY MAIN AND DRIVE STREET POLE KIOSKSMOUNTED ELECTRICAL - AVENUE PARK: MULTI-USE FIELD, 2554 KALADAR KALADAR SPRAY PAD SPRAY POSTS -WITH PARK REPLACE KALADAR WAY BREWER ARENA, BREWER SIDEWALK) MERIVALE ROAD (WEST Location DescriptionLocation NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE OFLANE FROBISHER SOUTH CUL-DE-SAC SOUTH STREET BANK NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE MORISSET AVENUE From Street From Page 16 Page NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE OFLANE NORTH HINKS - CUL-DE-SAC NORTH WEST NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE AVENUE OFSOUTH KIRKWOOD To Street To Buildings & Facilities Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Management Storm Water Management Storm Water -Road Resurfacing New Sidewalks Transitway Renewal Signals Traffic Renewal Park Renewal Park Renewal & Facilities Buildings Renewal -Road Sidewalk Type ofWork Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 Shawn Menard - 17 - Riley Brockington 16 WardDescription 238 237 236 235 234 233 232 231 230 229 228 227 226 225 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2022 2022 2021 2021 2021 2021 2021 2021

Construction Year PATHWAY LINK PATHWAY STREET RYDER DRIVE FEATHERSTON CHOMLEYAT CORONATION AVENUE AVENUE 1B SEWER-PHASE VALLEY STORM DRIVE TRUNK S AVENUE R AVENUE Q AVENUE P AVENUE O AVENUE N AVENUE AVENUE TERMINAL EQUIPMENT PLAY AND SENIOR PLAY -JOHN MURPHY PARK STRUCTURE REPLACE BIKE PARK FACILITY ALONG PLEASANT BILLINGS AVENUE Location DescriptionLocation BLACKSTONE CRESCENT BLACKSTONE ROAD WALKLEY STREET RYDER NOT APPLICABLE PARK TO WESTON AVENUE VALLEY FROM DRIVE FOLEY TREMBLAY ROAD TREMBLAY ROAD TREMBLAY ROAD TREMBLAY ROAD TREMBLAY ROAD END DEAD DRIVE TRAINYARDS NOT APPLICABLE NOT APPLICABLE From Street From Page 17 Page LANCASTER ROAD LANCASTER DRIVE FEATHERSTON EAST KILBORN AVENUE NOT APPLICABLE DRIVE SAUNDERSON TO PARK WESTON THROUGH EASEMENT P AVENUE P AVENUE P AVENUE ROAD OFSOUTH TREMBLAY ROAD OFSOUTH TREMBLAY TREMBLAY ROAD DRIVE OF TRAINYARDS WEST NOT APPLICABLE NOT APPLICABLE To Street To Road - Sidewalk Renewal -Road Sidewalk -Road Resurfacing -Road Resurfacing Signals Traffic Sewer Renewal Road, Sewer, Water Road, Sewer, Water Road, Sewer, Water Road, Sewer, Water Road, Sewer, Water Road, Sewer, Water -Road Resurfacing Renewal Park Cycling Routes Type ofWork Jean Cloutier Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 Jean Cloutier - 18 WardDescription 252 251 250 249 248 247 246 245 244 243 242 241 240 239 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2022 2022 2022 2022 2021

Construction Year BANK EQUIPMENT AND SENIOR PLAY- PARK STRUCTURE REPLACE BICENTENIAL KENMORE EQUIPMENT AND SENIOR PLAY - PARK STRUCTURE REPLACE LANE BRAMBLE STREET LAWRENCE CENTRE, RECREATION VERNON O'TOOLE ROAD KENNY ROAD FRANK ROAD BIRCHGROVE ROAD CREEK BECKETT'S DRIVE WILHAVEN MILLENNIUM - PARK PICNIC FACILITIES EQUIPMENT AND JUNIOR PLAY STRUCTURE LESLIE PARK: PLAYGROUND ROAD -ARMSTRONG - REPLACE RUSSELL DRIVE - PARK RANGE 655 DECOEUR HUNSDEEP VILLAGE - PARK CREEK 525 FAMILLE- AVENUE CARDINAL LAPORTE POSTFIRE STATION -71/PARAMEDIC 1246 COLONIALNAVAN, ROAD Location DescriptionLocation VICTORIA VICTORIA STREET ROAD AND ISLAND SNAKE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE DRIVE WILHAVEN COLONIAL ROAD MAGLADRY ROAD OLD DRIVE MONTREAL CREEK OFEAST BECKETT'S NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE From Street From Page 18 Page ROAD OFSOUTH MITCH OWENS NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD INNES ROAD INNES ROAD RUSSELL DRIVE WILHAVEN ROAD CANAAN NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Road -Road Resurfacing Renewal Park Renewal Park Renewal & Facilities Buildings -Road Surface Treatment -Road Resurfacing -Road Resurfacing -Road Resurfacing -Road Surface Treatment Renewal Park Renewal Park New Parks New Parks Renewal & Facilities Buildings Type ofWork George Darouze - 20 George Darouze - 20 George Darouze - 20 George Darouze - 20 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts - 19 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts -19 Catherine Kitts -19 WardDescription 266 265 264 263 262 261 260 259 258 257 256 255 254 253 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2022 2021 2021 2021 2021 April 30, 2021 2021 2021 2021 2021 2021 2021 2021 2022 2022

Construction Year CAPPAMORE PARK- QUINNS POINTPARK- CAPPAMORE - PARK QUINNS POINT2 SUBDIVISIONCALTRA PHASE MILLERS OVEN ROOMTEA - MILL STREET OFFICEMANOTICK DEPOT GARAGE AND COMMUNITYAND ARENA CENTRE STREET POSTFIRE STATION -94/PARAMEDIC MANOTICK, 5669 MANOTICK MAIN -DRIVE ROGER STEVENS FIRE STATION 83 - GOWER NORTH LINK MULTI-USE PATHWAY GREGOIRE ROAD -DRIVE PARK SKIPPER 69 SKIPPER DUN DUN GREELYROAD AT SCHOOL ELEMENTARY PARKWAY GREGOIRE ROAD ROAD BLANCHFIELD STREET BANK Location DescriptionLocation NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD OLD PRESCOTT ROAD MARVELVILLE NOT APPLICABLE NOT APPLICABLE LANE CORNER CARLETON ROAD ISLAND SNAKE ROAD OFSOUT MITCH OWENS From Street From Page 19 Page NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE REMINGTON WAY VICTORIA STREET NOT APPLICABLE NOT APPLICABLE ROAD MARVELVILLE ROAD STAGECOACH ROAD MITCH OWENS To Street To New Parks New Parks Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal & Facilities Buildings Renewal -Road Sidewalk -Road Resurfacing New Parks Signals Traffic -Road Resurfacing -Road Resurfacing -Road Resurfacing Type ofWork Scott Moffatt - 21 Scott Moffatt - 21, Jan Harder - 3 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 George Darouze - 20 George Darouze - 20 Meehan - 22 George Darouze - 20, Anne Carol George Darouze - 20 George Darouze - 20 George Darouze - 20 George Darouze - 20 WardDescription 280 279 278 277 276 275 274 273 272 271 270 269 268 267 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2021 2021 2021 2021 2021 April 30, 2021 2022 2022 2022 2022 2022 2022 2022 2021 2021

Construction Year POLLOCK ROAD ROAD MCCORDICK COURT MCLEAN MANOTICK MAIN STREET MEYNELL AND ROAD STREET PERTH MANOTICK MAIN AND STEET AVENUE BRIDGEPORT STREET COMMUNITYAND PERTH ARENA CENTRE, RICHMOND GAMBLE DRIVE 30 M OFSIGNAL STREET EAST - MIDBLOCK PERTH PEDESTRIAN STATION ROAD ASHTON (EASTSIDEWALK) MANOTICK MAIN STREET STREET FEE LANE -DRIVE WESTBOUND ROGER STEVENS EQUIPMENT AND SENIOR PLAYSTRUCTURE REPLACE - HEALEY AVENUE PARK: PLAYGROUND, 25 HEALEYS HEATH WEST - ELEVATION PARK QUINNS POINT Location DescriptionLocation MALAKOFF MALAKOFF ROAD ROAD WEST CENTURY BRIDGE ROAD AT BARNSDALE DRIVE VIEW ISLAND NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD PURDY STREET OFSOUTH CURRIER ROAD BANKFIELD 416 OFEAST HIGHWAY NOT APPLICABLE NOT APPLICABLE From Street From Page 20 Page FOURTH BROPHY ROAD OF NORTH DRISCOLL DRIVE AVENUE OFNORTH EASTMAN NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD FRANKTOWN STREET CURRIER CUL-DE-SAC LINE FIRST ROAD NOT APPLICABLE NOT APPLICABLE To Street To Road -Road Surface Treatment -Road Surface Treatment -Road Resurfacing -Road Resurfacing Intersection Modifications Intersection Modifications Renewal & Facilities Buildings Signals Traffic -Road Slurry Seal Renewal -Road Sidewalk -Road Resurfacing -Road Sealing Crack Renewal Park New Parks Type ofWork Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 Scott Moffatt - 21 WardDescription 294 293 292 291 290 289 288 287 286 285 284 283 282 281 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2022 2021 2021 2021 2021 April 30, 2021 2022 2021 2021 2021 2021 2021 2021 2022 2022

Construction Year TERRY 1 TERRY FOX(HIGHLANDS) STREET AND DRIVE DRIVE CORWNRIDGE AT DRIVE MEAOWBREEZE STREET SHERWOOD TERRY FOX DRIVE TO EAGLESON LARSEN MULTI PATHWAY USE ROMINAEAGLESON ROAD AND STREET STATION TRANSIT RIVERVIEW MIIKANA - PARK 655 MIIKANA ROAD DRIVE PARK - PARK FARM 392 BARRETT BARRETT LINK PATHWAY DRIVE OF WALES PRINCE - PARK PICNIC FACILITIES STONECREST Location DescriptionLocation NOT APPLICABLE OFSOUTH TIMM ROAD NOT APPLICABLE ABBEY HILL DRIVE ROAD CASTLEFRANK NOT APPLICABLE NOT APPLICABLE ROAD ARMSTRONG EARL NOT APPLICABLE NOT APPLICABLE DRIVE WINDHURST DRIVE OF WALES PRINCE DRIVE OFSOUTH ROCKY HILL NOT APPLICABLE From Street From Page 21 Page NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE ROAD HAZELDEAN NOT APPLICABLE NOT APPLICABLE LOOPEAST NOT APPLICABLE NOT APPLICABLE AVENUE STONEPOINT ROAD GREENBANK DRIVE BARNSTONE NOT APPLICABLE To Street To Intersection Modifications Renewal Watermain Signals Traffic Sewer Renewal -Road Resurfacing Multi-Use Pathways Intersection Modifications Transitway Renewal New Parks New Parks Renewal -Road Sidewalk -Road Sealing Crack -Road Sealing Crack Renewal Park Type ofWork Allan - 23 Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 MeehanAnne Carol - 22 MeehanAnne Carol - 22 MeehanAnne Carol - 22 MeehanAnne Carol - 22 MeehanAnne Carol - 22, Jan Harder - 3 , MeehanAnne Carol - 22 MeehanAnne Carol - 22 WardDescription 298 297 296 295 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (LongList)

Item 2022 2022 2022 2022 April 30, 2021

Construction Year MICHAEL COWPLAND DRIVE MICHAEL COWPLAND DRIVE EQUESTRIAN ROAD CASTLEFRANK ANIK WAY Location DescriptionLocation COURT EAST COURT MATTHEWS TERENCE POMMEL COURT ROAD HAZELDEAN CHIMO DRIVE From Street From Page 22 Page EAGLESON EAGLESON ROAD POMMEL COURT SOUTH WAY TORCASTLE ROAD KAKULU To Street To Road -Road Resurfacing -Road Resurfacing -Road Resurfacing -Road Resurfacing Type ofWork Allan Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 Hubley Allan - 23 WardDescription