May 22, 2020 Project Number: 200375 Ms. Ariane Côté, Environmental Manager Romney Energy Centre Limited Partnership 53 Jarvis Street, Ste 300 Toronto, ON M5C 2H2 E-mail:
[email protected] Re: Review of Operator Procedures with Respect to Renewable Energy Approval 3397-AV3NVX, Condition K2 Sewage Works of the Transformer Substation Spill Containment Facility Romney Wind Energy Centre Dear Ms. Côté: BluMetric Environmental Inc. (BluMetric ™) has prepared this letter for the Romney Wind Energy Centre (the ‘’Project’’) following review of plans and procedures prepared by others to confirm that the Project is in conformance with Condition K2 (1) of the Renewable Energy Approval (REA) 3397-AV3NVX, related to the construction and operations of a transformer substation containment facility (the ‘’facility’’). The Project REA is provided as Attachment 1. It is the intention that this letter will be provided to the Ministry of Environment, Conservation, and Parks (the Ministry). Prior to BluMetric’s involvement, Wood Canada Limited (Wood), was retained to ensure conformance of the REA Conditions K2 (1)(a) and (b) related to the actual construction and design of the facility. The final letter report by Wood stamped by a Professional Engineer licensed in Ontario is provided in Attachment 2. As such, the purpose of this letter is to review the following provided documents to Conditions K2 (1)(c) and (d) of the Project REA: • Spill Prevention Control and Countermeasure (SPCC) Procedure prepared by EDF Renewable Services, Document # HSE-01-2356, dated February 2020, Revision 1; and • Emergency Preparedness and Response Plan (EPRP) prepared by EDF Renewables, Document # EENA-OEMS-PR1201, dated January 2020, Revision 3.