West Northamptonshire Water Cycle Study Pre-Submission Joint Core

Total Page:16

File Type:pdf, Size:1020Kb

West Northamptonshire Water Cycle Study Pre-Submission Joint Core West Northamptonshire water cycle study – Pre-Submission Joint Core Strategy final detailed WCS report West Northamptonshire Water Cycle Study Pre-Submission Joint Core Strategy Detailed WCS Final report September 2011 1 Ref WUNNDC011 September 2011 West Northamptonshire water cycle study: Pre-Submission Joint Core Strategy final detailed WCS report West Northamptonshire Water Cycle Study Pre-Submission Joint Core Strategy Final detailed WCS report Halcrow Group Limited Burderop Park Swindon SN4 0QD 01793 812479 http://www.halcrow.com/html/our_markets/watercycleplanning.htm Halcrow Group Limited has prepared this report in accordance with the instructions of their client for their sole and specific use. Any other persons who use any information contained herein do so at their own risk. © Halcrow Group Limited 2011 Ref WUNNDC011 September 2011 2 2 West Northamptonshire water cycle study – Pre-Submission Joint Core Strategy final detailed WCS report West Northamptonshire water cycle study Pre-Submission Joint Core Strategy detailed WCS report Revision schedule: Date Document Stage Author reference 23/05/2010 WUNNDC007 Confidential draft report ADM for steering group consultation only 29/07/2010 WUNNDC008 Confidential draft final ADM report for steering group consultation only 11/01/2011 WUNNDC009 Confidential final report ADM (as amended with RSS addendum) for steering group consultation only 15/04/2011 WUNNDC010 Draft final detailed WCS ADM report for consultation 20/06/2011 WUNNDC011 Final detailed WCS report ADM for signoff. 17/08/2011 WUNNDC012 Final detailed WCS report ADM v2 for signoff. 30/09/2011 WUNNDC013 Final detailed WCS report ADM v3. 3 Ref WUNNDC011 September 2011 West Northamptonshire water cycle study: Pre-Submission Joint Core Strategy final detailed WCS report CONTENTS 1 Introduction........................................................................................................................................... 7 1.1 Background............................................................................................................................................................................... 7 2 Growth and development..................................................................................................................... 8 2.1 Water cycle processes .......................................................................................................................................................... 8 2.2 Sustainable growth.................................................................................................................................................................. 8 2.3 The current spatial distribution........................................................................................................................................... 9 2.4 Development policy context..............................................................................................................................................10 2.5 Distribution and phasing of development.......................................................................................................................10 2.6 Environmental considerations ...........................................................................................................................................14 2.7 The Water Framework Directive ....................................................................................................................................15 2.8 River Basin Management Plans ..........................................................................................................................................17 3 Water quality environmental capacity assessment.......................................................................... 26 3.1 Introduction............................................................................................................................................................................26 3.2 Data and References............................................................................................................................................................26 3.3 Methodology ..........................................................................................................................................................................27 3.4 Northampton water quality assessment.........................................................................................................................27 3.5 Brackley water quality assessment ...................................................................................................................................30 3.6 Towcester water quality assessment...............................................................................................................................33 3.7 Daventry water quality assessment..................................................................................................................................36 3.8 Water quality environmental capacity summary ..........................................................................................................39 4 Water resources and water supply.................................................................................................... 43 4.1 Introduction............................................................................................................................................................................43 4.2 Environment Agency Water Resource Management ..................................................................................................44 4.3 CAMS Review ........................................................................................................................................................................46 4.4 Water Company Planning...................................................................................................................................................49 4.5 Current Water Resources .................................................................................................................................................50 4.6 Water Efficiency Targets.....................................................................................................................................................54 4.7 Anglian Water Resource Strategy ....................................................................................................................................56 4.8 Future Water Demand Scenario Testing........................................................................................................................60 Ref WUNNDC011 September 2011 4 4 West Northamptonshire water cycle study – Pre-Submission Joint Core Strategy final detailed WCS report 4.9 Drivers and Constraints......................................................................................................................................................65 4.10 Water Resources Summary ...............................................................................................................................................65 5 Flood risk management...................................................................................................................... 67 5.1 Introduction............................................................................................................................................................................67 5.2 Northampton town catchment review ...........................................................................................................................72 5.3 Daventry..................................................................................................................................................................................80 5.4 South Northamptonshire....................................................................................................................................................84 6 Groundwater and Sustainable Drainage Systems ............................................................................ 92 6.1 Introduction............................................................................................................................................................................92 6.2 Geological and Hydrogeological Setting..........................................................................................................................92 6.3 SuDS for the West Northamptonshire Area ................................................................................................................92 6.4 Sustainable Drainage and Planning....................................................................................................................................92 6.5 Suitability of infiltration or attenuation system .............................................................................................................96 6.6 SuDS design: Daventry ........................................................................................................................................................99 6.7 SuDS design: South Northamptonshire ........................................................................................................................100 7 Water services infrastructure capacity ........................................................................................... 104 7.1 Introduction..........................................................................................................................................................................104
Recommended publications
  • Notice of Uncontested Elections
    NOTICE OF UNCONTESTED ELECTION West Northamptonshire Council Election of Parish Councillors for Arthingworth on Thursday 6 May 2021 I, Anna Earnshaw, being the Returning Officer at the above election, report that the persons whose names appear below were duly elected Parish Councillors for Arthingworth. Name of Candidate Home Address Description (if any) HANDY 5 Sunnybank, Kelmarsh Road, Susan Jill Arthingworth, LE16 8JX HARRIS 8 Kelmarsh Road, Arthingworth, John Market Harborough, Leics, LE16 8JZ KENNEDY Middle Cottage, Oxendon Road, Bernadette Arthingworth, LE16 8LA KENNEDY (address in West Michael Peter Northamptonshire) MORSE Lodge Farm, Desborough Rd, Kate Louise Braybrooke, Market Harborough, Leicestershire, LE16 8LF SANDERSON 2 Hall Close, Arthingworth, Market Lesley Ann Harborough, Leics, LE16 8JS Dated Thursday 8 April 2021 Anna Earnshaw Returning Officer Printed and published by the Returning Officer, Civic Offices, Lodge Road, Daventry, Northants, NN11 4FP NOTICE OF UNCONTESTED ELECTION West Northamptonshire Council Election of Parish Councillors for Badby on Thursday 6 May 2021 I, Anna Earnshaw, being the Returning Officer at the above election, report that the persons whose names appear below were duly elected Parish Councillors for Badby. Name of Candidate Home Address Description (if any) BERRY (address in West Sue Northamptonshire) CHANDLER (address in West Steve Northamptonshire) COLLINS (address in West Peter Frederick Northamptonshire) GRIFFITHS (address in West Katie Jane Northamptonshire) HIND Rosewood Cottage, Church
    [Show full text]
  • The London Gazette, 25 March, 1955 1797
    THE LONDON GAZETTE, 25 MARCH, 1955 1797 Type of Reference No. Parish path on Map Description of Route Sibbertoft Footpath . D.N. 3 From the north boundary of O.S. Plot 154, southwards across O.S. Plot 154 to the county road at The Manor, Sibbertoft. Sulby Footpath ... D.R. 2 From the west boundary of O.S. Plot 18, in a north-east direction across the site of the Polish Hostel to the north- east corner of O.S. Plot 18. Thornby Footpath ... D.S.3 From the Thornby-Great Creaton road at the south-east end of Thornby village, southwards to the Guilsborough parish boundary north of Nortoft Lodge Farm. Footpath ... D.S. 5 From the Winwick-Thornby road, east of Thornby Grange adjoining Rabbit Spinney, eastwards to the Thornby- Guilsborough road at the Guilsborough parish boundary. Walgrave Footpath ... D.T. 12 From the Walgrave-Broughton road at the east end of Walgrave village, north-eastwards to the Old-Broughton road, north-east of Red Lodge Farm. THE SECOND SCHEDULE Rights of way to be added to the draft maps and statements Type of Reference No. Parish path on Map Description of Route \rthingworth ... Footpath ... C.B. 5 From the Great Oxendon-Braybrooke road, southwards via Round Spinney to county road at junction with C.B. 4. frington Bridleway ... C.F. 20 From the Nobottie-Duston road at the east end of Nobottle village, south-eastwards to the Harpole parish boundary, east of Brices Spinney. riipston Footpath ... C.H. 22 From the junction of C.H. 19 and C.H.
    [Show full text]
  • Little Ouse and Waveney Project
    Transnational Ecological Network (TEN3) Mott MacDonald Norfolk County Council Transnational Ecological Network (TEN3) Little Ouse and Waveney Project May 2006 214980-UA02/01/B - 12th May 2006 Transnational Ecological Network (TEN3) Mott MacDonald Norfolk County Council Transnational Ecological Network (TEN3) Little Ouse and Waveney Project Issue and Revision Record Rev Date Originator Checker Approver Description 13 th Jan J. For January TEN A E. Lunt 2006 Purseglove workshop 24 th May E. Lunt J. B Draft for Comment 2006 Purseglove This document has been prepared for the titled project or named part thereof and should not be relied upon or used for any o ther project without an independent check being carried out as to its suitability and prior written authority of Mott MacDonald being obtained. Mott MacDonald accepts no responsibility or liability for the consequence of this document being used for a pur pose other than the purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to confirm his agreement to indemnify Mott MacDonald for all loss or damage re sulting therefrom. Mott MacDonald accepts no responsibility or liability for this document to any party other than the person by whom it was commissioned. To the extent that this report is based on information supplied by other parties, Mott MacDonald accepts no liability for any loss or damage suffered by the client, whether contractual or tortious, stemming from any conclusions based on data supplied by parties other than Mott MacDonald and used by Mott MacDonald in preparing this report.
    [Show full text]
  • Northampton Racecourse
    NORTHAMPTON GREEN INFRASTRUCTURE PLAN SEE NOTE IN SECTION 9.3.1 APPENDIX F: EXEMPLAR PROJECT PLANS LINKING KINGSTHORPE LOCAL NATURE RESERVE TO KINGSTHORPE NORTH MEADOWS Code on interactive map: A2 Context Kingsthorpe is a Local Nature Reserve in the Brampton Valley, on the north side of Northampton. It is a popular site, but has suffered from a lack of investment in recent years. This stretch of the Brampton Arm of the Nene has a number of LWS surrounded by semi- improved grassland and arable. There are opportunities to extend the site and link with other Wildlife Sites in the vicinity. Proposal Restoration of stream, wetland and meadow habitats in the Local Wildlife Site and surrounding land along the Brampton Arm of the Nene, to link Kingsthorpe Wildlife Trust Reserve to Kingsthorpe North Meadows and lake. Kingsthorpe Nature Reserve, entrance south of Project location map. Mill Lane Project Location: Valley of the Brampton Arm, south of Kingsthorpe Local Nature Reserve Project size: Approx. 40ha Possible Delivery Partners: Wildlife Trust, River Nene Regional Park, Kingsthorpe North Meadows Charitable Trust Current Status: An initial project idea. Indicative timescale following full award of funding: Year 1: Landowner engagement, river restoration works Year 2:Fencing, meadow restoration Year 3: circular walk, interpretation, 1 Fiona Fyfe Associates, July 2015 Consultation Draft NORTHAMPTON GREEN INFRASTRUCTURE PLAN APPENDIX F: EXEMPLAR PROJECT PLANS SEE NOTE IN SECTION 9.3.1 Indicative Project Costings (NOTE: Some items cannot be quantified until landowner engagement has taken place) Item Approx. no./ Approximate cost length/ area required Land advice time 10 days River improvements Fencing 4500m £182,000 Meadow Restoration (assuming topsoil strip) 6ha £643,000 Footpath works Interpretation Total Green Infrastructure Context Located within Local Level Component A (Brampton Arm of the River Nene), this project is positioned within the Sub-Regional GI Corridor of the Brampton Arm (Northampton to Market Harborough).
    [Show full text]
  • The Maltings, Main Street, Church Stowe, Northamptonshire NN7 4SG
    The Maltings, Main Street, Church Stowe, Northamptonshire NN7 4SG A s ubstantial family home Features with far reaching • Reception hall and cloakroom countryside views. • Three principal reception rooms including sitting room, dining room and office The Property • Fitted kitchen/breakfast room and separate Converted in the late 1980s from Victorian utility room former farm buildings, The Maltings stands • Five bedrooms with en suite bathroom to immediately adjacent to the church and churchyard in the heart of the village and is master bedroom built of brick and stone with slated roofs. The • Family bathroom property offers spacious and versatile five • Landscaped gardens bedroom family living accommodation • Double garage and off-road parking extending to over 3000 sq.ft. arranged over two floors. The house is peacefully situated with a pretty and well landscaped family Outside The property is approached from a private garden and has wonderful views over drive to the front of the property. There are countryside beyond. gravelled off-road parking areas, hedging, flowers and shrubs and lawn areas. The On the ground floor a front door opens to the principal gardens are situated to the rear of reception hall with stairs rising to first floor the house on two levels. There is a good size d galleried landing. There is an open plan paved terrace and family garden with lawns, dining area adjacent to the reception hall with shrub and herbaceous borders. double doors from the hall to the sitting room with open fireplace, incorporating an open About 0.11 of a hectare (0.26 of an acre) plan family/living area.
    [Show full text]
  • 4 February 2015 ______H ______
    Last update: 4 February 2015 __________________________________________________________________________________ H __________________________________________________________________________________ HADDON, Alice <1617-1635> The wife of George HADDON. Children: HADDON, Rebecca 1635-1635> Residence: From To <1635 1635> Preston Capes Sources: Preston Capes Baptisms Register Northamptonshire Record Office - 273p/218 HADDON, Alice <1628-1693 The wife of Robert HADDON, Alice was buried in the churchyard on 9 Jun 1693. Children: HADDON, Thomas 1646-1646> HADDON, Mary 1654-1654> HADDON, Valentine 1657-1657> HADDON, Elizabeth 1660-1734 Residence: From To <1646 1693 Preston Capes Sources: Preston Capes Baptisms Register Northamptonshire Record Office - 273p/218 Preston Capes Burials Register Northamptonshire Record Office - 273p/217 HADDON, Christian 1614/5-1614/5> The daughter of Thomas and Joan HADDON, Christian was baptised at Preston Capes on 18 Feb 1614/5. Residence: From To 1614/5 1614/5> Preston Capes Sources: Preston Capes Baptisms Register Northamptonshire Record Office - 273p/218 HADDON, Elizabeth 1660-1734 The daughter of Robert and Alice HADDON, Elizabeth was born on 19 Apr 1660 and baptised at Preston Capes on 19 May. She married Thomas SMITH at St. Sepulchre, Northampton on 14 Jul 1687, returning to live at Preston Capes with her husband. Elizabeth died at the age of 73 and was buried in the churchyard on 3 Mar 1734. Children: SMITH, Mary 1688-1688> SMITH, Elizabeth 1689-1780 SMITH, Thomas 1691-1691> SMITH, Alice 1693-1728 SMITH, Sarah 1695-1695> SMITH, Ann 1698-1698> SMITH, Martha 1701-1701> SMITH, Jane 1703-1789 Residence: From To 1660 1734 Preston Capes Sources: Preston Capes Baptisms Register Northamptonshire Record Office - 273p/218 Northampton Marriages Register Northamptonshire Record Office Preston Capes Burials Register Northamptonshire Record Office - 273p/217 HADDON, George <1617-1635> The husband of Alice HADDON.
    [Show full text]
  • Update Bulletin 10 29.7.2020
    Working on behalf of Customer Contact Centre: 0300 123 5000 www.highwaysengland.co.uk ESSENTIAL MAINTENANCE WORKS: A5 JACK’S HILL Multi-Disciplinary Project Update Bulletin 10 – 30.7.2020 Clearance of vegetation, tree removal, regrading of verges, footpath works, CCTV surveys of existing drainage pipelines and installation of drainage and kerbing were completed in Phase 4, which runs northwards from Main Street, Upper Stowe to Main Street, Church Stowe on Wednesday 29th July 2020. Similar works in Phase 5, which runs northwards from Main Street, Church Stowe to Heyford Lane, Stowe Hill and Phase 6, which runs northwards from Heyford Lane, Stowe Hill to Weedon Bec will be substantially completed by Friday 31st July 2020. NB: We are planning to return to Phases 5 and 6 on Monday 17th August 2020. This is so that we can repair existing surface water drainage pipelines using trenchless technology and also excavate to replace pipelines damaged by others. These works are expected to take approximately two weeks or so and will run concurrently until one of the phases is completed. Our next and final weekend closure is between 8pm Friday 31st July and 6am Monday 3rd August 2020 in both Phase 1, which runs northwards from Tove roundabout (A43) to Banbury Lane / Butcher’s Lane crossroads, Foster’s Booth and Phase 2, which runs northwards from Banbury Lane / Butcher’s Lane crossroads, Foster’s Booth to Northampton Road (Litchborough). Works in these phases will run concurrently and are planned as follows: During the period between 8pm Friday – 6am Saturday: Shallow depth milling of an area within both carriageways in Phase 1, just south of the Duncote turn.
    [Show full text]
  • Northampton Map & Guide
    northampton A-Z bus services in northampton to Brixworth, to Scaldwell Moulton to Kettering College T Abington H5 Northampton Town Centre F6 service monday to saturday monday to saturday sunday public transport in Market Harborough h e number operator route description daytime evening daytime and Leicester Abington Vale I5 Obelisk Rise F1 19 G to Sywell r 19.58 o 58 v and Kettering Bellinge L4 1 Stagecoach Town Centre – Blackthorn/Rectory Farm 10 mins 30 mins 20 mins e Overstone Lodge K2 0 1/4 1/2 Mile 62 X10 7A.10 Blackthorn K2 Parklands G2 (+ evenings hourly) northampton X10 8 0 1/2 1 Kilometre Boothville I2 0 7A.10 Pineham B8 1 Stagecoach Wootton Fields - General Hospital - Town Centre – peak-time hourly No Service No Service 5 from 4 June 2017 A H7 tree X10 X10 Brackmills t S t es Blackthorn/Rectory Farm off peak 30 mins W ch Queens Park F4 r h 10 X10 10 t r to Mears Ashby Briar Hill D7 Street o Chu oad Rectory Farm L2 core bus services other bus services N one Road R 2 Stagecoach Camp Hill - Town Centre - 15 mins Early evening only 30 mins verst O ll A e Bridleways L2 w (for full route details see frequency guide right) (for full route details see frequency guide right) s y d S h w a Riverside J5 Blackthorn/Rectory Farm le e o i y Camp Hill D7 V 77 R L d k a Moulton 1 o a r ue Round Spinney J1 X7 X7 h R 62 n a en Cliftonville G6 3 Stagecoach Town Centre – Harlestone Manor 5 to 6 journeys each way No Service No Service route 1 Other daily services g e P Av u n to 58 e o h Th Rye Hill C4 2 r Boughton ug 19 1 Collingtree F11 off peak 62 o route 2 Bo Other infrequent services b 7A r 5 a Crow Lane L4 Semilong F5 e Overstone H 10 3 Stagecoach Northampton – Hackleton hourly No Service No Service route 5 [X4] n Evenings / Sundays only a Park D5 D6 d Dallington Sixfields 7/7A 62 L 19 a Mo ulto routes 7/7A o n L 5 Stagecoach St.
    [Show full text]
  • Northamptonshire Past and Present, No 54
    THIS NUMBER HAS ARTICLES ON CATESBY IN THE MIDDLE AGES: AN INTERDISCIPLINARY STUDY ORTHAMPTONSHIRE THE WOODLAND LANDSCAPES OF SOUTHERN NORTHAMPTONSHIRE NPAST•AND•PRESENT AN HERALDIC PUZZLE AT 56 ST MARTIN’S, STAMFORD Number 54 (2001) THORPE HALL SCHOOL, PETERBOROUGH A PARK TOO DEAR: CREATING A MODERN DEER PARK A RAILWAY STATION FOR ROTHWELL? LIEUTENANT HENRY BOWERS BOOK REVIEWS JOURNAL OF THE NORTHAMPTONSHIRE RECORD SOCIETY WOOTTON HALL PARK, NORTHAMPTON NN4 8BQ £3.00 Cover illustration: Stamford St Martin’s, 1727 (Peck’s Stamford) AND PRESENT PAST NORTHAMPTONSHIRE Number 54 2001 £3.00 Northamptonshire Record Society NORTHAMPTONSHIRE PAST AND PRESENT 2001 Number 54 CONTENTS Page Notes and News . 5 Catesby in The Middle Ages: an interdisciplinary study . 7 Jane Laughton The Woodland Landscapes of Southern Northamptonshire . 33 David Hall An Heraldic Puzzle at 56 St Martin’s, Stamford . 47 Eric Till Thorpe Hall School, Peterborough . 50 A. R. Constable A Park Too Dear: Creating a Modern Deer Park . 62 T. J. Waterfield A Railway Station for Rothwell? . 80 J. V. Gough Lieutenant Henry Bowers . 82 Stephen Hollowell Book Reviews . 88 Obituary Notice . 97 All communications regarding articles in this and future issues should be addressed to David Hall, the Hon. Editor, Northamptonshire Record Society, Wootton Hall Park, Northampton, NN4 8BQ Published by the Northamptonshire Record Society Number 54 ISSN 01490 9131 Typeset by John Hardaker, Wollaston, Northants and printed by Alden Press, Oxford OX2 0EF 5 THE NORTHAMPTONSHIRE RECORD SOCIETY (FOUNDED IN 1920) WOOTTON HALL PARK, NORTHAMPTON NN4 8BQ President Sir Hereward Wake, Bart., M.C., D.L. NOTES AND NEWS Last year we reported the work of the Mellow’s Trust and the continued publication of Peterborough Abbey medieval cartularies.
    [Show full text]
  • T1)E Bedford,1)Ire Naturaii,T 45
    T1)e Bedford,1)ire NaturaIi,t 45 Journal for the year 1990 Bedfordshire Natural History Society 1991 'ISSN 0951 8959 I BEDFORDSHffiE NATURAL HISTORY SOCIETY 1991 Chairman: Mr D. Anderson, 88 Eastmoor Park, Harpenden, Herts ALS 1BP Honorary Secretary: Mr M.C. Williams, 2 Ive! Close, Barton-le-Clay, Bedford MK4S 4NT Honorary Treasurer: MrJ.D. Burchmore, 91 Sundon Road, Harlington, Dunstable, Beds LUS 6LW Honorary Editor (Bedfordshire Naturalist): Mr C.R. Boon, 7 Duck End Lane, Maulden, Bedford MK4S 2DL Honorary Membership Secretary: Mrs M.]. Sheridan, 28 Chestnut Hill, Linslade, Leighton Buzzard, Beds LU7 7TR Honorary Scientific Committee Secretary: Miss R.A. Brind, 46 Mallard Hill, Bedford MK41 7QS Council (in addition to the above): Dr A. Aldhous MrS. Cham DrP. Hyman DrD. Allen MsJ. Childs Dr P. Madgett MrC. Baker Mr W. Drayton MrP. Soper Honorary Editor (Muntjac): Ms C. Aldridge, 9 Cowper Court, Markyate, Herts AL3 8HR Committees appointed by Council: Finance: Mr]. Burchmore (Sec.), MrD. Anderson, Miss R. Brind, Mrs M. Sheridan, Mr P. Wilkinson, Mr M. Williams. Scientific: Miss R. Brind (Sec.), Mr C. Boon, Dr G. Bellamy, Mr S. Cham, Miss A. Day, DrP. Hyman, MrJ. Knowles, MrD. Kramer, DrB. Nau, MrE. Newman, Mr A. Outen, MrP. Trodd. Development: Mrs A. Adams (Sec.), MrJ. Adams (Chairman), Ms C. Aldridge (Deputy Chairman), Mrs B. Chandler, Mr M. Chandler, Ms]. Childs, Mr A. Dickens, MrsJ. Dickens, Mr P. Soper. Programme: MrJ. Adams, Mr C. Baker, MrD. Green, MrD. Rands, Mrs M. Sheridan. Trustees (appointed under Rule 13): Mr M. Chandler, Mr D. Green, Mrs B.
    [Show full text]
  • June 20162016
    JuneJune 20162016 www.bugbrookelink.co.ukwww.bugbrookelink.co.uk 2 The Bugbrooke “LINK” Committee Published bi-monthly. Circulated free to every household within the Parish boundary of Bugbrooke. The “LINK” Management Committee is elected in accordance with the Constitution and Rules at the AGM in May. Chairman Paul Cockcroft, 31 Pilgrims Lane Secretary Barbara Bell, 68 Chipsey Avenue Treasurer/Vice Chairman Jim Inch, 16a High Street Production & Website Geoff Cooke, 1 Browns Yard Advertising Sheila Willmore, 31 Oaklands Adverts Production Gwynneth White, 1 Homestead Drive Submissions Pat Kent, 1 High Street E-mail to [email protected] Web site address www.bugbrookelink.co.uk Deadline for August issue 4th July 2016 Whilst we check the information for grammar and spelling on articles supplied by our contributors, the LINK magazine can accept no responsibility for errors or omissions in the factual content of the information. The views expressed in these articles are those of the contributors and are not necessarily shared by the LINK Management Committee. Advertisements are used to fund the LINK, and their services are not necessarily endorsed by the LINK Management Committee. 3 4 5 5 6 Bugbrooke LINK Magazine (Issue 198), June 2016 Chairman: Paul Cockcroft I’m delighted that the LINK management committee was re-elected at our AGM on 4th May 2016; we look forward to continuing our efforts in drawing together all of the components of a successful village magazine. The backbone of the publication is the revenue that’s received from our numerous and varied advertisers, without whose generous support the printing costs could not be met.
    [Show full text]
  • SEMLEP Economic Plan
    FIGURE 2: KEY ASSETS MAP LEICESTER LEICESTER AIRPORT Daventry International Rail Freight Terminal iCon BUNTINGTHORPE AIRFIELD & PROVING GROUND M1 M6 COVENTRY COVENTRY AIRPORT M45 DAVENTRY 4 M1 NORTHAMPTON 11 Silverstone Daventry SEMLEP Area M40 Local Authorities SOUTH NORTHAMPTONSHIRE Towns within SEMLEP Towcester Towns and Cities outside SEMLEP Main Rail Routes 10 Motorways Banbury Major A Roads Waterways Brackley 2 Buckingham Bicester ecotown I N K S T L W E Airports S T E A Hospitals Bicester AYLESBURY VALE Colleges Science/Technology/Business Hubs CHERWELL Northampton Enterprise Zone 7 Silverstone Aylesbur y Priors Hall Park Corby LONDON OXFORD AIRPORT Millbrook Proving Ground Arla Dairy Universities / University Technical Colleges (UTC) OXFORD 1 University of Bedfordshire 2 University of Buckingham 3 Cran�eld University 4 University of Northampton 5 Open University 6 University Campus Milton Keynes 7 Bucks New University at Aylesbury 8 Central Bedfordshire UTC 9 Buckinghamshire UTC 10 Silverstone UTC 11 Daventry UTC 8 SECTION 1 \\ OVERVIEW SEMLEP \\ STRATEGIC ECONOMIC PLAN 2015-2020 Priors Hall Park Corby Northampton Waterside Enterprise Zone PETERBOROUGH Colworth Science Park CORBY KETTERING Kettering Bedford i-Lab E A S T W E S T L I N K CAMBRIDGE BEDFORD 1 Sandy Cran�eld Technology Park MILTON KEYNES 3 Biggleswade 6 5 CENTRAL Stotfold BEDFORDSHIRE Millbrook Proving Ground 8 1 LUTON LONDON LUTON AIRPORT 9 LONDON STANSTED 7 AIRPORT y M1 Butter�eld Enterprise Hub A1(M) M40 London Luton Airport HEATHROW AIRPORT CITY AIRPORT LONDON Arla Dairy SEMLEP \\ STRATEGIC ECONOMIC PLAN 2015-2020 SECTION 1 \\ OVERVIEW 9 1.4 STRATEGIC OBJECTIVES 1.4.1.
    [Show full text]