Minutes of the CAD Committee 4th meeting held on 07-08-2015, in the Chambers of the Engineer-in-Chief (A.W), 3rd Floor, Jalasoudha Building, Errummanzil, ,Hyderabad on O&M Action Plan of 2015-16.

Officers Present:

2. M.Giridhara Reddy, 1. M.V.Ravi Kumar Chief Engineer, CDO, Engineer-in-Chief (Admn.Wing), CAD Committee Member, A.P CAD Committee, Chairman, A.P.

3. S.Hari Babu, 4. K.V.L.N.P.Chowdary, Chief Engineer,GDS, Superintending Engineer, Dowlaiswaram, Irrigation circle,Guntur, CAD Committee Member, A.P CAD Committee Member, A.P.

5. R.Reddaiah, 6. U.Annam Naidu, Superintending Engineer, Executive Engineer, CAD, Irrigation circle,, CAD Committee, Convenor, CAD Committee, Convenor, A.P A.P

* * * * *

The 4th CAD Committee meeting was held on 07-08-2015 in the

Chambers of the Engineer-in-Chief (A.W), A.P, 3rd floor, Jalasoudha

Building, Errummanzil, Andhra Pradesh, Hyderabad for finalization of O&M works Action plan for the year 2015-16.

The Engineers-in-Chief (Irrigation) and the Chief Engineers have submitted the proposals of O&M works under Category ‘A’, Category ‘B,

Plan Head and Non Plan Head.

The above proposals were reviewed by the CAD Committee and approved the Annual Action plan of O&M works which are as shown below:

1

Category-A

(Rs. In Lakhs) 2700 –M&MI -01 Major Irrigation -Commercial MH 800 -OE –SH(08) -270/272 HOA Action Plan Action Plan Proposed Project Water Tax Approved Sl. HOD Circle Division Remarks Name Eligible No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11 Godavari The balance 2 10.00 2 10.00 ‹ Approved I.C.Circle, western available water Eluru Division, tax collection is 59 165.95 59 165.95 ‹ Approved Nidadavole Rs.2423.03L

The balance Drainage available water Division, 4 22.16 4 22.16 ‹ Approved tax collection is Kakinada G.D.S Rs.146.24L 1

The balance I.C.Circle, ‹ Approval Proceding will be Y.I.Division, available water Dowlaisw 1 2.50 1 2.50 issued only after submission of Peddapuram tax collection is aram estimate. Rs.3.24L The balance ENC(I) GC.Division, available water 4 7.06 4 7.06 ‹ Approved Dowlaiswaram tax collection is Rs.34.31L Drainage ‹ Approved The balance 1 0.62 1 0.62 Division,Repalle available water I.C.Circle, 2 K.D.S tax ‹ Approved Guntur Drainage collection is 5 16.37 5 16.37 Division, Chirala Rs.607.56 ‹ Deffered. No plough back details were furnished for approval. ‹ No plough back details are I.C.Circle, Nellore central 3 PDS Not furnished 326 478.37 -- -- furnished even for the previous Nellore division,Nellore approval of 212 works costing of Rs.408.72L. ‹ No inspection report enclosed.

2

The balance ‹ Approved to the extent of Kanupur available water available water tax collections. canal 22 96.96 8 39.18 tax collection is ‹ The remaining works are system, Rs.39.27 Deffered.

central Division, ‹ Deffered. 4 CE(P), Nellore ‹ Plough back details not NTRT furnished.. SPSR Not furnished 20 97.90 -- -- GP,Tir IC.Nellore ‹ 1 work pertains to Plan Head Project upati ‹ Remaining all works pertains to to formation Ayucut roads. The balance SP Division Somasila available water 5 No.II, 19 43.69 19 43.69 Approved Project tax collection is Nellore Rs.46.25 ‹ 1 work of Rs.2.30 Deffered The balance pertains to jeep track. K.C.C 4 7.31 3 5.01 K.C. available water ‹ 3 works Aprroved. 6 .Division, Canal tax collection is . CE(P), Nandyal I.C. Rs.63.41L ‹ Approved Kurnoo 1 1.00 1 1.00 Kurnool ‹ Brought from Category-B l The balance TBP division, available water ‹ Approved. 7 TBPLLC 1 8.72 1 8.72 Adoni tax collection is Rs.74.43L

Swarna ‹ Approval proceedings will be CE(P), I.C. Nellore South 8 mukhi Not furnished 7 19.93 7 19.93 communicated only after Ongole Nellore Division Nellore Barriage submission of plough details.

Total: 476 978.54 115 342.19

3

Category-B Rs.in Lakh HOA 2700 -80 -MH800 - SH (13) -500/503 O.E Action Plan Action Plan Remarks Project Budget Proposed Approved Sl. HOD Circle Division Name Availability No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11 K.E.Division, 18 88.05 -- -- I.C.Circle, Vijayawada ‹ There is no representation from Vijayawada K.C.Division, IC.Vijayawada 3 40.11 -- -- Vijayawada K.W.Division, 2 9.84 2 9.84 ‹ Approved 1 K.D.S Tenali Drainage ENC(I) I.C.Circle, Division, 23 145.68 23 145.68 ‹ Approved Guntur Repalle Drainage Proposed Division, Budget 8 52.84 8 52.84 ‹ Approved Chirala Rs.2000.00 Y.I.Division ‹ Approval Proceding will be issued only after 2 12.00 2 12.00 IC.Dowlais Peddapuram Action Plan submission of estimates. 2 GDS waram GC.Division, approved 2 9.23 2 9.23 ‹ Approved Dowlaiswaram Rs.2656.04 L ‹ Approved Excess over ‹ 3no’s of works of Rs.25.18 L pertains to CE(P), Yogi I.C. I.B.Division, the budget Category-A(No plough back details are 3 Ananth Vemana Ananthapur 11 81.18 5 46.09 Ananthapuram approval furnished) apur Project am (- ‹ 3 no’s of works of Rs.9.91 L pertains to plan )Rs.656.04L head.( shifted to Plan Head)

‹ Approved. ‹ Approval proceding will be communicated only after submitting the certificate that CE(P), 8 67.03 8 67.03 I.C. K.C.Canal these works are not taken up in KC.Canal 4 Kurnoo K.C. Canal Kurnool Nandyal modernaization. l

‹ Approved. 4 14.53 3 13.53 ‹ 1 Work of Rs.1.00 L pertains to Category-A Total: 81 520.49 53 356.24

4

Deposit Works HOA 8443 -00 -108 -00 -01 -000 -007 -Civil Deposits(DCW -Cash) Action Plan Action Plan Proposed Project Deposited by Approved Sl. HOD Circle Division Remarks Name GVMC No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11 CE(P), Raiwada Visakhapatn Northco IC.Vishakapa ‹ Approved under Civil Deposits Reservoir am Division, 1 ast,Visa tnam, 20.00 1 10.00 1 10.00 (DCW Cash) project, Visakhapatn khapatn am am Plan Head (Rs. In Lakhs) HOA 4700 -(01)MI -MH -165 -TBPHLC StageII -GH11 - NSP -SH (26) -D&A -270/272Mtc. Action Plan Action Plan Proposed Project Budget Approved Sl. HOD Circle Division Remarks Name available No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11 MRC TBPHLC TBPHLC Division, ‹ Approved 1 ENC(I) Stage-II Circle, 5.00 1 4.95 1 4.95 Ananthapur Anantapuram amu HOA 4700-(01)MI-MH-165- TBPHLC StageII -GH11-NSP-SH(26)-D&A-270/274HTCC Charges. MRC TBPHLC TBPHLC Division, ‹ Approved 2 ENC(I) Stage-II Circle, 20.00 1 9.00 1 9.00 Ananthapur Anantapuram amu HOA 4700-M&MI(01) Major IrrigationCommercial-MH 104 TBPHLC Stage-II-GH(11)-NSP-SH(26)-D&A 530/531 O.E TBPHLC TBPHLC HLC(I),Divisi ‹ Approved 3 ENC(I) Stage-II Circle, on,Anantha 1214 L 1 6.60 1 6.60

Anantapuram puram HOA 4700-SMJH 01-MH.136 KDS-GH.11-NSp-SH(27) C&D-530/531 O.E

Drainage Division, 27 134.09 27 134.09 Repalle ‹ Approved 4 ENC(I) KDS I.C.Guntur 10104.47L

Drainage Division, 7 52.63 7 52.63 Chirala 5

HOA 4701 COL on M&MI -03- Medium Irrigation -109 – Yogi vemana Reservoir-GH(11) -NSP-SH(26) D&A-530/531 O.E 4 9.15 4 9.15 ‹ Approved ‹ Approved. Yogi ‹ 1 Work is > Rs.10.00 L and may CE(P), I.C.Anantha IB Division, Vemana 60.00 2 22.85 2 22.85 be refered to Government as 5 Anantha puram, anantha Reservoir per rules in vouge. (Brought pur puram Project from Non Plan Head) ‹ Approved. -- -- 3 9.91 ‹ Brough from Category-B. HOA 4711-FCP(01)-FC-MH103-Civil works-GH(II) NSP-SH(05) embankments-530/531-O.E

CE(P), K.C. K.C.Canal ‹ Deffered. 6 I.C. Kurnool -- 2 20.00 -- -- Kurnool Canal Nandyal ‹ These 2 works are FDR works.

HOA 4700-SMJH-01-MH 121 SRBC-GH11-SH(27)C&D -270 Minor works/272 Maintenance.

SRBC-II CE(P), SRBC SRBCNo.2 ‹ Approved 7 Banaganap 9.00 3 2.97 3 2.97 Kurnool Project Nandhyal alli

Grand Total: 48 262.24 49 252.15

Non- Plan Head (Rs. In Lakhs) Action Plan Action plan Project Budget Proposed Approved Sl. HOD Circle Division Remarks Name availability No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11

HOA 2700 COL on M&MI-01 Major Irrigation Commercial MH 113 TBPHLC StageII SH(27) C&D 270/272 Mtc. ‹ The works may be placed before the next CAD committee meeting i.e.,only after receipt of funds from the TBPHLC DC division, Government. TBPHLC Circle, 1 ENC(I) Anantha Not Furnished 4 20.00 -- -- ‹ The HOD may take suitable action Anantha puram against the concerned for taking up the puram works without approval of CAD committee and not following the procedure.

6

HOA Not reported

I.C. K.C.Division, 5 26.92 -- -- ‹ There is no representation from 2 ENC(I) KDS Not Furnished Vijayawada Vijayawada IC.Vijayawada. 3 16.16 -- -- HOA 2711 Flood Control-01 Flood Control (800) OE-SH(04)- River Flood Banks-270-272 ‹ Approved ‹ The estimate amount is restricted to the extent of budget provision 1 15.60 1 12.20 made available. ‹ However the works > Rs.10.00L I.C.Eluru ID.Eluru may be referred to Government as per rules in Vogue.

3 ENC(I) GDS 22.09 L ‹ Approved 2 19.58 1 9.83 ‹ 1 Work of Rs. 9.75 L there is No budget provision made available.

‹ Deffered. GH Division, I.C.Dowlais ‹ No budget provision is made Dowlaiswara 11 57.81 -- -- waram available m ‹ Estimates not received. HOA Not furnished Yogi I.C. CE(P), IB Division, Vemana Anantha Not 4 Ananthapu anantha 2 22.85 -- -- ‹ Shifted to Plan Head. Reservoir puram, furnished. r puram Project HOA 2700- M&MI-01- Major Irrigation-Commercial MH-107 KCC SH-26 D&A-270/272 Maintenance.

5 1 9.90 1 9.90 ‹ Approved

‹ Approved 6 3 29.11 2 19.36 ‹ 1 work of Rs.9.75L Deffered pertains CE(P), K.C.Canal , K.C. Canal I.C. Kurnool 65.00 to Jeep track. Kurnool Nandyal ‹ Approved ‹ The rates for shutter & grease 7 5 2.29 5 2.29 provided in the estimates are to be verified with SSR before sanctioning of estimates.

7

HOA 2700-COL M&MI-01 – Major Irrigation-Commercial MH-107 KCC SH-27C& D-270/272 Maintenance. Budget: Rs.48.32 ‹ Approved. Already CE(P), K.C.Canal , ‹ The shutters rates provided in the 8 K.C. Canal I.C. Kurnool approved 1 2.40 1 2.40 Kurnool Nandyal Estimate are to be verified with SSR Rs.7.20 before sanctioning of Estimate. Balance Rs.27.27 Grand Total: 38 222.62 11 55.98

8

General Recommendations: ‹ The Action Plan of O&M works once approved by the CAD committee should not be repeated for the next 2 to 3 years except weed removal. ‹ The Chief Engineer/Superintending Engineer should certify that the proposed works are not repeated and taken up since last 2 to 3 years. In case of repetition of the same works in the succeeding year, the concerned Superintending Engineer will be personally held responsible. ‹ The Chief Engineer/Superintending Engineer should submit the proposal with full description of name of O&M work duly mentioning the chainages and the name of distributory/Sub-distributory / Minor/Sub-Minor etc. ‹ The Executive Engineer should inspect the works in his jurisdiction and the concerned Superintending Engineer should inspect the proposed works at random duly certifying its essentiality/ urgency of works and furnish the inspection report along with the proposals. ‹ The proposals of O&M works should be thoroughly verified/ scrutinized at Chief Engineer/Superintending Engineer level and categorized with available budget provision/ploughback funds before submission to CADA office. ‹ The CAD committee will accord the Action Plan approval after careful examination of available budgetary/ ploughback funds only. Necessary administrative approval shall be accorded by the competent authority as per rules in vogue. ‹ Each proposal of O&M works under category-A should invariably accompanied with the statement showing the availability of WUA wise/DC wise/PC wise plough back amount in the prescribed proforma already communicated to all concerned. However the same proforma is shown below. The O&M work proposlas without the statement of available ploughback amount will not be considered.

(Rs. in Lakhs) Plough back funds Action plan approved Expenditure Balance Year Admin. Admin. Admin. Admin. WUA DC PC Charge WUA DC PC WUA DC PC WUA DC PC Charges Charges Charges s 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

2007-08

2008-09

2009-10

2010-11

2011-12

2012-13 2013-14

‹ Inspite of specific instructions by the CAD committee from time to time, they are simply submitting the proposals with out following the above instructions and without any scrutiny and also without enclosing the details of eligible plough back amounts. ‹ Most of the proposals are directly placed before the CAD Committee on the meeting date itself without giving any scope for thorough examination. If any deviations are noticed in the later date the concerned EE’s/ SE’s will be held responsible. ‹ The above instructions may be communicated to the lower levels up to the AEE and shall be followed scrupulously. ‹ The HOD’s are requested to submit the proposals duly furnishing the budget availability for getting the works approved in the CAD Committee. 9

Committee recommended approval for the following list of works under Category-A, Category-B,Plan Head and Non Plan Head. Category-A

Project: GDS, I.C.Euru, Godavari western Division, Nidadavole Est. Amount S.No. Name of the work (Rs. in Lakhs) Desilting of Agadala lanka channel at Km0.00 to Km3.00 in Gundugolanu(V) 1 5.00 of Bhimadolu(M) in W.G.Dist. Desilting of Agadala lanka channel at Km11.00 to Km14.790 in 2 5.00 Chettunapadu(V) of Bhimadolu(M) in W.G.Dist. Total 10.00

Project: GDS, I.C.Euru, Godavari western Division, Nidadavole Estimate Amount Sl.No. Name of Constituency/ Work (Rs in Lakhs) (1) Tadepalligudem Renovation of Inspection path from Chilakampadu to Parimalla lock on Right 1 4.50 bank of V&W canal from KM 32.200 to 34.450 Desilting of Bommidi channel between Km.0.000 to 2.700 in Yagarlapalli, 2 2.00 Padala and Tadepalli (v) of Tadepalligudem (M) in W.G.Dist. Desilting of Azzarala channel between Km.0.000 to 1.648 in Tadepall and 3 0.80 Azzarala (v) of Tadepalligudem (M) in W.G.Dist. 4 Strengthening of banks of V&W canal right bank from KM.24.10 to 25.500 1.50 (2) Bhimavaram 5 Providing earth work for desilting of L.V.N.Puram channel from KM. 0.00 to 5.60 2.50 6 Providing earth work for Desilting of Thundurru branch channel 4.90 Providing earth work for Desilting of Balusumudi branch channel from Km.0.000 7 3.85 to TE. Renovation of Inspection path on Losari Main Channel from Km.9.300 to 8 9.63 10.500 in the Gollavanithippa Village limits Providing earth work for desilting of K.Bethapudi Branch channel from Km.0.00 9 2.50 to TE. Providing Shutters repairs on inlets of Yanamadurru drain Left Bank in Irrigation 10 2.50 Section Bhimavaram (3) Undi Providing earth work for desilting of Pamulaparru channel from Km.0.000 to tail 11 3.50 end (Km.5.20) 12 O&M and repairs to structures on Elurupadu No.1 channel 4.99 13 Providing earth work for Desilting of Seesali branch channel Km.0.00 to tail end 2.20 Strengthening of Right Bank of V&W canal at Km.61.500 to 61.800 near 14 3.23 Akiveedu Village limits 15 Desilting of K.Lanka Branch channel from KM.0.000 to 4.225 3.00 Strengthening of Banks to V&W Canal in Kaligotla and Pedakapavaram village 16 4.50 limits. 10

Providing earth work for desilting of Yelurupadu No.1 channel from Km.0.000 to 17 2.00 tail end (4) Achanta 18 Providing earth work for Desilting of Yallappa channel Km.0.00 to Km.2.50 1.50 19 Providing earth work for Desilting of Achanta Old channel Km.0.00 to Km.2.00 1.50 Providing earth work for Desilting of Mulaparru branch channel Km.0.00 to 20 2.00 Km.3.00 Providing earth work for Desilting of Kodamanchili main channel Km.0.00 to 21 3.00 Km.5.00 Strengthening of banks of Narasapuram Canal in Penugonda Village limis in 22 2.00 Penugonda Mandal Strengthening of banks of Narasapuram Canal in Kavitam Village limis in 23 2.00 Poduru Mandal (5) Narasapuram 24 Providing earth work for desilting of Chinamamidipalli channel 3.00 Providing earth work for desilting of Ramannapalem channel from Km.0.000 to 25 2.00 5.00 26 Providing earth work for desilting of K.Bethapudi channel 2.50 27 Providing earth work for desilting of Jinnuru channel from Km.16.00 to 24.00 4.90 28 Providing earth work for desilting of Rustumbada channel from Km.0.00 to 6.00 2.00 (6) Palakollu Providing earth work for desilting and protection banks of Vaddilanka channel 29 4.50 at Km.0.00 to10.00. 30 Providing earth work for desilting of Rapaka channel from Km. 14.00 to 27.00 4.50 Providing earth work for desiltig of chinchinada channel from Marteru to 31 4.50 Gummuluru from Km.0.00 to 8.00 32 Providing earth work for desiltig of Kontheru channel from Km.0.00 to 1.50 1.50 33 Providing earth work for desiltig of Digamarru channel from Km.0.00 to 3.00 2.00 (7) Tanuku Providing earth work for Desilting of East Vipparru channel from KM.0.000 to 34 4.50 6.00 O&M repairs to shuttering arrangements on Duvva channel on No.2 and No.3 35 1.00 dams 36 O&M repairs to shutters of Kondayyapalem branch channel NO.1, 2 & 3 dams 2.00 37 Removal of tape grass on Attili canal in bet. Km.10.70 to 32.975 3.90 38 Removal of tape grass on Duvva channel KM.0.000 to 10.768 2.00 Providing earth work for Desilting of Peravali east side channel from KM.0.000 39 3.00 to 4.00 40 Providing earth work for Desilting of Pekaru channel from KM.0.000 to 11.50 1.90 41 Strengthening of banks of Narasapuram Canal near Rapaka Head Sluice 2.00 42 Strengthening of banks of Narasapuram Canal near Itempudi (V) limits 2.00 (8) Nidadavoloe 43 Repairs to shutters of V.T.Channel surplus dam at Vadluru (v) Limits 2.50 44 Repairs to tail dam shutters of Satyawada channel 1.00

11

O&M and repairs & replacement of shutters Jatlapalem Escape and Regulator 45 2.20 No.5 46 Providing earth work for Desilting of Kanuru channel from Km.4.00 to TE 4.90 (9) Unguturu O&M etimate for fabrication erection of shutters and hosting equipments of 47 1.63 Goppicodu drain infal structure at Km.20.957 of Yenamdurru drain. O&M etimate for fabrication erection of shutters and hosting equipments of 48 1.63 Padmanabhacodu drain infall structure at Km.22.085 of Yenamdurru drain. Desilting of Bommidi channel between Km.2.700 to 6.800 and supplemental 49 2.30 channel in Uppakapadu, Bommidi (v) Unguturu (M) in W.g.Dist. Desiltig of Ravulaparru channel in Ravulaparru (v) Unguturu Mandal in 50 1.50 W.G.Dist. Desilting of Pedanindrakolanu branch channel between Km.0.000 to 4.800 in 51 3.00 Pedanindracolanu (v) Nidamarru (M) in W.G.Dist. Desilting of Agadallanka chanel between Km.3.200 and Km.10.800 in 52 Agadllanka chanel and strengthening he RB inb Lakshmipuram (v) in 5.00 Bhimadole in W.G.Dist Desilting of Nagulacodu, Bhadricodu branches and main channel under no.4 53 5.00 outlet in Gunduglanu, Korukollu (v) in Bhimadole (M) in W.G.Dit. Desilting of Gundugolanu tank sluice channel in Gundugolanu (v) limits in 54 3.00 Bhimadole (M) in W.G.Dist. Desilting of Gundugolanu No.1 channel and strengthening the bank in 55 1.20 Gundugolanu (v) limits in Bhimadole (M) in W.G.Dist. Desilting of Bhimadolu No.2 channel between Km.0.000 to 3.800 in Bhimadole 56 3.00 & Korukollu (v) limits in Bhimadole (M) in W.G.Dist. Repairs to shuttering arrangements to Nidamarru, Komatikodu, Veedikodu 57 0.90 sluices on Chinakapavaram Channel. 58 Providing earth work for Desilting of Kakaralamudi Old channel 1.85 Providing earth work for Desilting of Kakaralamudi New channel from Km.0.00 59 1.54 to 3.00 Total 165.95

Project: GDS, I.C.Dowlaiswaram, Drainage Division,Kakinada Est. S.No. Name of the work Amount in Rs. Lakhs Repairs to closing to Breach occurred on left bank of Kunavaram Major drain 4.89 1 between Km 0.650 to 0.700 in G.C.Delta Repairs to closing to Breach occurred on left bank of Kunavaram Major drain 4.85 2 between Km 0.710 to 0.780 in G.C.Delta Repairs to closing to Breach occurred on left bank of Kunavaram Major drain 4.72 3 between Km 0.800 to 0.900 in G.C.Delta Strenthening of left bank of Tulya Bhaga major Drain between Km 4.50 to 4 7.70 4.80 in G.E.Delta

Total 22.16

12

Project: GDS, I.C.Dowlaiswaram, GC Division, Dowlaiswaram Est. S.No. Name of the work Amount in Rs. Lakhs Special Repairs to Peravaram pumping Scheme 120 HP pumps 4 nos and 3.00 1 electrical panel Boards 2nos 2 Special Repairs to Peravaram pumping Scheme Delevery pipes. 2.90 3 Urgent Repairs to Nallamilli Channel Head Sluices. 0.55 4 Closing Breach to Magam channel L/B and R/B at Km 9.00 0.61 Total 7.06

Project: GDS, I.C.Dowlaiswaram, Y.I Division Peddapuram Est. S.No. Name of the work Amount in Rs. Lakhs 1 Desilting of Krishnavaram Calva of Krishnavaram (V) limits of Kirlampudi (M). 2.50

Project: KDS, I.C.Guntur, Drainage Division, Repalle Est. S.No. Name of the work Amount in Rs. Lakhs 1 Removal of Shoals in Ramannapeta Drain from Km.0.000 to Km.1.600 0.62

Project: KDS, I.C.Guntur, Drainage Division, Chirala Est. S.No. Name of the work Amount in Rs. Lakhs O&M to No.1 minor drain from Km.2.400 to Km.7.930 infalling into Romperu 1 0.94. Left Arm

2 Removal of Shoals on drain bed @ Km 13.800 on Nallamada drain above 4.70 3 Providing Shutters to inlets on Nallamada drain above Commamuru canal 1.03 Removal of Shoals on drain bed @ Km 9.700 on Nallamada drain above 4 4.90 Commamuru canal near Garlapadu (V) Removal of Shoals on drain bed @ Km 12.800 on Nallamada drain above 5 4.80 Commamuru canal near Nagulapadu (V) Total 16.37

Project: Kanupur canal system,IC.Nellore central Division,Nellore Estimate Sl. Name of the Work amount No in Rs. Removal of silt and water hyacinath from the bed of Kanupur Main canal from 1 4.70 Km 2.050 to km 5.050 in podalakur Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 2 4.70 from Km 5.100 to km 8.100 in podalakur Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 3 4.97 from Km 9.700 to km 11.700 in Nellore Rural Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 4 4.97 from Km 13.800 to km 15.800 in Nellore Rural Mandal.

13

Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 5 4.97 from Km 15.850 to km 17.850 in Nellore Rural Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 6 4.97 from Km 22.000 to km 24.000 in Nellore Rural Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 7 4.95 from Km 32.250 to km 36.000 in Nellore Rural Mandal. Removal of silt and cleaning obstructions from the bed of Kanupur Main canal 8 4.95 from Km 36.040 to km 40.040 in Venkatachalam Mandal.

Total 39.18

Somasila Project Circle, S.P.Division No.2, Nellore. S. Name of the work Estimate No Amount . Rs.

Part-I Weed Removal S.P.- K.C. - Removal of weed growth from drains, canals from KM 0.500 to 0.23 1 KM 2.000 of Damavaram Minor Distributory. S.P.- K.C. - Removal of weed growth from drains, canals from KM 2.000 to 0.34 2 KM 2.500 of Damavaram Minor Distributory. S.P.- K.C. - Removal of weed growth from drains, canals from KM 2.000 to 0.25 3 KM 2.500 of ulavapalla sub minor in Damavaram Minor Distributory. 0.80 4 S.P.- K.C. - Eradiction of weed growth in Chinakraka Balancing Reservoir. Part -II silt Removal

1 S.P.-K.C.- Removal of obstructions and depositing the earth from km. 0.000 to 3.10 km. 3.500 of Chamadala Minor Distributory. 2 S.P.-K.C.- Removal of obstructions and depositing the earth from km. 10.000 1.29 to km. 11.150 of Chamadala Minor Distributory. 3 S.P.-K.C.- Removal of obstructions and depositing the earth in canal bed 2.37 where ever necessary kin the sub minors taking off at km. 11.175, km. 11.675 and km.12.200 of Chamadala Minor Distributory. 4 S.P.-K.C.- Removal of obstructions and deposited earth in between K.M.0.000 8.24 to K.M.6.470 of SVPMD. 5 S.P.-K.C.- Removal of obstructions and deposited earth in between K.M.6.500 2.79 to K.M. 10.000 of SVPMD and 0.000 K.M. 2.450 of 14 L Minor Taking off at K.M. 10.000 of SVPMD. 6 S.P.-K.C.- Removal of obstructions and deposited earth in between 3.39 K.M.10.000 to K.M. 17.400 of SVPMD and 0.000 K.M. 1.10 of 1R sub Minor and 0.000 to 2.450 of 2R sub Minor of 14L Minor and 13L minor from km. 0.000 to 1.500 Taking off at K.M. 9.150/10.000 of SVPMD. 7 S.P.-K.C.- Removal of obstructions and earth deposits in canal bed portion of 0.50 5R, 6R majors and 6Ra minor Distributories of canal. 8 S.P.-K.C.- Removal of obstructions and earth deposits in canal bed portion of 2.37 Somavarappadu Major Distributory (7R) of Kavali canal. 9 S.P.-K.C.- Removal of obstructions and earth deposits in canal bed portion of 2.10 (8R) of AMD of Kavali canal 10 S.P.-K.C.- Removal of obstructions deposited earth from km.4.670 to 1.60 km.7.000 of Brahmanakraka Major Distributory 11 S.P.-K.C.- Removal of silt and earth deposits between km.0.000 to km.2.850 1.20 of 1R Major Distributory 12 S.P.-K.C.- Removal of silt and earth deposits in between KM 0.000 to KM 0.43 2.000 of 2R Major Distributory

14

13 S.P.-K.C.- Removal of silt and earth deposits in between KM 0.200 to KM 5.34 .13.500 of 3R Major Distributory 14 S.P.-K.C.- Removal of obstructions and deposited earth from km.5.500 to 3.10 km.10.000 of Gowravaram Major Distributory under Kavali canal. 15 S.P.-K.C.- Removal of obstructions and deposited earth from km.52.400 to 4.25 km.53.800 of Kavali Main Canal. 43.69 TOTAL

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division, Nandyal Estimate Sl. Name of the Work amount No in Rs. Weed Removal of water Hyacinth upto 30 CM thick Ukkayapalli Channel 1 Sub Distributory no’s 1L,2L,3L,4L,5L in Kadapa Municipal Corporation limits 1.55 in Kadapa(Dist). Weed Removal of water Hyacinth upto 30 CM thick in patha kadapa cheruvu 2 Channel Sub Distributory no’s 1L,2L,3L,4L,5L & 6Lin Kadapa Municipal 0.60 Corporation limits in Kadapa(Dist). Repairs to chinnamachupalli low level Distributory off take sluice at 3 2.86 Ch:300.800 Km of K.C.Canal in chennur(M) Kadapa(D) Total 5.01

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division Nandyal Estimate Sl. Name of the Work amount No in Rs. Removal of silt in Syphons of Kondapeta Channel in Mydukur municipal 1 1.00 Corporation limits in Kadapa(D)

Project: TBPLLC,I.C.Kurnool,TBP Division, Adoni Estimate Sl. Name of the Work amount No in Rs. 1 Repairs and Improvements to control point on DP 74 On TBPLLC 8.72

Project: Swarnamukhi Barrage, I.C.Nellore, Nellore South Division, Nellore. Est. Amount S.No. Name of the work in Rs. Lakhs Repairs to Right side supply Channel from cross regulator to Kalluru Tank 3.99 1 in Vakadu Mandal of SPSR Nellore(D) Repairs to Right side Channel from Kalluru Tank to Tirumuru Tank regulator 7.20 2 in Vakadu Mandal of SPSR Nellore(D) Repairs to Durgavaram Tank Feeder Channel in Vakadu Mandal of SPSR 0.44 3 Nellore(D) Repairs to Right side Channel from Tirumuru Tank regulator to Kodivaka 2.95 4 Tank in Vakadu Mandal of SPSR Nellore(D) Repairs to Right side supply Channel from Kodivaka Tank to 3.65 5 Duggarajapatnam Tank in Vakadu Mandal of SPSR Nellore(D) Repairs to Tirumuru Tank Feeder Channel in Vakadu Mandal of SPSR 0.55 6 Nellore(D) 15

Repairs to Valamedu Tank Feeder Channel in Vakadu Mandal of SPSR 7 1.15 Nellore(D) Total 19.93

CATEGORY – B

KDS,IC.Guntur,K.W.Division,Tenali 1 Strengthening of banks and reconstruction of UT atKm1.200 of Off take 4.85 Channel of Anna Channel at Km 3.370 LB 2 Strengthening of banks and reconstruction of UT atKm1.000 of Off take 4.99 Channel of Anna Channel at Km 4.152 LB Total: 9.84

KDS,IC.Guntur,Draiange Division, Repalle 1 Re-Construction of Box inlet on Parra Channel at Km.2.700 10.00 2 Re-Construction of Box-Culvert on Manduru-Karumurivaripalem minor drain 9.13 @ Km.3.200 3 Re-Construction of Box-inlet on Edlapalli Affluent mediun Drain @ Km.1.440 9.72 of infalling valiveru minor drain 4 Re-Construction of Box-inlet on Edlapalli Affluent mediun Drain @ Km.2.990 7.10 of infalling valiveru no.1 minor drain 5 Improvements to Kavuru Effluent medium drain from Km.1.500 to Km.8.200 9.85 6 Repairs to Yazali draim from Km.0.00 to Km.6.00 9.98 7 Re-Construction of Box Culvert in place of dilapidated pipe culvert at 4.98 Km.2.50 of Kondavenkatappaiah Minor drain. 8 Construction of Box Culvert in place of dilapilated slab culvert at Km.1.560 of 6.35 Mollagunta Extension drain. 9 Urgent repairs to Double lane bridge U/s and D/s at Km.13.300 of Repalle 4.40 Main drain. 10 Special repairs to Penumudi Minor Drain from Km.0.00 to Km.2.500 5.00 11 Special repairs to Penumudi Minor Drain from Km.2.500 to Km.6.800 4.97 12 Re-Construction of Box Culvert at Km.0.45 of Nalluripalem no.2 Minor drain 9.05 near Nalluriplaem (V), Repalle (M). 13 Re-Construction of Box Culvert at Km.0.150 of Nalluripalem no.1 Minor 5.00 drain near Kamarajugudda (V), Repalle (M). 14 Re-Construction of Box Culvert at Km2.00 of Feeder drain to Mollagunta 4.87 drain. 15 Re-Construction of Box Culvert on Parimi drain at Km.2.200 8.30 16 Improvements to Allaparru Medium Drain from Km.0.000 to Km.2.500. 9.97 17 Improvements to Allaparru Medium Drain from Km.2.500 to Km.5.900. 5.00 18 Improvements to Allaparru Medium Drain from Km.4.500 to Km.7.600 5.00 19 Improvements to Pakalagadi Medium Drain from Km.0.000 to Km.2.500. 4.85 20 Improvements to Nagaram South Medium Drain from Km.0.000 to Km.2.000 4.80

16

21 Improvements to Alluru Minor Drain from Km.0.000 to Km.4.000 3.80 22 Improvements to Pudivada Minor Drain from Km.0.000 to Km.2.800 1.16 23 Improvements to Mollagunta drain and Mollagunta Extension drain. 2.46 Total: 145.68

KDS,IC.Guntur,Draiange Division, Chirala 1 Reconstruction of Pipe Inlet at Km.4.000RB of Surplus course Medium Drain 2.45 near Ananthavarappadu Village in Vatticherukuru Mandal 2 Reconstruction of Pipe Inlet at Km.4.000LB of Surplus course Medium Drain 4.26 near Ananthavarappadu Village in Vatticherukuru Mandal 3 Reconstruction of Pipe Inlet at Km.0.800RB of Chebrolu side Medium Drain 3.26 near Chebrolu Village in Chebrolu Mandal 4 Reconstruction of Pipe Inlet at Km.8.650RB of Chebrolu side Major Drain 3.09 near MutluruVillage in Chebrolu Mandal 5 Reconstruction of Syphon at Km.0.700 on Seethagundam Minor Drain 9.98 across No.1 Branch of A.M Channel near Mutluru Village in Chebrolu Mandal 6 Restoration of Seethagundam Minor Drain by Constructing Retaining wall in 9.80 between Km.0.000 to Km.0.500 7 Restoration of Jallavagu No.1 Extension Medium Drain by constructing 10.00 Retaining wall fromKm.12.600 to Km.12.625R/B 8 Restoration of infalling drain by constructing retaining walls at km 11.000 of 10.00 extension of jallavagu no.1 medium drain near Chamallamudi village Total: 52.84

Project: GDS, I.C.Dowlaiswaram, Y.I Division, Peddapuram Est. S.No. Name of the work Amount in Rs. Lakhs Special repairs to Navayru canal offtake regulator at Km.0.100 in 9.90 1 Samarlakota (V) limits. Special repairs to 1R OT Sluice of Pitapuram Branch Canal of Samarlakota 2.10 2 (V) limits. Total 12.00

Project: GDS, I.C.Dowlaiswaram, GC Division, Dowlaiswaram Est. S.No. Name of the work Amount in Rs. Lakhs 1 Rehabilitation to pipe Aqueduct on Kunchenapalli Channel 4.23 2 Rehabilitation to Surplus Escape on Bank Cannal. 5.00 Total 9.23

Project: Yogi Vemana Project, I.C. Ananthapuram, I.B.Division, Ananthapuram Est. S.No. Name of the work Amount in Rs. Lakhs Improvements to 3L Didtributory under RSMC of YVR Project, Mudigubba 1 7.23 (M), Ananthapur (D) Improvements to 6L Didtributory under RSMC of YVR Project, Mudigubba 2 9.65 (M), Ananthapur (D) 17

Improvements to 14L Didtributory under RSMC of YVR Project, Mudigubba 3 9.89 (M), Ananthapur (D) Improvements to 16L Didtributory under RSMC of YVR Project, Mudigubba 4 9.61 (M), Ananthapur (D) Improvements to 17L Didtributory under RSMC of YVR Project, Mudigubba 5 9.71 (M), Ananthapur (D) Total 46.09

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division, Nandyal Estimate Sl. Name of the Work amount No in Rs. Construction of walls to feeder channel from Chapadu Channel to 1 Nagulapalli& Pallavolu system tanks of K.C.Canal(ch.0.00 to Km 0.170) Near 9.60 nagulapalli (V) & Chapadu(M) of Kadapa (D) Construction of walls to feeder channel from Chapadu Channel to 2 Nagulapalli& Pallavolu system tanks of K.C.Canal(ch 0.170 to Km 0.340) 9.60 Near nagulapalli (V) & Chapadu(M) of Kadapa (D) Reconstruction Sluice of Nagulapali system tank of K.C.Canal in Chapadu(M) 3 5.00 Kadapa (D) Reconstruction Sluice of Madur system tank of K.C.Canal in Chapadu(M) 4 4.21 Kadapa (D) Urgent Repairs to tankbund of Madur system tank of Chapadu channel of 5 9.90 K.C.Canal near madur(V) Chapadu(M) kadapa(D) Repairs to the crossbund of Nagulapalli tank from Ch.0.00 to Km 0.425 near 6 9.19 Nagulapalli(V) Chapadu(M) kadapa(D) Repairs to tankbund of Pallavolu tank from Ch.0.00 to km 0.850 near 7 9.78 Nagulapalli(V) Chapadu(M) kadapa(D) Repairs to tankbund of Pallavolu tank from Ch.0.850 to km 1.500 near 8 9.75 Nagulapalli(V) Chapadu(M) kadapa(D) Total 67.03

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division Nandyal Estimate Sl. Name of the Work amount No in Rs. Re-Construction of damaged Bhumayapalli Sluices at Ch.Km5.627 under 1 2.98 Mydukur channel in Kadapa(D) Repairs to Eturu Channel at Km 0.00KM of KCC in Chapadu(M) of 2 5.70 Kadapa(D) Repairs to the krishnampalli Sluice channel under Eturu Channel of KCC in 3 4.85 Chapadu Mandal in Kadapa(D) Total 13.53

Deposit Works

Project: Raiwada Reservoir project,IC.Vishakapatnam,Visakhapatnam Division, Visakhapatnam Estimate Sl. Name of the Work amount No in Rs. Re-Construction of H.T electrical line supply from transformer to Generator 1 room of Raiwada Reservoir project in devara palli(V&M) of 10.00 Visakhapatnam(D) 18

Plan Head

TBPHLC Stage -II,TBPHLC Circle, Ananthapuram, MRC Divn 1 Carrying out repairs to Trunion portion of radial gates at M.V.Dam site. 4.95

TBPHLC Stage -II,TBPHLC Circle, Ananthapuram, MRC Divn 1 Annual Maintenance Estimate of H.T Supply line (H.T.60) of M.V. Dam site for 9.00 the year 2016-16

TBPHLC Stage -II,TBPHLC Circle, Ananthapuram, HLC Divn 1 Annual maintenance estimate of H.T Main and electrical lines of Chagallu 6.60 Barrage site for the year 2015-16

KDS,Irrigation Circle,Guntur, Drainage Division, Repalle Estd. Sl. Amount Name of Work No in Rs.Lakhs Construction of Cattle Ramp at Km.5.19(L/S) of Guntur Nallah Drain near 1 4.90 Veeranayakuni palem village Construction of Cattle Ramp at Km.3.10(R/s)of Guntur Nallah Drain near 2 4.90 Salapadu 3 ReConstruction of Box inlet at km 25.200 of Bhattiprolu Main Drain 10.00 ReConstruction of box inlet at km 23.00 U/s of Double Lane bridge on 4 10.00 bhattiprolu Main Drain near Rachuru ReConstruction of inlet at km 1.000R/s of Kuchinapudi Medium Drain (infalling 5 8.10 of Adavuiadeevi no.1 Drain ReConstruction of inlet at km 14.200R/s of Repalli Main Drain near Ngaram 6 10.00 Mandal &village 9infalling of Local Drain ReConstruction of Procection Wall at km 1.100 of Mangalagunta Extension 7 5.72 Minor Drain ReConstruction of Box culvert at 3.80 of Thotapalli no.1 Minor Drain near 8 6.30 Thotapalli(v) Nagaram(m) 9 ReConstruction of Box Culvert at Km.2.000 of Alluru Minor Drain 6.12 10 ReConstruction of Box Culvert at Km.0.80 of Karumuru Minor Drain 5.00 ReConstruction of Cattle Ramp at Km.0.900 of Tummala Drain crossing PD 11 4.41 Channel Construction of Protection Walls at Km.0.850R/s of Thotapalli No.1 Minor 12 3.50 Drain Construction of Cattel Ramp at Km.11.300L/s of Repalle Main Drain (D/s of 13 3.30 Nagaram road bridge) Construction of Cattle Ramp at Km.11.000R/s of Repalle Main Drain (D/s of 14 3.30 Edupalli road bridge) 15 Construction of Cattle Ramp at Km.16.750L/s ofRepalle Main Drain 3.25 16 Construction of Cattle Ramp at Km.17.100L/s of Repalle Main Drain 3.25

17 Construction of Cattle Ramp at Km.19.600R/s. of Repalle Main Drain 3.25

19

Construction of Cattle Ramp at Km.13.650R/s of Repalle Main drain at 18 3.25 Nagaram ST colony road Construction of Cattle Ramp at Km.13.300L/s of Repalle Main Drain (D/s of 19 3.25 Nagaram road bridge)

20 Construction of Cattle Ramp at km 15.40 L/s of Repalli Drain 3.25

21 Construction of Cattle Ramp at km 25.30L/s Bhattiprolu Main Drain 3.00

22 Construction of Cattle Ramp at km 1.20L/s of Chinapulivarru Medium Drain 1.95

23 Construction of Cattle Ramp at km 3.00 L/s of chinapulivarru Medium Drain 1.95

Construction of protection works from km 2.520 to km 2.600 of L/s on 24 4.99 Gullapalli Minor Drain Construction of Protection works from Km.2.80 to Km.2.834 of L/s of Gullapalli 25 4.85 Minor Drain 26 Construction of Cattle Ramp at km.7.800 R/s of jaggajjerru Medium Drain 2.30 27 Construction of Box-Inlet at Km.23.000D/s of DLB on B.M Drain 10.00 Total 134.09

KDS,Irrigation Circle,Guntur, Drainage Division, Chirala Construction of Inlet at Km.0.000 Right bank on Nallamada drain near 1 9.00 Appapuram(V) 2 Construction of Retaining wall at km 0.000 on Nakkavagu lower arm 7.83 Construction of Inlet on "Minor Drain running Parallel to R/sof 3 Thimmasamudram-Inkollu road infalling into L/s Inkollu-Kadavakuduru road 10.00 above 'C' canal at Km.0.000 4 Construction of Retaining wall on C-D Muppalla-Maddirala Drain at Km.2.750 6.90 Construction of Inlet on Santharavuru-Kondavalivaripalem donka Minor Drain 5 infalling into Catch 6.30 Drain between Aleru-Swrna at Km.0.000 Construction of Inlet on Konaglabaduva Minor Drain infalling into Catch Drain 6 6.30 Between Aleru-Swarna at Km.0.000 Construction of Culvert on Emileru Channel Minor Drain at Thimmasamudram 7 6.30 limits infalling into Commamuru Canal at Km.3.000 Total 52.63

Project: Yogi Vemana Reservoir Project, I.C.Anantha puram, IB Division, Anantha puram Estimate Name of the Work amount

in Rs. Construction of Projection walls from ch.6.5Km to ch. 6.512Km of left side 1 main canal of Yogi vemana Reservoir project in Mudigubba(M) of 3.00 Ananthapurma District. Construction of Projection walls from ch.1.60Km to ch. 1.609Km GVP branch 2 canal of Yogi vemana Reservoir project in Mudigubba(M) of Ananthapurma 4.50 District. 20

Construction of Projection walls from ch.0.55Km to ch. 0.565Km GVP branch 3 canal of Yogi vemana Reservoir project in Mudigubba(M) of Ananthapurma 1.00 District. Construction of Projection walls from ch.2.85Km to ch. 2.585Km GVP branch 4 canal of Yogi vemana Reservoir project in Mudigubba(M) of Ananthapurma 0.65 District. Total: 9.15

Project: Yogi Vemana Reservoir Project, I.C.Anantha puram, IB Division, Anantha puram Estimate Sl. Name of the Work amount No in Rs. Painting to spillway (Radial type) of YVR (Maddileru) Project, Mudigubba (M), 1 6.50 Ananthapuramu District. Painting of steel components of Hoist bridge, sluices of YVR (Maddileru) 2 13.30 Project, Mudigubba (M), Ananthapuramu District. Total: 22.85

Project: Yogi Vemana Project, I.C. Ananthapuram, I.B.Division, Ananthapuram Estimate Sl. Name of the Work amount No in Rs. Supply and fixing of shutters to 3R distributor of GVP Branch canal and to 2.20 1 cross Regulators at Ch.5.338KM to Left side main canal of YVR Project, Mudigubba (M), Ananthapur (D) Construction of Protection walls from ch.KM 0.00 to KM0.110 of 5R 6.15 2 distributory of left side main canal of YVR Project, Mudigubba (M), Ananthapur (D) Laying of pipes from ch.KM0.485 to KM0.565 of 8R distributory of left side of 1.56 3 main canal of YVR Project, Mudigubba (M), Ananthapur (D) Total 9.91

Project: SRBC, SRBC-II Division, Nandyal,SRBC Banaganapalli Estimate Sl. Name of the Work amount No in Rs. 1 Repairs to regulator gate at Km 99.214 L/S of SRBC Main Canal 0.58 2 Repairs to regulator gate at Km 89.442 L/S of SRBC Main Canal 0.93 3 Repairs to Escape regulator gate at Km 89.412 L/S of SRBC Main Canal 1.46 Total 2.97

Non Plan Head

GDS,I.C.Eluru, ID,Eluru Estimate Sl. Name of the Work amount No in Rs. 1 Procurement of essential material for flood precautions to Thammileru river 12.20 in Eluru city limits for the year 2015-16

21

GDS, I.C. Eluru , ID, Eluru Estimate Sl. Name of the Work amount No in Rs. 1 Flood precautions under Yerra calava system for the year 2015-16 from D/s 9.83 of Konguvarigudem reservoir to nandamuru aqueduct

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division, Nandyal Estimate Sl. Name of the Work amount No in Rs. Repairs to the bund duly filling up Gullies and Rain cuts on the downstram 1 9.90 side slopes and berms of Alaganur Balancing Reservoir.

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division, Nandyal Estimate Sl. Name of the Work amount No in Rs. Repairs to the breached bund portion near tail end of the inlet channel of 1 9.45 Alaganur Balancing Reservoir Repairs to the weir portion near tail end of the inlet Channel of Alaganur 2 9.91 Balancing Reservoir Total 19.36

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division Nandyal Estimate Sl. Name of the Work amount No in Rs. O&M of Screw gearing shuttering arrangements and oiling,painting,repairs to 1 gear boxes from Ch234.560 to Km 253.91 i.e, between Rajolianicut to Jillela 0.54 “c” Sluice. O&M of Screw gearing shuttering arrangements and oiling,painting,repairs to 2 gear boxes from Ch. Km 270.00 to Km 289.000 of K.CMain Canal under 0.40 Eturu Channel. O&M of Screw gearing shuttering arrangements and oiling, painting, repairs 3 to gear boxes from Ch. Km 0.00 to Km 24.000 of Kondapeta Channel in 0.40 Khajipet(M),Kadapa(D). O&M of Screw gearing shuttering arrangements and oiling, painting, repairs 4 to gear boxes from Ch. Km 291.00 to Km 305.600 between Adinimayapalli 0.65 anicut to patha kadapaTank in Kadapa(D). O&M of Screw gearing shuttering arrangements and oiling, painting, repairs 5 to gear boxes from Ch. Km 253.915 to Km 270.000 of K.C.Canal Duvvur(M) 0.30 in Kadapa(D) Total 2.29

22

Project: K.C. Canal, I.C. Kurnool, K.C.Canal Division, Nandyal Estimate Sl. Name of the Work amount No in Rs. Repairs to the shutters of Sluices 2L,3L,7L,8L,9L,12L,14L,16L,20L, 1 2.40 22L,23L,24L,25L,26L in between Km 0.00 to Km 25.00 of K.C Canal Total 2.40

Abstract of works approved in the 4th CAD committee meeting.

1) Category-A : 115 No’s, Rs. 342.19 Lakh

2) Category-B : 53 No’s Rs. 356.24Lakh

Budget allotted = Rs.2000.00 L 1st CAD Approval = Rs. 837.79 L 2ndCAD Approval= Rs.1704.12 L 3rd CAD Approval= Rs. 114.13 L 4thCAD Approva l= Rs. 356.24 L Total= Rs.3012.28 L *Excess over the budget Approval = Rs.1012.28 L

3) Plan Head : 49 No’s, Rs. 252.15 Lakh.

4) Non Plan Head : 11 No’s, Rs. 55.98 Lakh.

5) Deposit works : 1 No, Rs. 10.00 Lakh

Sd/- Sd/- U.Annam Naidu, S.Hari Babu, Executive Engineer, CAD, Chief Engineer, GDS, CAD Committee Convenor, A.P. Dowlaiswaram, CAD Committee Member, A.P.

Sd/- Sd/- M.Giridhara Reddy, M.V.Ravi Kumar Chief Engineer, CDO, Engineer-in-Chief (A.W), CAD Committee Member, A.P. CAD Committee Chairman, A.P.