PCT Circumnavigation Road Map Devonport Start (2).Pdf

Total Page:16

File Type:pdf, Size:1020Kb

PCT Circumnavigation Road Map Devonport Start (2).Pdf 3. Turn right onto Stotts Road (5.6 km) Day 1 – 255 km 4. Turn left to stay on Stotts Road (350 m) 5. Take the first right to stay on Stotts Road Start – Depart Spirit of Tasmania (A) – (Click follow link) (1.4 km) 6. Turn left onto Pine Road/B17 (10 m) 1. Head North (110 m) 2. Continue straight onto Esplanade (400 m) Arrive in Riana (F) 3. Turn Left onto Murray Street (290 m) 1. Head North on Pine Road/B17 towards Corbetts 4. Turn right onto Tarleton Street (sign for National Road (9.5 km) Highway 1/Devonport/Hobart) (1 km) 2. Turn right to stay on Pine Road/B17 (2.2 km) 5. Slight right to stay on Tarleton Street (750 m) 3. Turn left to merge onto Bass Highway/National 6. Take the ramp onto Bass Highway/National Highway 1 towards Burnie (15.6 km) Highway 1 (3.7 km) 4. Turn left onto Mount Street/B18 (sign for upper 7. Take the B19 exit towards Burnie/Ridgley/Queenstown) (750 m) Don/Devonport/Spreyton (300 m) 5. Turn right onto Aileen Crescent (400 m) 8. Turn right onto Stony Rise Road/B19 (8.4 km) 6. Continue onto The Boulevard (280 m) 9. Turn Left onto Kindred Road/B16 (14.4 km) 7. Turn right onto Terrylands Street (350 m) 10. Turn Left onto Castra Road/B15 (2 km) 8. Take the second left onto Payne Street (290 m) Arrive in Sprent (B) Arrive in Burnie (G) 1. Head Southwest on Castra Road/B15 towards 1. Head North on Payne Street towards Lyons Street Whelans Road (9.8 km) (290 m) 2. Turn right onto Central Castra Road (5.2 km) 2. Turn right onto Terrylands Street (350 m) 3. Turn right to stay on Central Castra Road 3. Turn right onto The Boulevard (280 m) (500 m) 4. Continue onto Aileen Crescent (400 m) 4. Slight left onto Isandula Road (4.9 km) 5. Turn left onto Mount Street/B18 (750 m) 5. Turn right to stay on Isandula Road (1.8 km) 6. Turn left onto Bass Highway/National Highway 1 6. Take the first left onto Wilsonia Road (2.1 km) (6.6 km) 7. Turn right onto Preston Road (350 m) 7. Turn left onto Murchison Highway/A10 (41.2 km) 8. Take the first left onto Gunns Plains Road/B17 (9.5 km) Arrive in Hellyer Gorge State Reserve (Parrawe) (H) Arrive in Gunns Plains (C) 1. Head West on Murchison Highway/A10 towards Saxons Road (22.5 km) 1. Head Northwest on South Riana Road/B17 (1.4 km) 2. Turn left to stay on Murchison Highway/A10 2. Turn left to stay on South Riana Road/B17 (sign for Burine/Strahan) (240 m) (8.5 km) 3. Turn right to stay on Murchison Highway/A10 (sign for Queenstown/Strahan) (16.6 km) Arrive in South Riana (D) 4. Turn left onto Belvoir Road/C132 (26 km) 1. Head Northeast on South Riana Road/B17 towards 5. Turn right onto Cradle Mountain Road/C132 Jackson Road (3.1 km) (5.1 km) 2. Turn left onto South Riana Road (7.5 km) Finish – Cradle Mountain Lodge (I) – (Click follow link) 3. Turn right onto Natone Road/C102 (6.4 km) Arrive in Natone (E) 1. Head North on Natone Road/C102 (1.5 km) 2. Take the first right onto Camena Road (4.3 km) Day 2 – 141 km Day 3 – 310 km Start - Cradle Mountain Lodge (I) – (Click follow link) Start - Strahan (K) 1. Turn left onto Cradle Mountain Road/C132 1. Head Northeast on Harold Street towards (5.1 km) Esplanade (240 m) 2. Turn left onto Belvoir Road (26 km) 2. Turn right onto Reid Street/B24 (36.7 km) 3. Turn left onto Murchison Highway/A10 3. Turn right onto Lyell Highway (sign for (37.5 km) Queenstown/Hobart) (3.4 km) 4. Turn right onto Clemons Street (250 m) 4. Turn right onto Driffield Street (44 m) 5. Turn right onto Mount Black Road (100 m) 5. Take the first left onto Sticht Street (250 m) Arrive in Rosebury (J) Arrive in Queenstown (L) 1. Head Southwest on Mount Black Road towards 1. Head Northeast on Sticht Street towards Orr Street McDonald Street (100 m) (75 m) 2. Turn left onto Clemons Street (250 m) 2. Turn left onto Hunter Street (120 m) 3. Turn right onto Murchison Highway/A10 3. Turn right onto Driffield Street (170 m) (23.8 km) 4. Turn right onto Lyell Highway/A10 (208 km) 4. Turn right onto Zeehan Highway/B27 (sign for 5. Turn right onto Gordon River Road/B61 (sign for Strahan) (4.7 km) Bushy Park) (4.6 km) 5. Turn left onto Henty Road/Zeehan – Strahan 6. Turn left onto Glenora Road/B62 (7.6 km) Road/B27 (41.9 km) Arrive in Plenty (M) 6. At the roundabout, take the first exit onto Harvey Street/B24 (800 m) 1. Head East on Glenora Road/B62 (10.7 km) 7. Continue onto Harold Street (240 m) 2. At the roundabout, take the second exit onto Lyell Finish - Strahan (K) Highway/Montagu Street/A10 (16.3 km) 3. At the roundabout, take the second exit onto Brooker Highway/National Highway 1 (18.2 km) 4. At the roundabout, take the second exit onto Brooker Avenue/A6 (1.4 km) 5. Turn left onto Sandy Bay Road/B68 (2.5 km) Finish - Wrest Point (N) – (Click follow link) Day 4 – 204 km Day 5 – 288 km Start - Wrest Point (N) – (Click follow link) Start – Freycinet Lodge (O) – (Click follow link) 1. Head Northwest on Sandy Bay Road/B68 towards 1. Head Northeast towards Coles Bay Road (160 m) Lambert Avenue (2.6 km) 2. Turn right onto Coles Bay Road (30.8 km) 2. Turn right onto Macquarie Street/A6 (950 m) 3. Turn right onto Tasman Highway/A3 (signs for 3. Slight left onto Brooker Avenue (sign for St. Helens/St. Marys) (38.9 km) National Highway 1/Glenorchy/Launceston 4. Turn left onto Elephant Pass Road/A4 (7.4 km) (290 m) 5. Turn left to stay on Elephant Pass Road/A4 4. At the roundabout, take the third exit onto (8.8 km) Liverpool Street/A3 (9.6 km) 6. Turn left onto Esk Highway/A4 (110 m) 5. Exit onto Cambridge Road/B31 towards Arrive in St. Marys (P) Cambridge/Richmond (15.8 km) 6. Turn left onto Franklin Street/B31 (5.4 km) 1. Head Northeast on Esk Highway/A4 towards Story 7. Turn right onto Fingerpost Road (7.4 km) Street (9.7 km) 8. Turn left onto Tasman Highway/A3 (signs for 2. Continue straight onto Tasman Highway/A3 (sign for Orford/St. Marys) (99.2 km) St. Helens/Launceston) (124 km) 9. Turn left to stay on Tasman Highway/A3 3. Turn left onto Tasman Highway/A3 (sign for (31.9 km) Launceston) (210 m) 10. Turn right onto Coles Bay Road (sign for C302) Arrive in Scottsdale (Q) (30.8 km) 11. Turn left onto Freycinet Drive (160 m) 1. Head Southwest on Tasman Highway/A3 towards Charles Street (53.8 km) Finish – Freycinet Lodge (O) – (Click follow link) 2. Turn left onto Abels Hill Road/C403 (sign for St. Leonards) (1.9 km) 3. Turn left onto St. Leonards Road/National Route 401 (220 m) 4. Take the first right onto Johnston Road/C403 (5.7 km) 5. Merge onto Midlands Highway/National Highway 1 (1.2 km) 6. Merge onto Bass Highway/National Highway 1 via the ramp to Prospect/Devonport/Burnie (2.3 km) 7. Take the exit towards B54/Prospect (260 m) 8. Merge onto Meander Valley Road (63 m) 9. At the roundabout, take the second exit onto Westbury Road (800 m) 10. At the roundabout, take the first exit onto Country Club Avenue (700 m) Finish – Country Club Villas (R) – (Click follow link) 20. Turn right onto Olivers Road (13.9 km) Day 6 – 230 km Arrive at Mount Claude (T) Start – Country Club Villas (R) – (Click follow link) 1. Head Northwest on Olivers Road (7.1 km) 2. Turn left onto Claude Road/C136 (11.0 km) 1. Head Southeast on Country Club Avenue towards St. Andrews Circle (650 m) Arrive at Cethana Road (U) 2. At the roundabout, take the second exit onto 1. Head North on Cradle Mountain Road/C132 Westbury Road (750 m) (43.8 km) 3. At the roundabout, take the first exit onto 2. Turn right onto Fourth Road/B19 (6.9 km) Meander Valley Road (240 m) 4. Merge onto Bass Highway/National Highway 1 3. At the roundabout, take the third exit onto the (8.5 km) Bass Highway/National Highway 1 (110 m) 4. Keep left at the fork, follow signs for National 5. Exit onto Illawarra Road/B52 towards Highway 1/Launceston and merge onto Bass Longford/Hobart (8.5 km) Highway/National Highway 1 (4.3 km) 6. At the roundabout, take the second exit onto 5. Take the ramp the East Devonport (350 m) Tannery Road/B51 (1.4 km) 6. Merge onto Wright Street (1.4 km) 7. Keep right at the fork, continue to follow B51 7. At the roundabout, take the first exit onto Murray (10.9 km) Street (150 m) Arrive in Cressy (S) 8. Turn right towards Esplanade (46 m) 9. Turn left towards Esplanade (170 m) 1. Head Southeast on Cressy Road/B51 towards Church Street (450 m) 10. Turn left onto Esplanade (220 m) 2.
Recommended publications
  • Summary of Road Closures
    summary of road closures targa.com.au #TARGA | #TARGAhighcountry#TARGAtasmania | #TARGAtasmania2021 | #TARGAhighcountry2021 LEG ONE – monday 19th April MUNICIPALITY OF MEANDER VALLEY Stage Name: HIGH PLAINS Road closure time: 7:57 – 12:27 Roads Closed Between the following Roads Weetah Road Mitchells Road and East Parkham Road MUNICIPALITY OF LATROBE Stage Name: MORIARTY Road closure time: 8:27 – 12:57 Roads Closed Between the following Roads Valley Field Road Chaple Road and Oppenheims Road Oppenheims Road Valley Field Road and Hermitage Lane Hermitage Lane Oppenheims Road and Bonneys Road Bonneys Lane Hermitage Lane and Moriarty Road CITY OF DEVONPORT AND MUNICIPALITY OF KENTISH Stage Name: PALOONA Road closure time: 10:01 – 14:31 Roads Closed Between the following Roads Buster Road Melrose Road and Melrose Road Melrose Road Buster Road and Paloona Road Paloona Road Melrose Road and Paloona Dam Road Paloona Dam Road Paloona Road and Lake Paloona Road Lake Paloona Road Paloona Dam Road and Lower Barrington Road Stage Name: MT ROLAND Road closure time: 10:42 – 15:12 Roads Closed Between the following Roads Olivers Road Claude Road and Mersey Forest Road Mersey Forest Road Olivers Road and Liena Road MUNICIPALITY OF MEANDER VALLEY Stage Name: GOLDEN VALLEY Road closure time: 11:50 – 16:20 Roads Closed Between the following Roads Highland Lakes Road Golden Valley Road and Haulage Road MUNICIPALITY OF NORTHERN MIDLANDS Stage Name: POATINA Road closure time: 13:01 – 17:31 Roads Closed Between the following Roads Poatina Road Westons Road
    [Show full text]
  • Big Sur Capital Preventive Maintenance (CAPM) Project Approximately a 35-Mile Section on State Route 1, from Big Sur to Carmel-By-The-Sea, in the County of Monterey
    Big Sur Capital Preventive Maintenance (CAPM) Project Approximately a 35-mile section on State Route 1, from Big Sur to Carmel-by-the-Sea, in the County of Monterey 05-MON-01-PM 39.8/74.6 Project ID: 05-1400-0046 Project EA: 05-1F680 SCH#: 2018011042 Initial Study with Mitigated Negative Declaration Prepared by the State of California Department of Transportation April 2018 General Information About This Document The California Department of Transportation (Caltrans), has prepared this Initial Study with Mitigated Negative Declaration, which examines the potential environmental impacts of the Big Sur CAPM project on approximately a 35-mile section of State Route 1, located in Monterey County California. The Draft Initial Study was circulated for public review and comment from January 26, 2018 to February 26, 2018. A Notice of Intent to Adopt a Mitigated Negative Declaration, and Opportunity for Public Hearing was published in the Monterey County Herald on Friday January 26, 2018. The Notice of Intent and Opportunity for Public Hearing was mailed to a list of stakeholders that included both government agencies and private citizen groups who occupy and have interest in the project area. No comments were received during the public circulation period. The project has completed the environmental compliance with circulation of this document. When funding is approved, Caltrans can design and build all or part of the project. Throughout this document, a vertical line in the margin indicates a change that has been made since the draft document
    [Show full text]
  • Burkhardt, Wesley
    MAGISTRATES COURT of TASMANIA CORONIAL DIVISION Record of Investigation into Death (Without Inquest) Coroners Act 1995 Coroners Rules 2006 Rule 11 I, Simon Cooper, Coroner, having investigated the death of Wesley Ian Burkhardt Find, pursuant to Section 28(1) of the Coroners Act 1995, that a) The identity of the deceased is Wesley Ian Burkhardt; b) Mr Burkhardt died as a result of injuries sustained by him in a collision between the motorcycle he was riding and a truck; c) The cause of Mr Burkhardt’s death was exsanguination (acute blood loss); and d) Mr Burkhardt died on 20 February 2017 on the Esk Highway approximately 430 metres west of that road’s intersection with Mount Foster Road, near Fingal, Tasmania. In making the above findings I have had regard to the evidence gained in the comprehensive investigation into Mr Burkhardt’s death. The evidence comprises an opinion of the forensic pathologist who conducted the autopsy; the results of toxicological analysis of samples taken at autopsy; a detailed report from Tasmania Police Northern Crash Investigation Services; relevant police and witness affidavits; medical records and reports; and forensic and photographic evidence. On the afternoon of Monday 20 February 2017, Mr Burkhardt was riding a Harley Davidson motorcycle on the Esk Highway in a general westerly direction from Fingal towards Avoca. He was being followed closely by his father who was riding another Harley Davidson motorcycle. Mr Burkhardt failed to negotiate a sweeping left hand curve in the road and crossed double continuous white lines travelling into the oncoming traffic lane. At the same time, Mr Andrew Mitchell was driving a white TasNetworks Isuzu flatbed truck east on the highway towards Fingal.
    [Show full text]
  • THE TASMANIAN HERITAGE FESTIVAL COMMUNITY MILESTONES 1 MAY - 31 MAY 2013 National Trust Heritage Festival 2013 Community Milestones
    the NatioNal trust presents THE TASMANIAN HERITAGE FESTIVAL COMMUNITY MILESTONES 1 MAY - 31 MAY 2013 national trust heritage Festival 2013 COMMUNITY MILESTONES message From the miNister message From tourism tasmaNia the month-long tasmanian heritage Festival is here again. a full program provides tasmanians and visitors with an opportunity to the tasmanian heritage Festival, throughout may 2013, is sure to be another successful event for thet asmanian Branch of the National participate and to learn more about our fantastic heritage. trust, showcasing a rich tapestry of heritage experiences all around the island. The Tasmanian Heritage Festival has been running for Thanks must go to the National Trust for sustaining the momentum, rising It is important to ‘shine the spotlight’ on heritage and cultural experiences, For visitors, the many different aspects of Tasmania’s heritage provide the over 25 years. Our festival was the first heritage festival to the challenge, and providing us with another full program. Organising a not only for our local communities but also for visitors to Tasmania. stories, settings and memories they will take back, building an appreciation in Australia, with other states and territories following festival of this size is no small task. of Tasmania’s special qualities and place in history. Tasmania’s lead. The month of May is an opportunity to experience and celebrate many Thanks must also go to the wonderful volunteers and all those in the aspects of Tasmania’s heritage. Contemporary life and visitor experiences As a newcomer to the State I’ve quickly gained an appreciation of Tasmania’s The Heritage Festival is coordinated by the National heritage sector who share their piece of Tasmania’s historic heritage with of Tasmania are very much shaped by the island’s many-layered history.
    [Show full text]
  • District 1 / Northeastern Minnesota 1 Industry Clusters
    Manufacturers’ Perspectives on Minnesota’s Transportation System District 1/Northeastern Minnesota June 2017 Cover photo credits: Front cover: Large truck, ship/lighthouse, highway and snow plow (inside) - David Gonzalez, MnDOT Wind turbine blade shipment at Duluth Port - Robert Welton, courtesy of Duluth Seaway Port Authority Back cover: Congested traffic (inside) and Duluth Port - David Gonzalez, MnDOT Table of Contents Executive Summary ........................................................................................................................................5 Purpose and Methodology .....................................................................................................................................5 Results .....................................................................................................................................................................5 Findings ...................................................................................................................................................................6 District 1 Business Priorities ...............................................................................................................................7 Characteristics that Affect the Transportation System ......................................................................................7 Recommended Next Steps ......................................................................................................................................7 MnDOT District
    [Show full text]
  • Forty -Second Annual Report
    1955 VICTORIA COUNTRY ROADS BOARD FORTY -SECOND ANNUAL REPORT FOR YEAR ENDED 30TH JUNE, 1955 PRESENTED TO BOT:S. HOUSES 01<' PARLIAMENT PURSUA~'l' ro ACT No. 3662. ! Approximate Cost ot Rttport. ~ Preparat10tl1 nor. given. Printiug t l,OfJH l.:'oJ.Ue&J, ~770 ] By Autbomy : \V. J\L HOUSTON. c;OVERNMENT PRINTER. MELBOURNE. ;'i<o. 32.-[3s. 6d.i-l2648;55. Dual carriageway and channelization of Princes Highway through township of Dandenong. Cover.-A recently constructed pre-cast concrete bridge over Lightning Creek on tne Omeo Hignway. COUNTRY ROADS BOARD FORTY-SECOND ANNUAL REPORT, 1955 CONTENTS FINANCE~ Page Increase in revenue 7 fn&dequacy of funds for present works 9 Applications for funds 9 Receipts from motor registration fees, &c. 10 Commonwealth Aid Roads Act 1954 .. 10 I.nan moneys 11 Total works, allocation 11 MAIN ROADS- Allocation of funds 11 Apportionment of costs 11 Contributions by Municipal Councils 12 Particulars of works carried out 12 STATE HIGHWAYS- Restricted allocation of funds 18 Works carried out 18 TOURISTS' ROADS- Allocation of funds 27 Works carried out 27 J<'ORESTS RoADS- Funds allocated 29 Works carried out 29 UNCLASSIFIED ROADS- Applications from Councils for grants 29 Amounts allotted 29 Major works cal'ried out 29 BRIDGES- Board's financial resources immfficient 32 Construction-completed or in progress 32 Metropolitan bridges as Country bridges .. 33 J!'LOOD AND RGSH FIRE DAMAGE-- Most seriously affected areas 43 Applications received and grants made 43 WORKS FOR OTiillR AuTHORITms­ Department of Public Works
    [Show full text]
  • Tasmanian Road Futures
    TASMANIAN ROAD FUTURES FUNDING PRIORITIES 2019 & BEYOND Road Funding Commitments Funding Total Funding Total Funding Total from cost from cost from cost 2019 2019 2019 Greater Hobart Traffic Solution $72.1M $93.8M Includes: East Tamar Highway $6M $7M Northern Road Upgrades State and Federal $44.9M $54.2M State and Federal – Mowbray Connector Midland Highway 10 year plan Control of Macquarie and Davey streets Includes: West Tamar Highway $11.2M $12M Bass Highway – Deloraine to Latrobe Southern Outlet fifth lane Traffic Solution: Pedestrian crossing Campbell Town River Derwent ferry service Gravelly Beach Road to Rosevears Drive Tasman Highway at Myrtle Park Traffic incident response Atkinsons Road and Waldhorn Drive Dorset Roads Package and transport access points Overtaking opportunities between Exeter Bus priorities and active transport initiatives and Batman Highway junction Tomahawk to Gladstone Northern suburbs light rail Resealing and widening north of Batman Prossers Road Highway intersection to Lightwood Hills Road Underground bus transit centre Esk Main Road Left turn lane Motor Road/West Greater Hobart master plan Tamar Highway junction Airport to Evandale Road Improved Hadspen access Urban Congestion Fund State $24M State and Federal $84.7M $0.4m Federal $58.7M State $58M State Bridgewater Bridge $576M Midland Highway 10 year plan $325M Hobart Congestion Package (linked to Federal $236M Federal $111.4M projects in Greater Hobart Traffic Solution) Roads of Strategic Importance: Bass State $25.8M North West Road Upgrades State and Federal $35.7M $50.1M Tasman Highway Intelligent Transport Systems Highway (Wynyard to Marrawah), $606M Hobart to Sorell corridor, Birralee Federal $205M Bass Highway (West of Wynyard), including South East Traffic Solution State and Federal $25.9M $27M Main Road, Old Surry Road/Massey- Brittons Swamp, Wynyard to Smithton passing Greene Drive, Murchison Highway, lanes, access to Boat Harbour Primary School Tasman Highway near Tasmania Golf Club Lyell Highway.
    [Show full text]
  • Cambria & San Simeon: Open for Your Dream Vaca On
    FOR IMMEDIATE RELEASE Media Contact Stacie Jacob, Solterra Strategies 805-286-6874; [email protected] Cambria & San Simeon: Open For Your Dream Vacaon With the historic Highway 1 open, there’s never been a beer me to visit two of America’s best seaside towns. Here are the top ten reasons to set your vacaon sights on Cambria and San Simeon. AUGUST 9, 2018 (Along Historic Highway 1, Calif.) – Aer being closed for more than a year, the recent reopening of Highway 1—the ulmate California road trip—puts Cambria and San Simeon squarely back in the business of providing endless opportunies for outdoor recreaon, cultural experiences and the most stunning coastal views on the planet. Here are the top ten reasons to visit these two seaside burgs. SAN SIMEON Hearst Castle A Naonal Historic Landmark originally founded by William Randolph Hearst, San Simeon is home to Hearst Castle, which now offers a whole host of subject-specific tours, such as kitchen tours and private sessions in the opulent indoor swimming pool. Elephant Seals The Piedras Blanc as Rookery is the only elephant seal rookery in the world that is easily accessible, free, and open to the public daily. No reservaons are needed. The rookery is located seven miles north of San Simeon on Highway 1. In peak mes—January, April and October—there are up to 17,000 animals on the shores. Piedras Blancas Lighthouse One of California’s most archit ecturally interesng lighthouses, the Piedras Blancas Light Staon, built in 1875, is a standing beacon of the California coastline’s rich marime history.
    [Show full text]
  • Provision of Professional Services Western Tasmania Industry Infrastructure Study TRIM File No.: 039909/002 Brief No.: 1280-3-19 Project No.: A130013.002
    Provision of Professional Services Western Tasmania Industry Infrastructure Study TRIM File No.: 039909/002 Brief No.: 1280-3-19 Project No.: A130013.002 Western Tasmania Industry Infrastructure Study FINAL REPORT May 2012 Sinclair Knight Merz 100 Melville St, Hobart 7000 GPO Box 1725 Hobart TAS 7001 Australia Tel: +61 3 6221 3711 Fax: +61 3 6224 2325 Web: www.skmconsulting.com COPYRIGHT: The concepts and information contained in this document are the property of Sinclair Knight Merz Pty Ltd. Use or copying of this document in whole or in part without the written permission of Sinclair Knight Merz constitutes an infringement of copyright. LIMITATION: This report has been prepared on behalf of and for the exclusive use of Sinclair Knight Merz Pty Ltd’s Client, and is subject to and issued in connection with the provisions of the agreement between Sinclair Knight Merz and its Client. Sinclair Knight Merz accepts no liability or responsibility whatsoever for or in respect of any use of or reliance upon this report by any third party. The SKM logo trade mark is a registered trade mark of Sinclair Knight Merz Pty Ltd. Final Report Contents Executive Summary 1 1. Introduction and background 13 1.1. Strategic background 13 1.2. Policy and planning framework 14 1.3. This report 15 1.4. Approach adopted 16 2. Report 1: Infrastructure audit report 17 2.1. Introduction 17 2.2. Road Infrastructure 17 2.2.1. Roads Policy and Planning Context 17 2.2.2. Major Road Corridor 20 2.2.2.1. Anthony Main Road (DIER) 20 2.2.2.2.
    [Show full text]
  • ROUTE 49 School-Days Only
    ROUTE 49 School-Days Only Waterford Hickey N ntry Horizon ou C A Foothill W E d Heathcliff l O Bayshore Monterey Beaumont Glencourt S Skyline Manor Daly City Miagra Oceana High School Connect to gh ou Paloma r o tb Brisbane D s O 121, 140 e W E c l e C a a n Eureka m Connect to a Sharp Park in g o ECR, ECR Rapid, lle e Co R Skyline M 140, 398 Clarendon e Lakeside heryl o College r a e l l a n San Bruno d Claremont Westport uo Rockaway Beach Colusa A Sneath Reina Del Mar Legend Pacifica an B F Grundy S run o a s C sle Earl r B Bus Route 3 Cherry Green rd AM Bus Stops Fassler Miranda MasonTerra Nova PM Bus Stops Roberts De Solo High School Connect to Time Point (see schedule) Escalero Peralta 14, 16, 19, 110 uo Connection Point Lerida Eve rg lt la Point of Interest E d Regina Manzanita e tto s AM to Terra Nova School Bus Stops Weekdays Bus Stops Weekdays Old County/San Francisco 6:48a Oceana/Pacific Manor School Bayshore/Old County Oceana/Milagra San Bruno/3rd Good Shepherd School San Bruno/Green D Oceana/Paloma 7:22a B San Bruno/El Camino Real 6:58a Oceana/Eureka Cherry/Grundy Oceana/Clarendon Cherry/Sneath Francisco/Lakeside Sneath/Cherry Highway 1/Westport Sneath/Claremont Highway 1/Reina Del Mar C Sneath/Monterey 7:06a Highway 1/Rockaway Beach Sneath/Colusa Crespi/Highway 1 Sneath/Mendocino Crespi/Roberts Riverside/Moreland Crespi/De Solo College/Sheryl Crespi/Peralta Skyline College Transit Center Crespi/Seville Skyline/Westborough Crespi/Regina Manor/Skyline Crespi/Tapis Inverness/Glencourt Crespi/Manzanita Inverness/Heathcliff Crespi/Lerida Inverness/Foothill Crespi/Fassler Hickey/Catalina Terra Nova/Miranda Monterey /Beaumont Terra Nova/Mason Monterey /Waterford E Terra Nova High School 7:45a Bus Fares Cash Clipper Day Pass Monthly Pass Youth* (Age 18 & younger) $1.10 $1.00 $2.75 $27.00 Adult (Age 19 through 64) $2.25 $2.05 $5.50 $65.60 *Children: Two children age 4 or younger may travel free with each Adult or Eligible Discount fare-paying passenger.
    [Show full text]
  • A Review of Geoconservation Values
    Geoconservation Values of the TWWHA and Adjacent Areas 3.0 GEOCONSERVATION AND GEOHERITAGE VALUES OF THE TWWHA AND ADJACENT AREAS 3.1 Introduction This section provides an assessment of the geoconservation (geoheritage) values of the TWWHA, with particular emphasis on the identification of geoconservation values of World Heritage significance. This assessment is based on: • a review (Section 2.3.2) of the geoconservation values cited in the 1989 TWWHA nomination (DASETT 1989); • a review of relevant new scientific data that has become available since 1989 (Section 2.4); and: • the use of contemporary procedures for rigorous justification of geoconservation significance (see Section 2.2) in terms of the updated World Heritage Criteria (UNESCO 1999; see this report Section 2.3.3). In general, this review indicates that the major geoconservation World Heritage values of the TWWHA identified in 1989 are robust and remain valid. However, only a handful of individual sites or features in the TWWHA are considered to have World Heritage value in their own right, as physical features considered in isolation (eg, Exit Cave). In general it is the diversity, extent and inter-relationships between numerous features, sites, areas or processes that gives World Heritage significance to certain geoheritage “themes” in the TWWHA (eg, the "Ongoing Natural Geomorphic and Soil Process Systems" and “Late Cainozoic "Ice Ages" and Climate Change Record” themes). This "wholistic" principle under-pinned the 1989 TWWHA nomination (DASETT 1989, p. 27; see this report Section 2.3.2), and is strongly supported by the present review (see discussion and justification of this principle in Section 2.2).
    [Show full text]
  • Jane Hildebrant Postal Address: Email: Mob
    LRRCSC - INQUIRY INTO VICROADS' MANAGEMENT OF COUNTRY ROADS SUBMISSION NO: 152 RECEIVED: 12 JAN 2018 Submission: Management of Country Roads Submittor: Jane Hildebrant Postal Address: Email: Mob.: 11 January 2017 Terms of Reference 1. The effectiveness of VicRoads in managing country roads; 2. The existing funding model and its lack of effectiveness for country Victoria; 3. The lack of consultation with regional communities and their subsequent lack of input into prioritising which roads are in dire need of repair; and 4. The option of dismantling VicRoads and creating a specific Country Roads organisation and separate Metropolitan Roads body. 1. The effectiveness of VicRoads in managing country roads VicRoads appears to lack a clear management plan for managing country roads. Talking to local drivers, the consensus is that roads’ maintenance is reactive and piecemeal and that vast sums of money appear to be being spent on works that are largely ineffective and therefore, a complete waste of money and time. This assessment was clearly articulated in the recent “Country Roads: Your Insights, Our Actions” report. I wholeheartedly concur with the findings of this report, viz.: “The desire for better links between regions, safer overtaking opportunities and investment in sealed shoulders were commonly raised, along with concerns about poor roadside drainage and pot‐holes… [as well as] greater transparency about what is happening on [our] roads” (p1). This report states, p16 (10/19 online) that: “The condition and maintenance of country roads was raised by many people throughout our engagement. Participants shared a need for VicRoads to “go beyond the reactive approach and ‘band‐aid’ solutions, such as patching or reducing speeds, to fix and maintain the country roads’’.
    [Show full text]