National Strategic Plan for Solid Waste Management Executive Summary

Legends:

Intermediate Transfer Station Local Authority Disposal Site Treatment Facility Material Recovery Facility

MD Bahru Thermal 100 Treatment Plant Tengah Sanitary Landfill

MD 230 Waste Flow

Highway

MD Selatan 40 Federal Road

10 State Road 9 6 PBT 170 1. Pasir Gudang TFS 170 District Area 12. Johor MD 140 2. Kota Tinggi TFS 140 Bahru Local Authority (Seelong) SLF Area

Township Area MD Kota Tinggi 2230 7 40 3. TFS 40 5 (Desaru) 8 Abbreviations:

13 MD Pontian 170 4. Pontian TFS 170 TFS: Transfer Station MRF: Material Recovery Facility TTP: Thermal Treatment 2 MB 1600 11. Johor Bahru MRF 1340 Plant SLF: Sanitary Landfill 12 TPD: Tonne per Day Ha: Hectare 4 3 MD 380 Explanatory Note: Barat 1. Figures in flow diagram 11 1 5. Batu Pahat TFS 450 are projected tonnes per MD Batu Pahat day (TPD) of waste 70 collected in Year 2020. Timur

2. The locations of planned SWM facilities are

MD generic. No. SWM Facilities Capacity in Estimated Land Phase 60 13. Batu Selatan 3. Land areas requirement Pahat SLF 2020 (TPD) Area (Ha) 6. Segamat Selatan 260 are estimates.

1. Pasir Gudang TFS 170 3 II TFS 1490 4. Construction of facilities in MD Segamat Utara 200 3 phases: 2. Kota Tinggi TFS 140 3 I Phase I: 2003-2009 3. Desaru TFS 40 2 I Phase II: 2010-2014 MD Kluang Utara Phase III: 2015-2020 4. Pontian TFS 170 3 I 320 7. Kluang Utara TFS 320 5. Batu Pahat TFS 450 3 I 6. Segamat Selatan TFS 260 3 I MD Selatan 350 8. Muar Selatan TFS 350 7. Kluang Utara TFS 320 3 II Figure 4.11 8. Muar Selatan TFS 350 3 I MD Muar Utara 110 9. Muar Utara TFS 110 9. Muar Utara TFS 110 3 I Waste Flow and 10. TFS 80 2 III SWM Facilities 11. Johor Bahru MRF 1,600 8 I MD Mersing 80 10. Mersing TFS 80 Rompin SLF in Johor in 2020 12. Johor Bahru (Seelong) SLF 2,230 70 I, II, III 13. Batu Pahat SLF 1,490 45 I, II, III (see Figure A6.8-Pahang)

Page 24 of 24