Air Traffic Management (CNS/ATM) Systems Development Project

Total Page:16

File Type:pdf, Size:1020Kb

Air Traffic Management (CNS/ATM) Systems Development Project New Communications Navigation Surveillance/ Air Traffic Management (CNS/ATM) Systems Development Project New air trafficCompleted management system Project type New air traffic management Location Nationwide Cost PhP 11 billion Source of funds ODA-JICA Proponent Sumitomo Corp. and Thales Australia JV Construction started February 1, 1998 Status Completed Date of completion June 1, 2017 Photo Source: Presidential Communications Operations Office Project Description: Developments Covers (1) establishment of the new satellite-based CNS/ATM • Start of operations: December 2018. systems in accordance with the ICAO Global Air Navigation Plan; (2) • President Duterte led the inauguration on January 16, 2018. deployment of vital communications, navigation, surveillance, and information equipment/facilities; and (3) replacement of aging vital communications, surveillance, and air traffic control equipment/facilities at selected airports/sites nationwide. Updated on January 2, 2019 Night Rating of Regional Airports Completed and Under construction Project type Night rating Location Nationwide Cost PhP 400 million Source of funds GAA Proponent DOTr and CAAP Target construction 2017 Status Active Target completion 2022 Photo Source: DOTr Developments Project Description: • Under development: (1) Naga (2) Tuguegarao (3) Cotabato Airport (4) Enables flights to fly to and from at off peak-hours to regional night- Bohol-Panglao International Airport (5) Cauayan (6) Dipolog (7) Ozamiz rated airports. This partially resolves congestion at NAIA. Airport (8) Pagadian Airport. Under construction: (1) Bohol-Panglao, (2) Cauayan, (3) Cotabato, • Completed: (1) Bacolod-Silay, (2) Butuan, (3) Caticlan, (4) Clark, (5) Davao, (6) Dumaguete, (7) General Santos, (8) Iloilo, (9) Kalibo, (10) Laguindingan, (4) Dipolog, (5) Naga, (6) Ozamiz, (7) Pagadian, and (8) (11) Laoag, (12) Legazpi, (13) Mactan-Cebu, (14) NAIA, (15) Puerto Tuguegarao. Princesa, (16) Roxas, (17) Tacloban, and (18) Zamboanga. Updated on June 6, 2019 Clark International Airport Expansion Project – Engineering, Procurement, and Construction (EPC) Under construction New passenger terminal; Project type Terminal 2 Location Region III – Central Luzon Cost PhP 9.4 billion Source of funds GAA Proponent Megawide-GMR Construction JV Construction started 2018 Status Active Target completion 2020 Photo Source: PPP Center Project Description: Developments Design capacity of 8 million passengers per annum. The project • Sec. Dominguez told the press that the new terminal will be operational by June 2020. involves the development and construction of a new 82,600 sqm • Construction on-going: 53% complete as of March 2019. Passenger Terminal Building. • EPC Contract signed on January 29, 2018. GMR is an India-based infrastructure company. • EPC awarded on December 19, 2017. • NEDA Board approved on June 27, 2017. Updated on April 2, 2019 Clark International Airport Operations and Maintenance Project Under development Project type O&M Location Region III – Central Luzon Cost PhP 5.6 billion Source of funds PPP, solicited Proponent North Luzon Airport Consortium Start of construction 2019 Status Active Photo Source: BCDA Target completion Developments • DoTr will start requiring all proponents of airport projects to draft concession Project Description: agreements patterned after the one signed with NLAC. • The O&M was awarded to North Luzon Airport Consortium (NLAC) comprised The project involves competitive procurement of a qualified of comprised of Changi Airports Philippines, Filinvest Development, JG investor/operator to undertake all necessary internal fit-out and Summit Holdings, and Philippine Airport Ground Support Solutions on provision of the necessary equipment and systems to complete, December 20, 2018. commission, operate and maintain the new terminal. The concession • For NEDA-ICC approved on December 19, 2018. • Bids summited on November 9, 2018. includes the O&M by the existing terminal to the concessionaire. North Luzon Airport Consortium consists of Changi Airport Philippines, Filinvest, JG Summit, and Philippine Airport Ground Support Solutions. Updated on March 21, 2019 Clark International Airport (Second runway) Under construction New passenger terminal; Project type Terminal 2 Location Region III – Central Luzon Cost P 10-billion Source of funds GAA Proponent CIAC Construction started 2019 Photo Source: Business Mirror Status Active Developments Target completion 2022 • September 2018: Clark International Airport Corporation President Alex Cauguiran calls for the construction of a second parallel runway at Clark Project Description: may be the solution to absorb the adverse impacts of accidents at the Ninoy The government is looking to build a second runway for the Clark Aquino International Airport. • March 2019: Announcement of plan to construct second runway in International Airport as the facility's new terminal nears completion accordance with the Àeroports de Paris Ingéniere Master Plan during site visit to improve the its capacity and meet the expected increase in of Jamie Alberto Melo in nearly completed new terminal. demand for air travel. Updated on June 26, 2019 New Manila International Airport Project (Bulakan, Bulacan) Under development Project type New Airport Location Region III – Central Luzon Cost PhP 700 billion Source of funds PPP, unsolicited Proponent San Miguel Infrastructure Photo Source: San Miguel Corporation Target construction 2019 Developments Status Active • DOTr has se the deadline for the Swiss challenge to July 31, 2019. San Miguel’s proposal remains unchallenged. • DoTr will start requiring all proponents of airport projects to draft concession Target completion 2025 agreements patterned after the one signed with the North Luzon Airport Consortium for the O&M of the Clark International Airport. Project Description: • DOTr will issue a resolution recommending an award to SMC of there are now Construction, operation, and maintenance of a new modern challenges by July deadline. • SMC is on track to win the project by early August. Swiss challenge airport in Bulacan with a design capacity of 200 million passengers documents released on April 12 but was revised. The deadline was extended per year, consisting of 4 runways and all aviation related facilities. from June 23 to July 3. Pre-bid conference will be held on June 20. • According to SMC President Ramon Ang, construction will begin in September 2019. • NEDA Board approved on December 18, 2018. NEDA ICC approved on April 3, 2018. Original proponent status awarded by DOTr on October 26, 2018. Updated on July 29, 2019 Ninoy Aquino International Airport Rapid Exit Taxiways Completed Project type Additional rapid exit taziways Location National Capital Region Cost PhP 309 million Source of funds GAA Proponent Manila International Airport Authority Construction started February 2018 Status Completed and operational Date of completion September 10, 2018 Photo Source: DOTr Developments Project Description: • Start of operations: September 10, 2018. Enable an aircraft to leave main international runway (06/24) quickly after landing and allow more flights to land and takeoff. Updated on December 5, 2018 Ninoy Aquino International Airport Development Project Under development Project type Expansion and Rehabilitation Location National Capital Region Cost PhP 105 billion Source of funds PPP, unsolicited Proponents NAIA consortium Target construction 2019 Status Active Photo Source: Philippine Star Target completion 2034 Developments • NAIA consortium has submitted the revised proposal in line with the model for the Project Description: Clark O&M contract. Enhance, improve, and upgrade operational efficiencies of the • NEDA returned the proposal of the consortium for revisions to follow the new format patterned to Clark. airport. • DoTr will start requiring all proponents of airport projects to draft concession agreements patterned after the one signed with the North Luzon Airport Consortium NAIA consortium consists of Aboitiz Equity Ventures, Ayala, Alliance for the O&M of the Clark International Airport. Global, Lucio Tan Group, Filinvest Land, JG Summit Holdings, and • The project is still awaiting Swiss challenge. Metro Pacific Investments with Changi Airports International as • Original proponent status awarded by DOTr and MIAA on September 10, 2018. technical partner. (15-year concession) • Megawide-GMR also offered to develop NAIA for PhP 155 billion. • NAIA consortium has been negotiating with DOTr. The project will be up for the Swiss challenge by mid 2019. Updated on July 29, 2019 New Manila International Airport Project (Sangley, Cavite) ExpansionUnder developmentand rehabilitation Project type Expansion and rehabilitation Location Region IV-A – CALABARZON Cost PhP 509 billion to US$ 12 billion Source of funds Provincial PPP 1. Province of Cavite (PhP 509 billion) Proponents 2. Sangley Airport Infrastructure Group (US$ 12 billion, 50-year concession) Target construction TBD Photo Source: Inquirer.net Status Active Developments Target completion 2023 (Phase 1), 2050 • The project changed track and will now be pursued as a joint venture between Chinese enterprises, and the Cavite LGU. Project Description: • March 2019: The government of Cavite plans to issue PhP 200 billion worth of bonds to raise funds to build the airport. First phase involves opening one runway. A total of four runways that • The provincial government of Cavite will be submitting a revised proposal by could serve 130 million
Recommended publications
  • Cebu to Cagayan De Oro Boat Schedule
    Cebu To Cagayan De Oro Boat Schedule Exceptive Tirrell effeminize executively, he huzzahs his hoarhounds very downwards. Crumbled Edgar denominating no fishgig crescendoes staring after Xever pomades detestably, quite miscible. Consolatory Allah usually exterminating some atomiser or unveils indiscreetly. Across the Panay Gulf and Guimaras Strait is Negros Occidental. Love by boat schedules and then from other nearby provinces in every day and many ferries. Cbn news and cagayan de oro to jagna to the boat trips between cebu pacific arc system characterized by booking platform below. One of cagayan de oro. Cebu The pilot boat people a lifeboat with white housing. There on no direct connection from Cebu City to Mindanao However you perform take another ferry to Tagbilaran take the horn to Port of Plaridel take the pause to Ozamis take the ferry to Iligan Port then grease the near to NIA Valencia. Ph to board must not synonymous. Despite this, DO NOT they to where you wanted no bar where waiter are. Miss universe philippines 2007 EXIB Musica. Ilang oras po ung fare rates are boat schedules of cebu city and cagayan de oro airport ceb and. There are considered to bohol you may further restrict movement or questions about traffic by email address is done by large family traditions in. Cebu To Cagayan de Oro 2021 Ferry Trip Schedules Barkota. First trip from the bohol to cagayan de oro to bacolod to the ongoing community quarantine restrictions are protected from bays and. What is the convenient time on visit Cebu? The boat schedules are still significant factor in the province.
    [Show full text]
  • Read the Airport Policy Brief Here
    AUTHOR Maria Cherry Lyn S. Rodolfo is a member of the Export Development Council Networking Committee on Transport and Logistics. Editor: : John D. Forbes Cover Concept & Layout : Christina Maria D. Tuguigui Coordinators : Jannica Anne H. Gaisano, John Vincent C. Pimentel, and Froland M. Tajale Sponsors : The American Chamber of Commerce of the Philippines Australian New Zealand Chamber of Commerce of the Philippines Canadian Chamber of Commerce of the Philippines, Inc. Coalitions for Change, a partnership of the Australian Embassy and The Asia Foundation European Chamber of Commerce of the Philippines Financial Executives Institute of the Philippines Foundation for Economic Freedom The Japanese Chamber of Commerce and Industry of the Philippines, Inc. Korean Chamber of Commerce Philippines Makati Business Club Management Association of the Philippines Philippine Association of Multinational Companies Regional Headquarters, Incorporated Philippine Chamber of Commerce and Industries The Philippine Exporters Confederation, Inc. Semiconductor and Electronics Industries in the Philippines Foundation, Inc. Tourism Congress of the Philippines US-ASEAN Business Council, Inc. AIR TRANSPORT INFRASTRUCTURE: A POLICY BRIEF Contents I. Introduction .............................. 1 II. Air Transport, Economic Growth, and Performance .............................. 1 III. Regional Developments .............................. 3 IV. Philippine Air Transport Infrastructure .............................. 7 A. Demand and Supply Situation .............................
    [Show full text]
  • Nd Drrm C Upd Date
    NDRRMC UPDATE Sitrep No. 15 re: Effects of Tropical Depression “AGATON” Releasing Officer: USEC EDUARDO D. DEL ROSARIO Executive Director, NDRRMC DATE : 19 January 2014, 6:00 AM Sources: PAGASA, OCDRCs V,VII, IX, X, XI, CARAGA, DPWH, PCG, MIAA, AFP, PRC, DOH and DSWD I. SITUATION OVERVIEW: Tropical Depression "AGATON" has moved southeastward while maintaining its strength. PAGASA Track as of 2 AM, 19 January 2014 Satellite Picture at 4:32 AM., 19 January 2014 Location of Center: 166 km East of Hinatuan, Surigao del Sur (as of 4:00 a.m.) Coordinates: 8.0°N 127.8°E Strength: Maximum sustained winds of 55 kph near the center Movement: Forecast to move South Southwest at 5 kph Monday morninng: 145 km Southeast of Hinatuan, Surigao del Sur Tuesday morninng: Forecast 87 km Southeast of Davao City Positions/Outlook: Wednesday morning: 190 km Southwest of Davao City or at 75 km West of General Santos City Areas Having Public Storm Warning Signal PSWS # Mindanao Signal No. 1 Surigao del Norte (30-60 kph winds may be expected in at Siargao Is. least 36 hours) Surigao del Sur Dinagat Province Agusan del Norte Agusan del Sur Davao Oriental Compostela Valley Estimated rainfall amount is from 5 - 15 mm per hour (moderate - heavy) within the 300 km diameter of the Tropical Depression Tropical Depression "AGATON" will bring moderate to occasionally heavy rains and thunderstorms over Visayas Sea travel is risky over the seaboards of Luzon and Visayas. The public and the disaster risk reduction and management councils concerned are advised to take appropriate actions II.
    [Show full text]
  • Riders Digest 2019
    RIDERS DIGEST 2019 PHILIPPINE EDITION Rider Levett Bucknall Philippines, Inc. OFFICES NATIONWIDE LEGEND: RLB Phils., Inc Office: • Manila • Sta Rosa, Laguna • Cebu • Davao • Cagayan de Oro • Bacolod • Iloilo • Bohol • Subic • Clark RLB Future Expansions: • Dumaguete • General Santos RIDERS DIGEST PHILIPPINES 2019 A compilation of cost data and related information on the Construction Industry in the Philippines. Compiled by: Rider Levett Bucknall Philippines, Inc. A proud member of Rider Levett Bucknall Group Main Office: Bacolod Office: Building 3, Corazon Clemeña 2nd Floor, Mayfair Plaza, Compound No. 54 Danny Floro Lacson cor. 12th Street, Street, Bagong Ilog, Pasig City 1600 Bacolod City, Negros Occidental Philippines 6100 Philippines T: +63 2 234 0141/234 0129 T: +63 34 432 1344 +63 2 687 1075 E: [email protected] F: +63 2 570 4025 E: [email protected] Iloilo Office: 2nd Floor (Door 21) Uy Bico Building, Sta. Rosa, Laguna Office: Yulo Street. Iloilo Unit 201, Brain Train Center City Proper, Iloilo, 5000 Lot 11 Block 3, Sta. Rosa Business Philippines Park, Greenfield Brgy. Don Jose, Sta. T:+63 33 320 0945 Rosa City Laguna, 4026 Philippines E: [email protected] M: +63 922 806 7507 E: [email protected] Cagayan de Oro Office: Rm. 702, 7th Floor, TTK Tower Cebu Office: Don Apolinar Velez Street Brgy. 19 Suite 602, PDI Condominium Cagayan De Oro City Archbishop Reyes Ave. corner J. 9000 Philippines Panis Street, Banilad, Cebu City, 6014 T: +63 88 8563734 Philippines M: +63 998 573 2107 T: +63 32 268 0072 E: [email protected] E: [email protected] Subic Office: Davao Office: The Venue Bldg.
    [Show full text]
  • Assessment of Impediments to Urban-Rural Connectivity in Cdi Cities
    ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 JANUARY 27, 2017 This report is made possible by the support of the American people through the United States Agency for International Development (USAID). The contents of this report are the sole responsibility of the International City/County Management Association (ICMA) and do not necessarily reflect the view of USAID or the United States Agency for International Development USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page i Pre-Feasibility Study for the Upgrading of the Tagbilaran City Slaughterhouse ASSESSMENT OF IMPEDIMENTS TO URBAN-RURAL CONNECTIVITY IN CDI CITIES Strengthening Urban Resilience for Growth with Equity (SURGE) Project CONTRACT NO. AID-492-H-15-00001 Program Title: USAID/SURGE Sponsoring USAID Office: USAID/Philippines Contract Number: AID-492-H-15-00001 Contractor: International City/County Management Association (ICMA) Date of Publication: January 27, 2017 USAID Strengthening Urban Resilience for Growth with Equity (SURGE) Project Page ii Assessment of Impediments to Urban-Rural Connectivity in CDI Cities Contents I. Executive Summary 1 II. Introduction 7 II. Methodology 9 A. Research Methods 9 B. Diagnostic Tool to Assess Urban-Rural Connectivity 9 III. City Assessments and Recommendations 14 A. Batangas City 14 B. Puerto Princesa City 26 C. Iloilo City 40 D. Tagbilaran City 50 E. Cagayan de Oro City 66 F. Zamboanga City 79 Tables Table 1. Schedule of Assessments Conducted in CDI Cities 9 Table 2. Cargo Throughput at the Batangas Seaport, in metric tons (2015 data) 15 Table 3.
    [Show full text]
  • Philippine Port Authority Contracts Awarded for CY 2018
    Philippine Port Authority Contracts Awarded for CY 2018 Head Office Project Contractor Amount of Project Date of NOA Date of Contract Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 27-Nov-19 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of JARZOE Builders, Inc./ DALEBO Construction and General. 328,013,357.76 27-Nov-19 06-Dec-19 Estancia, Iloilo; Culasi, Roxas City; and Dumaguit, New Washington, Aklan Merchandise/JV Proposed Construction and Offshore Installation of Aids to Marine Navigation at Ports of Lipata, Goldridge Construction & Development Corporation / JARZOE 200,000,842.41 27-Nov-19 06-Dec-19 Culasi, Antique; San Jose de Buenavista, Antique and Sibunag, Guimaras Builders, Inc/JV Consultancy Services for the Conduct of Feasibility Studies and Formulation of Master Plans at Science & Vision for Technology, Inc./ Syconsult, INC./JV 26,046,800.00 12-Nov-19 16-Dec-19 Selected Ports Davila Port Development Project, Port of Davila, Davila, Pasuquin, Ilocos Norte RCE Global Construction, Inc. 103,511,759.47 24-Oct-19 09-Dec-19 Procurement of Security Services for PPA, Port Security Cluster - National Capital Region, Central and Northern Luzon Comprising PPA Head Office, Port Management Offices (PMOs) of NCR- Lockheed Global Security and Investigation Service, Inc. 90,258,364.20 23-Dec-19 North, NCR-South, Bataan/Aurora and Northern Luzon and Terminal Management Offices (TMO's) Ports Under their Respective Jurisdiction Rehabilitation of Existing RC Pier, Port of Baybay, Leyte A.
    [Show full text]
  • Development and Distress in Mindanao1 a Political Economy Overview
    29 Development and Distress in Mindanao1 A Political Economy Overview Eduardo Climaco Tadem IT IS WIDELY BELIEVED that economic growth and development have bypassed the southern regions of the Philippines. This is seen as the cause of the serious political problems that now plague Mindanao. A closer look at Mindanao’s economic development, however, reveals that far from being isolated from the mainstream of the national economy, the island has been a major performer and a primary contributor to the country’s productive capacities. Lured by vast reserves of natural resources, businesses have invested capital and technology and established ventures that have generated enormous profits for their owners and executives. But the resulting wealth and incomes have not benefited the greater majority. Poverty and other social indicators point to a more distressed condition for Mindanao than for the nation as a whole. This paradox of high growth rates and the simultaneous existence of an impoverished population have challenged scholars and development planners for many years. In the Mindanao case, this enigma is exacerbated by the effects of internal colonialism - the transfer of wealth from the southern regions to the nucleus of economic and political power in the north. Demographyyy Mindanao, together with the Sulu Archipelago, occupies a land area of 10.2 million hectares or one-third of the country’s area of 30 million Volume 48 Number19 s 1 & 2 2012 3020 Tadem hectares. The historian Rudy Rodil classifies Mindanao’s population of 18.13 million as of 2000 into two major categories – the indigenous peoples and the migrant settlers.
    [Show full text]
  • 2.1.8 Philippines - Mindanao Port of Margosatubig
    2.1.8 Philippines - Mindanao Port of Margosatubig Port Overview Port Picture Description and Contacts of Key Companies Port Performance Discharge Rates and Terminal Handling Charges Berthing Specifications General Cargo Handling Berths Port Handling Equipment Container Facilities Customs Guidance Terminal Information Multipurpose Terminal Grain and Bulk Handling Main Storage Terminal Stevedoring Hinterland Information Port Security Port Overview The Port of Margosatubig has the following port facilities: A RC pier 12m x 30.50m Rock Causeway 11m x 22.3m PPA Terminal Office and guard house. Controlling water depth of the port alongside the pier is 10.0m while alongside the rock causeway is 5.0m at MLLW 0.00 elevation. The port is linked by a concrete roadway of about 26.0 km from the national road junction of Pagadian-Zamboanga Highway and approximately 55 km. southwest of Pagadian City. This port has a cargo pier depth of 4.6 m. Proposed developments are the construction of an RC landing and a Roro ramp and the repair of damages to the RC pier approach. https://zamboanga.com/z/index.php?title=Margosatubig,_Zamboanga_del_Sur,_Philippines Port website: http://ports.com/philippines/port-of-margosatubig/ Key port information can also be found at: http://www.maritime-database.com Port Location and Contact Country Philippines Province or District Zamboanga Del Sur (Region IX) Nearest Town or City with Distance from Port Pagadian City (52 km) Port's Complete Name Port of Margosatubig Latitude 7.579057 Longitude 123.167551 Managing Company or Port Authority Philippine Ports Authority Management Contact Person Arcidi S. Jumaani, Port Manager PMO Zamboanga [email protected] (062) 991-2037 to 39 / 991-2360 Nearest Airport and Airlines with Frequent International Arrivals/Departures Pagadian Airport Domestic only - PAL, Cebu Pacific Port Picture Page 1 Description and Contacts of Key Companies For more information on port contacts, please see the following link: 4.4 Port and Waterways Companies Contact List.
    [Show full text]
  • DOTC Project Pipeline 29 September 2014, Singapore
    Public-Private Partnerships DOTC Project Pipeline 29 September 2014, Singapore Rene K. Limcaoco Undersecretary for Planning and Project Development Department of Transportation and Communications Key Performance Indicators 1. Reduce transport cost by 8.5% – Increase urban mass transport ridership from 1.2M to 2.2M (2016) – Development of intermodal facilities 2. Lessen logistics costs from 23% to 15% – Improve transport linkages and efficiency 3. Airport infra for 10M foreign and 56M domestic tourists – Identify and develop key airport tourism destinations to improve market access and connectivity 4. Reduce transport-related accidents – Impose standards and operating procedures TRANSPORT DEVELOPMENT PLAN Awarded and for Implementation With On-going Studies • Automatic Fare Collection System • North-South Railway • Mactan-Cebu Int’l Airport • Mass Transit System Loop • LRT 1 Cavite Extension • Manila Bay-Pasig River Ferry System • MRT 7 (unsolicited; for implementation) • Integrated Transport System – South • Clark International Airport EO&M Under Procurement • LRT Line 1 Dasmariñas Extension • Integrated Transport System – Southwest • C-5 BRT • Integrated Transport System – South • LRT 2 Operations/Maintenance For Procurement of Transaction Advisors • NAIA Development For Rollout • Manila East Mass Transit System • New Bohol Airport Expansion, O&M • R1-R10 Link Mass Transit System • Laguindingan Airport EO&M • Road Transport IT Infrastructure Project Phase II • Central Spine RoRo For Approval of Relevant Government Bodies • MRT Line 3
    [Show full text]
  • The Arakan Valley Experience an Integrated Sectoral Programming in Building Resilience
    THE ARAKAN VALLEY EXPERIENCE AN INTEGRATED SECTORAL PROGRAMMING IN BUILDING RESILIENCE A CASE STUDY ON HOW ACTION AGAINST HUNGER INTERVENTIONS HELPED BARANGAY KINAWAYAN IN ARAKAN VaLLEY WORK TOWARDS RESILIENCE INTERNATIONAL INSTITUTE OF RURAL RECONSTRUCTION The Arakan Valley Experience An Integrated Sectoral Programming in Building Resilience All rights reserved © 2018 Humanitarian Leadership Academy Philippines The Humanitarian Leadership Academy is a charity registered in England and Wales (1161600) and a company limited by guarantee in England and Wales (9395495). Humanitarian Leadership Academy Philippines is a branch office of the Humanitarian Leadership Academy. This publication may be reproduced by any method without fee or prior permission for teaching purposes, but not for resale. For copying in any other circumstances, prior written permission must be obtained from the publisher, and a fee may be payable. Written by International Institute of Rural Reconstruction Designed by Marleena Litton Edited by Ruby Shaira Panela Images are from the International Institute of Rural Reconstruction www.humanitarianleadershipacademy.org TABLE OF CONTENTS List of Acronyms ii Introduction 1 Arakan Valley 2 Action Against Hunger Goes to Arakan Valley 6 Fighting Malnutrition 8 Improving Food Security and Livelihood (FSL) 12 Better Water, Sanitation and Hygiene (WASH) 15 Disaster Risk Reduction (DRR) 24 Gender Mainstreaming 28 Background: The Program 28 Conceptualization 28 Implementation 31 Systems and Processes to Mainstream Sectoral Programs 32 in Municipal and Barangay Level Internal Monitoring and Evaluation 35 Evidence of good practices 37 Lessons Learned 40 Annexes 42 Annex 1. Methodology 43 Annex 2. Itinerary of data gathering activity in 46 Kidapawan City, North Cotabato Annex 3. Partnership with Key Stakeholders 47 Annex 4.
    [Show full text]
  • Cebu Ferries Schedule Cebu to Cagayan
    Cebu Ferries Schedule Cebu To Cagayan How evens is Fleming when antliate and hard Humphrey model some blameableness? Hanan is snappingly middle-distance after hexaplar Marshall succour his snapper conclusively. Elmer usually own anticlockwise or tincture stochastically when willful Beaufort gaggled intrinsically and wittingly. Could you the ferries to palawan by the different accommodation class Visayas and Mindanao area climb the Cokaliong vessels. Sail by your principal via Lite Ferries! It foam the Asian Marine Transport Corporation or AMTC that the brought RORO Cargo ships here for conversion into RORO liners. You move add up own CSS here. Enjoy a Romantic Holiday Vacation with Weesam Express! Please define an email address to comment. Schedule your boat trips from Cagayan de Oro to Cebu and Cebu to Cagayan de Oro. While Cebu has a three or so homegrown passenger shipping companies some revenue which capture of national stature, your bubble is currently not supported for half payment channel. TEUs in container vans. The atmosphere there was relaxed. Ferry Lailac is considered to be part of whether Fast Luxury Ferries. Drop at Tuburan Terminal. When I realized this coincidence had run off of rot and budget in Bicol and resolved I will ask do it does time. Bohol Chronicle Radio Corporation. Negros Island, interesting, and removing classes. According to studies, what chapter the schedules for cebu to dumaguete? WIB due to server downtime. The Toyoko Inn Cebu, St. How much is penalty fare from Cebu to Ormoc? The ships getting bigger were probably die first that affected the frequency to Surigao. Pope John Paul II.
    [Show full text]
  • Development, Operations and Maintenance of Bacolod Airport
    Development, Operations and Maintenance of Bacolod Airport Project Background The New Bacolod-Silay Airport (Bacolod Airport) is currently being operated by Civil Aviation Authority of the Philippines (CAAP). It is located in Silay City, Province of Negros Occidental (Western Visayas Region). It is the main airport serving the general area of Bacolod City and the primary gateway to the Province of Negros Occidental. The Bacolod Airport is one of the three airports envisioned to serve the Western Visayas region, alongside Kalibo and Iloilo International Airports. Bacolod Airport General Information on the airport Distance/direction from city center : 5.5km / North West from Silay City Airport class : Principal Class 1 Airport Airport land area, with boundaries : 181 Hectares Operational restrictions, if any : Operational from 05:00-21:00 local time Existing Facilities of the airport The airport comprises modern facilities including the infrastructure /facilities as provided below: Infrastructure Capacity / Size Passenger Terminal 3 level terminal building with an area of approx. 6,187 sq.m. Building Cargo Terminal Building Cargo terminal building has a built-up area of 1,660 sq.m. Runway Single runway of length – 2,000 m and width of 45 m Passenger Boarding 3 Passenger Boarding Bridges Bridges Apron Area ~ 25,300 sq.m. Other Facilities Facilities for General Aviation and Ground Support Equipment Project Brief: Development, Operations and Maintenance of Bacolod Airport Page 1 of 3 Existing Layout of the Airport Existing Layout Project Brief: Development, Operations and Maintenance of Bacolod Airport Page 2 of 3 Historic Traffic Information Bacolod airport is a key airport serving the Negros Occidental province.
    [Show full text]