127 Appendix 6: International Functional Equivalents Of APPENDIX 6: INTERNATIONAL FUNCTIONAL EQUIVALENTS OF AEMO Legislative or corporate Entity Ownership Corporate values Governance Finance mandate Transpower, New Zealand Electricity Industry Act 2010 (NZ) 100% State owned enterprise. The Our purpose Transpower is governeD by a BoarD of Transpower recovers the costs of shares are helD on behalf of the Crown seven Directors. The BoarD is responsible its regulateD transmission 8 Transpower is system operator by the Minister of Finance and the We connect New ZealanDers for Transpower’s performance, anD for business from generators and line to their power system, Minister for State OwneD Enterprises. guiDing anD monitoring the company on companies. The Commerce through safe, smart solutions behalf of the shareholDing Ministers. The Commission sets the amount of for toDay anD tomorrow. BoarD is appointeD by, anD accountable, (1) The system operator is revenue that Transpower can earn Transpower. to the Crown. Transpower’s General Our values Management Team is responsible for the from transmission activities. (2) As well as acting as system day-to-day operation of the company. operator for the electricity industry, The power of us The System Operator service is the system operator must— proviDeD and fundeD under an We listen to each other – we agreement with the Electricity (a) proviDe information, anD short- to unite to make things happen – Authority. meDium-term forecasting on all we are better together aspects of security of supply; anD We work with care (b) manage supply emergencies. (3) The CoDe must— We care for each other anD our communities and we keep (a) specify the functions of the system everyboDy safe – we are open, operator; anD honest and respectful (b) specify how the system operator's We're here for New ZealanD functions are to be performeD; and (c) set requirements relating to We work harD to keep the transparency anD performance. lights on for our fellow Kiwis anD we’re careful how we (4) A failure to comply with spenD their money subsection (2) is to be treateD, for the purposes of enforcement under this We Do clever simply Part, as a breach of the Code. This is a great place to work. We Deliver excellence – we change, aDapt, anD make better 127 Legislative or corporate Entity Ownership Corporate values Governance Finance mandate California Independent System California Public Utilities Code A non-profit public benefit corporation OUR PURPOSE There shall be five members of the The California ISO operates under the Operator Corporation (CAISO), organised under the Nonprofit Public Governing BoarD. Members of the terms anD conDitions of its FERC- 345. The Independent System California Benefit Corporation Law for the charitable Lead the way to tomorrow’s Governing BoarD are selecteD by approveD tariff, which is modifieD, Operator shall ensure efficient use anD purposes set forth in Chapter 2.3, Part 1, energy network appointment of the Governor of the State amenDeD, supplementeD or restateD reliable operation of the transmission Division 1 of the Public Utilities CoDe of the of California and subject to confirmation as neeDeD. griD consistent with achievement of State of California. OUR STRATEGY by the Senate of the State of California. planning and operating reserve criteria no less stringent than those • LeaD the transition to The BoarD selection process involving established by the Western Electricity renewable energy stakeholDers was outlineD in a FERC Coordinating Council and the North order issued July 1, 2005. The Board American Electric Reliability Council. • Maintain reliability During Nominee Review Committee is compriseD of six stakeholders from each of the inDustry transformation following member-class sectors: ISO Articles of Incorporation • ExpanD regional transmission owners, transmission- dependent utilities, public interest collaboration to unlock II.b. The specific purpose of this groups, enD-users and retail energy corporation is to ensure efficient use mutual benefits proviDers, alternative energy proviDers, anD reliable operation of the electric anD generators anD marketers. Each transmission griD pursuant to the OUR OPERATING PRINCIPLES sector is responsible for selecting its own Statute. six members to serve on the committee. For the benefit of our Once the Committee has been establisheD customers, we: CAISO Bylaws anD secretaries nominated, the Board member selection process proceeDs as ARTICLE II: PURPOSES AND • Attract, Develop anD retain a follows: OBJECTIVES highly skilled workforce • An inDepenDent search firm creates a Section 1. Purposes. • Operate the griD reliably anD list of at least four qualifieD canDiDates for each open seat on the efficiently The purpose of the Corporation is to BoarD. ensure efficient use anD reliable • ProviDe fair anD open • The list of qualifieD candiDates is then operation of the electric transmission transmission access forwarDeD to the 36-member BoarD facilities of those transmission owners Nominee Review Committee. that have transferreD operational • Promote environmental control of those facilities to the • Each member-class sector will select stewardship one person to represent the group to Corporation (the “ISO ControlleD conDuct a personal interview of GriD”), consistent with Chapter 2.3, • Facilitate effective markets selecteD canDiDates. Part 1, Division 1, of the California anD promote infrastructure Public Utilities Code. • BaseD on inputs from the member- development class sectors, recommenDations are submitteD to the Office of the • ProviDe timely anD accurate Governor for the State of California. information Terms of office of each member of the OUR COMMITMENTS Governing BoarD are three years in duration and are staggered in accordance We are committeD to being: with section 337 subDivision (e) of the California Public Utilities Code. Governors • Reliable may serve multiple terms, with no maximum number of terms. The Chair of the Governing Board shall be electeD by 128 Legislative or corporate Entity Ownership Corporate values Governance Finance mandate • Sustainable the Board from among the members of the Governing Board. • Efficient No member of the Governing BoarD shall • Resilient be affiliateD with any actual or potential participant in any market aDministereD • Responsive by the Corporation. OUR CORE VALUES • Integrity • Teamwork • Excellence • People focus • Open communication National Grid Electricity Electricity Act 1989 NGET is a public limiteD company, Connecting you to your energy The parent company, National GriD plc, is The cost that can be chargeD by NGET Transmission plc, UniteD registereD in EnglanD anD Wales. National toDay, trusteD to help you governeD by an eleven member BoarD of for its regulateD activities is governeD S 6(1)(b) a licence authorising a KingDom GriD Electricity Transmission plc operates meet your energy neeDs Directors. They are supporteD by an by RIIO-T1 pricing control moDel, person to transmit electricity for that as a subsiDiary of National GriD HolDings tomorrow. eleven member Executive Committee. where stanDs for: purpose in that person’s authoriseD One Plc. area (“a transmission licence”) Revenue = Incentives+Innovation+Outputs Transmission Licence Standard This process is controlleD by Ofgem. Conditions Condition C16: Procurement and use of balancing services 1. The licensee shall co-ordinate and direct the flow of electricity onto and over the national electricity transmission system in an efficient, economic anD co-ordinated manner 129 Legislative or corporate Entity Ownership Corporate values Governance Finance mandate Independent Electricity System (1) The objects of the IESO are, The IESO is a not-for-profit corporate The IESO is governeD by an independent The IESO's usage fees and licence Operator (as mergeD with the (a) to exercise the powers entity established in 1998 by the Electricity boarD of eleven Directors that oversees conDitions are approveD by the Ontario Power Authority from 1 anD perform the Duties assigneD to it Act of Ontario. its business anD affairs. The IESO BoarD Ontario Energy BoarD (OEB) in Jan 2015) under this Act, the regulations, also approves the Market Rules, policies accorDance with the Electricity Act, directions, the market rules and its anD guiDelines that govern the IESO- 1998. licence; administereD markets. (b) to enter into agreements with transmitters to give it authority The BoarD Directors are appointeD by the to Direct the operation of their transmission systems; Minister of Energy. However, the BoarD (c) to Direct the operation anD has the power to elect both their own maintain the reliability of the IESO- Chair and Vice-Chair from among the controlled grid to promote the Directors by a majority vote. purposes of this Act; (d) to participate in the The IESO StakeholDer ADvisory development by any standards Committee provides appointed authority of criteria anD stanDarDs stakeholDer representatives with the relating to the reliability of the opportunity to present advice and integrateD power system; recommenDations on market (e) to establish anD enforce development and planning decisions criteria anD stanDarDs relating to the directly to the IESO's Board of Directors reliability of the integrateD power system; anD Executive Leadership Team. (f) to work with the Members of the Committee represent responsible authorities outsiDe of electricity service proviDers, generators, Ontario to co-ordinate the IESO’s conveyors anD consumers of electricity. activities with the activities of those StakeholDers are encourageD
Recommended publications
  • Does Extending Daylight Saving Time Save Energy? Evidence from an Australian Experiment
    IZA DP No. 2704 Does Extending Daylight Saving Time Save Energy? Evidence from an Australian Experiment Ryan Kellogg Hendrik Wolff DISCUSSION PAPER SERIES DISCUSSION PAPER March 2007 Forschungsinstitut zur Zukunft der Arbeit Institute for the Study of Labor Does Extending Daylight Saving Time Save Energy? Evidence from an Australian Experiment Ryan Kellogg University of California, Berkeley Hendrik Wolff University of California, Berkeley and IZA Discussion Paper No. 2704 March 2007 IZA P.O. Box 7240 53072 Bonn Germany Phone: +49-228-3894-0 Fax: +49-228-3894-180 E-mail: [email protected] Any opinions expressed here are those of the author(s) and not those of the institute. Research disseminated by IZA may include views on policy, but the institute itself takes no institutional policy positions. The Institute for the Study of Labor (IZA) in Bonn is a local and virtual international research center and a place of communication between science, politics and business. IZA is an independent nonprofit company supported by Deutsche Post World Net. The center is associated with the University of Bonn and offers a stimulating research environment through its research networks, research support, and visitors and doctoral programs. IZA engages in (i) original and internationally competitive research in all fields of labor economics, (ii) development of policy concepts, and (iii) dissemination of research results and concepts to the interested public. IZA Discussion Papers often represent preliminary work and are circulated to encourage discussion. Citation of such a paper should account for its provisional character. A revised version may be available directly from the author. IZA Discussion Paper No.
    [Show full text]
  • Forward Contracts in Electricity Markets: the Australian Experience
    Forward Contracts in Electricity Markets: the Australian Experience Edward J Anderson and Xinmin Hu Australian Graduate School of Management University of New South Wales, Sydney, NSW 2052, Australia Donald Winchester Faculty of Commerce & Economics University of New South Wales, Sydney, NSW 2052, Australia Abstract Forward contracts play a vital role in all electricity markets, and yet the details of the market for forward contracts are often opaque. In this paper we review the existing literature on forward contracts and explore the contracting process as it operates in Australia. The paper is based on interviews with participants in Australia’s National Electricity Market. The interviews were designed to understand the contracting process and the practice of risk management in the Australian energy-only pool market. This survey reveals some significant gaps between the assumptions made in the academic literature and actual practice in the Australian market place. 1 Introduction Wholesale markets for electricity are complex, and their structure varies from one country to another. However, they have in common the characteristic that spot prices for electricity are highly volatile. This is a consequence of the inability to store electric power at any significant scale, so that power consumption and generation need to match each other very closely. Electricity demand is highly variable (e.g. with time of day and weather) and the volatility in price is exacerbated by the way that consumers are usually charged a fixed retail price independent of the spot market price. In this situation various types of generator reserves play an important role in ensuring stability of supply, with the necessary balancing role being 1 played by a ‘system operator’ who has the ability to dispatch generation.
    [Show full text]
  • ADAM PEARD Manager and Principal Consultant
    ADAM PEARD Manager and Principal Consultant PERSONAL DETAILS: Name: Adam Peard Languages: English, Pidgin English Email: [email protected] PROFESSIONAL QUALIFICATIONS: • Bachelor of Engineering (Electrical), The University of Queensland, 2002. • Advanced Diploma, Electronics Engineering, 1999. PROFESSIONAL AFFILIATIONS: AUSTRALIA • Fellow, Engineers Australia (FIEAust) • Chartered Professional Engineer, Engineers Australia (CPEng) • Registered Professional Engineer Queensland (RPEQ) EMPLOYMENT SUMMARY: 2017 – Present Manager and Principal Consultant Amplitude Consultants Pty Ltd (Part time in 2017) (Brisbane) 2017 – 2017 Director GridLink Consulting Pty Ltd (Western Australia) 2014 – 2016 System Analysis and Solutions Area Manager (SAS) Western Power Corporation (Western Australia) 2015 – 2016 Network Connections and Access Project Lead Public Utilities Office (Western Australia) 2013 – 2014 Engineering Team Leader Western Power Corporation (Western Australia) 2011 – 2013 Principal Engineer Western Power Corporation (Western Australia) 2010 – 2011 Senior Engineer Western Power Corporation (Western Australia) 2009 – 2010 Principal Engineer Australian Energy Market Operator – AEMO (Queensland) 2005 – 2009 Planning Specialist National Electricity Market Management Company NEMMCO (Queensland) 2003 – 2005 Planning Engineer National Electricity Market Management Company NEMMCO (Queensland) Amplitude Consultants Pty Ltd 2002 – 2003 National Product Manager (P&B Engineering Protection Relays) Control Logic (Queensland) 2001 – 2002
    [Show full text]
  • Australia's National Electricity Market
    Australia’s National Electricity Market Wholesale Market Operation Executive Briefing Disclaimer: All material in this publication is provided for information purposes only. While all reasonable care has been taken in preparing the information, NEMMCO does not accept liability arising from any person’s reliance on the information. All information should be independently verified and updated where necessary. Neither NEMMCO nor any of its agents makes any representation or warranty, express or implied, as to the currency, reliability or completeness of the information. ©NEMMCO 2005 – All material in this publication is subject to copyright under the Copyright Act 1968 (Commonwealth), and permission to use the information must be obtained in advance in writing from NEMMCO. Section 1 Contents Introduction 2 Section 1: Market Operator 2 History of Electricity Supply in Australia 3 Design of the NEM 4 Regional Pricing 4 The Spot Price 4 Value of Lost Load (VoLL) 5 Gross Pool and Net Pool Arrangements 5 Locational and Nodal Pricing 5 Energy-only Market 5 Section 2: Operating the Market 6 Registration of Participants 6 Generators 7 Scheduled and Non-scheduled Generators 8 Market and Non-market Generators 8 Market Network Service Providers 8 Scheduled Loads 8 Monitoring Demand 9 Forecasting Supply Capacity 9 Participation in Central Dispatch 9 Bidding 10 Pre-dispatch 11 Spot Price Determination 12 Scheduling 12 Dispatch 14 Failure to Follow Dispatch Instructions 14 Section 3: Operating the Ancillary Services Markets 15 Ancillary Services 15 Ancillary
    [Show full text]
  • Economics of Power Markets
    December 2003 Electricity industry restructuring in Australia Hugh Outhred School of Electrical Engineering and Telecommunications The University of New South Wales Sydney, Australia Tel: +61 2 9385 4035; Fax: +61 2 9385 5993; Email: [email protected] www.sergo.ee.unsw.edu.au Electricity industry restructuring: a complex design process • A design process within a cultural context: – Industry-specific laws, codes & markets • A mix of technical, economic & policy issues: – Physical behaviour continuous & cooperative – Commercial behaviour individual & competitive • Restructuring is still a learning situation: – A “social experiment” with few “safe exits” – No complete successes, some notable failures – Must solve commercial, technical & institutional challenges to keep the lights on at the right price Hugh Outhred: Electricity restructuring in Australia 2 Key lessons to date (Joskow, May ‘03): • Electricity market design: – Doesn’t matter much when: • Demand is moderate, supply elastic, ownership not concentrated & transmission not congested – Does matter when this is not the case, eg: • Few hours when demand high & network congested • Key aspects of good market design: – (approximate) nodal pricing – Derivatives including financial transmission rights – Consistent energy and ancillary service markets – Retail markets with spot & forward pricing Hugh Outhred: Electricity restructuring in Australia 3 The central challenge of electricity restructuring: to make economics & engineering compatible Main commercial markets (humans; individual;
    [Show full text]
  • AGL Supplementary
    AGL submission to Australian Energy Market Commission Review of Effectiveness of Competition in the Electricity and Gas Retail Markets in South Australia Date: September 2008 Table of Contents Introduction........................................................................... 1 The South Australian Wholesale Market...................................... 2 The Torrens Island Power Station.............................................. 6 Summer 2007/2008................................................................ 7 Outlook for prices in South Australia........................................ 11 Comments on the UnitingCare Wesley Submissions ................... 13 Introduction AGL has made a submission to the Commission in support of the Commission’s finding in its Draft Report1 that the gas and electricity markets in South Australia are demonstrating effective competition. In that submission we said that: • AGL concurs with the Commission’s findings that the South Australian energy markets are competitive; • The high prices for the first quarter of 2008 reflected the structure of the South Australian market and the extreme summer that had occurred; and • Market churn was not directly related to high prices. Since making that submission, AGL has becoming increasingly concerned about a number of comments made by an interested party in submissions to the Commission’s Issues Paper and the Draft Report that claim there is a lack of competition in the wholesale electricity market in South Australia. AGL believes that the facts do not support these contrary submissions and the arguments made in them cannot be supported. We are therefore providing additional information to the Commission to more fully discuss pricing issues in South Australia and to counter these claims. AGL notes that similar claims of market failure and generator profiteering were made in the aftermath of the extreme summer of 2000/01.
    [Show full text]
  • ERC0274-Mandatory PFR Final Determination EMBARGOED
    Australian Energy Market Commission RULE DETERMINATION RULE NATIONAL ELECTRICITY AMENDMENT (MANDATORY PRIMARY FREQUENCY RESPONSE) RULE 2020 PROPONENTS AEMO Dr. Peter Sokolowski 26 MARCH 2020 Australian Energy Rule determination Market Commission Mandatory PFR 26 March 2020 INQUIRIES Australian Energy Market Commission PO Box A2449 Sydney South NSW 1235 E [email protected] T (02) 8296 7800 F (02) 8296 7899 Reference: ERC0274 CITATION AEMC, Mandatory primary frequency response, Rule determination, 26 March 2020 ABOUT THE AEMC The AEMC reports to the Council of Australian Governments (COAG) through the COAG Energy Council. We have two functions. We make and amend the national electricity, gas and energy retail rules and conduct independent reviews for the COAG Energy Council. This work is copyright. The Copyright Act 1968 permits fair dealing for study, research, news reporting, criticism and review. Selected passages, tables or diagrams may be reproduced for such purposes provided acknowledgement of the source is included. Australian Energy Rule determination Market Commission Mandatory PFR 26 March 2020 EXECUTIVE SUMMARY 1 The Australian Energy Market Commission (AEMC or Commission) has made a more preferable final rule to require all scheduled and semi-scheduled generators in the National Electricity Market (NEM) to support the secure operation of the power system by responding automatically to changes in power system frequency. An increase in the provision of primary frequency response (PFR) from generators will improve the security of the national electricity system for the benefits of consumers and will give the Australian Energy Market Operator (AEMO) greater confidence that it is maintaining the power system in a secure operating state.
    [Show full text]
  • Inquiry Into Sustainable Cities 2025
    Australian Business Council for Sustainable Energy Inquiry into Sustainable Cities 2025 Submission to the House of Representatives Standing Committee on Environment and Heritage November 2003 Australian Business Council for Sustainable Energy Suite 304, 3rd Floor 60 Leicester St Carlton Victoria 3053 Tel. +61 3 9349 3077 Fax. +61 3 9349 3049 Email: [email protected] www.bcse.org.au Page 1 Introduction The Australian Business Council for Sustainable Energy (BCSE) welcomes the opportunity to make a submission to the House of Representatives’ Standing Committee on Environment and Heritage Inquiry into Sustainable Cities 2025. The BCSE has endeavoured to provide an effective, considered submission that benefits from ongoing BCSE engagement with the Australian sustainable energy industry in addition to leading research and analysis in this field. As such, this submission focuses on the sustainable energy industry, which is defined below. The sustainable energy industry is critical in the context of developing sustainable cities in greenhouse terms by 2025. Sustainability in this submission refers to the stabilisation and eventual reduction of greenhouse gas emissions in order to avoid detrimental change in climate. Great potential exists in Australia to meet sustainability in the energy sector. Provided with the correct policy framework, the sustainable energy industry is poised to meet customers’ energy needs in a manner that reduces greenhouse emissions while simultaneously increasing economic activity, jobs and investment. The BCSE asserts that from 2006 all new commercial buildings and all Government office buildings should have zero net greenhouse emissions. Household greenhouse emissions from energy use should be limited to one tonne per person (nearly a one-third reduction).
    [Show full text]
  • Useful Acronyms
    NSWIC PO Box R1437 Royal Exchange NSW 1225 NEW SOUTH WALES Tel: 02 9251 8466 IRRIGATORS’ Fax: 02 9251 8477 [email protected] COUNCIL www.nswic.org.au ABN: 49 087 281 746 Updated 8th December 2015 USEFUL ACRONYMS AAR Average Annual Recharge – Volume of water added to the groundwater source (aquifer) naturally, by infiltration from rainfall and river flows, assessed on a long-term average basis. ABC Australian Broadcasting Corporation – National TV and Radio ABARES Australian Bureau of Agriculture and Resource Economics and Sciences – Research organisation within DAFF. Providing independent, economic and scientific analysis on issues facing Australia’s primary industries. ABS Australian Bureau of Statistics – Government agency which collects statistical data for publication. Also conducts a census every 5 years which every person in Australia needs to fill in. ACCC Australian Competition and Consumer Commission – Australian government organisation responsible for ensuring compliance with the Trade Practices Act 1974. AEMA Australian Energy Market Agreement – sets out the legislative and regulatory framework for Australia’s energy markets. It provides for national legislation that is implemented in each participating state and territory. AEMC Australian Energy Market Commission –is an independent, national body responsible to the Council of Australian Governments (COAG) through the Standing Council on Energy and Resources (SCER). Has two roles, as statutory rule maker for the energy market and expert adviser for federal, state and territory governments. AEMO Australian Energy Market Operator – Commencing operations on 1 July 2009, superseding several organisations including NEMMCO, VENCorp, ESIPC, REMCo (South Australian operations only), GMC and GRMO. Delivers a range of gas and electricity market, operational, development and planning functions.
    [Show full text]
  • A South Australia's Electricity and Gas Industries
    A South Australia's Electricity and Gas Industries Both the electricity and gas industries in South Australia have undergone a range of significant reforms over the last fifteen years, commencing with the vertical disaggregation of the electricity and gas supply chains in the mid-1990s and culminating with the introduction of FRC for customers of all sizes during 2003-04. In the wake of FRC, gas and electricity retailing in South Australia has moved from a single host retailer model to a multiple retailer model. The remainder of this appendix provides both an historic perspective on the reforms that were undertaken in advance of the introduction of FRC and an overview of the current structure of energy retailing. A.1. Progression to FRC A.1.1. Electricity industry progression to FRC Between 1946 and 1995, the Electricity Trust of South Australia (ETSA) was responsible for undertaking all aspects of the electricity supply chain in South Australia including the generation, transmission, distribution and retail sale of electricity. On 1 July 1995, the Electricity Trust of South Australia was corporatised and became ETSA Corporation under the Public Corporations Act 1993. In January 1997 the South Australian Government undertook the first steps towards vertical disaggregation, by transferring ETSA’s generation assets to SA Generation Corporation. The second step toward vertical disaggregation occurred in October 1998 when the South Australian Government announced that, in order to meet its commitments under the Competition Principles Agreement and in preparation for entry into the NEM, ETSA Corporation and SA Generation Corporation would need to be further disaggregated.
    [Show full text]
  • LIVING OUR VALUES: ENERGEX 2009/10 Annual Report And
    We aim to live our corporate values every day. Our values express who we are and all that They underpin everything we do as a company we aspire to be. They are the foundation and articulate what we see as most important. for our reputation and success. PUT DELIVER IMPRESS SAFETY BALANCED OUR FIRST RESULTS CUSTOMERS We are committed We are passionate and disciplined Servicing our customers to achieving an about achieving our targets to ensure a injury free workplace to deliver sustainable performance positive experience RESPECT BE SET & SUPPORT A TEAM A GREAT EACH OTHER PLAYER EXAMPLE We value each We operate as a team We create an environment other’s views to achieve and leverage and learn that encourages people to grow, success together from each other achieve goals and lead the way Powering Lifestyles Forever – articulates our vision, our people and technical capabilities to deliver network reinforces our strategic direction and provides performance that achieves legislated Minimum Service a reference to guide both strategic planning and Standards (MSS), Guaranteed Service Levels (GSLs), day-to-day business operations. The purpose supports and associated network standards. our transition to becoming a customer-centric and sustainable business that delivers sustainable energy Linked with this goal is a focus on ‘lifestyles’ which solutions and balanced commercial outcomes. refl ects our growing need to understand the changing lifestyle, business and economic preferences of our Our purpose represents the three core areas upon customers and the implications this has for the way which we must focus to deliver our vision. A focus on in which we deliver power.
    [Show full text]
  • Mark up of National Electricity Rules
    National Electricity Rules Version 21 Status Information This is a draft consolidation based on the latest electronically available version of the National Electricity Rules as at 1 July 2008. This draft consolidated version of the National Electricity Rules includes the following draft amendment. Draft National Electricity Amendment (Regulatory Test Thresholds and Information Disclosure on Network Replacements) Rule 2008 This version of the National Electricity Rules is provided for information purposes only. The Australian Energy Market Commission does not guarantee the accuracy, reliability or completeness of this consolidated version. The official Draft National Electricity Amendment (Regulatory Test Thresholds and Information Disclosure on Network Replacements) Rule 2008 is published separately on the website of the Australian Energy Market Commission. This coversheet was last updated on 1 July 2008 TABLE OF CONTENTS 5. Network Connection 17 5.1 Statement of Purpose 17 5.1.1 [Deleted] 17 5.1.2 Purpose 17 5.1.3 Principles 17 5.2 Obligations 18 5.2.1 Obligations of Registered Participants 18 5.2.2 Connection agreements 19 5.2.3 Obligations of network service providers 20 5.2.4 Obligations of customers 24 5.2.5 Obligations of Generators 24 5.3 Establishing or Modifying Connection 25 5.3.1 Process and procedures 25 5.3.2 Connection enquiry 26 5.3.3 Response to connection enquiry 26 5.3.4 Application for connection 29 5.3.4A Negotiated access standards 30 5.3.5 Preparation of offer to connect 32 5.3.6 Offer to connect 33 5.3.7 Finalisation
    [Show full text]