MAJOR PROJECTS 2017-2019

MINISTRY OF PUBLIC WORKS JUNE 2017

CONCESSIONS

- The Loa Route - Route 5: Section Caldera - Antofagasta - Re-tender of Route N° 5 Los Vilos – La Serena and Conurbation - Interconnection Santiago--Viña del Mar (Route 68) + Alternatives - Costanera Central Highway - Section Av. La Florida – Camilo Henríquez - Eastern Américo Vespucio Urban Highway - Príncipe de Gales – Grecia - Interconnection Highway 68 with Highway 78 - Fruit Highway, G-66 - Re-tender Route 5 - Talca – Chillán - Re-tender Route 5 - Chillán – Collipulli - Nahuelbuta Route 180 - Route Freire – Villarrica – Pucón - Re-tender Route 5: Temuco – Rio Bueno + Access to Valdivia - Metropolitan Highway of Puerto Montt - North-South Route of Chiloé - Las Palmas Reservoir - Los Angeles Reservoir - Reservoir - La Tranca and Murallas Viejas Reservoirs

PROJECT DATA SHEET PUBLIC WORKS PPP - THE LOA ROUTE Updated: JUNE 2017

Location Map Project Information Communes of Sierra Gorda and Calama in Antofagasta Location Region

Increase service levels and improving connectivity and Objective territorial integration of the Region Rutas del Loa

 Revamping and expansion up to 2 lanes each side Description of the Route 25 of Works  Construction of the Eastern bypass to Calama connecting Routes 21, 23, 24 and 25

Economic  It considers MGI and ITC Conditions R Estimated US$ 293 million ut Investment as Type of PPP – BOT Investment de l  Improvement of service and standard levels of Lo Route 25. Benefits  Improvement of safety conditions and shorter travel a times (1 36

K Current Situation m. Timetable

Call for Bids ) 2nd Quarter 2017

• Bidding conditions ready Receipt of Tenders 4th Quarter 2017

Contract award 1st Semester 2018

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE 5: SECTION CALDERA - Updated: JUNE 2017 ANTOFAGASTA

Project Information: Location Map

Route 5 between the cities of Caldera and Location Antofagasta

Improvement of the standard in this section of the Objective Route 5

Description of  Two lanes in each side. Works  Max speed 120km/h

 Road tolls Economic Conditions  State subsidy 30 %

Estimated US$ 640 million Investment Type of PPP – BOT - Investment

 Expansion of the 4 lanes highway from Antofagasta to the south Benefits  Improvement of safety conditions and shorter travel times  More secondary access roads

Current Situation Timetable

Call for Bids 3rd Quarter 2018

 Studies of this private proposal under progress Receipt of Tenders 1st Quarter 2019

Contract award 2nd Semester 2019

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP

- RE-TENDER OF ROUTE N° 5 LOS VILOS – LA Updated: JUNE 2017 SERENA AND CONURBATION

Project Information Location Map Location North of Santiago from km 229 to km 474 Re- tender of the contract for Route N° 5 from Los Objective Vilos to Coquimbo, including urban sector between Coquimbo and La Serena

Description of  229 km 4-lanes intercity road Works  17 km of urban highway with three lanes in each direction

Economic  Road tolls Conditions

Estimated US$ 328 million Investment Type of PPP – BOT Investment

 Improve urban connectivity  Increase transport capacity on the urban sector Benefits  Reduce accidents  With this section the concessioned highway from Caldera to Pargua goes up to 1.955 km

Current Situation Timetable

 Private Initiative Call for bids 3rd Quarter 2017  Developing studies for: design, expropriations, environmental

assessment Reception of bids End of 2017  Finishing project proposal  Preparation of bidding conditions Contract award 1st Semester 2018

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - INTERCONNECTION SANTIAGO-VALPARAÍSO- Updated: JUNE 2017 VIÑA DEL MAR (ROUTE 68) + ALTERNATIVES

Project Information: Location Map

Location of Valparaíso and Santiago

Increase service levels and improving the standard Objective of the highway

Route 68, has 110 km. It needs a better standard Description of with different secondary roads, junctions and Works additional lanes.

Economic  Road tolls Conditions

Estimated US$ 600 million Investment

Type of PPP – BOT Investment

 Promotes regional economic growth and Benefits territorial integration of 2 of the most important metropolitan areas of the country and Valparaíso seaport

Current Situation Timetable

Call for Bids 1st Semester 2019  Studies of demand and Social Evaluation under progress Receipt of Tenders End of 2019  Re-tender Route 68 Santiago – Valparaíso – Viña del Mar.

Contract award 2nd Quarter 2020

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - COSTANERA CENTRAL HIGHWAY - SECTION AV. LA FLORIDA – CAMILO HENRÍQUEZ Updated: JUNE 2017

Project Information: Location Map South-east side of Santiago Location Metropolitan Area. Communes of La Florida and Puente Alto.

Improvement of transport system, connectivity and Objective infrastructure standard of the city  Building a high standard underground highway of 12 km.. 9 km is an underground route with 3 lanes in each side and the Description of other 3 km will have 2 lanes in each side. Works  The project includes connections to local roads and Américo Vespucio Sur Highway.

 Road tolls Economic  State subsidies 36 % Conditions  Free flow tolls

Estimated US$ 1.1 Billion Investment Type of Private Initiative - PPP – BOT Investment

 Improvement of connectivity between south-east districts and downtown  Reduction of traffic congestion Benefits  New public transport corridor  Reduction of operational costs.  Improvement of safety conditions and shorter travel times.

Current Situation Timetable Call for bids 2nd Quarter 2018  Developing of technical studies and bidding conditions  Citizen participation in local communities Receipt of tenders 1st Quarter 2019

Contract award 4th Quarter 2019

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - Eastern Américo Vespucio Urban Updated: JUNE 2017 Highway - Príncipe de Gales – Grecia

Project Information Location Map

Location Eastern side of Santiago

Complete the Americo Vespucio ring road with high Objective quality and service standard  Construction of two underground double tracks with 3 lanes each side Description of Works  Urban redeveloping in surface considering larger green areas and more facilities for public urban transportation.  Road tolls Economic  Estimated 15% of state subsidy Conditions  Free flow tolls Estimated US$ 786 million Investment Type of PPP – BOT Investment  Complete the Américo Vespucio ring road in Santiago with a high service standard  Reduce accidents and traffic jams, mainly during rush hours. Benefits  Reduce commuting time and pollution emissions.  Improve public transportation and connectivity in the city.

Current Situation Timetable

Call for Bids August 2016  Finishing technical studies and bidding bases

 Prequalification process re-open Receipt of Tenders 2nd Quarter 2017  Closing agreements and approval with authorities Contract award 4th Quarter 2017

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP INTERCONNECTION HIGHWAY 68 WITH HIGHWAY 78 Updated: JUNE 2017

Project Information: Location Map Western side of Santiago Location Metropolitan Area. Communes of Pudahuel and Maipú. Improvement of transport system, Objective connectivity and infrastructure standard of Western Santiago  Construction of a 9.4 km 4- lanes road, to reduce traffic impact in urban zones  Internal roads, lighting and drainage Description of Works  Construction of different flyovers and structures in the junctions with Route 68 and Route 78  Internal roads and road safety measures  Road tolls Economic Conditions  Free flow tolls  Not subsidies

Estimated Investment US$ 250 million

Type of Investment Private Initiative - PPP – BOT  Improve connectivity between central and western areas of Santiago  Improve connection to the main Benefits national seaports avoiding to cross through Santiago.  Better local urban development  Reduction of accidents, travel times and pollution emissions Current Situation Timetable Call for bids 3rd Quarter 2017  Finishing technical studies and developing of bidding contracts Reception of bids End of 2017

Contract award 1st Semester 2018

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - FRUIT HIGHWAY, G-66 Updated: JUNE 2017

Project Information Location Map 120 km south from Santiago to the port of San Location Antonio Improve connectivity for small and medium scale producers (fruits, vegetables and wine) from Objective O’Higgins and Maule Regions to the port of San Antonio  Restore and improve 138 km of the existing road and construction of a bidirectional road to reduce traffic impact in urban zones Description of  Construction of a 21 km 4-lanes road Works  Construction of different flyovers and structures to reduce negative impact on population  Road tolls Economic  State subsidies 50-60 % Conditions  Free flow tolls Estimated US$ 600 million Investment Type of PPP – BOT Investment  Improvement of connectivity  Reduction of transport costs for local Benefits producers  Reduction of accidents

Current Situation Timetable

Call for Bids 3rd Quarter 2017  Technical studies ready

 Agreements with local authorities and citizen participation Receipt of Tenders 1st Quarter 2018  Preparation of bidding contracts

Contract award 1st semester 2018

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP RE-TENDER ROUTE 5 - TALCA – CHILLÁN Updated: JUNE 2017

Project Information: Location Map Communes of Río Claro, San Rafael, Talca, Maule, San Javier, Villa Alegre, Linares, Longaví, Location Retiro, Parral y Ñiquén, San Carlos, San Nicolás, Chillán and Chillán Viejo. Increase service levels and improving the standard Objective of the highway with additional works

4-lanes road and 193.3 km, It will have: Description of  New local roads Works  Junctions – bridges  Bypass sectors  Free flow toll system

Economic  Road tolls Conditions  Not subsidies

Estimated US$ 225 million Investment Type of PPP – BOT Investment

 Improve connectivity between central and southern  Better local and regional economic Benefits development and integration  Reduction of accidents, travel times and pollution emissions

Current Situation Timetable

Call for Bids 1st Quarter 2019  Studies of demand and social evaluation under progress Receipt of Tenders 3rd Quarter 2019  TOR of basic engineering studies in preparation.

Contract award 1st Quarter 2020

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER ROUTE 5 - CHILLÁN – Updated: JUNE 2017 COLLIPULLI

Project Information: Location Map

Communes of Chillán, Bulnes, Cabrero, Los Location Ángeles, Mulchén and Collipulli in Biobío Region Improvement of actual highway standard, including Objective additional works and the increase of service levels while improving user safety Section of 160 km. in Route 5 with 2-lanes in each side.

To include: Description of Works  New local roads  Junctions – bridges  Bypass sectors  Free flow toll system

Economic  Road tolls Conditions  Not subsidies

Estimated US$ 225 million Investment Type of PPP – BOT Investment  Improvement of connectivity  Reduction of transport costs for local producers  Reduction of accidents  Improve connectivity between central and Benefits southern Chile  Better local and regional economic development and integration

Current Situation Timetable Call for Bids 1st Semester 2019  Studies under progress Receipt of Tenders 3rd Quarter 2019 Contract award 2nd Quarter 2020 Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - NAHUELBUTA ROUTE 180 Updated: JUNE 2017

Project Information Location Map

Location Km 520 south of Santiago

Improve connectivity and maximize economic and Objective social benefits in an area mainly focused on forests and forestry  55 km road Description of  4-lanes highway Works  Uneven junctions  Road tolls Economic  Estimated 41% of state subsidy Conditions  Manual tolls Estimated US$ 245 million Investment Type of PPP – B5OT Investment

 Connectivity improvement Benefits  Reduction of transport costs for local producers  Reduction of accidents

Current Situation Timetable

Call for Bids November 2016

 Bidding bases and procedures in progress Receipt of Tenders 2nd Quarter 2017  Agreements with local authorities and indigenous communities Contract award End of 2017

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER ROUTE 5: TEMUCO – RIO BUENO + Updated: JUNE 2017 ACCESS TO VALDIVIA

Location Map

Project Information: Communes of Gorbea, Loncoche, Lanco, San José Location de la Mariquina, Máfil, Los Lagos, Paillaco, La Unión, Río Bueno and Valdivia

Improvement of actual highway standard, including Objective additional works and the increase of service levels while improving user safety and better access to Valdivia city  Improvement of 172 km. of the 4 - lanes road  Upgrade to 2-lanes in each side to Valdivia (88 Description of km.) Works  New local roads  Junctions – bridges  Bypass sectors.

Economic - Road tolls Conditions - Not subsidies

Estimated US$ 250 million. Investment Type of PPP – BOT Investment  Increase of safety standard to decrease accident rate in acess to Valdivia

 Connectivity improvement

 Reduction of transport costs for local producers Benefits

 Reduction of accidents and congestion

 Better local and regional economic development

Current Situation Timetable

Call for Bids End of 2017  Private initiative. Proponent R y Q Ingeniería. Time limit for Receipt of Tenders 4th Quarter 2018 presentation of first studies: April 2017

Contract award 2nd Quarter 2019

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - METROPOLITAN HIGHWAY OF PUERTO Updated: JUNE 2017 MONTT

Project Information Location Map

Location Puerto Montt - 1.000 km. south of Santiago

• Improvement of transport system, connectivity Objective and infrastructure standard of Puerto Montt • Improvement of connection between Puerto Varas and El Tepual Airport Description of  4-lanes highway in 32 km. Works  Urban highway standard  Road tolls Economic  Estimated State subsidy; 30 % Conditions  Free flow tolls Estimated US$ 321 million Investment Type of Investment PPP – BOT

 Improvement of connectivity between Puerto Montt and Puerto Varas Benefits  Reduction of traffic congestion.  Reduction of operational costs.  Improvement of safety conditions.

Current Situation Timetable

 Private initiative Call for Bids End of 2017  Developing of technical studies (demand, environmental

assessement, business model, etc..) Receipt of Tenders 2nd Quarter 2018  Defining economic conditions  Citizen participation from 2nd Semester 2016 Contract award End of 2018

Source: CCOP

PROJECT DATA SHEET PUBLIC WORKS PPP - NORTH-SOUTH ROUTE OF CHILOÉ Updated: JUNE 2017

Project Information Location Map

Location 1,100 km south of Santiago

Improve and extend the transportation system in the Objective island of Chiloé  Improvement of 101 km road with 2-lanes each side Description of  Construction of auxiliary tracks, road safety Works measures, path rectification, construction of new bridges and maintenance of existing ones and environmental measures.

Economic  Road tolls Conditions  Not subsidies

Estimated US$ 250 million Investment Type of Private initiative – PPP BOT Investment

 Improve connectivity  Increase transport capacity on the trunk road of the island Benefits  Reduce accidents  Contribute to the economic development of the island

Current Situation Timetable

Call for Bids 3rd Quarter 2017  Private initiative (Constructora Internacional). Developing of

studies until June 2017 Receipt of Tenders 2nd Quarter 2018  Developing of bidding conditions Contract award End of 2018

Source: CCOP

NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - LAS PALMAS RESERVOIR Updated: JUNE 2017

Project Information: Location Map

Petorca , Commune Location

Volume of the reservoir: 55 Hm3. Description of Feeder channel: 58 km Works .

Irrigation área 2.932 Ha and 1,285 rural properties

River sections In communes of Petorca and Cabildo

Estimated VAN MM$ 35,000. investment and TIR = 8,9 % economic conditions US$ 161 million – State subsidy near 100 %

Hydroelectric Not generation The National Department has water rights for 10 Water rights Hm3/year, in rivulet Las Palmas.

Current Situation Timetable Activity Date End of design December 2016 Environment December 2016 1. Design studies under process Assessment Call for bids 3rd Quarter 2017 2. Project in the National System for Environment Assessment

Receipt of Tenders End of 2017 End of construction 2022

Source: Department of Irrigation Projects

NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - LOS ÁNGELES RESERVOIR Updated: JUNE 2017

Project Information Location Map

Location Petorca Province, Commune of .

Multipurpose reservoir with capacity of 30 Description of Hm3 and a feeder channel of 24 km (from Works Alicahue River).

Irrigation Area 2,160 Ha. and 676 rural properties

Socio-economic indicators VAN: MM$ 280

Estimated US$ 161 million – State subsidy near 100 % Investment

Hydroelectric No Generation Water rights under study. The reservoir has Water rights water rights from users.

Current Situation Timetable Activity Date Design Studies 1st Semester 2017 1. Environment assessment studies under progress. Environment Assessment 2nd Semester 2017 2. Complementary design studies are developing Call for bidding 4th Quarter 2017 3. The MOPW is analyzing PPP conditions Receipt of Tenders 1st Quarter 2018

Source: Department of Irrigation Projects

NATIONAL DEP. FOR HYDRAULIC PROJECT DATA SHEET WORKS - PUBLIC WORKS PPP - CATEMU RESERVOIR Updated: JUNE 2017

Project Information Location Map

San Felipe Province, Commune of Catemu in Location Valparaiso Region

Volume of the reservoir: 180 Hm3 Description Dam wall height: 65 m of Works Feeder Channel: 25 km (from Aconcagua River) and a capacity of 20 m3/s

Irrigation 33,100 Ha and 4,160 rural properties área

River Lower areas of 2nd, 3rd and 4th sections of Aconcagua sections River

Estimated US$ 423 million – State subsidy near 100 % investment

Hydroelectric 5 to 10 MW generation

The National Department has water rights for 630 Water rights Hm3/year in the 2nd section of Aconcagua River. Water rights of users equivalent to 70 % during winter.

Current Situation Timetable Activity Date

Environment

Assessment and 2nd Sem. 2017 Technical studies to review and complement the feasibility of the dam studies performed

Expropiations 2nd Sem. 2017 Study of environmental assessment under finishing process.

Bidding process 2nd Sem. 2017 Tender conditions ready

Receipt of Tenders 1st Sem. 2018

Source: Department of Irrigation Projects

NATIONAL DEP FPR HYDAULIC WORKS – PROJECT DATA SHEET PUBLIC WORKS PPP LA TRANCA RESERVOIR Updated: JUNE 2017

Project Information

Location Limari Province, commune of Combarbalá,

Cogotí River Multipurpose reservoir type CFRD Description of Capacity: 50 Hm3. Works Dam wall height: 120 m It includes some complementary works.

Benefits Commune of Combarbalá inhabitants 4,940 Ha of irrigation area and 432 rural properties. Estimated Investment US$ 177 million and 100 % subsidy

Hydroelectric Generation 2.4 MW

Water rights Mainly from rural users

Current situation Timetable End of basic design 2nd Semester 2017 Complementary design studies under progress studies

nd Environment assessment studies developing End of EAS 2 Semester 2017 Call for bidding End of 2017

Receipt of Tenders 3rd Quarter 2018

Source: Department of Irrigation Projects

NATIONAL DEP. FOR HYDRAULIC

PROJECT DATA SHEET WORKS – PUBLIC WORKS PPP MURALLAS VIEJAS RESERVOIR Updated: JUNE 2017

Project Information

Location Limarí Province, commune of Combarbalá, Combarbalá River

Description of Works Multipurpose reservoir type CFRD Capacity: 50 Hm3 Dam wall height: 107 m It includes some complementary works

Inhabitants and agriculture producers

of Combarbalá commune Benefits 2,370 Ha irrigation area and 500 rural properties Rural drinking water programme Estimated US$ 125 million with 100 % subsidies Investment

Hydroelectric 1 MW Generation . Water rights Mainly from rural users

Current Situation Timetable End of basic design 2nd Semester 2017 Complementary design studies under progress studies

Environment assessment studies developing End of EAS 2nd Semester 2017

Call for bidding 2nd Semester 2017

Receipt of Tenders 1st Semester 2018 Source: Department of Irrigation Projects

 La Tranca and Murallas Viejas reservoirs will be tendered jointly

BINATIONAL PROJECTS

- Agua Negra Binational Tunnel

PROJECT DATA SHEET CHILE-ARGENTINA - AGUA NEGRA BINATIONAL TUNNEL Updated: JUNE 2017

Project Information Location Map in Chile and San Juan Province Location in Argentina Improve integration between Chile and Argentina Objective and extend the transportation system with Mercosur countries

Description of  Construction of a tunnel of 13.9 km in the Works Andes Mountains at 3,600 mt of altitude

Economic Total costs according to the territorial part: 72 % Conditions Argentina and 28 % Chile

Estimated US$ 1.4 billion Investment Type of Direct public investment financed by IABD Investment

 Improve connectivity of Chile and Mercosur countries Benefits  Contribute to the economic development mainly of Coquimbo region and San Juan Province

Current Situation Timetable Call for October 19th, 2016 prequalification  Institutional organization of a binational entity: EBITAN Call for Bids 4th Quarter 2017  Prequalification in progress

Contract award 1st Semester 2018

Source: MOP

CONTACTS

CONCESSIONS

 Concessions Coordinator: Eduardo Abedrapo, Merced 753, Santiago, Chile, email: [email protected]

INTERNATIONAL COORDINATION

 International Coordinator MOP: Rigoberto García G., Morandé 59, 6º piso, Santiago, Chile, email: [email protected]