Major Projects 2017-2019
Total Page:16
File Type:pdf, Size:1020Kb
MAJOR PROJECTS 2017-2019 MINISTRY OF PUBLIC WORKS JUNE 2017 CONCESSIONS - The Loa Route - Route 5: Section Caldera - Antofagasta - Re-tender of Route N° 5 Los Vilos – La Serena and Conurbation - Interconnection Santiago-Valparaíso-Viña del Mar (Route 68) + Alternatives - Costanera Central Highway - Section Av. La Florida – Camilo Henríquez - Eastern Américo Vespucio Urban Highway - Príncipe de Gales – Grecia - Interconnection Highway 68 with Highway 78 - Fruit Highway, G-66 - Re-tender Route 5 - Talca – Chillán - Re-tender Route 5 - Chillán – Collipulli - Nahuelbuta Route 180 - Route Freire – Villarrica – Pucón - Re-tender Route 5: Temuco – Rio Bueno + Access to Valdivia - Metropolitan Highway of Puerto Montt - North-South Route of Chiloé - Las Palmas Reservoir - Los Angeles Reservoir - Catemu Reservoir - La Tranca and Murallas Viejas Reservoirs PROJECT DATA SHEET PUBLIC WORKS PPP - THE LOA ROUTE Updated: JUNE 2017 Location Map Project Information Communes of Sierra Gorda and Calama in Antofagasta Location Region Increase service levels and improving connectivity and Objective territorial integration of the Region Rutas del Loa Revamping and expansion up to 2 lanes each side Description of the Route 25 of Works Construction of the Eastern bypass to Calama connecting Routes 21, 23, 24 and 25 Economic It considers MGI and ITC Conditions R Estimated US$ 293 million ut Investment as Type of PPP – BOT Investment de l Improvement of service and standard levels of Lo Route 25. Benefits Improvement of safety conditions and shorter travel a times (1 36 K Current Situation m. Timetable Call for Bids ) 2nd Quarter 2017 • Bidding conditions ready Receipt of Tenders 4th Quarter 2017 Contract award 1st Semester 2018 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - ROUTE 5: SECTION CALDERA - Updated: JUNE 2017 ANTOFAGASTA Project Information: Location Map Route 5 between the cities of Caldera and Location Antofagasta Improvement of the standard in this section of the Objective Route 5 Description of Two lanes in each side. Works Max speed 120km/h Road tolls Economic Conditions State subsidy 30 % Estimated US$ 640 million Investment Type of PPP – BOT - Investment Expansion of the 4 lanes highway from Antofagasta to the south Benefits Improvement of safety conditions and shorter travel times More secondary access roads Current Situation Timetable Call for Bids 3rd Quarter 2018 Studies of this private proposal under progress Receipt of Tenders 1st Quarter 2019 Contract award 2nd Semester 2019 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - RE-TENDER OF ROUTE N° 5 LOS VILOS – LA Updated: JUNE 2017 SERENA AND CONURBATION Project Information Location Map Location North of Santiago from km 229 to km 474 Re- tender of the contract for Route N° 5 from Los Objective Vilos to Coquimbo, including urban sector between Coquimbo and La Serena Description of 229 km 4-lanes intercity road Works 17 km of urban highway with three lanes in each direction Economic Road tolls Conditions Estimated US$ 328 million Investment Type of PPP – BOT Investment Improve urban connectivity Increase transport capacity on the urban sector Benefits Reduce accidents With this section the concessioned highway from Caldera to Pargua goes up to 1.955 km Current Situation Timetable Private Initiative Call for bids 3rd Quarter 2017 Developing studies for: design, expropriations, environmental assessment Reception of bids End of 2017 Finishing project proposal Preparation of bidding conditions Contract award 1st Semester 2018 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - INTERCONNECTION SANTIAGO-VALPARAÍSO- Updated: JUNE 2017 VIÑA DEL MAR (ROUTE 68) + ALTERNATIVES Project Information: Location Map Location Provinces of Valparaíso and Santiago Increase service levels and improving the standard Objective of the highway Route 68, has 110 km. It needs a better standard Description of with different secondary roads, junctions and Works additional lanes. Economic Road tolls Conditions Estimated US$ 600 million Investment Type of PPP – BOT Investment Promotes regional economic growth and Benefits territorial integration of 2 of the most important metropolitan areas of the country and Valparaíso seaport Current Situation Timetable Call for Bids 1st Semester 2019 Studies of demand and Social Evaluation under progress Receipt of Tenders End of 2019 Re-tender Route 68 Santiago – Valparaíso – Viña del Mar. Contract award 2nd Quarter 2020 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - COSTANERA CENTRAL HIGHWAY - SECTION AV. LA FLORIDA – CAMILO HENRÍQUEZ Updated: JUNE 2017 Project Information: Location Map South-east side of Santiago Location Metropolitan Area. Communes of La Florida and Puente Alto. Improvement of transport system, connectivity and Objective infrastructure standard of the city Building a high standard underground highway of 12 km.. 9 km is an underground route with 3 lanes in each side and the Description of other 3 km will have 2 lanes in each side. Works The project includes connections to local roads and Américo Vespucio Sur Highway. Road tolls Economic State subsidies 36 % Conditions Free flow tolls Estimated US$ 1.1 Billion Investment Type of Private Initiative - PPP – BOT Investment Improvement of connectivity between south-east districts and downtown Reduction of traffic congestion Benefits New public transport corridor Reduction of operational costs. Improvement of safety conditions and shorter travel times. Current Situation Timetable Call for bids 2nd Quarter 2018 Developing of technical studies and bidding conditions Citizen participation in local communities Receipt of tenders 1st Quarter 2019 Contract award 4th Quarter 2019 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - Eastern Américo Vespucio Urban Updated: JUNE 2017 Highway - Príncipe de Gales – Grecia Project Information Location Map Location Eastern side of Santiago Complete the Americo Vespucio ring road with high Objective quality and service standard Construction of two underground double tracks with 3 lanes each side Description of Works Urban redeveloping in surface considering larger green areas and more facilities for public urban transportation. Road tolls Economic Estimated 15% of state subsidy Conditions Free flow tolls Estimated US$ 786 million Investment Type of PPP – BOT Investment Complete the Américo Vespucio ring road in Santiago with a high service standard Reduce accidents and traffic jams, mainly during rush hours. Benefits Reduce commuting time and pollution emissions. Improve public transportation and connectivity in the city. Current Situation Timetable Call for Bids August 2016 Finishing technical studies and bidding bases Prequalification process re-open Receipt of Tenders 2nd Quarter 2017 Closing agreements and approval with authorities Contract award 4th Quarter 2017 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP INTERCONNECTION HIGHWAY 68 WITH HIGHWAY 78 Updated: JUNE 2017 Project Information: Location Map Western side of Santiago Location Metropolitan Area. Communes of Pudahuel and Maipú. Improvement of transport system, Objective connectivity and infrastructure standard of Western Santiago Construction of a 9.4 km 4- lanes road, to reduce traffic impact in urban zones Internal roads, lighting and drainage Description of Works Construction of different flyovers and structures in the junctions with Route 68 and Route 78 Internal roads and road safety measures Road tolls Economic Conditions Free flow tolls Not subsidies Estimated Investment US$ 250 million Type of Investment Private Initiative - PPP – BOT Improve connectivity between central and western areas of Santiago Improve connection to the main Benefits national seaports avoiding to cross through Santiago. Better local urban development Reduction of accidents, travel times and pollution emissions Current Situation Timetable Call for bids 3rd Quarter 2017 Finishing technical studies and developing of bidding contracts Reception of bids End of 2017 Contract award 1st Semester 2018 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP - FRUIT HIGHWAY, G-66 Updated: JUNE 2017 Project Information Location Map 120 km south from Santiago to the port of San Location Antonio Improve connectivity for small and medium scale producers (fruits, vegetables and wine) from Objective O’Higgins and Maule Regions to the port of San Antonio Restore and improve 138 km of the existing road and construction of a bidirectional road to reduce traffic impact in urban zones Description of Construction of a 21 km 4-lanes road Works Construction of different flyovers and structures to reduce negative impact on population Road tolls Economic State subsidies 50-60 % Conditions Free flow tolls Estimated US$ 600 million Investment Type of PPP – BOT Investment Improvement of connectivity Reduction of transport costs for local Benefits producers Reduction of accidents Current Situation Timetable Call for Bids 3rd Quarter 2017 Technical studies ready Agreements with local authorities and citizen participation Receipt of Tenders 1st Quarter 2018 Preparation of bidding contracts Contract award 1st semester 2018 Source: CCOP PROJECT DATA SHEET PUBLIC WORKS PPP RE-TENDER ROUTE 5 - TALCA – CHILLÁN Updated: JUNE 2017 Project Information: Location Map Communes of Río Claro, San Rafael, Talca, Maule, San Javier, Villa Alegre, Linares, Longaví, Location Retiro, Parral y Ñiquén, San Carlos, San Nicolás, Chillán and Chillán Viejo. Increase service levels and improving the standard