OUR CCLEX
Presentation Outline DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project information
. Cable-stayed bridge 829 m . Total Length 8.5 km . Number of Lanes 2 x 2 or a total of 4 lanes . Height of Bridge 51 m (nav. clearance); 145 m (tower height) . Concession Period – 35 years (inclusive of construction period, exclusive of Russky Bridge (Russky Island, Russia) ROW) . Design Speed 80 - 90 kph . Alignment – Connection to Cebu City side via on- and off-ramps along Cebu South Coastal Road – Main bridge spanning the navigation path to Shell Island; – Viaduct that brings the bridge to the level of the causeway; – Causeway which leads to Pilipog in Cordova; and – At-grade road connecting to Mactan Circumferential Road Sunshine Skyway Bridge (Florida, USA) DRAFT
SEGMENT 9 – Other Activities (cont’d.)
1.4 km
Marcelo Fernan Bridge (1999)
7.5 km
Mandaue-Mactan Bridge (1972)
CCLEX (2021)
Project Plan Vicinity Map DRAFT
SEGMENT 9 – Other Activities (cont’d.)
CEBU MACTAN IS,
BOHOL
Project Plan CCLEX General Alignment DRAFT
SEGMENT 9 – Other Activities (cont’d.)
CSCR OFF RAMP (554 M) MAIN BRIDGE (400 M)
CORDOVA VIADUCT
CSCR ON RAMP (674 M) ORIGINAL TOLL PLAZA CEBU VIADUCT (554 M) LOCATION
MCR CONNECTION CORDOVA RECLAMATION CHANNEL BRIDGE (180 M)
PILIPOG SLAB BRIDGE (205 M) CSCR on/off ramps 0.732 km Main bridge 0.829 km Cebu viaduct 0.340 km
Cordova viaduct 0.810 km CAUSEWAY Causeway 5.126 km
Low level bridges 0.745 km CORDOVA FISHERMEN CORDOVA GABI-PILIPOG BRIDGE (60 M) Total Length 8.582 km BRIDGE (300 M)
Project information DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project Information CSCR, Cebu Viaduct and Main Span DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project information Project Information Main Bridge (829 m) DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project information Project Information Main Span DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project information Project Information Main Span DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project information Project Information Main Span DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project Information Main Towers DRAFT
SEGMENT 9 – Other Activities (cont’d.)
Project highlights
• Joint Venture Agreement with the City of Cebu and Municipality of Cordova signed on 15 Apr 2016 • Concession Agreement signed by the Grantors on 03 Oct 2016
• COWI A/S with DCCD Engineering Corporation as its sub-consultant engaged as Technical Advisor/Owner’s Engineer • Norconsult engaged as Independent Consultant
DRAFT
Procurement of Contractor
Contract was awarded to Cebu Link Joint Venture (CLJV), a consortium of 3 contractors: • Spain based Acciona S.A. • Philippine based First Balfour & D.M. Consunji
Commencement Date
Notice of award was issued last November 23, 2017 and Contract Signing was done last December 19, 2017, Notice to Proceed issued last January 8, 2018. Detailed Engineering Design is on-going
Projected Completion Date
The project is scheduled for completion by 1st quarter of 2021
DRAFT
Benefits
• Decongest traffic in the two existing bridges, the Mactan-Mandaue and Marcelo Fernan, linking Cebu City and Mactan Island • Serve as an additional access to the Mactan Cebu International Airport • Help minimize losses due to traffic congestion • Facilitate trade activities and spur economic development not just for the Metro but also for the province of Cebu and Central Visayas • Generate more jobs DRAFT
On-going Activities
Securing of clearances - Navigational Clearance from the Philippine Coast Guard Right-of-way acquisition - Parcellary survey completed - 9 lots and 21 improvements will be affected in Cordova - Documentation of affected lots ongoing