Table 2.16 WOOD-BASED PLANTS: 1994

Total Page:16

File Type:pdf, Size:1020Kb

Table 2.16 WOOD-BASED PLANTS: 1994 2014 Philippine Forestry Statistics Forest Management Bureau 2014 Philippine Forestry Statistics FOREWORD The Philippine Forestry Statistics is an annual publication of the Forest Management Bureau, Department of Environment and Natural Resources. It provides basic information on forestry in the country. The data comprising this edition are presented in six (6) parts: Part I refers to forest cover, forest resources, and forest activities; Part II contains forest resources utilization; Part III presents the summary data on foreign trade; Part IV provides price information of logs, processed wood products as well as non-timber forest products; Part V indicates the revenues derived from the utilization of forest resources; and Part VI pertains to other statistics relevant to forestry. Most of the data presented in this publication were collected from administrative reports of the DENR Regional Offices. Others were secondary data gathered from various agencies such as the National Mapping and Resource Information Authority (NAMRIA), Philippine Statistics Authority (PSA), and the Commission on Higher Education (CHED). We wish to extend our sincere acknowledgement to the different government agencies and other stakeholders for their invaluable assistance in making this publication possible. RICARDO L. CALDERON, CESO III Director TABLE OF CONTENTS Page Foreword ……………………………………………………………………………………………………………………………………………………….................... iii List of Statistical Tables ……………………………………………………………………………………………………………………………………………………. vi Figures .………………...…………….…………………………………………………………………………………………………………………………................... ix Unit of Measure for Timber Products .……………………………………………………………………………………………………………………………………... x Abbreviations …..…………………………………………………………………………………………………………………………………………………………... xi Synopsis ..…………………………………………………………………………………………………………………………………………………………………… xii FOREST RESOURCES AND FORESTRY ACTIVITIES Forest Resources ..………………………………………………………………………………………………………………………………………………. 4 Forestry Activities ...…………………………………………………………………………………………………………………………………………….. 34 FOREST RESOURCES UTILIZATION Licenses, Leases and Permits ..………………………………………………………………………………………………………………………………….. 41 Wood Processing Plants ...………………………………………………………………………………………………………………………………………. 55 Production ……………………………………………………………………………………………………………………………………………………….. 69 Logging Wastes and Residues .......……………………………………………………………………………………………………………………………… 88 FOREIGN TRADE Exports ..………………………………………………………………………………………………………………………………………………………… 93 Imports ..………………………………………………………………………………………………………………………………………………………… 100 PRICES Domestic ...………………………………………………………………………………………………………………………………………………………. 107 Exports ...………………………………………………………………………………………………………………………………………………………… 132 FOREST REVENUES Forest Charges ....………………………………………………………………………………………………………………………………………………… 135 OTHER FORESTRY RELATED STATISTICS Statistics on Forestry Establishments ...…………………………………………………………...………………………………………………………………. 141 Gross Domestic Product (GDP) and Gross Value Added (GVA) in Forestry …………………………………………………………………………………… 143 Number of Schools offering Forestry Courses, Enrollees and Graduates ......……………………………………………………………………………………. 144 GLOSSARY ..…..………………………………………………………………………………………………………………………………………………………….. 147 LIST OF STATISTICAL TABLES Page 1.01 Land Classification: 1994 – 2014 ................................................................................................................................................................................ 4 1.02 Status of Land Classification by Province: 2014 ........................................................................................................................................................ 5 1.03 Forest Cover of the Philippines: 2010 ......................................................................................................................................................................... 11 1.04 Forest Cover of the Philippines in Forestland: 2010 .................................................................................................................................................... 15 1.05 Forest Cover of the Philippines in Alienable and Disposal Land: 2010 ...................................................................................................................... 19 1.06 Watershed Forest Reserves by Province: 2014 ........................................................................................................................................................... 23 1.07 Community-Based Forest Management Agreements: 2014 ....................................................................................................................................... 34 1.08 Area Reforested by Sector: 1994 – 2014 .................................................................................................................................................................... 35 1.09 National Greening Program (NGP) – Area Planted: 2014 .......................................................................................................................................... 37 2.01 Timber Licenses: CY 1994 – 2014 .............................................................................................................................................................................. 41 2.02 Existing Timber License Agreements: 2014 ............................................................................................................................................................... 42 2.03 Integrated Forest Management Agreement/Industrial Tree Plantation Lease Agreement (IFMA/ITPLA), Tree Farm and Agro-Forestry Farm Leases: 1994 – 2014 ........................................................................................................................................... 43 2.04 Integrated Forest Management Agreement (IFMA) by Province: 2014 .................................................................................................................... 44 2.05 Tree Farm and Agro-Forestry Farm Leases by Province: 2014 .................................................................................................................................. 47 2.06 Socialized Industrial Forest Management Agreements: 2014 ...................................................................................................................................... 48 2.07 Private Forest Development Agreements by Province: 2014 ..................................................................................................................................... 49 2.08 Forest Land Grazing Management Agreements and Permits: 1994 – 2014 ............................................................................................................... 50 2.09 Forest Land Grazing Management Agreements by Province: 2014 ........................................................................................................................... 51 2.10 Special and Forest Land Use Permits and Agreements: 2014 .................................................................................................................................... 52 2.11 Rattan Cutting Contracts by Province: 2014 ................................................................................................................................................................ 54 2.12 Active Regular Sawmills: 1994 – 2014 ....................................................................................................................................................................... 55 2.13 Active Regular Sawmills by Province: 2014 ............................................................................................................................................................... 56 2.14 Existing Regular Sawmills by Province: 2014 ............................................................................................................................................................. 57 2.15 Existing Mini-Sawmills by Province: 2014 ................................................................................................................................................................. 59 2.16 Wood-based Plants: 1994 – 2014 ................................................................................................................................................................................ 61 2.17 Veneer Plants by Region: 2014 .................................................................................................................................................................................... 62 2.18 Plywood Plants by Region: 2014 ................................................................................................................................................................................ 65 2.19 Wood-Based Panel Plants: 2014 ................................................................................................................................................................................ 68 2.20 Roundwood Production: 1994 – 2014 ......................................................................................................................................................................... 69 2.21 Monthly Log Production by Province: 2014 ..............................................................................................................................................................
Recommended publications
  • 14-228-229-Vnr-Plywood Prod.Xlsx
    2014 Philippine Forestry Statistics Forest Management Bureau 2014 Philippine Forestry Statistics Forest Management Bureau 2014 Philippine Forestry Statistics Table 1.01 LAND CLASSIFICATION: 1994 - 2014 (In hectare) F o r e s t l a n d C l a s s i f i e d Year Total Area Certified Established National Military Total Unclassified Established Civil A & D Total Forest Parks & & Naval Fishpond Timberland Reservations Reserves GRBS/WA Reservations 2014 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2013 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2012 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2011 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2010 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2009 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2008 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2007 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2006 30,000,000 14,194,675 15,805,325 755,009 15,050,316 3,270,146 10,056,020 1,340,997 126,130 165,946 91,077 2005 30,000,000 14,207,582 15,792,418 753,427 15,038,991 3,222,360 10,090,899 1,342,579 126,130 165,946 91,077 2004
    [Show full text]
  • Download 6.02 MB
    Initial Environmental Examination January 2019 PHI: Integrated Natural Resources and Environmental Management Project Rehabilitation of Ilaya to Datag Access Road in Inabanga, Bohol Prepared by Municipality of Inabanga, Province of Bohol for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 03 December 2018 Year) The date of the currency equivalents must be within 2 months from the date on the cover. Currency unit – peso (PhP) PhP 1.00 = $ 0.019052 $1.00 = PhP 52.4864 ABBREVIATIONS ADB Asian Development Bank BDC Barangay Development Council BUB Bottom-Up Budgeting CNC Certificate of Non-Coverage CSC Construction Supervision Consultant CSO Civil Society Organization DED Detail Engineering Design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DSWD Department of Social Welfare and Development ECA Environmentally Critical Area ECC Environmental Compliance Certificate ECP Environmentally Critical Project EHSM Environmental Health and Safety Manager EIA Environmental Impact Assessment EIS Environmental Impact Statement EMB Environmental Management Bureau ESS Environmental Safeguards Specialist GAD Gender and Development IEE Initial Environmental Examination INREMP Integrated Natural Resources and Environment Management Project IP Indigenous People IROW Infrastructure Right of Way LGU Local Government Unit LPRAT Local Poverty Reduction Action Team MDC Municipal Development Council NAAQ National Ambient Air Quality Guidelines NCB National Competitive Bidding NECA Non-Environmental Critical
    [Show full text]
  • The London School of Economics and Political Science Hegemony
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by LSE Theses Online The London School of Economics and Political Science Hegemony, Transformism and Anti-Politics: Community-Driven Development Programmes at the World Bank Emmanuelle Poncin A thesis submitted to the Department of Government of the London School of Economics for the degree of Doctor of Philosophy. London, June 2012. 1 Declaration I certify that the thesis I have presented for examination for the MPhil/PhD degree of the London School of Economics and Political Science is solely my own work other than where I have clearly indicated that it is the work of others (in which case the extent of any work carried out jointly by me and any other person is clearly identified in it). The copyright of this thesis rests with the author. Quotation from it is permitted, provided that full acknowledgement is made. This thesis may not be reproduced without my prior written consent. I warrant that this authorisation does not, to the best of my belief, infringe the rights of any third party. I declare that my thesis consists of 99,559 words. Statement of use of third party for editorial help I can confirm that my thesis was copy edited for conventions of language, spelling and grammar by Patrick Murphy and Madeleine Poncin. 2 Abstract This thesis scrutinises the emergence, expansion, operations and effects of community-driven development (CDD) programmes, referring to the most popular and ambitious form of local, participatory development promoted by the World Bank.
    [Show full text]
  • Lidar Surveys and Flood Mapping of Loboc River
    LiDAR Surveys and Flood Mapping of Loboc River 1 Hazard Mapping of the Philippines Using LIDAR (Phil-LIDAR 1) 2 LiDAR Surveys and Flood Mapping of Loboc River © University of the Philippines Diliman and University of San Carlos 2017 Published by the UP Training Center for Applied Geodesy and Photogrammetry (TCAGP) College of Engineering University of the Philippines – Diliman Quezon City 1101 PHILIPPINES This research project is supported by the Department of Science and Technology (DOST) as part of its Grants-in-Aid Program and is to be cited as: E. C. Paringit and R. S. Otadoy (eds.) (2017), LiDAR Surveys and Flood Mapping of Loboc River, Quezon City: University of the Philippines Training Center for Applied Geodesy and Photogrammetry- 128pp. The text of this information may be copied and distributed for research and educational purposes with proper acknowledgement. While every care is taken to ensure the accuracy of this publication, the UP TCAGP disclaims all responsibility and all liability (including without limitation, liability in negligence) and costs which might incur as a result of the materials in this publication being inaccurate or incomplete in any way and for any reason. For questions/queries regarding this report, contact: Dr. Roland Emerito S. Otadoy Project Leader, Phil-LiDAR 1 Program University of San Carlos Cebu City, Philippines 6000 E-mail: [email protected] Enrico C. Paringit, Dr. Eng. Program Leader, Phil-LiDAR 1 Program University of the Philippines Diliman Quezon City, Philippines 1101 E-mail: [email protected]
    [Show full text]
  • Integrated Natural Resources and Environmental Management Project (INREMP)
    Environmental and Social Monitoring Report Semi-annual Report July 2018 PHI: Integrated Natural Resources and Environmental Management Project (INREMP) Reporting period: July to December 2016 Prepared by Department of Environment and Natural Resources - Forest Management Bureau for the Asian Development Bank This Semi-annual Environmental and Social Monitoring Report is a document of the Borrower. The views expressed herein do not necessarily represent those of ADB Board of Directors, Management or staff, and my be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as the legal or other status of any territory or area. ABBREVIATIONS ADB Asian Development Bank ADSDPP Ancestral Domain sustainable Development and Protection Plan BURB Bukidnon Upper River Basin CENRO Community Environment and Natural Resource Office CP Certificate of Precondition CURB Chico Upper River Basin DED Detailed engineering Design DENR Department of Environment and Natural Resources FMB Forest Management Bureau GAP Gender Action Plan GOP Government of the Philippines GRM Grievance Redress Mechanism EA Executing Agency IEE Initial Environmental Examination IFAD International Fund for Agricultural Development INREMP Integrated Natural Resources and Environmental Management Project IP Indigenous People IPDP Indigenous Peoples Development Plan IPP Indigenous
    [Show full text]
  • Integrated Natural Resources and Environmental Management Project
    Project Administration Manual Project Number: 41220 Loan and/or Grant Number(s): October 2012 Republic of the Philippines: Integrated Natural Resources and Environmental Management Project Contents ABBREVIATIONS I. PROJECT DESCRIPTION 1 II. IMPLEMENTATION PLANS 2 A. Project Readiness Activities 2 B. Overall Project Implementation Plan 7 III. PROJECT MANAGEMENT ARRANGEMENTS 11 A. Project Implementation Organizations – Roles and Responsibilities 11 B. Key Persons Involved in Implementation 15 C. Project Organization Structure 16 IV. COSTS AND FINANCING 19 A. Detailed Cost Estimates by Expenditure Category 21 B. Allocation and Withdrawal of Loan and Grant Proceeds 23 C. Detailed Cost Estimates by Financier 26 D. Detailed Cost Estimates by Outputs/Components 28 E. Detailed Cost Estimates by Year 30 F. Contract and Disbursement S-curve 31 G. Fund Flow Diagram 32 V. FINANCIAL MANAGEMENT 33 A. Financial Management Assessment 33 B. Disbursement 37 C. Accounting 40 D. Auditing 41 VI. PROCUREMENT AND CONSULTING SERVICES 42 A. Assessment of Procurement Capacity 42 B. Advance Contracting 42 C. Procurement of Goods, Works and Consulting Services 43 D. Procurement Plan 44 E. Consultant's Terms of Reference 49 VII. SAFEGUARDS 52 VIII. GENDER AND SOCIAL DIMENSIONS 64 IX. PERFORMANCE MONITORING, EVALUATION, REPORTING AND COMMUNICATION 66 A. Project Design and Monitoring Framework 66 B. Monitoring 69 C. Evaluation 69 D. Reporting 69 E. Stakeholder Communication Strategy 70 X. ANTICORRUPTION POLICY 72 XI. ACCOUNTABILITY MECHANISM 76 XII. RECORD OF PAM CHANGES 76 APPENDIXES 1. Implementation Arrangements 2. Detailed Cost Tables (Per Subcomponent) 3. INREMP Performance Based Grant System: Conceptual Framework 4. Implementation Arrangements and Funds Administration/Flow 5.
    [Show full text]
  • The Hydrology of Central Bohol
    NORGES VASSDRAGS- OG ELEKTRISITETSVESEN VASSD RAGSDIREKTORATET HYDROLOGISK AVDELING THE HYDROLOGY OF CENTRAL BOHOL The Philippines A field and desk study OPPDRAGSRAPPORT 6 - 81 NORGES VASSDRAGS- OG ENERGIVERK BIBLIOTEK OPPDRAGSRI~PPORT 6-81 Rapportens tittel: Dato: 1981-05-20 THE HYDROLOGY OF CENTRAL BOHOL. Rapporten er: Apen The phi lippines. Opplag: 50 A field and desk study. Saksbehandler/Forfatter: Leif-Egil LØrum EDB-kontoret Oppdragsgiver: NORCONSULT A. S. Sammendrag: Hydrologien i de sentrale deler av Bohol-provinsen på Filippinene er vurdert på grunnlag av feltbefaring og analyse av allerede publiserte nedbør- og avløpsdata. Datagrunnlaget for estimering av hydrologiske parametre til bruk ved forprosjektstudie av vannkraftverk i provinsen er relativt spinkelt. Middelavløp, flomstørrelser og lavvannsverdier er overført til prosjektområdene ved hjelp aven antatt sammenheng med nedbørfeltenes størrelse og beliggenhet. Varighetskurven fra den antatt beste måle• stasjonen er foreløpig valgt som representativ for de sentrale deler av Bohol. En vesentlig kompliserende faktor er de karst-hydrologiske problemene i området. Eksistensen av drenering i undergrunnen er åpenbar enkelte steder. Det topografiske og hydrologiske vannskillet stemmer ikke overens for nedslagsfeltet til Bilar River. En reduksjon til effektivt drenering sa real er antydet. En forsvarlig analyse av hydrologien i området krever at supplerende målestasjoner opprettes så snart som mulig. Enkelte eksisterende måle• stasjoner kan dessuten forbedres. Flere alternativer for
    [Show full text]
  • 'Demonizing' Media
    Cebu Journalism & Journalists CJJ12 2017 ‘Demonizing’ media Fake news inflicts more damage in social media Restoring faith in journalism 23+2 / 33 CEBU PRESS Freedom WEEK 25th fete, 33rd year 1984 | Sept. 9-15 1999 | Sept. 19-25 was revived with SunStar as lead managers signed a memorandum The Association of Cebu Journalists, Lead convenor: The Freeman news group. of understanding on valuing public the Cebu Newspaper Workers’ The convenors’ group institutionalized safety in the coverage of crisis Foundation (Cenewof) and Cebu Cebu Press Freedom Week and 2006 | Sept. 17 to 23 situations. A street in Barangay News Correspondents Club organized agreed that each of the three Lead convenor: Cebu Daily News Sambag II, Cebu City was named after the Cebu Press Week celebration newspapers take turns in leading the CJJ2 was launched, and Lens held a sportswriter Manuel N. Oyson Jr. to remind the public and the press activity every year. photo exhibit. SunStar produced the that the freedom it enjoys must be documentary “Killing Journalists.” 2012 | Sept. 15-22 protected from all threats. 2000 | Sept. 17-23 Lead convenor: Cebu Daily News Lead convenor: Cebu Daily News 2007 | Sept. 15-22 Firsts for the celebration included 1988 | Sept. 4-10 The Cebu Federation of Beat Lead convenor: SunStar Cebu the Globe Cebu Media Excellence The Council of Cebu Media Leaders Journalists was organized. SunStar debuted its “Reaching Awards, and the launch of an e-book (CCML)—organized to promote out to future journalists” forum version for the CJJ7 magazine. the development of media as a 2001 | Sept. 16-22 with Masscom students from Cebu profession, upgrade its practice Lead convenor: SunStar Cebu universities.
    [Show full text]
  • The BALANCED Project Final Report, September 2008
    Building Actors and Leaders for Advancing Community Excellence in Development: The BALANCED Project FINAL REPORT For Period September 2008 to September 2013 USAID Cooperative Agreement No. GPO-A-00-08-00002-00 Population, Health and Environment Technical Leadership Cooperative Agreement Implemented by: Coastal Resources Center at the University of Rhode Island PATH Foundation Philippines, Inc. Conservation International This document was produced for review by the United States Agency for International Development under the terms of Cooperative Agreement No. GPO-A-00-08-00002-00. The Project is managed by the Coastal Resources Center at the University of Rhode Island in collaboration with PATH Foundation Philippines, Inc. and Conservational International. For more information contact: Lesley Squillante Email: [email protected] Table of Contents I. Introduction ........................................................................................................................... 1 I. Assessment of Project Impact .............................................................................................. 1 II. Cumulative Results Achieved .............................................................................................. 6 IR1 Capacity built for integrated PHE implementation .......................................................... 7 Achievements .......................................................................................................................... 7 Lessons Learned: .................................................................................................................
    [Show full text]
  • Building Low Emission Alternatives to Develop Economic Resilience and Sustainability (B-Leaders) Project
    BUILDING LOW EMISSION ALTERNATIVES TO DEVELOP ECONOMIC RESILIENCE AND SUSTAINABILITY (B-LEADERS) PROJECT ANNUAL REPORT FISCAL YEAR 2016 COVERING OCTOBER 1, 2015 – SEPTEMBER 30, 2016 October 15, 2016 This document was produced for review by the United States Agency for International Development. It was prepared by IRG, an Engility company. 1 BUILDING LOW EMISSION ALTERNATIVES TO DEVELOP ECONOMIC RESILIENCE AND SUSTAINABILITY (B-LEADERS) PROJECT ANNUAL REPORT FISCAL YEAR 2016 COVERING OCTOBER 1, 2015 – SEPTEMBER 30, 2016 DISCLAIMER The author’s views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. TABLE OF CONTENTS EXECUTIVE SUMMARY ...................................................................................................... 9 SECTION 1: PROJECT OVERVIEW AND EXPECTED RESULTS ...................................... 14 A. General Overview .......................................................................................................................... 14 B. Expected Results ............................................................................................................................ 14 SECTION 2: ACTIVITY IMPLEMENTATION PROGRESS ............................................... 21 A. Progress Narrative ......................................................................................................................... 21 B. Quantitative Results for FY 2016 .............................................................................................
    [Show full text]
  • 3 International River Summit Held In
    DENR, BukSU & GIZ COSERAM … (from p. 2) Nicole Bendsen and senior advisor Adonis Gonzales for partnering EDITORIAL BOARD with BukSU and the participants for the two-day productive research Consultants forum. DENR 10 conducts assessment…(p. 2) Ruth M. Tawantawan, CESO III Regional Director A workshop was also conducted in the crafting of IEC Work and Financial Plan for 2017 to identify the different activities to be Ester A. Olavides, CESE conducted next year. This will also identify the trainings, workshops, OIC, Assistant Regional Director and seminars to be attended by the information officers to capacitate for Management Services them in the IEC campaign and activities. Felix S. Mirasol, Jr., DPA Topics discussed during the activity include Programs and OIC, Assistant Regional Director Projects CY 2016 presented by Assistant Chief, Planning and for Technical Services Management Division Dario P. Barbarona and preparation of the minutes of the meeting by SCDO Lina D. Calvez. RPAO Staff DENR 10 inks MOA… (from p. 2) RD Lina D. Calvez 3 INTERNATIONAL RIVER SUMMIT HELD IN CDO INREMP Project Manager Amie Rabang of the National Editor in Chief Project Coordination Office said the 80% funding of the RIS will come from INREMP while the 20% will be from the local Rosita T. Lubguban government units as equity. DENR 10 Regional Director Ruth Managing Editor M. Tawantawan congratulates Other Rural Infrastructure Subprojects to be implemented are participants of the 3rd International in Malaybalay City with the 19 kilometer rehabilitation of Canayan- Marlowe M. Paragas River Summit (IRS) for coming up Kibalabag-Manalog Access Road; Damulog with 5.97 kilometer Associate Editor with recommendations that would rehabilitation of Purok 1 to Purok 3 via Purok 2, San Isidro Access empower the local government, Road; and Pangantucan with 5.26 improvement and rehabilitation of Shannon Lyn A.
    [Show full text]
  • Ecosystems and Natural Resources
    ecosystems and natural resources “Live off the interest, don’t mine the capital.” Bohol is considered as one of the few provinces in the country that still has some of its diverse ecosystems left in reasonable condition. Its varied ecosystems are home to both migratory and endemic wildlife species. Bohol’s freshwater, beach, mangrove, coral reef, and open-water ecosystems are intricately tied culturally, economically and ecologically with the life of the Boholano people. This chapter provides a description of the ecosystems and natural resources of Bohol as a basis for understanding how to manage them. Chapter 2 Figure 2.1. The coasts are the natural crossroads between the sea and the land Chapter 2 — Ecosystems and Natural Resources 17 Figure 2.2. Map of river networks and watershed areas in Bohol 18 Bohol Island: Its Coastal Environment Profile FRESHWATER ECOSYSTEM There are eleven major rivers in Bohol fed by hundreds of tributaries emanating from the upland watersheds. The major river systems include the Wahig-Inabanga River (Inabanga), Ipil River (Trinidad), Soom River (Ubay), Caru-od River (Candijay), Lumbay River (Anda-Guindulman), Manaba River (Garcia Hernandez), Loboc River (Loay-Loboc), Panampan River (Dimiao), Abatan River (Cortes-Maribojoc), Moalong River (Loon) and Alejawan River (Duero). Bohol has three major watersheds, all of which have been declared as protected areas under the National Integrated Protected Area System (NIPAS). These are the Wahig-Inabanga Watershed, Loboc Watershed and Duero Watershed. The Wahig-Inabanga Watershed covers two watershed projects of the DENR, namely, the Bohol Watershed Reforestation Project (BWRP) in Dagohoy and Wahig-Pamacsalan Watershed Reforestation Project (WPWRP) in Pilar.
    [Show full text]