TENDER FOR THE CONSTRUCTION AND COMPLETION OF 16 UNITS (BLOCK E & F) SINGLE STOREY STAFF QUARTERS AT SESCo TOWNSHIP AT BATANG AI,

TABLE OF CONTENT Page

1. FORM OF TENDER

2. INSTRUCTIONS TO TENDERERS

3. SUMMARY OF TENDER

4. APPENDIX A - APPENDIX TO THE AGREEMENT

5. APPENDIX B - SCHEDULE OF BASIC RATES FOR LABOUR AND MACHINERY

6. APPENDIX C - SCHEDULE OF PLANTS

7. APPENDIX D - SCHEDULE OF SUB-CONTRACTOR

8. APPENDIX E - INFORMATION TO BE SUPPLIED BY CONTRACTOR

9. APPENDIX F - SCHEDULE OF SITE STAFF

10. APPENDIX G - SCHEDULE OF MANUFACTURERS

11. APPENDIX H - SCHEDULE OF SUPPLIERS

12. APPENDIX I - RECENT CONTRACTS

13. APPENDIX J - ELECTRICAL WORKS – INSTALLATION OF INTERNAL WIRING

14. SCHEDULE OF FINISHES

15. SCHEDULE OF RATES

16. GENERAL CONDITIONS OF CONTRACT

17. PROJECT SPECIFICATION

18. HEALTH, SAFETY AND ENVIRONMENTAL REQUIREMENT FOR CONTRACTOR

19. LIST OF TENDER DRAWINGS

INSTRUCTIONS TO TENDERER

1. The Tenderer is to note that this is a Lump Sum Contract. The Tender shall be signed with all blanks in the Form of Tender, Summary of Tender, Schedule of Rates and Appendices filled in.

2. No alteration is to be made in the Form of Tender, Summary of Tender, Appendices or Schedule of Rates except in filling in the blanks as directed. If any such alteration be made or if these instructions be not fully complied with, the Tender may be rejected.

3. If the Tenderer should wish to submit for consideration an alternative method of construction or other variation, he shall in all cases submit a Tender in accordance with Paragraph 2 above, and in addition shall submit an alternative proposal, clearly stating the omissions and additions together with the Tenderer’s detailed estimate which would give effect to the alternative.

4. If the Tenderer has any doubt as to the meaning of any portion of the Specification, the General Conditions of Contract, he shall contact the Company in writing at the following address:-

THE CHIEF EXECUTIVE OFFICER, ENERGY BERHAD, MENARA SARAWAK ENERGY, LEVEL 8, NO.1, THE ISTHMUS, 93050 , SARAWAK, .

Fax. No: 082-481144

5. If the Employer discovers errors or omissions in any tender, he will require the same to be corrected but in such cases a compensating adjustment by means of a Lump Sum will be made so that the Tender Price remains unaltered. Any arithmetical adjustments made by the Employer in the Tender will be stated to the Tenderer if the Employer makes an offer to accept the Tender.

6. The Tenderer will be deemed to have visited the site to ascertain local conditions under which the works are to be executed and thus the Tender Price must include all incidental and contingent expenses. No claims will be entertained on the ground of lack of knowledge of the site conditions or any difficulty that may arise in respect with the entirety of the work specified.

7. The Tenderer's particular attention is drawn to the fact that the Tender Price must include for all costs associated with labour including the cost of any incentives necessary to attract and retain the necessary labour on site to meet the requirements of the programme stated in the tender.

The Tenderer's attention is further directed to the fact that the Tender Price must include for all increases in the cost of labour and materials.

8. The Employer will not be responsible for or pay any expenses or losses which may be incurred by the Tenderer in the preparation of his Tender.

9. When the Employer has decided on a Tender which it is willing to accept, a letter of acceptance will be sent to the Tenderer who submitted the Tender, and it will state the terms on which the acceptance is given.

10. The Employer does not bind itself to accept the lowest or any tender, nor to assign any reason for the rejection of any tender.

1

TENDER FOR THE CONSTRUCTION AND COMPLETION OF 16 UNITS (BLOCK E & F) SINGLE STOREY STAFF QUARTERS AT SESCO TOWNSHIP AT BATANG AI, LUBOK ANTU DISTRICT

SUMMARY OF TENDER

(A) PREAMBLES TO TENDER

(1) The Tender is to note that this is a Lump Sum contract. Tenderers are required to price and complete the Summary of Tender all in accordance with the Contract Document specified in Clause 1.6 of the Project Specification.

(2) Tenderes are required to pay particular attention to the Project Specification.

(3) The Company reserves the right to delete, add or substitute item of works according to the rates tendered here in.

(4) Tenderers are required to submit catalogues or brochures and literature of building materials specified or proposed as and when requested. Samples are also required to be submitted for approval. Upon approval are set of catalogue and samples of the approval materials when be kept at the site office.

(5) Tenderers shall allow for provision to the Engineer comprehensive installation details and shop drawings for all sections of works as deemed necessary. Three sets of shop drawings are to be submitted for approval are set to be duly marked by the Engineer as approved and the Tenderer shall then commence works within 14 day, of delivery of the corresponding approved shop drawings, unless directed otherwise by the Engineer or except return of the approved shop drawings.

(6) The Tenderer shall be responsible for carrying out the whole of the works, provisions and requirements of the contract or seeing to that they and carrying out by all concerned, in a thoroughly safe and satisfactory manner and in particular shall strictly confirm to the requirements of any by- laws, regulations, orders and advices relating to the safety of person, on or about site, made of any public authority and government having jurisdiction in the matter.

(7) The Tenderer should provide a site office for SESCo’s supervisory staff. Amenities like furniture, fan, a cellular phone and a digital camera shall also be provided.

(8) The Tenderer should allow for a progressive site meeting on site at least once a month. All minutes of meeting are to be recorded. A progressive works programme and report with sufficient photographs are to be submitted before each meeting.

(9) The Tenderer should put up hoarding board with sufficient signs.

1 Locality Plan