Soil Fertility Map Province of Lanao Del Norte

Total Page:16

File Type:pdf, Size:1020Kb

Soil Fertility Map Province of Lanao Del Norte 123°40' 123°50' 124°0' 124°10' 124°20' 124°30' Province of Misamis Oriental 8°20' R E P U B L I C O F T H E P H I L I P P I N E S 8°20' D E P A R T M E N T O F A G R I C U LT U R E BUREAU OF SOIL S AND WATER M ANAGEMENT Elliptical Road Cor. Visayas Ave., Diliman, Quezon City SOIL FERTILITY MAP ( Key Rice Areas ) PROVINCE OF LANAO DEL NORTE ° LEGEND SCALE 1:95,000 0 1 2 3 4 5 6 7 MAPPING AREA DESCRIPTION Kilometers UNIT ha % - - Projection : Transverse Mercator ILIGAN Low Datum : Luzon 1911 - - DISCLAIMER : All political boundaries are not authoritative 6,698 40.68 Moderately Low 8,562 51.99 589 3.58 Moderately High 618 3.75 I l i g a n B a y - - High - - Bacolod Kauswagan Linamon TOTAL 16,467 100.00 Paddy Irrigated Paddy Non Irrigated AArereaa e srteifmearste tdo b tahsee da cotnu acl taurael afi eslud rsvueryveyd, botyh tehr ein ffioerlmd astuiornve fyro tmea DmA.-RFO's, MA's NIA Service Area, NAMRIA Land Cover (2010) and BSWM 8°10' Land Use System Map. 8°10' Maigo Tagoloan II Matungao Province of Bukidnon Baloi Kolambugan Province of Misamis Occidental Tagoloan Poona Piagapo Pantar Pantao Ragat TUBOD Province of Lanao del Sur Magsaysay Baroy Tangcal P a n g u i l B a y 8°0' 8°0' Munai Lala Province of Zamboanga del Sur Salvador Kapatagan Sapad LOCATION MAP 7°50' 7°50' Nunungan 8°30' Misamis Oriental Misamis Occidental LUZON 15° LANAO DEL NORTE Sultan Naga 8° Dimaporo Lanao del Sur VISAYAS 10° North Cotabato 7°30' Maguindanao S i g a y a n B a y MINDANAO 5° 124° 124°30' 120° 125° CONVENTIONAL SIGNS MISCELLANEOUS INFORMATION ROADS BOUNDARY HYDROLOGY SOURCES OF INFORMATION : Topographic information taken from NAMRIA Topographic Map at a scale of 1:50,000. Elevation data taken from SRTM 1 arc-second global dataset (2015). Bathymetry information taken Rivers / Lake from British Oceanographic Centre. Fertility data gathered through the Bureau of Soils and Water Management Expressway Regional (BSWM), National Soil Sampling and Testing for Fertility and Crop Suitability Assessment Project led by the Soils Survey Division (SSD) in 2016. Trunk line Provincial Shoreline Users noting errors or omissions in this publication are requested to inform the BSWM, SRDC Bldg., Elliptical Rd.,cor. Visayas Avenue, Diliman, Quezon City, Philippines or visit the BSWM Primary website(http://www.bswm.da.gov.ph). District PLACES Copyright © 2016. All rights reserved to the Bureau of Soils and Water Management. No part of this publication Secondary ^ may be reproduced, stored in a retrieval system or published without written consent from the BSWM. Municipal \ Capital City / City Tertiary Prepared and produced by the Geomatics and Soil Information Technology Division, BSWM. P ! Capital Town / Town I l l a n a B a y Province of North Cotabato 7°40' 123°40' 123°50' 124°0' 124°10' 124°20' 124°30'.
Recommended publications
  • Philippines: Marawi Armed-Conflict 3W (As of 18 April 2018)
    Philippines: Marawi Armed-Conflict 3W (as of 18 April 2018) CITY OF Misamis Number of Activities by Status, Cluster & Number of Agencies EL SALVADOR Oriental 138 7,082 ALUBIJID Agencies Activities INITAO Number of CAGAYAN DE CLUSTER Ongoing Planned Completed OPOL ORO CITY (Capital) organizations NAAWAN Number of activities by Municipality/City 1-10 11-50 51-100 101-500 501-1,256 P Cash 12 27 69 10 CCCM 0 0 ILIGAN CITY 571 3 Misamis LINAMON Occidental BACOLOD Coord. 1 0 14 3 KAUSWAGAN TAGOLOAN MATUNGAO MAIGO BALOI POONA KOLAMBUGAN PANTAR TAGOLOAN II Bukidnon PIAGAPO Educ. 32 32 236 11 KAPAI Lanao del Norte PANTAO SAGUIARAN TANGCAL RAGAT MUNAI MARAWI MAGSAYSAY DITSAAN- CITY BUBONG PIAGAPO RAMAIN TUBOD FSAL 23 27 571 53 MARANTAO LALA BUADIPOSO- BAROY BUNTONG MADALUM BALINDONG SALVADOR MULONDO MAGUING TUGAYA TARAKA Health 79 20 537 KAPATAGAN 30 MADAMBA BACOLOD- Lanao TAMPARAN KALAWI SAPAD Lake POONA BAYABAO GANASSI PUALAS BINIDAYAN LUMBACA- Logistics 0 0 3 1 NUNUNGAN MASIU LUMBA-BAYABAO SULTAN NAGA DIMAPORO BAYANG UNAYAN PAGAYAWAN LUMBAYANAGUE BUMBARAN TUBARAN Multi- CALANOGAS LUMBATAN cluster 7 1 146 32 SULTAN PICONG (SULTAN GUMANDER) BUTIG DUMALONDONG WAO MAROGONG Non-Food Items 1 0 221 MALABANG 36 BALABAGAN Nutrition 82 209 519 15 KAPATAGAN Protection 61 37 1,538 37 Maguindanao Shelter 4 4 99 North Cotabato 7 WASH 177 45 1,510 32 COTABATO CITY TOTAL 640 402 6,034 The boundaries, names shown and the designations used on this map do not imply official endorsement or acceptance by the United Nations Creation date: 18 April 2018 Sources: PSA
    [Show full text]
  • Land Disputes in Conflict Affected Areas of Mindanao: Report of the Joint World Bank – International Organization for Migration Scoping Mission
    LAND DISPUTES IN CONFLICT AFFECTED AREAS OF MINDANAO: REPORT OF THE JOINT WORLD BANK – INTERNATIONAL ORGANIZATION FOR MIGRATION SCOPING MISSION MAY 2013 Table of Contents Acronyms and Abbreviations ............................................................................................................................. i Executive Summary .............................................................................................................................................. ii A. Background ..................................................................................................................................................... 1 B. Objectives ........................................................................................................................................................ 1 C. Findings ............................................................................................................................................................ 2 C. 1. General Observations ..................................................................................................................................... 2 C. 2. Findings on Competing and Overlapping Land Claims .................................................................... 4 C. 3. Institutions Involved in Land Management and Resolving Competing Land Claims ........ 14 C. 4. Availability of land tenure information (ownership and usage) ................................................ 17 C. 5. Ongoing Initiatives .......................................................................................................................................
    [Show full text]
  • Sitrep 67 NDCC Update Idps in Mindanao
    OCD Region X turned over a total of Php465,000.00 worth of financial assistance to the claimants/beneficiaries of dead and injured victims of Kolambugan and Kauswagan, Lanao del Norte The NDCC continue to enjoin all humanitarian actors providing support to the IDPs to coordinate with the local authorities, government cluster leads and work within the NDCC/RDCC and LDCC framework to ensure complimentarily and unity of efforts, minimize duplication and prioritize the provision of assistance to the most in need UN Agencies, and NGOs/INGOs, Humanitarian partners/agencies are advised to coordinate all actions with the following OCDRCs Directors who were designated as principal coordinator for a more effective delivery of assistance and information/data management : Regional Centers OCDRC Director Contact Nos. OCDRC X Dir. Carmelito A. Lupo (088) 8573988, (08822) 725673, (0917) 613-4274, (0919) 416- 3343 OCDRC XII Dir. Lita B. Enok (083) 5532994, (0916) 870-6731, (0917) 398-4732 OCD-ARMM Dir. Armando Duque (064) 4250330, (0917) 504-6233 The International Committee of Red Cross (ICRC) and the Philippine Red Cross’ emergency operations complements the efforts of the Philippine government agencies and other international organizations. It continues to coordinate its activities with the authorities in Mindanao, in particular with the representatives of NDCC and DSWD at regional, provincial and municipal levels. ICRC has now 53 staff members in Mindanao A. IDPs (No changes from the last report) Total number of IDPs INSIDE evacuation centers: 19,481 families/97,037 persons Total number of IDPs OUTSIDE evacuation centers: 56,450 families/278,827 persons Total number of IDPs served inside and outside evacuation centers: 75,931 families/375,864 persons 2 B.
    [Show full text]
  • NARAN NG Department of Education EDUK Region X - Northern Mindanao DIVISION of LANAO DEL NORTE
    Republic of the Philippines NARAN NG Department of Education EDUK Region X - Northern Mindanao DIVISION OF LANAO DEL NORTE Gov. A. Quibranza Prov'1. Gov't. Compound nm , Pigcarangan, Tubod Lanao del Norte nwnstos NG (063)227-6633, (063)341-5109 lanac.norte @deped gov. ph d.C 1713 DATE DIVISION MEMORANDUM No. 94_s, 2020 SIGNATURE NE2 2ED MAME TO ASSISTANT SCHOOLS DIVISION SUPERINTENDENT RECIPIENT SCHOOLS OF SBFP PUBLIC OF FY 2020-2021 SCHOOL FEEDING CoORDINATORS SGOD PERSONNEL BUDGET SECTION HEAD ACCOUNTING SECTION HEAD CONCERNED BOOKEEPERSS SCHOOL HEALTH PERSONNEL This Division FROM EDILBERSO L. OPLENARIA, CESO V SchoolsDivision Superintendent SUBJECT 2020 SCH0OL- BASED FEEDING PROGRAM (SBFP) ORIENTATiON DATE DECEMBER 9, 2020 immune of learners in this time ensure the and and to boost the system of1. pandemic,To the DepEdgrowth -Lanaodevelopment del Norte adheres to DepEd Order No. 039, s. 2017, " Operational Guidelines on the Implementation of School- Based Feeding Program for School Years 2017-2022, Years 2018 and 2019. and by the supplemental guidelines issued by DepEd for the Fiscal ( FY) of the 2020 SBFP Nutritious Food Packs 2. In line with this, an orientation for the implementation Division Office on December 16, 2020 at and Milk Component shall be held at the DepEd-LDN selected SGOD and selected school 9:30 AM to 1:00 PM. Physical attendees shall be the personnel below: feeding coordinator of public elementary schools mentioned NAME OF SCHOOL FEEDING DISTRICTS NAMES OF SCHOOL COORDNATOR SHEILA CASPE KAPATAGAN EAST BALILI CS DISTRICT | KAPATAGAN WEST SIXTO MAGHANOY SMCS EVA PEREZ DISTRICT KAPATAGAN CENTRAL KAPATAGAN ECS LOURDEs CARPENTERO SND WEST DISTRICT FELIX SUSON ES FE APAT SND EAST DISTRICT SULTAN ALI DIMPORO MIS CABIBA DERIPOSUN SND CENTRAL SULTAN NAGA DIMAPORO MIS | ARLENE PIOGADO SAPAD DISTRICT SAPAD CS JHAIRA DIMPORO Meanagene #GO100 Syiem A s0 9001 2015 TUVRhemlan Republic of the Philippines ARAN NG Department of Education EDUKA Region X - Northern Mindanao DIVISION OF LANAO DEL NORTE Gov.
    [Show full text]
  • Energy Projects in Region X
    Energy Projects in Region X Lisa S. Go Chief, Investment Promotion Office Department of Energy Energy Investment Briefing – Region X 16 August 2018 Cagayan De Oro City, Misamis Oriental Department of Energy Empowering the Filipino Energy Projects in Northern Mindanao Provinces Capital Camiguin Mambajao Camiguin Bukidnon Malaybalay Misamis Oriental Cagayan de Oro Misamis Misamis Misamis Occidental Oroquieta Occidental Gingoog Oriental City Lanao del Norte Tubod Oroquieta CIty Cagayan Cities De Oro Cagayan de Oro Highly Urbanized (Independent City) Iligan Ozamis CIty Malaybalay City Iligan Highly Urbanized (Independent City) Tangub CIty Malayabalay 1st Class City Bukidnon Tubod 1st Class City Valencia City Gingoog 2nd Class City Valencia 2nd Class City Lanao del Ozamis 3rd Class City Norte Oroquieta 4th Class City Tangub 4th Class City El Salvador 6th Class City Source: 2015 Census Department of Energy Empowering the Filipino Energy Projects in Region X Summary of Energy Projects Per Province Misamis Bukidnon Camiguin Lanao del Norte Misamis Oriental Total Occidental Province Cap. Cap. Cap. Cap. No. No. No. No. Cap. (MW) No. No. Cap. (MW) (MW) (MW) (MW) (MW) Coal 1 600 4 912 1 300 6 1,812.0 Hydro 28 338.14 12 1061.71 8 38.75 4 20.2 52 1,458.8 Solar 4 74.49 1 0.025 13 270.74 18 345.255 Geothermal 1 20 1 20.0 Biomass 5 77.8 5 77.8 Bunker / Diesel 4 28.7 1 4.1 2 129 6 113.03 1 15.6 14 290.43 Total 41 519.13 1 4.10 16 1,790.74 32 1,354.52 6 335.80 96 4,004.29 Next Department of Energy Empowering the Filipino As of December 31, 2017 Energy Projects in Region X Bukidnon 519.13 MW Capacity Project Name Company Name Location Resource (MW) Status 0.50 Rio Verde Inline (Phase I) Rio Verde Water Constortium, Inc.
    [Show full text]
  • Download 3.52 MB
    Initial Environmental Examination November 2019 PHI: Integrated Natural Resources and Environmental Management Project Rehabilitation of Rapagas-Macao Access Road Prepared by the Municipality of Kadingilan, Province of Bukidnon for the Department of Environment and the Asian Development Bank. CURRENCY EQUIVALENTS (as of 19 November 2019) The date of the currency equivalents must be within 2 months from the date on the cover. Currency unit – peso (PhP) PhP 1.00 = $ 0.01938 $1.00 = PhP 50.6180 ABBREVIATIONS ADB Asian Development Bank BDC barangay development council CBMS community base monitoring system CNC certificate of non-coverage CSC construction supervision consultant CSO Civil Society Organization DED detailed engineering design DENR Department of Environment and Natural Resources DILG Department of Interior and Local Government DPWH Department of Public Works and Highway DSWD Department of Social Welfare and Development ECA environmentally critical area ECC environmental compliance certificate ECP environmentally critical project EIA environmental impact assessment EIAMMP environmental impact assessment management and monitoring plan EIS environmental impact statement EMB environmental management bureau ESS environmental safeguards specialist FDBB full disclosure bulletin board FIBECO First Bukidnon Electric Cooperative GAD gender and development IEE initial environmental examination INREMP Integrated Natural Resources and Environment Management Project IP indigenous people IRA internal revenue allotment IROW infrastructure right
    [Show full text]
  • Response Clusters Situation Report #12 (As of 01 July 2017, 3PM)
    Response Clusters Philippines MARAWI SIEGE Situation Report #12 | 1 Situation Report #12 (as of 01 July 2017, 3PM) MARAWI SIEGE Situation Overview Emergency Observation Report: At around 1400H on 23 May 2017, a fire fight incident transpired between the Armed Forces of the Philippines (AFP) and members of the Maute Group and Bangsamoro Islamic Freedom Fighters (BIFF) who have pledged allegiance to the Islamic State of Iran and Syria (ISIS). The incident has affected all residents of Barangays Marawi Poblacion (Sarimanok Road), Basak Malutlut, Bangon, Tuca, Calocan East, Marinaut West, and Kilala of Marawi City. Residents of the city were not allowed to go out from their respective houses for security reasons. Exchange of gunfire in Barangays Tuca, Caloocan, and northern Marinaut has not stopped and roads leading to the city are being blocked both by government forces and Maute militants. REGIONAL COMMAND AND COORDINATION CENTER (RCCC): In the morning of 27 May 2017, at RED ALERT status, the First Coordination Meeting among the Marawi Siege responders was held at Tomas Cabili Gymnasium, Iligan City. In the afternoon of 27 May 2017, the RCCC of ARMM and Region X was set up at the 3rd floor of Frostie Bites, Iligan City upon national directive to have a centralized reporting and gathering of relevant information as well as efforts in responding to the prevailing situation in Marawi City through the activation of Inter-Regional Response Clusters. Likewise, the RCCC Logistics Hub was also established on this day in Iligan City. NDRRMC EMERGENCY OPERATIONS CENTER (NEOC): On 17 June 2017, the NEOC was set up in Mahogany Hills, Kaplag, Brgy.
    [Show full text]
  • Sitrep 48 NDCC Update Complex Emergency
    Members of various clusters, WASH, NUTRITION, HEALTH, FOOD, CAMP Coordination and Management in ARMM committed to regularly meet to discuss issues and concerns of IDPs The total cost of assistance extended to the IDPs is Php95.049 Million. Of this amount, Php74.982 Million was provided by the Government while Php20.067 Million was provided by NGOs, INGOs, ICRC and the UN System. Relief assistance provided were in the form of food assistance (rice and food packs); temporary shelter (construction of bunkhouses); health services (consultation and disease surveillance in ECs and provision of medicines); psychosocial services and WASH services (provision of latrines and construction of toilet facilities in evacuation sites. Intensified information, education campaign on proper hygiene; and training of volunteers in providing psychosocial support The NDCC enjoined all humanitarian actors on the grounds, both from the government and non-government organizations to continue coordinating to ensure the timely delivery of humanitarian aid to the most in need, resources are optimized and duplications/gaps are minimized The safety and security of those delivering humanitarian aid is one of the prime concerns of the Government, hence the NDCC encourage the optimization of existing coordination mechanism at all level of governance and the government cluster leads The NDCC and the Commission of Human Rights encourage the need for more information exchange between the NDCC and other humanitarian actors to improve on data collection, validation and disaggregated data for purposes of identifying further relief needs of IDPs by sex, age group and beliefs, etc. The Commission on Human Rights reported that there are no reports of sexual abuse and human trafficking in ECs DSWD deployed the Quick Response and Social Welfare and Development (QR/SWAD) teams to undertake data generation, relief distribution, operation/ management of evacuation centers, community kitchens, supplemental feeding to children, crisis counseling, etc.
    [Show full text]
  • NDRRMC Update Sitrep No. 30 29 Jan 2014 6AM.Pdf
    C. AFFECTED POPULATION (TAB C) • A total of 244,344 families/1,148,621 persons were affected in 1,002 barangays in 118 municipalities in 16 provinces of Regions X, XI, XII, CARAGA and ARMM • Out of the total affected, 20,086 families / 97,110 persons were displaced and served inside 223 evacuation centers D. STATUS OF LIFELINES • A total of 9 roads and 2 bridges are still not passable in Regions VIII, X, XI and CARAGA (TAB D) • Mate, Bacolod Water System, Brgy. Purakan and Brgy. Bosque Linamon water pipes were damaged in Lanao del Norte • The province of Dinagat Islands experienced total blackout on 17 January 2014 due to heavy rains and strong winds but resumed electricity earlier of 18 January 2014 E. STATUS OF MAJOR RIVERS AND DAMS • Irrigation Dams in Aragon and Brgy Taytayan in Cateel, Davao Oriental were damaged due to flooding F. DAMAGED HOUSES (TAB E) • A total of 2,880 houses were damaged (1,161 totally/1,719 partially). G. COST OF DAMAGES (TAB F) • The total cost of damages amounted to PhP527,115,686.72, with PhP273,623,750.00 for infrastructure and PhP253,491,936.72 for agriculture in Regions X, XI and CARAGA. H. COST OF ASSISTANCE • PhP80,878,110.81 worth of relief goods were provided to the affected families from the combined resources of DSWD (PhP41,229,171.21), LGUs (PhP35,486,090.55), NGOs/Other GOs (PhP2,059,685.00) and DOH (PhP2,103,164.05) in Regions V, X, XI, XII and CARAGA. I. STATE OF CALAMITY RESOLUTION REGION PROVINCE/MUNICIPALITY/CITY DATE NO.
    [Show full text]
  • Iligan Airport
    FEASIBILITY STUDY AND MASTER PLANNING DRAFT FINAL REPORT FOR REPUBLIC OF THE PHILIPPINES DEPARTMENT OF TRANSPORTATION AND COMMUNICATONS AND COORDINATING COUNCIL OF THE PHILIPPINE ASSISTANCE PROGRAM CAGAYAN DE ORO - ILIGAN AIRPORT VOLUME II - MASTER PLAN Prepared by: LOUIS BERGER INTERNATIONAL, INC. in association with LOCKWOOD GREENE TRANS-ASIA (PHILS.) INC. INTERNATIONAL, INC. CONSULTANT MANAGEMENT GLOBETROTTERS ENGINEERING SERVICES, INC. CORPORATION ERNST & YOUNG Under U.S. Agency for International Development Contract No. 492-0452-C-00-000990 Philippine Assistance Program Support Project No. 492-0452 September 1991 The completion of this study/report was funded by the United States Agency for International Development (USAID). The views, statements, and opinions contained in this report are the authors' alone and are not intended as USAID reconunendations, conclusions or statements of USAID policy. IIOUIS BERGER INTERNATIONAL, Architects . r •Enqineers Econor~ists - Planners TIM 8ED10, ik]llh!(_owl C.xiitw. ,OCr ' 3:3O .8:,0a Am m '.l()!.i. I oq i'p[i\/illar! - 88.06-.90 Meto M dtui,PHI LIPPINES 817 0405 Te 6etax(13 (2)819 3965 Ref. No.: SBD/152C/91-1867/rgt October 4, 1991 Mr. Alex Sundermann, P.E. Project Officer/Office of Capital Projects USAID/Manila 18F, Ramon Magsaysay Center 1680 Roxas Boulevard Manila, Philippines Subject: DRAFT FINAL REPORT Project: DELIVERY ORDER NO. LBII-03 FEASIBILITY STUDY AND MASTER PLANNING CAGAYAN DE ORO - ILIGAN CORRIDOR AIRPORT PHILIPPINE ASSISTANCE PROGRAM SUPPORTr. CONTRACT NO. 492-0452-C-00-0099-00 Dear Mr. Sundermann: Pursuant to Section V.C. of the Scope of Work for the subject Delivery Order Contract, we are pleased to submit herewith for your review and comment three (3) copies of the Draft Final Report for the Cagayan de Oro - Iligan Airport Study.
    [Show full text]
  • REGIONAL REPORT on the APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 10
    REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 10 May 2019 Date No. Company Name and Address Project Name Project Owner Approved LEXAND CONSTRUCTION & 1 INSTALLATION OF 25 UNITS DOUBLE ARM LGU-TANGCUB CITY, DEVELOPMENT 5/2/2019 ELECTRICAL POST AT TAN AVENUE MISAMIS OCCIDENTAL Banadero, Ozamiz City LEXAND CONSTRUCTION & 2 INSTALLATION OF 25 UNITS DOUBLE ARM ROUND LGU-TANGCUB CITY, DEVELOPMENT 5/2/2019 STEEL ELECTRICAL POST AT BARANGAY STA. CRUZ MISAMIS OCCIDENTAL Banadero, Ozamiz City J.M LACORTE CONSTRUCTION 3 PROPOSED 2 CLASSROOM SCHOOL BUILDING AT PROVINCE OF MISAMIS P-17 Tanguile St. Poblacion Bayugan 5/2/2019 KALAGONOY ELEMENTARY SCHOOL, GINGOOG CITY ORIENTAL City DEPARTMENT OF PUBLIC WORKS AND 19KC0080-RESURFACING OF UNPAVED ROAD D2J BUILDERS VENTURE HIGHWAYS REGION X SHOULDERS ALONG BARANDIAS-DOMINOROG ROAD 4 BLOCK 11 LOT 15 SILVER CREEK BUKIDNON 3RD JCT.MARADUGAO-CAMP KIBARITAN-DOMINOROG 5/6/2019 SUBDIVISION DISTRICT ENGINEERING ROAD AND MARAMAG MARADUGAO CARMEN CAGAYAN DE ORO CITY OFFICE DICKLUM, ROAD,PANGANTUCAN AND KALILANGAN , BUKIDNON MANOLO FORTICH BUKIDNON MEGAKONSTRUK DEVELOPMENT 5 18K00335-REPAIR/MAINTENANCE OF DWPH BUILDING VOLUNTEERISM ST., FICCOVILLE DPWH-REGION X 5/6/2019 OLD QAHD BUILDING SUBD OPOL, MISAMIS ORIENTAL HANSIE CORPORATION Unit 303 Victoria Towers C. Timog NGCP-NATIONAL GRID 6 ONSHORE PORTION OF THE MINDANAO Avenue Corner CORPORATION IN THE 5/6/2019 SUBSTATION UPGRADING PROJECT Panay Avenue, Brgy Paligsahan PHILIPPINES Quezon City BENEFORTE D. TAN MALLACK/ADMIN 7 BENEFORTE D. TAN B-4, L-386 R.E.R Kauswagan, PROPOSED RESIDENTIAL/ COMMERCIAL BUILDING 5/7/2019 MALLACK Cagayan De Oro City KIOKONG CONSTRUCTION & 8 DEVELOPMENT CORP.
    [Show full text]
  • Regional Physical Framwork Plan 2013-2040
    Style Definition: BodyText_RDP i Message The formulation of this DRR/CCA- Formatted: Font: 11.5 pt Enhanced RPFP, 2013-2040 is hastened Formatted: Font: 11.5 pt after the region was badly hit by TS Sendong in December 2011. The approval of the Enhancing Capacities on DRRM/CCA Project by the Project Board of the Integrating DRR/CCA Project1 of Formatted: Font: 11.5 pt 2 the NEDA is our concrete contribution Formatted: Font: 11.5 pt to the region in terms of reducing the Formatted: Font: 11.5 pt vulnerability and improving Formatted: Font: 11.5 pt preparedness of its disaster-prone communities. The Enhancing Capacities on DRRM/CCA Project complements the Integrating DRR/CCA project which provides technical assistance in the preparation of the DRR/CCA-Enhanced PDPFPs of its two pilot provinces, Bukidnon and Camiguin. Remarkably, Region X is the only region that comprises all five provinces in the implementation of the Integrating DRR/CCA Project, even with only two pilot provinces (not 2 but 5 in 10). The coverage even extends to the three cities that were severely affected by TS Sendong: Cagayan de Oro, Iligan and Valencia in the preparation of DRR/CCA-Enhanced CLUPs. Further, to have a more holistic and comprehensive perspective of mainstreaming DRR/CCA in development and physical planning, the riverbasinriver basin/watershed approach is adopted in the formulation/updating of the regional physical framework plan. As early as 2005, the National Land Use Committee (NLUC), with the NEDA as the Chairperson has come up with an action agenda on disaster risk management, primarily to strengthen DRR in physical planning.
    [Show full text]