Proposal and Statement of Qualifications for Sacramento County Delta Legacy Communities Flood Risk Reduction Feasibility Studies Proposal and Statement of Qualifications for Sacramento County Delta Legacy Communities Flood Risk Reduction Feasibility Studies SACRAMENTO COUNTY DEPARTMENT OF WATER RESOURCES Submitted by GEI Consultants, Inc. 2868 Prospect Park Drive, Suite 400 Rancho Cordova, CA 95670 T: 916.631.4500 F: 916.631.4501 November 18, 2016 November 18, 2016 Mr. George H. Booth, PE, CFM Senior Civil Engineer Sacramento County Department of Water Resources Consulting 827 7th Street, Room 301 Engineers and Sacramento, CA 95814 Scientists Subject: Proposal and Statement of Qualifications – Sacramento County Delta Legacy Communities Flood Risk Reduction Feasibility Studies Dear Mr. Booth: GEI Consultants, Inc. (GEI) appreciates the opportunity to submit our Proposal and Statement of Qualifications for Sacramento County’s Delta Legacy Communities Flood Risk Reduction Feasibility Studies. We look forward to the prospect of providing professional services required to support Sacramento County’s efforts of achieving a 100-year level of flood protection for some of the County’s Delta Legacy Communities where possible, and substantially reducing the risk to flooding in others, consistent with funding available from the Department of Water Resources (DWR) Small Communities Flood Risk Reduction Program. GEI has assembled a team of local experts for the North Delta Legacy Communities inclusive of MBK Engineers, Blackburn Consulting, DCC Engineering, KSN Engineering, and Foster Morrison. All but Blackburn are active with Sacramento County’s current efforts developing Flood Emergency Action Plans (EAPs) for each of the Reclamation Districts (RDs) in the North Delta communities. MBK Engineers and HDR were key participants and authors of the Lower Sacramento/North Delta Regional Flood Management Plan (RFMP) which is inclusive of all the Delta Legacy Communities in Sacramento County, namely Hood, Courtland, Locke, Walnut Grove, Ryde and Isleton. Both MBK and HDR have also been very active participants and leaders in the Agricultural Floodplain Ordinance Task Force (AFOTF) that is identifying non-structural solutions, inclusive of changes to the NFIP to benefit agricultural communities in the floodplain, particularly in California. It is anticipated the AFOTF recommendations can be applied to the Sacramento County Delta Legacy Communities and surrounding agricultural lands to reduce flood insurance costs and increase the ability to cost effectively construct, or improve, agricultural structures in the floodplain. GEI has developed a clear understanding of the study challenges and Sacramento County’s goals and objectives to implement flood risk reduction solutions (structural and non-structural) for each of the noted communities. This was done while collectively developing the County’s EAPs and assisting the RDs and the County in formulating the feasibility grant applications recently submitted to DWR. Sacramento County is seeking a consultant team to conduct thorough feasibility studies ultimately leading to locally preferred alternatives that can be reasonably implemented with nominal local funds leveraged with higher DWR cost-sharing opportunities. Sacramento County is looking for a consultant team with the following attributes and qualifications: • Very experienced with flood management feasibility studies, consistent with the Guidelines and PSP for the DWR Small Communities Flood Risk Reduction Program, assuring full GEI Consultants, Inc. 2868 Prospect Park Drive, Suite 400, Rancho Cordova, CA 95670 www.geiconsultants.com 916.631.4500 fax: 916.631.4501 Mr. George H. Booth, PE, CFM Page 2 of 2 November 18, 2016 Sacramento County reimbursement to the County for all work performed during the course of the 12-month study period of the feasibility studies. • Well versed in working with local RDs, various stakeholders and the levee systems in the North Delta regulated by the Central Valley Flood Protection Board and the U.S. Army Corps of Engineers (USACE); • Extensive knowledge of the Central Valley Flood Protection Plan (CVFPP), the Central Valley Hydrology Study (CVHS), the Central Valley Floodplain Evaluation and Delineation (CVFED) modeling tools, and the DWR Non-Urban Levee Evaluations (NULE) investigations specific to Sacramento County’s immediate needs. GEI has been in the forefront assisting local flood control interests such as the Yuba County Water Agency, Three Rivers Levee Improvement Authority, SAFCA, and others with flood management feasibility studies before and after the passage of the California Flood Control Bond Act of 2006. GEI’s successful feasibility evaluations for local agencies combined with the extensive CVFPP work experience gives GEI a unique understanding and a perspective of both local and state agencies and provides Sacramento County with a consultant team that is extremely qualified for the feasibility studies at-hand, and ultimately for project implementation. The additional benefits that GEI brings to Sacramento County include: • A Proven Project Manager – Jeffrey Twitchell has extensive experience in managing multi- objective and multi-discipline flood control projects throughout Northern California that seek flood risk reduction measures and multi-objective benefits. • Experienced Team Leaders – Graham Bradner, Chris Ferrari, Vance Howard, and Leo Winternitz all of GEI, who have extensive project management experience and expert technical knowledge in their fields of science, engineering, and stakeholder facilitation. They will lead teams of experienced professionals including others from MBK, KSN, DCC, HDR, Blackburn, who have worked together on flood control projects throughout the north state and Delta. • Commitment to Sacramento County and Delta RDs – Each member of our team is committed to working closely and collaboratively with Sacramento County staff and stakeholders, inclusive of the RDs, to successfully complete the feasibility studies project. We hope that you will find our team composition, qualifications, and approach compelling. We appreciate the opportunity to be considered for this important project. If you have any questions about our proposal and qualifications or require additional information, please contact Jeffrey Twitchell at 916.631.4555, [email protected]. Sincerely, GEI Consultants, Inc. Jeffrey Twitchell, PE Bill Bennett, PE, GE Senior Consultant, Project Manager Vice President, QA/QC Manager COUNTY OF SACRAMENTO // PROPOSAL AND QUALIFICATIONS FOR THE DELTA LEGACY COMMUNITIES FLOOD RISK REDUCTION FEASIBILITY STUDIES TABLE OF CONTENTS 1. PROJECT UNDERSTANDING, OBJECTIVES AND APPROACH ....................................................................... 1 1.1 Project Understanding and Objectives ......................................................................................................... 1 1.2 Overall Project Approach .............................................................................................................................. 2 2. FIRM QUALIFICATIONS ...................................................................................................................................... 3 2.1 Introduction to the GEI Project Team and Key Roles ................................................................................... 3 2.2 Staffing Organization and Qualifications ....................................................................................................... 8 2.3 Key Team Bio Summaries ............................................................................................................................ 8 3 PROJECT SCOPING, SCHEDULING, AND COST ESTIMATES ....................................................................... 14 3.1 Project Scope and Tasks ............................................................................................................................ 14 3.2 Project Schedule ........................................................................................................................................ 19 3.3 Project Cost Estimates and GEI Team Rate Sheets .................................................................................. 21 4. PROJECT DESCRIPTIONS, REFERENCES, AND CLIENTS ........................................................................... 32 4.1 GEI Consultants, Inc. .................................................................................................................................. 32 4.2 MBK Engineers and HDR Engineering ....................................................................................................... 38 4.3 DCC Engineers ........................................................................................................................................... 40 4.4 KSN Engineering ........................................................................................................................................ 41 4.5 Foster-Morrison .......................................................................................................................................... 42 4.6 Blackburn Consulting .................................................................................................................................. 43 5. RESUMES OF GEI PROJECT TEAM................................................................................................................. 45 GEI CONSULTANTS, INC. // PAGE i COUNTY OF SACRAMENTO // PROPOSAL AND QUALIFICATIONS FOR THE DELTA LEGACY COMMUNITIES FLOOD RISK REDUCTION FEASIBILITY STUDIES 1. PROJECT
Recommended publications
  • 0 5 10 15 20 Miles Μ and Statewide Resources Office
    Woodland RD Name RD Number Atlas Tract 2126 5 !"#$ Bacon Island 2028 !"#$80 Bethel Island BIMID Bishop Tract 2042 16 ·|}þ Bixler Tract 2121 Lovdal Boggs Tract 0404 ·|}þ113 District Sacramento River at I Street Bridge Bouldin Island 0756 80 Gaging Station )*+,- Brack Tract 2033 Bradford Island 2059 ·|}þ160 Brannan-Andrus BALMD Lovdal 50 Byron Tract 0800 Sacramento Weir District ¤£ r Cache Haas Area 2098 Y o l o ive Canal Ranch 2086 R Mather Can-Can/Greenhead 2139 Sacramento ican mer Air Force Chadbourne 2034 A Base Coney Island 2117 Port of Dead Horse Island 2111 Sacramento ¤£50 Davis !"#$80 Denverton Slough 2134 West Sacramento Drexler Tract Drexler Dutch Slough 2137 West Egbert Tract 0536 Winters Sacramento Ehrheardt Club 0813 Putah Creek ·|}þ160 ·|}þ16 Empire Tract 2029 ·|}þ84 Fabian Tract 0773 Sacramento Fay Island 2113 ·|}þ128 South Fork Putah Creek Executive Airport Frost Lake 2129 haven s Lake Green d n Glanville 1002 a l r Florin e h Glide District 0765 t S a c r a m e n t o e N Glide EBMUD Grand Island 0003 District Pocket Freeport Grizzly West 2136 Lake Intake Hastings Tract 2060 l Holland Tract 2025 Berryessa e n Holt Station 2116 n Freeport 505 h Honker Bay 2130 %&'( a g strict Elk Grove u Lisbon Di Hotchkiss Tract 0799 h lo S C Jersey Island 0830 Babe l Dixon p s i Kasson District 2085 s h a King Island 2044 S p Libby Mcneil 0369 y r !"#$5 ·|}þ99 B e !"#$80 t Liberty Island 2093 o l a Lisbon District 0307 o Clarksburg Y W l a Little Egbert Tract 2084 S o l a n o n p a r C Little Holland Tract 2120 e in e a e M Little Mandeville
    [Show full text]
  • Transitions for the Delta Economy
    Transitions for the Delta Economy January 2012 Josué Medellín-Azuara, Ellen Hanak, Richard Howitt, and Jay Lund with research support from Molly Ferrell, Katherine Kramer, Michelle Lent, Davin Reed, and Elizabeth Stryjewski Supported with funding from the Watershed Sciences Center, University of California, Davis Summary The Sacramento-San Joaquin Delta consists of some 737,000 acres of low-lying lands and channels at the confluence of the Sacramento and San Joaquin Rivers (Figure S1). This region lies at the very heart of California’s water policy debates, transporting vast flows of water from northern and eastern California to farming and population centers in the western and southern parts of the state. This critical water supply system is threatened by the likelihood that a large earthquake or other natural disaster could inflict catastrophic damage on its fragile levees, sending salt water toward the pumps at its southern edge. In another area of concern, water exports are currently under restriction while regulators and the courts seek to improve conditions for imperiled native fish. Leading policy proposals to address these issues include improvements in land and water management to benefit native species, and the development of a “dual conveyance” system for water exports, in which a new seismically resistant canal or tunnel would convey a portion of water supplies under or around the Delta instead of through the Delta’s channels. This focus on the Delta has caused considerable concern within the Delta itself, where residents and local governments have worried that changes in water supply and environmental management could harm the region’s economy and residents.
    [Show full text]
  • Programmatic Environmental Impact Report
    Water Hyacinth Control Program FINAL Programmatic Environmental Impact Report Volume I – Chapters 1 to 7 November 30, 2009 A program for effective control of Water Hyacinth in the Sacramento-San Joaquin Delta and its tributaries. Copies of this Final Programmatic Environmental Impact Report in hard copy form, or on computer compact disc (CD), can be obtained from the California Department of Boating and Waterways. To request a report copy, please contact: Ms. Terri Ely Aquatic Weed Program California Department of Boating and Waterways 2000 Evergreen Street, Suite 100 Sacramento, California 95815 (916) 263-8138 [email protected] Cover photo: March 14, 2008, by NewPoint Group, Inc., of the Wheeler Island Duck Club, at Honker Bay. [PARTIAL] Water Hyacinth Control Program Water Hyacinth Control Program A program for effective control of Water Hyacinth in the Sacramento-San Joaquin Delta and its tributaries. FINAL Programmatic Environmental Impact Report Volume I – Chapters 1 to 7 November 30, 2009 Prepared by: The California Department of Boating and Waterways With Technical Assistance from: NewPoint Group, Inc. 2555 Third Street, Suite 215 Sacramento, California 95818 (916) 442-0508 www.newpointgroup.com ~----Pei:at f~m.A; _ _,__,..._... AniJru--~- ' --sepat Table of Contents Volume I – Chapters 1 to 7 Page Acronyms and Abbreviations ......................................................... AA-1 Executive Summary.......................................................................... ES-1 1. Introduction ........................................................................................
    [Show full text]
  • Summary of Delta Dredged Material Placement Sites
    Summary of Delta Dredged Material Placement Sites Capacity Overall Map Dredge Material Placement Active Types of Material Years in Remaining Capacity ID Site (Yes/No) Owner/Operator Accepted Service (CY) (CY) Notes 1 S1 2 S4 3 S7 4 S9 5 S11 Port of Sacramento S12 (Department of 6 1,710,000 3, 5 South Island Prospect Island Interior Bureau of Land Management?) 7 S13 S14 8 USACE N/A 3 Grand Island Placement Site S16 9 USACE 3,000,000 3 Rio Vista Placement Site DWR, Mega S19 10 Sands, Port of 20,000,000 3 Decker Island Placement Site Sacramento S20 Port of Sacramento 11 1,000,000 3, 5 Augusta Pit Placement Site (DWR?) S31 12 Port of Sacramento Placement Port of Sacramento Site Reclamation S32 13 Districts 999 and (six segments) 900 S35 DOW Chemical 14 Montezuma Hills Placement 890,000 3 Company Site 15 SX Sacramento Muni 1 Capacity Overall Map Dredge Material Placement Active Types of Material Years in Remaining Capacity ID Site (Yes/No) Owner/Operator Accepted Service (CY) (CY) Notes Utility District Sherman Lake (Sherman 16 USACE 3,000,000 3 Island?) 17 Montezuma Wetlands Project Montezuma LLC Montezuma Wetlands 18 Montezuma LLC Rehandling Site Expanded Scour Pond Dredge material 19 Placement Site (also called Yes DWR according to WDR #R5- 250,000 1, 2, 3,4 Sherman Island?) 2004-0061 Port of Stockton McCormack Pit Placement maintenance material 20 Site (also called Sherman Yes DWR only 250,000 3,4 Island?) WDR R5-2003-0145 Proposed Iron House Levy repair and 21 Jersey Island Placement Site Restoration 3 Sanitation District maintenance
    [Show full text]
  • 2010-2011 California Regulations for Waterfowl and Upland Game Hunting, Public Lands
    Table of Contents CALIFORNIA General Information Contacting DFG ....................................... 2 10-11 Licenses, Stamps, & Permits................... 3 Waterfowl & Upland Shoot Time Tables ................................... 4 Game Hunting and Unlawful Activities .......................... 6 Hunting & Other Public Uses on State & Federal Waterfowl Hunting Lands Regulations Summary of Changes for 10-11 ............... 7 Seasons and Limits ................................. 9 Effective July 1, 2010 - June 30, 2011 Waterfowl Consumption Health except as noted. Warnings ............................................. 12 State of California Special Goose Hunt Area Maps ............ 14 Governor Arnold Schwarzenegger Waterfowl Zone Map ....Inside Back Cover Natural Resources Agency Upland Game Bird, Small Game Secretary Lester A. Snow Mammal, and Crow Hunting Regulation Summary ............................. 16 Fish and Game Commission President Jim Kellogg Seasons & Limits Table ......................... 17 Vice President Richard B. Rogers Hunt Zones ............................................ 18 Commissioner Michael Sutton Hunting and Other Public Uses on Commissioner Daniel W. Richards State and Federal Areas Acting Executive Director Jon Fischer Reservation System .............................. 20 General Public Use Activities on Department of Fish and Game Director John McCamman All State Wildlife Areas ....................... 23 Hunting, Firearms, and Archery Alternate communication formats are available upon request. If reasonable
    [Show full text]
  • GRA 9 – South Delta
    2-900 .! 2-905 .! 2-950 .! 2-952 2-908 .! .! 2-910 .! 2-960 .! 2-915 .! 2-963 .! 2-964 2-965 .! .! 2-917 .! 2-970 2-920 ! .! . 2-922 .! 2-924 .! 2-974 .! San Joaquin County 2-980 2-929 .! .! 2-927 .! .! 2-925 2-932 2-940 Contra Costa .! .! County .! 2-930 2-935 .! Alameda 2-934 County ! . Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2013 Calif. Dept. of Fish and Wildlife Area Map Office of Spill Prevention and Response I Data Source: O SPR NAD_1983_C alifornia_Teale_Albers ACP2 - GRA9 Requestor: ACP Coordinator Author: J. Muskat Date Created: 5/2 Environmental Sensitive Sites Section 9849 – GRA 9 South Delta Table of Contents GRA 9 Map ............................................................................................................................... 1 Table of Contents ...................................................................................................................... 2 Site Index/Response Action ...................................................................................................... 3 Summary of Response Resources for GRA 9......................................................................... 4 9849.1 Environmentally Sensitive Sites 2-900-A Old River Mouth at San Joaquin River....................................................... 1 2-905-A Franks Tract Complex................................................................................... 4 2-908-A Sand Mound Slough ..................................................................................
    [Show full text]
  • Transitions for the Delta Economy
    Transitions for the Delta Economy January 2012 Josué Medellín-Azuara, Ellen Hanak, Richard Howitt, and Jay Lund with research support from Molly Ferrell, Katherine Kramer, Michelle Lent, Davin Reed, and Elizabeth Stryjewski Supported with funding from the Watershed Sciences Center, University of California, Davis Summary The Sacramento-San Joaquin Delta consists of some 737,000 acres of low-lying lands and channels at the confluence of the Sacramento and San Joaquin Rivers (Figure S1). This region lies at the very heart of California’s water policy debates, transporting vast flows of water from northern and eastern California to farming and population centers in the western and southern parts of the state. This critical water supply system is threatened by the likelihood that a large earthquake or other natural disaster could inflict catastrophic damage on its fragile levees, sending salt water toward the pumps at its southern edge. In another area of concern, water exports are currently under restriction while regulators and the courts seek to improve conditions for imperiled native fish. Leading policy proposals to address these issues include improvements in land and water management to benefit native species, and the development of a “dual conveyance” system for water exports, in which a new seismically resistant canal or tunnel would convey a portion of water supplies under or around the Delta instead of through the Delta’s channels. This focus on the Delta has caused considerable concern within the Delta itself, where residents and local governments have worried that changes in water supply and environmental management could harm the region’s economy and residents.
    [Show full text]
  • Comparing Futures for the Sacramento-San Joaquin Delta
    comparing futures for the sacramento–san joaquin delta jay lund | ellen hanak | william fleenor william bennett | richard howitt jeffrey mount | peter moyle 2008 Public Policy Institute of California Supported with funding from Stephen D. Bechtel Jr. and the David and Lucile Packard Foundation ISBN: 978-1-58213-130-6 Copyright © 2008 by Public Policy Institute of California All rights reserved San Francisco, CA Short sections of text, not to exceed three paragraphs, may be quoted without written permission provided that full attribution is given to the source and the above copyright notice is included. PPIC does not take or support positions on any ballot measure or on any local, state, or federal legislation, nor does it endorse, support, or oppose any political parties or candidates for public office. Research publications reflect the views of the authors and do not necessarily reflect the views of the staff, officers, or Board of Directors of the Public Policy Institute of California. Summary “Once a landscape has been established, its origins are repressed from memory. It takes on the appearance of an ‘object’ which has been there, outside us, from the start.” Karatani Kojin (1993), Origins of Japanese Literature The Sacramento–San Joaquin Delta is the hub of California’s water supply system and the home of numerous native fish species, five of which already are listed as threatened or endangered. The recent rapid decline of populations of many of these fish species has been followed by court rulings restricting water exports from the Delta, focusing public and political attention on one of California’s most important and iconic water controversies.
    [Show full text]
  • Draft Environmental Assessment for the Shiloh Iii Wind Plant Project Habitat Conservation Plan
    DRAFT ENVIRONMENTAL ASSESSMENT FOR THE SHILOH III WIND PLANT PROJECT HABITAT CONSERVATION PLAN P REPARED BY: U.S. Fish & Wildlife Service 2800 Cottage Way, W-2650 Sacramento, CA 95825 Contact: Mike Thomas, Chief Habitat Conservation Planning Branch W ITH TECHNICAL ASSISTANCE FROM: ICF International 630 K Street, Suite 400 Sacramento, CA 95814 Contact: Brad Schafer 916.737.3000 February 2011 U.S. Fish and Wildlife Service. 2011. Draft Environmental Assessment for the Shiloh III Wind Plant Project Habitat Conservation Plan. February. (ICF 00263.09). Sacramento, CA. With technical assistance from ICF International, Sacramento, CA. Contents Chapter 1 Purpose and Need ........................................................................................................... 1‐1 1.1 Background ................................................................................................................................ 1‐1 1.2 Species Covered by the HCP ...................................................................................................... 1‐2 1.3 Proposed Action Addressed in this EA ....................................................................................... 1‐2 1.4 Purpose of and Need for the Proposed Action .......................................................................... 1‐2 Chapter 2 Proposed Action and Alternatives .................................................................................. 2‐1 2.1 Alternative 1: Proposed Action .................................................................................................
    [Show full text]
  • Structured Decision Making for Delta Smelt Demo Project
    Structured Decision Making for Delta Smelt Demo Project Prepared for CSAMP/CAMT Project funded by State and Federal Water Contractors Prepared by Graham Long and Sally Rudd Compass Resource Management Ltd. 604.641.2875 Suite 210- 111 Water Street Vancouver, British Columbia Canada V6B 1A7 www.compassrm.com Date May 4, 2018 April 13th – reviewed by TWG and comments incorporated Table of Contents Table of Contents ............................................................................................................... i Executive Summary .......................................................................................................... iii Introduction ...................................................................................................................... 1 Approach .......................................................................................................................... 1 Problem Definition ........................................................................................................... 4 Objectives ......................................................................................................................... 5 Alternatives ...................................................................................................................... 9 Evaluation of Trade-offs ................................................................................................. 17 Discussion and Recommendations ................................................................................
    [Show full text]
  • California Regional Water Quality Control Board Central Valley Region Karl E
    California Regional Water Quality Control Board Central Valley Region Karl E. Longley, ScD, P.E., Chair Linda S. Adams Arnold 11020 Sun Center Drive #200, Rancho Cordova, California 95670-6114 Secretary for Phone (916) 464-3291 • FAX (916) 464-4645 Schwarzenegger Environmental http://www.waterboards.ca.gov/centralvalley Governor Protection 18 August 2008 See attached distribution list DELTA REGIONAL MONITORING PROGRAM STAKEHOLDER PANEL KICKOFF MEETING This is an invitation to participate as a stakeholder in the development and implementation of a critical and important project, the Delta Regional Monitoring Program (Delta RMP), being developed jointly by the State and Regional Boards’ Bay-Delta Team. The Delta RMP stakeholder panel kickoff meeting is scheduled for 30 September 2008 and we respectfully request your attendance at the meeting. The meeting will consist of two sessions (see attached draft agenda). During the first session, Water Board staff will provide an overview of the impetus for the Delta RMP and initial planning efforts. The purpose of the first session is to gain management-level stakeholder input and, if possible, endorsement of and commitment to the Delta RMP planning effort. We request that you and your designee attend the first session together. The second session will be a working meeting for the designees to discuss the details of how to proceed with the planning process. A brief discussion of the purpose and background of the project is provided below. In December 2007 and January 2008 the State Water Board, Central Valley Regional Water Board, and San Francisco Bay Regional Water Board (collectively Water Boards) adopted a joint resolution (2007-0079, R5-2007-0161, and R2-2008-0009, respectively) committing the Water Boards to take several actions to protect beneficial uses in the San Francisco Bay/Sacramento-San Joaquin Delta Estuary (Bay-Delta).
    [Show full text]
  • Subsidence Reversal for Tidal Reconnection
    PERFORMANCE MEASURE 4.12: SUBSIDENCE REVERSAL FOR TIDAL RECONNECTION Performance Measure 4.12: Subsidence Reversal for Tidal Reconnection Performance Measure (PM) Component Attributes Type: Output Performance Measure Description 1 Subsidence reversal 0F activities are located at shallow subtidal elevations to prevent net loss of future opportunities to restore tidal wetlands in the Delta and Suisun Marsh. Expectations Preventing long-term net loss of land at intertidal elevations in the Delta and Suisun Marsh from impacts of sea level rise and land subsidence. Metric 1. Acres of Delta and Suisun Marsh land with subsidence reversal activity located on islands with large areas at shallow subtidal elevations. This metric will be reported annually. 2. Average elevation accretion at each project site presented in centimeters per year. This metric will be reported every five years. Baseline 1. In 2019, zero acres of subsidence reversal on islands with large areas at shallow subtidal elevations. 2. Short-term elevation accretion in the Delta at 4 centimeters per year. 1 Subsidence reversal is a process that halts soil oxidation and accumulates new soil material in order to increase land elevations. Examples of subsidence reversal activities are rice cultivation, managed wetlands, and tidal marsh restoration. DELTA PLAN, AMENDED – PRELIMINARY DRAFT NOVEMBER 2019 1 PERFORMANCE MEASURE 4.12: SUBSIDENCE REVERSAL FOR TIDAL RECONNECTION Target 1. By 2030, 3,500 acres in the Delta and 3,000 acres in Suisun Marsh with subsidence reversal activities on islands, with at least 50 percent of the area or with at least 1,235 acres at shallow subtidal elevations. 2. An average elevation accretion of subsidence reversal is at least 4 centimeters per year up to 2050.
    [Show full text]