District wise Description of Disaster Relief Operation in State dt. 18 July, 2013 Description of Distributed Relief Material Weight of Amount S. District Food Kerosen No. of Quantity of Distributed to Description of Restored and No. Name Name of the Villages Material e (in LPG Fodder till Date (in blocked roads (in Liters) cylinders (in Quintals) Rs.) Quintals)

Rishikesh-Kedarnath NH till Simli Barsudi, Mahad, Jakholi, forward Tilwara is open for Purviyana, Nagrasu, Bhatt Gaon, transportation. 1 Rudrapayag Gwan, Kyark, Dankot, Dangi, 576.85 0 0 0 6,09,83,400 Tilwara-Mayali routs in Syalsuen, Nainipaundar, Beeron, Basukedar, Rishikesh-Guptkashi (Via Mayali) in Bhunalgaon, Sidhsaurh Panja and Gopeshwar-Chopta motor roads are obstructed.

Rishikesh-Badrinath NH till Joshimath, Ukhimath- Chopta and Karnaprayag- -Kathgoadam roads are open for transportation. Gopeshwar-Pokhri in Hafla, 2 Chamoli Ghoda padaw 5.80 0 0 0 2,51,23,600 Karnprayag-Pokhri in Dev, Nandprayag-Ghat, Narayanbagad- Tharali and Simli-Narayanbagad motor roads are obstructed due to debris.

Bageshwar-Almora and Kapkot- 3 Bageshwar Saung and Badiyakot 2275 0 0 0 38,46,874 Bageshwar-Shama motor roads are open for transportation.

Dharasu-Badkot-Damta-Dehradun, Devidhar-Dhohtari-Kotdhaar- Lambgaon between Uttarkashi and Dharasu, Chinyalisaud-Suwakholi- Mussoorie, Badkot-VikasNagar, 4- Uttarkashi 38 Villeges 76 150 0 0 6,53,51,739 Lambgaon-Pipaldali-Tehri and Uttarkashi-Chinyalisaud motor roads are open for transportation. Rishikesh-Gangotri NH at Netala and Rishikesh-Yamunotri NH at Vadia are obstructed.

Ghaat-Pitthoragarh-Augla-Jauljeevi- Baluwakot and Pitthoragarh-Ghaat- Almora roads are completely open for transportation. Else Baluwakot- Dharchula road till Dharchula and Jauljeevi-Madkot road till Chami are Bangapani, Sirtola, Munsyari and open for Light Motor Vehicle. 5 Pithoragarh 22 0 314 0 7,25,60,805 Dharchula Dharchula-Tawaghaat-Pangla NH is obstructed at Kulagadh, Elagadh due since Bridge has broken. Thal-Munsyari road in Hardiya drain, Munsyari-Madkot road in Kainthi-Bhadenli and Tawaghat- Sovla road are obstructed. Khairna-Ranikhet-Almora, Almora- Ghaat-Pitthoragarh, Bageshwar- 6 Almora ______0 0 0 0 83,75,455 Almora and Khairna-Almora roads along with Almora- NH are open for transportation.

Lohaghat-Balik Motor road is open 7 Champawat ______0 0 0 0 22,53,350 for transportation.

Disaster Effected 37 roads were re started out of 39 roads. Two roads 8 Haridwar ______0 0 0 0 1,53,44,380 are obstructed, work is progress to restored the obstructed roads.

Pauri-Satpuli, Pauri-Devprayag, Pauri-Sringar and Pauri-Dugadda- 9 Pauri ______0 0 0 0 1,28,45,048 Nazibabad roads along with Ramnagar -Buwakhal NH are open for transportation.

Chamba-Mussoorie, Mayali-Tilwara, Guptkash-Mayali-Chirbatiya-Tihri, Ghansali-Tipri-New Tehri and 10 Tehri ______0 0 0 0 3,76,03,800 Ghansali-Tipri-Devprayag roads are open for transportation. Chamba-Rishikesh motor roads is obstructed in Tachala.

Bhawali-Almora NH and Haldwani- Almora NH are open for transportation. 11 ______0 0 0 0 76,16,500 In the district 3 Rural motor roads are obstructed. Work is progress to rebuild the roads.

Tyuni-Chakrata-Sahiya-Kalsi- Dehradun, Chakrata-Yamuna 12 Dehradun ______0 0 0 0 5,43,98,986 Bridge, Chakrata-Lakhamandal- Barnigad and other major roads in district are open for transportation.

Uddhamsingh All major roads are open for 13 ______0 0 0 0 30,38,500 Nagar transportation.

2955.65 150 314 0 36,93,42,437 Total

Note :

1- All the above mentioned information has been collected from State Emergency Operational Centre, Dehradun and all concerned District Information Officers of States via E-mail/Fax/Telephone. 2- Out of 198 drinking water schemes, 136 schemes out of 168 in Garhwal Mandal and 7 out 0f 30 schemes in Kuamaon Region have been restarted. Now work is on to start remaining 55 schemes. 3- Out of total 2093 obstructed roads due to disaster 1736 are functional again. Work is progress to reopen the remaining 357 roads. 4- Due to disaster, 4200 villages have been cut off by road. Though 3789 villages have been reconnected, work is progress to reconnect 411 villages to roads. In this work, 385 Dozers/JCB are being used and more than 5800 workers have been employed. 5- Out of 3758 disaster affected villages, electricity has been resumed in 3709 villages and work is progress to resume electricity in remaining 49 villages.

Information & Public Relations Department, Uttarakhand.