GULF ELITE GENERAL CONTRACTING CO.

Strictly Private and Confidential 1 Table of Contents

1) Introduction ……Page 3 2) Objective ……Page 5 3) Company Location ……Page 6 4) Business Overview 4.1) History of Business ……Page 7 4.2) Licenses and Certificates ……Page 7 4.3) Key Management Structure ……Page 7 4.4) Key Management Organization Chart ……Page 8 4.5) Employee Structure ……Page 8 4.6) Shareholder Structure ……Page 8 4.7) Specialty/Core Competence ……Page 9 4.8) Historical Clients ……Page 9 5) Organization Chart ……Page 10 6) Manpower ……Page 11 7) Construction Equipment and Tools ……Page 12 8) Company Vehicle’s List and Accommodation ……Page 13 9) Latest Project Description 9.1) Status of Existing Projects ……Page 14 10) Potential 10.1) Overview ……Page 16 11) List of Projects 11.1) On Going Projects ……Page 17 11.2) Completed Projects ……Page 19 12) Government Registration Documents ……Page 38 13) ISO Certificate ……Page 44 14) Awards ……Page 45

2 1) Introduction

Gulf Elite General Contracting Co. (GEGC) is a pioneer in general contracting with more than thirty (30) years of experience in the construction industry, mainly with strengthened by its acquisition of Jaffar M. Al Hamood Est.

GEGC goal is to be one of the major Organization serving the Construction Industry in the Gulf Region. Its mission is to deliver to the client a Quality Product on Time.

Since the acquisition of Jaffar M. Al Hamood Est., GEGC has been executing projects for Saudi Aramco as a Main Contractor, as a Subcontractor or in joint venture with another Contractor as shown in the list of projects (see page 17 to 37).

Furthermore, GEGC has expanded its activities to the Private Sector whereas we have completed a Housing Project for EMAAR MIDDLE EAST LLC, in the Eastern Province of .

We have implemented major modifications to the Management and Project Staffs to facilitate a modern, healthy and strong organization in order for GEGC to cope up with the recent challenges of the Construction Industry.

GEGC with enhanced management and strategies, backed up by the numerous achievements (more than $570 Million of completed and ongoing projects) in the past forty (40) years with Saudi Aramco, is progressing steadily towards its goal.

GEGC Net Assets (Vehicles, Equipment and Tools) as of December, 2017 was SR 1.134 Million.

3 1) Introduction – Continued

The number of GEGC Direct Employees is 342 including 43 Saudi Nationals. Labor Office status is “Green”.

Furthermore, GEGC other outstanding achievements are:

1. Quality Control, ISO 9001:2015 Certified with an in‐place QA/QC Department overseeing construction procurement, including third party inspection services locally and overseas. 2. Tremendous achievements in the Safety Field. 3. Dedicated teamwork efforts contributed to timely achievement on most of the projects it has undertaken. 4. Executed projects on LSTK or Joint Venture basis including Design, Procurement and Construction. 5. Vast Experience with Saudi Aramco in the fields of: • Building Construction • Hospital and Clinics • Laboratories, R & D and NDT • Industrial Facilities and Infrastructure • Inside Plant Construction Projects • Electrical Installations • Mechanical and HVAC Projects 6. First Prices winners in Safety, Quality and Achievement Awards.

4 2) Objective

Gulf Elite General Contracting Co. is a fully owned company by Mohammed Al‐Mojil Group (The Owner) which has created a niche for itself in the Civil Industrial and Commercial Industry. It is a company with dedicated and skilled manpower servicing SAUDI ARAMCO and International Contractors for the past 40 years.

The owner is undertaking a strategic realignment of its activities with a focus on its core activity in the construction business in order to meet increasing market demands.

5 3) Company Location

6 4) Business Overview

4.1) History of the Business Gulf Elite was established in 1976 as Jaffar Al‐Hamood Est. was sold to group of 4 Businessmen in 2004 who in turn sold it to Mohammad Al‐Mojil Group in May 2011. 4.2) Licenses and Certificates

Licenses Reference Number Source Issuing Date Expiry Date Commercial Registration 2050047126 Ministry of Commerce August 1, 2017 July 15, 2020 Saudi Aramco Vendor 10031511 Saudi Aramco March 27, 2004 - Contractor Registration 054 B (04/2004) Saudi Electric Company April 30, 2005 - Vendor Qualification 504926 SABIC February 19, 2008 - Marafiq Vendor 2240 MARAFIQ February 21, 2006 -

4.3) Key Management Structure

Basic Salary Name Position Nationality Background University Years with Co. SAR'

Maurice Salim Matar General Manager Lebanese Bachelor of Science in Civil Engineer Louisiana Tech. University, Louisiana 13 years Samy Ahmed Abdul Fattah Finance Manager Egyptian Bachelor Degree in Commerce University of Cairo 11 years S. Kumar Dwivedi Procurement Manager Indian B. Tech / MBA Lucknow University, India 6 years Maher Mussiry Administration Manager Saudi - - 8 years Note: Key Management Personnel have an average of 30 years experience in Saudi Arabia mostly with the Company as Gulf Elite or as Jaffar Al Hamood Est.

7 4) Business Overview – Continued 4.4) Key Management Structure Organization Chart

Maurice S. Matar General Manager

Samy Abdul Fattah Shailendra Kumar Dwivedi Maher Mussiry Finance Manager Procurement Manager Admin Manager

4.5) Employee Structure Total 342 workforce as per the list of manpower at item no. 6 (page 11).

4.6) Shareholder Structure

. The shareholder structure stated in the original article of association (April 2011) is shown in the table.

. GEGC founding shareholders are MMG (99%), and Mohammed AlBahraini (1%).

8 4) Business Overview – Continued 4.7) Specialty / Core Competence Gulf Elite specializes in civil industrial buildings projects such as Schools, Office buildings, Hospitals, Laboratories, Residential housing, In‐plant industrial buildings, In‐plant foundations and pipe racks. Gulf Elite has executed turnkey projects on the basis of: . Procure and construct for the vast majority of its projects . Joint venture, with Al‐Mabani for the construction of R&D Laboratory for SAUDI ARAMCO Contract Number 44319 . Design procure and construct, NDT facility for SAUDI ARAMCO contract 45983 and Shaybah Industrial Support Facilities for SAUDI ARAMCO Contract Number 6600026865

Gulf Elite has established its presence in the civil construction industry by executing quality projects on time. Gulf Elite possesses an excellent record with SAUDI ARAMCO and all other clients. 4.8) Historical Clients Being an approved contractor for SAUDI ARAMCO, the majority of Gulf Elite projects are either directly contracted with SAUDI ARAMCO or with International Contractors who were awarded SAUDI ARAMCO projects. Besides SAUDI ARAMCO, Gulf Elite has contracted with SKEC, Drake And Scull, Arabian Bemco, Tecnicas Reunidas Ltd. and EMAAR.

9 COMPANY ORGANIZATIONAL CHART

5) Organization Chart 6) Manpower ANALYSIS OF MANPOWER BY WORK CATEGORIES Position No. of Heads Administration: Manager 6 Accountant 6 Staff 18 Project Sites: Project Manager 2 Construction Manager 2 Safety Managers 1 Safety Supervisor 1 Safety Officer 4 QA/QC Manager 2 QA/QC Supervisor 2 QC Inspector 3 Engineer 12 Site Superintendent 6 Site Supervisor 7 Support Staff 28 Craftsmen 104 Foreman 42 Leadsman 16 Driver & Operator 20 Assistant / Helper / Labor 60 TOTAL 342 11 7) Construction Equipment and Tools

EQUIPMENT CONSTRUCTION TOOLS

NUMBER NUMBER SN DESCRIPTION SN DESCRIPTION OWNED OWNED

1 LOADER 3 1 POWER TRAWLER 18 2CRANE, 50 TONS 2 2 PNEUMATIC JACKHAMMER 20 3 BACKHOE 3 3 ASPHALT CUTTER 20 4 SKID LOADER 2 4 CONCRETE MIXER 15 5 FORKLIFT 4 5 CONCRETE VIBRATOR 30 6MANLIFT 3 6 CORE CUTTING MACHINE 10 7POWER GENERATOR 15 7 HYDROSTATIC TEST PUMP 8 8PORTABLE GENERATOR 30 8 THREADING MACHINE 15 9WELDING MACHINE 15 9 TILE CUTTER w/ STAND 10 10 STUD WELDING MACHINE 3 10 HEAVY DUTY DRILL PRESS 15 11 AIR COMPRESSOR 15 11 POWER PLAINER 5 12 ROLLER COMPACTOR 15 12 WOOD SHAPING MACHINE 3 13 PLATE COMPACTOR 25 14 JUMPING COMPACTOR 25

12 8) Company Vehicle’s List and Accommodation

COMPANY VEHICLE’S LIST ACCOMMODATION NUMBER COMPANY SN DESCRIPTION OWNED LOCATION OWNED TYPE CAPACITY 1BUS, 50 SEATER 5 (YES/NO) AL YES PORTABLE CAMP 20 2MINI BUS 1 AL KHOBAR NO VILLA (3) 3 3DUMP TRUCKS 2 AL KHOBAR NO APARTMENT (2) 3 4TRAILERS 1 NO APARTMENT (3) 15 5 BOOM TRUCKS 2 NO BUILDING 250 6WATER TANKERS 3 7CHEVROLET 1 8DYNA 3 9SUV 5 10 PICK‐UP, DOUBLE CABIN 9 11 PICK‐UP, SINGLE CABIN 3 12 GMC VAN 1 13 GMC SAFARI 1 14 AMBULANCE 2 15 CAR, SEDAN 20

13 9) Latest Project’s Description 9.1) Status of Existing Projects:  Fit‐Out Works in Elevated Stations in Line 4 of Riyadh Metro Project –Package 3 A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐834. Project Started: February 2017 Completion Date: January 2020 Percentage Completed: 88.63 % Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.

 Fit‐Out Works in Two Shallow Underground Stations (4C2 & 4G1) in Line 4 of Riyadh Metro Project –Package 3 A subcontract to Gulf Co‐Operation Symbols under Subcontract No. CJV‐CNTR‐902. Project Started: December 2017 Completion Date: March 2019 Percentage Completed: 43.54 % Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.

14 9) Latest Project’s Description ‐ Continued 9.1) Status of Existing Projects:  Fit‐Out Works in Elevated Stations in 6F1 Station in Line 6 of Riyadh Metro Project –Package 3 A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐1001. Project Started: December 01, 2018 Completion Date: February 29, 2020 Percentage Completed: 42.01% Description: To perform all necessary design details, shop drawings, calculation with specifications and installation of architectural finishing work.

 Finishing Works for Emergency Exit Shaft (EES) at C&C 6‐1 Area in Line 6 of Riyadh Metro Project –Package 3 A subcontract to Fast Consortium LLC under Subcontract No. CJV‐CNTR‐0994. Project Started: February 2019 Percentage Completed: 22.18%

15 10) Potential 10.1) Overview

 Target Civil, Oil & Gas Projects.

 Market is saturated with opportunity.

 Target Saudi Aramco & International Contractors.

 Competitors are KHODARI, NESMA, CCE, OSAIS & KAMCO.

 Gulf Elite good record will facilitate invitations from Clients.

 Competitive edge: Gulf Elite possesses a competitive edge on most of tendered projects due to: . The management and supervisory staff (Project Management, Estimation & Procurement) have an average of 20 years experience. . Gulf Elite possesses a regularly updated cost data bank in materials, manpower and equipment breakdown on all related construction activities.

16 11) List of Projects 11.1) Ongoing Projects

• Fit‐Out Works in Two Shallow Underground Stations (4C2 & 4G1) in Line 4 of Riyadh Metro Project –Package 3 • Contract Value: 36,380,515.57 SAR

17 11) List of Projects 11.1) Ongoing Projects – Continued

• Fit‐Out Works in Elevated Stations in Line 4 of Riyadh Metro Project –Package 3 • Contract Value: 59,317,066.04 SAR

18 11) List of Projects – Continued 11.2) Completed Projects

COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) CONTRACT NO. SSF‐SH‐SC‐2016‐004 BRANCH OF SINOHYDRO 1 RIC BLDG. 224 AT SHAYBAH SUPPORT FACILITIES TO APRIL 2016 OCT 2017 65.919,025.59 YUE FENG CRUDE INCREMENT PURCHASE ORDER NO. 6510742008. A MID‐FORM CONTRACT AT WASIT INDUSTRIAL SAUDI ARABIAN OIL CO. 2 SEPT 2015 DEC 2016 10,417,340.00 SUPPORT FACILITIES FOR COMPLETION OF YAHYA SULIMAN AL‐JUHANI REMAINING WORKS.

CONTRACT NO. 6600026594 SAUDI ARABIAN OIL CO. 3 SHAYBAH NGL RESIDENTIAL & INDUSTRIAL APR 2011 OCT 2016 MOHAMED S. AL‐HAKBANI 380,000,585.00 COMPLEX TEL 013 876 6330

SAUDI ARABIAN OIL CO. CONTRACT NO. 6600026865 4 JUNE 2011 JULY 2016 MOHAMED S. AL‐HAKBANI 256,855,410.00 SHAYBAH NGL INDUSTRIAL SUPPORT FACILITIES TEL 013 876 6330 CONTRACT NO. 6600024662 SK ENGINEERING & KING ABDULLAH PETROLEUM STUDIES & CONSTRUCTION 5 SEPT 2011 JULY 2012 22,208,400.00 RESEARCH CENTER (KAPSARC) CONT NAME: MR. S. G. KIM COMMUNITY HOUSING PROJECT, RIYADH CLIENT: SAUDI ARAMCO CONTRACT NO. 6600025822 DRAKE & SCULL INTERNATIONAL KING ABDULLAH PETROLEUM STUDIES & 6 JAN 2011 JULY 2012 CONT NAME: MR. HAITHAM ADI 47,000,000.00 RESEARCH CENTER (KAPSARC) SUPERSTRUCTURE CLIENT: SAUDI ARAMCO PACKAGE, RIYADH CONTRACT NO.6600024660 KING ABDULLAH PETROLEUM STUDIES & SAUDI ARABIAN OIL CO. 7 MAY 2010 JUNE 2012 161,232,854.00 RESEARCH CENTER (KAPSARC) CONT NAME: MR. A. AL‐QAED SUBSTRUCTURE PACKAGE AT RIYADH 19 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) CONTRACT NO.6600021328 SAUDI ARABIAN OIL CO. 8 MAR 15, 2009 JAN 31, 2012 44,950,000.00 REPLACE OFFICE BUILDING AT CONT NAME: MR. H.M. MILLIBARI SAUDI ARABIAN OIL CO. CONTRACT NO. 6600020863 & 6600020902 CONT NAME: MR. FAROUK 9 UPGRADE SECURITY GATEHOUSES AT AUG 02, 2008 MAR 31, 2011 74,647,006.00 SHALABI YANBU, & , TEL 02 427 0613

AKL‐002 EMAAR MIDDLE EAST LLC 10 AL‐KHOBAR LAKES DEVELOPMENT JULY 2008 ‐ 116,300,000 CONT. NAME : MR. A. AL‐KHULI VILLAGE 1 PHASE C & VILLAGE 2 PHASE B

MAIN CONTRACTOR CONTRACT NO. BC‐098/2511 ARABIAN BEMCO CONTG. CO SUBCONTRACT FOR CIVIL WORKS, EARTH WORKS CONT NAME: MR. FAROUK AND SOIL IMPROVEMENT FOR UPGRADE JGP GHAZIRI 11 WASTE WATER AND SPENT CAUSTIC SYSTEM AT FEB. 2008 MARCH 2009 13,600,000 TEL 02 669 5851 JUAYMAH GAS PLANT. CLIENT: SAUDI ARAMCO MR. HAMAD M. AL SAADI SAUDI ARAMCO CONTRACT NO. 6600018208 TEL 677 8743 CONTRACT NO. 8410‐ZA‐C04‐K MAIN CONTRACTOR SUBCONTRACT FOR CIVIL WORKS INCLUDING TECNICAS REUNIDAS GULF CO. FOUNDATIONS, BUILDINGS, STRUCTURAL STEEL CONTACT NAME: 12 ERECTION AND UNDER GROUND UTILITIES AT JUNE 2006 APRIL 2009 MR. MODESTO G. BETHENCOURT 153,700,000 HAWIYAH GAS PLANT. TEL 857 5904 CLIENT: SAUDI ARAMCO S. ARAMCO CONTRACT NO. 6600015024 MR. SAMIR I. AL DHAMEEN 20 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) CONTRACT NO. 8396‐ZA‐C04‐K MAIN CONTRACTOR SUBCONTRACT FOR CIVIL WORKS AND TECNICAS REUNIDAS GULF CO. STRUCTURAL STEEL, ERECTION OF PIPE RACKS, CONTACT NAME: SUPPLY AND ERECTION OF PRECAST SUBSTATION MR. CARLOS NAZAR 13 # 24 AND OME BUILDING AND INSTALLATION OF JAN. 2006 DEC. 2008 64,800,000 TEL 857 5904 GRP PIPES AND FITTINGS AT JUAYMAH GAS CLIENT: SAUDI ARAMCO PLANT. MR. IBRAHIM E. AL DOSSARY TEL 677 8774 S. ARAMCO CONTRACT NO. 6600012800 CONTRACT NO. BC‐069 MAIN CONTRACTOR PROCUREMENT OF MATERIAL AND ARABIAN BEMCO CONT. CO. LTD. CONSTRUCTION OF CIVIL WORKS FOR BULK CONTACT NAME: 14 ‐ DEC. 2006 11,880,000 PLANTS AT TABUK AND DUBA. MR. FAROUK GHAZIRI TEL. 02‐667 0092 SAUDI ARAMCO CONTRACT NO. 6600012794 CLIENT: SAUDI ARAMCO MAIN CONTRACTOR AL OSAIS SUBCONTACT UNDER AL OSAIS FOR CONTACT NAME PROCUREMENT AND CONSTRUCTION OF MR. JAMIL KATRIB 15 SECURITY GUARDHOUSE UPGRADE – ‐ APRIL 2005 11,587,000 CLIENT : SAUDI ARAMCO & TANAJIB. SAPD/SECUIRTY UPGRADE PROJS SAUDI ARAMCO CONTRACT # 6600011449 ATTN : MR. IMAD ABU HIMAD TEL : 8727542

21 11) List of Projects – Continued 11.2) Completed Projects – Continued

COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) MAIN CONTRACTOR DUBAIB AND SULAIM COMPANY CONTRACT NO.4363‐001 (DSCO) SUBCONTRACT UNDER DUBAIB AND SULAIM CONTACT NAME: MR. MAN SING COMPANY PROCUREMENT AND CONSTRUCT HF TEL: 858 1666 16 ‐ SEPT. 30, 2006 19,200,000 RECEIVER FACILITY RELOCATION AT MANIFA & CLIENT: SAUDI ARAMO HALF MOON BAY. (SA/COMMS. PROJECT SUPPORT SAUDI ARAMCO CONTRACT NO.6600014112 GROUP) ATTN: MR. ABDULAZIZ AL KHALAF TEL: 872 0300 CONTRACT NO. 6600006783 SAUDI ARAMCO PROCUREMENT & CONSTRUCTION OF CFC PD & CD/C&IPS/U & CPU 17 ‐ JUNE 2005 32,400,000 PHASEOUT CHILLER REPLACEMENT PHASE ‐1, MR. PIERRE G. BECHARA DIB , , RAS TANURA, UDHAILIYAH TEL: 862 5394 CONTRACT NO. 6400044729 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION OF NEW SAPD/S.A. PLANTS PRJ.DIVN. 18 ‐‐ 17,935,000 CONTROL, SERVICE AND GENERATOR BUILDINGS MR.ABDULLA A. AL MULLA AT AIN DAR GOSP‐2,4 & 6 TEL. 03 574 4058 SAUDI ARAMCO CONTRACT NO. 6400053110 COMM. & BLDG. MAINT. DEPT. 19 PROCUREMENT AND CONSTRUCTION OF ‐ FEB. 2004 20,390,000 MR. YOUSEF AL ALI MULTIPURPOSE CENTER, DHAHRAN. TEL. 872 2753

22 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) CONTRACT NO. 6400044684 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION CR/WR APD COMM. PROJ. DIV 20 ‐ OCT. 2003 21,515,000 COMMUNICATIONS, INSTALLATION AND MR. RICHAR LEIGHTON MAINTENANCE (I & M) BUILDING, RAS TANURA TEL. 862 2661 SAUDI ARAMCO CONTRACT NO. 6400044671 PD & CD/C&IPS/U & CPU 21 PROCUREMENT AND CONSTRUCTION OF ‐ MAY 2003 20,522,500 MR. ALI A. AL HAMDAN SURVEYING SERVICE BUILDING AT DHAHRAN TEL: 862 5474 CONTRACT NO. 44319/00 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION OF LAB. PD & CD/C&IPS/U & CPU 22 ‐ DEC. 2000 154,557,531 RESEARCH AND DEVELOPMENT (R & D) CENTER MR. FAISAL M. AL TURKI PHASE ‐ 1 ‐ DHAHRAN TEL. 862‐5463 MAIN CONTRACTOR AMEC BKW ARABIA LTD. CONTRACT NO. 44374/00 & 44375/00 CONTACT NAME: MR. JOHN ETHANE RECOVERY PLANT (BUILDING FACILITIES) THOMAS 23 ‐ APRIL 2002 45,000,000 A SUBCONTRACT UNDER AMEC BKW ARABIA LTD FOR CIVIL WORKS CLIENT: SAUDI ARAMCO NAPD/BERRI NGL RECOVERY DIVISION SAUDI ARAMCO CONTRACT NO. 44330/00 CAPD & CD/C&IPD 24 CONSTRUCTION OF SABG BOYS AND GIRLS ‐ JULY 2000 31,796,026 MR. A.Y. HAMEED ELEMENTARY SCHOOLS ‐ SAIHAT TEL. 862‐5439

23 11) List of Projects – Continued 11.2) Completed Projects – Continued START COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS CLIENT'S NAME DATE DATE PROJECT (SR) SAUDI ARAMCO CONTRACT NO. 44220/00 (CAPD & CD/COMM & INDUST'L 25 PROCUREMENT AND CONSTRUCTION OF THE NEW ‐ AUGUST 1998 PROJECTS DIV.) 21,245,500 HIGH FREQUENCY TRANSMITTER SITE IN DHAHRAN MR. ABDULBARI H. MUSALLAM Tel. 862 5462 SAUDI ARAMCO CONTRACT NO. 38747/00 COMMUNITY MAINTENANCE 26 RENOVATION OF EAST & WEST ADMINISTRATION ‐ MAY 1998 14,903,872 DEPARTMENT BUILDING CONSIST OF TWO FLOORS MR. CHARLES W. HENNE SAUDI ARAMCO CONTRACT NO. 45934/00 CAPD & CD/C & IPD 27 PROCUREMENT AND CONSTRUCTION OF A SINGLE ‐ AUG 1998 22,905,032 Mr. SAEED AL DABBOUS STOREY ONCOLOGY TREATMENT CENTER, DHAHRAN Tel: 862 5456 CONTRACT NO. 45983/00 SAUDI ARAMCO DESIGN AND PROVIDE ALL PLANT, TOOLS AND CAPD & CD/C & IPD EQUIPMENT, LABOUR SUPERVISION, TECHNICAL AND THIS IS A CONSORTIUM PROJECT PROFESSIONAL SERVICES, MATERIALS, SUPPLIED AND OF SCADO & JAFFAR M. AL 28 ARTICLES AND SHALL PERFORM ALL OPERATIONS ‐ DEC. 1998 25,127,613 HAMOOD EST. INCLUDING TESTING AND COMMISSIONING NECESSARY TO CONSTRUCT A NON‐ DESTRUCTIVE MR. KHALID AL GUNAIAN TESTING FACILITY AND RADIATION CONTAINMENT Tel: 862‐5457 BUILDING AR DHAHRAN SAUDI ARAMCO CONTRACT NO. 45871/00 CAPD & CD/CPD 29 PROCUREMENT AND CONSTRUCTION OF ‐ AUG 1997 9,601,291 MR. RICHARD LEIGHTON COMMUNICATION BUILDING ‐ RIYADH REFINERY TEL. 862 2661 24 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) SAUDI ARAMCO CONTRACT NO. 45571/00 CAPD & CD/C & IPD 30 PROCUREMENT AND CONSTRUCTION OF BOYS ‐ OCT. 1997 31,780,393 MR. HISHAM BUKHARI AND GIRLS INTERMEDIATE SCHOOLS AT SAFWA TEL 862 5438 CONTRACT NO. 45008/00 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION OF NEW CAPD & CD/C & IPD 31 ‐ MAR 1997 24,912,685 OFFICE SUPPORT FACILITY BUILDINGS AT ABQAIQ MR. ALLAN WICKLINE PRODUCING ORGANIZATION ‐ ABQAIQ LIP TEL 862 5467 SAUDI ARAMCO CONTRACT NO. 37769/00 CAPD & CD/C & IPD 32 PROCUREMENT AND CONSTRUCTION OF BOYS ‐ JAN. 1996 23,650,000 MR. WALLACE H. COLLY AND GIRLS ELEMENTARY SCHOOLS AT TEL. 03 577 2583 CONTRACT NO. 37698/00 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION OF 33 ‐ NOV. 1995 CAPD & CD/CPD 14,500,000 PERMANENT COMMUNICATION BUILDINGS MR. R.R. GALANG ALONG EAST/WEST PIPELINE CONTRACT NO. 37529/00 & 37530/00 SAUDI ARAMCO PROCUREMENT AND CONSTRUCTION OF BOYS 34 ‐ MARCH 1994 CAPD & CD/CPD 32,992,280 AND GIRLS ELEMENTARY SCHOOLS AT NORTH MR. F.L. DINNEEN DHAHRAN CLIENT: AL QAHTANI‐FISK (SAUDI ARAMCO CENTRAL AREA CONTRACT NO. 37711/00 35 AUG 1995 MAY 14,1996 PD & C DEPARTMENT) 1,529,608 COMMUNICATION BUILDING ‐ WARIAH PROJECT ENGINEER: MR. SANJI SONI

25 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) PROCUREMENT & CONSTRUCTION OF 36 WAREHOUSE BLDG AND WORKERS FACILITIES AT AUG 1994 APRIL 1995 CLIENT: HEMPEL PAINTS 3,000,000 DAMMAM FIRST INDUSTRIAL AREA. SAUDI ARAMCO (CAPD & CD/CPD) CONTRACT NO.: 37863/00 37 JULY 1994 JULY 1995 MR. SAEED A. AL‐DABBOUS 11,750,000 CLASSROOM ADDITIONS ‐ ABQAIQ AND RAHIMA Tel No. 862‐5456 CLIENT: AL‐KHODARI & SONS CONTRACT NO.: 37765/00 (SAUDI ARAMCO CAPD & CD/CPD) 38 SABG BOYS ELEMENTARY & INTERMEDIATE DEC. 1993 JUNE 1995 6,534,000 PROJECT ENGINEER: SCHOOLS ‐ MR. F. L. DINNEEN SAUDI ARAMCO (CAPD & CD/CPD) CONTRACT NO.: 37744/00 MR. SALEH A. AL‐BALOOSHI 39 APR 1994 APR 1995 3,580,000 RECEIVING OFFICE BUILDING ‐ DHAHRAN PROJECT ENGINEER Tel. No. 8761537 SAUDI ARAMCO (NAPD & CD/RT APD) 40 CONTRACT NO.: 37652/00 DEC. 1993 SEP 1994 Mr. J.M. AL‐SAHWAN, PROJECT 3,315,000 ENGINEER Tel. No. 673‐3193 SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS CONTRACT NO.: 37632/00 DIVISION) 41 NOV. 1993 APR 1994 575,000 SABG BOYS ELEMENTARY SCHOOL ‐ DAMMAM MR. ALI H. AL SAID,PROJECT ENGINEER Tel. No. 873‐8274

26 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) SAUDI ARAMCO (CAPD & CD/CPD) CONTRACT NO.: 37774/00 42 DEC. 1994 JAN 1995 MR. TARIQ M. AL‐HAJRI 9,444,000 CLASSROOM ADDITIONS – SAFWA AND Tel. No. 873‐7600 SAUDI ARAMCO CONTRACT NO.: 37498/00 (CSPD/ COMMS. PD & C DIVISION) 43 PERMANENT COMMUNICATION BUILDING – JUN 1992 OCT 1993 11,200,000 MR. W.A. CONNER, Tel. No. UTHMANIYAH & SHEDGUM 8274448 SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS DIVISION) CONTRACT NO.: 37451/00 44 MAR 1992 JAN 1994 MR. MOHAMED A. AL‐ 5,625,000 SABG GIRLS SECONDARY SCHOOL ‐ QATIF ABDULKARIM PROJECT ENGINEER Tel. No. 8765166 NALCO SAUDI CO. LTD. (PMT ‐ KING WILKINSON (S.A.) LTD.) CONSTRUCTION OF NALCO LABORATORY 45 MAR 1992 OCT 1992 NALCO ‐ CONTACT NAME: 2,621,000 BUILDING ‐ DAMMAM MR. JOHN K. JACKSON K.W (S.A) LTD. ‐ CONTACT NAME: MR. MICK PICTON SAUDI ARAMCO (CSPD/ COMMS. CONTRACT NO.: 37478/00 PD & C DIVISION) 46 COMMUNICATION BUILDING ‐ RAS TANURA MAR 1992 MAR 1993 3,980,000 MR, ROMEO R. GALANG TERMINAL Tel. No. 8721365

27 11) List of Projects – Continued 11.2) Completed Projects – Continued

COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) SAUDI ARAMCO (CAPD & CONTRACT NO.: 37426/00 CD/COMMUNITY & MEDICAL 47 SEWAGE LIFT STATION & WATER CHLORINATION OCT 1991 AUG 1992 PROJECTS DIVISION) 5,012,000 FACILITY ‐ SAFWA Mr. S. A. AL‐DABBOUS Tel. No. 876‐5114 SAUDI ARAMCO (CAPD & CD/COMMUNITY PROJECTS CONTRACT NO.: 37402/00 DIVISION) 48 AUG 1991 JUN 1992 3,445,000 SEWAGE PUMP STATION ‐ ABQAIQ MR. KHALED AL‐SHEHAB PROJECT ENGINEER Tel. No. 874‐0125 CONTRACT NO.: 43099/00 SAUDI ARAMCO (AVIATION DEPT / CONSTRUCTION OF NEW PASSENGER TERMINAL, Ground SUPPORT OPERATION 49 GUARD HOUSE AND OBSERVATION TOWER AT JULY 1991 MAR1992 DIVISION) 2,867,000 TANAJIB AIRSTRIP. MR. FAHAD AL‐BAADI Tel. No. (03) 8774717 CONTRACT NO.: 37285/00 SAUDI ARAMCO (CAPD & CD/IPD) MAGNETIC RESONANCE IMAGER BUILDING (MRI) Mr. A.A. AL‐GHAMDI 50 OCT 1990 JULY 1991 4,200,000 ‐ DHAHRAN PROJECT ENGINEER Tel. No. (03) 876‐6036 CONTRACT NO.: 37243/00 AL‐KHODARI & SONS INFRASTRUCTURE SUPPORT FACILITES AND SAUDI ARAMCO (SAPD & C/IYEC 51 GOVERNMENT SECURITY POST BUILDINGS AT MAY 1990 JAN 1992 UNIT) 17,399,400 PUMP STATION NO. 5, 6, 7 & 8 @ EAST/WEST PROJECT ENGINEER: PIPELING. Mr. AHMED AL MOHSEN

28 11) List of Projects – Continued 11.2) Completed Projects – Continued COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) SAUDI ARAMCO (CSPD/TEL., CONTRACT NO.: 37268/00 OSP PROJS. DIV.) 52 MAY 1990 JAN 1991 970,000 COMMUNICATION BUILDING ‐ PUMP STATION # 1 PROJECT ENGINEER: MR. ROMEO GALANG CONTRACT NO.: 37111/00 SAUDI ARAMCO CAPD & CD/CAPD COMPLETION OF TWO GARDENS AND THREE NOVEMBER PROJECT ENGINEER: 53 OCTOBER 1990 2,509,000 PARKING LOTS AT WEST KHOBAR 1989 MR. ABDUL BARI MUSALLAM Tel. No. 8737824 AL‐OSAIS TRAD. & CONT. (SAUDI ARAMCO CAPD/ CONTRACT NO.: 37104/00 ABGS PROJS. DIV.) 54 SABG BOYS INTERMEDIATE SCHOOL ‐ DAMMAM OCTOBER 1989 OCTOBER 1990 1,450,000 PROJECT ENGINEER: M.A. AL‐ABDUL KARIM Tel. No. 8765166 SAUDI ARAMCO , CAPD & CD/IPD CONTRACT NO.: 37197/00 PROJECT ENGINEER: 55 MODIFY LITHOTRIPSY ROOM ‐ DHAHRAN HEALTH MAY 1989 AUGUST 1989 460,000 Mr. A.A. AL‐GHAMDI CENTER Tel. No. 8766036 SAUDI ARAMCO CSPD/TEL. OSP & CONTRACT NO.: 37174/00 FACILITIES PROJECTS DIVISION 56 UPGRADE & RENOVATE NORTH ADMINISTRATION MARCH 1989 MARCH 1990 2,488,000 PROJECT ENGINEER: BUILDING AND BUILDING 510 ‐ DHAHRAN Mr. S.M. AL‐GHAMDI AL‐KHODARI & SONS CONTRACT NO.: 29542/00 (SAUDI ARAMCO CAPD & CD/CPD) 57 JULY 1988 MARCH 1990 3,930,000 SABG BOYS ELEMENTARY SCHOOL ‐ SAFWA ARAMCO PROJECT ENGINEER: MR. K.S. AL‐BESHRI

29 11) List of Projects – Continued 11.2) Completed Projects – Continued

COMPLETION VALUE OF SN CONTRACT NO. & PROJECT DESCRIPTIONS START DATE CLIENT'S NAME DATE PROJECT (SR) AL‐OSAIS CONT. & TRADING EST. CONTRACT NO.: 29543/00 (SAUDI ARAMCO CAPD & CD/CPD) 58 JULY 1988 MARCH 1990 1,000,000 SABG BOYS ELEMENTARY SCHOOL –RAHIMA ARAMCO PROJECT ENGINEER: MR. A.A. AL‐NAZER AL‐KHODARI & SONS (SAUDI ARAMCO CAPD & CD/CPD) CONTRACT NO.: 29541/00 59 JUNE 1988 DECEMBER 1989 ARAMCO PROJECT ENGINEER: MR. 7,328,000 SABG BOYS SECONDARY SCHOOL ‐ DAMMAM RASHEED AL KHALDI Tel. No. 8743964 SAUDI ARAMCO NAPD/COMM & CONTRACT NO.: 26350/00 SCADA PROJECTS DIVISION UPGRADE AND RENOVATE ENGINEERING 60 JANUARY 1988 JULY 1988 PROJECT ENGINEER: MR. RAFIQUE 1,174,000 BUILDING BASEMENT FOR TELECOMMUNICATION M. JAD EQUIPMENT ‐ DHAHRAN Tel. No. 8734164 AL‐OSAIS CONT. & TRADING EST. CONTRACT NO.: 29553/00 (SAUDI ARAMCO CAPD/ABGSPD) 61 SABG BOYS ELEMENTARY SCHOOL –NORTH MARCH 1988 AUGUST 1988 ARAMCO PROJECT ENGINEER Mr. 980,000 DHAHRAN H.I. AL‐HUSSAIN Tel. No. 8738195 AL‐OSAIS CONT. & TRADING EST. CONTRACT NO.: 37048/00 (SAUDI ARAMCO CAPD/ABGSPD) 62 SABG BOYS & GIRLS ELEMENTARY SCHOOL ‐ AUGUST 1988 JUNE 1989 ARAMCO PROJECT ENGINEER: Mr. 2,775,000 RAHIMA A.A. Al‐Nazer Tel. No. 6736883 TOTAL COMPLETED PROJECTS VALUE: 2,075,254,326

30 11) List of Projects 11.2) Completed Projects – Continued

• Project’s Name: Shaybah NGL RIC Bldg. 224 • Contract Value: 65,919,025.59 SAR

31 11) List of Projects – Continued 11.2) Completed Projects – Continued

• Project’s Name: A Mid‐Form Contract at Wasit Industrial Support Facilities under Purchase Order No. 6510742008. Contract Value is 4,417,340.08 SAR.

32 11) List of Projects – Continued 11.2) Completed Projects – Continued

• Project’s Name: Shaybah NGL Residential & Industrial Complex (RIC) • Contract Value: 380,000,585.00 SAR

33 11) List of Projects – Continued 11.2) Completed Projects – Continued

• Project’s Name: Shaybah NGL Industrial Support Facilities (ISF) • Contract Value: 256,855,410.00 SAR

34 11) List of Projects – Continued 11.2) Completed Projects – Continued

• Project’s Name : Al‐Khobar Lakes Development Village‐1 Phase C and Village‐2 Phase B • Contract Value: 116,300,000.00 SAR

ARABIC TYPE SPANISH TYPE

35 11) List of Projects – Continued 11.2) Completed Projects – Continued

Project’s Name: • KAPSARC Substructure Project – Saudi Aramco under Contract No.6600024660. Project Value is 61,232,854.00 SAR whereas Gulf Elite’s scope is construction and building the Substructure of the Research and Office Complex. • KAPSARC Superstructure Project – Subcontract at Drake and Scull (DSI) under Saudi Aramco Contract No. 6600025822. Project Value is 47,000,000 SAR whereas Gulf Elite’s scope is construction of buildings structural concrete works.

36 11) List of Projects – Continued 11.2) Completed Projects – Continued

SAUDI ARAMCO R&D DHAHRAN PROJECT UNDER JAFFAR AL‐HAMOOD

SAUDI ARAMCO BOYS & GIRLS ELEM. SCHOOL SAIHAT PROJECT UNDER JAFFAR AL‐HAMOOD

37 12) Government Registration Documents

Commercial Registration (CR) 38 12) Government Registration Documents – Continued

Chamber of Commerce 39 12) Government Registration Documents – Continued

SAUDIZATION CERTIFICATE GOSI 40 12) Government Registration Documents – Continued

Zakat Certificate 41 12) Government Registration Documents – Continued

VAT Certificate

42 12) Government Registration Documents – Continued

Municipality License 43 13) ISO Certificate

44 14) Awards:

45 14) Awards:

46 14) Awards:

47 14) Awards:

48 END

49