Shanghai Daily Tuesday 8 December 2015 Metro A5 Metro Glitch Causes Chaos During Rush Hour

Total Page:16

File Type:pdf, Size:1020Kb

Shanghai Daily Tuesday 8 December 2015 Metro A5 Metro Glitch Causes Chaos During Rush Hour Shanghai Daily Tuesday 8 December 2015 METRO A5 Metro glitch causes chaos during rush hour Zhang Ningning Han, said those stuck inside the crowded carriage were becom- IT was a chaotic start to the ing impatient. week for many commuters as “I saw two arguments. Both Metro services were disrupted started as they blamed the other due to malfunctions during the for pushing. I could only hear morning rush hour yesterday. people say ‘there’s no space’ and A Metro Line 2 train suffered a brake problem and was stuck ‘stop pushing me.’” at Wein ing Road Station at about Both Wang and Han were late 8:20am. Authorities were forced for work by about 20 minutes. limit the speed of other trains As more commuters crowded between Songhong Road Station on to stations, the Metro opera- and People’s Square Station. tor, with the help of subway Normal service only resumed police, launched crowd control after an hour at about 9:30am. measures at People’s Square, But it led to chaos as commut- Jiangsu Road, Century Avenue ers were stranded on platforms and Jing’an Temple stations. on Line 2, prompting the Metro The stations took crowd pre- operators to think up of alter- ventive measures like making it nate plans. one-way passage, closing some Emergency plans to tackle the transfers and turnstiles to avoid large passenger volume was put clashing and stampede between in place at major spots, espe- incoming and commuters going in the opposite direction. cially at People’s Square and Crowds move slowly at the passageway between Metro Line 1, Line 8 and Line 2. — Yan Junmin Century Avenue stations. Local police were also roped “I was pushed onto the train in to support station staff and down at the next station and “Otherwise the flow from the from Huangpi Road S. to a nd pu s he d bac k on t he pl at for m evacuate commuters. haul themselves back in the other two lines would result in Xujiahui. Passengers on the by the crowd,” a local resident Some trains on Line 8 and opposite direction. more passengers getting strand- malfunctioning train were named Wang Qi told Shanghai Line 7 did not halt at People’s “The two stations are very ed at the stations. That would evacuated and the service Daily after being stuck at the Square and Jing’an Temple sta- busy ever y morn i ng. As the com- have been dangerous.” resumed in about 10 minutes. busy People’s Square Station. tions to reduce the pressure on muters could not be transported But shortly after Line 2 As it was almost at the end “The air was also very bad commuters on Line 2, the metro by Line 2 from the stations in resumed operation, a carriage of morning rush hours, fewer as a lot of people were in the operator said on its Weibo ac- time, we had to take measures,” door problem affected Line 1 com muters were affected. Later, carriage.” count at 9:10am. a Metro spokesperson, sur- service on Huangpi Road S. the Metro operator apologized Another commuter, surnamed Passengers were forced to get named Xu, told Shanghai Daily. Station, affecting operations for the inconvenience. Unruly passenger offloaded Chen Huizhi captain allowed three police officers to enter the aircraft. They in itially tried A CHINESE passenger was offloaded to persuade him to leave the aircraft, from a United Airlines flight after and then forcibly removed him. creating a scene at Shanghai Pudong A scuffle ensued in which the offi- International Airport on Sunday. cers were hurt. Police said the passenger, who is Two of the police officers were back not from Shanghai, has been detained on duty while the third one was taking and faces charges for assaulting three a day off, police told Shanghai Daily police officers and deliberately ob- yesterday. structing public activity. There have been similar incidents After boarding Flight UA087 for New like this before. York, the passenger, surnamed Lu, In 2013, a female passenger on insisted on a seat upgrade, and then Shanghai Airlines flight from Harbin went and occupied a seat assigned to from Pudong was detained for five days another passenger. for slapping an air hostess after being The captain of the flight asked Lu Subscribe told that the already delayed f light was to leave the aircraft after he refused waiting for the clearance to take-off. to go back to his seat and notified the In this case, Lu possibly faces a fine airport police. of 200 yuan (US$31) and a maximum After Lu refused to budge, the 37 days in detention. Now 2016 Subscription (Monday to Sunday) EXPLORE MORE AT WWW.SHANGHAIDAILY.COM/METRO Mark " √ " Copies Price Type Line 18 extension Fans punished RMB720/year Print METRO Line 18 will link Changjiang TEN Ch i nese fa n s of a Sout h Korea n pop RMB500/year Digital Road S. to Changbei Road in Baoshan star were penalized after they bought RMB820/year Print + Digital Package District, the city government an- flight tickets to enter the restricted nounced yesterday. Construction work area at the Pudong International Air- on the first phase of the line, that will port. The immigration authorities said run from Hangtou Station to Changji- the fans had valid flight tickets but Hotline: (8621) 962288, did not board the flight. One of them a ng Road S. Station, will begin at the end stayed up for seven hours to catch a 5292 0024 (weekdays 10am-5pm) of this month. On completion, the Line glimpse of the stars. 18 will run through Baoshan, Yangpu E-mail: [email protected] and the Pudong New Area districts. The western extension, stretching 7 Lindquist joins CAS kilometers, will add five new under- AndERS Lindquist, Swedish applied ground stations. The route will run mathematician and control theorist, along Changjiang Road S. to Yujiangx- has been elected as the new foreign www.ShanghaiDaily.com iang Road, Changjiang Road W. and member of the Chinese Academy of www.iDEALShanghai.com Kangning Road. Commuters will be Sciences. He is among the 12 foreign Scan to explore more able to transfer to Line 1 at Tonghe scientists to be elected to the country’s Xincun Station. top academic institution. .
Recommended publications
  • US Individual Income Tax Return Sign Here Paid Preparer Use Only Uu X
    Department of the Treasury - Internal Revenue Service (99) 1040 OMB No. 1545-0074 Form U.S. Individual Income Tax Return 2018 IRS Use Only - Do not write or staple in this space. Filing status: SingleX Married filing jointly Married filing separately Head of household Qualifying widow(er) Your first name and initial Last name Your social security number BRUCE H. MANN Your standard deduction: Someone can claim you as a dependentX You were born before January 2, 1954 You are blind If joint return, spouse's first name and initial Last name Spouse's social security number ELIZABETH A. WARREN Spouse standard deduction: Someone can claim your spouse as a dependentX Spouse was born before January 2, 1954 X Full-year health care coverage Spouse is blind Spouse itemizes on a separate return or you were dual-status alien or exempt (see inst.) Home address (number and street). If you have a P.O. box, see instructions. Apt. no. Presidential Election Campaign. (see inst.) XXYou Spouse City, town or post office, state, and ZIP code. If you have a foreign address, attach Schedule 6. If more than four dependents, CAMBRIDGE, MA 02138 see inst. andu here| Dependents (see instructions): (2) Social security number(3) Relationship to you (4) u if qualifies for (see inst.): (1) First name Last name Child tax credit Credit for other dependents Under penalties of perjury, I declare that I have examined this return and accompanying schedules and statements, and to the best of my knowledge and belief, they are true, Sign correct, and complete. Declaration of preparer (other than taxpayer) is based on all information of which preparer has any knowledge.
    [Show full text]
  • 8Th Metro World Summit 201317-18 April
    30th Nov.Register to save before 8th Metro World $800 17-18 April Summit 2013 Shanghai, China Learning What Are The Series Speaker Operators Thinking About? Faculty Asia’s Premier Urban Rail Transit Conference, 8 Years Proven Track He Huawu Chief Engineer Record: A Comprehensive Understanding of the Planning, Ministry of Railways, PRC Operation and Construction of the Major Metro Projects. Li Guoyong Deputy Director-general of Conference Highlights: Department of Basic Industries National Development and + + + Reform Commission, PRC 15 30 50 Yu Guangyao Metro operators Industry speakers Networking hours President Shanghai Shentong Metro Corporation Ltd + ++ Zhang Shuren General Manager 80 100 One-on-One 300 Beijing Subway Corporation Metro projects meetings CXOs Zhang Xingyan Chairman Tianjin Metro Group Co., Ltd Tan Jibin Chairman Dalian Metro Pak Nin David Yam Head of International Business MTR C. C CHANG President Taoyuan Metro Corp. Sunder Jethwani Chief Executive Property Development Department, Delhi Metro Rail Corporation Ltd. Rachmadi Chief Engineering and Project Officer PT Mass Rapid Transit Jakarta Khoo Hean Siang Executive Vice President SMRT Train N. Sivasailam Managing Director Bangalore Metro Rail Corporation Ltd. Endorser Register Today! Contact us Via E: [email protected] T: +86 21 6840 7631 W: http://www.cdmc.org.cn/mws F: +86 21 6840 7633 8th Metro World Summit 2013 17-18 April | Shanghai, China China Urban Rail Plan 2012 Dear Colleagues, During the "12th Five-Year Plan" period (2011-2015), China's national railway operation of total mileage will increase from the current 91,000 km to 120,000 km. Among them, the domestic urban rail construction showing unprecedented hot situation, a new round of metro construction will gradually develop throughout the country.
    [Show full text]
  • Appendix a Monorail Database Formatted 1.13.2020.Xlsx
    Appendix A Global Scan Summary Number and Type Location Year Open Length # Stations Ridership (Daily Average) Ridership (Annual) Speed Travel Time Design/Construction Cost Infrastructure Technology/Guidence System of Vehicles Australia, 1989 (Closed 2017) Straddle-beam Steel box beam Broadbeach Australia, Queensland, Sea 1986 1.2 miles 2 17 mph $3M (Australian) 3, 9-car trains Straddle-beam Von Roll Mk II World 500 V AV power, generator provided to clear trains in emergencies. Built to operate 12 minutes (entire Von Roll Type III, 6, Australia, Sydney 1988 (Closed 2013) 2.24 miles 8 70 million (lifetime) 21 mph (average) $55 million USD Straddle-beam autonomously, breakdowns loop) 7-car trains (construction) soon after opening led to $10-15 million USD decision to retain drivers for (demolish) each train Approx. $550,000 dollars Belgium, Lichtaart 1975 1.15 miles 3 4.7 mph 15 minutes Straddle-beam Schwarzkopf (1978) 2021 (proposed Capacity of 150,000 $650 million Brazil, Salvador 12.4 miles 22 Straddle-beam BYD Skyrail estimate) passengers a day (approximately) 54 seven-car trains 500,000 (estimated once fully $1.6 billion (estimated for Brazil, Sao Paulo, 12 min (50 minutes (total once Phase 1: 2016 4.7 miles (out of 17 6 (out of 18 completed) entire project, not clear CITYFLO 650 automatic train Line 15 (Expresso 50 mph (average) end to end once completed), Straddle-beam Phase 2: 2018 miles planned) planned) 40,000 passengers per hour what is included in this control Tiradentes) fully completed) Bombardier Innova per direction amount)
    [Show full text]
  • Development of High-Speed Rail in the People's Republic of China
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Haixiao, Pan; Ya, Gao Working Paper Development of high-speed rail in the People's Republic of China ADBI Working Paper Series, No. 959 Provided in Cooperation with: Asian Development Bank Institute (ADBI), Tokyo Suggested Citation: Haixiao, Pan; Ya, Gao (2019) : Development of high-speed rail in the People's Republic of China, ADBI Working Paper Series, No. 959, Asian Development Bank Institute (ADBI), Tokyo This Version is available at: http://hdl.handle.net/10419/222726 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by-nc-nd/3.0/igo/ www.econstor.eu ADBI Working Paper Series DEVELOPMENT OF HIGH-SPEED RAIL IN THE PEOPLE’S REPUBLIC OF CHINA Pan Haixiao and Gao Ya No.
    [Show full text]
  • Form IT-201 Resident Income Tax Return Tax Year 2020
    Department of Taxation and Finance Resident Income Tax Return IT-201 New York State • New York City • Yonkers • MCTMT For the full year January 1, 2020, through December 31, 2020, or fiscal year beginning ... 2 0 and ending ... For help completing your return, see the instructions, Form IT-201-I. Your first name MI Your last name (for a joint return, enter spouse’s name on line below) Your date of birth (mmddyyyy) Your Social Security number Spouse’s first name MI Spouse’s last name Spouse’s date of birth (mmddyyyy) Spouse’s Social Security number Mailing address (see instructions, page 14) (number and street or PO box) Apartment number New York State county of residence City, village, or post office State ZIP code Country (if not United States) School district name Taxpayer’s permanent home address (see instructions, page 14) (number and street or rural route) Apartment number School district code number ............... City, village, or post office State ZIP code Taxpayer’s date of death (mmddyyyy) Spouse’s date of death (mmddyyyy) Decedent NY information Did you have a financial account located in a A Filing Single D1 foreign country? (see page 15) .............................. Yes No status Were you required to report any nonqualified (mark an Married filing joint return D2 (enter spouse’s Social Security number above) deferred compensation, as required by IRC § 457A, in one X on your 2020 federal return? (see page 15) .............. Yes No box): Married filing separate return (enter spouse’s Social Security number above) E (1) Did you or your spouse maintain living quarters in NYC during 2020? (see page 15) .
    [Show full text]
  • By Hai-Min Lyu Et Al
    Hydrol. Earth Syst. Sci. Discuss., https://doi.org/10.5194/hess-2019-28-AC1, 2019 © Author(s) 2019. This work is distributed under the Creative Commons Attribution 4.0 License. Interactive comment on “Scenario-based inundation analysis of metro systems: a case study in Shanghai” by Hai-Min Lyu et al. Hai-Min Lyu et al. [email protected] Received and published: 12 May 2019 This manuscript presented an investigation on the flooding risk of metro system, espe- cially for the stations’ inundation during severe rainstorm. The topic is interesting and within the scope of this journal. Overall quality of this manuscript is well. However, to improve the quality and readability of the manuscript, suggestions should be consid- ered by the authors. Following comments would help the authors; (1) Page 1 in line 18; suggest to rephrase the sentence structure “In addition, an equation is proposed to qualitatively calculate the inundation to figure out possible inundation risks of Shanghai metro system; Answer: Thanks for the reviewer’s suggestive comment. We have revised this sentence C1 from line 17 to line 18 in page 1. Line 17-18 in page 1: In addition, an equation is proposed to qualitatively calculate the inundation around a metro station to predict the potential inundation risks of metro system. (2) Page 4; in Introduction: “Begin with a broad, general statement of the topic and narrow it down to the context”. Please add some introductory lines of Shanghai metro system regarding inundation or overflow problems in the past, before the objectives of the research; Answer: Thanks for the reviewer’s suggestive comment.
    [Show full text]
  • Form 2210 – Underpayment of Estimated
    Underpayment of Estimated Tax by OMB No. 1545-0074 Form 2210 Individuals, Estates, and Trusts 2020 ▶ Department of the Treasury Go to www.irs.gov/Form2210 for instructions and the latest information. Attachment Internal Revenue Service ▶ Attach to Form 1040, 1040-SR, 1040-NR, or 1041. Sequence No. 06 Name(s) shown on tax return Identifying number Do You Have To File Form 2210? Complete lines 1 through 7 below. Is line 4 or line 7 less than Yes ▶ Don’t file Form 2210. You don’t owe a penalty. $1,000? No ▼ Complete lines 8 and 9 below. Is line 6 equal to or more than Yes You don’t owe a penalty. Don’t file Form 2210 unless ▶ line 9? box E in Part II applies, then file page 1 of Form 2210. No ▼ Yes You must file Form 2210. Does box B, C, or D in Part II You may owe a penalty. Does any box in Part II below apply? ▶ apply? No No Yes ▶ You must figure your penalty. ▼ Don’t file Form 2210. You aren’t required to figure ▼ your penalty because the IRS will figure it and send You aren’t required to figure your penalty because the IRS you a bill for any unpaid amount. If you want to figure will figure it and send you a bill for any unpaid amount. If you it, you may use Part III or Part IV as a worksheet and want to figure it, you may use Part III or Part IV as a enter your penalty amount on your tax return, but worksheet and enter your penalty amount on your tax return, don’t file Form 2210.
    [Show full text]
  • 2019 IT-511 Individual Income Tax Booklet
    IT 511 Rev. 07.22.20 Brian Kemp David M. Curry Governor Revenue Commissioner Georgia Department of Revenue 2019 Individual Income Tax 500 and 500EZ Forms and General Instructions WHAT'S INSIDE? ELECTRONIC FILING Charitable Contributions/Donations.....................................23 Filing Requirements..............................................................9 Form 500 Instructions.....................................................11-13 Free Electronic Filing ...........................................................4 General Information...........................................................7-8 Qualified taxpayers can file electronically for Georgia Tax Center..............................................................2 free! Georgia Tax Rate Schedule................................................21 Receive your refund by direct deposit! Low Income Tax Credit Worksheet.....................................20 File fast and securely from your home PC! Mailing Addresses................................................................5 Message from Commissioner Curry.................................1 Other State's Tax Credit Worksheet.................................. 19 ON-LINE PAYMENTS Part-year Resident and Nonresident Instructions.........17-18 Payment Options.................................................................4 The Georgia Department of Revenue accepts Visa, Penalty and Interest.............................................................7 American Express, MasterCard, and Discover credit Requesting an Extension
    [Show full text]
  • Form IL-1040 Individual Income Tax Return Or for Fiscal Year Ending / Over 80% of Taxpayers File Electronically
    Illinois Department of Revenue *60012201W* 2020 Form IL-1040 Individual Income Tax Return or for fiscal year ending / Over 80% of taxpayers file electronically. It is easy and you will get your refund faster. Visit tax.illinois.gov. Step 1: Personal Information A Enter personal information and Social Security numbers. You must provide the entire Social Security number for you and your spouse. Do not provide a partial Social Security number. - - Your first name and initial Your last name Year of birth Your Social Security number - - Spouse’s first name and initial Spouse’s last name Spouse’s year of birth Spouse’s Social Security number Mailing address (See instructions if foreign address) Apartment number County (Illinois only) City State ZIP or Postal Code Foreign Nation, if not United States (do not abbreviate) B Filing status: Single Married filing jointly Married filing separately Widowed Head of household C Check If someone can claim you, or your spouse if filing jointly, as a dependent. See instructions. You Spouse D Check the box if this applies to you during 2020: Nonresident - Attach Sch. NR Part-year resident - Attach Sch. NR Step 2: Income (Whole dollars only) 1 Federal adjusted gross income from your federal Form 1040 or 1040-SR, Line 11. 1 .00 2 Federally tax-exempt interest and dividend income from your federal Form 1040 or 1040-SR, Line 2a. 2 .00 3 Other additions. Attach Schedule M. 3 .00 4 Total income. Add Lines 1 through 3. 4 .00 Step 3: Base Income 5 Social Security benefits and certain retirement plan income received if included in Line 1.
    [Show full text]
  • Development of High-Speed Rail in the People's Republic of China
    ADBI Working Paper Series DEVELOPMENT OF HIGH-SPEED RAIL IN THE PEOPLE’S REPUBLIC OF CHINA Pan Haixiao and Gao Ya No. 959 May 2019 Asian Development Bank Institute Pan Haixiao is a professor at the Department of Urban Planning of Tongji University. Gao Ya is a PhD candidate at the Department of Urban Planning of Tongji University. The views expressed in this paper are the views of the author and do not necessarily reflect the views or policies of ADBI, ADB, its Board of Directors, or the governments they represent. ADBI does not guarantee the accuracy of the data included in this paper and accepts no responsibility for any consequences of their use. Terminology used may not necessarily be consistent with ADB official terms. Working papers are subject to formal revision and correction before they are finalized and considered published. The Working Paper series is a continuation of the formerly named Discussion Paper series; the numbering of the papers continued without interruption or change. ADBI’s working papers reflect initial ideas on a topic and are posted online for discussion. Some working papers may develop into other forms of publication. Suggested citation: Haixiao, P. and G. Ya. 2019. Development of High-Speed Rail in the People’s Republic of China. ADBI Working Paper 959. Tokyo: Asian Development Bank Institute. Available: https://www.adb.org/publications/development-high-speed-rail-prc Please contact the authors for information about this paper. Email: [email protected] Asian Development Bank Institute Kasumigaseki Building, 8th Floor 3-2-5 Kasumigaseki, Chiyoda-ku Tokyo 100-6008, Japan Tel: +81-3-3593-5500 Fax: +81-3-3593-5571 URL: www.adbi.org E-mail: [email protected] © 2019 Asian Development Bank Institute ADBI Working Paper 959 Haixiao and Ya Abstract High-speed rail (HSR) construction is continuing at a rapid pace in the People’s Republic of China (PRC) to improve rail’s competitiveness in the passenger market and facilitate inter-city accessibility.
    [Show full text]
  • CHENGDU Brought to You by Our Guide to Southwest China’S Thriving Megacity
    C H E N G D U CHENGDU Brought to you by Our guide to Southwest China’s thriving megacity Our third Sinopolis guide This is the third in our Sinopolis series of city guides. They Chengdu has likewise made major strides in moving up are designed to give you insights into China’s larger cities, the industrial value chain. Its high-tech special zone plays and are written with the business person in mind. host to the likes of Intel chip factories, as well as the As we pointed out in our first Sinopolis (which looked at Foxconn assembly lines that make many of the world’s Hangzhou), we know that knowledge of Beijing and iPads. The city has also become a hub for software Shanghai is already quite strong, so our goal here is to engineers, partly because property prices are dramatically Chengdu was a create a series of useful overviews of China’s other, less cheaper than those of Beijing and Shanghai (see our starting point for well-known major cities. This guide focuses on the chapter on the property market), and likewise its high the ancient Silk Southwestern metropolis of Chengdu, the provincial quality local universities. But the other reason why skilled Road and is capital of Sichuan and one of China’s biggest cities by engineers like the city is its liveability. Famed for its reprising that population (16 million). It is also one of the country’s most teahouse culture, Chengdu is also a gastronomic capital: role thanks to ancient cities: thanks to its silk trade it was a starting point Sichuanese cuisine is one of China’s four great culinary President Xi Jinping’s for the Silk Road.
    [Show full text]
  • Congressional Record United States Th of America PROCEEDINGS and DEBATES of the 113 CONGRESS, SECOND SESSION
    E PL UR UM IB N U U S Congressional Record United States th of America PROCEEDINGS AND DEBATES OF THE 113 CONGRESS, SECOND SESSION Vol. 160 WASHINGTON, WEDNESDAY, MAY 28, 2014 No. 81 Senate The Senate was not in session today. Its next meeting will be held on Friday, May 30, 2014, at 2 p.m. House of Representatives WEDNESDAY, MAY 28, 2014 The House met at noon and was Mr. HOYER. Mr. Speaker, I rise mittee in its work. And he honored the called to order by the Speaker pro tem- today to pay tribute to an extraor- tradition of the office he headed, au- pore (Mr. WOLF). dinary life, to an extraordinary indi- thoring a history of the House Library f vidual, to a dear and good friend of and promoting ties with the Senate Li- mine for many, many years. Emanuel brary and the Library of Congress’ DESIGNATION OF SPEAKER PRO Raymond Lewis was the librarian Congressional Research Service. TEMPORE emeritus, the last and longest-serving As I said, Mr. Speaker, I knew Ray The SPEAKER pro tempore laid be- librarian of the U.S. House of Rep- Lewis for much of the time I served in fore the House the following commu- resentatives, a prolific author, archi- the House of Representatives. I got to nication from the Speaker: vist, educator, humorist, historian, il- know him, his sense of humor, his WASHINGTON, DC, lustrator, psychologist, and recognized sense of this institution, his sense of May 28, 2014. expert on military and naval history. decency, and his sense of excitement of I hereby appoint the Honorable FRANK R.
    [Show full text]