95048 Procurement Plan, RRP-II: Procurement Plan for the project Rural Roads Project -II (PMGSY) For Bihar This is an indicative plan prepared by the Project for the entire project period. The Project shall update the Procurement Plan annually or as needed throughout the duration of the project in agreement with the Bank to reflect the actual project implementation needs and improvements in institutional capacity. The Project shall implement the Procurement Plan in the manner in which it has been approved by the Bank. This plan has been reviewed during negotiations Public Disclosure Authorized

I. General

1. Bank’s approval Date of the procurement Plan xxxxx, 2014 2. Date of General Procurement Notice issued for Consultancies only:xxxx. 3. Period covered by this procurement plan: For the entire project period

II. Goods and Works

1. Procurement Methods and Prior Review Threshold: Procurement Decisions shall be subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement.

Public Disclosure Authorized Expenditure Category Procurement Method Prior Review Threshold Comments US$ GOODS, EQUIPMENT & MACHINERY 1. Goods and Equipment ICB All contracts World Bank SBD will be used and the estimated to cost equivalent of procurement will be as per procedures US$ 300,000 or more per described in World Bank Guidelines contract 2. Goods and Equipment NCB First contract for goods for The NCB bidding document agreed with estimated to cost less than each state , irrespective of GOI will be used and the procurement will US$ 300,000 and greater than value and all contracts be as per procedures described in the US$ 100,000 equivalent per estimated to cost more than Procurement and Contract Management contract US$ 200,000 equivalent per Manual. contract Public Disclosure Authorized 3. Goods and Equipment Shopping procedure with at All post review estimated to cost less than least three quotations from US$ 100,000 equivalent per qualified bidders in contract accordance with the Page 1 of 36

Public Disclosure Authorized Procurement Plan, RRP-II: Bihar provisions of paragraph 3.5 of procurement Guidelines.

Procurement through DGS&D rate contracts will be considered equivalent to shopping procedure. 4. Goods and Equipment that Direct Contracting Upto US$ 10000 post review meet the requirements of and balance prior review paragraph 3.6 and 3.7 of Procurement Guidelines. CIVIL WORKS 5. Civil works contracts ICB * All contracts World Bank SBD will be used and the . estimated to cost more than procurement will be as per procedures US$ 10,000,000 equivalent described in World Bank Guidelines. per contract Civil works contracts NCB First contract for works for The procurement will be done as per 6. estimated to cost up to US$ each state, irrespective of procedures described in the Procurement 10,000,000 equivalent per value and all contracts cum Contract Management Manual and contract estimated to cost more than using the « Model Bidding Document » US$ 5,000,000 equivalent cleared by the Bank per contract will be subject to prior review by the Bank. All other works contracts will be subject to post review.

* As per current planning, no ICB contracts are envisaged for civil works.

2. Pre-qualification. Not Applicable

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not Applicable

4. Reference to (if any) Project Operational/Procurement Manual: A Procurement cum contract Management Manual is already circulated by NRRDA after taking WB into confidence. All procurement in the project will be done as per procedures described in it. . Page 2 of 36

Procurement Plan, RRP-II: Bihar

5. Any Other Special Procurement Arrangements:

The following provisions constitute additional provisions applicable for purposes of National Competitive Bidding (NCB). NCB will be conducted in accordance with paragraph 3.3 and 3.4 of the Guidelines and the following provisions:

 Only the model bidding documents for procurement of works through NCB agreed with the Bank (and as amended for time to time), shall be used for bidding; 

No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small scale enterprises or enterprises from any given State;  Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder; 

 The system of rejecting bids outside a pre-determined margin or "bracket" of prices shall not be used in the project; 

However, as an exception in this project, two part bidding for NCB works (as described in the model bidding document) has been agreed by the Bank subject to appropriate fiduciary safeguards(e- procurement system and complaint handling mechanism acceptable to the Bank)  All procurement of works through NCB in the eight participating states will be done through a standardized e-procurement system acceptable to the Bank.  As per paragraph 1.14(e) of the World Bank's Procurement Guidelines, the Association's right to inspect the accounts and records of bidders, suppliers and contractors will be included in the bidding documents.

Page 3 of 36

Procurement Plan, RRP-II: Bihar III. Selection of Consultants

1. Selection Methods and Prior Review Threshold: Selection decisions shall be subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Expenditure x Selection Method Prior Review Threshold Category Value threshold per contract

Consultancy -Quality and Cost Based (QCBS) method All prior review. contracts to be Each contract estimated to cost -REOI to be published in UNDB on line awarded to US$ 200,000 equivalent or Consultant firms more per contract including -Quality and Cost Based (QCBS) method All single source selection of selection of Each contract estimated to cost -Quality Based (QBS) method of selection consultants with estimated cost training institutes less than US$ 200,000 in accordance with the provisions of of more than US$ 30,000 by equivalent per contract paragraph 3.1 to 3.4 of Consultant’s equivalent per contract will be NRRDA/SRRDAs Guidelines. subject to prior review. All -Consultant’s Qualifications (CQS) method. other contracts will be subject to -Least Cost Method (LCS). post review but with TORs -Fixed BudgetMethod. subject to prior review by the -Single Source Selection Bank

Individual Consultant -Through comparison of qualifications of at All cases subject to post review estimated to cost less than US$ least three candidates. but with TORs subject to prior 30,000 or equivalent per review by the Bank. contract All contracts for single source -Sole Source Selection d\selection of individual consultant will be subject to prior review.

2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $ 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. Any Other Special Selection Arrangements: NIL

Page 4 of 36

Procurement Plan, RRP-II: Bihar Rural Roads Project II Procurement Packages with Methods and Time Schedule

Procurement Plan with Methods & Time Schedule for 12 Months period starting December 13 - for CIVIL WORKS Estimated Package Estimated Cost Review Expected Cost Sl. Reference Length (Rs. in Lakhs) of Procurement by Bank bid Contract (Description) (Rs. in Lakhs) of Comments no Package No. (Km) Method (Prior / opening Const. Maint. Const. Maint. Post) * date * First contract of each State will be Subjected to prior review by the Bank 1 PWD Road T02 To Kharhar 1.519 89.56 7.50 13-01- 01RRP-02 218.88 17.88 NCB Post 2014 2 T02 To Bathurbari East 2.118 129.32 10.38

3 T02 To Sharanpur North 1.800 99.80 7.93 13-01- 01RRP-03 456.49 33.73 NCB Post 2014 4 Jamua To Khemgarh 5.274 356.69 25.80

5 T02 To Kasraila 1.101 62.61 5.13 13-01- 6 01RRP-05 Farbisganj Road To Chikni 1.124 132.47 5.44 276.77 16.50 NCB Post 2014 7 T01 To Bhagparasi 1.188 81.69 5.93

8 T02 To Katpahar 1.288 74.86 6.04 13-01- 9 01RRP-06 T01 To Chaita 1.587 160.90 8.00 368.78 22.97 NCB Post 2014 10 T02 To Maratipur Mandaltola 1.899 133.02 8.93

11 Rajoula To Muslim Tola 2.063 122.66 9.83 13-01- 01RRP-07 468.67 33.76 NCB Post 2014 12 T01 To Sikatia Bangali Tola 2.198 171.60 9.93

Page 5 of 36

Procurement Plan, RRP-II: Bihar 13 Gaus Nagar To Gangai Tola 2.985 174.41 14.00 13-01- 14 01RRP-14 L021 To Bhagparasi 14.520 1225.08 73.63 1225.08 73.63 NCB Post 2014 15 Tarbit T03 To Marichgaon 1.257 98.46 5.77 13-01- 01RRP-15 441.38 30.67 NCB Post 2014 16 T01 To Kurhaili 5.334 342.92 24.90

17 L027 To Dakatia 1.610 93.76 7.53 13-01- 01RRP-16 400.81 26.81 NCB Post 2014 18 T02 To Barkumba 3.933 307.05 19.28

19 L025 To Chamra Dhar 1.688 105.96 8.17 13-01- 20 01RRP-17 Deepnagar T03 To Belbari 1.848 98.55 8.76 426.25 36.55 NCB Post 2014 21 Kankhudia To Dogachhi 3.922 221.74 19.62

22 T01 Dehipaura To Dainia 1.694 129.13 8.22 13-01- 01RRP-22 352.74 23.59 NCB Post 2014 23 Sikti To Pararia 3.203 223.61 15.37

24 T04 To Aulabari 2.560 199.26 11.93 13-01- 01RRP-24 467.76 32.51 NCB Post 2014 25 T04 To Ranikatta 4.105 268.50 20.58 REO Road Chandighasi Wooden 26 1.632 101.93 7.62 Bridge To Chandighasi 13-01- 27 01RRP-26 PWD To Simarbani North 1.795 141.98 8.38 362.98 25.73 NCB Post 2014 28 PWD Road To Yadav Tola Kusmaul 1.917 119.07 9.73

29 Akela Mor To Harua Tola 2.295 167.82 10.60 13-01- 01RRP-27 353.93 23.34 NCB Post 2014 30 PWD Road To Kujra Tola 2.574 186.11 12.74 13-01- 31 01RRP-28 Khajuri To Yadav Tola 2.829 162.69 13.69 461.47 28.85 NCB Post 2014 Page 6 of 36

Procurement Plan, RRP-II: Bihar 32 PWD Road To Dhariagara 3.122 298.78 15.16 13-01- 33 01RRP-29 PWD Road To Sonapur 3.161 205.54 15.71 205.54 15.71 NCB Post 2014 13-01- 34 01RRP-30 PWD Road To Chauhan Tola Paikpar 4.144 297.83 20.41 297.83 20.41 NCB Post 2014 13-01- 35 01RRP-31 Jilebiamore REO Road To Gamharia 4.170 259.60 20.11 259.60 20.11 NCB Post 2014 PWD Road To Harijan Tola to 13-01- 36 01RRP-33 5.446 411.27 27.01 411.27 27.01 NCB Post Kusmaul 2014 37 Matiario To Chauhan Tola 1.276 76.14 5.86 13-01- 38 01RRP-35 L024 To Tiraskund 1.740 114.55 8.55 479.29 34.19 NCB Post 2014 39 Samaraha To Pothia Dhumgarh 4.227 288.60 19.78

40 T01 To Ghiwaha via Bhagparwaha 1.325 85.87 6.07 13-01- 41 01RRP-36 Kusmaha To Halla 1.421 103.16 6.06 451.03 31.43 NCB Post 2014 42 T01 To Binodpur 4.056 262.00 19.30

43 T01 To Eidgah Paswan Tola 1.658 91.15 7.50 13-01- 44 01RRP-37 Parwaha To Harijantola 1.727 107.94 7.66 462.00 30.76 NCB Post 2014 45 Shaffganj To Doria Sonapur 3.282 262.91 15.60

46 Rmai More To Lahasunganj 2.735 190.62 12.37 13-01- 01RRP-39 479.36 25.71 NCB Post 2014 47 T02- Gopalpur To Majua 2.831 288.74 13.34

48 Lakshmipur to Dumaria 1.468 90.33 7.21 13-01- 01RRP-40 479.45 32.78 NCB Post 2014 49 Rajganj to Sahebganj 5.609 389.12 25.57 13-01- 50 01RRP-41 Kanhali to Tamganj 6.267 415.26 29.24 415.26 29.24 NCB Post 2014 Page 7 of 36

Procurement Plan, RRP-II: Bihar NH-57 Rajganj to Nathpurnarpatganj 13-01- 51 01RRP-42 6.682 417.09 32.33 417.09 32.33 NCB Post Border 2014 52 Kajra To Pachira 1.995 183.00 9.40 13-01- 01RRP-44 501.18 30.22 NCB Post 2014 53 T02 To Ekara 4.388 318.18 20.82

54 Hingana To Musalman Tola 4.295 277.85 21.34 13-01- 01RRP-45 433.74 33.34 NCB Post 2014 55 Parsa Hat To Bengwahi East 2.259 155.89 12.00

56 Math Basaithi To Gunwanti 2.391 154.19 10.74 13-01- 01RRP-46 415.73 26.43 NCB Post 2014 57 PWD Road To Naraenpur 3.379 261.54 15.69

58 Amarpur Sahkund to Biswaspur 0.720 37.20 2.52

59 Khaira to Bhimsen 0.983 55.45 4.65 13-01- 60 03RRP-01 Samukhia More to Rajpur 1.316 64.01 6.14 358.24 31.92 NCB Post 2014 61 Belsira Pansalla to Pathaki 1.431 76.58 6.73

62 Amarpur Chokar Road to Tetaria 2.532 125.00 11.88

63 Amarpur Chokar to Majhagain 1.470 70.22 6.85 13-01- 03RRP-02 462.02 43.39 NCB Post Nandlalpatti to Laxmipur via 2014 64 7.852 391.80 36.54 Ramchandarpur 65 Banka-Dev T02 To Sadpur 0.769 38.84 3.65

66 Banka- T04 To Jamhara 1.045 51.18 4.88 13-01- 03RRP-03 214.92 15.35 NCB Post 2014 67 Singarpur L032 To Gopalpur 1.108 66.22 1.58 Banka-Samukhiya More-Pokhiriya 68 1.125 58.68 5.24 T05 To Lalmatiya Banka-via-Jamdaha To Deoghar T02 13-01- 69 03RRP-04 1.476 68.00 6.82 221.62 21.23 NCB Post Desaria 2014 Page 8 of 36

Procurement Plan, RRP-II: Bihar 70 L078-Katali L053 To Bhukhiya 1.501 72.54 6.98

71 Balimara L066 To Katahara 1.585 81.08 7.42

72 Banka-Pokharia T04-L054 To Jagai 2.822 135.91 13.05 13-01- 03RRP-07 446.30 43.25 NCB Post Banka-Pokhariya T04 Dudhari 2014 73 6.512 310.39 30.20 Chhatarpal L051 To Gangati-Bhounra 74 Belhar Jhunhka T04 To Giddha 0.808 38.02 3.83

75 Belhar Sandipi T05 To Diwandih 1.203 60.47 5.74 13-01- 03RRP-08 257.79 22.07 NCB Post 2014 76 Belhar Sandipi to Duhba 1.206 58.04 5.73

77 Belhar Sandipi Sautadih to Boka 1.803 101.26 6.77

78 Samukhiya More to Kdbara 1.927 95.71 9.11 13-01- 79 03RRP-10 Parachak to Rajwara Khoji 2.080 126.58 6.64 403.11 28.60 NCB Post 2014 80 Samukhia-Ramsaraiya To Kushaha 3.102 180.82 12.85

81 Lakha to Paidapur 2.121 116.90 10.28 13-01- 03RRP-12 365.91 29.16 NCB Post Jalani Basbitta Road to Mohanpur 2014 82 4.853 249.01 18.88 Garhi 83 Bhera More Panjwara to Dharhara 3.860 231.61 9.42 13-01- 03RRP-16 469.17 25.44 NCB Post 2014 84 BGP Dumka Road to Mohanpur 4.612 237.56 16.02

85 Punsia Ajitnagar Road To Hizarpur 3.625 171.27 17.15 13-01- 03RRP-17 454.01 44.06 NCB Post Banka Dhaka More To Kharihara 2014 86 5.871 282.74 26.91 Road to Gorwa Belhar Katoria PWD Road to 87 1.570 76.22 7.48 Barganiya 13-01- 03RRP-19 376.11 34.08 NCB Post 2014 88 Gauripur to Gobindpur 1.739 94.09 8.30 Page 9 of 36

Procurement Plan, RRP-II: Bihar 89 Ghogha-Dabar Road to Lathani 1.885 98.08 8.88 Chandan Deo PWD Road to 90 1.954 107.72 9.42 Baghmari 91 Nawadih Road to Nari Jamdaha 2.279 116.35 10.84 13-01- 92 03RRP-20 PWD Katoriya Road to Lohari 2.365 125.98 11.26 373.79 35.14 NCB Post 2014 93 Garkar Road to Biharo 2.723 131.46 13.04

94 Tingarwa to Baradih 1.260 65.11 5.97 13-01- 03RRP-22 221.31 20.37 NCB Post 2014 95 Tingarwa to Jaktaha 3.059 156.20 14.40 Belhar Katoria PWD Road via To 13-01- 96 03RRP-26 8.718 462.04 30.21 462.04 30.21 NCB Post Manjhladih 2014 97 T03 to Kathoni 1.328 61.09 6.06 13-01- 98 03RRP-28 T02 Kusmi To Kotra 1.717 83.57 8.02 233.56 20.36 NCB Post 2014 Punsiya Dhoraiya Manikpur Road to 99 1.759 88.90 6.28 Makesar 100 Kathra to Phulwariya 1.366 63.29 6.42 13-01- 101 03RRP-29 T02 Kadma More To Maheshpur 1.826 89.90 8.57 240.55 23.65 NCB Post 2014 102 T01 Rifaetpur To Rampur 1.867 87.36 8.67

103 Bazar Via Balanchak to Logain 2.120 109.82 9.95 13-01- 03RRP-30 251.16 23.32 NCB Post T03 To RahmanKitta Via 2014 104 2.868 141.34 13.36 Raghunikiatta Kathbangaon to Alamnagar 105 2.020 104.68 7.21 Bhagaonda 13-01- 03RRP-31 248.67 21.81 NCB Post T02 Pipra More To Khajurigariya , 2014 106 3.131 143.99 14.59 Lakshmakitta 13-01- 107 03RRP-32 T01 to Goura to Pair 3.144 167.89 13.80 418.73 39.49 NCB Post 2014 Page 10 of 36

Procurement Plan, RRP-II: Bihar T04 Dabaiya To Bazardih Via 108 5.538 250.84 25.68 Sibanchak 109 T02 To Kharwa 1.390 82.17 5.86 13-01- 110 03RRP-33 T02 To Mahutchak 1.451 75.78 6.91 242.41 20.79 NCB Post 2014 111 BGP-Dumka Road To Morama 1.687 84.46 8.02

112 Kolhara To Rajpur 0.865 47.83 3.99 13-01- 03RRP-34 234.86 23.13 NCB Post 2014 113 BGP-Dumka Road To Ghutia 4.209 187.03 19.14

114 L024 To Malahi 1.779 95.52 8.53 BGP-Dumka Road Majhgain To 13-01- 115 03RRP-35 2.013 118.95 6.18 408.61 33.05 NCB Post Subkha 2014 116 Darpa To Mohanpur 4.030 194.14 18.34

117 Gondalbari To Banadih 2.296 117.01 9.51 13-01- 15RRP-01 237.32 20.06 NCB Post 2014 118 Bara To Budhwadih 2.400 120.31 10.56

119 Sirsa to Lodhma 2.371 111.20 9.90 13-01- 15RRP-02 232.36 20.61 NCB Post 2014 120 Raghosar To Mahasapathal 2.495 121.16 10.71 Chakai Sarawn PMGSY Road To Tola 121 2.601 118.61 10.99 Chhachhudih 13-01- 15RRP-03 256.70 22.20 NCB Post 2014 122 Leruwa To Jabardaha 2.650 138.09 11.21

123 Asanghatia To Babudih 2.202 108.14 8.96 13-01- 15RRP-04 239.75 20.30 NCB Post 2014 124 T05 To Behra 2.665 131.61 11.34

125 Budhuraidih To Madhuri 1.797 94.19 7.60 13-01- 15RRP-06 219.18 18.95 NCB Post 2014 126 Basatpur To Salaia 2.700 124.99 11.35 Page 11 of 36

Procurement Plan, RRP-II: Bihar 127 Near Budhurdih To Jagadih 2.107 104.98 8.83 13-01- 15RRP-07 213.04 17.65 NCB Post 2014 128 Balkar T01 To Paharpur 2.128 108.06 8.82

129 Gopidih To Chhata 2.093 105.06 8.78 13-01- 15RRP-08 248.47 20.14 NCB Post 2014 130 Bela To Raichor 2.756 143.41 11.36

131 Hariaindhi To Karmatanr 1.618 74.65 6.83 13-01- 132 15RRP-09 T01 To Algori 1.623 79.35 6.87 234.98 20.67 NCB Post 2014 133 Jamui Road to Pipra 1.660 80.98 6.97

134 L080 To Korhia 1.768 82.51 7.33 13-01- 15RRP-10 214.52 19.08 NCB Post 2014 135 Berbari To Dhorsakola 2.780 132.01 11.75

136 Chhotaki Kerwatanr To Kerwatanr 1.414 69.13 6.22 13-01- 137 15RRP-11 Muratanr To Baski Taur 1.415 70.58 6.20 208.33 18.92 NCB Post 2014 138 Gadhara To Garbhudih 1.534 68.62 6.50

139 Basbutti To Dhawatanr 1.574 84.82 6.85 13-01- 15RRP-12 216.96 18.74 NCB Post 2014 140 Matedih To Pararia 2.814 132.14 11.89

141 Ghutiari To Dalridih 1.390 65.52 5.87 13-01- 15RRP-14 219.72 18.55 NCB Post 2014 142 Karna To Chunwariadih 3.032 154.20 12.68

143 Karna To Baghmara 1.063 52.36 4.65 13-01- 144 15RRP-15 Near Batpar To Gomdadih 1.076 51.72 4.68 256.34 22.09 NCB Post 2014 145 Basbutia To Gajahi 3.135 152.26 12.76 Page 12 of 36

Procurement Plan, RRP-II: Bihar 146 PWD Road T01 To Bhundra 1.187 58.67 4.93 13-01- 15RRP-16 219.40 18.16 NCB Post 2014 147 Basbutia To Pipra 3.254 160.73 13.23

148 Rangania To Binjhi 2.606 127.83 11.12 13-01- 149 15RRP-17 T03 To Badgaunda 3.430 167.87 14.34 469.58 40.43 NCB Post 2014 150 Harni to Kachuwa 3.564 173.88 14.96

151 Simultala To Pandua 1.226 72.18 3.76 13-01- 152 15RRP-21 Jhajha Sono PWD Road To Amba 2.765 154.84 8.44 377.46 19.19 NCB Post 2014 153 Godaia To Damgitari 3.014 150.44 6.99

154 Jurpania To Dhanukatari 3.602 211.04 11.02 13-01- 15RRP-22 401.12 17.93 NCB Post 2014 155 Tabhawa To Baliadih 3.614 190.08 6.91 13-01- 156 15RRP-25 Narganjo To Jurpania 8.969 533.73 27.46 533.73 27.46 NCB Post 2014 157 Barmania To Dudhania 2.218 146.24 6.92 13-01- 158 15RRP-28 L045 To Lewa 2.283 143.84 7.02 378.02 18.57 NCB Post 2014 159 Kusaia To Gandar Mandal Tola 1.488 87.94 4.63

160 L057 To Jaeijori 1.543 94.80 4.87 13-01- 161 15RRP-29 Itwa To Barabak 2.426 152.30 7.46 411.45 20.15 NCB Post 2014 Salaia Raghunatha PMGSY Road to 162 2.540 164.35 7.82 Lahathara 163 Rakatrohania To Kuan Babk 1.958 108.47 5.97 13-01- 15RRP-30 384.38 20.26 NCB Post 2014 164 Bisunpur To Bhelsumbhia 2.142 125.63 6.38 Page 13 of 36

Procurement Plan, RRP-II: Bihar 165 Ghotari To Binjhi 2.576 150.28 7.91

166 Rakat Rohania To Muslim Tola 1.398 78.11 4.29 13-01- 167 15RRP-31 Naiyadih To Binjhi 2.646 169.29 8.34 408.50 21.06 NCB Post 2014 168 Vithara To Bagmadmgi 2.728 161.10 8.43

169 Panbajan To Teliachhauart 1.916 113.11 5.95 13-01- 170 15RRP-32 Near Ghutwe To Balsom 2.788 160.53 8.54 470.28 23.78 NCB Post 2014 171 Tilbaria To Kodwatanr 2.989 196.64 9.29 Keshofarka Near Bhaluahi More To 172 1.138 65.02 3.49 Amethiadih 13-01- 15RRP-33 155.85 7.78 NCB Post 2014 173 Askro To Askro Yadav Tola 1.392 90.83 4.29

174 Khotwa To Panari 3.192 197.81 9.82 13-01- 15RRP-36 469.67 24.22 NCB Post 2014 175 Piuprabank To Asstua 4.684 271.86 14.40 Jamui Lakhisarai PWD Road to Itwa 13-01- 176 15RRP-43 6.000 402.43 22.15 402.43 22.15 NCB Post Pratappur 2014 177 Khaira Sono Road to Mange Chapri 3.800 213.99 5.38 13-01- 15RRP-46 430.38 12.53 NCB Post 2014 178 Amatari to Garbhubar 3.900 216.39 7.15

179 Nim Nawada to Teliadih 3.900 248.88 7.51 13-01- 15RRP-47 481.16 15.10 NCB Post 2014 180 Amin Khaira Road to Dhab 4.000 232.28 7.59

181 Nim Nawada REO Road to Fatehpur 4.000 230.92 6.48 13-01- 15RRP-48 454.56 14.50 NCB Post Jamui Kauwakol Road to Sokho 2014 182 4.400 223.64 8.02 Mission 13-01- 183 15RRP-49 Jamui Kauwakol Road to Bichkorba 2.950 172.80 5.16 435.45 14.01 NCB Post 2014 Page 14 of 36

Procurement Plan, RRP-II: Bihar 184 Kendua to Jhundo 4.700 262.65 8.85

185 Bujhayat to Masarhandi 3.500 196.38 6.37 13-01- 15RRP-50 447.00 15.10 NCB Post 2014 186 Nim Nawada Road to Suwerkar Tola 4.900 250.62 8.73 13-01- 187 15RRP-51 Jamui Kauwakol Road to Goli 8.800 462.52 19.73 462.52 19.73 NCB Post 2014 Kohbarba More Katahra River REO 188 1.870 99.39 3.14 Road to Donha 189 Kenuhat Ratanpur PWD Road to Bela 2.200 120.93 4.67 13-01- 15RRP-53 465.74 18.07 NCB Post 2014 Jamui Kharagpur PWD Road to 190 Shivdih via Ravidas Tola, Musahari 4.800 245.42 10.26 Tola 191 Kenuhat Ratanpur Road to Maraiya 2.250 126.77 3.94 13-01- 15RRP-55 365.06 12.88 NCB Post Kenuhat Ratanpur PWD Road to 2014 192 4.500 238.29 8.94 Hiramba 193 Jinhara Road to Barmania 2.150 119.01 3.91 13-01- 15RRP-57 438.05 14.25 NCB Post Kohbarba More Katahara River REO 2014 194 5.650 319.04 10.34 Road to Harchak 195 Thana Road to Yogiya 2.250 127.64 3.87 13-01- 15RRP-58 460.29 16.74 NCB Post Kohbarba More Katahara River Road 2014 196 6.500 332.65 12.87 L025 to Banjhikusum Kohbarba More Katahara River to 13-01- 197 15RRP-59 9.680 502.22 17.06 502.22 17.06 NCB Post Purnadih 2014 13-01- 198 15RRP-60 Sondipi Karamtanr Road to Thari 12.000 616.69 22.85 616.69 22.85 NCB Post 2014 199 Hussainganj to Sarsa 1.750 122.92 3.33 13-01- 15RRP-62 227.06 7.18 NCB Post 2014 200 Manjosh to Baruna 1.980 104.14 3.85 13-01- 201 15RRP-63 Kumar to Tuladih 1.020 51.93 2.16 242.44 8.61 NCB Post 2014

Page 15 of 36

Procurement Plan, RRP-II: Bihar 202 Amin to Bakshanpur 3.000 190.51 6.45 13-01- 203 15RRP-65 Near Kairi To Belakura 8.611 538.09 26.51 538.09 26.51 NCB Post 2014 13-01- 204 15RRP-67 Cheriya To Nainipathal 9.340 557.15 28.68 557.15 28.68 NCB Post 2014 13-01- 205 16RRP-02 T01 To Rahar 2.400 142.24 8.29 142.24 8.29 NCB Post 2014 206 T03 To Siyalpara 2.025 105.66 8.23 13-01- 16RRP-03 281.78 16.82 NCB Post 2014 207 T05 Kayanganj To Gora Salampur 2.497 176.12 8.59 13-01- 208 16RRP-04 Ibrahimpur To Dhumtola 3.108 237.58 8.57 237.58 8.57 NCB Post 2014 13-01- 209 16RRP-06 Khampur To Uphareal 3.804 237.50 15.48 237.50 15.48 NCB Post 2014 13-01- 210 16RRP-07 Mirjadpur T02 To Taiyapur 6.470 429.55 27.89 429.55 27.89 NCB Post 2014 13-01- 211 16RRP-11 L035 Mahamadia To Dherua 3.932 232.08 7.96 232.08 7.96 NCB Post 2014 212 Kolasi To Madhura 1.401 97.69 0.22 13-01- 213 16RRP-12 Dighri To Amirpur Hardas 2.250 140.04 7.80 447.71 12.80 NCB Post 2014 PMGSY Road Vinodpur To Bengali 214 2.390 209.98 4.78 Tola 215 Narhat Road To Patrang 0.579 31.09 1.69

216 Fatehpur Govindpur Road To Sirpat 0.688 34.92 2.48 13-01- 217 25RRP-01 Shyama Pachrukhi T04 To Pironta 0.750 40.58 2.41 193.37 11.84 NCB Post 2014 218 Lakhmohana Road To Khaira 0.772 47.76 2.57

219 NH-31 To Patangi 0.794 39.02 2.69 13-01- 220 25RRP-02 Khanpur Road L023 To Baksanda 0.565 28.97 1.89 217.55 15.43 NCB Post 2014 Page 16 of 36

Procurement Plan, RRP-II: Bihar 221 Bhanail To Jahana 0.835 41.06 2.57

222 NH-31 To Kumhar Bigha 0.890 44.13 2.68 Chaprahat Road T010 To Malikpur 223 0.956 44.80 3.70 East Jafara 224 NH-31 To Manpur 1.305 58.59 4.59

225 Koiri Bigha To Ingoona 1.848 89.97 7.24 13-01- 25RRP-04 186.41 14.32 NCB Post 2014 226 NH-31 Fatehpur To Asharafpur 1.899 96.44 7.08

227 Maheshdih To Ashma 1.124 52.84 4.04 13-01- 228 25RRP-05 Darma Road To Gopalpur 1.129 56.47 4.20 226.18 17.56 NCB Post 2014 229 Telbhadro Road To Ratanpur 2.247 116.87 9.32

230 NH-31 To Dewara 2.136 97.06 7.39 13-01- 25RRP-06 212.39 15.91 NCB Post 2014 231 Gosai Bihga Road To Balia 2.379 115.33 8.52 Telbhadaro Road To Mohanpur 232 1.796 98.62 6.98 Khurd 13-01- 233 25RRP-07 NH-31 Kendua To Oraiya 2.987 159.81 11.10 432.88 30.62 NCB Post 2014 234 Supaul To Manka 3.959 174.45 12.54 13-01- 235 25RRP-11 Kariouna To Pharaitha 9.723 455.27 36.59 455.27 36.59 NCB Post 2014 236 NH-31 To Pranchak 1.242 56.87 3.86 13-01- 237 25RRP-17 Dhamni Road L067 To Khijua 1.253 73.63 5.17 195.18 13.11 NCB Post 2014 238 Amawa L026 To Laxmi Bigha 1.287 64.68 4.08 13-01- 239 25RRP-18 NH-31 To Manjhila 1.207 53.19 4.09 204.98 15.73 NCB Post 2014 Page 17 of 36

Procurement Plan, RRP-II: Bihar 240 Dhamani Road L067 To Karanpur 3.547 151.79 11.64

241 Bahadarpur Road L069 To Adil Bigha 1.104 60.20 3.62 13-01- 25RRP-20 234.68 17.01 NCB Post 2014 242 NH-31 To Bhaunr 3.795 174.48 13.39

243 L064 To Dulan Bigha 1.303 51.92 4.36 13-01- 244 25RRP-21 Kendua To Madhorampur 1.564 76.72 4.51 216.71 15.43 NCB Post 2014 245 Sirdala Road T05 To Khushiyali Bihta 1.678 88.07 6.56

246 NH-31 To Manhar 1.568 89.61 4.42 13-01- 25RRP-22 207.63 14.09 NCB Post 2014 247 Dhamaul T06 To Laxmipur 2.498 118.02 9.67

248 Jogya Maran To Bhaijibhita 0.725 45.98 1.69 13-01- 249 25RRP-23 Dhamni Road To Maliyatanr 0.753 40.18 2.66 221.02 14.17 NCB Post 2014 250 Murhena Road L066 To Pahwa Chak 2.606 134.86 9.82 13-01- 251 25RRP-26 Jaila Road To Anidih 3.227 171.07 10.72 171.07 10.72 NCB Post 2014 252 Dhab L082 To Babhani 0.924 56.92 3.92 13-01- 253 25RRP-27 Jaynagar Road To Sonari 0.971 51.82 3.51 203.44 13.94 NCB Post 2014 254 Sirdala To Barhi Bigha & Yadav Tola 2.103 94.70 6.51

255 Upardih L028 To Pirauta 1.576 88.09 4.67 13-01- 25RRP-28 206.71 11.28 NCB Post 2014 256 Pratap Pur L034 To Mahbatpur 2.026 118.62 6.61

257 Dhab Road To Parsa 1.346 89.73 5.32 13-01- 25RRP-29 439.31 32.29 NCB Post 2014 258 Sirdala Road L038 To Chaili 2.396 107.56 8.51 Page 18 of 36

Procurement Plan, RRP-II: Bihar 259 Dhab L038A To Khanpura 4.777 242.02 18.46

260 Sirdala Road T04 To Beri 0.863 60.83 3.45 13-01- 261 25RRP-30 Kushahan To Chhapri 2.598 126.61 9.43 422.11 31.60 NCB Post 2014 262 Bardiha Road To Laxmi Bigha 4.895 234.67 18.72

263 Laund T03 To Rabio 1.389 70.32 3.80 Meskaur Sirdala Part To Bholakurha 13-01- 264 25RRP-31 2.748 139.95 10.68 446.26 29.36 NCB Post Sarhmajhgawn 2014 265 Meskaur Rirdal Part To Sarh 4.600 235.99 14.88

266 Bardaha To Angara 2.259 96.35 8.40 13-01- 267 25RRP-32 Rajauli Gaya Road T06 To Barsot 3.115 152.13 10.29 402.18 30.91 NCB Post 2014 268 Kendua To Akauna 3.195 153.70 12.22 13-01- 269 25RRP-34 Sirdala Gaya Road To Khatangi 10.700 510.25 35.48 510.25 35.48 NCB Post 2014 270 Hisua Rajgir Road To Bagodar 0.554 26.33 2.11

271 T03 To Arian 0.843 48.90 2.37 13-01- 272 25RRP-36 T01 To Muhammandpur 0.949 48.29 3.59 361.03 26.73 NCB Post 2014 273 T06 NH Singhouli To Sarkatiya 1.944 87.55 7.37

274 T04 Khanpur To Chitabigha 2.939 149.96 11.29 13-01- 275 25RRP-37 Baurhi To Dhanpur 3.692 186.86 14.19 186.86 14.19 NCB Post 2014 Purani Mahulidih To Samatand 276 1.397 72.71 4.57 Beldari 13-01- 25RRP-44 225.22 16.85 NCB Post 2014 277 NH-31 To Gopalpur via Trilokbigha 1.518 75.87 6.13 Page 19 of 36

Procurement Plan, RRP-II: Bihar 278 Nawada Hisua T07 To Laxmi Bigha 1.636 76.64 6.15

279 T017 To Dilo English 0.708 39.74 2.61 13-01- 280 25RRP-45 Sakulachak Road To Harihar Bigha 1.676 77.32 6.57 198.59 15.55 NCB Post 2014 Nawada Nardiganj Road To Chutkiya 281 1.764 81.53 6.37 Bisar 282 NH-31 To Piparpati 1.712 95.62 5.91 13-01- 25RRP-47 202.55 11.91 NCB Post 2014 283 PWD Road To Ghostawan 1.526 106.93 6.00

284 Nawada Gaya Road To Mahuli 1.916 92.74 6.63 13-01- 25RRP-48 220.77 15.57 NCB Post 2014 285 PWD Road To Atowa 2.287 128.03 8.94 Pathra English Steel Nagar Road To 286 0.538 29.20 1.88 Singhouli 13-01- 287 25RRP-49 PWD Road To Gonawan 0.628 40.90 1.78 205.68 11.90 NCB Post 2014 288 Kadirganj To Biharibag 2.650 135.58 8.24

289 Pakaribarawan Road To Lodipur 1.020 45.66 3.33

290 PWD Road To Mathgulni 1.145 61.69 3.92 13-01- 25RRP-50 228.73 15.20 NCB Post 2014 291 PWD Road To Gulwariya 1.168 61.99 4.15

292 PWD Road To Gopalpur 1.206 59.39 3.80

293 Rewar Road To Budhan Bigha 1.417 69.47 5.08 13-01- 294 25RRP-66 Iruri Road To Bhaluri 1.541 78.28 5.25 220.16 16.78 NCB Post 2014 295 Dharhara Road To Durgapur 1.571 72.41 6.45 13-01- 296 25RRP-51 Rupo Road To Budhauli 0.738 37.49 2.42 220.82 14.82 NCB Post 2014 Page 20 of 36

Procurement Plan, RRP-II: Bihar 297 Thalpos Road To Ushari Barhi Road 1.581 75.40 6.14

298 Pakribarawan Road To Rajobigha 1.751 107.93 6.26

299 Pakribarawan Road To Madhurapur 1.627 90.75 5.63 13-01- 25RRP-52 199.33 11.25 NCB Post 2014 300 Dhanrha Road To Laxmipur 1.814 108.58 5.62

301 Borma Road To Abid Bigha 0.705 39.08 2.56 13-01- 25RRP-54 196.79 14.26 NCB Post 2014 302 Dumri Road To Lilo 2.973 157.71 11.70

303 PWD Road To Gulni 2.083 89.21 7.90 13-01- 304 25RRP-55 Kapsandi To Kurhaitha 3.241 162.80 12.41 455.31 33.21 NCB Post 2014 305 PWD Road To Dumrawan 3.979 203.30 12.90

306 Sundarpur To Thalpos 3.264 173.32 12.35 13-01- 25RRP-58 446.92 34.27 NCB Post 2014 307 Meghipur To Baliyari 5.798 273.60 21.92

308 Kunanpur To Sumka 2.074 115.19 8.28 13-01- 25RRP-59 459.58 31.88 NCB Post 2014 309 Pakribarawan Road To Madra 7.195 344.39 23.60 Kochgaon Sorhipur Road To Bheriya 310 1.219 69.92 3.88 Phatha 13-01- 311 25RRP-60 PWD Road T04 To Korma 1.252 63.62 2.72 206.22 11.76 NCB Post 2014 312 Rasanpur To Thera 1.500 72.68 5.16

313 Milki Road To 1.600 102.59 3.25 13-01- 25RRP-61 210.81 9.64 NCB Post 2014 314 PWD Road T07 To Masankhawan 2.097 108.22 6.39 Warsaliganj Kharant Road T07 To 13-01- 315 25RRP-62 2.141 95.62 7.43 218.54 15.94 NCB Post Kumbhi 2014 Page 21 of 36

Procurement Plan, RRP-II: Bihar 316 Barnama To Tika Bigha 2.506 122.92 8.51

317 PWD Road T03 To Balwapar 0.792 44.53 2.16 13-01- 25RRP-65 420.84 13.01 NCB Post 2014 318 PWD Road To Baghi 3.171 376.31 10.85 13-01- 319 27RRP-04 Jainagara to Balu Tola 2.650 193.85 15.87 193.85 15.87 NCB Post 2014 13-01- 320 27RRP-05 Makhand Milik L026 to Deori 9.100 575.41 54.83 575.41 54.83 NCB Post 2014 321 L032 to Lila 0.990 67.21 3.63

322 T02 to Brahman Tola 1.059 75.25 2.04 13-01- 27RRP-06 397.44 17.55 NCB Post 2014 323 T05 to Mushari Tola Kukroun 1.100 75.87 4.54

324 T01 to Choudhary Tola 3.020 179.11 7.34

325 Sapha to Nandgola 1.388 78.04 8.37 13-01- 27RRP-07 274.77 26.43 NCB Post Kankala Chok to Madhepura Border 2014 326 3.005 196.73 18.06 Via Phulkia Lachhmaniya 13-01- 327 27RRP-10 Begampur to Jhuhari 3.910 254.70 6.40 254.70 6.40 NCB Post 2014 328 T01 to Gangeli 1.605 105.94 2.92 13-01- 27RRP-11 266.48 9.14 NCB Post 2014 329 T05 NH-107 to Gokhulpur 2.762 160.54 6.22 13-01- 330 27RRP-12 L039-Mahendrapur Fasiya to Buari 2.139 132.28 3.47 132.28 3.47 NCB Post 2014 331 T01 to Balua 1.469 78.32 3.48 13-01- 332 27RRP-13 Sri Nagar to Raharhia 2.850 157.69 6.53 420.59 17.94 NCB Post 2014 333 L030 to Sonapur 3.439 184.58 7.93 Suryapura Bhalunidham Road to 13-01- 334 28RRP-01 0.600 34.98 2.62 190.71 14.78 NCB Post Tekanpura 2014 Page 22 of 36

Procurement Plan, RRP-II: Bihar Dinara PWD Road to 335 1.050 55.87 4.30 Khirodharpur 336 Turti to Baruna 1.990 99.86 7.86

337 Ara PWD Road to Dumariya 0.770 43.06 3.22 Bikramganj Dinara PWD Road to 13-01- 338 28RRP-02 1.228 84.40 7.47 217.81 16.53 NCB Post Reriya 2014 339 Ghosiyakhurd to Kandadih 1.470 90.35 5.84

340 Bikramganj Dinara Road to Bhaluahi 1.940 101.69 7.61 Dhangain Suryapura Road to 13-01- 341 28RRP-03 2.030 123.67 6.24 372.54 26.42 NCB Post Amapokhar 2014 342 Bhaluahi to Parsa Madhopur 2.062 147.18 12.56

343 NH-30 to Paramdih 1.735 95.18 10.56 13-01- 28RRP-04 210.19 22.14 NCB Post Panchmandir to Sahadat 2014 344 1.912 115.01 11.58 Dehra 345 Fatehganj to Khairahi 1.252 71.50 7.60 13-01- 28RRP-05 194.46 20.13 NCB Post 2014 346 NH-30 to Bunda Dih 2.065 122.96 12.53

347 L024 to Hathadihan 0.754 60.90 4.52 13-01- 28RRP-06 174.15 11.82 NCB Post Bikramganj Dumraon PWD Road to 2014 348 1.195 113.25 7.30 Babhanul 349 T09 To via Basuhari 1.415 102.69 8.92 13-01- 28RRP-09 473.08 48.73 NCB Post 2014 350 T02 To Rampur Khurd 6.495 370.39 39.81

351 T02 To Madhopur via Bardiha 1.569 97.01 9.84 13-01- 352 28RRP-10 T09 To Pachauli 1.660 100.79 10.28 401.56 38.62 NCB Post 2014 353 L024 To Korariya 2.982 203.76 18.50 Page 23 of 36

Procurement Plan, RRP-II: Bihar 354 L090 To Dharmagatpur 0.620 61.33 3.89

355 Gunsej NH-30 To Lohara 0.640 48.36 3.96 13-01- 28RRP-14 455.73 41.06 NCB Post 2014 356 NH-30 To Girdhariya 0.662 60.20 4.11

357 Garigawan To Bhuawal 4.694 285.84 29.10 NH-30 Gunsej To Pongarhi via 13-01- 358 28RRP-15 8.969 612.37 55.06 612.37 55.06 NCB Post Ganjbharasara 2014 359 Tendua Road to Jamodhi 1.221 79.83 7.52 13-01- 360 28RRP-18 Khetalpur More to Khetalpur 1.790 120.99 11.08 425.53 33.38 NCB Post 2014 Ara Sasaram Road Sanjhauli to 361 4.000 224.71 14.78 Chaira Bharaoi 362 Kosand Kala to Dhango 0.670 58.20 4.03 13-01- 28RRP-21 407.61 35.78 NCB Post Suryapura Dhangain PWD Road to 2014 363 5.170 349.41 31.75 Agrer Khurd 364 T03 To Dehriya 1.200 88.01 7.29 13-01- 28RRP-22 145.07 12.17 NCB Post 2014 365 T08 To Chorhi 0.800 57.06 4.88

366 T08 To Chilhauira 1.500 97.50 9.16 13-01- 367 28RRP-24 T01 To Chitrataar 1.650 114.14 10.14 368.76 34.75 NCB Post 2014 368 T05 To Auraiya 2.500 157.12 15.45

369 T06 To Pethawan 0.650 53.39 4.12 13-01- 28RRP-25 417.27 37.66 NCB Post 2014 370 T06 To Bhurkura 5.500 363.88 33.54

371 Konar Jagadatpura Road To Bahera 1.500 102.49 9.34 13-01- 28RRP-27 218.37 19.82 NCB Post Barawan Jahanabad Road To 2014 372 1.700 115.88 10.48 Kharahana Page 24 of 36

Procurement Plan, RRP-II: Bihar 373 T06 To Panhauti 1.052 72.61 6.53 13-01- 28RRP-29 212.70 18.85 NCB Post 2014 374 L042 Road To Soni 2.000 140.09 12.32 Sasaram Chousa Road Baispura Road 375 0.900 60.71 5.53 To Chhitani 13-01- 28RRP-31 217.06 18.98 NCB Post Karagahar Fuli Road To Mathiya 2014 376 2.159 156.35 13.45 Rasulpur 377 Konar Jagatpur Road Larui 0.850 60.61 3.00 13-01- 28RRP-34 229.94 17.24 NCB Post 2014 378 L098 To Bhagwanpur 2.300 169.33 14.24 Sasaram Chousa Road To Pipara 379 0.550 36.12 3.42 Road To Tilokpur 13-01- 28RRP-37 230.91 19.85 NCB Post 2014 380 T13 To Bahuwara 2.614 194.79 16.43

381 NH-30 To Semariya 1.000 82.13 6.22 13-01- 28RRP-40 205.46 16.20 NCB Post 2014 382 T011 To Khorari 1.600 123.33 9.98

383 NH-30 Nauwa Road To Khaira 0.800 69.14 4.82 13-01- 28RRP-41 213.48 19.11 NCB Post 2014 384 Kochas Nauwan To Padamasi Dehra 2.300 144.34 14.29

385 T09 To Bedwaliya 0.700 51.01 4.39 13-01- 386 28RRP-42 NH-30 Mau Dehra To Bathori 2.000 176.03 12.51 460.76 36.92 NCB Post 2014 387 T09 To Chhitandehra 3.193 233.72 20.02

388 Usaraw Barahari To Latara 2.900 206.69 18.28 13-01- 28RRP-43 427.48 37.06 NCB Post 2014 389 Sasaram Chousa Road To Korigawan 3.000 220.79 18.78

390 Katharai Road To Sakarauli 1.500 123.89 9.46 13-01- 28RRP-45 481.27 37.23 NCB Post T04 Narwar To Bijan Dihara 2014 391 4.500 357.38 27.77 Hardaspur Page 25 of 36

Procurement Plan, RRP-II: Bihar Sasaram Chousa Road To 13-01- 392 28RRP-46 6.300 461.23 38.88 461.23 38.88 NCB Post Sawandehri 2014 13-01- 393 28RRP-48 Katharai Road To Atharwaliya 7.200 520.00 45.25 520.00 45.25 NCB Post 2014 394 Mokar Bhaisahi Road to Lok Dehri 0.745 47.07 4.50

395 Kopdih Road to Nirmalpur 0.800 52.44 4.98 13-01- 28RRP-50 222.79 21.22 NCB Post 2014 396 Gotpa Road to Karma 0.900 58.12 5.61 Amara babhanpurwa Jaipur Road to 397 1.000 65.16 6.13 Baradih Sasaram Darigaon Road T07 to 398 0.900 68.62 5.47 Sikariya 13-01- 28RRP-51 209.75 19.27 NCB Post 2014 399 Amara Babhanpurwa Road to Belwa 2.260 141.13 13.80 Sasaram Chausa Road to 400 1.000 62.82 6.10 Chaukhanda Chitauli 13-01- 401 28RRP-52 Amara Babhanpurwa Road to Rudna 1.010 74.77 6.24 218.93 19.62 NCB Post 2014 402 Gotpa Road to Tenua 1.200 81.34 7.28

403 Akodhigola Road to Bishrampur 1.500 117.67 9.23 13-01- 28RRP-53 207.97 18.36 NCB Post Samardiha Dumara Agrer Road to 2014 404 1.500 90.30 9.13 Dhanrahi Amara Babhanpurwa Road to 405 0.630 50.77 3.75 Durgapur 13-01- 28RRP-55 190.58 15.91 NCB Post 2014 406 Mokar Bhaisahi Road to Bisunpur 2.030 139.81 12.16

407 Amra Babhanpurwa Road to Sahpur 1.273 90.50 7.68 Amara Bhabanpurwa Road to 13-01- 408 28RRP-57 2.087 138.98 12.85 434.39 39.98 NCB Post Khudhanu 2014 Amara Bhabhanpurwa Road to 409 3.200 204.91 19.45 Jaipur 13-01- 410 28RRP-58 NH-2 To PAKHNARI 0.900 78.32 6.09 401.43 37.12 NCB Post 2014 Page 26 of 36

Procurement Plan, RRP-II: Bihar 411 Konar To Barela Road To Kaithee 1.300 77.15 7.92

412 G. T Road To Marichwar 3.800 245.96 23.11 Seosagar Chenari PWD Road To 413 1.800 159.70 10.91 Kekai 13-01- 28RRP-59 409.65 32.87 NCB Post Dearigaon Malhipur Road To Ulho 2014 414 3.600 249.95 21.96 via Kanchanath Barakadih 415 Konar Barela Road To Pariagpur 0.900 66.92 5.44 13-01- 416 28RRP-60 Mojari Road To Telara 1.950 153.25 14.76 440.47 39.43 NCB Post 2014 417 Darigaon Malhipur Road to konki 3.200 220.30 19.23

418 T05 To Bedwalia 0.959 57.34 5.89 Itimha Nonahar PWD Road To 13-01- 419 28RRP-61 0.961 66.96 5.82 203.48 18.04 NCB Post Malpura 2014 Itimha Nonahar PWD Road To 420 1.048 79.18 6.33 Kesuari 421 Belarhi Pull To Sanagyta 0.769 56.03 4.58 13-01- 422 28RRP-63 PWD Road To Tenua 1.750 111.67 10.64 422.13 42.87 NCB Post 2014 Bihata Nasriganj PWD Road To 423 4.553 254.43 27.65 Sohada via Amauna Karakat Thumia Road To 424 1.522 95.79 9.32 Kishundasdih 13-01- 425 28RRP-64 Sohda Road To Koni 2.019 137.94 12.38 435.66 41.04 NCB Post 2014 426 Sohda Road Rampur Barheta To Leva 3.161 201.93 19.34

427 Gorari Sakla Road To Badaldih 1.388 80.29 8.47 13-01- 28RRP-65 228.54 22.34 NCB Post 2014 428 T07 To Banye Dehri 2.251 148.25 13.87 13-01- 429 28RRP-66 Karup Belwahi Road To Nanhu 1.065 69.25 6.58 208.32 20.55 NCB Post 2014 Page 27 of 36

Procurement Plan, RRP-II: Bihar 430 Dhawani To Karma via Titho 2.278 139.07 13.97

431 T05 To Hathini 1.250 69.63 5.02 13-01- 432 28RRP-68 T01 To Tarar 1.300 78.60 5.20 223.19 15.40 NCB Post 2014 433 T04 To Kusahi 1.300 74.96 5.18 Nokha Nasriganj PWD Road to 434 1.030 59.96 4.16 Rajandih Chaudhari Charan Singh Collage to 435 1.040 61.61 3.69 Mallow 13-01- 28RRP-72 358.21 23.88 NCB Post Nokha Nasriganj PWD Road to 2014 436 1.050 51.80 4.21 Mishrawaliya Nokha Nasriganj PWD Road to 437 3.080 184.84 11.82 Dhobdiha 438 Dehri Yadunathpur Road to Katdhar 0.968 66.02 6.09 Dehri Yadunathpur Road to 13-01- 439 28RRP-75 1.158 79.66 7.29 369.79 32.91 NCB Post Hankarpur 2014 440 Karamdiha to Bhurwa 3.093 224.11 19.53 13-01- 441 28RRP-76 Dhanauti to Dumariya 7.266 570.74 46.11 570.74 46.11 NCB Post 2014 Dehri Yadunathpur Road to 13-01- 442 28RRP-77 0.806 63.52 4.89 63.52 4.89 NCB Post Baknaura 2014 13-01- 443 28RRP-79 Dehri Yadunathpur Road to Budhua 14.114 1058.13 87.95 1058.13 87.95 NCB Post 2014 444 Tilauthu Sasaram to Alinagar 0.567 40.64 3.63 Tilauthu Sasrama Road to 13-01- 445 28RRP-80 0.644 44.67 4.01 147.76 12.86 NCB Post Maheshdih 2014 446 Chandanpura to Sonepura 0.837 62.45 5.22

447 Godiyani to Gaurahia 1.477 85.31 6.53 13-01- 37RRP-02 426.65 30.73 NCB Post 2014 448 L032 to Kanu Tola 2.586 172.56 11.90 Page 28 of 36

Procurement Plan, RRP-II: Bihar 449 Sahi Tola to Matia Bandobasti 2.804 168.78 12.30 13-01- 450 37RRP-04 T01 Gonauli to Dharampur 1.275 84.89 4.43 84.89 4.43 NCB Post 2014 451 T02 to Bariagi Tola 0.570 38.06 0.01 13-01- 452 37RRP-05 L021 to Mushhari Tola 1.565 105.08 2.52 426.62 23.31 NCB Post 2014 453 T02 to Thawaia 5.114 283.48 20.78

454 T03 at Madhopur to Sekh Toli 1.290 88.95 5.25 13-01- 37RRP-06 431.01 24.11 NCB Post 2014 455 T02 to Gudra 4.550 342.06 18.86 T07 at Ratanmala Tatwali to Ahir Toli 456 0.656 35.91 3.11 Ratanmala 13-01- 457 37RRP-07 L043A to Tatwa Toli 1.643 116.22 7.34 432.76 31.48 NCB Post 2014 458 L041 to Ahir Tola 4.750 280.63 21.03

459 Gharwa to Bathna 1.875 128.74 7.19 13-01- 37RRP-08 436.37 26.09 NCB Post 2014 460 T06 at Champaran to Khutia Indu 4.314 307.63 18.90

461 T04 to Bhanachak 2.208 144.00 10.02 13-01- 37RRP-09 406.61 25.38 NCB Post 2014 462 T01 to Pandey Tola 4.300 262.61 15.36

463 L028 to Nawka Tola 1.290 88.95 5.25 13-01- 464 37RRP-10 L022 to Harizan Tola 2.245 148.64 7.59 428.57 25.85 NCB Post 2014 Manjhaulia Dhokraha Road to 465 2.880 190.98 13.00 Dusadh Tola 466 Rulahi to Chamar Toli 2.170 151.65 2.46 13-01- 37RRP-11 410.54 19.32 NCB Post 2014 467 T04 at Bairia Tola to Harizan Tola 4.000 258.89 16.86 Page 29 of 36

Procurement Plan, RRP-II: Bihar 468 L056 Sekh Toli to Malah Toli 2.100 132.23 9.23 13-01- 469 37RRP-13 T02 to Dhobi Tola 2.100 119.50 9.19 429.09 28.34 NCB Post 2014 470 L027 to Chamar Toli 2.700 177.36 9.92

471 T03 To Harijan Tola 1.455 86.90 5.30 13-01- 472 37RRP-14 T03 To Bakharia 2.775 162.71 12.43 416.55 29.31 NCB Post 2014 473 T05 to Dudha 2.816 166.94 11.58

474 Ramnagar to Bairiya 1.655 100.94 7.05 13-01- 475 37RRP-15 Machhargwn to Shiorajpur 1.698 119.78 5.60 455.67 26.49 NCB Post 2014 476 K.R.Pitch Road to Sofwa Tola 3.863 234.95 13.84

477 Gosaitola to Paterwa 1.770 116.44 5.72 13-01- 478 37RRP-16 Sansaria to Baroria Tola 2.244 127.77 10.02 426.13 28.54 NCB Post 2014 479 Hardipatti BT to Lilapatti 2.838 181.92 12.80

480 Dabaria Bazar to Makri Tola 1.406 91.71 5.33 13-01- 37RRP-18 182.48 12.08 NCB Post 2014 481 Nautan Road to Chamar Toli 1.508 90.77 6.75

482 Jhakhra Bazar to Purbi Tola 1.064 65.69 4.33 13-01- 37RRP-19 257.03 18.14 NCB Post 2014 483 Jhakahara Pitch to Baswariya 2.981 191.34 13.81

484 T01 at Bhawanipur To Dularpati 1.180 83.66 4.67 13-01- 485 37RRP-21 T01 To Balua Deorajpur 1.300 84.38 4.33 412.26 24.97 NCB Post 2014 486 Bhawanipur To Ramna 3.800 244.22 15.96 Page 30 of 36

Procurement Plan, RRP-II: Bihar 487 T05 to Puraina Gosai 2.024 144.60 9.40 Bettiah Mainatar PWD Road to 13-01- 488 37RRP-22 2.160 141.85 10.07 434.11 29.69 NCB Post Banawatola 2014 489 T06 to Barahka Gaun 2.224 147.66 10.22

490 T03 to Chargahan 1.232 76.19 5.47 13-01- 491 37RRP-25 Tikuliya to Gidha 2.270 154.05 9.84 427.25 29.00 NCB Post 2014 492 T02 to Barharwa 2.986 197.01 13.69 Kaithwalia Chaube Tola to 493 3.300 198.33 14.81 Sembhapur 13-01- 37RRP-26 468.38 36.45 NCB Post 2014 494 Rampurawa to Raidhurawa 4.662 270.05 21.64 Bhitharwa REO Road to Semra 495 1.462 120.91 0.18 Sirampur 13-01- 37RRP-29 233.49 4.21 NCB Post 2014 496 PWD Road Cants to Chitwani 1.592 112.58 4.03

497 Dumri to Jamhauli 1.675 102.08 3.49 13-01- 37RRP-31 225.95 5.31 NCB Post 2014 498 Done Canal to Mitni 1.690 123.87 1.82

499 L050 to Tahkaul 1.309 91.59 2.37 13-01- 37RRP-32 260.38 8.05 NCB Post 2014 500 Mehnaul Kala to Hardi 2.402 168.79 5.69

501 T03 to Dhokrahan 1.202 92.91 1.83 13-01- 502 37RRP-38 T02 To Parsauni 1.290 85.61 2.36 379.27 9.61 NCB Post 2014 503 T01 to Sabeya 2.716 200.75 5.42

504 L043 to Sirhwa 1.509 103.87 3.29 13-01- 37RRP-39 212.75 6.81 NCB Post 2014 505 T03 to Tilojpur 1.597 108.88 3.52 Page 31 of 36

Procurement Plan, RRP-II: Bihar 506 T03 to Bhatuhwa 1.647 125.00 2.53 13-01- 507 37RRP-41 L040 to Sahpur Parsauni 1.654 108.46 4.45 366.57 10.41 NCB Post 2014 508 T04 Podmole to Basantpur 1.774 133.11 3.43

509 to Durgwalia Tola 1.100 76.13 4.75 13-01- 510 37RRP-43 T01 Sikarpur to Dakchin Tola 1.100 91.89 0.24 410.80 12.05 NCB Post 2014 511 T01 to Khairawa 3.450 242.78 7.06

512 Chitamanpur to Malda 1.980 150.66 2.63 13-01- 513 37RRP-45 to Pipra 2.180 153.51 4.37 454.44 15.53 NCB Post 2014 514 T02 to Katahari 2.220 150.27 8.53

515 T01 Mathura to Belwania 1.560 110.44 3.90 13-01- 516 37RRP-47 T03 to Kehuniya 2.041 156.84 8.69 473.98 25.19 NCB Post 2014 517 T03 to Mathia 2.693 206.70 12.60

518 L021 to Nautanwa 1.200 97.77 0.67 13-01- 519 37RRP-48 T07 to Roari 1.334 100.61 6.60 468.48 16.44 NCB Post 2014 520 L022 to Rakhahi 3.850 270.10 9.17

521 T03 To Basantpur 0.564 45.98 0.10

522 T03 To Purbi 0.939 71.12 1.68 13-01- 37RRP-50 379.87 8.22 NCB Post 2014 523 T04 To 1.023 75.55 1.58

524 T02 To Ausanpur 2.687 187.22 4.87 Page 32 of 36

Procurement Plan, RRP-II: Bihar 525 L036 To Nonia Tola 1.324 100.75 2.67 13-01- 526 37RRP-51 T03 To Senuria via Sindhwalia 1.704 122.45 3.95 358.67 8.61 NCB Post 2014 527 L036 To Mahamadwa 1.882 135.47 1.99

Total 1286.497 77761.490 5251.697 77761.490 5251.697 0.000 0.000

BRIDGE SECTION 13-01- 528 BR-01R-174 BARGACHI - MADANPUR SIKTI 47.120 291.18 7.88 291.18 7.88 NCB Post 2014 13-01- 529 BR-01R-175 PALSI - MADANPUR KHURSLIGHAT 212.360 1243.82 33.44 1243.82 33.44 NCB Post 2014 13-01- 530 BR-01R-176 PALSI - MADANPUR KHURSALIGHAT 159.280 991.96 25.36 991.96 25.36 NCB Post 2014 KURSAKATTA HATTA CHOWK - 13-01- 531 BR-01R-177 DONGRABANDH VIA FORBESGANJ 106.200 537.94 14.35 537.94 14.35 NCB Post 2014 PART B 13-01- 532 BR-01R-178 BARGACHI - MADANPUR SIKTI 79.660 405.94 11.06 405.94 11.06 NCB Post 2014 BGP DUMKA ROAD - BASMATTA 13-01- 533 BR-03R-345 58.620 159.83 4.57 159.83 4.57 NCB Post GOKULA 2014 SHYAM BAZAR - BHALJOR DAM 13-01- 534 BR-03R-346 79.620 183.28 5.27 183.28 5.27 NCB Post ROAD 2014 PARIAHI BGP DUMKA ROAD - 13-01- 535 BR-03R-347 164.780 380.68 10.88 380.68 10.88 NCB Post SUKHIYABARAIT 2014 PARIHARI BGP DUMKA ROAD - 13-01- 536 BR-03R-348 164.780 482.19 13.72 482.19 13.72 NCB Post GOLHATTI 2014 PARIAHI BGP DUMKA ROAD - 13-01- 537 BR-03R-349 282.480 757.22 21.46 757.22 21.46 NCB Post RAMPURPABRA 2014 13-01- 538 BR-03R-350 BGP DUMKA ROAD - KAIRI 159.240 381.53 10.79 381.53 10.79 NCB Post 2014 KATORIYA SIMULTALLA 13-01- 539 BR-03R-351 132.700 322.83 9.25 322.83 9.25 NCB Post PWD ROAD - AAHRA 2014 13-01- 540 BR-03R-352 SUIYA BHELWA ROAD - BALIAMARA 318.480 837.21 23.73 837.21 23.73 NCB Post 2014

Page 33 of 36

Procurement Plan, RRP-II: Bihar 13-01- 541 BR-16R-153 JHAUA - GARARUA 86.160 316.26 8.97 316.26 8.97 NCB Post 2014 13-01- 542 BR-16R-154 NH 31 AT BAJARGAON - SALEMPUR 43.600 137.45 3.97 137.45 3.97 NCB Post 2014 13-01- 543 BR-16R-155 BALRAMPUR - TELTA 20.000 59.16 1.70 59.16 1.70 NCB Post 2014 13-01- 544 BR-16R-156 PIPRA - BAIDANDA 70.160 317.92 9.01 317.92 9.01 NCB Post 2014 13-01- 545 BR-16R-157 RANIKOL - NARGADA 20.000 72.10 2.23 72.10 2.23 NCB Post 2014 13-01- 546 BR-16R-158 RANIKOL - NARGADA 64.620 275.49 8.05 275.49 8.05 NCB Post 2014 13-01- 547 BR-16R-159 RANIKOL - NARGADA 43.600 138.58 4.10 138.58 4.10 NCB Post 2014 13-01- 548 BR-16R-160 CHAUNKI - KACHORA 58.620 247.66 8.03 247.66 8.03 NCB Post 2014 13-01- 549 BR-16R-161 CHAUNKI - KACHORA 43.600 142.90 4.12 142.90 4.12 NCB Post 2014 13-01- 550 BR-16R-162 CHAUNKI - KACHORA 52.620 240.01 6.93 240.01 6.93 NCB Post 2014 13-01- 551 BR-16R-163 RANIKOL - NARGADA 60.000 156.28 4.61 156.28 4.61 NCB Post 2014 13-01- 552 BR-16R-164 CHAUNKI - KACHORA 52.620 229.45 6.64 229.45 6.64 NCB Post 2014 13-01- 553 BR-16R-165 RATANI - DURIA 40.200 127.53 3.75 127.53 3.75 NCB Post 2014 BASTOUL-SONAILI PWD ROAD - 13-01- 554 BR-16R-166 50.000 122.88 3.56 122.88 3.56 NCB Post MAHESHPUR VIA MAKHNA JHUNKI 2014 BASTOUL-SONAILI PWD ROAD - 13-01- 555 BR-16R-167 141.240 464.26 13.28 464.26 13.28 NCB Post MAHESHPUR VIA MAKHNA JHUNKI 2014 KATIHAR-SONAILI PWD ROAD - 13-01- 556 BR-16R-168 BASTAUL-SONAILI PWD ROAD 20.000 79.06 2.35 79.06 2.35 NCB Post 2014 NAWADA KUMARIPUR ON RCD ROAD - 13-01- 557 BR-16R-169 58.620 256.56 6.90 256.56 6.90 NCB Post BAHADURPUR 2014 KUMARIPUR ON RCD ROAD - 13-01- 558 BR-16R-170 58.620 243.46 7.48 243.46 7.48 NCB Post BAHADURPUR 2014

Page 34 of 36

Procurement Plan, RRP-II: Bihar 13-01- 559 BR-16R-171 KEWATIA MACHOLA - MAJHELI 107.700 376.88 10.76 376.88 10.76 NCB Post 2014 PWD ROAD BAKHRIPUR - KATIHAR 13-01- 560 BR-16R-172 44.000 112.97 3.36 112.97 3.36 NCB Post MANIHARI RCD ROAD AT KAJRA 2014 NH 57 KAASBA GERWA PATH - 13-01- 561 BR-27R-246 117.740 590.09 16.08 590.09 16.08 NCB Post NALOPARA BAMMADHAR 2014 NH 57 KASBA GERWA PATH - 13-01- 562 BR-27R-247 159.280 676.95 18.71 676.95 18.71 NCB Post NALOPARA DAKATA 2014 13-01- 563 BR-27R-248 TEDRAHI - RAILI 43.600 166.58 4.38 166.58 4.38 NCB Post 2014 13-01- 564 BR-27R-249 JALALGARH - BAKANIA 43.600 164.91 4.35 164.91 4.35 NCB Post 2014 NH 57 KASBA GARWA PATH - 13-01- 565 BR-27R-250 185.820 1089.07 29.34 1089.07 29.34 NCB Post NALOPARA RASELIGHAT 2014 NH 57 KASBA GERWA PATH - 13-01- 566 BR-27R-251 79.660 389.45 10.64 389.45 10.64 NCB Post NALOPARA KALIBASA 2014 NH 57 KASBA GERWA PATH - 13-01- 567 BR-27R-252 52.660 324.44 8.91 324.44 8.91 NCB Post NALOPARA KHARDUHA 2014 NH 57 KASBA GERWA PATH - 13-01- 568 BR-27R-253 132.740 759.24 21.17 759.24 21.17 NCB Post NALOPARA PULKATTA 2014 ANWAR CHOWK - BHAURA POOL 13-01- 569 BR-27R-254 70.660 340.12 9.46 340.12 9.46 NCB Post BISHARIGHAT 2014 NH 31 BELGACHI VIA SAGUNIA - 13-01- 570 BR-27R-255 79.660 381.48 10.56 381.48 10.56 NCB Post TOLIPATH GHUSKIPATH 2014 NH 31 BELGACHI VIA SAGUNIA - 13-01- 571 BR-27R-256 117.740 563.62 15.63 563.62 15.63 NCB Post TOLIPATH BAKANIA 2014 13-01- 572 BR-27R-257 KHARBHARI - JHAJHIYAN ROAD 60.000 143.57 4.24 143.57 4.24 NCB Post 2014 GANGHBABAILI REO ROAD 13-01- 573 BR-27R-258 78.160 301.21 8.61 301.21 8.61 NCB Post JIYANGANJ - SAUTHA 2014 Total 4322.620 16983.200 473.660 16983.200 473.660

Page 35 of 36

Procurement Plan, RRP-II: Bihar

Procurement Plan with Methods & Time Schedule for 12 Months period starting December 13 - for CIVIL WORKS Review by Reference Estimated No.s/qua Procurement Bank Expected bid Sl. no Package Contract (Description) Cost (Rs. Comments ntity Method (Prior / opening date No. In Lakh) Post) * * First contract of each State will be subject to prior review by the Bank 3. BIHAR - CONSULTANCY Appointment of Project Management Consultant QCBS 1 Prior 11 Jan 2014 In Process (Selection ) under PMGSY (Time Based) Rural Roads Project-II

Engineer-in-Chief-cum- Additional Commissoner-cum-Special Secretary, Rural Works Department

Page 36 of 36