Maritime Acronyms and Abbreviations 1

Total Page:16

File Type:pdf, Size:1020Kb

Maritime Acronyms and Abbreviations 1 2 0 0 3 Maritime A C R O N Y M S and Abbreviations L O R E N Z O C I M A D O R R e v: 0 3. 0 0 Maritime Acronyms and Abbreviations 1 Ac actinium AC Alternating Current A AC altocumulus. a altitude intercept (Ho~Hc); altitude AC&I Acquisition, Construction & factor (change of altitude in 1 minute Improvement of time from meridian transit); ACADIS Coast Guard Academy Information assumed: ampere. System A amplitude; augmentation; away ACC Antarctic Circumpolar Current. (altitude intercept); Arctic/Antarctic (air mass). a semimajor axis; anode; ACC Area Control Centre angstrom; area of pipe; Area; ACC Automatic Control System Certified Acceleration (in general); Ampere; ACCU Automatic Control System Certified for search area. Unattended Engine Room Å angstrom ACD Allocated Configuration A.L.R.S. Admiralty List of Radio Signals. Documentation A.M.C. American Maritime Cases ACE American Council on Education A/C aircraft ACFN American Committee for Flags of A/D analog/digital Necessity A/F All Fast ACG Annual Cargo Gear Survey A/M automatic/manual ACI Allocated Configuration Identification A/S Alongside ACINT Acoustic Intelligence AA arithmetical average and Aluminum ACIP Aviation Career Incentive Pay Association ACK ACKnowledge AAAA Always Afloat, Always Accessible ACMS Aviation Computerized Maintenance AAC Activity Address Code System AAE Administration Acquisition Executive ACN Activity Control Number AAP Affirmative Action Plan ACN Advance Change Notice AAPA American Association of Port Authority ACO Administrative Contracting Officer AAPS Automated Aid Positioning System ACO Aircraft Co-ordinator AAR After Action Report ACO Authorized Certifying Officer AARA Amsterdam-Antwerp-Rotterdam Area ACOPS Advisory Committee on Protection of the Sea AAS Annual Automation Control Survey ACOT Advisory Committee on Offshore AASO Association of American Shipowners Technology AAW Anti-Air Warfare ACP Agency Capital Plan ABAND abandoned. ACP Alternate Compliance Program ABC Activity-Based Costing ACP Area Contingency Plan ABCI Allocated Baseline Configuration Index ACR Allowance Change Request ABCM Activity Based Cost Management ACS American Chemical Society ABCU Automated Bridge Control System For ACS Arab Classification Society Unattended Engine Room ACU Air Control Unit ABL Allocated Baseline ACV Air Cushion Vehicle ABN Abandoned ADA Americans with Disabilities Act ABS Acrylonitrile Butadiene Styrene ADAS Automatic Data Annotation System ABS American Bureau of Shipping (classification society) ADB African/Asian Development Bank ABS Class of Vessel ADC Analog to Digital Converter ABT About ADCCP Advanced Data Communications Control Procedures Maritime Acronyms and Abbreviations 2 ADCOM Address Commission AFB Air Force Base Add Addendum AFC Allotment Fund Code add'l additional. AFC Automatic Frequency Control ADE Above-Deck Equipment AFC automatic frequency control. ADEC Alaska Department of Environmental AFDD Accumulated Freezing-Degree Days Conservation AFIPS American Federation of Information ADF Automatic Direction Finding Processing Societies ADIOS© Automated Data Inquiry for Oil Spills AFL-CIO American Federation of Labor and ADIZ Air Defense Identification Zone Congress of Industrial Organizations ADLC Advanced Data Link Control AFM Abrasive Flow Machinery ADM Acquisition Decision Memorandum AFMDC Air Force Machinability Data Center ADM Admiral AFN aeronautical fixed network ADM Assistant Deputy Minister AFRA Average Freight Rate Assessment ADNET Anti Drug Network AFRAMAX A tanker of such size as to take commercial advantage under ADOC Air Defense Operations Center Worldscale (generally, tankers 80,000- ADOT Active Duty Other Than Training 119,000 DWT) ADP Ammonium Dihydrogen Phosphate AFRASEC Afro Asian Organization for Economic Co-operation ADP Automated Data Processing AFSPS Arrival First Sea Pilot Station (Norway) ADPCM Adaptive Differential Probe Code Modulation AFTN aeronautical fixed telecommunications network ADPL Active Duty Promotion List AFTS Automated Funds Transfer System ADR Alternative Dispute Resolution AG Accessibility Guidelines ADS Application Development System AG Algeria (Flag) ADS Automated Data Systems AG Arabian Gulf (See PG) ADS Automated Dependance Surveillance Ag Silver ADSEG Active Duty Supplemental Education Grants AGA American Gas Association ADSS Automated Dependent Surveillance AGC Automatic Gain Control System AGMA American Gear Manufacturers ADSW-AC Active Duty Special Work in Support of Associations Active Component AHL Australian Hold Ladders ADSW-RC Active Duty Special Work in Support of AHP Analytic Hierarchy Process Reserve Component AHS Annual Hull Survey ADT Active Duty for Training AHT Anchor handling tug ADT-AT Active Duty for Annual Training AHTS AHT which is also a combined supply ADT-OTD Active Duty for Training - Other vessel Training Duty AI Airborne Interceptor AEA AEA Technology Plc AI Artificial Intelligence AEB acquisition exclusion boundary. AIChE American Institute of Chemical AEL Allowance Equipage List Engineers AEP Affirmative Employment Program AICP Aviation Inventory Control Point AERO aeronautical. AID Agency for International Development AES Aeronautical Earth Station (USA) AES Atmospheric Environment Services AIGSS Annual Inert Gas System Survey AEW Airborne Early Warning AIM Academy Introduction Mission AF Audio Frequency Maritime Acronyms and Abbreviations 3 AIMS American Institute of Merchant AMCONSUL American Consulate Shipping Amd Amendment AIMU American Institute of Marine AMEMBASSY American Embassy Underwriters AMIG Australian MAP Interest Group AIP Aeronautical Information Publication AMIO Alien Migrant Interdiction Operations AIRSTA Air Station AMMI Aviation Maintenance Management AIS Aeronautical Information Services Information System AIS Automated Information System AMNI Associate Member of The Nautical AIS Automatic Identification System Institute AISC American Institute of Steel AMOSUP Associated Marine Officers' and Construction Seamen's Union of the Philippines AISM Association Internationale de AMP Aftmost Measuring Point Signalisation Maritime (International AMS Aeronautical Mobile Service Association of Lighthouse Authorities). AMS Annual Machinery Survey AIT Autogenous Ignition Temperature AMS Customs' Automated Manifest System Al Aluminum AMS(R)S Aeronautical Mobile Satellite (Route) aL assumed latitude. Service al assumed longitude. AMSA Australian Maritime Safety Authority Al.,Alt, alternating (light). AMSS Aeronautical Mobile Satellite Service Al2O3 aluminum oxide (alumina) AMT Aviation Maintenance Technician ALAMAR Associacon Latinamericano de AMVER Automated Mutual Assistance Vessel Armadores (Valparaiso) Rescue System ALARA as low as reasonably achievable AMWELSH 93 Americanized Welsh Coal Charter ALC automatic level control (1993) ALCOAST Message Traffic Intended for Service- ANB Buoy Tender wide Distribution ANC Air Navigation Commission ALCON All Concerned Anch anchorage. ALDIST Message Traffic Intended for District- ANG Air National Guard wide Distribution ANGRC Air National Guard Readiness Center ALE Automatic Link Establishment ANMS Automated Notice to Mariners System. ALGOL ALGorithmic Oriented Language ANPRM Advanced Notice of Proposed ALJC Administrative Law Judge Circular Rulemaking ALJIPP Administrative Law Judge Internal ANS Aquatic Nuisance Species Practices and Procedures ANSC Auxiliary National Supply Center ALLI Annual Load Line Inspection ANSI American National Standards Institute ALMIS Aviation Logistics Management Information System ANSO Association of Naval Service Officers ALPAT Alaskan Patrol ANT Netherlands Antilles (Flag) ALT Administrative Lead Time ANTHAM Antwerp-Hamburg Range ALU Arithmetic Logic Unit antilog antilogarithm. ALU TUCP Philippine Seafarers' Union AO Assignment Officer am amber. AODC Association of Offshore Diving Contractors Am americium AOI Area of Interest AM amplitude modulation AOO Area of Operations AM ante meridian (before noon). AOP Area of Probability AMAB Arctic Marine Advisory Board AOPS Abstract of Operations Data System AMB Ambassador Maritime Acronyms and Abbreviations 4 AOR Area of Responsibility ARPA Advanced Research Projects Agency AOR-E Atlantic Ocean Region-East ARPA, ARPAs Automatic Radar Plotting Aid AOR-W Atlantic Ocean Region-West ARS Annual Cargo Refrigeration System AOU Area of Uncertainty Survey AP Acquisition Plan ARSC aeronautical rescue sub-centre AP Assumed Position. ARTCC Air Route Traffic Control Center APA Administrative Procedure Act ARTIC Abolish Red Tape in Contracting Program APA Appropriation Purchase Account AS air supply APB Acquisition Project Baseline AS Annual Survey APCIS Asian Pacific Computerized Information System As arsenic APD avalanche photodiode AS Australian Standard APEC Asian Pacific Economic Cooperation ASA American Standards Association APHA American Public Health Association ASA Applied Science Associates Limited API American Petroleum Industry ASAM anti-ship action message. APL A Programming Language ASAP As Soon as Possible APL Allowance Parts List ASBA Association of Shipbrokers and Agents (U.S.A.) Inc. APLMRI Atlantic Protected Living Marine Resources Initiative ASBA II A Type of Standard Voyage Charter Party Issued by ASBA APP Application Portability Profiles ASBATANKVOY A Type of Standard Voyage Charter approx. approximate, approximately. Party Issued by ASBA APS Acquisition Phase Summary ASC Accredited Standards Committee APS Arrival Pilot Station ASCII American Standard Code for APSO Asylum Pre-Screening Officer Information Interchange
Recommended publications
  • The National Fleet Plan
    THE NATIONAL FLEET PLAN DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS UNITED STATES COAST GUARD OFFICE OF THE COMMANDANT August 2015 This Page Left Intentionally Blank This Page Left Intentionally Blank This Page Left Intentionally Blank TABLE OF CONTENTS Section Page No. 1. Preamble…..……………………………………………………………………………… 9 2. Purpose……………………………………………………………………………………. 9 3. National Fleet Plan Overview…………...……………………………………………….. 9 4. Plan Progression and Oversight………………………………………………………… 10 5. National Fleet Plan……………………………………………………………………… 10 5.1. Current and Evolving Operations ……………………………………...….................. 10 5.2. Integrated Logistics………………………………………….……………………….. 12 5.3. Training……………………………………………………………..………………… 15 5.4. Maritime Security Cooperation…………………….…………………….…………… 21 5.5. Command, Control, Communications (C3) Systems…………………….…………… 22 5.6. Sensors………………………………………………………………………………... 25 5.7. Weapon Systems…………………………………………………….………………... 26 5.8. Engineering Systems…………………………………………………...……………... 28 5.9. Platforms………………………………………………………………….…………… 29 5.10. Intelligence and Information Integration………………………………….................. 34 6. Programmatic Collaboration…………………………………………………………… 36 7. Integrated Plan of Action and Milestones…………………………………..………….. 36 8. Navy-Coast Guard Memoranda of Understanding/Memoranda of Agreement………... 44 9. Legal Authorities…………………………………………………………….................. 48 Chartered Commonality Working Groups: Mission/Plan of Action and Milestones Appendix A. Permanent Joint Working Group…………………………………… 50
    [Show full text]
  • Updating MIT's Cost Estimation Model for Shipbuilding
    Updating MIT's Cost Estimation Model for Shipbuilding By LTJG Matthew B. Smith, USCG B.S., Naval Architecture and Marine Engineering (2004) United States Coast Guard Academy Submitted to the Department of Mechanical Engineering in Partial Fulfillment of the Requirements for the Degree of Master of Science in Naval Architecture & Marine Engineering at the Massachusetts Institute of Technology June 2008 C 2008 Massachusetts Institute of Technology All rights reserved Signature of Author ....................................... ........... ..... Matthew Smith May 9, 2008 Certified by...................... ....... ............ ............. Henry Marcus Professor of Mechanical Engineering- Marine Systems Thesis Reader Certified by........................................ .................... Associate Professor of the Practice of Naval Construction and Engineering Thesis Supervisor A ccepted by ............................. ....... ... ........... ... .............. Professor Lallit Anand ~I ~ ~ ~ ~ • ~ .I• ~ Cha~irman-` "IIII Il[L MASSAcHýs IrSTR OF TEOHNOLOGY Department Committee on Graduate Students JUL 0 3 2008 LIBRARIES TABLE OF CONTENTS Table of Contents ......................................................... ......... 2 List of Figures/Tables ............................................................ 3 Acknowledgements............................................................. 4 Abstract........................................................................ 5 Introduction ..................................................................
    [Show full text]
  • Coast Guard Cutter Procurement: Background and Issues for Congress
    Coast Guard Cutter Procurement: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs January 27, 2016 Congressional Research Service 7-5700 www.crs.gov R42567 Coast Guard Cutter Procurement: Background and Issues for Congress Summary The Coast Guard’s program of record (POR) calls for procuring 8 National Security Cutters (NSCs), 25 Offshore Patrol Cutters (OPCs), and 58 Fast Response Cutters (FRCs) as replacements for 90 aging Coast Guard cutters and patrol craft. The NSC, OPC, and FRC programs have a combined estimated acquisition cost of about $21.1 billion, and the Coast Guard’s proposed FY2016 budget requested a total of $449.9 million in acquisition funding for the three programs. NSCs are the Coast Guard’s largest and most capable general-purpose cutters. They have an estimated average procurement cost of about $684 million per ship. The first five are now in service. The sixth, seventh, and eighth are under construction and scheduled for delivery in 2016, 2018, and 2019, respectively. A ninth ship in the class, which was not requested by the Coast Guard, was funded in FY2016. (The Coast Guard’s proposed FY2016 budget requested $91.4 million in acquisition funding for the NSC program for structural enhancements on the first two NSCs and post-delivery activities on NSCs 5 through 8.) OPCs are to be smaller, less expensive, and in some respects less capable than NSCs. They have an estimated average procurement cost of about $484 million per ship. The first OPC is to be procured in FY2018. Three shipyards—Bollinger Shipyards of Lockport, LA, Eastern Shipbuilding Group of Panama City, FL, and General Dynamics Bath Iron Works (GD/BIW) of Bath, ME—are competing for the contract to build the first 9 to 11 ships in the class.
    [Show full text]
  • NATIONAL REGISTER ELIGIBILITY ASSESSMENT VESSEL: USS Escape (ARS-6) USCGC Escape (WMEC-6)
    NATIONAL REGISTER ELIGIBILITY ASSESSMENT VESSEL: USS Escape (ARS-6) USCGC Escape (WMEC-6) USS Escape (ARS-6) underway in 1946. www.nafts.net/ars6.htm. Contributed by Craig Rothhammer. USCGC Escape (WMEC-6) U.S. Coast Guard photo. 2 Vessel History USS Escape (ARS-6) was a Diver-class Rescue Salvage Ship built for the U.S. Navy in 1942. Escape was launched November 22, 1942 and commissioned November 20, 1943. In December of 1943 Escape sailed from San Diego to Norfolk, Virginia, where it provided towing and salvage services. Between July and mid-September of 1944, Escape performed similar duties in Bermuda. After returning to Norfolk in September, Escape rescued the cargo ship George Ade, which was damaged and disabled in the Atlantic during a fierce hurricane. Escape was able to tow the vessel safely into port despite passing through another violent storm. Escape operated out of Bermuda for the first five months of 1945, during which time it towed three ships damaged by heavy seas safely into port. After returning to Norfolk, Escape sailed for the Pacific on August 11. However, when the war ended, its orders were changed and Escape returned from the Panama Canal Zone towing scows to Tampa, Florida. From there Escape proceeded to Davisville, Rhode Island to transport mooring buoys to Jacksonville, Florida, where the crew installed them in 1945. On November 8, Escape sailed from Key West escorting, and later towing, the Italian submarine Mameli. It delivered the submarine to Taranto, Italy and returned to Norfolk January 22, 1946. Escape was decommissioned July 20, 1946 and placed in the Reserve Fleet at Orange, Texas.
    [Show full text]
  • Coast Guard Cutter Procurement: Background and Issues for Congress
    Coast Guard Cutter Procurement: Background and Issues for Congress Ronald O'Rourke Specialist in Naval Affairs January 5, 2015 Congressional Research Service 7-5700 www.crs.gov R42567 Coast Guard Cutter Procurement: Background and Issues for Congress Summary The Coast Guard’s program of record (POR) calls for procuring 8 National Security Cutters (NSCs), 25 Offshore Patrol Cutters (OPCs), and 58 Fast Response Cutters (FRCs) as replacements for 90 aging Coast Guard cutters and patrol craft. The NSC, OPC, and FRC programs have a combined estimated acquisition cost of about $21.1 billion, and the Coast Guard’s proposed FY2015 budget requests a total of $768 million in acquisition funding for the three programs. NSCs are the Coast Guard’s largest and most capable general-purpose cutters. They have an estimated average procurement cost of about $684 million per ship. The first four are now in service, the fifth through seventh are in various stages of construction, and long lead time materials (LLTM) are being procured for the eighth. The Coast Guard’s proposed FY2015 budget requests $638 million for the NSC program, including $558.7 million for the eighth NSC. OPCs are to be smaller, less expensive, and in some respects less capable than NSCs. They have an estimated average procurement cost of about $484 million per ship. The first OPC is to be procured in FY2017. The Coast Guard’s proposed FY2015 budget requests $20 million in acquisition funding for the OPC program. FRCs are considerably smaller and less expensive than OPCs. They have an estimated average procurement cost of about $73 million per boat.
    [Show full text]
  • Glossary and Abbreviations, Phase I Uniform National Discharge Standards for Vessels of the Armed Forces, Technical Development
    This document includes the Glossary and Abbreviations from the “Phase I Final Rule and Technical Development Document of Uniform National Discharge Standards (UNDS),” published in April 1999. The reference number is EPA-842- R-99-001. Phase I Final Rule and Technical Development Document of Uniform National Discharge Standards (UNDS) Glossary and Abbreviations April 1999 GLOSSARY AND ABBREVIATIONS AAV amphibious assault vehicle ABT aerostat balloon tender AC area command cutter AC anti-corrosive – as related to vessel hull coatings ACE armored combat earthmover Administrator the Administrator of the U.S. Environmental Protection Agency AE ammunition ship AF anti-fouling AFB air force base AFDB large auxiliary floating drydock AFDL small auxiliary floating drydock AFDM medium auxiliary floating drydock AFFF aqueous film-forming foam AFS combat store ship AG miscellaneous auxiliary AGER environmental research ship AGF miscellaneous command ship AGM missile range instrumentation ship AGOR oceanographic research ship AGOS ocean surveillance ship AGS surveying ship AGSS auxiliary research submarine AH hospital ship AKR vehicle cargo ship Amps amperes Anode the site at which oxidation occurs in an electrochemical cell ANB aids to navigation boat AO oiler AOE fast combat support ship AP area point system search craft APF afloat pre-positioning force APL barracks craft GL-1 GLOSSARY AND ABBREVIATIONS (contd.) APU auxiliary power unit AR repair ship ARC cable repairing ship ARD auxiliary repair dock ARDM medium auxiliary repair dock ARS salvage ship AS submarine tender ASR annual sedimentation rate ASTM American Society for Testing and Materials ASW anti-submarine warfare AT armored troop carrier ATC mini-armored troop carrier ATF fleet ocean tug avg.
    [Show full text]
  • Fleet Week Ships 2014
    FLEET WEEK SHIPS 2014 FLEET WEEK SHIPS 2014 TABLE OF CONTENTS Table of Contents USS CHOSIN (CG 65)......................................................................................................................................3 HMCS CALGARY (FFH 335) .............................................................................................................................4 HMCS YELLOWKNIFE......................................................................................................................................5 HMCS BRANDON (MM 710) ...........................................................................................................................6 MV CAPE HORN ............................................................................................................................................7 USS AMERICA (CV‐66) ............................................................................................................................. 8 & 9 USS KIDD (DDG‐100) ....................................................................................................................................10 USCG ACTIVE (WMEC‐618)...........................................................................................................................11 FLEET WEEK SHIPS 2014 USS CHOSIN • In March 2003 Chosin was assigned to Cruiser‐Destroyer Group One.[3] [4] • In April 2008, Chosin failed her Board of Inspection and Survey (InSurv) examination and was judged "unfit for sustained combat operations."[5][6] • In Spring
    [Show full text]
  • Phase I Uniform National Discharge Standards for Vessels of the Armed Forces
    United States Office of Water EPA 821-R-99-001 Environmental Protection 4303 April 1999 Agency PHASE I UNIFORM NATIONAL DISCHARGE STANDARDS FOR VESSELS OF THE ARMED FORCES TECHNICAL DEVELOPMENT DOCUMENT Technical Development Document for Phase I Uniform National Discharge Standards for Vessels of the Armed Forces Naval Sea Systems Command U.S. Department of the Navy Arlington, VA 22202 and Engineering and Analysis Division Office of Science and Technology Office of Water U.S. Environmental Protection Agency Washington, DC 20460 April, 1999 FOREWORD This Technical Development Document was produced jointly by the Naval Sea Systems Command of the United States Navy and the Office of Water of the United States Environmental Protection Agency. The purpose of this document is to provide, in part, the technical background that was used to develop the Phase I regulation that is issued under authority of the Uniform National Discharge Standards provisions of the Clean Water Act, 33 U.S.C., 1322(n). TABLE OF CONTENTS EXECUTIVE SUMMARY .........................................................................................ES-1 CHAPTER 1. BACKGROUND OF THE UNIFORM NATIONAL DISCHARGE STANDARDS 1.1 Background ............................................................................................................... 1-1 1.2 Legal Authority and Statutory Requirements for the UNDS Regulations ................ 1-2 1.2.1 Discharges.................................................................................................. 1-2 1.2.2 Vessels ......................................................................................................
    [Show full text]
  • Coast Guard Cutter Procurement: Background and Issues for Congress
    Coast Guard Cutter Procurement: Background and Issues for Congress Updated December 18, 2019 Congressional Research Service https://crsreports.congress.gov R42567 Coast Guard Cutter Procurement: Background and Issues for Congress Summary The Coast Guard’s program of record (POR) calls for procuring 8 National Security Cutters (NSCs), 25 Offshore Patrol Cutters (OPCs), and 58 Fast Response Cutters (FRCs) as replacements for 90 aging Coast Guard high-endurance cutters, medium-endurance cutters, and patrol craft. The Coast Guard’s proposed FY2020 budget requests a total of $657 million in procurement funding for the NSC, OPC, and FRC programs. NSCs are the Coast Guard’s largest and most capable general-purpose cutters; they are intended to replace the Coast Guard’s 12 aged Hamilton-class high-endurance cutters. NSCs have an estimated average procurement cost of about $670 million per ship. Although the Coast Guard’s POR calls for procuring a total of 8 NSCs to replace the 12 Hamilton-class cutters, Congress through FY2019 has funded 11 NSCs, including the 10th and 11th in FY2018. Eight NSCs have entered service; the seventh and eighth were commissioned into service on August 24, 2019. The 9th through 11th are under construction; the 9th is scheduled for delivery in 2021. The Coast Guard’s proposed FY2020 budget requests $60 million in procurement funding for the NSC program; this request does not include funding for a 12th NSC. OPCs are to be less expensive and in some respects less capable than NSCs; they are intended to replace the Coast Guard’s 29 aged medium-endurance cutters.
    [Show full text]
  • REPORT to CONGRESS BIENNIAL ASSESSMENT of the SHIP DISPOSAL PROGRAM January 2018
    U. S. Department of Transportation Maritime Administration REPORT TO CONGRESS BIENNIAL ASSESSMENT OF THE SHIP DISPOSAL PROGRAM January 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 INTRODUCTION 1 I. GOVERNMENT OWNED VESSELS 4 Government Owned Vessels by Agency………………………………………….….. 4 II. PLANNED VESSEL OBSOLESCENCE AND SERVICE RETIREMENT 8 Agency Planned Vessel Retirement Schedules ……………………………………… 8 III. DISPOSAL OF GOVERNMENT OWNED VESSELS IN THE US ……………. 10 Legislative Limitation ………………………………………………………………... 10 MARAD Federal Ship Outreach Program. ………………………………………..…. 10 Domestic Scrap Steel Prices …………………………………………………………. 10 Scrap Steel Market Outlook ………………………………………………………….. 13 Domestic Ship Recycling Industry…………………………………………………… 13 Domestic Ship Recycling Capacity ………..……………………………………...…. 15 MARAD Ship Disposal Program ……………………….…………………….……... 16 Historic Low Number of MARAD Ships Awaiting Disposal ………………………. 17 Simplified Acquisition for Vessel Recycling ………………………………………... 17 MARAD Ship Disposal Solicitation Process ………………………………………… 18 Submittal of General Technical Proposal – Step One ……………………………….. 18 General Technical Proposal Evaluation Criteria …………………………………….. 19 Submittal of Sales Offers or Price Revisions – Step Two …………………………… 20 Evaluation and Award of Sales and Price Quotations ……………………………….. 21 Basis for Best-Value Award …………………………………………………………. 21 MARAD Vessel Awards by Fiscal Year …………………………………………….. 22 MARAD Ship Disposal Funding …………………………………………………….. 22 Navy Ship Disposal Program ………………………………………………………… 25 Environmental
    [Show full text]
  • OFFICE of SHIP DISPOSAL PROGRAMS U. S. Department Of
    OFFICE OF SHIP DISPOSAL PROGRAMS ANNUAL REPORT FOR FISCAL YEAR 2016 December 2016 U. S. Department of Transportation Maritime Administration OBSOLETE SHIPS RESERVE FLEET MARITIME ADMINISTRATION OFFICE OF SHIP DISPOSAL PROGRAMS TABLE OF CONTENTS Executive Summary ..…………………………………………………………...... 2 I. Ship Disposal Programs ….………………………………………………….. 5 Domestic Scrap Steel Prices …………………………………………………. 5 Domestic Recycling Industry ………………………………………………… 7 Federal Ship Outreach ……………………………………………………….. 8 Planned Vessel Retirement Schedules ………………………………………. 11 European Ship Recycling Regulation ………………………………………... 13 Environmental Stewardship ………………………………………………….. 14 Ship Disposal Alternatives …………………………………………………… 15 Best Value Ship Disposal Source Selection …………………………………. 16 Ship Disposal Funding ……………………………………………………….. 17 Sales Revenues ………………………………………………………………. 18 Fiscal Year 2017 Disposal Activities ………………………………………… 19 Five Year Disposal Program Projections …………………………………….. 19 Ship Disposal Performance Measures ……………………………………….. 21 Environmental Regulation and Related Legal Challenges ………………….. 23 II. N.S. Savannah ……………………………………………………………….... 24 Licensed Activities …………………………………………………………... 24 Stewardship ………………………………………………………………….. 25 Protective Storage ……………………………………………………………. 26 FY 2016 Significant Activities ………………………………………………. 26 III. Conclusions …………………………………………………………………… 28 IV. Appendix United States Army Corp of Engineers – List of Vessels ……………………. 29 United States Department of the Army – List of Vessels ……………………. 30 United States Maritime
    [Show full text]
  • Call Signbook for Ships
    UNCLASSIFIED ACP 113 (AE) ACP 113(AE) CALL SIGN BOOK FOR SHIPS JUNE 2003 I UNCLASSIFIED UNCLASSIFIED ACP 113 (AE) FOREWORD 1. ACP 113(AE), CALL SIGN BOOK FOR SHIPS, is an UNCLASSIFIED publication. Periodic accounting is not required. 2. ACP 113(AE) will be effective for National, Service, or Allied use when directed by the appropriate Implementing Agency and, when effective, will supersede ACP 113(AD) which is to be destroyed in accordance with current security regulations. 3. This publication contains Allied military information and is furnished for official purposes only. 4. It is permitted to copy or make extracts from this publication. 5. This publication may be carried in aircraft for use therein. 6. This ACP is to be maintained in accordance with provisions of the current version of ACP198 II UNCLASSIFIED UNCLASSIFIED ACP 113 (AE) THE COMBINED COMMUNICATION-ELECTRONICS BOARD LETTER OF PROMULGATION FOR ACP 113(AE) 1. The purpose of this Combined Communication Electronics Board (CCEB) Letter of Promulgation is to implement ACP113. CALL SIGN BOOK FOR SHIPS, 2. ACP 113 (AE) is effective on receipt for CCEB Nations and when directed by the NATO Military Committee (NAMILCOM) for NATO and strategic Commands. When effective, will supersede ACP 113 (AD) which shall be destroyed in accordance with National regulations. EFFECTIVE STATUS Publication Effective for Date Authority ACP 113(AE) CCEB On Receipt LOP 3. Service-originated correspondence will be forwarded through the normal military chain of command, marked for the attention of the appropriate Service communications chief or director. All proposed amendments to the publication are to be forwarded to the national coordinating authorities of the CCEB.
    [Show full text]