2 Fall 2014 Quarterly Newsletter No.25 In The Name Of God

First Words Indigenous knowledge, a solution for compatibility with environmental threats Indigenous knowledge is a part of each nation’s capital that consists of their local beliefs, methods, tools and information.Through this knowledge, various nations have sought their livelihood from their environment during several centuries (Emadi & Abbasi, 1999). Agriculture & livestock knowledge, is a knowledge that is experienced by farmers and ranchmen and transfer it to other generations. History shows that indigenous agriculture knowledge will be removed gradually and the rest is experimented. Such knowledge includes the smart and precise observations on plants, animals, climate, soil, pests and classified systems that are fully compatible with local conditions. One of the requirements of indigenous knowledge is new limitation and failure. The failures are happened due to different reasons including lack of indigenous knowledge and experience. This inattention may be derived from social factors as proud of holders of new knowledge against holders of indigenous knowledge or imagination of new knowledge holders from indigenous knowledge as one that belongs to the ancients. The characteristics of indigenous knowledge for sustainable development are as follow: compatibility with plenty of work force and low demand of capital, dynamism, local full adaptability, accepting the various productive systems, emphasis on conservation of resources and avoiding risk, logical decision making, flexible strategies for emergency cases ( drought & famine) simple,innovative and intelligent agriculture system that is proper for simultaneous cultivation of several products, complete combination of productive methods with social bodies, flexibility & capability of high entrepreneurship.(Emadi & Abbasi, 1999). The most important applicable fields of indigenous knowledge against environmental threats due to climate change and inappropriate management with ecological capacities are : 1. Conservation of natural resources is our traditional honor. Traditional methods like common range management will be the proper method for comprehensive management of watershed areas. 2. Active collaboration of the operators in decision making, planning, executing & monitoring and evaluation on the basis of indigenous knowledge & environmental recognition, is the sponsor of achieving the land sustainable development indicators, e.g. in the past that nomads territory was recognized as a territory under public management, while migrating, they paid attention to range reclamation through seeding with efficient methods and they conserved the land for the next year. 3. The modern knowledge in combination with indigenous knowledge can be more efficient. Traditional systems for rain water extraction and logical use of water in Hormozgan, Golestan, Yazd shows the high potential of traditional knowledge in land management. But lack of attention and emphasis on the modern knowledge as movement of construction of dams in the world and , indicated how a land can be faced down a serious challenge while it had conserved its indigenous knowledge for several centuries. 4. The people can express the real problems relying on indigenous knowledge and organize the priorities based on real needs of a watershed area. Houshang Jazi National Project Management HablehRoud & MENARID

Quarterly Newsletter Deputy of Watershed Management, Range and Desert Affair National Project Management HablehRoud & MENARID: Houshang Jazi Gathering: Zohreh Jamshidi Coauthors: Abouzar Koushki, Ahmad Golivari, Rouhollah Darvish, Maryam Tajiki, Sheyda Aghazadeh, Seyed Vahid Khatami, Mohammad Rastin Translated by: Zahra Goudarzi Address: Forests,Ranges & Watershed Management Organization, After Mini City – Artesh Boulevard.Tehran Zip Code: 1955756113 Telefax: 22488572 Designer: Dariush Golesorkhi Print: Omran Publish Quarterly Newsletter No.25 Fall 2014 1

Implementation of the project for repairing & dredging Amidabad aqueduct with partnership of local communities

For the purpose of the second achievement of Hableh Roud project and promoting the condition of land & water resources management, and controlling the lands destruction through partnership processes, an agreement was concluded between Semnan watershed management and natural resources office and Qomes green village cooperative with subject matter of collaborative implementation of repairing the aqueduct in Amidabad of Laasjerd (Sorkheh City). It should be noted that after visiting and expert studies in several aqueducts in desert and low water regions, Amidabad was selected as pilot and the operations were implemented with collaboration of Hableh Roud project & local communities. Amidabad aqueduct with the length of 2500 m is located in Sorkheh city in the same region. After dredging and repairing the aqueducts, increase of water debi to 3 times provide the proper conditions for agriculture in the abandoned lands.

Mr.Karami, Sorkheh governor while visiting the executive process of Hableh Roud project, emphasized on inter-organizational solidarity and stated that the implementation of the next phases of sample water village requires the collaboration of executive bodies. Mr.Hemati head of natural resources and watershed management of Sorkheh, reported the rate of predicted credits and executive process of Hableh Roud projects and addressed the collaboration of operators in projects implementation for the purpose of promoting the condition of land & water resources management, proper operation of underground waters and achieving the sustainable development using the indigenous knowledge. It should be mentioned that, Sorkheh governor while visiting the first phase of sample water village in Asadabad and repairing the Amidabad aqueduct, discussed with the operators on implementation of the project and their satisfaction. Visit of Sorkheh governor from executive process of Hableh Roud project 2 Fall 2014 Quarterly Newsletter No.25

Considering the emphasis of Hableh Roud on land & water management, promoting the efficiency of the production Implementation of sample water factors, increase of production and promoting the methods of village project (Asadabad) with land & water management through increase of the knowledge and skill of the operators, an agreement was concluded collaboration of local communities between natural resources & watershed management office in

Semnan and CBO of Asadabad farmers with the purpose of construction of sample water village and collaborative execution in construction of water transferring channel as the first phase of the project. For this purpose, it was taken into account that several meetings with local communities, executive directors be held in the future. In these meetings while Hableh Roud project was introduced, it was emphasized on performing the collaborative projects for land & water resources management and presenting the sample water village, the comments and suggestions of the operators on region potentials and the necessity of land & water resources management was studied. In order to make intersection co-ordinations, some explanations were presented on better implementation of sample water village project as pilot and it was emphasized on the necessity of cooperation and providing technical and expert assistance of executive bodies in this project. It should be mentioned that considering the sharp drop in underground water level and replacing the traditional irrigation systems (aqueducts) by modern systems (wells) and its high costs, maintenance and repairing the wells that had negative effects on the income of the families, performing the collaborative project of sample water village will result in the improvement of the living of local communities and finally providing the arrangements for increasing products and annual income of the operators, the proper conditions will also be made for returning the immigrants to the villages and reduction of the rate of immigration to cities for earning money. The project of sample water village in Asadabad, located in west 10th km of Sorkheh, is ready to perform and will cover about 200 Acres of the agricultural lands. In the first phase of the project, a 1200m concrete channel water is constructed with collaboration of local communities.

Third meeting of management and planning committee of Sorkheh was held on 15/12/2014 in meeting Management of water resources, identifying hall of Sorkheh governorship with the presence of the cultivation method and change of living, Mr.Karami governor, the representatives of executive the main factors of returning the rural bodies as Jihad-e- Agriculture, water resources affairs, housing foundation, the representatives of the local communities and Hableh Roud project. The attendees discussed on the proposed projects of 2015, Hableh Roud project in Sorkheh and stated that being deserted the south of communication roads are the main factor of immigration of the rural and said that the water resources management, identifying the cultivation method and change in living of the people are its solution. Quarterly Newsletter No.25 Fall 2014 3

Mr.Alexander Borde international consultant of environment economy of MENARID project had a visit From performing projects of Sorkheh in Hableh Roud watershed area. In this visit Mr.Nocheh executive director of Hableh Roud in Semnan while presenting the projects, explained about the performance processes and its effect on the living of the local communities and its environmental effects. Mr. Borde while visiting the projects of sample water village of Asadabad and repairing Amidabad aqueduct, talked with local communities on the effects of the projects and the rate of satisfaction. Visit of international Considering the suggestion of Mr. consultant of MENARID Borde on repairing the aqueducts in dry and semi-dry lands in the form project from performing of Hableh Roud, he expressed his projects of Hableh Roud satisfaction of the result of repair and rehabilitation of aqueduct and said that performing the projects as water management in dry lands is important.

External and internal correlation, the main factor in stability of CBOs Mr.Jazi executive director of Hableh Roud & Menarid projects and Mr. Nocheh provincial executive director of the project and its experts visited the workshop of noodles in Farvan village on 3rd December that was held by Iranian sustainable development and culture institute. He stated that, the reason for selection of Farvan is the involved people in water & land problems and also existing record of establishment of CBO in this village. He asked the women to express their goals, expectations and the way of external interactions in the form of CBOs. He also stated that the important factor in CBOs sustainability is external and internal correlation.

Aradan governor announced his readiness to collaborate with Hableh Roud project

The coordination meeting of Hableh Roud work plan in Aradan was held with the presence of Mr.Afshar Naderi governor, the director of Jihad-e-agriculture of Aradan and the members of Hableh Roud executive team in Aradan governorship. Mr.Afshar Naderi called Hableh Roud River as one of the gifts of GOD that should be protected and used properly. He announced his readiness to resolve the existing problems and cooperation in establishment of water conservation council. 4 Fall 2014 Quarterly Newsletter No.25

For the purpose of evaluating the executive process of sustainable agriculture development project by IPCM strategy, a meeting was held on 19/10/2014 with the presence of the agriculture work group members. In this neeting the status of the project in Tehran, the problems and obstacles were studied and Mr.Sharifi Moghadam the project consultant reported the execution process of IPCM plan and the reasons for its inefficiency, the obstacles and defects. Mr.Jazi while expressing his dissatisfaction of execution process of the above plan, asked for removing the existing defects and presenting a work plan with time table of holding the courses. It was also provided that the relative report is sent for Dr. Shahpasand by consultant. Presenting the work plan by IPCM consultant

Holding the workshops of capacity building and facilitating in Jaban, Sarbandan,Mashad & Roudafshan

was very high by the efforts of Ms.Gholamrezaei for accepting Hableh Roud project, so that it seems the collaborative work and holding the required courses for women will be successful. The considerable activities in the region are: handicrafts, packing the products, food The empowerment workshop for local communities was products and dry goods and held in Jaban & Sarbandan, Villages. In these workshops, medicinal plants. Mr.Ziyadbakhsh capacity building consultant of the It should be noted that, the connection with the people project explained the necessity for organizing the food was not cut in Jaban, even after ending the empowerment productions of the women, establishment of coherent workshops; the women participated in role-playing CBO and cooperative. exposition in sustainable development emphasized on These workshops were welcomed by the rural women resistive economy and offering the food products of Jaban and it seems that the preliminary capacity of the village women. Quarterly Newsletter No.25 Fall 2014 5

aspects, said that the most important executive action based on preparation plan in north Hableh Roud is its protective and tourism action and water producing as its most important responsibility. He emphasized on the importance of providing the strategic plan under governorship and stated that this plan while identifying the strategy of intersection relation among different bodies shows the action and the way of investment. It was also provided that a common meeting with the presence of Hableh Roud experts and Jihad-e- agriculture management of Damavand be held on the

The coordination meeting of Hableh Roud was held on Priority of the protection and 18th Nov. in Damavand governorship. At the beginning tourism actions in northern of the meeting, Mr.Tabbakhi deputy of Tehran watershed part of Hableh Roud management office, reported the status of the project in the current year and executive propositions and stated that the main goal of the meeting is coordination with governor status of the cultivation method and preparing agriculture for better implementation of the project. During the cadastre to achieve the sustainable development and visit meeting, Mr.Jazi executive director of the project, while of southern part of Hableh Roud area was approved by explaining about the last visit of governors of Hableh Roud members of the planning committee. watershed area from Menarid pilot in Yazd and its positive

Correlative implementation of piling operation in Seyd Abad village

Piling operation was started in a broad area of the and the required tools were supplied by local community range in Seyed Abad by cooperation of local people and of Seyed Abad and local investors, if implemented, the Hableh Roud project in Damavand in the second half of protection plan may cause considerable rehabilitation in November. In this operation all costs of providing the seed the range while making a beautiful landscape. 6 Fall 2014 Quarterly Newsletter No.25

One of the most important goals of Tehran watershed management deputy is conducting the watershed management projects by national and provincial credit to Hableh Roud watershed area. For this purpose, based on the request and the need of the people for controlling the seasonal floods and fertile sediments and protect & promote the vegetation of the region, a stone-cement check dam was constructed in Jam Abroud area and Khosravan, Ayneh varzan villages with a credit of 3920 million RLs. As a part of mechanical operations and biological operations including pile and planting will be implemented in the next phase.

Watershed management operations in Jam Abroud area

The planning and monitoring committee of Hableh Roud project was established on 30 /11/2014 in Tehran governor general headquarter with the presence of planning and occupation deputy, Tehran water managing director, Damavand governor, deputy of range, desert in forest, range and watershed management organization, head of Tehran Jihad-e-agriculture organization, general manager of natural resources and watershed management of Tehran, deputy of agriculture research centre and a group of managers and experts of Hableh Roud. In this meeting the final goal of Hableh Roud project in the second phase was presented and proposed integrated management of Hableh Roud and improvement of the conditions of natural resources and it was proposed that the preparation project be approved by other bodies as future action base. while thanking of the efforts and presence of the attendees, Hableh Roud project funding noted that in allocated credits of Hableh Roud, whatever in Tehran by governor general is determined by Tehran natural resources and watershed headquarter management office, the governor general office will provide them without limitation and regarding other The importance of space organizing through strategic bodies,the credit will be provided in the form of identified plan was emphasized by governor and establishment of work groups and based on the terms of reference. Finally, permanent secretariat of area management in governor it was provided that the credit and planning of sustainable office, establishment of water, land & range work group, agriculture development plan and agriculture cadastre be agriculture work group and identifying the cultivation implemented by Jihad-e-agriculture organization and method and preparing the cadastre map in Delichay area they agreed on holding the seasonal meetings of provincial and implementing the IPCM plan were proposed as planning and monitoring committee and the location of important goals. permanent secretariat of area management committee Mr. Torki deputy of governor in planning & occupation, was identified in Damavand & Firouzkouh counties. Quarterly Newsletter No.25 Fall 2014 7

Collaborative repair of artificial feeding pond in Seyd Abad village

Artificial feeding pond of Seyd Abad has been constructed Cooperation of the people for paying all costs is the in the past years by cooperation of Hableh Roud project considerable point in its repair. & the rural, but it was not useable due to technical It should be mentioned that it has a significant role in problems so that it was repaired with the rural investment. collecting the surface waters and artificial feeding of lower wells.

Integrated irrigation project in Mahmoudabad village

For the purpose of intersection coordination, in 30th Nov. a meeting was held in Mahmoudabad village with the presence of Mr. Mehrifar governor of Firouzkouh, Mr.Samani from Islamic parliament research centre, a group of managers and experts of Hableh Roud project and local authorities. Mahmoudabad is the successful sample of water management and intersection coordination (relation with Jihad-e-agriculture, water organization, natural resources, Hableh Roud project and environment organizations) in Firouzkouh. stated that transferring the 150 acres of Mahmoudabad In the beginning of the meeting, Mr.Mehri Firouzkouh lands will be specified to the regions that have maximum governor referring to high economic capacity of cooperation and fortunately Mahmoudabad has the desired Mahmoudabad in planting the high-grade pomegranates characteristics. Concerning the water consumption and management, he said that the integrated irrigation project (using the mechanized irrigation network and the methods of water consumption) will be implemented in the near future. Firouzkouh governor referring to integrated management, asked for integrated agriculture improvement, lands rehabilitation, mechanized irrigation system for advanced agriculture. Dehyar of Mahmoudabad claimed that the role of the women in this village for helping to economy of the family through sub-products as pomegranate sauce is effective. Mr. Jazi national executive director of Hableh Roud explaining the necessity of water integrated management 8 Fall 2014 Quarterly Newsletter No.25 and its proper consumption from upper to lower parts alterant industries. of the area that will lead to land & water conservation, It should me mentioned that the participants visited the said that Hableh Roud project is not contrary to the flattened lands transferring to Mehr Anar cooperative for agriculture development. Mr.Tabakhi deputy of Tehran planting the pomegranates. This meeting was continued watershed management referring that Hableh Roud in Hesarbon village and Mr. Shah Hoseini member of the project is seeking for coordination for sustainable use council, referring to execution of watershed management of basic environmental resources such as land & water, operations and blood controlling in the first phase that emphasized on management & increase the richness of caused to preserve the roads, gardens and the houses, asked the range, producing the healthy products, marketing and for continuation of watershed management operations.

Establishment of development fund in Taroud village

this meeting, Mr.Hoseini explained the conditions for establishment and the method of management of the fund as a facilitator. The representatives of range undertook to receive the sharing costs from the members and three of them were selected as member of board of directors that are authorized to sign. One of them was defined as a contact person between BOD and other members and For the purpose of establishment of development fund, expert team of Hableh Roud project for announcing the a meeting was held in dehyari office with the presence dates of the meetings. of representatives of range management project. In

For the purpose of using the experiences of Hableh Roud project, a group of experts and managers of natural Exchanging the experiences of Hableh resources and watershed management office of Golestan Roud project with natural resources and visted Lazour village in Firouzkouh on 09/11/2014. Mr.Zakaria Shojaa managing director of Rizbarg Alborz watershed management office of Golestan Company explained the activity of Hableh Roud project in Lazour focused on the people cooperation in decision making, planning and execution. He also described the establishment of cooperative, the procedures and the way of follow up and consultation concerning the credits. Ms.Shokat Esfandiar representative of the women community and responsible of support and financial dept. of the company explained the way of women involvement into the collaborative topics and their special issues. Finally, Mr.Bahou explained about the condition of starting Hableh Roud project and establishment of active women groups on medicinal plants and considering the existing & provided conditions for their activity, predicted a good future. While they were visiting the steam boilers and the machines for production of herbal essence, the necessary explanations were given to the visitors. Quarterly Newsletter No.25 Fall 2014 9

Introducing the representatives of local communities to councils and dehyaran with presence of Firouzkouh governor

The ceremony for introducing the local communities representatives was held with the presence of Firouzkouh governor, Arjmand prefect, dehyaran and the councils of the west villages and rural districts and Hableh Roud experts. At the beginning of the meeting, Mr.Bahou while organizations care this region. He said the main reason presenting a summary on the success of the city and for transience is separation of science and execution and participation of the people and selection the maximum referring the experiences of Mr.Shojaa representative of pilot in the first phase of the project in Firouzkouh, added local communities, asked for his presence in each village that all bodies should adapt their responsibilities with this of Arjmand district through cooperation and coordination project and prioritize them. of the office and said, postponing the actions will result in For the purpose of integrated management of land & water, dispersion of votes and thoughts. Firouzkouh governor asked for integrated agriculture It should be mentioned that in Arjmand district, Ms. improvement, lands rehabilitation, mechanized irrigation Esfandiar as representative of women local community and advanced agriculture that will cause tourism and Mr.Zakaria Shojaa, were selected as pioneers of improvement. Indicating Firouzkouh as a global schema Hableh Roud project in the first phase. and sustainability pilot explains the point that world

Visit of international projects from executive process of Hableh Roud

Different organizations take some measures for coordination and taking coherent approaches that have controlling the natural resources destruction, but most integrated management of natural resources, seems of them will be followed separately and based on special necessary. To achieve this goal, Hableh Roud project is policies of the same bodies. Therefore, intersection cooperating with other projects in I.R.Iran under a single support. For this purpose, on 29/09/2014, the project managers of UNDP visited the living projects of Hableh Roud in Tehrann & Semnan. The visit was started from Farvan village with explanations of Ms. Karimipour technical expert of Hableh Roud, concerning the goals, approaches and achievements of the project. Then the group had a meeting with governor, Aradan prefect, managing director of natural resources and watershed management of Semnan, executive national director of international projects of Hableh Roud & Menarid and a group of provincial authorities. In this meeting Mr. Afshar Naderi, Aradan governor said that irregular exploitation of water resources in upper part 10 Fall 2014 Quarterly Newsletter No.25 of the area through illegal digging of wells, agriculture in Farvan and desertification project in Abdolabad pilot, development plan will affect on the water resources in Semnan. lower part of the area. Then, they went to Firouzkouh for visiting the executive Ms.Rameh (managing director of Rameh women rural projects of Tehran, in this visit Mr.Garshaasbi deputy of cooperation ) said that Hableh Roud project will affect watershed management and range and desert affairs and on different aspects of the living such as economic, social deputy of national director of international projects of and cultural, and stated that the workshops and training Hableh Roud and Menarid and Mr.Mehri Firouzkouh courses resulted in raising the public information on governor and other authorities were present and they management of land & water resources and their action visited Lazour, Kashkerez nursery and workshop of to prevent the land destruction and their empowerment medicinal plants and herbal essences in Rizbarg-e-Alborz for supplying the livelihood through cultivation and Firouzkouh governor stated that these visits will cause and exploitation of sub-products of the range, bee encouragement and rise of talents and human capacities keeping,……….. She reminded that Hableh Roud and its and local communities and emphasized on the increase of actions are as a university and course for the rural. project qualities and identifying the inconveniences that Mr.Shah Hoseini, managing director of Barijeh karan-e- threaten the project and promised that the government Rameh stated that through holding the training workshops, and governor office are ready to prepare the required the level of information against the importance and value facilities for rising Lazour and its progress. of sub-products of the range, reduction of the number of Mr.Shojaa representative of local communities, the animals and its effects on controlling the flood was explained about Kashkerez nursery and Rizbarg-e-Alborz increased. cooperative on economic benefit of the mentioned Then, the group visited the workshop of cutting noodles projects and solving the problem of the flood in this area. Quarterly Newsletter No.25 Fall 2014 11

Visit of governors and deputies of governor-offices of Hableh Roud watershed area from Menarid pilot (Yazd-Behabad )

Bonkouh area. She stated two important issues in Hableh Roud as regional water and establishment of a secretariat for making relationships among organizations. In this meeting, Mr.Babaei deputy of Yazd governor stated that the actions should increase the added value, reduce the price and increase the efficiency. In the second day, the group visited Asfij For sensitization and better interaction of governmental & Kamkouyeh villages located in 35 km of authorities of Hableh Roud (Tehran & semnan ) and Behabad- Menarid site and Behabad governor stated that intersection coordination and taking coherent approaches occupation, not using the resources and low efficiency, among international projects that have natural resources are the major problems of this city and villages so that we integrated management, a visit from executed activities of should take it into consideration and use the experiences Menarid in Behabad pilot-Yazd was organized. in the national level. This visit was organized on 21/10/2014 by coordination In the village, there are small living projects, bakery of different parts such as UN,ministry of foreign affairs, and shops and bee keeping including 50 hives resulted Tehran & Semnan governor office and governors of in decreasing the animals. They also visited Vahdatabad Hableh Roud watershed area. In the first day of the visit, village from anthropology museum where the tools, a meeting of Hableh Roud watershed area management agriculture and livestock equipments were collected by committee and familiarity with the experiences gained in the rural. Menarid project was held on strengthen and organizational The rural asked for financial, spiritual support and solidarity. In this meeting Mr.Jazi, executive director of technical and professional trainings for better agriculture Menarid & Hableh Roud projects explained the goals and and livestock. Despite of existing limitations including programs of Hableh Roud project. water, soil and economic problems, the people are trying During the meeting, Ms.Karimipour technical expert to develop the goals of the project and their villages and of Hableh Roud reported from land use program in the local authorities have also good interaction with them.

Establishment of water transfer network by water organizations of Tehran & Semnan with cooperation of Jihad-e-agriculture

The second meeting of water resources management deputy of watershed management and deputy of national work group of Hableh Roud watershed area was held on executive director of international projects of Hableh 08/12/2014 in forest, range and watershed management Roud & Menarid, general managers of natural resources organization aimed at presenting the executive terms of and watershed management of Tehran, Semnan, the reference of the work group, considering its importance authorities of water organizations and the heads of Jihad- and the necessity of special attention to conserve the e-agriculture of both provinces and staff experts. water resources with the presence of Mr.Garshasbi In this meeting, it was emphasized on drawing target 12 Fall 2014 Quarterly Newsletter No.25

beside the work group. The executive terms of reference of work group was also presented and discussed. At the end of the meeting, the approvals were : introducing a representative for integrating the information and attending in the meetings of both province water organizations, establishment of water transfer network by both water organizations with cooperation of Jihad-e- agriculture, amendment of executive terms of reference and notifying other members by national office of the project, identifying the consultant for companionship of the work group and compilation and collecting the opinions, dividing the 5 work groups to 2 work groups and identifying the crisis, the common goal & look in of planning in province level and executive in city level proper water consumption, the consumption template by secretary of the work group, holding the monthly and cultivation method in upper & lower parts of Hableh meetings by work group secretary. Roud watershed area, the necessity of having an advisor

List of executive projects of Hableh Roud in the first & second phase

One of the proceedings of Hableh Roud project in 2014 is to prepare a complete list of executive projects with their specifications. A full list of the projects with some information like province, city, sub-region, village, place, volume/level, the number of operators, the first and last year, the amount of credit and the percent of public partnership with assistance of executive team in Tehran & Semnan.The map of executive projects was prepared in three topics of water management, land management and socio-economic issues based on the mentioned information and it was put at disposal of those who are interested in. Based on the information, 157 executive projects were implemented in , and villages of Behvard, Ghiasabad, Karous,Chandab, Dehsoltan, Sarouzan, emamzadehAbdollah, Lasjerd, Abdolabad, Rameh, Joveyn,Eij & Ashni, Farvan, Mohammadabad and in the regions of Abbasabad, Ouzdarreh, Sinakchaal and Eyvankey, and 54 executive projects are implemented in Tehran province in the villages of Aro, Dehnar, Havir, Mashad, Jaban, Lazour, Hesarbon, Taroud and Anzaha, the full list of the projects with their specifications is presented in the appendix.

In order to enjoy the valuable experiences of Ms.Rameh, 18/11/2014.She attended in a meeting that was held with managing director of Rameh cooperative, she has been presence of governor, the heads of the offices and CBOs invited by Mr.Ghazi governor of Miami to go there on and cooperatives of Miami.

Using the experiences of women CBO in Rameh – Miami Quarterly Newsletter No.25 Fall 2014 13

In this meeting, she presented the full descriptions on holding the workshops for empowerment of the women, the condition of establishment of the CBO, its proceedings and sustainable living. She referred to traditional texture of Miami and said that paying attention to handicrafts is the main factor of tourism improvement in this city. She declared her readiness to help the women for establishment of the cooperative. It should be mentioned that sustainable management of land & water resources project (Hableh Roud) joint with UNDP has been the founder of Rameh women rural cooperation in 1997.

Participation of Rameh women rural cooperation in the first exhibition of Quran fruits

The Quran fruits exhibition introducing medicinal plants, healthy food products and traditional medicine products was held for the first time in Eram Park from 10/11/2014 until 21/11/2014. Amendment of the wrong styles of feeding with the approach of Iranian-Islamic medicine – promotion and teaching the consumption of healthy and natural products – educational and cultural modeling on medicinal effects of Quran fruits were the aims of this exhibition. In this exhibition that was held with more than 100 stalls including pomegranate, olive, date,grape, participated by direct offer of Honey that is one of the figs and handicrafts, Rameh women cooperative products of Rameh cooperative.

For the purpose of changing the planting method, the farm of Saffron of Mr.Aboli, Abdolabad was visited. Mr.Rahaei head of Aradan natural resources and watershed management office expressed that considering the dry and semi dry climate of Aradan and shortage of water resources, the change in planting method is main solution for amending the water consumption Change of planting method, the model in agriculture part and water as one of the limitative basic solution for amendment of factors of production, has the main role in identifying the Water consumption method kinds of cultivation. Vulnerability of underground aquifers due to irregular exploitation of water resources, finishing the developed potential, using the underground waters for agriculture and low efficiency of irrigation, has made necessary the amendment in water consumption model. 14 Fall 2014 Quarterly Newsletter No.25

During the visit, Mr.Aboli stated that in the year 2011, the rate of harvest in the second year was 3kg and 3600m of the lands was allocated for Saffron cultivation; reminded that Saffron needs 3 times irrigation per year.

Readiness of water resources office of Aradan for cooperation with Hableh Roud for managing the water exploitation

The coordination meeting of Hableh Roud work plan was held on 29/10/2014 with the presence of Mr Taheri governor of Garmsaar, Mr.Jazi national executive director of the project, Mr.Jourablou head of water resources office of the Garmsaar and Mr. Nocheh provincial executive director of the project. Mr.Jourablou referring to the rate of raining, recent drought and loss of agriculture water said that over 110 villages in Aradan & Garmsaar that their water is supplied by Hableh Roud river, announced their readiness to cooperate with the harvest management. Mr.Taheri proposed the change in cultivation model considering the existing shortage of water and said that one of the important missions of Hableh Roud is justice in water distribution from upper parts to lower parts. Quarterly Newsletter No.25 Fall 2014 15

Implementation of a project for establishment of underground culvert With cooperation of local communities

Considering the reduction of discharge rate of a spring The collaborative project of Ashni was established aimed at located in Ashni and affecting the agriculture in the region improving the living conditions of farmers and providing and request of the rural, after the study and necessary the cause for increasing production and per capita income researches, local communities and Hableh Roud project of the operators.the project of underground culvert in agreed on establishment of underground culvert. For this Ashni covers about 14 acres of agriculture lands. In this purpose an agreement was concluded between Semnan project 300m underground culvert was established with natural resources and watershed management office and collaboration of local communities in paying the costs farmers CBO of Ashni and the meetings were held with and executive operations. local communities. 16 Fall 2014 Quarterly Newsletter No.25 unfinished unfinished status completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed 30% 30% 30% 30% 60% 40% 30% 20% 30% 50% 30% 15% 30% 30% 30% 30% 30% percent of collaboration by local community rate of credit credit international credit 243000 national (million Rls) ished 2005 2001 2009 2003 2004 2012 2001 2009 2005 2001 2005 2003 2006 2004 2004 2004 unfin - finish 2002 1999 2003 2001 2003 2005 1999 2003 2000 2000 2004 2001 2003 2003 2003 2003 2000 startyear first first first first first first first first first first first first first first first first first phase of 30 20 15 15 15 15 13 30 25 10 10 330 village village village village number total area operator m m m m m m m3 m3 m3 m3 m3 m3 m3 m3 V/S unit V/S 635 300 660 360 270 200 200 250 3500 1000 2000 2076 1000 dredg - ing 100 Damavand-Delichay- Aro place (province-city- sub area-village) Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Aro Damavand-Delichay- Dehnar Damavand-Delichay- Dehnar Damavand-Delichay- Dehnar Damavand-Delichay- Dehnar Damavand-Delichay- Aro Damavand-Delichay- Aro Damavad-Delichay- Havir construction of the pool and piping in Persova piping and construction of the pool for development in Sarand region construction of a pool in green plain of Aro piping (3500) for irrigating Zavar region operations construction of pool and cover of the streams in Afrasiab region piping and construction of the pool for development in Aghouzdar region dredging and repair of Aro aqudeuct Algan pool construction establishment of cooperative ( Fajr arboriculture, piping and pool construction in north east of Aro- Delivhay old road) construction of meteorology building in Aro piping and water transfer to Heliyer gardens flood control and construction of check dam in 3 valleys of Dehnar pool and piping in Mamasan Hozzeh beach wall of Dehnar village beach wall of Havir village (1) beach wall of Havir village (2) pool and water transfer piping in Malek takht village 2 3 4 1 5 6 8 9 7 10 11 12 13 14 15 16 17 item tehran Executive projects in the first & second phases of sustainable management of land & water resources of Hableh Roud project in Tehran in of Hableh Roud project resources in the first & second phases of sustainable management land water Executive projects Quarterly Newsletter No.25 Fall 2014 17 unfinished unfinished unfinished unfinished unfinished status completed completed completed completed completed completed completed completed completed completed completed completed completed - - 0 20% 25% 35% 25% 25% 20% 24% 35% 30% 50% 40% 30% 50% percent of collaboration by local community rate of credit credit international 65520 84200 80000 70200 credit 428400 619200 409500 189000 250000 160000 115000 1036800 1224000 national (million Rls) ished ished 2006 2006 2006 2006 2006 2006 2006 2006 2014 2006 2012 2014 2000 2005 unfin - unfin - finish 1998 1998 1998 1998 1998 1998 1998 1998 2014 1998 2013 2013 2013 2000 2003 2000 startyear first first first first first first first first first first first first phase second second second second of 20 10 650 650 650 650 650 650 650 650 650 village village village village village number operator m m m m3 m3 m3 m3 m3 m3 m3 V/S unit unit 4 V/S 700 140 200 8000 6000 2400 3400 1200 1200 70000 Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen place (province-city- sub area-village) Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Damavand-Jame Abroud-Jaban Damavand-Jame Abroud-Jaban Damavad-Delichay- Havir Damavand-Delichay- Jaban Damavad-Delichay- Havir Damavand-Delichay- Mashad Damavad-Delichay- Havir construction of reserved pool water transfer operations piping operations cement stone operations soil operations concrete operations Gabion stone operations rigid stone operations construction of bench terracing topography of repair of Jaban artificial feeding operations sustainable agriculture of IPCM of Damavand & Firouzkouh construction of trough in Asheghan empowerment of women in Jaban pool and water transfer piping in Javaher cheshmeh the project of construction of 200m3 stone and gabion structuresin Mashad construction of a tank and piping for drinking water in Havir 30 31 32 27 28 29 25 26 33 24 23 18 22 20 21 19 item tehran 18 Fall 2014 Quarterly Newsletter No.25 unfinished status completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed 35% 35% 25% 25% 35% 35% 30% 25% 30% 35% 35% 35% 35% 35% 35% 35% 35% percent of collaboration 112300 by local community rate of credit credit international 6390 6840 18000 15120 97200 credit 572300 280800 200000 1382400 national (million Rls) 2006 2006 2006 2006 2009 2006 2006 2009 2006 2006 2009 2009 2009 2009 2009 2009 2009 finish 1998 1998 1998 1998 2008 1998 1998 2008 1998 1998 2008 2008 2008 2008 2008 2008 2008 startyear first first first first first first first first first first first first first first first first first phase of 650 650 650 650 650 650 650 650 650 650 650 650 650 650 650 650 650 number operator m m m m2 m3 m3 ton ton V/S tree tree tree acre acre acre acre acre acre unit 7 4 7 7 40 40 80 V/S 240 500 600 700 300 3200 4500 2000 2001 13000 Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen place (province-city- sub area-village) Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Kangelin Vaen Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Kashkerez planting operations construction of grass depot improvement of the plants protection operations piling operations buying and distribution of muck covering the streams seeding operations embowering the pool operations buying and distribution of fertilizer construction the terrace spraying the plants replanting operations planting Tabrizi tree planting Tabrizi crust breaking in 6 phases reapir of the walls soil check dam repair of cement overflow 39 41 42 40 38 43 36 37 35 44 34 45 46 47 48 49 50 item tehran Quarterly Newsletter No.25 Fall 2014 19 unfinished status completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed completed 9% 35% 35% 35% 20% 20% 20% 20% 27% 27% 27% 27% 12% 10% 27% 27% 27% 27% percent of collaboration by local community rate of credit credit international credit 150000 800000 123070 738780 2720000 national (million Rls) 2009 2009 2009 2009 2009 2009 2011 2011 2011 2011 2009 2006 2006 2011 2011 2011 2006 2011 finish 2008 2008 2008 2008 2008 2008 2010 2010 2010 2010 2008 1999 1999 2010 2010 2010 1999 2010 startyear first first first first first first first first first first first first first first first first first first phase of 650 650 650 650 650 650 650 650 650 650 650 320 320 650 650 650 320 650 number operator m m m m m3 m3 m3 m2 m3 m3 m3 m3 m3 m2 m3 m3 V/S tree unit unit 1 36 50 V/S 100 200 200 240 250 250 600 600 600 800 4400 2400 1915 2926 8500 place (province-city- sub area-village) Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Siahroud-Kashkerez- Aloudor Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh-lazour- Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh-lazour- Siahroud-Kashkerez Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad operations dredging the pool repair of gabion check dams buying and carrying the polyethylene pipe and its couplings Gabion repair operations cement stone operations cementation of Siahroud check dam the increase of length of the pipe from Siahroud check dam replantation increase of the height of check dam construction of apron on the inner level of check dam completition and repair of gabion operations construction of bench terrace in Kashkerez stone chekdam cement stone operations cementation of Siahroud level cement stone operation fencing operation around the check dam gabion stone operations 51 52 53 54 55 56 57 58 59 60 61 62 67 68 63 64 65 66 item tehran 20 Fall 2014 Quarterly Newsletter No.25 unfinished status completed completed completed completed completed completed completed completed completed completed completed completed - - - - 40% 25% 14% 20% 10% 10% 40% percent of collaboration by local community rate of credit credit international 5760 26000 26520 credit 190000 208000 439000 1092000 national (million Rls) 2012 2006 2006 2010 2010 2010 2010 2012 2012 2006 2006 finish 2012 1999 1999 2009 2009 2009 2009 2012 2012 1999 1999 startyear first first first first first first first first phase second second second of 220 320 320 350 350 350 350 220 220 320 320 number operator m3 m2 m3 m3 m3 m3 m3 m3 m3 V/S acre acre unit 60 V/S 300 400 180 700 650 160 1700 14000 20000 182000 place (province-city- sub area-village) Firouzkouh-anzaha- darreh sakhreh- Kandou Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh- hesarbon-darreh sorkheh-garagar- goshad darreh-darreh khodadad Firouzkouh-anzha- darreh masjed Firouzkouh-anzha- darreh masjed - construction of gabion stone check dam operations soil operations (con struction of sediment basins, soil dam,dik....) fence check dams piling operations protection and conservation operations repair & completing the soil operations dredgingand carrying the sediments from the basins repair of stone overflows from cement check dams repair of agbion stone check dams construction of stone gabion check dam making dock in river bed of floodway 79 69 70 71 72 73 74 75 76 77 78 item tehran Quarterly Newsletter No.25 Fall 2014 21 unfinished status * * * completed 40 40 40 of public percentage collaboration 5 local community 0 0 0 international credit(Million Rial) 2500 national end 2002 2001 2003 year start 2001 2000 2002 first first/ phase second of 32 families number operators m m v/a m3 m3 m3 m3 m3 m3 m3 m2 m3 m3 m2 acre acre acre acre case case acre unit time time 2 2 4 5 1 1 8 10 10 800 300 520 150 230 600 250 area 1050 2200 5300 17204 10000 55000 volume/ village Behvard sub-area Behvard- Chandaab place city Garmsaar Semnan province completing the soil check dam (1) stone & cement operation stone and cement bench terracing planting soil with density (2) holding the collaborative workshop soil with density (1) project bench terracing stone and cement holding the collaborative workshop Gabion fence check dams bench terracing construction of underground check dam water transfer with polyethylene pipe 60mm, 6 atm. stone & cement ( water reservoir pool) Gabion rain gauge installation bench terracing & planting grid beton check dams water transfer in Khartizeh with polyethylene pipies 250/180/160mm - 4,6 atmosphere 7 8 9 2 3 4 5 6 1 10 12 11 13 14 15 16 17 18 19 20 21 22 item Specifications Of Executive Projects In The First & Second Phases Of Hableh Roud Land & Water Resources & Second Phases Of Hableh Roud Land Water In The First Projects Specifications Of Executive Management In Behvard Area Sustainable Management In Semnan 2000- 2004 Watershed 22 Fall 2014 Quarterly Newsletter No.25 unfinished unfinished status status * * * * * * * * * completed completed 25 50 30 of public of public percentage percentage collaboration collaboration 0 300 300 local local ommunity community 0 0 0 0 0 international international credit(Million Rial) credit(Million Rial) 300 300 2500 national national end 2003 end 2004 2005 year start 2001 year start 2003 2004 first first/ first first/ phase phase second second of of 32 families number number operators operators 4 families m m v/a v/a m3 m3 m3 m3 m2 m3 m3 m3 m3 m2 acre acre acre acre unit unit 8 6 1 8 600 700 600 750 250 280 105 260 100 400 area area 2700 1200 volume/ volume/ village Behvard village Anjirdar sub-area Behvard- Chandaab Rameh sub-area place place city city Aradan Garmsaar Semnan Semnan province province project project stone & cement check dams stone & cement gabion check dams bench terracing planting forage planting water transfer with polyethylene pipe 160 rip rap grid beton check dams water transfer with polyethylene pipe 500 water reservoir pool bench terracing & planting gabion check dams stone & cement repair of Khartizak check dam wooden check dams with beton base 32 23 24 33 34 35 36 25 26 37 38 27 28 29 30 31 item item total credit cost from 2000 until 2004 in first phase - Rameh-Anjirdar (million Rls. ) - watershed management section total credit cost from 2000 until 2004 in the first phase Behvard area (million Rls)- watershed management section specifications of executive projects in the first & second phases of Hableh Roud land specifications of executive & water resources sustainable management in Rameh-Anjirdar 2000- 2004 Quarterly Newsletter No.25 Fall 2014 23 unfinished status * * * * * * * * * * * * * * * * * completed 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 of public percentage collaboration local ommunity 0 0 international 0 credit(Million Rial) 20 20 10 70 80 15 75 30 10 10 70 70 70 200 180 120 150 national 1200 end 2010 year start 2009 first/ phase second second of number operators - - per per v/a day day son son m3 m2 m3 per per acre acre case acre acre case acre acre acre acre unit trees trees 2 3 50 50 50 600 480 100 100 100 600 area 1000 2000 2020 20000 41150 50000 volume/ ـــ village Karous Lasjerd Abdollah Abdollah Abdollah Eyvankey Sarouzan Dehsoltan Ghiasabad Emamzadeh Emamzadeh Emamzadeh Abdolabad Ashni Eyvankey Garmsaar Rameh sub-area Rameh sub-area Rameh sub-area Karous Makresh sub-area place city Aradan Garmsaar Sorkheh Semnan province planting project controlling the sewage holding the empowerment workshop desertification (plantin g ) construction of trough planting construction of check dam beton foundation construction of water reservoir pool construction of trough annual irrigation of planting execution of pasture management construction of water reservoir pool execution of pasture management improvement of the soil improvement of the soil improvement of the soil teaching production of vermi compost 55 40 52 39 51 47 53 54 48 41 49 42 50 43 44 45 46 item total credit cost in 2009 ( Million Rls.) specifications of executive projects in the first & second phases of Hableh specifications of executive Roud land & water resources sustainable management in Semnan - 2009 24 Fall 2014 Quarterly Newsletter No.25 unfinished status * * * * * * * * * * * * * * * * * * * * * * completed 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 of public percentage collaboration local ommunity 0 international credit(Million Rial) 34 34 68 34 28 22 34 45 17 79 28 78 40 19 19 19 45 146 118 113 145 135 national end 2011 year start 2010 first/ phase second second of number operators v/a m2 m3 km m3 case acre case case acre case case acre case case acre acre acre acre acre acre unit 1 4 1 1 2 1 2 2 5 10 40 30 500 150 100 100 100 100 100 area 2000 volume/ ـــ region village Karous Rameh Rameh Rameh abdollah abdollah Behvard Behvard Sarouzan Sinakchal Dehsoltan Abdolabad Abdolabad Abdolabad emamzadeh emamzadeh area Garmsar Garmsar Garmsar Eyvankey Eyvankey abdollah abdollah Karous Rameh Rameh Rameh Rameh chandab chandab sub-area Makresh Behvard- Behvard- Abdolabad Abdolabad Abdolabad emamzadeh emamzadeh place city Aradan Garmsar Sorkheh Semnan province empowerment of local fund establishment creating alive carminative around the farms project bench terracing & planting establishment of Rameh local fund for women construction of stone & cement check dam piling & seeding visit of local CBOs improvement of the soil establishment of local fund for beneficiaries of sucidiary products of thr range development of the activities of bee keeper women in Rameh construction of trough repair of the spring and water transfer amendment of the transfer direction of Behvard underground check dam execution of pilot projects of planting without irrigation by cooperation of private section iannual irrigation of plants in desert planting of desert completion of soil improvement project completion of soil improvement project completion of soil improvement project paling and completion of the water reservoir pool of Kouros construction of check dam construction of check dam beton foundation holding the consultation workshop for providing the strategic plan and case visits 61 59 56 74 75 62 60 63 57 58 76 77 64 65 66 67 68 69 70 71 73 72 item specifications of executive projects in the first & second phases of Hableh Roud land specifications of executive & water resources sustainable management in Semnan -2010 Quarterly Newsletter No.25 Fall 2014 25 unfinished status * * * * * * * * * * * * * * * completed 50 50 100 100 100 100 100 100 100 100 100 100 100 100 of public percentage collaboration 34 22 56 local ommunity 0 0 international credit(Million Rial) 9 8 30 34 22 17 40 50 45 30 15 50 30 45 25 1390 national end 2012 year start 2011 first/ phase second second of number operators m "" "" "" "" """ """ v/a case case case case case unit person 1 1 2 1 1 1 1 2500 area volume/ village Lasjerd abdollah abdollah Abdolabad emamzadeh emamzadeh Sorkheh sub-area province province province province province province province province province province abdollah abdollah place Abdolabad emamzadeh emamzadeh centralized in the centralized in the centralized in the centralized in the centralized in the centralized in the centralized in the centralized in the centralized in the centralized in the city Semnan province holding training workshop of garden development project holding training workshop of garden development creating a database of the project production of documentary film of the project achievements inn the first phase and the starting processes of the second phase execution of the project for collecting and transferring the water visit of local CBOs execution of collaborative project for water transfer cooperation in preparing the local newsletter of provincial CBOs cooperation in creating a web blog by local CBO s of Garmsar cooperation in web blog creation by local CBOs of Semnan visits of the CBOthe visits of members of subsidiary products operators in Rameh holding the workshop of intersection coordination, developent of strategic plan in the province & city level visit of the experts strategic plan from successful projects visit of the operators and members of local CBOs of Semnan signing a contract with an expert for the purpose of making arrangement of sustainable production 79 78 83 90 82 80 81 84 91 85 92 86 87 88 89 item total credit cost in 2010 (million Rls) specifications of executive projects in the first & second phases of Hableh specifications of executive Roud land & water resources sustainable management in Semnan 2011 26 Fall 2014 Quarterly Newsletter No.25 unfinished status * * * * * * * * * * * * * * * * * * * completed 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 of public percentage collaboration local ommunity 0 international credit(Million Rial) 5 70 15 30 30 10 15 15 15 15 50 60 40 90 35 30 50 45 113 national end 2012 year start 2011 first/ phase second second of number operators "" "" "" "" "" bit v/a m2 m3 km acre acre acre acre case acre case case unit trees trees 1 1 5 1 4 8 1 1 1 1 1 1 35 15 15 100 area 1000 1000 50000 volume/ ـــــ Eij ـــــ village Joveyn Rameh Rameh Behvard Behvard Behvard Behvard Behvard Chandab Ghiasabad Ghiasabad Ghiasabad Ghiasabad Eij Eij Rameh Rameh Rameh chandab chandab chandab Chandab Chandab Chandab Behvard- Behvard- Behvard- Behvard- Behvard- Behvard- Eyvankey sub-area Makresh Makresh Garmsar place city Aradan Sorkheh Garmsar semnan province annual irrigation of plants in desert execution of a project for managing the regions with high growth of galbanum holding the training workshop for beekeeper women in Rameh repair of Gbion check dams of Behvard annual irrigation of plants in desert annual replanting project annual replanting improvement of agriculture lands collaborative repair of Behvard aqueduct collaborative repair of water transfer direction to underground check dam & Behvard soil chgeck dam repair of wooden check dams of Behvard holding training workshop for beneficiries of subsidiary products of Rameh workshop of empowerment and establishment of CBO holding the training workshop for Eyvankey bee keepers visit of local CBO members of Garmsar collaborative bench terracing & planting holding the empowerment workshop and establishment of local CBO in Joveyn holding the empowerment workshop and establishment of pilot CBO of Behvard- Chandab holding empowerment workshop and establishment of local CBO in Eij 97 98 99 93 94 96 95 101 107 108 100 102 103 104 105 109 106 110 111 item specifications of executive projects in the first & second phases of Hableh Roud specifications of executive land & water resources sustainable management in Semnan 2011 Quarterly Newsletter No.25 Fall 2014 27 unfinished status * * * * completed 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 of public percentage collaboration 0 local ommunity 0 0 80 32 100 international credit(Million Rial) 0 50 10 30 40 30 70 80 40 60 40 20 20 30 60 110 123 1323 national end year start first/ phase second second of number operators per kg day bit v/a m2 km km km shop acre acre acre case case case case unit unit time time time work - person 5 9 8 6 1 2 4 4 4 7 8 2 1 100 200 400 area 2000 50000 150000 volume/ deh bad bad region region Ashni village Abdollah Sinakchal Emamza - Abdola - Abdola - Ghiasabad Abdolabad Ouzdarreh Rameh Rameh Garmsar deh bad bad centre centre centre centre centre centre centre Karous Rameh Rameh Abdollah Abdola - Abdola - Abdolabad Emamza - sub-area place city centralized in province centralized in province centralized in province centralized in province centralized in province centralized in province centralized in province Aradan Sorkheh Garmsar Semnan province collaborative execution of piling for protecting the range construction o f trough collaborative execution of water transfer of Emamzadeh Abdollah execution of pasture management project project execution of the project for the regions with high growtrh of Galbanum collaborative water transfer collaborative repair of the spring visit of local communities from collaborative projects outside of province holding the meetings of organizing committee in cities holding the mmetings of monitoring committee of the province holding the meetings of local committee holding the workshops of management project in province level collaborative repair of the spring construction of check dam beton foundation collaborative construction of carminative documentation of the project participation of local communities in exhibitions collecting the galbanum seed holding the workshop for producing vermi cimpost 113 117 112 116 118 122 123 124 125 126 127 128 114 115 121 129 130 119 120 item total credit cost in 2011 (million Rls) specifications of executive projects in the first & second phases of Hableh Roud specifications of executive land & water resources sustainable management in Semnan2012-2013 28 Fall 2014 Quarterly Newsletter No.25 unfinished status completed 100 100 100 100 100 100 of public percentage collaboration 0 356 local ommunity 70 110 100 170 250 230 1142 1142 international credit(Million Rial) 0 583 7296 national end year start first/ phase second second of number operators v/a acre case unit time time time pilot 1 1 15 10 11 area 9000 volume/ abad Abbas village Rameh Qazvin Behvard Moham - mad abad Garmsar Rameh Chandab Behvard- sub-area Garmsar Dehnamak place city Garmsaar Sorkheh province socio-economic and environmental evaluation project holding the empowerment workshop and development of entrepreneurship in villages IPCM sustainable agriculture teaching the students workshop of range management desrtification workshop using indigenous knowledge 131 132 133 134 135 136 item total credit cost in 2012-2013 (million Rls ) total credit cost in Hableh Roud project from beginning to th end