Ascertaining the Quality of Fly Ash Discharged by M/S Maithon Power Ltd., Dhanbad and Its Effect on Environment, Air and Water and Its Effects on Agriculture

Total Page:16

File Type:pdf, Size:1020Kb

Ascertaining the Quality of Fly Ash Discharged by M/S Maithon Power Ltd., Dhanbad and Its Effect on Environment, Air and Water and Its Effects on Agriculture Ascertaining the Quality of Fly Ash Discharged by M/s Maithon Power Ltd., Dhanbad and its Effect on Environment, Air and Water and its Effects on Agriculture Sponsor Jharkhand State Pollution Control Board, Ranchi [Towards compliance of order dated 13.03.2014 of Hon’ble High Court of Jharkhand at Ranchi in WP (PIL) No. 2663 of 2011] CSIR- National Environmental Engineering Research Institute (NEERI), Nehru Marg, Nagpur 440 020 (Maharashtra) November 2014 Ascertaining the Quality of Fly Ash Discharged by M/s Maithan Power Ltd., Dhanbad and its Effect on Environment, Air and Water and its Effects on Agriculture Sponsor Jharkhand State Pollution Control Board, Ranchi [Towards compliance of order dated 13.03.2014 of Hon’ble High Court of Jharkhand at Ranchi in WP (PIL) No. 2663 of 2011] CSIR- National Environmental Engineering Research Institute (NEERI), Nehru Marg, Nagpur 440 020 (Maharashtra) November 2014 Project Personnel Study Component Scientist Team Member Flyash Charactrization Dr. Amit Bansiwal Mr. Alok Kumar Meher and Leaching Study Dr. Sadhana Rayalu Soil Quality and Mr. P.R. Salve Ms. Ekta Singh Agriculture Ms. Rakhi Nikhade Ms. Minal Choudharkar Ms. Leena Das Water Quality Dr. Sunita Shastry Mr. Y.J. Baseshankar Ms. Dipti Giri Ms. Ashwini Wankhede Ms. Mayuri Shivankar Ms. Rupa Roy Ms. Komal Dhillon Mr. Rama Krishna Air Quality Dr. Deepanjali Majumdar Mr. P. B. Sanyal Mr. Debasish Sengupta Dr. S.R. Pramanik Mr. R. N. Goswami Mr. Mintu Saha Mr. Vivek Manik Report Compilation and Dr. Harshvardhan Singh Mr. Ashish Warhade Mr. Anup Dhoble Integration Dr. S.K. Goyal Mr. Amey Panke Ms. Punam Mandape Project Leaders Dr. Harshvardhan Singh Dr. S.K. Goyal Project Coordinator Dr. S.R Wate Director Contents Item No. Particulars Page No. List of Tables (iv) List of Figures (vi) List of Exhibits (vii) List of Annexures (vii) Chapter 1: Introduction 1.1-1.13 1.1 Preamble 1.1 1.2 Scope of Work 1.2 1.3 Visit of NEERI Team to M/s MPL and Abandoned Mines 1.4 1.4 Maithon Power Plant 1.4 1.4.1 Brief about MPL 1.4 1.4.2 Coal Consumption, Ash Generation and Ash Disposal/Utilization 1.5 1.4.3 Ash Disposal/Utilization : Mode and Quantity 1.6 1.4.4 Transport of Ash to Abandoned Mines 1.7 1.4.4.1 Fly Ash Transportation from Main Silos to Abandoned Mines 1.7 1.4.4.2 Bottom Ash Transportation from Hydrobin to Abandoned Mines 1.7 1.4.4.3 Ash Transportation from Ash Pond to Abandoned Mines 1.7 Chapter 2: Fly Ash Characterization and Leaching Study 2.1-2.16 2.1 Methods and Materials 2.1 2.1.1 Collection of Fly Ash Samples 2.1 2.1.2 Characterization of Fly Ash 2.1 2.1.2.1 Particle Size Analysis (PSA) 2.1 2.1.2.2 Powder X-ray Diffraction (PXRD) 2.2 2.1.2.3 Fourier Transform Infrared Spectroscopy (FTIR) 2.2 2.1.2.4 Scanning Electron Microscopy (SEM) 2.2 2.1.2.5 Loss on Ignition (LOI) 2.2 2.1.2.6 Specific Gravity 2.3 2.1.2.7 Elemental Analysis 2.3 2.1.2.8 Leaching Tests 2.3 2.2 Characterization of Fly Ash 2.4 2.2.1 Physical Parameters 2.4 2.2.2 Elemental Composition 2.4 i Item No. Particulars Page No. 2.3 Phase Analysis 2.5 2.4 FTIR Studies 2.5 2.5 Morphological Studies 2.6 2.6 Metal Leaching Tests (TCLP) 2.6 2.7 Conclusions & Recommendations 2.7 2.7.1 Conclusions 2.7 2.7.2 Recommendations 2.7 Chapter 3: Effect on Ambient Air Quality 3.1-3.13 3.1 Air Quality Monitoring Locations 3.1 3.2 Sampling Methodology 3.2 3.3 Air Quality Status 3.3 3.3.1 Particulate Matter and Gaseous Pollutants 3.3 3.3.2 Particulate Associated Toxic Pollutants 3.4 3.4 Conclusion 3.6 Chapter 4: Effect on Water Quality 4.1-4.15 4.1 Water Sampling Locations 4.1 4.2 Water Quality Status 4.2 4.2.1 Surface Water Quality 4.2 4.2.2 Ground Water Quality 4.3 4.3 Conclusion 4.4 Chapter 5: Effect on Soil Quality and Agriculture 5.1-5.12 5.1 Soil Sampling 5.1 5.2 Analytical Methods 5.1 5.3 Soil Quality 5.2 5.3.1 Physical Characteristics of Soil 5.2 5.3.2 Chemical Characteristics of Soils 5.2 5.3.3 Fertility / Nutrient Status of Soil 5.4 5.3.4 Heavy Metal Content in the Soil 5.4 5.3.5 Soil Microbiology 5.5 5.4 Conclusion 5.5 ii Item No. Particulars Page No. Chapter 6: Effect of Fly Ash Filling in Abandoned Mines 6.1-6.7 6.1 Preamble 6.1 6.2 Findings of MPL Related Studies 6.1 6.2.1 Report entitled "Study on Environmental Impact of Filling of Fly Ash by Maithon Right Bank Thermal Power Plant" 6.1 6.2.2 Report entitled "Advice on the Suitability of Underground working below Ash Filled Open Cast Mines at Mugma Area, ECL” 6.4 6.2.3 Report entitled “Hydrogeological Studies for Ash Pond of 2 x 525 MW Maithon Power Limited and an Abandoned Coal Mine, District Dhanbad, Jharkhand” 6.5 Chapter 7: Conclusions and Recommendations 7.1-7.6 7.1 Conclusions 7.1 7.1.1 Introduction 7.1 7.1.2 Fly Ash Characterization and Leaching Study 7.1 7.1.3 Effect on Ambient Air Quality 7.2 7.1.4 Effect on Water Quality 7.3 7.1.5 Effect on Soil Quality and Agriculture 7.3 7.1.6 Effect of Fly Ash Filling in Abandoned Mines 7.4 7.2 Recommendations 7.5 7.2.1 Fly Ash related 7.5 7.2.2 Air Quality related 7.5 7.2.3 Water Quality related 7.5 7.2.4 Soil Quality / Agriculture related 7.6 7.2.5 Recommendations for M/s MPL 7.6 iii List of Tables Table No. Title Page No. 1.1 Co-ordinates of Different Facilities of MPL and Abandoned Mines 1.4 1.2 Basic Information about M/s Maithon Power Plant 1.5 1.3 Annual Coal Consumption, Ash Generation and Ash Disposal / Utilization during 2011-12 to 2013-14 1.6 1.4 Monthly Coal Consumption, Ash Generation and Ash Disposal / Utilization during 2014-15 (up to August 2014) 1.6 1.5 Ash Disposal/Utilization upto August 2014 1.7 2.1 Physical Parameters of Various Fly Ash Samples 2.9 2.2 Elemental Composition of Different Fly Ash Samples 2.9 2.3 Concentration of Class A and Class B Elements in Fly Ash Samples 2.9 2.4 Regulatory Limits of Metals in Leachates of TCLP 2.10 2.5 Concentration of Various Metals in Leachate of TCLP Tests 2.10 3.1 Details of Ambient Air Quality Locations 3.8 3.2 Ambient Air Quality Monitoring Method Used 3.8 3.3 Air Quality Status in and around Maithon Power Limited 3.9 3.4 Summary of Air Quality Status 3.9 3.5 Heavy Metal Content in Particulate Matter (PM10) 3.10 3.6 BaP Content in Particulate Matter (PM10) 3.10 4.1 Details of Water Quality Sampling Locations 4.5 4.2 Water Quality Status - Physical Parameters 4.6 4.3 Water Quality Status - Inorganic Parameters 4.7 4.4 Water Quality Status - Nutrient and Demand Parameters 4.8 4.5 Water Quality Status - Heavy Metals 4.9 iv Table No. Title Page No. 5.1 Details of Soil Sampling Locations 5.6 5.2 Soil Quality Assessment Methods 5.6 5.3 Textural Class of Soil Samples 5.7 5.4 Physical Characteristics of Soil Samples 5.7 5.5 Chemical Characteristics of Soil Extract 5.8 5.6 Cation Exchange Capacity of Soil Samples 5.8 5.7 Relationship of CEC with Productivity of Soil 5.9 5.8 Relationship of CEC with Adsorptivity of Soil 5.9 5.9 Fertility Status of Soil Samples 5.9 5.10 Heavy Metal Content in Soil Samples 5.10 5.11 Microbiological Characteristic of Soil Samples 5.10 v List of Figures Figure No. Title Page No. 1.1 Location of Different Facilities of MPL and Abandoned Mines 1.9 2.1 Particle Size Distribution of Fly Ash Collected from Silo (SFA) 2.11 2.2 Particle Size Distribution of Fly Ash Collected from Ash Dyke (ADFA) 2.11 2.3 Particle Size Distribution of Fly Ash Collected from Mines (MFA) 2.11 2.4 Powder XRD Patterns of fly ash samples (Q: Quartz, M: Mullite) 2.12 2.5 Powder XRD Patterns of Mine Overburden 2.12 2.6 FTIR Spectra of Various Fly Ash Samples 2.13 2.7 SEM Images of Fly ash Samples Collected from Silo (A), Ash Dyke (B) and Mine Dumping Site (C) 2.14 2.8 Concentration of Heavy Metals in Leachates from TCLP Tests 2.15 3.1 Ambient Air Quality Monitoring Locations 3.11 4.1 Water Sampling Locations around MPL Ash Pond (Top) and Abandoned Mines Site (Bottom) 4.10 5.1 Soil Sampling Locations in the Study Area 5.11 vi List of Exhibits Exhibit No. Title Page No. 1.1 Photographs Showing Visit of NEERI Team to MPL and Ash Pond Area 1.10 1.2 Photographs Showing Visit of NEERI Team to Abandoned Mine Used for Ash Filling 1.11 1.3 Flyash Loading System in MPL 1.12 1.4 Flyash Disposal at Abandoned Mines 1.13 2.1 Collection of Fly Ash Sample from Ash Dyke 2.16 2.2 Collection of Fly Ash Sample from Disposal Site at Abandoned Mine 2.16 3.1 Photographs Showing Air Quality Monitoring Locations 3.12 4.1(a) Photographs Showing Water Quality Sampling Locations 4.11 4.1(b) Photographs Showing Water Quality Sampling Locations 4.12 5.1 Photographs Showing Soil Sampling from Different Locations 5.12 List of Annexures Ann.
Recommended publications
  • Government of India
    Contents: Sl. No Topic Page No 1 General characteristics of the District 1 1.1 Location & geographical area 1 1.2 Topography 1 1.3 Availability of Minerals 2 1.4 Forest 2 1.5 Administrative setup 2 2 District at a Glance 3-5 2.1 Existing status of Industrial Area in the District 6 3 Industrial Scenario of …. 6 3.1 Industry at a glance 6 3.2 Year wise trend of Units registered 7 3.3 Details of existing Micro & small enterprises & Artisan Units in the 8 District 3.4 Large Scale Industries/ Public Sector Undertakings 9 3.5 Major Exportable Items 9 3.6 Growth Trend 10 3.7 Vendarization /Ancillarisation of the Industry 10 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in Dhanbad & near by Area 11 3.8.2 Major Exportable Item 11 3.9 Service Enterprises 11 3.9.1 Coaching Industry --------- 3.9.2 Potential Areas for Service Industry 11 3.10 Potentials for New MSMEs 12-15 4 Existing clusters of Micro & Small Enterprise 15 4.1 Details of Major Clusters 15 4.1.1 Manufacturing Sector 15 4.1.2 Service Sector 15 4.2 Details of identified cluster 15 4.2.1 Refractory Cluster: Present Status, 15 5 General issues raised by the industry association during the course of 16 meeting 6 Steps to set up MSMEs 17 Brief Industrial Profile of Dhanbad District 1. General Characteristics of the District: Dhanbad District, an administrative district of Jharkhand has it’s headquarter at Dhanbad.
    [Show full text]
  • Tourist Places in and Around Dhanbad
    Tourist Places in and around Dhanbad Dhanbad the coal capital of India lies at the western part of Eastern Indian Shield, the Dhanbad district is ornamented by several tourist spots, namely Parasnath Hill, Parasnath Temple, Topchanchi, famous Jharia coalfields, to mention a few. Other important places are Bodh Gaya, Maithon Dam, and this town is only at 260 km distance by rail route from Kolkata. Bodh Gaya Lying at 220 km distance from Dhanbad. Bodh Gaya is the place where Gautam Buddha attained unsurpassed, supreme Enlightenment. It is a place which should be visited or seen by a person of devotion and which would cause awareness and apprehension of the nature of impermanence. About 250 years after the Enlightenment, the Buddhist Emperor, Ashoka visited the site of pilgrimage and established the Mahabodhi temple. Parasnath Temple The Parasnath Temple is considered to be one of the most important and sanctified holy places of the Jains. According to Jain tradition, no less than 23 out of 24 Tirthankaras (including Parsvanatha) are believed to have attained salvation here. Baidyanath Temple Baidyanath Jyotirlinga temple, also known as Baba dham and Baidyanath dham is one of the twelve Jyotirlingas, the most sacred abodes of Shiva. It is located in Deoghar at a distance of 134 km from Dhanbad. It is a temple complex consisting of the main temple of Baba Baidyanath, where the Jyotirlinga is installed, and 21 other temples. Maithon Dam Maithon is 52 km from Dhanbad. This is the biggest reservoir in the Damodar Valley. This dam, designed for flood control, has been built on Barakar river.
    [Show full text]
  • Dto Name Jun 2016 Jun 2016 1Regn No V Type
    DTO_NAME JUN_2016 JUN_2016_1REGN_NO V_TYPE TAX_PAID_UPTO O_NAME F_NAME ADD1 ADD2 CITY PINCODE STATUS TAX_AMOUNT PENALTY TOTAL RANCHI N N JH01BZ8715 BUS 19-08-16 KRISHNA KUMHARS/O LATE CHHOTUBARA MURIKUMHAR CHHOTASILLI MURI RANCHI SUCCESS 6414 1604 8018 RANCHI N N JH01G 4365 BUS 15-08-16 ASHISH ORAONS/O JATRU ORAONGAMARIYA SARAMPO- MURUPIRIRANCHI -PS- BURMU 000000 SUCCESS 5619 1604 7223 RANCHI N N JH01BP5656 BUS 29-06-16 SURESH BHAGATS/O KALDEV CHIRONDIBHAGAT BASTIBARIATU RANCHI SUCCESS 6414 6414 12828 RANCHI N N JH01BC8857 BUS 22-07-16 SDA HIGH SCHOOLI/C HENRY SINGHTORPA ROADKHUNTI KHUNTI , M- KHUNTI9431115173 SUCCESS 6649 3325 9974 RANCHI Y Y JH01BE4699 BUS 21-06-16 DHANESHWARS/O GANJHU MANGARSIDALU GANJHU BAHERAPIPARWAR KHELARIRANCHI , M- 9470128861 SUCCESS 5945 5945 11890 RANCHI N N JH01BF8141 BUS 19-08-16 URSULINE CONVENTI/C GIRLSDR HIGH CAMIL SCHOOL BULCKERANCHI PATH , M- RANCHI9835953187 SUCCESS 3762 941 4703 RANCHI N N JH01AX8750 BUS 15-08-16 DILIP KUMARS/O SINGH SRI NIRMALNEAR SINGH SHARDHANANDANAND NAGAR SCHOOLRANCHI KAMRE , M- RATU 9973803185SUCCESS 3318 830 4148 RANCHI Y Y JH01AZ6810 BUS 12-01-16 C C L RANCHII/C SUPDT.(M)PURCHASE COLLY MGR DEPARTMENTDARBHANGARANCHI HOUSE PH.NO- 0651-2360261SUCCESS 19242 28862 48104 RANCHI Y Y JH01AK0808 BUS 24-04-16 KAMAKHYA NARAYANS/O NAWAL SINGH KISHORECHERI KAMRE NATHKANKE SINGH RANCHI SUCCESS 4602 2504 7106 RANCHI N N JH01AE6193 BUS 04-08-16 MRS. GAYTRIW/O DEVI SRI PRADEEPKONBIR KUMARNAWATOLI GUPTA BASIAGUMLA SUCCESS 4602 2504 7106 RANCHI Y Y JH01AE0222 BUS 22-06-16 RANCHI MUNICIPALI/C CEO CORPORATIONGOVT OF JHARKHANDRANCHI RANCHI SUCCESS 2795 3019 5814 RANCHI N N JH01AE0099 BUS 06-07-16 RANCHI MUNICIPALI/C CEO CORPN.GOVT.
    [Show full text]
  • Tata Power: “Renewables to Power Growth” an Exemplar of the Indian Energy Transition
    Simon Nicholas, Energy Finance Analyst 1 Tim Buckley, Director of Energy Finance Studies April 2019 Tata Power: “Renewables to Power Growth” An Exemplar of the Indian Energy Transition Executive Summary Tata Power recently made it publicly clear that it will not be building any new coal- fired power capacity going forward. Furthermore, the company has committed to driving the great majority of its power capacity expansion via lower cost renewable energy. The majority of Tata Power’s thermal capacity is centred on its Mundra coal-fired power plant which is financially unviable and making consistent, significant losses that are dragging back the company’s overall financial performance. Since the Mundra plant was commissioned in fiscal year (FY) 2012-13, thermal power has made up only 3% of net capacity additions whilst wind and solar make up 87% and hydro 11%. This represents a significant departure from the accepted wisdom of just a few years ago that a major expansion of coal-fired power would be required to serve India’s growing electricity demand. Figure 1: Renewables and Hydro Will Dominate Tata Power’s Future Capacity Additions (MW) Source: Tata Power Strategic Intent 2025. Tata Power: “Renewables to Power Growth” 2 Tata Power’s shift mirrors the transition underway within the Indian power sector as a whole, driven by least cost renewable energy. Over the first 11 months of FY2018- 19, only 20 megawatts (MW) (net) Tata Power’s shift mirrors of thermal power has been added in the transition underway within India after taking closures into account. Renewable energy the Indian power sector, driven additions over the same period by least cost renewable energy.
    [Show full text]
  • Jharkhand State Pollution Control Board Government of Jharkhand
    Jharkhand State Pollution Control Board Government of Jharkhand DIPP Point No. 109 Question 5d. Authorization under Hazardous Waste (Management and Handling) Rules, 1989 Q: Design and implement a system that allows online application, payment, tracking and monitoring without the need for a physical touch point for document submission and verification Supporting: URL: http://jhkocmms.nic.in/OCMMS/index.gsp Userid : O1618801720 Password: bigbang123@ Click Here Click Here and select ‘Hazardous Waste Management Jharkhand State Pollution Control Board Government of Jharkhand Fill in General details Fill in Product details Jharkhand State Pollution Control Board Government of Jharkhand Fill in Fee details Fill in Hazardous Waste details Jharkhand State Pollution Control Board Government of Jharkhand Upload files Click on ‘Proceed’ to continue Jharkhand State Pollution Control Board Government of Jharkhand Select the payment mode and make payment FOR TRACKING AND MONITORING STATUS User can track status from here SUPPORTING DOCUMENT Application Type Status Occ Name Designation Ind Name Address City District Mobile No Email Id A-3, 2nd-Phase, Adityapur Kandra SERAIKELA 303293 HWM pending Diloo B Parikh Director Mithila Motors Pvt. Ltd. Adityapur 9204058603 [email protected] Road, Adityapur KHARSAWAN LARGE SCALE INDUSTRIAL ESTATE, SERAIKELA 303321 HWM pending K Shankar Marar Managing Director TAYO ROLLS LIMITED GAMHARIA 9243587464 [email protected] GAMHARIA KHARSAWAN OM PRAKASH BALMUKUND SPONGE & MANJHILADIH, GADISRIRAMPUR, 319248 HWM
    [Show full text]
  • Tata Power (TATPOW) | 71 Target : | 79 Target Period : 12 Months Potential Upside : 12% All Round Performance …
    Result Update May 25, 2016 Rating matrix Rating : Buy Tata Power (TATPOW) | 71 Target : | 79 Target Period : 12 months Potential Upside : 12% All round performance … • Revenues came in at | 9374 crore up 13.8% YoY, higher that I-Direct What’s changed? estimates of | 9037 crore. On a segmental basis, power segment Target Changed from | 67 to | 79 revenues were higher that estimates at | 7025 crore (estimate of EPS FY17E Changed from | 5.3 to | 4.6 |6624 crore) while coal segment revenues came in line at | 2023 EPS FY18E Changed from | 5.8 to | 5.1 crore vs. estimate of |2000 crore. Rating Changed from Hold to Buy • Performance across subsidiaries was reasonably strong. The likes of Maithon power (strong generation), Mundra (lower fuel costs), Tata Quarterly performance Solar (strong revenue booking and outlook) added to overall Q4FY16 Q4FY15 YoY (%) Q3FY16 QoQ (%) performance. Revenue 9333 8240 13 8952 4 • EBITDA margins came in at 20.4% for Q4FY16 vs. our estimate of EBITDA 1913 1962 (3) 2095 (9) 23% for the quarter. The key miss stemmed due to miss in the power EBITDA (%) 20 24 (331) 23 (291) segment EBIT which came in at 17.3% YoY as compared to 19.4% in PAT 356 (13) 2884 260 37 Q4FY15. The same is reiterated from the fuel costs which have gone up sharply by 73% YoY Key financials • Higher than expected revenues, strong subsidiary performance and | Crore FY15 FY16 FY17E FY18E one off regulatory gain led to a PAT of |360 crore higher than our Net Sales 34366.9 37480.2 39642.3 41154.6 estimates of |320 crore in Q4FY16 .
    [Show full text]
  • BHARAT COKING COAL LIMITED ( a Subsidiary of Coal India Limited ) Office of the General Manager(M&S) Koyla Bhawan
    BHARAT COKING COAL LIMITED ( A Subsidiary of Coal India Limited ) Office of the General Manager(M&S) Koyla Bhawan. Dhanbad CIN :-U10101JH1972GOI000918 Ref NO: BCCL/M&S/RS/2019/ 147 NOTICE Dated: 14.09.2019 OFFER FOR THE MONTH OF AUGUST’2019 FOR COKERY GROUP CONSUMERS WHOSE FUEL SUPPLY AGREEMENT EXPIRED/GOING TO EXPIRE POST CUT OFF DATE OF TRENCH-IV (LINKAGE e-AUCTION-OTHERS) i.e. AFTER 30-09-2018 (LIST OF THESE FSA CONSUMERS IS ENCLOSED IN ANNEXURE-I). RTGS PAYMENT ALONG WITH COMPLETE APPLICATIONS ETC. SHALL BE ACCEPTED IN ROAD SALES SECTION W.E.F 16.09.2019 TO 23.09.2019. Proposed %age of Proposed %age of SL. ACQ for all ACQ for all cokery No. Source Seam Grade transferred cokery Consumers of consumers from ECL BCCL to BCCL 1 W3 MURAIDIH V/VI/VII(COMB) 2% 2% STEAM 2 W3 MURAIDIH(SATABDI) V/VI/VII(COMB) 2% 2% STEAM 3 W3 PHULARITAND V/VI/VII(COMB) 4% 4% STEAM 4 AMAL.BLOCK-II W3 V/VI/VII(COMB) 3% 3% (BENEDIH) STEAM 5 AMAL.BLOCK-II W3 V/VI/VII(COMB) 3% 4% (NUDKHURKEE) STEAM 6 AMAL.BLOCK-II IV/V/VI/VII W3 3% 4% (JAMUNIA) (COMB) STEAM 7 WII JOGIDIH I SEAM 1% - STEAM 8 W3 BASTACOLLA II (B)/III (B) 1% 1% STEAM 9 W3 KUYA OCP III(T&B) 3% 3% STEAM 10 W3 MAHESHPUR IXB 1% 1% STEAM 11 W3 KHARKHAREE XV 1% 1% STEAM 12 AKWM OCP W3 V/VI 3% 3% (KUMARIJORE PATCH) STEAM 13 W3 S.BANSJORA VIII 5% 6% STEAM 14 W3 NICHITPUR III 3% 2% STEAM 15 W4 TETULMARI V/VI 3% 2% STEAM 16 W3 SOUTH JHARIA VII/VIII (COMB) 6% 7% STEAM 17 W II BHOWRAH (N) VI - - STEAM 18 W3 GODHUR V/VI/VII/VIII (COMB) 4% 3% STEAM TOTAL 48% 48% Consumers are required to make RTGS Payment in favour of Bharat Coking Coal Limited A/c._______________ (name of the consumer along with their application) payable at Dhanbad and they must deposit the same during the commencement and expiry of the date of booking indicating their consumer code numbers along with Bank advice and other relevant details in Road Sales Section of BCCL up to 3.00 PM on each working day except Saturday when the same will be accepted till 1.00 PM.
    [Show full text]
  • Environmental Statement in Form-V Cluster No
    ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 1 (GROUP OF MINES) Environmental statement for the financial year ending 31st March, 2019 FOR THE YEAR: 2018-19 CONTENTS SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 7-17 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 18-22 II NOISE LEVEL 23 III MINE AND GROUND WATER QUALITY REPORT 24-30 IV GROUNDWATER LEVEL 31 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R. No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No.
    [Show full text]
  • Access Jharkhand-Obj07-04-2021-E-Book
    Index 01. Jharkhand Special Branch Constable (Close 16. JSSC Assistant Competitive Examination Cadre) Competitive Exam 01-09-2019 28.06.2015. 02. J.S.S.C. - Jharkhand Excise Constable Exam 17. Jharkhand Forest Guard Appointment Com- 04-08-2019 petitive (Prelims) Exam - 24.05.2015. 03. SSC IS (CKHT)-2017, Intermediate Level (For 18. Jharkhand Staff Selection Commission the post of Hindi Typing Noncommittee in Com- organized Women Supervisor competitive puter Knowledge and Computer) Joint Competi- Exam - 2014. tive Exam 19. Fifth Combined Civil Service Prelims Compet- 04. JUVNL Office Assistent Exam 10-03-2017 itive Exam - 15.12.2013. 05. J.S.S.C. - Post Graduate Exam 19-02-2017 20. Jharkhand Joint Secretariat Assistant (Mains) 06. J.S.S.C Amin Civil Resional Investigator Exam Examination 16.12.2012. 08-01-2017 21. State High School Teacher Appointment 07. JPSC Prelims Paper II (18.12.2016) Examination 29.08.2012. 08. JPSC Prelims Paper-I (Jharkhand Related 22. Jharkhand Limited Departmental Exam- Questions Only on 18.12.2016) 2012. 09. Combined Graduation Standard Competitive 23. Jharkhand Joint Secretariat Assistant Exam- (Prelims) Examinations 21.08.2016 2012. 10. Kakshpal appointment (mains) Competitive 24. Fourth Combined Civil Service (Prelims) Examination 10.07.2016. Competitive Examination - 2010. 11. Jharkhand Forest guard appointment (mains) 25. Government High School Teacher Appoint- Competitive Examination 16.05.2016. ment Exam - 2009. 12. JSSC Kakshpal Competitive (Prelims) Exam - 26. Primary Teacher Appointment Exam - 2008. 20.03.2016. 27. Third Combined Civil Service Prelims 13. Jharkhand Police Competitive Examination Competitive Exam - 2008. 30.01.2016. 28. JPSC Subsidiary Examination - 2007.
    [Show full text]
  • 01.04.2014 Date of Order: 19.11.2014
    CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Petition No. 274/2010 Coram: Shri Gireesh B. Pradhan, Chairperson Shri M. Deena Dayalan, Member Shri A.K.Singhal, Member Date of Hearing: 01.04.2014 Date of Order: 19.11.2014 In the matter of Approval of capital cost and determination of generation tariff of Maithon Power Limited (1050 MW) for the period from the date of commercial operation of Unit-I and Unit-II to 31.3.2014. And In the matter of Maithon Power Ltd, Jeevan Bharti, 10th Floor, Tower-I 124, Connaught Circus, New Delhi-110001 ……Petitioner Vs 1. Tata Power Delhi Distribution Ltd 33 kV Sub-station, Kingsway Camp Delhi –110 009 (2) Damodar Valley Corporation, DVC Towers, VIP Road Kolkata-700054 (3) West Bengal State Electricity Distribution Company Ltd, Bidyut Bhawan (8th Floor), Block-DJ, Sector-II Salt Lake, Kolkata-700091 (4) Punjab State Power Corporation Ltd The Mall, Secretariat Complex, Patiala – 147 001 (5) Tata Power Trading Company Ltd, Corporate Centre, 'A' Block 34, Sant Tukaram Road, Carnac Bunder, Mumbai -400006 …..Respondents Order in Petition No. 274/2010 Page 1 of 50 Parties Present: For Petitioner: Shri Apoorva Misra, Advocate, MPL Shri Aveek Chatterjee, MPL Shri Tarun Negi, MPL For Respondents: None ORDER This petition has been filed by Maithon Power Ltd (MPL) for approval of capital cost and determination of generation tariff of Maithon Right Bank Thermal Power Plant (Units-I and II) (2 x 525 MW) (hereinafter referred to as "the generating station") for the period from the anticipated date of commercial operation of Unit- I (25.12.2010) and Unit-II (25.4.2011) till 31.3.2014, based on the provisions of the Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations, 2009 ('the 2009 Tariff Regulations').
    [Show full text]
  • National Mega & Ultra Mega Power Plants
    NATIONAL MEGA & ULTRA MEGA POWER PLANTS • Mega Power Plant- According to a circular issued by the Government of India dated 10th November, 1995 regarding the ‘Setting up of power plants of capacity 1000 MW or more supplying power to more than one State’, Government of India had set the guidelines of setting up the mega power projects of capacity 1000 MW or more supplying power to more than one State had been issued vide D.O. letter N. C.- 286/95-IPC, dated 10th November, 1995. S. No. POWER PLANT STATE COMMISSIONED CAPACITY (MW) COAL BASED THERMAL POWER PLANTS 1. Sipat Thermal Power Station, NTPC Chhattisgarh 2,980 2. Korba Super Thermal Power Plant, Chhattisgarh 2,600 NTPC 3. Rihand Thermal Power Station, NTPC Uttar Pradesh 3,000 4. Singrauli Super Thermal Power Uttar Pradesh 2,000 Trans India Law Associates, Advocates & Legal Consultants Office: TILA SUITE, JA-120, DLF Tower - A, Jasola District Center, New Delhi-110025 Chamber: TILA Chamber No. 555, New Delhi Court Complex, New Delhi-110 001 Tel.: 91-11-26943664, Fax.: 91-11-26970075 Whatsapp: +91 9810070075 [email protected] www.tila.in NEW DELHI | Associates/Consultants all over India & Abroad Bangladesh/ Cameroon/ China/ Myanmar/ Nepal/ Singapore/ South Korea/ UAE Station, NTPC 5. NTPC Dadri Uttar Pradesh 1,820 6. Feroj Gandhi Unchahar Thermal Uttar Pradesh 1,050 Power Plant, NTPC 7. Barh Super Thermal Power Station, Bihar 3,300 NTPC 8. Talcher Super Thermal Power Station, Odisha 3,000 NTPC 9. Mejia Thermal Power Station, DVC West Bengal 2,340 10. Kahalgaon Super Thermal Power Bihar 2,340 Station, NTPC 11.
    [Show full text]
  • SUPREME COURT of INDIA Page 1 of 5
    http://JUDIS.NIC.IN SUPREME COURT OF INDIA Page 1 of 5 CASE NO.: Appeal (civil) 1736 of 2008 PETITIONER: Eastern Coalfields Ltd. & Ors RESPONDENT: Kalyan Banerjee DATE OF JUDGMENT: 04/03/2008 BENCH: S.B. Sinha & V.S. Sirpurkar JUDGMENT: J U D G M E N T CIVIL APPEAL NO. 1736 OF 2008 [Arising out of SLP (Civil) No. 7375 of 2006] S.B. SINHA, J : 1. Leave granted. 2. Respondent was an employee of Eastern Coal Fields Limited, Appellant No. 1 herein in the Mugma Area, in the district of Dhanbad, Jharkhand. The General Manager of the area, whose office is also situated at Mugma was his appointing and disciplinary authority. The services of the respondent were terminated at Mugma. He filed a writ application before the Calcutta High Court. As he was serving in the Mugma Area and the office of the General Manager was situated at Mugma which is in the State of Jharkhand, a preliminary objection was raised in regard to the jurisdiction of the Calcutta High Court. In support of the said objection, reliance was placed upon a decision of a learned Single Judge in N.N. Singh v. Coal India Limited [C.O. No. 5869 (W) of 1994]. 3. The learned Single Judge, however, disagreed with the said view and referred the matter to the Division Bench. The Division Bench by a judgment and order dated 26.03.2003 opined that the Calcutta High Court had no territorial jurisdiction to entertain the said writ petition stating: "\005In this case the Division Bench relying on an observation of the learned Single Judge held that since the registered office of Eastern Coalfields Ltd.