TENDER NOTICE

Sealed tenders based on item rates / percentage above or below on approved estimated (DNIT) amount are hereby invited, for the works mentioned below from the contractors / firms enlisted / renewed with C&W Department for the current financial year 2021-22 in the field of Highways Works. Tender documents can be obtained from the date of publication of invitation of bids in the newspaper from any of the below mentioned offices, upon written request accompanied with attested copies of enlistment / upto date renewal letter, PEC license, Identity Card of contractor / managing partner / director of the firm along with registered power of attorney and on payment of prescribed tender fee deposited in shape of original Challan Form-32-A deposited in National Bank of , under Head of Account C-02716-Others in favour of Executive Engineer Highway Division :- i) Chief Engineer (North), Highway Department, . ii) Commissioner, Sargodha Division, Sargodha. iii) Deputy Commissioner, Khushab. iii) Superintending Engineer, Highway Circle, Sargodha. iv) Executive Engineer Highway Division Khushab. v) Assistant Commissioner, Concerned.

Tendered rates and amounts should be filled in figures as well as in words and tenders should be signed as per general directions given in the tender documents. No rebate on tendered rates will be acceptable. Tender documents will be issued from the date of publication upto 13.08.2021 and will be received on 16.08.2021 from 02:00 PM to 02:30 PM and will be opened at 03.00 PM simultaneously in the offices of Chief Engineer (North), Punjab Highway Department, Lahore and Commissioner Sargodha Division, Sargodha on fixed date and time by the respective Tenders Opening Committee at the above venues in the presence of intending contractors or their authorized representatives. The conditional tenders and tenders not accompanied with earnest money @ 2% of the estimated cost in shape of CDR only from any scheduled Bank in favour of Executive Engineer, Highway Division Khushab and attested copies of registered partnership deed and power of attorney in case of firms will not be entertained. The procuring agency may reject all bids or proposal as per PPRA Rule 35 (Rejection of Bids). Estimated Earnest Sr. T.S No. & Tender Completion Name of Works Cost Money @ 2% No. Date Fee Time Rs. in Million Rs. in Million ANNUAL DEVELOPMENT PROGRAMME (NEW ADP 2021-22) 1 Rehabilitation / Improvement of road from Sargodha-Khushab-Mianwali road to EE No.1435/D 06 Shumar via Hayat Chowk (Length = 2.00 6.409 0.128 dated 10000 Months KM), (Reach 0.00 to 0.90= 0.9 Km) District 19.07.2021 Khushab. 2 Rehabilitation of road from main Khushab EE No.1436/D 06 Road to Kotli Length = 3.00 KM (Reach 9.613 0.192 dated 10000 Months 0.00 to 1.30= 1.30 Km) District Khushab 19.07.2021 3 Rehabilitation of road Naushehra- EE No.1437/D Sakessar road to Girls Degree College 06 9.993 0.200 dated 10000 Naushehra Length = 1.00 KM (Actual Months 19.07.2021 length 0.66 Km) District Khushab. 4 Rehabilitation / Improvement of road from Gunjial Noorpur road to Jay Singh via EE No.1438/D 06 Mitha Khoo (Length = 3.50 KM), (Actual 13.430 0.269 dated 10000 Months length 10.30 Km) Reach 8.90 to 19.07.2021 10.30=1.40 Km District Khushab.

Page 1 of 6

5 Construction of road from Khushab an Pull EE No.1439/D 06 to Dera Niaz Hussain Bochal Length 0.85 6.354 0.127 dated 10000 Months Km in District Khushab. 19.07.2021 6 Rehabilitation of road from Muzafargarh - EE No.1440/D Mitha Tiwana road including 47/MB to 06 3.205 0.064 dated 10000 48/MB (balance work) Length 676 Rft in Months 19.07.2021 District Khushab. 7 Construction of road from Khuhsab EE No.1441/D Minawali road to Shabir Colony via Moh. 06 7.269 0.145 dated 10000 Malik Asad Mundial, Jauharabad Length Months 19.07.2021 1600 Rft in District Khushab. 8 Rehabilitation/ Improvement of road from EE No.1442/D 06 Muzafargarh road to Chak No.13 and 14 2.303 0.046 dated 10000 Months Length 1850 Rft in District Khushab. 19.07.2021 9 Construction of road from Jauharabad to EE No.1443/D Skassar road via Asif Colony, Rasool 06 10.963 0.219 dated 10000 Nagar, Length 1.10 Km in District Months 19.07.2021 Khushab. 10 Construction of road from Noushera road EE No.1444/D 06 (Dada Golra) to Dhok Chapri Length 0.75 9.000 0.180 dated 10000 Months Km in District Khushab. 19.07.2021 11 Rehabilitation of road from main Katha EE No.1445/D 06 road to Moh. Sabirabad, Length 0.60 Km in 7.322 0.146 dated 10000 Months District Khushab. 19.07.2021 12 Rehabilitation of road Tiba Qaim Din to EE No.1446/D 06 Zakirabad Length 1.55 District Khushab. 13.719 0.274 dated 10000 Months 19.07.2021 13 Construction/Reconstruction of road block EE No.1447/D 06 No.6 and 12 Jauharabad Length 0.89 Km 9.135 0.183 dated 10000 Months District Khushab. 19.07.2021 14 Construction of road from Jauharabad Sarfraz Colony road to Khushab EE No.1448/D 06 Muzafargarh road Balance reachalongwith 9.986 0.200 dated 10000 Months Bola Drain Jauharabad Length 1.25 Km 19.07.2021 District Khushab. 15 Construction of road from Jauharabad EE No.1449/D Sarfraz Colony road to Khushab 06 9.994 0.200 dated 10000 Muzafargarh road Jauharabad Length 0.61 Months 19.07.2021 Km District Khushab. 16 Construction/ Reconstruction of road from AabadiTirkhanwali to By-pass road EE No.1450/D 06 Jauharabad via Ghareeb Colony 5.659 0.113 dated 10000 Months Jauharabad Length 0.60 Km District 19.07.2021 Khushab. 17 Construction of road from Khushab EE No.1451/D 06 Muzafargarh to Rehman Colony Length 13.616 0.272 dated 10000 Months 1.55 Km District Khushab. 19.07.2021 18 Construction of link road Jhugimanda EE No.1452/D 06 Muhammad Khan Manda Length 1.40 13.632 0.273 dated 10000 Months District Khushab. 19.07.2021 19 Rehabilitation of road from Aadhi Sargal to EE No.1453/D 06 40 DB (Length = 4.00 KM) Reach 0.00 to 13.723 0.274 dated 10000 Months 1.70 = 1.70 Km District Khushab 19.07.2021 20 Widening/ Reconstruction of road from EE No.1454/D 06 Khushab-Muzafargarh Road to Billo Farm 6.355 0.127 dated 10000 Months Length 0.72 Km District Khushab 19.07.2021 21 Widening/ Reconstruction of internal roads EE No.1455/D 06 in Hamoka Length 1.00 Km District 9.051 0.181 dated 10000 Months Khushab 19.07.2021 22 Widening/Improvement of road from SE No.1481/B Sargodha-Khushab- Mianwali road to 06 20.110 0.402 dated 10000 Mohajar Canal Branch (Length =2.50 KM), Months 24.07.2021 Actual length 1.78 Km District Khushab.

Page 2 of 6

23 Widening/Improvement of road from Mohajir Canal Branch to - SE No.1485/B 06 Sakessar road via Bandial Shumali 25.007 0.500 dated 10000 Months (Length =6.50 KM), Reach 0.00 to 24.07.2021 3.55=3.55 Km District Khushab. 24 Rehabilitation/ Improvement of road from SE No.1489/B Quaidabad-Harnoli road (Anwar Chowk) to 06 30.784 0.616 dated 10000 Chak No.35 DB Length = 8.00 KM (Reach Months 24.07.2021 0.00 to 4.60=4.60 Km) District Khushab. 25 Rehabilitation/ Improvement of road from SE No.1493/B Quaidabad Harnoli road to Chak No.36/DB 06 23.066 0.461 dated 10000 (Length = 6.00 KM), Reach 0.00 to Months 24.07.2021 3.30=3.30 Km District Khushab. 26 Rehabilitation/ Improvement of road from SE No.1497/B Okhali Mohla Quaidabad road to 06 16.168 0.323 dated 10000 DerajatBingi (Length = 5.00 KM), Reach Months 24.07.2021 0.00 to 2.00= 2.00 Km District Khushab. 27 Construction of road from Mohajir Canal SE No.1501/B Branch (Chussu) to Pull Habib Khel 06 32.688 0.654 dated 10000 (Length = 4.00 KM), Reach 0.00 to 3.80 = Months 24.07.2021 3.80 Km District Khushab. 28 Construction of road from Sargodha - Mianwali Road to Dera Falku-Khel, Dera SE No.1505/B 06 Ali-Khel, etc. Shumar, UC Gunjial Length = 33.414 0.669 dated 10000 Months 4.00 KM Actual length 4.20 Km District 24.07.2021 Khushab. 29 Rehabilitation of road from Golywali to SE No.1509/B 06 Riazabad Stop Length = 7.50 KM (Reach 24.153 0.483 dated 10000 Months 0.00 to 2.45= 2.45 Km District Khushab. 24.07.2021 30 Construction of road to Dhok SE No.1513/B 06 Dhatta, Dhok Lakshial Khushab Length = 41.687 0.834 dated 10000 Months 5.00 KM District Khushab 24.07.2021 31 Construction of road from Atta Rice Mills to SE No.1517/B 06 Mohajir Canal Branch (Length = 5.00 KM), 42.026 0.841 dated 10000 Months Actual length 4.00 Km District Khushab. 24.07.2021 32 Rehabilitation/ Improvement of road from SE No.1521/B to Chab (Length = 8.00 KM), 06 30.059 0.601 dated 10000 Reach 0.00 to 5.25 = 5.25 District Months 24.07.2021 Khushab. 33 Rehabilitation/ Improvement of road from Sargodha- Khushab-Mianwali road to Dera SE No.1525/B 06 Haji Shahadat Utra (Length = 4.00 KM), 15.387 0.308 dated 10000 Months Reach 0.00 to 2.42 = 2.42 Km District 24.07.2021 Khushab. 34 Reconstruction of road from Nehar Mohajir SE No.1529/B Branch to Golewali via Dera Iqbal 06 42.055 0.841 dated 10000 Golewali, Lift Irrigation Length 4.50 District Months 24.07.2021 Khushab. 35 Construction of road from Fateh Pur Goliwali road (Dera Gadian Wala) to Dera SE No.1533/B 06 Baqiwal, Dera Muqarab Khel (Length = 20.634 0.413 dated 10000 Months 2.50 KM) Reach 0.00 to 2.15 = 2.15 Km 24.07.2021 Actual length District Khushab. 36 Construction of road from Jauharabad SE No.1537/B 06 Morr to Dera Kandan via Chak No.5 Drain 27.389 0.548 dated 10000 Months Length 2.80 Km in District Khushab. 24.07.2021 37 Construction of road from Pull Pindi Kora SE No.1541/B 06 to village Nara Shumali in District Khushab 22.799 0.456 dated 10000 Months Length 2.50 Km. 24.07.2021 38 Construction of road from Head Shamral SE No.1545/B 06 Mohajir Canal Branch to Dera Majhial 22.876 0.458 dated 10000 Months Length 2.80 Km in District Khushab. 24.07.2021 39 Construction of road from Mohajir Canal SE No.1549/B 06 Branch to Derajat Nali Length 1.70 Km in 18.167 0.363 dated 10000 Months District Khushab. 24.07.2021

Page 3 of 6

40 Construction of road from Pull Dharyal SE No.1553/B Mohjir Canal Branch to Hero in District 06 18.111 0.362 dated 10000 Khushab Length 1.75 Km in District Months 24.07.2021 Khushab. 41 Construction of road from Khushab Katha SE No.1557/B 06 road, Chak No.65/MB Length 2.65 Km in 22.703 0.454 dated 10000 Months District Khushab. 24.07.2021 42 Widening/ Reconstruction of road from SE No.1561/B Nikro to Boranawala via Bambool Length 06 45.822 0.916 dated 10000 15.00 Km (Reach 0.00 to 6.95= 6.95 Km) Months 24.07.2021 District Khushab. 43 Construction/ Reconstruction of road from SE No.1417/B Mohal Colony to Jauharabad Sugar Mills 06 25.519 0.510 dated 10000 via Awan Town Jauharabad Length 1.50 Months 24.07.2021 Km District Khushab. 44 Construction of road from Bhan Bhaseen SE No.1421/B 06 to Bhan Angra Length 2.00 KM. District 18.389 0.368 dated 10000 Months Khushab. 24.07.2021 45 Construction/Reconstruction of Balance SE No.1425/B 06 reach Bola By-pass road Length 1.50 Km 16.407 0.328 dated 10000 Months District Khushab. 24.07.2021 46 Rehabilitation of roads Hadali (Bhan Teto 1.5 KM, Bhan Chekianwla 1KM, Bhan SE No.1429/B 06 Bhaseen 1.0, Bhan Angra 1.38 KM 21.998 0.440 dated 10000 Months (Section Bhan Bhaseen Angra 2.50 Km). 24.07.2021 District Khushab. 47 Construction of road from Hadali to SE No.1433/B 06 (Journally road) Length 3.50 Km District 34.827 0.697 dated 10000 Months Khushab. 24.07.2021 48 Rehabilitation of road from Mitha Tiwana- SE No.1437/B Aadhi Kot road Chak 21 MB to Girot Aadhi 06 41.268 0.825 dated 10000 Kot Road (Adda Muradabad) Length 6.80 Months 24.07.2021 Km District Khushab. 49 Rehabilitation of road from Noorpur Thal to District Boundary Khushab Bhakhar via SE No.1441/B 06 Jharkil to Maken (Length = 24.00 KM) 41.095 0.822 dated 10000 Months Reach 0.00 to 3.53= 3.53 Km District 24.07.2021 Khushab. 50 Widening/ Reconstruction of road from SE No.1445/B 06 Girot City to Langerwala bypass Road 45.293 0.906 dated 10000 Months Length 1.50 Km District Khushab 24.07.2021 51 Reconstruction of road from JARA to SE No.1449/B 06 Jharkil Length 2.42 Km District Khushab. 25.569 0.511 dated 10000 Months 24.07.2021 52 Widening/ Reconstruction of road from SE No.1453/B 06 Shahwala to Mahmood Shaheed Length 18.261 0.365 dated 10000 Months 1.79 Km District Khushab. 24.07.2021 53 Mitha Tiwana - Mitha Tiwana (Bhan SE No.1457/B 06 Dhiliyanwala to Dera JatMahal Length 2.00 16.500 0.330 dated 10000 Months Km District Khushab. 24.07.2021 54 Widening/ Reconstruction of road from SE No.1461/B 06 Botala to Chak 42 MB Length 3.00 Km 29.194 0.584 dated 10000 Months District Khushab. 24.07.2021 55 Repair/ Rehabilitation of Road Rangpur SE No.1465/B Kalurkot Road Adda Arshadabad to 06 45.902 0.918 dated 10000 Mehmood Shaheed Via Chak 51 DB) Months 24.07.2021 Length 4.85 Km District Khushab. 56 Khushab Mianwali road to Derajat Norgi SE No.1469/B Tiwana Botala Length 2.00 Km (Reach 06 16.505 0.330 dated 10000 0.00 to 1.50= 1.50 Km= 1.50 Km) District Months Khushab. 24.07.2021

57 Construction of road from NPT City to SE No.1473/B Bhan Baggianwala Length 4.15 Km District 06 31.776 0.636 dated 10000 Khushab. Months 24.07.2021

Page 4 of 6

58 Construction of road from Chak 13 Alf to SE No.1477/B 06 Dravi Length 1.94 Km District Khushab. 18.163 0.363 dated 10000 Months 24.07.2021 59 Rehabilitation of road from Pakistan Totel SE No.1405/B 06 to Dera Khizar Sangha Length 3.00 Km 22.250 0.445 dated 10000 Months District Khushab. 24.07.2021 60 Rehabilitation/ Reconstruction of road from SE No.1409/B Gunjial Noorpur road to Chak 40 DB via 06 31.969 0.639 dated 10000 Aadhi Sargal Length 8.00 Km. (Reach 5.00 Months to 8.00 = 3.20 Km District Khushab. 24.07.2021 61 Construction of road from Kurrar to SE No.1413/B 06 Khushab Lillah road Length 2.70 Km. 21.792 0.436 dated 10000 Months District Khushab. 24.07.2021

62 Widening/Improvement of road from Shah CE (N) wala to Anwar Chowk including link road No.1101/P 06 100.280 2.006 10000 Jhajha and Mehru (Length = 9.55 KM), dated Months Actual length 9.20 Km District Khushab. 23.07.2021 63 Rehabilitation/ Improvement of road from CE (N) Khushab, Naushera road (Khura) to Trairi No.1102/P 06 67.954 1.360 10000 Length 5.15 Km in District Khushab. dated Months 23.07.2021 64 Rehabilitation of road from Gunjial Noorpur CE (N) road to Mitha Khu (Length = 6.00 KM), No.1103/P 06 62.951 1.260 10000 Actual length 5.50 Km District Khushab. dated Months 23.07.2021 65 Widening/Reconstruction of road from Khushab Muzafargarh road to Noorpur CE (N) Thal road via Aino Dhamak Length 30 Km No.1104/P 06 112.888 2.258 10000 (Group-1 From Noopur Thal to Dhamak dated Months 7.5 Km) District Khushab. 23.07.2021

66 Rehabilitation/ Reconstruction of road from CE (N) Shakar Kot to Anga via KotliUgali and Kufri No.1105/P 06 149.988 2.100 10000 Morr Length 11.50 Km District Khushab. dated Months 23.07.2021 67 Widening/ Reconstruction/ Construction of Link Roads on Khushab Muzafargarh road to Villages (Burhan 2 KM, (Reach 0.00 to 1.30=1.30 Km) Majoka 3.5KM,(Reach 0.00 to 2.32=2.32 Km) Sath Shahani 2.5, (Reach 0.00 to 2.30=2.30 Km) KM, New CE (N) No.1106/P 06 Majoka 1.75 KM, (Reach 0.00 to 0.50=0.50 89.985 1.800 10000 Km) Obhal to Sheikh Panja 0 .75 KM), dated Months Tetri 1.5, (Reach 0.00 to 0.50=0.50 Km) 23.07.2021 Bhan Jorianwala 0.75 reach 0.00 to 0.6 KM, Behlol Pur 1 KM reach 0.00to 0.85=0.85,ThathiLanger 1.5 km, (Reach 0.00 to 1.00=1.00 Km) District Khushab.

68 Widening/ Reconstruction of road from CE (N) Noorpur Thal to Kalwal via Shahwala (NPT No.1107/P 06 69.928 1.399 10000 to Shahwala) (Length 27.00 KM) Reach dated Months 0.00 to 6.05=6.05 Km District Khushab. 23.07.2021 69 Widening/ Reconstruction of road from CE (N) Khushab Mianwali Road to Panja via Bijar No.1108/P 06 Length 8.40 Km District Khushab. 89.910 1.798 10000 dated Months 23.07.2021 70 Winding/ Rehabilitation of road from Kufri CE (N) More/ Chowk to Angah, Length 6.25 KM No.1109/P 06 (Reach 0.00 to 5.25= 5.25 Km) in District 77.475 1.550 10000 dated Months Khushab. 23.07.2021 Page 5 of 6

ANNUAL DEVELOPMENT PROGRAMME Improvement/ Repair of Internal road/ CE (N) streets of Jauharabad City 14 Nos. No.775/Plg 09 1 53.235 1.065 10000 Schemes, District Khushab (Phase-I) dated Months Group-II. 23.06.2021 SUGAR CANE DEVELOPMENT CESS FUNDS Widening/ Reconstruction of road from SE No.1124/B Sargodha Khushab Mianwali road to Ukhli 06 1 34.156 0.683 dated 10000 Mohla, including Link Length 5.14 KM in Months 24.06.2021 District Khushab. Rehabilitation of road from Pak Kuwait EE No.996/D Textile Mills to Bola (Balance Reach) 02 2 8.396 0.168 dated 10000 Length 2725 Rft (0.83 KM) in District Months 09.06.2021 Khushab. COMMUNITY DEVELOPMENT

PROGRAMME PHASE-II Construction of road from (i) Mitha Tiwana Okhli Mohla road to Khaghli (Length 1 SE No.1128/B 06 1 KM). (ii) From Mosque Muhammad Khan 19.384 0.388 dated 10000 Months (Bandial) to Dera Jaat (Length 1.8 KM) in 24.06.2021 District Khushab. Construction of road from Railway EE No.994/D Pull (Muhajir Branch) to Govt. Elementary 03 2 12.827 0.257 dated 10000 School Canal Colony Gunjial Shumali Months 09.06.2021 (Length 2.07 KM) in District Khushab. Construction of road from Bhan Bhaseen EE No.1081/D 03 3 Block No.29 and Bola Length 4710 Rft in 10.277 0.206 dated 10000 Months District Khushab. 17.06.2021

If any tender or all tenders are not matured/ received on fixed date and time due to any reason then the same would be received on next working day i.e. 17.08.2021 at same time and venue.

Executive Engineer, IPL Superintending Engineer, Highway Division Khushab Highway Circle Sargodha No.7484