Honda of the UK Manufacturing Security Office Fit-Out
Total Page:16
File Type:pdf, Size:1020Kb
Project Showcase Honda of the UK Manufacturing Security Office Fit-Out Office & Commercial CP1 Security Office We broke up the existing office The masterpiece was the curved Moving Wall Room 508 into 3 separate rooms, the larger frontage for the reception desk, Honda UK Manufacturing, in one being used for the main which was formed out of specialist We also installed a Solo Acoustic Swindon – one of the largest operators and receptionist, and flexible gypsum board and a Moving wall from Creatif during car manufacturers in the UK the 2 smaller rooms being a 24- beautiful curved 50mm thick the Honda factory shutdown – approached Cobus about hour CCTV monitoring station and counter top, with the surroundings at the beginning of June 2017. refurbishing one of their security kitchenette. being finished to a very high We did this to divide their main offices. As requested, we came up standard by our senior decorating conference facility into two and with several alternative designs At the client’s request we stripped team. Chemistry desking and still maintain a maximum degree to not only freshen and update out the existing ceilings, walls, storage from Senator was then of soundproof performance. With the office, but to completely partitions, doors, blinds, FF&E and installed on top of the newly laid each panel having an integral reconfigure it. By constructing internal glazing. A new ceiling Forbo Allura Flex “concrete-effect” electronic seal on both the top a curved front with integrated with updated aircon unit and LED flooring. Clipper Mesh Back Task and bottom, the result was not reception desk, we created more lighting was installed, followed Chairs and black Bisley A3 Multi- only that of high quality, but space in the office and extended closely by new internal partitions drawer units were then provided fantastic to look at – both closed, the receptionist’s position into the and doors. to turn it into a productive, state partly and fully open. foyer. This design was inspired of the art and up-to-date 24-hour by the all-important transitional Security and Reception area. previous year (2016) for Honda, Frameless 10mm laminated glazed where they became the global panels were used on the counter production hub for the new Civic top to finish it off from the foyer hatchback. and staff entrance. Project Date: June 2017 Project Manager: Simon Coldrick Project Value: ££ Categories: Office & Commercial Honda of the UK Manufacturing - Security Office Fit-Out - Manufacturing UK the Honda of Office & Commercial We’d love to work with you too, whether that’s designing and installing your next interior project or supplying the furniture for your commercial, educational or social and living spaces. To discover more about how we’re changing people’s lives by transforming their interior spaces, contact: 01452 418789 or [email protected]. To see more inspiring spaces, visit cobus-spaces.com. Cobus Spinnaker Road t. 01452 418789 Hempsted e. [email protected] Gloucester GL2 5FD w. cobus-spaces.com.