TFKT 10 2015 Kai Tak Development Progress Report

Total Page:16

File Type:pdf, Size:1020Kb

TFKT 10 2015 Kai Tak Development Progress Report Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of October 2015 (Paper No. TFKT/10/2015) Planning Vision/ Themes/ Initiatives Planning Vision A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing Kowloon East initiatives 2 Kai Tak Outline Zoning Plan San Po Kong Basic information: Site Area : ~ 320 ha Kowloon City Open Space : ~ 100 ha Waterfront : ~ 11 km Infrastructure works Kowloon Bay Total cost : more than HK$100B Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm Kwun Tong Legend : Kai Tak Land Use Zoning Kwun Tong Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project 新蒲崗 Reconstruction and San Po Kong Upgrading of Kai Tak Nullah (2016-18) 九龍城 Kowloon City Stage 3A Infrastructure Works at North Apron (mid 2017) Shatin to Central Link (2019) 啟德發展區 Stage 1 & 2 Infrastructure Works at North Apron Kai Tak Development (2013 & 2015) 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North Apron 馬頭角 Ma Tau Kok Stage 3 Infrastructure Works For Developments (end 2016) at Southern Part of Former Runway (2019) Advanced Infrastructure Works for KTCT (2013) 觀塘 觀塘避風塘 Kwun Tong Kwun Tong Typhoon Shelter Kai Tak Approach Channel and Kwun Tong Stage 2 Infrastructure Works For Developments Typhoon Shelter Improvement Works (Phase 1) at Southern Part of Former Runway (2014) (2019) Dredging Works for 2nd berth Legend: (early 2016) Completed Under Construction / to be constructed in 2015 4 Major Supporting Infrastructure and Related Works Project 新蒲崗 San Po Kong Stage 3B Infrastructure Works at North Apron 九龍城 Stage 5 Infrastructure WorksKowloon City at North Apron 啟德發展區 Kai Tak Approach Channel and Kwun Tong Typhoon Kai Tak Development Shelter Improvement Works (Phase 2) 九龍灣 Kowloon Bay 馬頭角 Ma Tau Kok Local Roads at South Apron Route 6 (Central Kowloon Route) 觀塘 Kwun Tong Route 6 (Trunk Road T2) Road D3 (Metro Park Section) 觀塘避風塘 Kwun Tong Typhoon Shelter Legend: Projects under Active Planning 5 Major G/IC Buildings / Facilities and Development Sites 新蒲崗 San Po Kong Public Rental Housing (2013) Trade and Industry Tower (2015) 九龍城 Kowloon City 九龍灣 Kowloon Bay 馬頭角 Kai Tak Fire Station cum Ma Tau Kok Ambulance Depot (2013) 觀塘 Kwun Tong 觀塘避風塘 Kwun Tong Typhoon Shelter Kai Tak Cruise Terminal (2013 & 2014) Legend: Completed Under Construction Projects under Active Planning 6 Major G/IC Buildings / Facilities and Development Sites 新蒲崗 San Po Kong 2 Primary Schools (2015) Trade and Industry Tower (2015) 九龍城 Kowloon City Public Rental Housing (2013) 九龍灣 Residential Development sites Kowloon Bay Po Leung Kuk Stanley Ho Sau Nan Primary School 馬頭角 Ma Tau Kok Hong Kong Children’s Hospital (2017) 觀塘 Kai Tak Fire Depot (2013) Kwun Tong 觀塘避風塘 Kwun Tong Typhoon Shelter Kai Tak Cruise Terminal (2013) Artist’s Impression SHK Holy Cross Primary School Hong Kong Children’s Hospital Artist’s Impression Artist’s Impression Legend: Completed Under Construction Projects under Active Planning 7 Major G/IC Buildings / Facilities and Development Sites Kowloon East Regional Headquarters & Joint-User Building 新蒲崗 San Po Kong Operational Base cum Ngau Tau Kok Divisional Police Station (2019) Inland Revenue Tower Secondary School Trade and Industry Tower 2 Primary Schools (2015) 九龍城 (2015) Kowloon City Public Rental Housing (2013) 九龍灣 Residential Development sites Kowloon Bay Multi-purpose Sports Complex Kai Tak New Acute Hospital Kai Tak Fire Depot (2013) Hong Kong Children’s Hospital (2017) 觀塘 Kwun Tong 觀塘避風塘 Kai Tak Cruise Terminal Multi‐purpose Sports Complex (MPSC) Kwun Tong Typhoon Shelter (2013) Artist’s Impression Legend: Completed Under Construction Projects under Active Planning 8 Major Open Space and Recreational Projects Station Square Avenue Park Phase 1 Sung Wong Toi Park Waterfront Promenade adjacent to HKCH Kwun Tong Promenade Stages 1 and 2 Hoi Sham Park Extension KTCT Park Legend: Completed Under Design Stage (TF consulted) Runway Park Phase 1 Projects under Active Planning Kai Tak Fantasy • International Ideas Competition result announced in Nov 2014 Kai Tak 2.0: Healthy Lift Off • Planning and Urban Design Review for Developments at Runway Tip (be commenced in end 2015) • Planning and Engineering Study on Kwun Tong Action Area (be commenced in early 2016) • Inviting EOI for the development of Tourism Node (till Dec 2015) Revitalizing Ex‐fireboat Pier Ex-fireboat Pier Pier Footpath to Shing Fung Road Pier 11 Environmental Friendly Linkage System (EFLS) • Detailed feasibility study commenced in October 2015 • Evaluate most suitable green public transport mode(s) • Formulate integrated multi-modal linkage system • Examine financial viability, environmental acceptability and technical feasibility of EFLS • Target to complete in phases by end 2017 Artist’s Impression 12 Cycle Track Network in Kai Tak Development • Feasibility study to commence in late November 2015 • Review alignment and connections with adjacent districts • Develop schematic design with ancillary facilities including rental & parking provision • Examine implementation approach and management options 新蒲崗 Legend:Legend: San Po Kong 彩虹 Choi Hung 啟德發展區邊界Access Point to KTD KTD Site Boundary KTD Site Boundary 分區計劃大綱圖說明書中的單車俓 九龍城 Cycle Track in PODP Kowloon City (走綫由詳細設計硏究) CycleProposed Track Cycle in ES Trackof Kai ExtensionTak OZP Loop (Alignment subject to detailed design) Access Point ‐ with Additional Width 九龍灣 建議延長網絡Reserved for Future走綫由未來發展及詳 Cycle Track Kowloon Bay ( Proposed Cycle Track Extension – 細設計硏究Provision ) 馬頭圍 Proposed Cycle Track Extension Ma Tau Wai Proposed Bicycle Rental Facilities Network (Alignment subject to future Exchange Meeting developmentScenic Spots/Historical and detailed & Cultural design) Interest/Tourism Attractions 土瓜灣 To Kwa Wan 觀塘 Kwun Tong Cycle track running along Kwun Tong Transportation Link 13 Public Creatives – Pedestrian Street Naming Objectives: • A public event under the Public Creatives concept • Promotion of sense of ownership Scope: • 10 pedestrian streets within Grid Neighborhood Adoption of Winning Entries • At full discretion of Government Thank You.
Recommended publications
  • Rail Construction Commences
    Kowloon City Section Newsletter June 2012 Rail construction commences The Shatin to Central Link (SCL) project was first gazetted under the "Railways Ordinance" on 26 November 2010, followed with the first and second amendment schemes gazetted on 15 July and 11 November 2011 respectively. The Legislative Council’s Finance Committee approved funding for the SCL project in May 2012. Following the funding approval, the construction of the project commences. The Tai Wai to Hung Hom Section is expected to be completed in 2018 followed by the Hung Hom to Admiralty Section in 2020. Benefits Upon its completion, the SCL will provide a fast, reliable and convenient rail service to Kai Tak, To Kwa Wan, Ma Tau Wai and Ho Man Tin areas, which are not yet served by the network. Passengers from the Kowloon City district will be able to travel directly to destinations in New Territories East and West through the "East West Corridor" formed by the Ma On Shan Line, the Tai Wai to Hung Hom Section and the West Rail Line; while the Hung Hom to Admiralty Section will further link up the existing railway network. The Tai Wai new service will give passengers more options to Che Kung Temple reach their destinations and with more convenient interchanges, making it easier to travel around Hong Hin Kong Island, Kowloon and the New Territories. Keng Diamond Alignment 圭⨑戍 Hill Lai Chi Kok Kowloon Tong Wong Tai Sin ⶾᛚ The Kowloon City Section of the SCL will have four stations - Kai Tak, Lok Fu Cheung Sha Wan 䏹䒔ល To Kwa Wan, Ma Tau Wai and Ho Man Tin Stations.
    [Show full text]
  • South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review
    THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION PLANNING DEPARTMENT Agreement No. CE4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review Technical Report No.4H Preliminary Sustainability Assessment (February 2007) CITY PLANNING – MAUNSELL JOINT VENTURE in association with Atkins China Ltd. Edaw Urban Design Ltd. ADI Ltd. Agreement No: CE 4/2004 (TP) South East Kowloon Development Comprehensive Planning and Engineering Review Stage 1: Planning Review (Feasibility Study) Preliminary Sustainability Assessment Table of Contents Abbreviation and Acronyms 1. INTRODUCTION 1-1 1.1 Purpose 1-1 1.2 Report Structure 1-1 2. REVISED PRELIMINARY OUTLINE DEVELOPMENT PLAN 2-1 2.1 Study Area and Major Proposals 2-1 2.2 Land Use Budget and Key Development Parameters 2-2 3. ASSESSMENT APPROACH 3-1 3.1 Sustainability Development 3-1 3.2 Purpose of Sustainability Assessment 3-1 3.3 Approach of the Present PSA 3-1 4. PRELIMINARY SUSTAINABILITY ASSESSMENT 4-1 4.1 Economy 4-1 4.2 Natural Resources 4-4 4.3 Society and Social Infrastructure 4-7 4.4 Leisure and Cultural Vibrancy 4-8 4.5 Environmental Quality 4-9 4.6 Mobility 4-11 4.7 Other Major Considerations: Non-quantifiable Indicators 4-11 4.8 Other Major Considerations: Non-quantifiable Issues 4-17 5. SUMMARY AND CONCLUSION 5-1 5.1 Summary 5-1 5.2 Conclusion 5-5 List of Tables Table 2.2.1 Land Use Budget for the Study Area Table 2.2.2 Key Development Parameters Table 3.3.1 CASET Indicators Not Relevant to the Present Study Table 3.3.2
    [Show full text]
  • Laforet, Causeway Bay Castle Peak Road, Yuen Long (Near HSBC) Training / Day Off Nathan Road, Prince Edward (Near Pioneer Centre
    WWF - DDC Location Plan Apr-2016 Mon Tue Wed Thu Fri Sat Sun 1 2 3 Castle Peak Road, Yuen Long Team A Laforet, Causeway Bay Training / Day off (near HSBC) Nathan Road, Prince Edward Team B Lam Tin Estate Training / Day off (near Pioneer Centre) 4 5 6 7 8 9 10 Chai Wan Road, Chai Wan San Fung Avenue, Sheung Shui Yun Ping Road, Causeway Bay 8/F, Cheung Kong Electronic Building, Team A Training / Day off Sai Wan Belcher Street, Sai Wan Training / Day off (near Bank of China) (near HSBC) (Near Hang Seng Bank) Kwun Tong Sing Woo Road, Happy Valley Bonham Strand Street, Sheung Wan Sai Ying Pun MTR Station Castle Peak Road, Yuen Long Castle Peak Road, Sham Tseng Chuk Yuen Shopping Centre, Team B Training / Day off (Happy Valley wet market) (near Municipal Services Building) Exit C (near HSBC) (near Rhine Garden) Wong Tai Sin 11 12 13 14 15 16 17 Cheung Sha Wan Road, Lai Chi Kok Kowloon Tong MTR Station Ma Tau Wai Road, To Kwa Wan Great George Street, Chan Man Street, Sai Kung Team A Amoy Plaza, Kownloon Bay Amoy Plaza, Kownloon Bay (near Cheung Sha Wan Plaza) Exit C (near Horae Place) Causeway Bay (near Library) Castle Peak Road, Yuen Long Sing Woo Road, Happy Valley Yun Ping Road, Causeway Bay Nam Ning Street, Aberdeen Team B Amoy Plaza, Kownloon Bay Amoy Plaza, Kownloon Bay Training / Day off (near HSBC) (Happy Valley wet market) (near Hang Seng Bank) (near Aberdeen Centre) 18 19 20 21 22 23 24 Team A Amoy Plaza, Kownloon Bay Hang Hau MTR Station Exit A Shek Kip Mei MTR Station Exit C Mikiki Mall, San Po Kong Mikiki Mall, San Po Kong Mikiki
    [Show full text]
  • Hong Kong Government's Policy Address 2020
    Hong Kong Government’s Policy Address 2020 Key Takeaways primarily relevant to the Real Estate and Infrastructure sector November 25, 2020 Summary Authors/Presenters This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land Andrew MacGeoch and housing supply, infrastructure, the environment, Co-Author collaboration with the Greater Bay Area (“GBA”), and HK’s Partner and Regional Practice Group Leader - Real Estate ongoing role as an international financial center. We set Asia out a list of key takeaways below highlighting primarily Hong Kong [email protected] those aspects involving real estate and infrastructure. OPENING This year’s Policy Address was delivered today (25th November 2020) amidst the backdrop of a changing and dynamic environment. The Chief Executive (“CE”) has set out a variety of key initiatives to address the city’s land and housing supply, infrastructure, the environment, collaboration with the Greater Bay Area (“GBA”), and HK’s ongoing role as an international financial center. We set Page 1 of 11 out a list of key takeaways below highlighting primarily those aspects involving real estate and infrastructure. LAND SUPPLY Increasing land supply is a top priority of the Government. Glenn Haley At present, the Government has identified new land supply Co-Author with a total area of 90 hectares along the Northern Link, Partner Hong Kong including the San Tin / Lok Ma Chau Development Node. [email protected] Further initiatives to support the increase of land supply include: Development of Siu Ho Wan Depot Site.
    [Show full text]
  • 126 Chapter 19 SWD – Central and Islands 4/F, Harbour Building 2852
    SWD – Central and Islands 4/F, Harbour Building 2852-3137 Integrated Family 38 Pier Road, Central Service Centre Hong Kong SWD – High Street G/F, Sai Ying Pun 2857-6867 Integrated Family Community Complex Service Centre 2 High Street, Sai Ying Pun Hong Kong SWD – Aberdeen Unit 2, G/F, Pik Long House 2875-8685 Integrated Family Shek Pai Wan Estate Service Centre Aberdeen, Hong Kong The Hong Kong Catholic G/F, La Maison Du Nord 2810-1105 Marriage Advisory Council 12 North Street – Grace and Joy Integrated Kennedy Town, Hong Kong Family Service Centre 126 Chapter 19 Caritas – Hong Kong – 3/F & 5/F, Caritas Jockey Club 2555-1993 Caritas Integrated Family Aberdeen Social Centre Service Centre – Aberdeen 20 Tin Wan Street (Tin Wan / Pokfulam) Aberdeen, Hong Kong The Neighbourhood 1/F, Carpark 1 3141-7107 Advice-Action Council Yat Tung Estate, Tung Chung – The Neighbourhood Lantau Island Advice-Action Council Tung Chung Integrated Services Centre Hong Kong Sheng Kung Shop 201, 2/F 2525-1929 Hui Welfare Council Fu Tung Shopping Centre Limited – Hong Kong Fu Tung Estate Sheng Kung Hui Tung Tung Chung, Lantau Island Chung Integrated Services SWD – Causeway Bay 2/F, Causeway Bay 2895-5159 Integrated Family Community Centre Service Centre 7 Fook Yum Road North Point, Hong Kong SWD – Quarry Bay 2/F & 3/F, The Hong Kong 2562-4783 Integrated Family Federation of Youth Groups Service Centre Building, 21 Pak Fuk Road North Point, Hong Kong SWD – Chai Wan (West) Level 4, Government Office 2569-3855 Integrated Family New Jade Garden Service Centre 233 Chai
    [Show full text]
  • LC Paper No. PWSC81/20-21(01) - 2
    LC Paper No. PWSC81/20-21(01) - 2 - Encl. c.c.(w/e) Antiquities and Monuments Office (Attn: Ms. Susanna SIU) Architectural Services Department (Attn: Ms. Jackie LEE) Leisure and Cultural Services Department (Attn: Mr. Horman CHAN) Civil Engineering and Development Department (Attn: Mr. Ricky CHAN) Enclosure Legislative Council Public Works Subcommittee PWP Item 470RO – Lung Tsun Stone Bridge Preservation Corridor at Kai Tak Follow-up Actions arising from the Meeting held on 27 January 2021 The Public Works Subcommittee discussed the LegCo Paper No. PWSC(2020-21)31. In response to the request from the Chairman and Hon Junius HO Kwan-yiu, the Administration hereby provide the following supplementary information to elaborate the heritage and historic value of remnants of Lung Tsun Stone Bridge (LTSB), and how the proposed item of LTSB preservation corridor can effectively preserve and interprete its heritage and historical values. The relevant supplementary information is as follows: History of LTSB 2. Built between 1873 and 1875, Lung Tsun Stone Bridge (LTSB) was was originally about 210 meters in length and 2.6 to 4 meters in width (Photo 1). In 1892, a wooden extension of 80 metres was added by the local charity organisation Lok Sin Tong (樂善堂) after fund raising (Photo 2). In 1910, the timber extension of LTSB was replaced by a concrete structure, which was later modified to become the Kowloon City Pier. Part of LTSB was buried by the Kai Tack Bund reclamation carried out by the Government between 1916 and 1924 at the west shore of Kowloon Bay for property development.
    [Show full text]
  • Tfkt-04-2017
    Task Force on Kai Tak Harbourfront Development Kai Tak Development Progress Report as of February 2017 (Paper No. TFKT/04/2017) Planning Vision/ Themes/ Initiatives Planning Vision A distinguished, vibrant, attractive and people-oriented community by the Victoria Harbour Planning Themes/ Initiatives Heritage, green, sports and tourism hub of Hong Kong Green web for sustainable development Quality living environment Help regenerate adjacent old districts under Energizing Kowloon East initiatives 2 Kai Tak Outline Zoning Plan San Po Kong Basic information: Site Area : ~ 320 ha Kowloon City Open Space : ~ 100 ha Waterfront : ~ 11 km Infrastructure works Kowloon Bay Total cost : more than HK$100B Gross Floor Area - Non-domestic : ~ 2.3M sqm - Domestic : ~ 2.2M sqm Kwun Tong Legend : Kai Tak Land Use Zoning Kwun Tong Typhoon Shelter Commercial Comprehensive Development Area Residential (Group A) Residential (Group B) Residential (Group C) Government, Institution or Community Open Space Other Specified Uses Other Specified Uses (Amenity Area) 3 Major Supporting Infrastructure and Related Works Project Stage 3B Infrastructure Works at North Apron 新蒲崗 CEDD (2020) Reconstruction and San Po Kong Upgrading of Kai Tak Nullah CEDD (2018) Stage 3A Infrastructure Works at North Apron 九龍城 CEDD (2017) Stage 5A InfrastructureKowloon Works City at North Apron CEDD (2020) Stage 1 & 2 Infrastructure Works at North Apron CEDD (2013 & 2015) Shatin to Central Link HyD (2019) 啟德發展區 Kai Tak Development 九龍灣 Stage 4 Infrastructure Kowloon Bay Works at North
    [Show full text]
  • Bank of China (Hong Kong)
    Bank of China (Hong Kong) Bank Branch Address 1. Central District Branch 2A Des Voeux Road Central, Hong Kong 2. Prince Edward Branch 774 Nathan Road, Kowloon 3. 194 Cheung Sha Wan Road 194-196 Cheung Sha Wan Road, Sham Shui Po, Branch Kowloon 4. Pak Tai Street Branch 4-6 Pak Tai Street, To Kwa Wan, Kowloon 5. Tsuen Wan Branch 297-299 Sha Tsui Road, Tsuen Wan, New Territories 6. Kwai Chung Road Branch 1009 Kwai Chung Road, Kwai Chung, New Territories 7. Sheung Kwai Chung 7-11 Shek Yi Road, Sheung Kwai Chung, New Branch Territories 8. Ha Kwai Chung Branch 192-194 Hing Fong Road, Kwai Chung, New Territories 9. Fuk Tsun Street Branch 32-40 Fuk Tsun Street, Tai Kok Tsui, Kowloon 10. Kwong Fuk Road Branch 40-50 Kwong Fuk Road, Tai Po Market, New Territories 11. Texaco Road Branch Shop A112, East Asia Gardens, 36 Texaco Road, Tsuen Wan, New Territories 12. Cheung Hong Estate 2 G/F, Commercial Centre, Cheung Hong Estate, Commercial Centre Branch Tsing Yi Island, New Territories 13. Kin Wing Street Branch 24-30 Kin Wing Street, Tuen Mun, New Territories 14. Choi Wan Estate Branch Shop Nos. A317 and A318, 3/F, Choi Wan Shopping Centre Phase II, No. 45 Clear Water Bay Road, Ngau Chi Wan, Kowloon 15. Lung Hang Estate Branch 103 Lung Hang Commercial Centre, Sha Tin, New Territories 16. Lei Cheng Uk Estate Shop 108, Lei Cheng Uk Commercial Centre, Lei Branch Cheng Uk Estate, Kowloon 17. Heng Fa Chuen Branch Shop 205-208, East Wing Shopping Centre, Heng Fa Chuen, Chai Wan, Hong Kong 18.
    [Show full text]
  • Hang Seng Bank Branch Location
    Hang Seng Bank Bank Branch Address 1. Wong Tai Sin Branch Shop No.121A, Level 1, Wong Tai Sin Plaza 2. MTR Kwai Fong Station (This branch was closed after July 31, 2021) Office 3. Metro City Branch Shop 211, Level 2, Metro City, Phase 1 4. Lok Fu Plaza Branch Shop G202, Lok Fu Plaza 5. Castle Peak Road Branch 339 Castle Peak Road 6. Quarry Bay Branch 989 King's Road 7. Polytechnic University Room VA207, The HK Polytechnic University Branch 8. Shau Kei Wan Branch Shop 6, 1/F, i-UniQ Residence, 295 Shau Kei Wan Road 9. Tai Po Branch 35 Kwong Fuk Road 10. Johnston Road Branch 142 Johnston Road 11. Taikoo Shing Branch Shop G15, G/F, Fu Shan Mansion, 25 Taikoo Shing Road 12. Tam Kung Road Branch 38 Tam Kung Road 13. 141 Prince Edward Road 141 Prince Edward Road Branch 14. Aberdeen Centre Branch 10 Nam Ning Street 15. Fanling Branch 9 Luen Hing Street, Luen Wo Market 16. Sheung Wan Branch Shop 9-10, 1/F, Tung Ning Building, 251 Des Voeux Road Central 17. Tsz Wan Shan Branch 63 Fung Tak Road 18. Tai Wai Branch 33 Tai Wai Road 19. Mei Foo Sun Chuen (Nassau 10 Nassau Street St) Branch Bank Branch Address 20. Mei Foo Sun Chuen (Nassau Shops Nos. N23-N25, G/F, Nos. 1-15, 2-24 Nassau St) Prestige Banking Centre Street, Mei Foo Sun Chuen 21. San Fung Avenue Branch 53 San Fung Avenue 22. San Fung Avenue Prestige 94 San Fung Avenue Banking Centre 23.
    [Show full text]
  • Kowloon P P P
    Branch ATM District Branch / ATM Address Voice Navigation ATM Prince Edward Branch 774 Nathan Road, Kowloon P P P Fuk Tsun Street Branch 32-40 Fuk Tsun Street, Tai Kok Tsui, Kowloon P P P P 4-4A Humphrey's Avenue, Tsim Sha Tsui, Humphrey's Avenue Branch P P Kowloon Mong Kok (Silvercorp Int'l Tower) Shop B, 707-713 Nathan Road, Mong Kok, P P P P Branch Kowloon 1/F, Sino Cheer Plaza, 23-29 Jordan Road, Jordan Road Branch P P Kowloon Mong Kok Branch 589 Nathan Road, Mong Kok, Kowloon P P Prince Edward Road West (Mong Kok) 116-118 Prince Edward Road West, Mong P P Branch Kok, Kowloon 24-28 Carnarvon Road, Tsim Sha Tsui, Tsim Sha Tsui Branch P P Kowloon Shanghai Street (Prince Edward) 689-693 Shanghai Street, Mong Kok, Kowloon P P Branch 73-77 Tai Kok Tsui Road, Tai Kok Tsui, Tai Kok Tsui Branch P P P P Kowloon Shop 19-20, 2/F, China Hong Kong City, 33 China Hong Kong City Branch P P Canton Road, Tsim Sha Tsui , Kowloon Mong Kok Road Branch 50-52 Mong Kok Road, Mong Kok, Kowloon P P P Shop 133, 1/F, Olympian City 2, 18 Hoi Ting Olympian City Branch P P Road, Kowloon Apartments A-B on G/F & 1/F, Holly Mansion, Kimberley Road Branch P P P P 37 Kimberley Road, Tsim Sha Tsui, Kowloon. Shop 1003-1004, 1/F, Elements, 1 Austin Road Elements Branch P P P West, Kowloon Mong Kok (President Commercial 608 Nathan Road, Mong Kok, Kowloon P P P Centre) Branch Yau Ma Tei Branch 471 Nathan Road, Yau Ma Tei, Kowloon P P P Shop 3,LG/F,Hilton Towers,96 Granville Tsim Sha Tsui East Branch P P Road,Tsim Sha Tsui East, Kowloon Cameron Road Wealth Management 30
    [Show full text]
  • TFKT/01/2021 on 14 April 2021
    Task Force on Kai Tak Harbourfront Development For discussion TFKT/01/2021 on 14 April 2021 Progress Update on Kai Tak Sports Park and Adjoining Public Open Space PURPOSE This paper provides update to Members on the latest progress and detailed design of the Kai Tak Sports Park (the Sports Park) and the adjoining Public Open Space (POS), and our responses to Members’ suggestions and comments raised at the meeting on 15 January 2019. BACKGROUND 2. We have provided regular updates to the Task Force on Kai Tak Harbourfront Development (the Task Force) since the early planning stage of the Sports Park project. We last briefed the Task Force on 15 January 2019 after the award of the Sports Park contract in end-December 2018. The latest design development and detailed design of the Sports Park are set out in the ensuing paragraph(s). Our responses to the comments and suggestions raised by Members at the last meeting (extract of the minutes of meeting at Annex A) are highlighted in the bracket after each item for easy reference – (a) Design (i) coherent design of the pedestrian walkways and POS (para. 8). (b) Water-land interface (i) design elements to promote or activate the waterbody nearby (paras. 12 to 16); Task Force on Kai Tak Harbourfront Development TFKT/01/2021 (c) Vibrancy (i) provision for pre-event and post-event food and beverage concessions and ad-hoc retail (paras. 12 to 16); (d) Accessibility (i) 24-hour pedestrian access for pedestrians to go to harbourfront promenade from the hinterland freely (para.
    [Show full text]
  • Outlet Address Dream Team Premium Showroom
    Outlet Address Dream Team Premium Showroom - Kwun Tong Address: Unit A3, 9/F, Block A, East Sun Industrial Centre, 16 Shing Yip Street, Kwun Tong, Kowloon Tel: +852 2628 3535 Dream Team TKO Gateway - Tseung Kwan O Address: Shop No. W111, 1/F., West Wing, TKO Gateway, 2 Sheung Ning Road, Tseung Kwan O, New Territories Tel: +852 2109 2018 Dream Team Mostown - Ma On Shan Address: Shop No 3205, Level 3, Mostown, 18 On Luk Street, Ma On Shan, New Territories Tel: +852 2109 2200 Dream Team Waldorf Avenue - Tuen Mun Address: Shop 4m Level 3, Waldorf Avenue ,No1 Tuen Lee Street, Tuen Mun, New Territories Tel: +852 2668 2263 Dream Team Nam Fung Plaza - Hang Hau Address: Shop B177, 1/F, Nam Fung Plaza, 8 Pui Shing Road, Tseung Kwan O, New Territories Tel: +852 2191 1622 Dream Team Kingswood Ginza - Tin Shui Wai Address: G37B, Kingswood Ginza Phase 2, 12-18 Tin Yan Road, Tin Shui Wai, New Territories Tel: +852 2448 8834 Dream Team Fortune City One Plus – Sha Tin Address: Shop No.83, G/F, Fortune City One Plus, Sha Tin, New Territories Tel: +852 2686 9622 Dream Team Chung Fu Plaza - Tin Shui Wai Address: Shop L203, 2/F, Chung Fu Plaza Stage 1,30 Tin Wah Road, Tin Shui Wai, New Territories Tel: +852 2392 1600 Dream Team Mikiki - San Po Kong Address: Shop 108, 1/F, Mikiki, 638 Prince Edward Road East, San Po Kong, Kowloon Tel: +852 2567 0878 Sunshine Telecom Tin Chak Shopping Centre - Tin Shui Wai Address: Shop 123B, 1/F, Tin Chak Shopping Centre , Tin Shui Wai, New Territories Tel: +852 2881 8280 Sunshine Telecom Tin Yiu Plaza - Tin Shui Wai Address: Shop L054, G/F, Tin Yiu Est, Tin Wu Rd, Tin Shui Wai, New Territories Tel: +852 2323 0235 Sunshine Telecom Leung King Plaza - Tuen Mun Address: Shop No.
    [Show full text]