Bob Cabana, Director Kennedy Space Center National Aeronautics and Space Administration
Premier Multi-User Spaceport KSC Programs and Projects
Commercial Crew Program Launch Services Program Exploration Ground Systems
Gateway — A spaceport for human and Exploration Research & Technology robotic exploration to the Moon and beyond Programs 2019 KSC Key Milestones o March 2 SpaceX Demo-1 LC 39A o June 27 Mobile Launcher rolls testing to SLC 39B o July 2 Orion Launch Abort System Test SLC-46 o October 10 ICON Mission CCAFS
Remaining Milestones Planned in 2019
Boeing Pad Abort Test – Target date 11/4/19 Boeing Orbital Flight Test – Target date mid December SpaceX In-Flight Abort Test – Target date early December Gateway Logistics Contract Award 2020 KSC Key Milestones
Orion Mass Simulator on dock KSC - 1/24/20 SpaceX Demo-2 Boeing Crewed Flight Test Solar Orbiter – 2/5/20 SLS Boosters arrive and processing begins - 3/18/20 Orion turnover to EGS - 5/16/20 MARS 2020 -7/17/20 Sentinel 6A - 11/15/20 Landsat-9 – 12/15/20 7 National Aeronautics and Space Administration
SpaceX Demo-1 March 2, 2019 Boeing Hotfire & Parachute Tests May 22, 2019
National Aeronautics and Space Administration
High Performance Spaceflight Computing Precision Solar Landing Electric Space Technology for Propulsion 2024 and Beyond
Surface Cryofluid Lunar Dust Excavation/Construction Management Mitigation
In Situ Resource Extreme Environments Utilization
Extreme Access Lunar Surface Power
Lunar Surface Innovation Initiative NASA Internal Use Only Do Not Distribute 18 EGS Striving Toward Launch of Artemis I SLS Block 1
National Aeronautics and Space Administration Orion
Liquid oxygen Artemis I Intertank
Core Stage 322 feet 322
Booster Mobile Launcher
130 feet 130 Rocket Rocket
Crew Access Arm
274 feet 380 feet Engine
NASA Internal Use Only Do Not Distribute Vehicle Assembly Building 380 feet
• 10.5 million lbs. • Tower about 355 ft. tall Mobile Launcher
Launch Pad 39B Landing and Recovery U.S. Navy
Orion Test Article Orion Ascent Abort-2 Flight Test July 2, 2019 Firing Rooms and Launch Control SLS Core Stage Pathfinder October 15-16, 2019 Launch Services Program Manifest
2019 2020
ICON Venture Class Sentinel 6A Ionospheric Connection Explorer Launch Services Solar Orbiter Mars 2020 (Jason-CS) Landsat-9
Providing Advisory Services
Commercial Crew Commercial Gateway Logistics Program Resupply Services Ionospheric Connection Explorer (ICON) October 10, 2019 Exploration Research and Technology Programs Exploration Research and Technology - 2019 Awards
FLC Interagency Partnership Award for Technology Transfer • KSC is the only NASA center to win award in 2019
• The Autonomous Flight Termination System (AFTS) augments or replaces the functions of the traditional human-in-the-loop system
• Allows multiple vehicles to be launched and tracked at the same time
• AFTS transferred to 30+ commercial space companies and other government organizations
NASA’s Technology Transfer Licensing Award • KSC won with 18 patent licenses in FY18
• Patent licensing is one of the ways we transfer NASA technologies to industry KSC Roadmap – September 2019
2019 2020 2021 2022 2023 2024
Exploration Research & ~ 65 NASA launches, 10+ NASA launches/year Technology Mass Spectrometer Orbital Syngas/ Commodity Restore-L Observing Lunar Operations Augmentation Reactor Robotic spacecraft servicing
International SpX-22 Space Station NG-11 SpX-18 NG-12 HTV9 NG-13 NG-14 SpX-23 HTV-X1 HTV-X2 SpX-24 SpX-25 ~ 22 ISS launches SpX-26 SpX-17 HTV8 SpX-19 SpX-20 SpX-21 NG-15 CRS 2-14 CRS 2-12 CRS 2-13 Commercial Crew In-Flight CM~ -114 crewedCM-2 launchesCM-3 CM-4 SpaceX DM-1 Abort Test DM-2 CM-5 CM-6
Pad Abort PCM-3 Boeing Test OFT CFT ~ 16 CCPPCM-1 launchesPCM-2 PCM-4 PCM-5 PCM-6 Launch Services IXPE VCLS-E DART JPSS-2 VCLS-L Mars 2020 Sentinel 6A SWOT Psyche ICON ~ 17 LandsatLSP 9 launches Lucy PACE GOES-U GOES-T Restore-L SPHEREx IMAP Solar Orbiter
Lunar Gateway Power/Propulsion Element MiniHab Logistics Contract Award Logistics-1 Human Lander System ~ 5 Gateway launches Commercial Lunar Crewed Lunar Surface
Payload Services ~ 7+ ~ fleets vehicle launch ML-1 Roll to ML-1 ML-1, VAB Modifications LC-39B DCR Emergency Egress System SLS SM-1 Facilities CT-2 VAB, LC-39B SLS Artemis I SLS Artemis II Block 1 SLS Artemis III SAR SAR Block 1 Block 1 Cargo(Europa) Block 1B OPI AA-2 MPPF ~ 4 EGSUncrewed launches Crewed Crewed DCR ML-2 ML-2 Design/Build Contract Award DCR
Construction of Facilities 103 CoF Projects at >$1B value National Aeronautics and Space AdministrationCCHQ CCHQ PHSF KSC Shoreline Robotic Mining Launch VAB Utility CCF, LC-39B LC-39B CCHQ Phase 1 Solar Plant Upgrades Restoration Competition Complex 48 Annex Upgrades LH2 Upgrades LN2 System Phase 2 (2026) 35 National Aeronautics and Space Administration