Bob Cabana, Director National Aeronautics and Space Administration

Premier Multi-User Spaceport KSC Programs and Projects

Commercial Crew Program Exploration Ground Systems

Gateway — A spaceport for human and Exploration Research & Technology robotic exploration to the Moon and beyond Programs 2019 KSC Key Milestones o March 2 SpaceX Demo-1 LC 39A o June 27 Mobile Launcher rolls testing to SLC 39B o July 2 Launch Abort System Test SLC-46 o October 10 ICON Mission CCAFS

Remaining Milestones Planned in 2019

Boeing Pad Abort Test – Target date 11/4/19 Boeing Orbital Flight Test – Target date mid December SpaceX In-Flight Abort Test – Target date early December Gateway Logistics Contract Award 2020 KSC Key Milestones

Orion Mass Simulator on dock KSC - 1/24/20 SpaceX Demo-2 Boeing Crewed Flight Test Solar Orbiter – 2/5/20 SLS Boosters arrive and processing begins - 3/18/20 Orion turnover to EGS - 5/16/20 MARS 2020 -7/17/20 Sentinel 6A - 11/15/20 Landsat-9 – 12/15/20 7 National Aeronautics and Space Administration

SpaceX Demo-1 March 2, 2019 Boeing Hotfire & Parachute Tests May 22, 2019

National Aeronautics and Space Administration

High Performance Spaceflight Computing Precision Solar Landing Electric Space Technology for Propulsion 2024 and Beyond

Surface Cryofluid Lunar Dust Excavation/Construction Management Mitigation

In Situ Resource Extreme Environments Utilization

Extreme Access Lunar Surface Power

Lunar Surface Innovation Initiative NASA Internal Use Only  Do Not Distribute 18 EGS Striving Toward Launch of Artemis I SLS Block 1

National Aeronautics and Space Administration Orion

Liquid oxygen Artemis I Intertank

Core Stage 322 feet 322

Booster Mobile Launcher

130 feet 130 Rocket Rocket

Crew Access Arm

274 feet 380 feet Engine

NASA Internal Use Only  Do Not Distribute Vehicle Assembly Building 380 feet

• 10.5 million lbs. • Tower about 355 ft. tall Mobile Launcher

Launch Pad 39B Landing and Recovery U.S. Navy

Orion Test Article Orion Ascent Abort-2 Flight Test July 2, 2019 Firing Rooms and Launch Control SLS Core Stage Pathfinder October 15-16, 2019 Launch Services Program Manifest

2019 2020

ICON Venture Class Sentinel 6A Ionospheric Connection Explorer Launch Services Solar Orbiter Mars 2020 (Jason-CS) Landsat-9

Providing Advisory Services

Commercial Crew Commercial Gateway Logistics Program Resupply Services Ionospheric Connection Explorer (ICON) October 10, 2019 Exploration Research and Technology Programs Exploration Research and Technology - 2019 Awards

FLC Interagency Partnership Award for Technology Transfer • KSC is the only NASA center to win award in 2019

• The Autonomous Flight Termination System (AFTS) augments or replaces the functions of the traditional human-in-the-loop system

• Allows multiple vehicles to be launched and tracked at the same time

• AFTS transferred to 30+ commercial space companies and other government organizations

NASA’s Technology Transfer Licensing Award • KSC won with 18 patent licenses in FY18

• Patent licensing is one of the ways we transfer NASA technologies to industry KSC Roadmap – September 2019

2019 2020 2021 2022 2023 2024

Exploration Research & ~ 65 NASA launches, 10+ NASA launches/year Technology Mass Spectrometer Orbital Syngas/ Commodity Restore-L Observing Lunar Operations Augmentation Reactor Robotic spacecraft servicing

International SpX-22 Space Station NG-11 SpX-18 NG-12 HTV9 NG-13 NG-14 SpX-23 HTV-X1 HTV-X2 SpX-24 SpX-25 ~ 22 ISS launches SpX-26 SpX-17 HTV8 SpX-19 SpX-20 SpX-21 NG-15 CRS 2-14 CRS 2-12 CRS 2-13 Commercial Crew In-Flight CM~ -114 crewedCM-2 launchesCM-3 CM-4 SpaceX DM-1 Abort Test DM-2 CM-5 CM-6

Pad Abort PCM-3 Boeing Test OFT CFT ~ 16 CCPPCM-1 launchesPCM-2 PCM-4 PCM-5 PCM-6 Launch Services IXPE VCLS-E DART JPSS-2 VCLS-L Mars 2020 Sentinel 6A SWOT ICON ~ 17 LandsatLSP 9 launches PACE GOES-U GOES-T Restore-L SPHEREx IMAP Solar Orbiter

Lunar Gateway Power/Propulsion Element MiniHab Logistics Contract Award Logistics-1 Human Lander System ~ 5 Gateway launches Commercial Lunar Crewed Lunar Surface

Payload Services ~ 7+ ~ fleets vehicle launch ML-1 Roll to ML-1 ML-1, VAB Modifications LC-39B DCR Emergency Egress System SLS SM-1 Facilities CT-2 VAB, LC-39B SLS Artemis I SLS Artemis II Block 1 SLS Artemis III SAR SAR Block 1 Block 1 Cargo(Europa) Block 1B OPI AA-2 MPPF ~ 4 EGSUncrewed launches Crewed Crewed DCR ML-2 ML-2 Design/Build Contract Award DCR

Construction of Facilities 103 CoF Projects at >$1B value National Aeronautics and Space AdministrationCCHQ CCHQ PHSF KSC Shoreline Robotic Mining Launch VAB Utility CCF, LC-39B LC-39B CCHQ Phase 1 Solar Plant Upgrades Restoration Competition Complex 48 Annex Upgrades LH2 Upgrades LN2 System Phase 2 (2026) 35 National Aeronautics and Space Administration