ANNEXURE CRIDP PROPOSAL 2011-12 LIST OF WORKS - STATE HIGHWAYS

Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening of - 1-CRIDP-11- city 1 Pallavaram Thoraipakkam Road Km 0/6- 0.70 98.00 12-S-0001 roads 1/3 (SH 109)

Strengthening of pallavaram - 1-CRIDP-11- Chennai city 2 Pallavaram Thoraipakkam Road Km 1/3- 0.70 98.00 12-S-0002 roads 2/0 (SH 109)

Strengthening of - 1-CRIDP-11- Chennai city 3 Tambaram Mudichur - Sriperumbudur 0.70 80.00 12-S-0003 roads road Km 6/8 - 7/5 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Chennai city 4 Tambaram Mudichur - Sriperumbudur 0.80 88.00 12-S-0004 roads road Km 6/0 - 6/8 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Chennai city 5 Tambaram Mudichur - Sriperumbudur 0.90 95.00 12-S-0005 roads road Km 4/2 - 5/1 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Chennai city 6 Tambaram Mudichur - Sriperumbudur 0.90 95.00 12-S-0006 roads road Km 3/3 - 4/2 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Chennai city 7 Tambaram Mudichur - Sriperumbudur 0.90 95.00 12-S-0007 roads road Km 5/1 - 6/0 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Chennai city 8 Tambaram Mudichur - Sriperumbudur 0.90 95.00 12-S-0008 roads road Km 2/4-3/3 (SH 110)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 9 Thoraipakkam road Km 9/7 - 0.70 98.00 12-S-0009 roads nallur 10/4 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 10 Thoraipakkam road Km 9/0 - 0.70 98.00 12-S-0010 roads nallur 9/7 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 11 Pallavaram Thoraipakkam road Km 2/0 - 0.70 98.00 12-S-0011 roads 2/7 (SH 109)

SH Page 1 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 12 Thoraipakkam road Km 6/2 - 0.70 98.00 12-S-0012 roads nallur 6/9 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 13 Thoraipakkam road Km 5/5 - 0.70 98.00 12-S-0013 roads nallur 6/2 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 14 Thoraipakkam road Km 4/8 - 0.70 98.00 12-S-0014 roads nallur 5/5 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 15 Pallavaram Thoraipakkam road Km 2/7- 0.70 98.00 12-S-0015 roads 3/4 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 16 Pallavaram Thoraipakkam road Km 3/4- 0.70 98.00 12-S-0016 roads 4/1 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 17 Pallavaram Thoraipakkam road Km 4/1 - 0.70 98.00 12-S-0017 roads 4/8 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 18 Thoraipakkam road Km 6/9 - 0.70 98.00 12-S-0018 roads nallur 7/6 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city Shozhinga 19 Thoraipakkam road Km 7/6 - 0.70 98.00 12-S-0019 roads nallur 8/3 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 20 Shozhinganallur Thoraipakkam road Km 8/3 - 0.70 98.00 12-S-0020 roads 9/0 (SH 109)

Strengthening of Pallavaram - 1-CRIDP-11- Chennai city 21 Shozhinganallur Thoraipakkam road Km 0.20 30.00 12-S-0021 roads 10/4 - 10/6 (SH 109)

Strengthening/ Improvements 15.10 1950.00 Total

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 22 Pallavaram 88.00 12-S-0022 roads 0/6-3/0 of Pallavaram - Thoraipakkam road (SH 109)

SH Page 2 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 23 Pallavaram 90.00 12-S-0023 roads 3/0 - 5/5 of Pallavaram - Thoraipakkam road (SH 109)

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 24 Shozhinganallur 90.00 12-S-0024 roads 5/5 - 8/0 of Pallavaram - Thoraipakkam road (SH 109)

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 25 Shozhinganallur 92.00 12-S-0025 roads 8/0 -10/6 of Pallavaram - Thoraipakkam road (SH 109)

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 26 Shozhinganallur 89.00 12-S-0026 roads 17/4-19/8 of East Coast road (SH 49)

Land Acquisition at Km 1/7 1-CRIDP-11- Chennai city of Tambaram - Mudichur- 27 Tambaram 10.00 12-S-0027 roads Sriperumbudhur road (SH 110)

Widening the left out portion 1-CRIDP-11- Chennai city of culvert at Km 6/4 of Inner 28 250.00 12-S-0028 roads Ring Road including shifting of electric cables. (SH 2)

Construction of crash barrier 1-CRIDP-11- Chennai city type centre median in Km 29 Shozhinganallur 73.00 12-S-0029 roads 19/8 - 21/8 of East Coast road (SH 49)

Bridges/ CD Works/ Others 8 Nos. 782.00 Total

Chennai city 15.10 2732.00 roads Total

Widening from intermediate lane to double lane of 1-CRIDP-11- Maduranthagam - 30 Chengalpattu Cheyyur 4.90 95.00 12-S-0030 Vennangupattu Road km18/7-22/0 & 28/4-30/0 (SH 117)

SH Page 3 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from intermediate lane to double lane and 1-CRIDP-11- 31 Chengalpattu Maduranthagam Strengthening of Cheyyur - 1.40 75.00 12-S-0031 Wandawasi - Polur Road Km.13/0 - 14/4 (SH 115)

Widening from intermediate lane to double lane and 1-CRIDP-11- 32 Chengalpattu Maduranthagam Strengthening of Cheyyur - 1.60 85.00 12-S-0032 Wandawasi - Polur Road Km.14/4 - 16/0 (SH 115)

Widening from intermediate lane to double lane and 1-CRIDP-11- Strengthening of Walajabad - 33 Chengalpattu Sriperumbudur 0.77 80.00 12-S-0033 Sunguvarchathiram - Keelacheri Road Km.17/630 - 18/4 (SH 120)

Widening from intermediate lane to double lane and 1-CRIDP-11- Strengthening of Walajabad - 34 Chengalpattu Sriperumbudur 0.90 100.00 12-S-0034 Sunguvarchathiram - Keelacheri Road Km.15/7 - 16/6 (SH 120)

Widening from intermediate lane to double lane and 1-CRIDP-11- Strengthening of Walajabad - 35 Chengalpattu Sriperumbudur 0.93 100.00 12-S-0035 Sunguvarchathiram - Keelacheri Road Km.16/6 - 17/530 (SH 120)

Widening from intermediate lane to double lane and 1-CRIDP-11- Strengthening of Walajabad - 36 Chengalpattu Sriperumbudur 0.90 100.00 12-S-0036 Sunguvarchathiram - Keelacheri Road Km.14/8 - 15/7 (SH 120)

Widening & Improvements 11.40 635.00 Total

SH Page 4 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening to Cheyyur - 1-CRIDP-11- 37 Chengalpattu Maduranthagam Wandawasi - Polur Road 2.00 75.00 12-S-0037 Km.32/0 - 34/0 (SH 115)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 38 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0038 Road Km.14/5 - 15/2 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 39 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0039 Road Km.17/3 - 18/0 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 40 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0040 Road Km.13/8 - 14/5 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 41 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0041 Road Km.18/0 - 18/7 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 42 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0042 Road Km.13/1 - 13/8 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 43 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0043 Road Km.12/4 - 13/1 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 44 Chengalpattu Sriperumbudur 0.30 50.00 12-S-0044 Road Km.18/7 - 19/0 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 45 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0045 Road Km.11/7 - 12/4 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 46 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0046 Road Km.11/0 - 11/7 (SH 110) Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 47 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0047 Road Km.10/3 - 11/0 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 48 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0048 Road Km.9/6 - 10/3 (SH 110)

SH Page 5 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 49 Chengalpattu Sriperumbudur 0.50 80.00 12-S-0049 Road Km.23/0 - 23/500 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- 50 Chengalpattu Sriperumbudur Mudichur - Sriperumbudur 0.70 100.00 12-S-0050 Road Km.8/9 - 9/6 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 51 Chengalpattu Sriperumbudur 0.75 100.00 12-S-0051 Road Km.21/5 - 22/250 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- 52 Chengalpattu Sriperumbudur Mudichur - Sriperumbudur 0.70 100.00 12-S-0052 Road Km.7/5 - 8/2 (SH 110)

Strengthening to (Chennai 1-CRIDP-11- 53 Chengalpattu Thiruporur Mamallapuram Road (via) 1.40 50.00 12-S-0053 Tiruporur) Km 52/2 - 53/6 (Left Side) (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 54 Chengalpattu Thiruporur Mamallapuram Road (via) 0.60 60.00 12-S-0054 Tiruporur) Km 50/0 - 50/6 (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 55 Chengalpattu Thiruporur Mamallapuram Road (via) 1.00 75.00 12-S-0055 Tiruporur) Km 49/0 - 50/0 (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 56 Chengalpattu Thiruporur Mamallapuram Road (via) 1.00 75.00 12-S-0056 Tiruporur) Km 47/0 - 48/0 (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- Mamallapuram Road (via) 57 Chengalpattu Thiruporur 0.60 30.00 12-S-0057 Tiruporur) Km.44/0 - 44/4 and 45/8 - 46/0 (Left Side) (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 58 Chengalpattu Thiruporur Mamallapuram Road (via) 1.00 72.00 12-S-0058 Tiruporur) Km 48/0 - 49/0 (SH 49A)

SH Page 6 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 59 Chengalpattu Thiruporur Mamallapuram Road (via) 0.80 50.00 12-S-0059 Tiruporur) Km 43/2 - 44/0 (left Side) (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai - 1-CRIDP-11- 60 Chengalpattu Thiruporur Mamallapuram Road (via) 1.20 58.00 12-S-0060 Tiruporur) Km 42/0 - 43/2 (SH 49A)

Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 61 Chengalpattu Thiruporur Mamallapuram Road (via) 2.00 100.00 12-S-0061 Tiruporur) Km 40/0 - 42/0 (SH 49A)

Strengthening to Cheyyur - 1-CRIDP-11- 62 Chengalpattu Maduranthagam Wandawasi - Polur Road 2.00 75.00 12-S-0062 Km.30/0 - 32/0 (SH 115)

Strengthening of Tambaram - 1-CRIDP-11- 63 Chengalpattu Sriperumbudur Mudichur - Sriperumbudur 0.70 100.00 12-S-0063 Road Km.8/2 - 8/9 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 64 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0064 Road Km.16/6 - 17/3 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 65 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0065 Road Km.15/9 - 16/6 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 66 Chengalpattu Sriperumbudur 0.70 100.00 12-S-0066 Road Km.15/2 - 15/9 (SH 110)

Strengthening of Tambaram - 1-CRIDP-11- Mudichur - Sriperumbudur 67 Chengalpattu Sriperumbudur 0.75 100.00 12-S-0067 Road Km22/250 -23/0 (SH 110)

Strengthening to Rajiv Gandhi Salai (Chennai 1-CRIDP-11- 68 Chengalpattu Thiruporur Mamallapuram Road (via) 2.00 100.00 12-S-0068 Tiruporur) Km 38/0 - 40/0 (SH 49A)

SH Page 7 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening of 1-CRIDP-11- Thirukkalukundram - 69 Chengalpattu Thiruporur 2.20 82.00 12-S-0069 Mamallapuram Road Km.11/0 - 13/2 (SH 49B)

Strengthening of 1-CRIDP-11- Thirukkalukundram - 70 Chengalpattu Thiruporur 2.00 73.00 12-S-0070 Mamallapuram Road Km.9/0 - 11/0 (SH 49B)

Strengthening of Rajiv Gandhi Salai (Chennai - 1-CRIDP-11- 71 Chengalpattu Thiruporur Mamallapuram Road (via) 2.00 55.00 12-S-0071 Thiruporur) Km.53/6 - 55/6 (SH 49A)

Strengthening to Rajiv Gandhi Salai (Chennai - 1-CRIDP-11- 72 Chengalpattu Thiruporur Mamallapuram Road (via) 1.00 80.00 12-S-0072 Thiruporur)Km.46/0 - 47/0 (SH 49A)

Strengthening to Sadras - Chengalpattu - 1-CRIDP-11- 73 Chengalpattu Kanchipuram - Arakkonam - 2.00 75.00 12-S-0073 Thirthani Road Km.61/0 - 63/0 (SH 58)

Strengthening of Sadras - Chengalpattu -Kanchipuram 1-CRIDP-11- - Arakkonam -Thirthani 74 Chengalpattu Chengalpattu 1.60 90.00 12-S-0074 Road Km.31/8 - 32/4 , 33/8 - 34/2 & 34/8 - 35/4 (SH 58)

Strengthening of Sadras - Chengalpattu -Kanchipuram 1-CRIDP-11- 75 Chengalpattu Chengalpattu - Arakkonam -Thirthani 1.60 90.00 12-S-0075 Road Km.30/2 - 31/8 (SH 58)

Strengthening of 1-CRIDP-11- Uthiramerur - Kanchipuram 76 Chengalpattu Uthiramerur 1.80 95.00 12-S-0076 Road Km.0/2 - 2/0 (SH 118)

Strengthening Sadras - Chengalpattu -Kanchipuram 1-CRIDP-11- 77 Chengalpattu Chengalpattu - Arakkonam -Thirthani 1.40 80.00 12-S-0077 Road Km.37/6 - 38/4, 38/6 - 38/8 & 39/0 - 39/4 (SH 58)

SH Page 8 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening to Rajiv Gandhi Salai (Chennai - 1-CRIDP-11- 78 Chengalpattu Thiruporur Mamallapuram Road (via) 1.20 65.00 12-S-0078 Tiruporur) Km 34/8 - 36/0 (SH 49A) Strengthening to Rajiv Gandhi Salai (Chennai - 1-CRIDP-11- 79 Chengalpattu Thiruporur Mamallapuram Road (via) 2.00 100.00 12-S-0079 Tiruporur) Km 36/0 - 38/0 (SH 49A)

Strengthening/ Improvements 47.90 3635.00 Total

Chengalpattu 59.30 4270.00 Total "Widening from IL to DL of 1-CRIDP-11- 80 Thiruvallur Thiruttani Nagari - Pallipet road Km 2.00 54.00 12-S-0080 4/0- 6/0" (SH 53) Widening from IL to DL of 1-CRIDP-11- 81 Thiruvallur Thiruttani Nagari - Pallipet Road KM 2.00 54.00 12-S-0081 6/0 - 8/0 (SH 53) "Widening from IL to DL of 1-CRIDP-11- Nagari - Pallipet road Km 82 Thiruvallur Thiruttani 2.40 66.00 12-S-0082 1/050- 1/450, 2/0- 4/0 (SH 53) "Widening from IL to DL of 1-CRIDP-11- 83 Thiruvallur Thiruttani Nagari - Pallipet road Km 3.20 91.00 12-S-0083 8/0 - 11/2" (SH 53) Widening & Improvements 9.60 265.00 Total

Improvements to lane separation at Km 7/0-7/4 of 1-CRIDP-11- 84 Thiruvallur Mount 0.40 60.00 12-S-0084 road in Chennai Bypass service road (SH 55)

Improvements to - 1-CRIDP-11- 85 Thiruvallur Poonamallee Thinnanur - Peraiyapalaym 2.00 75.00 12-S-0085 road km.16/0-18/0(SH 50A)

Improvements to 1-CRIDP-11- - Uthukkottai 86 Thiruvallur Gummidipoondi 2.00 75.00 12-S-0086 Road Km 44/0 - 46/0 (SH 50)

SH Page 9 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Korattur - 1-CRIDP-11- Thinnanur - Peraiyapalaym 87 Thiruvallur Poonamallee 2.00 75.00 12-S-0087 road km.18/0-20/0 (SH 50A) Strengthening the 1-CRIDP-11- Korthaliyar Bridge Puthur 88 Thiruvallur Gummidipoondi 1.50 80.00 12-S-0088 Road km 26/5- 28/0 (SH 51)

Strengthening the riding 1-CRIDP-11- surface at Km 10/0-11/0 of 89 Thiruvallur 1.00 97.00 12-S-0089 - Ambathur - road (SH 205)

Strengthening the riding 1-CRIDP-11- surface at Km 11/0-12/2 of 90 Thiruvallur Madhavaram 1.20 98.00 12-S-0090 Vanagaram - Ambathur - Puzhal road (SH 205)

Strengthening the riding 1-CRIDP-11- surface at Km 12/2-13/4 of 91 Thiruvallur Madhavaram 1.20 98.00 12-S-0091 Vanagaram - Ambathur - Puzhal road (SH 205)

Strengthening the riding 1-CRIDP-11- surface at Km 14/3-15/3 of 92 Thiruvallur Avadi 1.00 98.00 12-S-0092 Mount - Poonamallee - Avadi road (SH 55)

Strengthening the riding surface at Km 13/2-13/5 & 1-CRIDP-11- 93 Thiruvallur Avadi Km 13/6-14/3 of Mount - 1.00 98.00 12-S-0093 Poonamallee - Avadi road (SH 55) Strengthening the riding surface at Km 3/0-3/5 of 1-CRIDP-11- 94 Thiruvallur Maduravoyal - 0.50 50.00 12-S-0094 Sriperumbudur road (SH 113) Strengthening the riding surface at Km 3/7-4/4 of 1-CRIDP-11- 95 Thiruvallur Maduravoyal Kodambakkam- 0.70 70.00 12-S-0095 Sriperumbudur road (SH 113)

Strengthening the 1-CRIDP-11- Korthaliyar Bridge -Puthur 96 Thiruvallur Gummidipoondi 1.50 80.00 12-S-0096 Road km 25/0 - 26/5 (SH 51)

SH Page 10 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening the 1-CRIDP-11- Korthaliyar Bridge -Puthur 97 Thiruvallur Gummidipoondi 1.90 95.00 12-S-0097 Road km 21/0 - 22/9 (SH 51)

Strengthening the 1-CRIDP-11- Korthaliyar Bridge Puthur 98 Thiruvallur Gummidipoondi 1.80 90.00 12-S-0098 Road km 22/9 - 24/7 (SH 51)

Improvements to Chennai - 1-CRIDP-11- 99 Thiruvallur Thiruttani Tiruttani - Renigunta road 0.90 28.00 12-S-0099 Km 83/9 - 84/8 (SH 54)

Improvements to Chittoor - 1-CRIDP-11- 100 Thiruvallur Thiruttani Tiruttani road Km 47/0 - 1.40 50.00 12-S-0100 48/4 (SH 54) Improvements to Chittoor - 1-CRIDP-11- 101 Thiruvallur Thiruttani Tiruttani road Km 37/0 - 2.00 72.00 12-S-0101 39/0 (SH 54) Improvements to R.K.Pet - 1-CRIDP-11- 102 Thiruvallur Thiruttani Pallipet road Km 0/6 - 2/0 1.40 50.00 12-S-0102 (SH 108) Improvements to R.K.Pet - 1-CRIDP-11- 103 Thiruvallur Thiruttani Pallipet road Km 16/0 - 2.00 67.00 12-S-0103 18/0 (SH 108)

Improvements to R.K.Pet - 1-CRIDP-11- 104 Thiruvallur Thiruttani Pallipet road Km 18/0 - 1.60 53.00 12-S-0104 19/6 (SH 108)

Raising the Low level portion of the road & Construction of 1-CRIDP-11- Side Drain in Km:18/2-18/4 105 Thiruvallur Madhavaram 0.20 35.00 12-S-0105 of Greater Northern Trunk Road (SU 15)

Improvements to 1-CRIDP-11- Thirumazhisai - Uthukkottai 106 Thiruvallur Gummidipoondi 2.00 75.00 12-S-0106 Road Km 42/0 - 44/0 (SH 50)

Providing Approach road to the Bridge at Km 13/5-13/6 1-CRIDP-11- 107 Thiruvallur Poonamallee of Mount Poonamallee Avadi 0.10 60.00 12-S-0107 Road (SH 55) including Land Acquisition

Strengthening/ Improvements 31.30 1729.00 Total

SH Page 11 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of Storm Water Drain in Km :3/8-4/2 & 4/6 1-CRIDP-11- 108 Thiruvallur Maduravoyal - 5/250 of Mount- 72.00 12-S-0108 Poonamallee-Avadi Road (SH 55) Providing R.C.C Portable Crash barrier type median in 1-CRIDP-11- Km :3/8-5/0 of 109 Thiruvallur Maduravoyal 42.00 12-S-0109 Kodambakkam- Sriperumbudur road (SH 113) Providing R.C.C Portable Crash barrier type median in 1-CRIDP-11- Km :0/3-3/2 of 110 Thiruvallur Maduravoyal 92.00 12-S-0110 Kodambakkam- Sriperumbudur road (SH 113)

Providing revetment @ Km 1-CRIDP-11- 111 Thiruvallur Poonamallee 13/6 of Thirumazhisai - 16.00 12-S-0111 Uthukkottai Road (SH 50)

Bridges/ CD Works/ Others 4 Nos. 222.00 Total Thiruvallur 40.90 2216.00 Total

Widening from IL to DL and Improvements to Arcot Kannamangalam Road 1-CRIDP-11- 112 Vellore Arcot Km.16/2 - 17/4 including 1.20 57.00 12-S-0112 Widening of Narrow Culvert @ Km.16/6, 16/8 and 17/4 (SH 129)

Widening from IL to DL and Improvements to Arcot Kannamangalam Road 1-CRIDP-11- 113 Vellore Arcot Km.17/4 - 18/8 including 1.40 66.00 12-S-0113 Widening of Narrow Culvert @ Km.17/10, 18/2 and 18/6 (SH 129)

SH Page 12 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL and Improvements to Arcot Kannamangalam Road Km.22/8 - 24/2 & 24/4 - 1-CRIDP-11- 114 Vellore Arcot 24/8 and Widening of 1.80 75.00 12-S-0114 Narrow Culvert @ Km.23/2, 23/4 and 24/2 and construction of Drain.(SH 129)

Widening from IL to DL and Improvements to Arcot Kannamangalam Road 1-CRIDP-11- Km.14/6 - 16/2 including 115 Vellore Arcot 1.60 76.00 12-S-0115 Construction of Culverts @ Km.15/4 and Widening of Narrow Culvert @ Km.15/2, 15/6 and 15/8 (SH 129)

Widening from IL to DL and Improvements to Arcot Kannamangalam Road Km.13/0 - 14/6 including 1-CRIDP-11- 116 Vellore Arcot Construction of Culverts @ 1.60 76.00 12-S-0116 Km.13/2 &13/8 and Widening of Narrow Culvert @ Km.13/2, 13/6, 13/8 & 14/6 (SH 129)

"Widening from IL to DL and Improvements to 1-CRIDP-11- Kilvaithinan 117 Vellore Panamadangi Poojarivalasai 2.20 100.00 12-S-0117 kuppam Paradarami road Km 0/8 - 3/0" (SH 125)

"Widening from IL to DL Improvements Panamadangi 1-CRIDP-11- Kilvaithinan 118 Vellore Poojarivalasai Paradarami 2.00 94.00 12-S-0118 kuppam road Km 3/0 - 5/0 " (SH 125)

Widening from IL to DL and Improvements to 1-CRIDP-11- Kilvaithinan 119 Vellore Panamadangi Poojarivalasai 2.00 100.00 12-S-0119 kuppam Paradarami Road Km 10/0 - 12/0 (SH 125)

SH Page 13 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL and 1-CRIDP-11- Improvements to Kalavai 120 Vellore Arcot 1.70 98.00 12-S-0120 Valapandal Road Km 14/3 - 16/0. (SH 123)

Widening from IL to DL and 1-CRIDP-11- Improvements to Kalavai 121 Vellore Arcot 1.40 87.00 12-S-0121 Valapandal Road at Km 17/4 -18/8 (SH 123)

Widening from IL to DL and 1-CRIDP-11- Improvements to Kalavai 122 Vellore Arcot 1.40 85.00 12-S-0122 Valapandal Road at Km 16/0 - 17/4. (SH 123)

Widening from IL to DL and 1-CRIDP-11- Improvements to Kalavai 123 Vellore Arcot 1.50 40.00 12-S-0123 Valapandal Road at Km 18/8 - 20/3 (SH 123)

Widening & Improvements 19.80 954.00 Total

Improvements to Pallikonda 1-CRIDP-11- Kilvaithinan 124 Vellore Palamaneri Road Km 5/4- 2.00 40.00 12-S-0124 kuppam 7/4 (SH 124)

Improvements to 1-CRIDP-11- Krishanagiri Ranipet Road 125 Vellore Vellore 1.00 65.00 12-S-0125 Km.118/0 - 119/0 (Abandoned NH) (SU 24)

Improvements to Arakkonam Ocheri Road Km 15/0 - 17/0 1-CRIDP-11- 126 Vellore Sholinghur and 24/0 - 25/0 including 3.00 90.00 12-S-0126 Construction of Drainage (SH 126)

Improvements to 1-CRIDP-11- 127 Vellore Ranipet Krishanagiri Ranipet Road 2.00 85.00 12-S-0127 Km.136/0 - 138/0 (SU 24)

Improvements to Krishnagiri - 1-CRIDP-11- 128 Vellore Ranipet Ranipet Road Km 134/0 - 2.00 75.00 12-S-0128 136/0 (SU 24)

Improvements to 1-CRIDP-11- 129 Vellore Vellore Krishanagiri Ranipet Road 1.80 85.00 12-S-0129 Km.115/0 - 116/8 (SU 24)

SH Page 14 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Walajah - 1-CRIDP-11- Sholinghur - Arakonam 130 Vellore Sholinghur 2.60 100.00 12-S-0130 Road Km 23/8 - 26/4.(SH 61)

Improvements to 1-CRIDP-11- 131 Vellore Ranipet Krishanagiri Ranipet Road 1.60 60.00 12-S-0131 Km.142/8 - 144/4 (SU 24)

Improvements to 1-CRIDP-11- 132 Vellore Ranipet Krishanagiri Ranipet Road 1.00 52.00 12-S-0132 Km.139/0 - 140/0 (SU 24)

Improvements to Ranipet 1-CRIDP-11- 133 Vellore Ranipet Ponnai Road Km 1/2 - 2/4 1.20 65.00 12-S-0133 (SH 124A) Improvements to Ranipet 1-CRIDP-11- 134 Vellore Ranipet Ponnai Road Km 0/0 - 1/2 1.20 65.00 12-S-0134 (SH 124A) Improvements to Ponnai 1-CRIDP-11- 135 Vellore Katpadi Thiruvalam Road Km 7/0 - 2.00 70.00 12-S-0135 9/0 (SH 124) Improvements to Ponnai 1-CRIDP-11- 136 Vellore Katpadi Thiruvalam Road Km 10/0 - 2.80 100.00 12-S-0136 12/8 (SH 124) Improvements to Ranipet 1-CRIDP-11- 137 Vellore Katpadi Ponnai Road Km 9/4 - 12/5 3.10 100.00 12-S-0137 (SH 124A)

Improvements to Curve at Km 0/6 - 0/8 of 1-CRIDP-11- Kilvaithinan Panamadangi Poosarivalasai 138 Vellore 0.20 50.00 12-S-0138 kuppam Paradarami Road including Construction of Culvert at Km 0/8 (SH 125)

Improvements to Sadras - Chengalpattu - 1-CRIDP-11- 139 Vellore Arakonam Kanchipuram - Arakkonam - 3.00 90.00 12-S-0139 Thiruthani Road Km 97/0 - 100/0 (SH 58)

Strengthening/ Improvements 30.50 1192.00 Total

SH Page 15 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of Bridge at Km 88/4 Sadras - 1-CRIDP-11- Chengalpattu - 140 Vellore Arakonam 310.00 12-S-0140 Kanchipuram - Arakkonam - Thiruthani Road. (Kallar bridge) widening. (SH 58)

Widening Narrow Bridge at Km.80/10 Sadras 1-CRIDP-11- 141 Vellore Arakonam Chengalpattu Kanchipuram 20.00 12-S-0141 Arakkonam Thiruthani Road (SH 58)

Bridges/ CD Works/ Others 2 Nos 330.00 Total

Vellore Total 50.30 2476.00

Widening and Improvements from Intermediate lane to 1-CRIDP-11- Kilvaithinan 142 Vaniyambadi Double lane of Pallikonda 2.70 95.00 12-S-0142 kuppam Palamaneri Road KM 16/7 - 19/4 (SH 127)

Widening and Improvements from Intermediate lane to 1-CRIDP-11- Kilvaithinan 143 Vaniyambadi Double lane of Pallikonda 2.60 94.00 12-S-0143 kuppam Palamaneri Road KM 19/4 - 22/0 (SH 127)

Widening and Improvements from Intermediate lane to 1-CRIDP-11- Kilvaithinan 144 Vaniyambadi Double lane of Pallikonda 1.70 65.00 12-S-0144 kuppam Palamaneri Road KM 15/0 - 16/7 (SH 127)

Widening and Improvements from Intermediate lane to 1-CRIDP-11- Kilvaithinan 145 Vaniyambadi Double lane of Pallikonda 2.00 78.00 12-S-0145 kuppam Palamaneri Road KM 13/0 - 15/0 (SH 127)

SH Page 16 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Improvements from Intermediate lane to 1-CRIDP-11- Double lane and 146 Vaniyambadi Gudiyatham 2.00 80.00 12-S-0146 Improvements of Pallikonda Palamaneri Road KM 11/0 - 13/0 (SH 127)

Widening and Improvements Intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 147 Vaniyambadi Ambur Gadambur - Kailasagiri - 2.00 67.00 12-S-0147 Vaniyambadi Road. Km 23/0 - 25/0 including C.D.Works (SH 130)

Widening and Improvements from intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 148 Vaniyambadi Ambur Gadambur - Kailasagiri - 2.00 67.00 12-S-0148 Vaniyambadi Road. Km 21/0- 23/0 including CD works (SH 130)

Widening and Improvements from intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 149 Vaniyambadi Ambur Gadambur - Kailasagiri - 2.00 72.00 12-S-0149 Vaniyambadi Road. Km 19/0 - 21/0 including CD works (SH 130)

Widening and Improvements from Intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 150 Vaniyambadi Ambur Gadambur - Kailasagiri - 2.00 67.00 12-S-0150 Vaniyambadi Road. Km 17/0 - 19/0 including CD works (SH 130)

SH Page 17 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Improvements from Intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 151 Vaniyambadi Ambur Gadambur - Kailasagiri - 3.00 99.00 12-S-0151 Vaniyambadi Road. Km 14/0 - 17/0 including CD works (SH 130)

Widening and Improvements from Intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 152 Vaniyambadi Gudiyatham Gadambur - Kailasagiri - 1.40 68.00 12-S-0152 Vaniyambadi Road. Km 12/6 - 14/0 including CD works (SH 130)

Widening and Improvements from Intermediate lane to Double lane of Gudiyatham - 1-CRIDP-11- 153 Vaniyambadi Gudiyatham Gadambur - Kailasagiri - 1.60 75.00 12-S-0153 Vaniyambadi Road. Km 11/0 - 12/6 including CD works (SH 130)

Widening & Improvements 25.00 927.00 Total

Improvements to Chittoor 1-CRIDP-11- Kilvaithinan Gudiyattam Road KM 8/6- 154 Vaniyambadi 1.20 50.00 12-S-0154 kuppam 8/8, 9/4-9/8, 10/0-10/6 (SH 88)

Improvements to Abdullapuram - 1-CRIDP-11- 155 Vaniyambadi Anaicut Asanampattu - Alangayam - 1.40 60.00 12-S-0155 Tirupattur Road. Km 13/6 - 15/0 (SH 122)

Improvements to Abdullapuram - 1-CRIDP-11- 156 Vaniyambadi Anaicut Asanampattu - Alangayam - 1.20 50.00 12-S-0156 Tirupattur Road. Km 15/0 - 16/2 (SH 122)

SH Page 18 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Abdullapuram - 1-CRIDP-11- 157 Vaniyambadi Anaicut Asanampattu - Alangayam - 1.00 45.00 12-S-0157 Tirupattur Road. Km 16/4 - 17/2 & 17/8 (SH 122)

Improvements to Abdullapuram - 1-CRIDP-11- 158 Vaniyambadi Anaicut Asanampattu - Alangayam - 2.00 90.00 12-S-0158 Tirupattur Road. Km 18/0 - 20/0 (SH 122)

Improvements to Abdullapuram - 1-CRIDP-11- 159 Vaniyambadi Ambur Asanampattu - Alangayam - 2.50 100.00 12-S-0159 Tirupattur Road. Km 20/0 - 22/5 (SH 122)

Improvements to Abdullapuram - 1-CRIDP-11- 160 Vaniyambadi Ambur Asanampattu - Alangayam - 0.80 35.00 12-S-0160 Tirupattur Road. Km 25/10, 26/6- 10 & 27/2 (SH 122)

Improvements to Ambur - 1-CRIDP-11- 161 Vaniyambadi Gudiyatham Sathgur Road. Km 1/4 - 3/0 1.60 65.00 12-S-0161 (SH 130A)

Improvements to Hogenakal - 1-CRIDP-11- Pennagaram - Dharumapuri - 162 Vaniyambadi Thirupattur 2.25 90.00 12-S-0162 Tirupattur road 90/750 - 93/0 (SH 60)

Improvements to Hogenakal - 1-CRIDP-11- Pennagaram - Dharumapuri - 163 Vaniyambadi Thirupattur 0.60 25.00 12-S-0163 Tirupattur road 106/4 - 107/0 (SH 60)

Improvements to Bargur - 1-CRIDP-11- 164 Vaniyambadi Thirupattur Tirupattur road km 7/8 - 2.20 90.00 12-S-0164 10/0 (SH 131)

Improvements to Pallikonda 1-CRIDP-11- Kilvaithinan 165 Vaniyambadi Palamaneri Road KM 0/0- 1.20 50.00 12-S-0165 kuppam 1/2 (SH 127)

Improvements to Ambur 1-CRIDP-11- 166 Vaniyambadi Gudiyatham Sathgur Road KM 10/0 - 2.00 40.00 12-S-0166 12/0 (SH 130A)

SH Page 19 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Gudiyattam Gadambur 1-CRIDP-11- 167 Vaniyambadi Gudiyatham Kailasagiri Vaniyambadi 3.00 60.00 12-S-0167 Road KM 8/0 - 11/0 (SH 130) Improvements to Bargur - 1-CRIDP-11- Tirupattur road km 11/0 - 168 Vaniyambadi Thirupattur 1.40 57.00 12-S-0168 11/4,13/6 & 17/6 - 18/4 (SH 131)

Improvements to Abdullapuram - 1-CRIDP-11- Asanampattu - Alangayam - 169 Vaniyambadi Anaicut 1.80 75.00 12-S-0169 Tirupattur Road. Km 10/0 - 11/2, 12/2 ,12/6 -12/10 (SH 122)

Strengthening/ Improvements 26.15 982.00 Total

Reconstruction of culvert in Km 7/6 of Gudiyattam 1-CRIDP-11- 170 Vaniyambadi Gudiyatham Gadambur Kailasagiri 4.00 12-S-0170 Vaniyambadi Road (SH 130)

Reconstruction of culvert in 1-CRIDP-11- Km 99/2 (I) of Hogenakal - 171 Vaniyambadi Thirupattur 4.00 12-S-0171 Pennagaram - Dharumapuri - Tirupattur road (SH 60)

Reconstruction of culvert in 1-CRIDP-11- 99/2 (II) of Hogenakal - 172 Vaniyambadi Thirupattur 4.00 12-S-0172 Pennagaram - Dharumapuri - Tirupattur road (SH 60)

Reconstruction of culvert in 1-CRIDP-11- 173 Vaniyambadi Thirupattur 10/2 of Bargur - Tirupattur 4.00 12-S-0173 road (SH 131)

Reconstruction of culvert in 1-CRIDP-11- 174 Vaniyambadi Thirupattur 17/4 of Bargur - Tirupattur 4.00 12-S-0174 road (SH 131)

Reconstruction of culvert in 1-CRIDP-11- 175 Vaniyambadi Thirupattur 18/2 of Bargur - Tirupattur 4.00 12-S-0175 road (SH 131)

SH Page 20 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert in 1-CRIDP-11- 176 Vaniyambadi Thirupattur 21/2 of Bargur - Tirupattur 4.00 12-S-0176 road (SH 131)

Reconstruction of culvert in 1-CRIDP-11- Km 56/2 of Abdullapuram - 177 Vaniyambadi Vaniyambadi 3.00 12-S-0177 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 56/4 of Abdullapuram - 178 Vaniyambadi Vaniyambadi 4.00 12-S-0178 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 57/2 of Abdullapuram - 179 Vaniyambadi Vaniyambadi 4.00 12-S-0179 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 57/6 of Abdullapuram - 180 Vaniyambadi Vaniyambadi 3.00 12-S-0180 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 58/2 of Abdullapuram - 181 Vaniyambadi Vaniyambadi 3.00 12-S-0181 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 10/10 of Gudiyattam 182 Vaniyambadi Gudiyatham 4.00 12-S-0182 Gadambur Kailasagiri Vaniyambadi Road (SH 130)

Reconstruction of culvert in 1-CRIDP-11- Km 7/2 of Gudiyattam 183 Vaniyambadi Gudiyatham 4.00 12-S-0183 Gadambur Kailasagiri Vaniyambadi Road (SH 130)

Reconstruction of culvert in 1-CRIDP-11- Km 5/10 of Gudiyattam 184 Vaniyambadi Gudiyatham 4.00 12-S-0184 Gadambur Kailasagiri Vaniyambadi Road (SH 130)

SH Page 21 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert in 1-CRIDP-11- 185 Vaniyambadi Gudiyatham Km 8/8 of Pallikonda 4.00 12-S-0185 Palamaneri Road (SH 127)

Reconstruction of culvert in 1-CRIDP-11- 186 Vaniyambadi Gudiyatham Km 8/6 of Pallikonda 4.00 12-S-0186 Palamaneri Road (SH 127)

Reconstruction of culvert in Km 0/8 of Gudiyattam 1-CRIDP-11- Kilvaithinan 187 Vaniyambadi Gadambur Kailasagiri 4.00 12-S-0187 kuppam Vaniyambadi Road (SH 130)

Reconstruction of culvert in 1-CRIDP-11- Kilvaithinan 188 Vaniyambadi Km 5/4 of Chittoor 4.00 12-S-0188 kuppam Gudiyattam Road (SH 88)

Reconstruction of culvert in 1-CRIDP-11- Kilvaithinan 189 Vaniyambadi Km 5/2 of Chittoor 4.00 12-S-0189 kuppam Gudiyattam Road (SH 88)

Reconstruction of culvert in 1-CRIDP-11- Kilvaithinan 190 Vaniyambadi Km 4/4 of Chittoor 4.00 12-S-0190 kuppam Gudiyattam Road (SH 88)

Reconstruction of culvert in 1-CRIDP-11- Km 55/6 of Abdullapuram - 191 Vaniyambadi Vaniyambadi 4.00 12-S-0191 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 53/6 of Abdullapuram - 192 Vaniyambadi Vaniyambadi 3.00 12-S-0192 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 50/6 of Abdullapuram - 193 Vaniyambadi Vaniyambadi 3.00 12-S-0193 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

Reconstruction of culvert in 1-CRIDP-11- Km 49/8 of Abdullapuram - 194 Vaniyambadi Vaniyambadi 4.00 12-S-0194 Asanampattu - Alangayam - Tirupattur Road. (SH 122)

SH Page 22 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert in 1-CRIDP-11- Kilvaithinan 195 Vaniyambadi Km 4/8 of Chittoor 4.00 12-S-0195 kuppam Gudiyattam Road (SH 88)

Bridges/ CD Works/ Others 26 Nos. 99.00 Total Vaniyambadi 51.15 2008.00 Total

Improvements to Cheyyur 1-CRIDP-11- Tiruvanna Vandavasi Polur road Km 196 Vandawasi 2.50 80.00 12-S-0196 malai 64/0-65/4, 66/4-67/5 (SH 155)

Improvements to Cheyyur 1-CRIDP-11- Tiruvanna 197 Vandawasi Vandavasi Polur road Km 2.50 85.00 12-S-0197 malai 70/0 - 72/5 (SH 155)

Improvements to 1-CRIDP-11- Tiruvanna Kancheepuram Vandavasi 198 Vandawasi 3.40 85.00 12-S-0198 malai road Km 26/2 - 29/6 (SH 116) Improvements to 1-CRIDP-11- Tiruvanna Tiruvannamalai Avalurpet 199 Kilpennathur 3.00 90.00 12-S-0199 malai road Km 9/6 - 12/6 (SH 133A) Improvements to Arcot 1-CRIDP-11- Tiruvanna Tindivanam road Km 46/0 - 200 Cheyyar 2.80 85.00 12-S-0200 malai 47/0, 48/0-8, 49/0-50/0 (SH 5) Improvements to 1-CRIDP-11- Tiruvanna Kancheepuram Vandavasi 201 Vandawasi 4.00 95.00 12-S-0201 malai road Km 29/6 - 33/6 (SH 116)

Improvements to Cheyyur 1-CRIDP-11- Tiruvanna 202 Vandawasi Vandavasi Polur road Km 2.60 85.00 12-S-0202 malai 61/0 - 63/6 (SH 115)

Improvements to 1-CRIDP-11- Tiruvanna Tiruvannamalai Avalurpet 203 Kilpennathur 2.50 85.00 12-S-0203 malai road Km 5/5 - 8/0 (SH 133A)

Improvements to Villupuram 1-CRIDP-11- Tiruvanna 204 Tiruvannamalai Tiruvannamalai road Km 1.20 90.00 12-S-0204 malai 53/0 - 54/2 (SH 135)

Improvements to 1-CRIDP-11- Tiruvanna Tiruvannamalai Avalurpet 205 Kilpennathur 2.50 85.00 12-S-0205 malai road Km 3/0 - 5/5 (SH 133A)

SH Page 23 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Tiruvanna Tiruvannamalai 206 Tiruvannamalai 2.40 85.00 12-S-0206 malai Thiyagadurgam road Km 11/6 - 14/0 (SH 9A) Improvements to 1-CRIDP-11- Tiruvanna Tiruvannamalai 207 Tiruvannamalai 2.60 45.00 12-S-0207 malai Thiyagadurgam road Km 9/0 - 11/6 (SH 9A) Improvements to 1-CRIDP-11- Tiruvanna Thandrampet Kottakulam 208 Chengam 2.20 75.00 12-S-0208 malai road Km 16/0 - 18/2 (SH 6B) Improvements to 1-CRIDP-11- Tiruvanna Thandrampet Kottakulam 209 Chengam 3.20 85.00 12-S-0209 malai road Km 10/8 - 14/0 (SH 6B)

Improvements to Cheyyur 1-CRIDP-11- Tiruvanna Vandavasi Polur road Km 210 Polur 2.60 85.00 12-S-0210 malai 78/4-79/4, 80/0 - 80/4 & 86/0-87/2 (SH 115)

Improvements to Arcot 1-CRIDP-11- Tiruvanna 211 Polur Villupuram road Km 51/6 - 2.30 80.00 12-S-0211 malai 53/9 (SH 4) Improvements to Arcot 1-CRIDP-11- Tiruvanna 212 Polur Villupuram road Km 40/0 - 3.00 85.00 12-S-0212 malai 43/0 (SH 4)

Improvements to Arcot 1-CRIDP-11- Tiruvanna 213 Polur Villupuram road Km 43/0- 3.00 85.00 12-S-0213 malai 44/0, 46/0-48/0 (SH 4)

Improvements to Arcot 1-CRIDP-11- Tiruvanna Villupuram road Km 24/6 - 214 Arani 2.20 80.00 12-S-0214 malai 26/6 & 27/10 (Arni Town) (SH 4) Improvements to Arcot 1-CRIDP-11- Tiruvanna Villupuram road Km 48/0- 215 Polur 2.60 90.00 12-S-0215 malai 49/0, 50/0-51/6 ( Town) (SH 4)

Improvements to Arcot 1-CRIDP-11- Tiruvanna Tindivanam road Km 21/6 - 216 Cheyyar 3.00 85.00 12-S-0216 malai 22/4, 22/8 - 24/0, 32/0 - 33/0 (SH 5)

Strengthening/ Improvements 56.10 1745.00 Total

SH Page 24 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of Culvert at 1-CRIDP-11- Tiruvanna 217 Polur Km 48/6 of Arcot 35.00 12-S-0217 malai Villupuram road (SH 4)

Bridges/ CD Works/ Others 1 No. 35.00 Total Tiruvanna 56.10 1780.00 malai Total

Chennai Other works : 41 Nos. 272.85 15482.00 Circle Total

Widening from IL to DL of Sanipoondy-Keelpennathur- 1-CRIDP-11- 218 Villupuram Gingee Avalurpet-chetpet road 4.70 88.00 12-S-0218 Km.21/0-23/3, 24/0-26/4 (SH 4A)

Widening from IL to DL of 1-CRIDP-11- Sanipoondy-Keelpennathur- 219 Villupuram Gingee 5.00 92.00 12-S-0219 Avalurpet-chetpet road Km. 26/4-31/4 (SH 4A)

Widening & Improvements 9.70 180.00 Total

Improvements to Villupuram- 1-CRIDP-11- 220 Villupuram Villupuram Mambalapattu-Tirukoilur 2.00 90.00 12-S-0220 road Km.43/2-45/2 (SH 7)

Improvements to 1-CRIDP-11- Mundiyampakkam- 221 Villupuram Vikravandi 1.50 60.00 12-S-0221 Pondicherry road Km 9/0- 10/5 (SH 203)

Improvements to Tindivanam- 1-CRIDP-11- 222 Villupuram Tindivanam Marakkanam road Km.0/0- 2.00 78.00 12-S-0222 2/0 (SH 134)

Improvements to Old NH-45 1-CRIDP-11- passing through 223 Villupuram Vikravandi 1.36 60.00 12-S-0223 Vikkiravandy town Km.146/640-148/0 (SU 43)

Improvements to Arcot- 1-CRIDP-11- 224 Villupuram Gingee Villupuram road Km.53/9- 2.10 76.00 12-S-0224 56/0 (SH 4)

SH Page 25 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Arcot- 1-CRIDP-11- 225 Villupuram Gingee Villupuram road Km.56/0- 2.00 72.00 12-S-0225 58/0 (SH 4)

Improvements to Arcot- 1-CRIDP-11- 226 Villupuram Mailam Villupuram road Km.80/0- 2.00 72.00 12-S-0226 82/0 (SH 4)

Improvements to Arcot- 1-CRIDP-11- 227 Villupuram Mailam Villupuram road Km.82/0- 2.20 80.00 12-S-0227 84/2 (SH 4)

Improvements to 1-CRIDP-11- Mundiyampakkam- 228 Villupuram Vikravandi 1.50 60.00 12-S-0228 Pondicherry road Km 10/5- 12/0 (SH 203)

Improvements to Tindivanam- 1-CRIDP-11- 229 Villupuram Tindivanam Marakkanam road Km.2/0- 2.00 78.00 12-S-0229 4/0 (SH 134)

Strengthening/ Improvements 18.66 726.00 Total

Villupuram 28.36 906.00 Total

Widening from IL to DL of 1-CRIDP-11- Cuddalore-Thirukoilur- 230 Cuddalore Panruti 3.09 90.00 12-S-0230 Sankarapuram road km.30/100-33/187 (SH 68)

Widening from IL to DL of 1-CRIDP-11- Cuddalore-Thirukoilur- 231 Cuddalore Panruti 3.10 90.00 12-S-0231 Sankarapuram road km.27/0-30/100 (SH 68)

Widening from IL to DL and Improvements to Jaillhill- 1-CRIDP-11- 232 Cuddalore Kurinjipadi Vellakarai Kumalankulam 3.30 100.00 12-S-0232 road Km 1/8-5/100 (SH 138) Widening from IL to DL and Improvements to Jaillhill- 1-CRIDP-11- 233 Cuddalore Kurinjipadi Vellakarai Kumalankulam 3.30 100.00 12-S-0233 road Km 5/100-8/4 (SH 138)

Widening from IL to DL and 1-CRIDP-11- Improvements to Jaillhill- 234 Cuddalore Kurinjipadi 3.30 100.00 12-S-0234 Vellakarai Kumalankulam road Km 8/4-11/7 (SH 138)

SH Page 26 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL and Improvements to Jaillhill- 1-CRIDP-11- 235 Cuddalore Kurinjipadi Vellakarai Kumalankulam 3.30 100.00 12-S-0235 road Km 11/7-15/0 (SH 138) Widening from IL to DL and Improvements to Jaillhill- 1-CRIDP-11- 236 Cuddalore Kurinjipadi Vellakarai Kumalankulam 3.30 85.00 12-S-0236 road Km 15/0-18/3 (SH 138) Widening from IL to DL and Improvements to Jaillhill- 1-CRIDP-11- 237 Cuddalore Kurinjipadi Vellakarai Kumalankulam 0.60 55.00 12-S-0237 road Km 18/3-18/9 (SH 138) Widening & Improvements 23.29 720.00 Total Cuddalore 23.29 720.00 Total

Widening and Strengthening (IL-DL) Vridhachalam 1-CRIDP-11- ulundurpet Vilupuram Road 238 Kallakurichi Tirukkoyilur 0.80 95.00 12-S-0238 km 43/8-44/6 including Widening of CD work (SH 69)

Widening (IL-DL) Tiruvannamalai 1-CRIDP-11- 239 Kallakurichi Rishivandhiyam Thiyagadurgam Road km 3.66 70.00 12-S-0239 25/0-25/160 & 25/500 - 29/0 (SH 9A)

Widening and Strengthening 1-CRIDP-11- (IL-DL) Tiruvannamalai 240 Kallakurichi Rishivandhiyam 1.40 76.00 12-S-0240 Thiyagadurgam Road km 20/6-22/0 (SH 9A)

Widening (IL-DL) Cuddalore Tirukoilur Sankarapuram 1-CRIDP-11- 241 Kallakurichi Rishivandhiyam Road km 79/1-81/6 2.50 58.00 12-S-0241 including Widening of CD work (SH 9A)

Widening and Strengthening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 242 Kallakurichi Rishivandhiyam 1.40 80.00 12-S-0242 19/2-20/6 including Widening of CD work (SH 9A)

SH Page 27 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening (IL-DL) 1-CRIDP-11- Tiruvannamalai 243 Kallakurichi Rishivandhiyam 2.84 55.00 12-S-0243 Thiyagadurgam Road km 48/2-51/040 (SH 9A) Widening (IL-DL) 1-CRIDP-11- Tiruvannamalai 244 Kallakurichi Rishivandhiyam 3.00 55.00 12-S-0244 Thiyagadurgam Road km 45/2-48/2 (SH 9A)

Widening (IL-DL) Cuddalore Tirukoilur Sankarapuram 1-CRIDP-11- 245 Kallakurichi Rishivandhiyam Road km 76/6-79/1 2.50 58.00 12-S-0245 including Widening of CD work (SH 68)

Widening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 246 Kallakurichi Rishivandhiyam 4.00 80.00 12-S-0246 41/2-45/2 including Widening of CD work (SH 9A)

Widening and Strengthening from IL to DL in Cuddalore 1-CRIDP-11- Tirukoi lur Sankarapuram 247 Kallakurichi Rishivandhiyam 1.00 95.00 12-S-0247 Road Km97/0-98/0 including CD works at Km 97/6 (SH 68)

Widening and Strengthening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 248 Kallakurichi Rishivandhiyam 1.50 89.00 12-S-0248 22/0-23/5 including Construction of Retaining wall (SH 9A)

Widening and Strengthening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 249 Kallakurichi Rishivandhiyam 1.50 89.00 12-S-0249 23/5-25/0 including Widening of CD work (SH 9A)

Widening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 250 Kallakurichi Rishivandhiyam 3.00 60.00 12-S-0250 29/0 -32/0 including Widening of CD work (SH 9A)

SH Page 28 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening (IL-DL) Tiruvannamalai 1-CRIDP-11- Thiyagadurgam Road km 251 Kallakurichi Rishivandhiyam 5.24 100.00 12-S-0251 32/0-37/240 including Widening of CD work (SH 9A) Widening (IL-DL) Tiruvannamalai Thiyagadurgam Road km 1-CRIDP-11- 252 Kallakurichi Rishivandhiyam 37/240-41/2 including 3.96 75.00 12-S-0252 Widening of CD work and Construction of Retaining wall (SH 9A)

Widening and Strengthening 1-CRIDP-11- from IL to DL in Cuddalore 253 Kallakurichi Sankarapuram 1.00 57.00 12-S-0253 Tirukoi lur Sankarapuram Road Km98/0-99/0 (SH 68)

Widening and Strengthening from IL to DL in Cuddalore 1-CRIDP-11- 254 Kallakurichi Sankarapuram Tirukoi lur Sankarapuram 1.00 57.00 12-S-0254 Road Km99/0-100/0 (SH 68)

Widening and Strengthening from IL to DL in Cuddalore 1-CRIDP-11- 255 Kallakurichi Sankarapuram Tirukoilur Sankarapuram 1.00 58.00 12-S-0255 Road Km 100/0 - 101/0 (SH 68)

Widening and Strengthening from IL to DL in Cuddalore 1-CRIDP-11- 256 Kallakurichi Sankarapuram Tirukoilur Sankarapuram 1.05 58.00 12-S-0256 Road Km 101/0 - 102/052 (SH 68)

Widening (IL-DL) Vridhachalam Ulundurpet 1-CRIDP-11- 257 Kallakurichi Tirukkoyilur Vilupuram Road km 45/4- 3.20 80.00 12-S-0257 48/600 including Widening of CD work (SH 69)

Widening and Strengthening (IL-DL) Vridhachalam 1-CRIDP-11- 258 Kallakurichi Tirukkoyilur Ulundurpet Vilupuram Road 0.90 99.00 12-S-0258 km 48/600-49/5 including Widening of CD work (SH 69)

SH Page 29 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Strengthening (IL-DL) Vridhachalam 1-CRIDP-11- 259 Kallakurichi Tirukkoyilur Ulundurpet Vilupuram Road 0.90 99.00 12-S-0259 km 49/5-50/4 including Widening of CD work (SH 69)

Widening and Strengthening (IL-DL) Vridhachalam 1-CRIDP-11- 260 Kallakurichi Tirukkoyilur ulundurpet Vilupuram Road 0.80 95.00 12-S-0260 km 44/6-45/4 including Widening of CD work (SH 69)

Widening & Improvements 48.15 1738.00 Total

Strengthening Vridhachalam 1-CRIDP-11- 261 Kallakurichi Ulundurpettai Ulundurpet Viluppuram 2.00 100.00 12-S-0261 Road Km.34/0-36/0 (SH 69)

Strengthening Vridhachalam 1-CRIDP-11- Ulundurpet Viluppuram 262 Kallakurichi Ulundurpettai 2.00 100.00 12-S-0262 Road Km.29/0-30/3, 31/3- 32/0 (SH 69)

Strengthening Villupuram- 1-CRIDP-11- 263 Kallakurichi Tirukkoyilur Mampalapattu-Thirukoilur 1.40 56.00 12-S-0263 Road Km.. 65/2-66/6 (SH 7)

Strengthening Villupuram- 1-CRIDP-11- 264 Kallakurichi Tirukkoyilur Mampalapattu-Thirukoilur 2.20 80.00 12-S-0264 Road Km..60/0-62/2 (SH 7)

Strengthening Kallakurichi- 1-CRIDP-11- Koothakudi Road Km.6/5- 265 Kallakurichi Kallakurichi 1.50 88.00 12-S-0265 8/0 including Widening of CD Works (SH 204)

Strengthening Thirukoilur - 1-CRIDP-11- 266 Kallakurichi Ulundurpettai Asanur Road Km.34/0- 1.70 100.00 12-S-0266 35/7. (SH 137)

Strengthening Thirukoilur - 1-CRIDP-11- 267 Kallakurichi Ulundurpettai Asanur Road Km.32/4-34/0 1.60 95.00 12-S-0267 (SH 7)

SH Page 30 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening Villupuram- 1-CRIDP-11- 268 Kallakurichi Tirukkoyilur Mampalapattu-Thirukoilur 1.40 58.00 12-S-0268 Road Km.57/2-58/6 (SH 7)

Strengthening Villupuram- 1-CRIDP-11- 269 Kallakurichi Tirukkoyilur Mampalapattu-Thirukoilur 1.40 57.00 12-S-0269 Road Km.58/6-60/0. (SH 7)

Strengthening Kallakurichi- Thiruvannamalai Road 1-CRIDP-11- 270 Kallakurichi Sankarapuram Km.20/2-22/2 including 2.00 99.00 12-S-0270 Widening of CD work (SH 6)

Strengthening Kallakurichi- Thiruvannamalai Road 1-CRIDP-11- 271 Kallakurichi Sankarapuram Km.18/4-20/2 including 1.80 99.00 12-S-0271 Widening of CD work (SH 6)

Strengthening Kallakurichi- 1-CRIDP-11- 272 Kallakurichi Kallakurichi Thiruvannamalai Road 1.00 70.00 12-S-0272 Km.0/0-1/0 (SH 6)

Strengthening Kallakurichi- 1-CRIDP-11- 273 Kallakurichi Rishivandhiyam Thiruvannamalai Road 1.60 95.00 12-S-0273 Km.38/0-39/6 (SH 6)

Strengthening Thirukoilur - 1-CRIDP-11- Asanur Road Km.29/100- 274 Kallakurichi Ulundurpettai 1.70 100.00 12-S-0274 30/8 including Widening of CD Works (SH 137)

Strengthening Thirukoilur - 1-CRIDP-11- 275 Kallakurichi Ulundurpettai Asanur Road Km.30/8- 1.60 95.00 12-S-0275 32/4. (SH 137)

Strengthening Kallakurichi- Thiruvannamalai Road 1-CRIDP-11- Km.39/6-41/3 including 276 Kallakurichi Rishivandhiyam 1.70 100.00 12-S-0276 Widening of CD Works including Bus Lay at km 40/4 (SH 6)

Strengthening/ Improvements 26.60 1392.00 Total Kallakurichi 74.75 3130.00 Total

SH Page 31 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL in km 28/0 - 28/4 of Ariyalur - 1-CRIDP-11- 277 Ariyalur Jayankonadam Muthuvanchery - 0.80 20.00 12-S-0277 Sripuranthan road including CD works. (SH 139)

Widening IL to DL and 1-CRIDP-11- improvements in Km.8/0- 278 Ariyalur Kunnam 1.50 93.00 12-S-0278 9/500 of Mathur - Thittakudi road. (SH 143)

Widening SL to DL and improvements in km 47/850 1-CRIDP-11- 279 Ariyalur Jayankonadam - 48/6 of Virthachalam - 0.75 62.00 12-S-0279 Madhanathur road (Via) Jayakondam (SH 140)

Widening IL to DL and 1-CRIDP-11- improvements in Km.9/500 - 280 Ariyalur Kunnam 1.50 93.00 12-S-0280 11/0 of Mathur - Thittakudi road. (SH 143)

Widening IL to DL in 1-CRIDP-11- 281 Ariyalur Kunnam Km.11/0-13/0 of Mathur - 2.00 50.00 12-S-0281 Thittakudi road (SH 143)

Widening IL to DL and 1-CRIDP-11- Improvements in Km.13/0- 282 Ariyalur Kunnam 1.00 100.00 12-S-0282 14/0 of Mathur - Thittakudi road (SH 143)

Widening IL to DL and 1-CRIDP-11- improvements in Km 14/0- 283 Ariyalur Kunnam 1.00 75.00 12-S-0283 15/0 of Mathur - Thittakudi road (SH 143) Widening IL to DL and 1-CRIDP-11- improvements in Km 15/0- 284 Ariyalur Kunnam 1.00 100.00 12-S-0284 16/0 of Mathur - Thittakudi road (SH 143) Widening IL to DL in Km 1-CRIDP-11- 20/0-20/350 & 21/800- 285 Ariyalur Kunnam 2.55 75.00 12-S-0285 24/0 of Mathur - Thittakudi road (SH 143)

Widening IL to DL in Km 1-CRIDP-11- 286 Ariyalur Kunnam 24/0 - 25/900 of Mathur - 1.90 55.00 12-S-0286 Thittakudi road (SH 143)

Widening IL to DL in km 0/0 1-CRIDP-11- 287 Ariyalur Jayankonadam - 4/0 of Kodukkur - 4.00 100.00 12-S-0287 Kaduvetti road (SH 144)

SH Page 32 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL in km 4/0 1-CRIDP-11- 288 Ariyalur Jayankonadam - 8/0 of Kodukkur - 4.00 99.00 12-S-0288 Kaduvetti road (SH 144)

Widening IL to DL in Km.16/0-17/0 and improvements to Km.16/950- 1-CRIDP-11- 17/070 of Mathur - 289 Ariyalur Kunnam 1.00 80.00 12-S-0289 Thittakudi road including reconstruction of bridge and protective wall at Km.16/6, 8. (SH 143)

Widening & Improvements 23.00 1002.00 Total

Improvements in Km 48/0- 50/0, Athur - Perambalur 1-CRIDP-11- 290 Ariyalur Ariyalur road and construction of 2.00 86.00 12-S-0290 retaining wall at km 49/8,10 (SH 157)

Improvements in Km 50/0 - 1-CRIDP-11- 291 Ariyalur Perambalur 50/4 & 51/4 - 52/0 of Athur 1.00 44.00 12-S-0291 - Perambalur road (SH 157)

Strengthening/ Improvements 3.00 130.00 Total

Ariyalur Total 26.00 1132.00

Villupuram 152.40 5888.00 Circle Total

Widening From DL to ML & Improvements at km 135/8- 1-CRIDP-11- 136/6, 137/4-137/6 of 292 Trichy Trichyeast 0.75 100.00 12-S-0292 Nagai -Gudalur -Mysore Road including construction of center median (SU 89)

Widening & Improvements 0.75 100.00 Total

SH Page 33 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Trichy - 1-CRIDP-11- 293 Trichy Musiri Namakkal Road km 27/0- 1.60 97.00 12-S-0293 28/6 (double lane) (SH 25)

Improvements to Trichy - 1-CRIDP-11- 294 Trichy Musiri Namakkal Road km 28/6- 1.40 86.00 12-S-0294 30/0 (double lane) (SH 25)

Improvements to Trichy - 1-CRIDP-11- 295 Trichy Musiri Namakkal Road km 30/4- 1.20 72.00 12-S-0295 31/6 (double lane) (SH 25)

Improvements to Trichy - 1-CRIDP-11- 296 Trichy Manachanallur Namakkal Road km 17/2- 1.60 100.00 12-S-0296 18/8 (double lane) (SH 25)

Improvements to Trichy - 1-CRIDP-11- 297 Trichy Manachanallur Namakkal Road km 18/8- 1.20 70.00 12-S-0297 20/0 (double lane) (SH 25)

Improvements to Samayapuram - Byepass Road Km 306/0-307/050 1-CRIDP-11- 298 Trichy Manachanallur including Construction of 1.05 100.00 12-S-0298 culvert at km 306/6 and construction of side drain (SU 134)

Improvements to Musiri - 1-CRIDP-11- Thuraiyur -Athur Road km 299 Trichy Thuraiyur 2.60 97.00 12-S-0299 14/0-16/025, 16/665- 17/236 (double lane) (SH 30)

Improvements to Musiri - Kulithalai -Pudukkottai - 1-CRIDP-11- Alangudy -Peravoorani - 300 Trichy Srirangam 0.60 25.00 12-S-0300 Sethubavachathram Road km 35/2-35/8 (double lane) (SH 71) Improvements to Trichy - 1-CRIDP-11- Thuraiyur Road km 23/0- 301 Trichy Manachanallur 2.60 100.00 12-S-0301 23/8, 19/4-21/2 (double lane) (SH 62)

Improvements to Trichy - 1-CRIDP-11- 302 Trichy Thuraiyur Thuraiyur Road km 23/8- 2.40 95.00 12-S-0302 26/2, (double lane) (SH 62)

Improvements to Trichy - 1-CRIDP-11- 303 Trichy Thuraiyur Thuraiyur Road km 27/0- 2.60 100.00 12-S-0303 29/6 (double lane) (SH 62)

SH Page 34 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Namakkal - 1-CRIDP-11- Kannanur Road km 44/0- 304 Trichy Thuraiyur 1.43 60.00 12-S-0304 45/428 (double lane) (SH 161)

Improvements to Chennai - 1-CRIDP-11- Trichy -Dindugal Road km 305 Trichy Trichyeast 0.70 50.00 12-S-0305 317/0-317/7 (Mulitilane ) (SU 9)

Improvements to Trichy - 1-CRIDP-11- Thuraiyur Road km 11/0- 306 Trichy Manachanallur 2.40 90.00 12-S-0306 12/0, 13/2-14/6 (double lane) (SH 62)

Improvements to Trichy - 1-CRIDP-11- 307 Trichy Manachanallur Thuraiyur Road km 14/6- 2.40 93.00 12-S-0307 17/0 (double lane) (SH 62)

Improvements to Trichy - 1-CRIDP-11- 308 Trichy Manachanallur Thuraiyur Road km 17/0- 2.40 92.00 12-S-0308 19/4 (double lane) (SH 62)

Strengthening/ Improvements 28.17 1327.00 Total

Re construction of culverts 1-CRIDP-11- at km 17/8 of Manapparai - 309 Trichy Manapparai 20.00 12-S-0309 Thuvarankurichi Road (SH 71A)

Bridges/ CD Works/ Others 1 No. 20.00 Total Trichy Total 28.92 1447.00

Widening from Intermediate lane to Double lane in KM 89/6-91/2 and Improvements in KM 89/6- 1-CRIDP-11- 91/2 of Musiri - Kulithalai - 310 Pudukottai pudukottai 1.60 80.00 12-S-0310 Pudukkottai - Alangudi - - Sethubavachathiram road including reconstruction of culvert at KM 90/8 (SH 71)

SH Page 35 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Intermediate lane to Double lane in KM 91/2-93/0 and Improvements in KM 91/2- 93/0 of Musiri - Kulithalai - 1-CRIDP-11- 311 Pudukottai pudukottai Pudukkottai - Alangudi - 1.80 92.00 12-S-0311 Peravurani - Sethubavachathiram road including reconstruction of culvert at KM 92/2,92/6 (SH 71)

Widening from Intermediate lane to Double lane in KM 80/0-82/6 and Improvements in KM 81/0- 1-CRIDP-11- 82/6 of Musiri - Kulithalai - 312 Pudukottai Viralimalai 2.60 97.00 12-S-0312 Pudukkottai - Alangudi - Peravurani - Sethubavachathiram road including culvert at KM 81/6 (SH 71)

Widening from Intermediate lane to Double lane in KM 82/6-84/6 and Improvements in KM 83/6- 1-CRIDP-11- 313 Pudukottai Viralimalai 84/6 of Musiri - Kulithalai - 2.00 68.00 12-S-0313 Pudukkottai - Alangudi - Peravurani - Sethubavachathiram road (SH 71)

Widening Intermediate lane to Double lane and 1-CRIDP-11- 314 Pudukottai Aranthangi Improvements in KM 0/8- 3.20 97.00 12-S-0314 4/0 of Aranthangi - Kattumavadi road (SH 145)

Widening Intermediate lane to Double lane and 1-CRIDP-11- Improvements in KM 4/4- 315 Pudukottai Aranthangi 3.60 100.00 12-S-0315 6/6, 7/2-7/5, 7/9-9/0 of Aranthangi - Kattumavadi road (SH 145)

SH Page 36 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening Intermediate lane to Double lane in KM 81/6- 85/0 of - - Aranthangi - Karaikudi - Kallal - 1-CRIDP-11- 316 Pudukottai Alangudi Kalaiyarkoil - 3.40 63.00 12-S-0316 Maravamangalam - Illyangudi - Paramakudi - Muthukulathur - Sayalkudi road including culvert at KM 84/4 (SH 29)

Widening & Improvements 18.20 597.00 Total

Improvements to Thiruchirappalli - 1-CRIDP-11- Pudukkottai - Aranthangi - 317 Pudukottai Aranthangi 1.80 72.00 12-S-0317 Mimisal road KM 77/2-77/6, 79/6-81/0 including culvert at KM 77/6, 79/8 ( SH 26 )

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 318 Pudukottai Alangudi Alangudi - Peravurani - 1.60 62.00 12-S-0318 Sethubavachathiram road KM 112/0-113/6 ( SH 71 )

Improvements to Thiruchirappalli - 1-CRIDP-11- 319 Pudukottai Aranthangi Pudukkottai - Aranthangi - 2.00 78.00 12-S-0319 Mimisal road KM 81/0-83/0 ( SH 26 )

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 320 Pudukottai Alangudi Alangudi - Peravurani - 1.40 55.00 12-S-0320 Sethubavachathiram road KM 113/6-115/0 (SH 71)

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 321 Pudukottai Alangudi Alangudi - Peravurani - 2.00 75.00 12-S-0321 Sethubavachathiram road KM 128/0-130/0 (SH 71)

SH Page 37 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 322 Pudukottai Alangudi Alangudi - Peravurani - 2.00 75.00 12-S-0322 Sethubavachathiram road KM 130/0-132/0 (SH 71)

Improvements to 1-CRIDP-11- Thirukkattuppalli - 323 Pudukottai Gandharvakottai 1.60 62.00 12-S-0323 Sengipatti - Pattukkottai road KM 35/4-37/0 (SH 99)

Improvements to 1-CRIDP-11- Thirukkattuppalli - 324 Pudukottai Gandharvakottai 1.60 50.00 12-S-0324 Sengipatti - Pattukkottai road KM 43/4-45/0 (SH 99)

Improvements to 1-CRIDP-11- Thirukkattuppalli - 325 Pudukottai Gandharvakottai 2.00 75.00 12-S-0325 Sengipatti - Pattukkottai road KM 45/0-47/0 (SH 99)

Strengthening/ Improvements 16.00 604.00 Total

Pudukottai 34.20 1201.00 Total

Widening from Intermediate lane to Double lane and Improvements to Thanjavur- Pattukkottai-Aranthangi- Karaikkudi-Kallal- Kalaiyarkoil - 1-CRIDP-11- 326 Tanjavur Peravurani Maravanmangalam- 2.20 140.00 12-S-0326 elaiyankudi-paramakkudi- Muthukulathur-Sayalkudi road K.M. 61/8-64/0 including culverts at K.M. 61/10, 62/6, 62/10, 63/6, 63/10 (SH 29)

SH Page 38 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Intermediate Lane to Double Lane and Improvements of Nagore - Nannilam - Nachiyarkoil 1-CRIDP-11- 327 Tanjavur Thiruvidaimaruthur Road in Km 41/2-42/4 and 1.20 81.00 12-S-0327 Reconstruction of culvert @ KM 41/10 , KM 42/4 and construction of retaining wall in KM 42/4. (SH 67)

Widening from Intermediate lane to Double lane and Improvements to Thanjavur- Pattukkottai-Aranthangi- Karaikkudi-Kallal- Kalaiyarkoil - 1-CRIDP-11- 328 Tanjavur Peravurani Maravanmangalam- 2.80 155.00 12-S-0328 elaiyankudi-paramakkudi- Muthukulathur-Sayalkudi road K.M. 59/0-61/8 including culverts at K.M. 59/2,4,6 60/4,60/10 & 61/2.(SH 29)

Widening from Intermediate Lane to Double Lane and 1-CRIDP-11- Improvements of Nagore - 329 Tanjavur Thiruvidaimaruthur 1.00 70.00 12-S-0329 Nannilam - Nachiyar koil Road in KM 44/0-45/0 (SH 67)

Widening from Intermediate Lane to Double Lane and Improvements of Nagore - 1-CRIDP-11- 330 Tanjavur Thiruvidaimaruthur Nannilam - Nachiyarkoil 1.20 84.00 12-S-0330 Road in Km 40/0-41/2 and construction of retaining wall in KM 40/6. (SH 67)

Widening IL to DL and Improvements to 1-CRIDP-11- Mannargudi - 331 Tanjavur Pattukottai 1.80 122.00 12-S-0331 Sethubavachatram Road Km 28/0- 29/8 including culvert at Km 29/4 (SH 146)

SH Page 39 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening Indermetiate lane to Double lane & Improvements to 1-CRIDP-11- 332 Tanjavur Orathanadu Mannargudi - 2.40 169.00 12-S-0332 Sethubavachatram Km 10/6- 13/0 pipe culvert at Km 11/6,12/8 (SH 146)

Widening and Improvements to Mannargudi- Sethubavachatram Road Km 1-CRIDP-11- 333 Tanjavur Orathanadu 13/0-15/6 including 2.60 178.00 12-S-0333 reconstruction of Pipe culvert at Km 14/10, 15/2 (SH 146)

Widening and Improvements to Mannargudi- Sethubavachatram Road Km 1-CRIDP-11- 15/6-18/0 including 334 Tanjavur Orathanadu 2.40 171.00 12-S-0334 Reconstruction of pipe culvert at Km 15/10, 16/8 and reconstruction of slab culvert at Km 17/2 (SH 146)

Widening and Improvements to Mannargudi- 1-CRIDP-11- Sethubavachatram Road Km 335 Tanjavur Orathanadu 2.40 168.00 12-S-0335 18/0-20/4 including reconstruction of pipe culvert at Km 19/8. (SH 146)

Widening & Improvements 20.00 1338.00 Total Improvements to Grand 1-CRIDP-11- Anaicut - Cauveripattinam 336 Tanjavur 1.00 42.00 12-S-0336 Road Km 56/0-57/0. (SH 22)

Improvements to Perabalur - 1-CRIDP-11- 337 Tanjavur Thanjavur Manamadurai Road Km 0.40 32.00 12-S-0337 73/6 - 74/0 (SH 27)

Improvements to Nagai - 1-CRIDP-11- 338 Tanjavur Thanjavur Gudalore - Mysore road Km 1.00 42.00 12-S-0338 85/0 - 86/0 (SU 89)

SH Page 40 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Thanjavur - 1-CRIDP-11- 339 Tanjavur Thanjavur Road Km 2/0-2/6 0.60 50.00 12-S-0339 (ML) (SH 99A)

Improvements to Thanjavur - 1-CRIDP-11- 340 Tanjavur Thanjavur Vallam Road Km 3/0-3/6 0.60 50.00 12-S-0340 (ML) (SH 99A)

Improvements to Thanjavur - 1-CRIDP-11- 341 Tanjavur Thanjavur Vallam road Km 4/0 - 4/4 0.40 35.00 12-S-0341 (SH 99A) Improvements to Nagai - 1-CRIDP-11- 342 Tanjavur Thanjavur Gudalore - Mysore road Km 0.80 49.00 12-S-0342 83/0 - 83/8 (SU 89) Improvements to Grand 1-CRIDP-11- Anaicut - Cauveripattinam 343 Tanjavur Thiruvidaimaruthur 1.26 50.00 12-S-0343 Road Km 79/0-80/255 (SH 22)

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 344 Tanjavur Peravurani Alangudi - Peravurani - 1.00 40.00 12-S-0344 Sethubavachatram road K.M.140/0-141/0. (SH 71)

Improvements to 1-CRIDP-11- 345 Tanjavur Thiruvidaimaruthur - Sirkali Road 1.20 50.00 12-S-0345 Km 11/0-12/2 (SH 54)

Improvements to Grand 1-CRIDP-11- Anaicut - Cauveripattinam 346 Tanjavur Kumbakonam 1.00 45.00 12-S-0346 Road in KM 62/6-63/6 (SH 22)

Improvements to Grand Anaicut - Cauveripattinam 1-CRIDP-11- 347 Tanjavur Papanasam Road Km 58/0-59/0 1.00 45.00 12-S-0347 including drain at Km 58/6, 8,10 (DL) (SH 22)

Improvements to Grand Anaicut - Cauveripattinam 1-CRIDP-11- Road Km 54/0-55/0 348 Tanjavur Papanasam 1.00 46.00 12-S-0348 including drain at Km 54/2,10 and culvert km.54/2 (DL) (SH 22)

Improvements to Thanjavur - 1-CRIDP-11- 349 Tanjavur Thanjavur Vallam Road Km 3/6-4/0 0.40 33.00 12-S-0349 (ML) (SH 99A)

SH Page 41 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Thanjavur - 1-CRIDP-11- 350 Tanjavur Thanjavur Vallam Road Km 2/6-3/0 0.40 33.00 12-S-0350 (ML) (SH 99A)

Improvements to Nagai - 1-CRIDP-11- 351 Tanjavur Thanjavur Gudalore - Mysore road Km 1.00 42.00 12-S-0351 86/0-87/0 (SU 89)

Improvements to Perambalur 1-CRIDP-11- 352 Tanjavur Thanjavur - Manamadurai Road Km 0.60 48.00 12-S-0352 74/0-74/6 (SH 27)

Improvements to Grand 1-CRIDP-11- Anaicut - Cauveripattinam 353 Tanjavur Kumbakonam 1.00 45.00 12-S-0353 Road in KM 63/6-64/6 (SH 22)

Improvements to Grand Anaicut - Cauveripattinam 1-CRIDP-11- 354 Tanjavur Papanasam Road Km 55/0-56/0 1.00 43.00 12-S-0354 including drain at Km 55/6 (SH 22)

Improvements to Grand Anaicut - Cauveripattinam 1-CRIDP-11- Road Km 57/0- 355 Tanjavur Papanasam 1.00 44.00 12-S-0355 58/0including culvert at Km 57/6 and drain at Km 57/6. (DL) (SH 22)

Improvements to Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthuthuraipoondi - 356 Tanjavur Orathanadu 1.05 45.00 12-S-0356 Vedaranyam - Kodiyakkarai Road Km 13/4 - 14/450 (SH 63)

Improvements to 1-CRIDP-11- 357 Tanjavur Thiruvidaimaruthur Kumbakonam - Sirkali Road 1.20 50.00 12-S-0357 Km 6/0- 7/2 (SH 64)

Improvements to Thanjavur - 1-CRIDP-11- 358 Tanjavur Thanjavur Vallam road Km 4/4 - 4/8 0.40 35.00 12-S-0358 (SH 99A) Improvements to Nagai - 1-CRIDP-11- 359 Tanjavur Thanjavur Gudalore - Mysore road Km 0.80 49.00 12-S-0359 83/8 - 84/6 (SU 89)

Strengthening/ Improvements 20.11 1043.00 Total

Tanjavur 40.11 2381.00 Total

SH Page 42 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL and Improvements in km 75/8- 77/0 of Thanjavur- 1-CRIDP-11- 360 Vedaranyam Mannargudi - 1.20 85.00 12-S-0360 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road. (SH 63)

Widening from IL - DL in km 105/0 - 108/0 of 1-CRIDP-11- 361 Nagapattinam Poompuhar Grandanaicut - 3.00 85.00 12-S-0361 Cauveripattinam Road (SH 22)

Widening from IL - DL and Improvements of 1-CRIDP-11- 362 Nagapattinam Mayiladuthurai Vaitheeswarankoil - 1.70 100.00 12-S-0362 Loweranaicut road km 16/450 - 18/150 (SH 150)

Widening from IL - DL and improvements in km 111/0 - 1-CRIDP-11- 363 Nagapattinam Poompuhar 112/700 of Grandanaicut - 1.70 97.00 12-S-0363 Cauveripattinam Road (SH 22)

Widening from IL - DL in km 114/500 - 116/745 and 1-CRIDP-11- Improvements in km 364 Nagapattinam Poompuhar 2.25 90.00 12-S-0364 114/500 - 115/8 of Grandanaicut - Cauveripattinam (SH 22)

Widening from IL to DL in Km 0/0 - 2/0 and 1-CRIDP-11- 365 Nagapattinam Sirkazhi Improvements to Km 1/0 - 2.00 82.00 12-S-0365 1/8 of Vaitheeswarankoil - Loweranaicut road. (SH 150)

Widening from IL to DL and improvements in Km 1-CRIDP-11- 116/745 - 118/0 of 366 Nagapattinam Poompuhar 1.26 75.00 12-S-0366 Grandanaicut - Cauveripattinam road. (SH 22) Widening from IL to DL and Improvements in km 1-CRIDP-11- 112/700-114/500 of 367 Nagapattinam Poompuhar 1.80 97.00 12-S-0367 Grandanaicut - Cauveripattinam Road. (SH 22)

SH Page 43 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL in Km 118/0 - 119/6 and 1-CRIDP-11- Improvements to Km 118/0 - 368 Nagapattinam Sirkazhi 1.60 92.00 12-S-0368 121/0 of Grandanaicut - Cauveripattinam road. (SH 22)

Widening from IL to DL in 1-CRIDP-11- km 2/0-4/0 of 369 Nagapattinam Sirkazhi 2.00 61.00 12-S-0369 Vaitheeswarankoil - Loweranaicut Road. (SH 150)

Widening from IL to DL and Improvements in km 119/6- 1-CRIDP-11- 370 Nagapattinam Sirkazhi 121/0 of Grandanaicut- 1.40 83.00 12-S-0370 Cauveripattinam Road. (SH 22)

Widening from IL to DL and improvements in Km 74/6 - 75/8 of Thanjavur - 1-CRIDP-11- 371 Nagapattinam Vedaranyam Mannargudy - 1.20 95.00 12-S-0371 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road. (SH 63)

Widening from IL to DL and Improvements of 1-CRIDP-11- 372 Nagapattinam Mayiladuthurai Vaitheeswarankoil - 1.70 98.00 12-S-0372 Loweranaicut Road Km 18/150-19/850. (SH 150)

Widening from IL to DL and improvements in Km 95/4 - 95/6, 96/0-97/0 of 1-CRIDP-11- 373 Nagapattinam Vedaranyam Thanjavur - Mannargudy - 1.20 98.00 12-S-0373 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road (SH 63)

Widening from IL to DL in Km 98/0 - 99/0 of 1-CRIDP-11- Thanjavur - Mannargudy - 374 Nagapattinam Vedaranyam 1.00 48.00 12-S-0374 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road (SH 63)

SH Page 44 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from IL to DL in Km 104/3 - 106/8 of 1-CRIDP-11- Thanjavur - Mannargudy - 375 Nagapattinam Vedaranyam 2.50 92.00 12-S-0375 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road (SH 63)

Widening from IL to DL and improvements in Km 14/0- 1-CRIDP-11- 376 Nagapattinam Nagapattinam 14/250, 20/0-21/0, of 1.25 84.00 12-S-0376 Nagore - Nannilam - Nachiyarkoil Road (SH 67)

Widening from IL to DL and Improvements in km 21/4- 1-CRIDP-11- 377 Nagapattinam Nagapattinam 22/0 and 23/2-24/0 of 1.40 91.00 12-S-0377 Nagore - Nannilam - Nachiyarkoil Road (SH 67)

Widening from IL to DL and Improvements in km 97/0- 98/0 of Thanjavur - 1-CRIDP-11- 378 Nagapattinam Vedaranyam Mannargudi - 1.00 68.00 12-S-0378 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road (SH 63)

Widening from IL to DL in km 99/0-100/4 of 1-CRIDP-11- Thanjavur - Mannargudi - 379 Nagapattinam Vedaranyam 1.40 58.00 12-S-0379 Thiruthuraipoondi - Vedaranyam - Kodiyakarai Road.(SH 63)

Widening from IL to DL in km 108/0-111/0 of 1-CRIDP-11- 380 Nagapattinam Poompuhar Grandanaicut - 3.00 74.00 12-S-0380 Cauveripattinam Road. (SH 22) Widening & Improvements 35.55 1753.00 Total

Reconstruction of culvert at 1-CRIDP-11- 381 Nagapattinam Sirkazhi km 48/10 of Kumbakonam - 6.00 12-S-0381 Sirkali Road (SH 64)

Bridges/ CD Works/ Others 1 No. 6.00 Total Nagapattinam 35.55 1759.00 Total

SH Page 45 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Intermediate Lane to Double Lane and 1-CRIDP-11- Improvements from Km.27/0- 382 Tiruvarur Mannargudi 1.00 57.00 12-S-0382 28/0 of S.H.202 Tiruvarur - Mannargudi - Muthupet road (SH 202)

Widening from IL to DL of Nagore - Nagapattinam - 1-CRIDP-11- Thiruthurai Ramnad - Tuticorin road 383 Tiruvarur 1.20 62.00 12-S-0383 poondi Km.55/8 - 57/0 and including Construction of Side drain (SH 200)

Widening from IL to DL and Improvements of SH.65 1-CRIDP-11- 384 Tiruvarur Tiruvarur Tiruvarur - Kodavasal - 0.40 16.50 12-S-0384 Kumbakonam road Km.2/6 - 3/0 (SH 65)

Widening from IL to DL of Thanjavur - Mannargudi - Thiruthuraipoondi - Vedaranyam - Kodiakkarai 1-CRIDP-11- Thiruthurai 385 Tiruvarur road Km.59/200 - 59/300 0.10 30.00 12-S-0385 poondi and including curves improvements at Km.59/2, 59/8 and Side drain at Km.59/4 & 59/6 (SH 63)

Widening from Intermediate lane to Double Lane and Improvements of - 1-CRIDP-11- Thiruthurai 386 Tiruvarur Mannargudi-Muthupet Road 0.90 58.00 12-S-0386 poondi Km.55/100-56/0 including Reconstruction of Culvert @ Km.55/4 (SH 202)

Widening from Intermediate lane to Double Lane and 1-CRIDP-11- Thiruthurai 387 Tiruvarur Improvements of Thiruvarur- 1.00 75.00 12-S-0387 poondi Mannargudi-Muthupet Road Km.56/0-57/0 (SH 202)

SH Page 46 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Intermediate lane to Double Lane and Improvements of Thiruvarur- 1-CRIDP-11- Thiruthurai 388 Tiruvarur Mannargudi - Muthupet 1.20 80.00 12-S-0388 poondi Road Km.57/0-58/2 and including protective works at Km.57/10(Lt) (SH 202)

Widening from Intermediate Lane to Double Lane and 1-CRIDP-11- Improvements from Km.25/3- 389 Tiruvarur Mannargudi 1.70 97.00 12-S-0389 27/0 of S.H.202 Tiruvarur - Mannargudi - Muthupet road (SH 202)

Widening from IL to DL of Nagore - Nagapattinam - 1-CRIDP-11- Thiruthurai Ramnad - Tuticorin road 390 Tiruvarur 2.00 88.00 12-S-0390 poondi Km.57/0 - 59/0 and including Construction of Side drain (SH 200)

Widening from Intermediate lane to Double Lane of 1-CRIDP-11- Thiruthurai 391 Tiruvarur SH.202 Thiruvarur- 1.30 45.00 12-S-0391 poondi Mannargudi-Muthupet Road Km.58/2-59/500 (SH 202)

Widening & Improvements 10.80 608.50 Total Improvements to 1-CRIDP-11- Thiruthurai Mayiladuthurai - 392 Tiruvarur 1.60 62.00 12-S-0392 poondi Thiruthuraipoondi road Km.56/4 - 58/0 (SH 23)

Improvements to Tiruvarur - 1-CRIDP-11- Mannargudi - Muthupet 393 Tiruvarur Mannargudi 2.50 76.00 12-S-0393 road Km.32/500 - 35/0 (SH 202)

Improvements to Tiruvarur - 1-CRIDP-11- Mannargudi - Muthupet 394 Tiruvarur Mannargudi 2.50 75.00 12-S-0394 road Km.30/0 - 32/500 (SH 202)

SH Page 47 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 395 Tiruvarur 1.40 53.00 12-S-0395 poondi Vedaranyam - Kodiakkarai road Km.49/6 - 51/0 (SH 63) Improvements to 1-CRIDP-11- Thiruthurai Mayiladuthurai - 396 Tiruvarur 2.00 78.00 12-S-0396 poondi Thiruthuraipoondi road Km.58/0 - 60/0 (SH 23)

Improvements to Thiruvarur - 1-CRIDP-11- 397 Tiruvarur Tiruvarur Kodavasal - Kumbakonam 1.20 50.00 12-S-0397 road Km.1/4 - 2/6 (SH 65)

Improvements to Thiruvarur - 1-CRIDP-11- Mannargudi - Muthupet 398 Tiruvarur Tiruvarur 1.00 36.00 12-S-0398 road Km.13/8, 15/2- 16/0 (SH 202)

Improvements to Mayiladuthurai - 1-CRIDP-11- 399 Tiruvarur Tiruvarur Thiruthuraipoondi road 2.20 78.00 12-S-0399 Km.48/6,8, 49/8, 50/2,4, 53/2,6,8,10, 54/4,6 (SH 23)

Improvements of Mayiladuthurai - 1-CRIDP-11- 400 Tiruvarur Tiruvarur Thiruthuraipoondi road 1.00 40.00 12-S-0400 Km.31/0 - 32/0 (7.00m) (SH 23) Improvements of Nagore - 1-CRIDP-11- Nannilam - Nachiyarkoil 401 Tiruvarur Nannilam 1.60 65.00 12-S-0401 Road Km.34/0-35/6 (7.00m) (SH 67) Improvements of Nagore - 1-CRIDP-11- Nannilam - Nachiyarkoil 402 Tiruvarur Nannilam 1.40 58.00 12-S-0402 Road Km.35/6-37/0 (7.00m) (SH 67) Improvements of Mayiladuthurai- 1-CRIDP-11- 403 Tiruvarur Nannilam Thiruthuraipoondi Road 1.20 50.00 12-S-0403 Km.12/0-13/0 and 23/2- 23/4 (7.00m) (SH 23)

Improvements of Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 404 Tiruvarur 1.20 48.00 12-S-0404 poondi Vedaranyam - Kodiakkarai road Km.40/8 - 42/0 (7.00m) (SH 63)

SH Page 48 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements of Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 405 Tiruvarur 1.80 72.00 12-S-0405 poondi Vedaranyam - Kodiakkarai road Km.42/6 - 44/4 (7.00m) (SH 63)

Improvements of Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 406 Tiruvarur 1.10 45.00 12-S-0406 poondi Vedaranyam - Kodiakkarai road Km.44/4 - 45/5 (7.00m) (SH 63)

Improvements of Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 407 Tiruvarur 1.50 61.00 12-S-0407 poondi Vedaranyam - Kodiakkarai road Km.45/5 - 47/0 (7.00m) (SH 63)

Improvements to Approach road at Km.39/2 of Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthuraipoondi - 408 Tiruvarur Mannargudi 0.20 35.00 12-S-0408 Vedaranyam - Kodiakkarai road including construction of Centre media and Retaining wall (SH 63)

Improvements to 1-CRIDP-11- Nagapattinam - Gudalore - 409 Tiruvarur Tiruvarur 0.62 46.50 12-S-0409 Mysore road Km.24/050 - 24/670 (SU 89)

Improvements to Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthuraipoondi - 410 Tiruvarur Mannargudi 1.80 73.00 12-S-0410 Vedaranyam - Kodiakkarai road Km.26/8 - 28/6 (SH 63) Improvements to Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthuraipoondi - 411 Tiruvarur Mannargudi 1.80 74.00 12-S-0411 Vedaranyam - Kodiakkarai road Km.28/6 - 30/4 (SH 63) Improvements to Nagore - 1-CRIDP-11- 412 Tiruvarur Tiruvarur Vettar road Km.17/0 - 18/5 1.50 60.00 12-S-0412 (SH 148)

SH Page 49 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Nagore - 1-CRIDP-11- 413 Tiruvarur Tiruvarur Vettar road Km.18/5 - 20/0 1.50 60.00 12-S-0413 (SH 148)

Improvements to Mayiladuthurai - 1-CRIDP-11- 414 Tiruvarur Tiruvarur Thiruthuraipoondi road 2.00 72.00 12-S-0414 Km.30/0 - 31/0, 34/8, 10, 37/2, 37/8,10 (SH 23)

Improvements to Thanjavur - Mannargudi - 1-CRIDP-11- Thiruthurai Thiruthuraipoondi - 415 Tiruvarur 1.80 68.00 12-S-0415 poondi Vedaranyam - Kodiakkarai road Km.51/0 - 52/6 & 59/750 - 59/950 (SH 63)

Improvements to Thiruvarur - 1-CRIDP-11- Mannargudi - Muthupet 416 Tiruvarur Tiruvarur 2.60 96.00 12-S-0416 road Km.0/2,4, 4/6 - 6/8 (SH 202)

Strengthening/ Improvements 39.02 1531.50 Total

Reconstruction of Box culvert at Km.18/2 of 1-CRIDP-11- 417 Tiruvarur Nannilam Mayiladuthurai - 7.00 12-S-0417 Thiruthuraipoondi road (SH 23)

Reconstruction of culvert at 1-CRIDP-11- Thiruthurai Km.42/10 of Nagore - 418 Tiruvarur 25.00 12-S-0418 poondi Nagapattinam - Ramnad - Tuticorin road (SH 200)

Bridges/ CD Works/ Others 2 Nos. 32.00 Total Tiruvarur 49.82 2172.00 Total

Trichy Circle Other works : 4 Nos. 188.60 8960.00 Total

Widening and Improvements from DL to FL in Km.4/6- 1-CRIDP-11- 5/6 of Salem - Ulunderpet 419 Salem Salemsouth 1.00 150.00 12-S-0419 road including widening culvert at Km.4/8, 4/10. (SU 55)

SH Page 50 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and improvements from DL to FL in km.201/7- 202/6 including Widening the minor bridge at km.201/8 and 1-CRIDP-11- 420 Salem Salemwest Reconsturciton of culvert at 0.90 170.00 12-S-0420 km.201/900 and construction of storm water drain in Km. 202/100- 202/800of V.C.C road (SU 80)

Widening and Improvements 1-CRIDP-11- from DL to ML in Km.24/4 - 421 Salem Yercaud 0.60 35.00 12-S-0421 25/0 of Salem Junction - Yercaud Road (SH 188)

Widening from DL to FL in Km 3/0 - 3/250 , Widening and Improvements from DL to FL in Km.3/250-4/4 and Improvements in Km.4/4 - 1-CRIDP-11- 422 Salem Salemnorth 4/500, including 1.50 155.00 12-S-0422 reconstruction of culvert at Km.4/2, 4/4 and providing strom water drain at KM.3/6- 4/4 of Salem New Byepass road. (SU 54)

Widening & Improvements 4.00 510.00 Total

Improvements in Km.16/0 - 1-CRIDP-11- 423 Salem Yercaud 18/0 of Salem Junction - 2.00 71.00 12-S-0423 Yercaud Road (SH 188)

Improvements to Km.7/0- 1-CRIDP-11- 424 Salem Gangavalli 9/0 of Attur - Perambalur 2.00 85.00 12-S-0424 road. (SH 157)

Improvements from Km.2/0- 1-CRIDP-11- 3/0 of Malliyakarai- 425 Salem Attur 1.00 40.00 12-S-0425 Rasipuram- Thiruchengode - Erode road (SH 79)

SH Page 51 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km.3/150- 1-CRIDP-11- 426 Salem Salemnorth 5/2 of Salem Junction - 2.05 199.00 12-S-0426 Yercaud road (SH 188)

Strengthening/ Improvements 7.05 395.00 Total Reconstruction of Minor Bridge to High Level Bridge 1-CRIDP-11- 427 Salem Yercaud at Km.18/10 of Salem 40.00 12-S-0427 Junction - Yercaud Road (SH 188)

Construction of Storm water drain in Sankari Builtup 1-CRIDP-11- area in Km.34/4-35/6 (NH- 428 Salem Sankari 100.00 12-S-0428 47) including construction of culvert at Km.35/4 (Left out portion) (SU 117)

Bridges/ CD Works/ Others 2 Nos. 140.00 Total Salem Total 11.05 1045.00

Widening the Komarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur Road from IL to DL of Km 6/150- 6/300, km 6/750-8/350, Km 33/700- 33/800 and 1-CRIDP-11- 429 Namakkal Kumarapalayam widening of pipe culvert and 1.85 81.00 12-S-0429 RCC Slab culvert at Km 2/6, 2/8, 2/10 (i) and (ii), 3/4, 3/8, 4/2,4/6,4/8, 4/10, 5/8, 6/8, 6/10, 7/2, 7/6, 8/6, 8/8 and Constructon of Retaining wall at km 3/4,5/10and 8/6. (SH 198)

SH Page 52 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and improvements from single lane to Intermediate lane in km.35/3-36/100 and Improvements to Km.36/100- 1-CRIDP-11- 36/300 of Komarapalayam- 430 Namakkal Paramathivelur 0.80 100.00 12-S-0430 Pallipalayam - Jadarpalayam- Pandamangalam - Velur road and including Reconstruction of cutstone slab culvert at Km.35/10 (SH 198)

Widening and Improvements from Intermediate lane to Double lane in Km.42/800- 1-CRIDP-11- 431 Namakkal Paramathivelur 44/4 of Komarapalayam- 1.60 90.00 12-S-0431 Pallipalayam - Jadarpalayam- Pandamangalam - Velur road. (SH 198)

Widening and improvements from Intermediate lane to Double lane in Km.39/600- 41/200 of Komarapalayam- 1-CRIDP-11- 432 Namakkal Paramathivelur Pallipalayam - Jadarpalayam- 1.60 86.00 12-S-0432 Pandamangalam - Velur road including Widening of Slab culvert at Km 40/8 (SH 198)

Widening and improvements from Intermediate lane to Double lane in km.38/0- 39/600 of Komarapalayam- 1-CRIDP-11- 433 Namakkal Paramathivelur Pallipalayam - Jadarpalayam- 1.60 94.00 12-S-0433 Pandamangalam - Velur road including Widening of Slab culvert at Km 38/10 (SH 198)

SH Page 53 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Improvements from Intermediate lane to Double lane in Km.44/400- 44/800, 47/100-48/0 and 1-CRIDP-11- 434 Namakkal Paramathivelur Improvements to Km.46/700- 1.10 96.00 12-S-0434 47/100 of Komarapalayam- Pallipalayam - Jadarpalayam- Pandamangalam - Velur road. (SH 198)

Widening and Improvements from Intermediate lane to Double lane in Km.41/200- 42/800 of Komarapalayam- 1-CRIDP-11- 435 Namakkal Paramathivelur Pallipalayam - Jadarpalayam- 1.60 83.00 12-S-0435 Pandamangalam - Velur road including Widening of Slab culvert at Km 41/8 & 42/8. (SH 198)

Widening & Improvements 10.15 630.00 Total

Improvements to the Kumarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur road Km 13/0-15/0 1-CRIDP-11- 436 Namakkal Kumarapalayam Reconstruction of RCC slab 2.00 98.00 12-S-0436 culvert 1.00m span at Km 12/6 and Reconstruction of RCC 2.00m span slab culvert at Km 12/10. (SH 198)

Junction Improvements in 1-CRIDP-11- 437 Namakkal Kumarapalayam KM.2/2 of Kumarapalayam - 50.00 12-S-0437 Bavani Road (SU 78)

Improvements from Km.77/4- 77/8, 83/0-84/0 & 85/0- 1-CRIDP-11- 438 Namakkal Tiruchengodu 86/0 of Mallikarai - 2.40 120.00 12-S-0438 Rasipuram - Tiruchengode - Erode Road (SH 79)

SH Page 54 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to the Malliakarai-Rasipuram- Tiruchengode-Erode road 1-CRIDP-11- 439 Namakkal Tiruchengodu Km 72/0-74/0 and 2.00 95.00 12-S-0439 Reconstruction of RCC 1.00 m span slab culvert at Km 72/8. (SH 79)

Improvements from Km.86/0- 87/0 of Mallikarai - Rasipuram - Tiruchengode - 1-CRIDP-11- 440 Namakkal Tiruchengodu Erode Road and 1.00 59.00 12-S-0440 Construction of Strom water drain at Km.84/6-85/0 at Left side. (SH 79)

Improvements from Km.87/0- 88/0 of Mallikarai - Rasipuram - Tiruchengode - 1-CRIDP-11- 441 Namakkal Kumarapalayam Erode Road and Widening 1.00 59.00 12-S-0441 the RCC pipe culvert at Km.87/4 and 87/8 on both sides. (SH 79)

Improvements from Km.90/2- 92/2 of Mallikarai - Rasipuram - Tiruchengode - 1-CRIDP-11- 442 Namakkal Kumarapalayam Erode Road and 2.00 109.00 12-S-0442 Construction of strom water drain at Km.91/6 both sides. (SH 79)

Improvements from Km.89/0- 90/0 of Mallikarai - Rasipuram - Tiruchengode - 1-CRIDP-11- 443 Namakkal Kumarapalayam Erode Road and Widening 1.00 59.00 12-S-0443 both side of RCC pipe culvert at Km.89/4 and bus lay bye. (SH 79)

Improvements from Km.88/0- 89/0 of Mallikarai- 1-CRIDP-11- Rasipuram- Tiruchengode - 444 Namakkal Kumarapalayam 1.00 54.00 12-S-0444 Erode Road and Widening both side of RCC Slab culvert at Km 88/8. (SH 79)

SH Page 55 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km.28/0- 29/0, 31/0-32/0 of 1-CRIDP-11- 445 Namakkal Rasipuram Malliakarai-Rasipuram - 2.00 91.00 12-S-0445 Tiruchengode - Erode Road (SH 79)

Improvements to Km.20/0- 21/2, 23/0-24/0 of 1-CRIDP-11- 446 Namakkal Rasipuram Malliakarai - Rasipuram - 2.20 100.00 12-S-0446 Tiruchengode - Erode Road. (SH 79)

Improvements from km 11/0- 1-CRIDP-11- 12/2, 12/4-13/4 of 447 Namakkal Senthamangalam 2.20 100.00 12-S-0447 Namakkal-Kannanur Road (SH 161)

Improvements to the road from Km 18/650-20/500 of 1-CRIDP-11- Tiruchengode-Namakkal 448 Namakkal Namakkal 1.85 87.00 12-S-0448 road and Construction of Retaining wall at km 19/4. (SH 94).

Improvements from Km 254/8-256/4 of VCC road 1-CRIDP-11- 449 Namakkal Namakkal including bus lay bye at km 1.60 95.00 12-S-0449 254/10 (L) and 255/2 (R).(SU 121)

Improvements to the road from Km 20/500-22/500 of Tiruchengode-Namakkal 1-CRIDP-11- road and Construction of 450 Namakkal Namakkal 2.00 96.00 12-S-0450 RCC Slab Culvert at Km 21/4.and Construction of Retaining wall at km 21/6.(SH 94).

Improvements to the Kumarapalayam- Pallipalayam-Jedarpalayam- 1-CRIDP-11- Pandamangalam-Velur road 451 Namakkal Kumarapalayam 2.00 110.00 12-S-0451 Km 21/0-23/0 and Reconstruction of RCC slab culvert at Km 22/10 and 21/6. (SH 198)

SH Page 56 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to the road from Km 60/900-61/500, 63/0-63/400, 65/2-65/8, 1-CRIDP-11- 71/0-71/300 and 75/0- 452 Namakkal Namakkal 2.30 105.00 12-S-0452 75/4 of Tricy-Namakkal road including Construction of Retainingwall at km 63/4. (SH-25)

Improvements to the Kumarapalayam- Pallipalayam-Jedarpalayam- Pandamangalam-Velur road 1-CRIDP-11- 453 Namakkal Kumarapalayam Km 11/4-13/0 and 1.60 97.00 12-S-0453 construction of RCC 2.00 m span slab culvert and Retaining wall at Km 8/10. (SH 198)

Improvements to the road junction connecting Km 1-CRIDP-11- 77/4 of Trichy-Namakkal 454 Namakkal Namakkal 36.00 12-S-0454 road and Km 253/8 of VCC road, (Old NH) including storm water drain. (SU 84)

Junction Improvements in 1-CRIDP-11- 455 Namakkal Kumarapalayam KM.1/6 of Kumarapalayam - 49.00 12-S-0455 Bavani Road (SU 78)

Improvements to the road 1-CRIDP-11- from Km 1/6-2/8 of 456 Namakkal Namakkal 1.20 51.00 12-S-0456 Namakkal-Kannanur road (SH 161).

Improvements from km13/4- 1-CRIDP-11- 14/6, 15/0-15/1 of 457 Namakkal Senthamangalam 1.30 60.00 12-S-0457 Namakkal-Kannanur Road (SH 161)

Improvements to the road from Km 3/0-4/8 of Namakkal-Kannanur road 1-CRIDP-11- 458 Namakkal Namakkal including Reconstruction of 1.80 83.00 12-S-0458 Cutstone culvert at km 3/2(ii) to single row pipe culvert (SH 161).

Strengthening/ Improvements 34.45 1863.00 Total

SH Page 57 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of Strom water drain at Km.21/6 of 1-CRIDP-11- 459 Namakkal Rasipuram Malliakarai - Rasipuram - 5.00 12-S-0459 Tiruchengode - Erode Road (Right side) (SH 79)

Construction of retaining wall at Km 24/2 of 1-CRIDP-11- 460 Namakkal Senthamangalam Namakkal - Kannanur road 25.00 12-S-0460 (Pavithram Tank bund Eri Right side). (SH 161)

Bridges/ CD Works/ Others 2 Nos. 30.00 Total Namakkal 44.60 2523.00 Total

Improvements to Km 38/6- 40/0, 42/0-42/6, 46/0- 1-CRIDP-11- 461 Krishnagiri Veppanahalli 47/0 of Malur - Hosur - 3.00 110.00 12-S-0461 Adhiyamankotta Road. (SH 17)

Improvements to km 11/0- 1-CRIDP-11- 14/0 of Hosur Denkanikottai 462 Krishnagiri Hosur 3.00 130.00 12-S-0462 road (SH 17A)

Improvements to km 2/4- 1-CRIDP-11- 463 Krishnagiri Hosur 3/8, 4/2-5/6 of Hosur 2.80 120.00 12-S-0463 Denkanikottai road (SH 17A)

Improvements to km 0/0- 1-CRIDP-11- 464 Krishnagiri Hosur 0/4, 0/8-2/4 Hosur 2.00 80.00 12-S-0464 Denkanikottai road (SH 17A)

Improvements to km 0/4- 0/8, 1/4-2/0, 2/2-3/0, 3/2- 1-CRIDP-11- 465 Krishnagiri Hosur 4/0 of Malur Hosur 2.60 120.00 12-S-0465 Adhiyamankottai Road (SH 17)

Improvements to Kaveripattinam SH km 1-CRIDP-11- 101/150-101/2 , 101/8- 466 Krishnagiri Krishnagiri 1.88 80.00 12-S-0466 102/125, 102/325-102/935 , 103/290-103/8, 105/6- 105/980 (SU 128)

Improvements to Bargur 1-CRIDP-11- 467 Krishnagiri Bargur Thirupathur road km 6/0 - 1.80 60.00 12-S-0467 7/8 (SH 131)

SH Page 58 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of Retaining wall and Straightening the 1-CRIDP-11- Bund portion of Km 71/4- 468 Krishnagiri Uthangarai 0.40 90.00 12-S-0468 71/8 of Hogenakkal- Pennagaram-Dharmapuri- Thirupathur road (SH 60)

Construction of Retaining wall and straightening the Tank Bund Portion of Road 1-CRIDP-11- 469 Krishnagiri Uthangarai at Km 84/6-85/2 of 0.60 100.00 12-S-0469 Hogenakkal-Pennagaram- Dharmapuri -Thirupathur road (SH 60)

Improvements to Bargur 1-CRIDP-11- 470 Krishnagiri Bargur Thirupathur road km 2/4- 3.00 110.00 12-S-0470 5/4 (SH 131)

Improvements to Km 10/0- 10/8, 14/4-16/4,17/0 - 1-CRIDP-11- 471 Krishnagiri Thalli 17/4, 19/0 - 19/4, of Hosur - 3.60 140.00 12-S-0471 Denkanikotta Road (via) Thally.(SH 17B)

Strengthening/ Improvements 24.68 1140.00 Total

Construction of culvert at 1-CRIDP-11- 472 Krishnagiri Bargur km 5/4 of Bargur 15.00 12-S-0472 Thiupathur road (SH 131)

Bridges/ CD Works/ Others 1 No. 15.00 Total Krishnagiri 24.68 1155.00 Total Widening IL to DL at KM 43/0-47/0 & including construction of culvert at KM 1-CRIDP-11- 43/2,46/8 and KM 473 Dharmapuri Harur 4.00 100.00 12-S-0473 43/10,45/6 Protective wall of Thiruvannamalai - Harur (Via) Thanippadi road (SH 6A)

SH Page 59 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL at KM 59/0-63/0 and Construction of Retaining wall at KM 60/4,62/4,62/6 ,62/8 and 1-CRIDP-11- widening the culvert at KM 474 Dharmapuri Harur 4.00 100.00 12-S-0474 62/8 and contruction of road side drain at KM 60/0 - 60/6 of Thiruvannamalai - Harur (Via) Thanipadi road (SH 6A)

Widening IL to DL at KM 72/0-75/3 of including construction of Well 1-CRIDP-11- 475 Dharmapuri Harur protective wall at KM 72/4 3.30 70.00 12-S-0475 Thiruvannamalai - Harur (Via) Thanippadi road (SH 6A)

Widening from DL to ML & Improvements KM 143/0- 143/6 of Dharmapuri State 1-CRIDP-11- 476 Dharmapuri Dharmapuri Highways (Old National 0.60 100.00 12-S-0476 Highways-7) road including widening of culvert at KM 143/2. (SU 129)

Widening from DL to ML & Improvements KM 143/6 - 144/6 of Dharmapuri State 1-CRIDP-11- 477 Dharmapuri Dharmapuri Highways (Old National 1.00 200.00 12-S-0477 Highways-7) road including widening of culvert at KM 144/4. (SU 129)

Widening & Improvements 12.90 570.00 Total

Improvements to KM 32/8- 1-CRIDP-11- 34/0, 34/2-36/6 of 478 Dharmapuri Harur 3.60 85.00 12-S-0478 Dharmapuri - Harur (Via) Morappur road (SH 60A)

Improvements to KM 27/2- 1-CRIDP-11- 28/1, 28/9-29/8 of 479 Dharmapuri Harur 1.80 65.00 12-S-0479 Dharmapuri - Harur (Via) Morappur road (SH 60A)

SH Page 60 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Providing Bus lay bye at KM 1-CRIDP-11- 22/4-22/8 of Hogenakkal - 480 Dharmapuri Pennagaram 0.40 20.00 12-S-0480 Pennagaram - Dharmapuri - Thiruppatur road (SH 60)

Improvements to Km 136/6- 138/4 and including Reconstruction of culvert at 1-CRIDP-11- 481 Dharmapuri Dharmapuri Km 137/2, 137/8 and 1.80 80.00 12-S-0481 construction of culvert at Km 138/4 of Dharmapuri State Highways road (SU 129)

Improvements to KM 147/0- 1-CRIDP-11- 148/0 of Dharmapuri State 482 Dharmapuri Dharmapuri 1.00 50.00 12-S-0482 Highways (Old National Highways-7) (SU 129)

Improvements to Km 135/8- 1-CRIDP-11- 483 Dharmapuri Dharmapuri 136/4 of Dharmapuri State 0.60 48.00 12-S-0483 Highways road (SU 129)

Improvements to KM 125/4- 1-CRIDP-11- 484 Dharmapuri Palacodu 126/5 of Mattlampatti State 1.10 49.00 12-S-0484 highways road (SU 131)

Improvements to Tank Bund Portion Km 86/150 - 86/850 1-CRIDP-11- of Malur - Hosur - 485 Dharmapuri Palacodu 0.70 63.00 12-S-0485 Adhiyamankottai road inlcuding widening of culvert at KM 86/4 (SH 17))

Improvements to KM 82/6- 1-CRIDP-11- 84/4 of Malur - Hosur - 486 Dharmapuri Palacodu 1.80 70.00 12-S-0486 Adhiyamankottai road (SH 17))

Improvements to KM 77/0- 78/3 78/9-80/0 Including 1-CRIDP-11- junction improvements at 487 Dharmapuri Palacodu 2.40 95.00 12-S-0487 KM 78/2 of Malur - Hosur - Adhiyamankottai road (SH 17))

SH Page 61 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to KM 72/0- 73/6, 74/2-74/6 Including 1-CRIDP-11- junction improvements at 488 Dharmapuri Palacodu 2.00 92.00 12-S-0488 KM 74/4 of Malur - Hosur - Adhiyamankottai road (SH 17))

Improvements to KM 88/0- 1-CRIDP-11- 89/4, 90/3-90/6 of Malur - 489 Dharmapuri Palacodu 1.70 70.00 12-S-0489 Hosur - Adhiyamankottai road (SH 17))

Improvements to KM 122/0- 1-CRIDP-11- 490 Dharmapuri Palacodu 123//2 of Periyampatti State 1.20 60.00 12-S-0490 road (SU 130)

Improvements to KM 1-CRIDP-11- 115/700-116/600 ,117/2 of 491 Dharmapuri Palacodu 1.00 45.00 12-S-0491 Karimangalam State Highway road (SU 20)

Improvements to KM 19/6 - 20/0, 21/2 - 22/0, 22/8 - 23/2, 24/0 - 24/4, 25/4 - 1-CRIDP-11- 492 Dharmapuri Pennagaram 25/6, 26/4 - 26/750 of 2.55 95.00 12-S-0492 Hogenakkal - Pennagaram - Dharmapuri -Thiruppatur road (SH 60)

Improvements to KM 132/6- 1-CRIDP-11- 133/8 of Dharmapuri State 493 Dharmapuri Dharmapuri 1.20 50.00 12-S-0493 Highways (Old National Highways-7) (SU 129)

Strengthening/ Improvements 24.85 1037.00 Total

Construction of bridge in lieu 1-CRIDP-11- of weak bridge at KM 51/10 494 Dharmapuri Harur 39.00 12-S-0494 of Salem -Thirupathur - Vaniyambadi road (SH 18)

SH Page 62 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening the culvert at Km 37/8, 56/4, 56/8, 56/10, 57/6, 62/4(I) & 62/4(II) and 1-CRIDP-11- including reconstruction of 495 Dharmapuri Dharmapuri 30.00 12-S-0495 culvert at Km 55/2, 58/8 of Hogenakkal - Pennagaram - Dharmapuri -Thiruppatur road (SH 60)

Bridges/ CD Works/ Others 2 Nos. 69.00 Total Dharmapuri 37.75 1676.00 Total

Salem Circle Other works : 7 Nos 118.08 6399.00 Total

Widening from IL to DL of km 0/0-3/2 and 1-CRIDP-11- improvements in km0/6-1/0- 496 Tiruppur Palladam 3.20 93.00 12-S-0496 , 2/4-3/2 of Kamanaickenpalayam- Annur road (SH 165)

Widening from DL to ML in 1-CRIDP-11- km 6/050 - 6/550 of 497 Tiruppur Palladam 0.50 30.00 12-S-0497 Tirupur - Somanur road. (SH 169)

Widening from IL to DL of 1-CRIDP-11- km 7/0-10/450 of 498 Tiruppur Palladam 3.45 64.00 12-S-0498 Kamanaickenpalayam- Annur road (SH 165)

Widening from IL to DL of km 3/2-7/0 and 1-CRIDP-11- 499 Tiruppur Palladam Improvements in Km 3/2- 3.80 78.00 12-S-0499 3/6 of Kamanaickenpalayam- Annur road (SH 165)

Widening from IL to DL of km 11/4-12/650 and 1-CRIDP-11- improvemetns in km 10/450- 500 Tiruppur Palladam 2.20 90.00 12-S-0500 12/650 of Kamanaickenpalayam- Annur road (SH 165) Widening & Improvements 13.15 355.00 Total

SH Page 63 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 51/5 - 1-CRIDP-11- 501 Tiruppur Kangeyam 53/3 of Erode - Dharapuram 1.80 85.00 12-S-0501 road (SH 83A)

Improvements to km 21/4 - 1-CRIDP-11- 502 Tiruppur Kangeyam 22/7 of Tirupur - Kangayam 1.30 60.00 12-S-0502 road (SH 172)

Improvements to km 61/4 - 1-CRIDP-11- 503 Tiruppur Kangeyam 62/0 and 62/6 of Erode - 0.80 35.00 12-S-0503 Dharapuram road (SH 83A)

Improvements in km 13/4- 13/950, 15/6-15/950 & 1-CRIDP-11- 504 Tiruppur Palladam 16/1-16/8 of Palladam- 2.00 75.00 12-S-0504 Dharpapuram road (SH 174A)

Improvements to km 54/0 - 1-CRIDP-11- 505 Tiruppur Kangeyam 55/7 of Erode - Dharapuram 1.70 70.00 12-S-0505 road (SH 83A)

Improvements to km 43/0 - 45/0 of Erode - Perundurai - 1-CRIDP-11- 506 Tiruppur Kangeyam Kangayam road including 2.00 95.00 12-S-0506 dip raising at km 43/2 (SH 96)

Improvements in km 5/8- 1-CRIDP-11- 6/8 and 7/4 - 7/6 of 507 Tiruppur Avinashi 1.20 41.00 12-S-0507 Avinashi - Mettuppalayam road (SH 80)

Improvements in km 7/6- 1-CRIDP-11- 8/6 of Avinashi - 508 Tiruppur Avinashi 1.00 47.00 12-S-0508 Mettuppalayam road (SH 80)

Improvements in km 3/2- 1-CRIDP-11- 4/0 & 4/7 - 5/1 of Avinashi - 509 Tiruppur Avinashi 1.20 46.00 12-S-0509 Mettuppalayam road (SH 80)

Improvements in km 1/6- 1-CRIDP-11- 2/8 of Avinashi - 510 Tiruppur Avinashi 1.20 42.00 12-S-0510 Mettuppalayam road (SH 80)

Improvements in km 15/6- 16/6 of Avinashi - Tirupur 1-CRIDP-11- 511 Tiruppur Tiruppursouth Palladam - Pollachi - Cochin 1.00 93.00 12-S-0511 (via) Meenkarai Road (SH 19)

SH Page 64 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 19/2 - 1-CRIDP-11- 512 Tiruppur Kangeyam 21/4 of Tirupur - Kangayam 2.20 95.00 12-S-0512 road (SH 172)

Improvements in km 17/2 - 18/0 of Avinashi - Tirupur 1-CRIDP-11- 513 Tiruppur Palladam Palladam - Pollachi - Cochin 0.80 82.00 12-S-0513 (via) Meenkarai Road (SH 19)

Improvements Tirupur 1-CRIDP-11- Perumanallur Kunnathur 514 Tiruppur Tiruppurnorth 0.40 68.00 12-S-0514 Perundurai road Km. 5/0 - 5/4 (SH 196)

Improvements in Km 10/2- 1-CRIDP-11- 11/0 of Tirupur - 515 Tiruppur Tiruppurnorth 0.80 75.00 12-S-0515 Perumanallur - Kunnathur Perundurai road, (SH 196)

Improvements Tirupur 1-CRIDP-11- Perumanallur Kunnathur 516 Tiruppur Tiruppurnorth 1.00 85.00 12-S-0516 Perundurai road Km.4/0 - 5/0. (SH 196)

Improvements in Km. 20/8 - 21/0 & 24/8 - 25/2 of 1-CRIDP-11- 517 Tiruppur Tiruppurnorth Tirupur -Perumanallur - 0.60 45.00 12-S-0517 Kunnathur -Perundurai road (SH 196)

Improvements in Km.5/0 - 1-CRIDP-11- 5/8 of Avinashi - Tirupur - 518 Tiruppur Avinashi 0.80 83.00 12-S-0518 Palladam - Pollachi - Cochin (via) Meenkarai road (SH 19)

Improvements Gobi Uthukuli 1-CRIDP-11- 519 Tiruppur Tiruppurnorth Padiyur road Km.34/2-35/2 1.00 45.00 12-S-0519 (SH 81) Improvements in Km.5/8 - 6/4 of Avinashi Tirupur 1-CRIDP-11- 520 Tiruppur Tiruppurnorth Palladam Pollachi Cochin 0.60 60.00 12-S-0520 (via) Meenkarai road (SH 19) Improvements in km 8/0- 1-CRIDP-11- 521 Tiruppur Palladam 10/0 of Palladam- Avinashi 2.00 80.00 12-S-0521 Road (SH 166)

SH Page 65 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements at Km 5/4- 1-CRIDP-11- 6/0 of Tirupur - 522 Tiruppur Tiruppurnorth 0.60 52.00 12-S-0522 Perumanallur - Kunnathur - Perundurai road. (SH 196)

Strengthening/ Improvements 26.00 1459.00 Total

Construction of Bridge at 1-CRIDP-11- 523 Tiruppur Tiruppurnorth Km.21/2 of Gobi Uthukuli 75.00 12-S-0523 Padiyur road . (SH 81)

Construction of slab culvert at Km 16/4, 16/8 17/6of 1-CRIDP-11- 524 Tiruppur Palladam Avinashi - Tirupur Palladam - 36.00 12-S-0524 Pollachi - Cochin (via) Meenkarai Road (SH 19)

Improvements to pipe Culvert at Km.17/6 and 1-CRIDP-11- junction improvement at km 525 Tiruppur Tiruppurnorth 25.00 12-S-0525 20/8 of Tirupur Perumanallur Kunnathur Perundurai road. (SH 196)

Widening of narrow culvert at km 5/6 and 1-CRIDP-11- reconstruction of culvert at 526 Tiruppur Avinashi 24.00 12-S-0526 km 12/4 of Avinashi - Mettuppalayam road (SH 80) Bridges/ CD Works/ Others 4 Nos. 160.00 Total Tiruppur 39.15 1974.00 Total Improvements to km 34/942 1-CRIDP-11- - 36/8 of Pollachi - 527 Dharapuram Dharapuram 1.86 95.00 12-S-0527 Dharapuram - Karur road (SH 81)

Improvements to km 73/6- 1-CRIDP-11- 528 Dharapuram Kangeyam 74/6 of Erode - Dharapuram 1.00 45.00 12-S-0528 road (SH 82A)

SH Page 66 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 66/4 - 68/4 of Mettur - 1-CRIDP-11- Palakkanuthu - 529 Dharapuram Dharapuram 2.00 80.00 12-S-0529 Oddanchatram - Dharapuram - Tirupur road (SH 37)

Improvements to km 71/2 - 71/8 & km 73/8 - 74/6 of 1-CRIDP-11- Mettur - Palakkanuthu - 530 Dharapuram Dharapuram 1.40 60.00 12-S-0530 Oddanchatram - Dharapuram - Tirupur road (SH 37)

Improvements to km 24/8 - 1-CRIDP-11- 26/0 of Palladam - 531 Dharapuram Dharapuram 1.20 50.00 12-S-0531 Dharapuram road (SH 174A)

Improvements to km 23/2 - 1-CRIDP-11- 532 Dharapuram Dharapuram 24/6 of Palani - 1.40 56.00 12-S-0532 Dharapuram road (SH 83)

Improvements to km 20/8 - 21/2, 26/4-26/8, 27/0- 1-CRIDP-11- 533 Dharapuram Dharapuram 27/4 , 27/6-28/0 of 1.60 98.00 12-S-0533 Udumalpet - Dharapuram road (SH 97)

Improvements to km 22/0- 1-CRIDP-11- 534 Dharapuram Kangeyam 22/6 of Kangayam - 0.60 22.00 12-S-0534 Kodumudi road (SH 189)

Improvements to Pollachi - 1-CRIDP-11- 535 Dharapuram Udumalapet Dharapuram - Karur Road 1.20 42.00 12-S-0535 Km.16/8 - 18/0 (SH 21)

Strengthening/ Improvements 12.26 548.00 Total

Dharapuram 12.26 548.00 Total

SH Page 67 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening Intermediate Lane to Double Lane at Km. 31/6 - 33/400 & 34/0 - 34/370 and Improvements to Km. 1-CRIDP-11- 31/6 - 32/050& 32/500 - 536 Erode Modakkurichi 2.17 90.00 12-S-0536 33/100, 33/500 - 33/8 of Kangayam - Kodumudi Road including widening of culverts at Km31/8, 32/10 (SH 189)

Widening Intermediate Lane to Double Lane and Improvements to Km. 34/500-35/800 of 1-CRIDP-11- Kangayam - Kodumudi Road 537 Erode Modakkurichi 1.30 70.00 12-S-0537 including widening of culverts at Km34/6, 34/8 and construction of retaining walls to Km 34/8 -35/2 (SH 189) Widening & Improvements 3.47 160.00 Total

Improvements to km 1/2- 1/300,1/8-2/100,2/4- 2/700,4/8-5/700,10/250- 1-CRIDP-11- 10/400,10/500-10/6, 538 Erode Modakkurichi 2.65 100.00 12-S-0538 12/900-13/4, 14/8-15/100 of Erode -Mulanur road (via)Muthur, vellakoil (SH 84 A)

Improvements to Km 39/0- 41/700 of Erode - Karur 1-CRIDP-11- 539 Erode Modakkurichi Road including widening of 2.70 100.00 12-S-0539 culvert at Km 39/10 (SH 84)

Improvements to Km 37/6- 38/4 of Sathy -Athani - 1-CRIDP-11- 540 Erode Bhavani Bhavani road including 0.80 47.00 12-S-0540 widening the Causeway at km 38/6 (SH 82)

Improvements to km 19/164 - 20/4 of Erode - Perundurai 1-CRIDP-11- 541 Erode Perundhurai - Kangayam road including 1.24 75.00 12-S-0541 Dip raising at km 19/8, 20/4 (SH 96)

SH Page 68 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 8/6- 9/0, 10/0-11/0, 17/500- 1-CRIDP-11- 542 Erode Modakkurichi 18/2 and 20/2-21/2 of 3.10 120.00 12-S-0542 Erode Dharapuram Road (SH 82A)

Improvements at Km. 10/6- 11/2,11/4-11/7, 13/0 - 15/0 of Karumandampalayam - Salaipudur Road 1-CRIDP-11- 543 Erode Modakkurichi via)Malayampalayam, 2.90 120.00 12-S-0543 Thamarai palayam including widening of culverts at Km 11/2,14/8 and construction of retaining walls at Km 11/6,14/8 (SH 190)

Improvements to km 21/2 - 23/0 of Erode - Perundurai - 1-CRIDP-11- 544 Erode Perundhurai Kangayam road including 1.80 94.00 12-S-0544 Dip raising at km 21/4,21/8 &22/6 (SH 96)

Improvements to Km. 15/2- 17/2, of Karumandam palayam - Salaipudur Road (via)Malayampalayam, 1-CRIDP-11- 545 Erode Modakkurichi Thamarai palayam including 2.00 80.00 12-S-0545 widening of culvertsat Km 15/8,16/8 &17/2 and construction of retaining walls at Km 15/8 (SH 190)

Improvements to Km 7/0- 1-CRIDP-11- 9/4 of Bhavani -Anthiyur - 546 Erode Bhavani 2.40 91.00 12-S-0546 Chellampalayam road (SH 175)

Improvements to km 32/0 - 33/0 and km 34/2 - 35/4 of 1-CRIDP-11- 547 Erode Perundhurai Tiruppur - Perumanallur - 2.20 90.00 12-S-0547 Kunnathur - Perundurai road (SH 196)

Improvements to Km 12/0- 1-CRIDP-11- 13/0 of Bhavani - Anthiyur - 548 Erode Anthiyur 1.00 38.00 12-S-0548 Chellampalayam road (SH 175)

SH Page 69 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 30/0 - 1-CRIDP-11- 32/0 of Tiruppur - 549 Erode Perundhurai 2.00 90.00 12-S-0549 Perumanallur - Kunnathur - Perundurai road (SH 196)

Strengthening/ Improvements 24.79 1045.00 Total

Improvements to Junction at Km 15/2 & 16/8 of Bhavani- 1-CRIDP-11- Anthiyur - Chellampalayam 550 Erode Anthiyur 41.00 12-S-0550 road including widening of culvert at km 15/2 (SH 175)

Construction of Centre 1-CRIDP-11- Median at km 6/0-7/8 of 551 Erode Erodewest 75.00 12-S-0551 Erode-Perundurai- Kangayam road (SH 96)

Providing Bus lay bye at km 1-CRIDP-11- 160/8 of Ooty-Kothagiri- 552 Erode Erodeeast 35.00 12-S-0552 Mettupalayam-Sathy-Gobi- Erode road (SH 15)

Construction of retaining 1-CRIDP-11- wall at Km 39/2 of Sathy - 553 Erode Bhavani 15.00 12-S-0553 Athani -Bhavani Road (SH 82)

Reconstruction of damaged cut stone culvert at Km 1-CRIDP-11- 554 Erode Anthiyur 79/10 of Thoppur- Mettur- 3.00 12-S-0554 Bhavani- Erode road (SH 20)

Bridges/ CD Works/ Others 5 Nos. 169.00 Total Erode Total 28.26 1374.00

Widening IL to DL and Improvements to Km 24/4 - 26/4 of Vaiyampatty - Karur 1-CRIDP-11- Krishnaraya 555 Karur Road. (Via) Mylampatty , 2.00 96.00 12-S-0555 puram Uppidamangalam and including widening culverted Km 26/4. (SH 199)

SH Page 70 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL and Improvements to Km 26/4 - 28/4 of Vaiyampatty - Karur 1-CRIDP-11- Krishnaraya 556 Karur Road. (Via) Mylampatty , 2.00 99.00 12-S-0556 puram Uppidamangalam Including Widening the culverts @ Km. 26/10. (SH 199)

Widening IL to DL to Km 28/4 - 30/6 and Improvements at Km 28/4- 29/2 & 30/2-30/6 of 1-CRIDP-11- Krishnaraya 557 Karur Vaiyampatty - Karur Road. 2.20 70.00 12-S-0557 puram (Via) Mylampatty , Uppidamangalam. Including Widening of culverts @ Km. 28/6, 29/6 (SH 199)

Widening IL to DL and Improvements to Km 30/6 - 32/5 of Vaiyampatty - Karur 1-CRIDP-11- Krishnaraya 558 Karur Road. (Via) Mylampatty , 1.90 97.00 12-S-0558 puram Uppidamangalam. Including Widening of culvert @ Km 31/8. (SH 199)

Widening IL to DL and Improvements to Km 32/5 - 34/4 of Vaiyampatty - Karur 1-CRIDP-11- Krishnaraya 559 Karur Road. (Via) Mylampatty , 1.90 97.00 12-S-0559 puram Uppidamangalam. Including Reconstrucion of culvert @ Km 37/10. (SH 199)

Widening & Improvements 10.00 459.00 Total

Improvements to Km 54/3 - 1-CRIDP-11- 560 Karur Karur 56/0and 57/4 - 57/6 Erode - 1.90 72.00 12-S-0560 Karur Road (SH 84)

Improvements to Km 58/0 - 1-CRIDP-11- 59/100 and 59/500 - 61/0 561 Karur Karur 2.60 95.00 12-S-0561 of Dindugul - Gujiliamparai - Karur Road (SH 74)

SH Page 71 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km 108/4 - 109/0, 110/0-111/4 and 1-CRIDP-11- 562 Karur Aravakurichi 116/2-116/8 of Pollachi - 2.60 98.00 12-S-0562 Dharapuram - Karur Road (SH 21)

Improvements to Musiri - Kulithalai - Pudukkottai - Alangudi - Peravoorani - 1-CRIDP-11- 563 Karur Kulithalai Sethubavachatram road km 2.00 100.00 12-S-0563 12/0 - 14/0 & Widening the pipe culvert at km 13/6 ( SH 71 )

Improvements to Musiri - Kulithalai - Pudukkottai - 1-CRIDP-11- 564 Karur Kulithalai Alangudi - Peravoorani - 2.00 75.00 12-S-0564 Sethubavachatram road km 10/0 - 12/0 (SH 71)

Improvements to Km 21/0 - 23/0, and Widening of culvert at Km 22/2 including Reconstruction of culvert at 1-CRIDP-11- Krishnaraya 565 Karur Km 22/10 of Musiri- 2.00 85.00 12-S-0565 puram Kulithalai - Pudukottai - Alangudi - Peravurani - Sethuhavachatran Road (SH 71)

Improvements to Km 95/8 - 97/2, 101/0 - 101/570 & 1-CRIDP-11- 566 Karur Aravakurichi 101/720 - 102/0 of Pollachi - 2.25 76.00 12-S-0566 Dharapuram - Karur road (SH 21)

Improvements to Km 33/0 - 1-CRIDP-11- 34/0 & 43/0 - 44/950 of 567 Karur Aravakurichi 2.95 95.00 12-S-0567 Thadicombu - Pallapatti - Aravakurichy road (SH 193)

Strengthening/ Improvements 18.30 696.00 Total

Karur Total 28.30 1155.00

Tiruppur Other works : 9 Nos 107.97 5051.00 Circle Total

SH Page 72 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Double lane to Four Lane and 1-CRIDP-11- 568 Coimbatore Coimbatorenorth Improvements in Km.1/4 - 0.60 95.00 12-S-0568 2/0 of North Coimbatore - Maruthamalai Road (SH 167)

Widening from Double lane to Four Lane and 1-CRIDP-11- 569 Coimbatore Coimbatorenorth Improvements in Km.2/0 - 1.00 165.00 12-S-0569 3/0 of North Coimbatore - Maruthamalai Road (SH 167)

Widening from Double lane to Four Lane and 1-CRIDP-11- 570 Coimbatore Coimbatorenorth Improvements in Km 3/0 - 1.00 165.00 12-S-0570 4/0 of North Coimbatore - Maruthamalai Road (SH 167)

Widening from Double lane to Four Lane and 1-CRIDP-11- 571 Coimbatore Coimbatorenorth Improvements in Km 4/0 - 1.00 160.00 12-S-0571 5/0 of North Coimbatore - Maruthamalai Road (SH 167)

Widening & Improvements 3.60 585.00 Total

Providing paved shoulders 1-CRIDP-11- including Improvements in 572 Coimbatore Coimbatorenorth 0.80 80.00 12-S-0572 Km. 3/6 - 4/4 of Coimbatore - Anaikatty Road (SH 164)

Providing paved shoulders in km 4/4 - 6/0 & 1-CRIDP-11- 573 Coimbatore Coimbatorenorth Improvements in Km. 5/4 - 1.60 85.00 12-S-0573 6/0 of Coimbatore - Anaikatty Road (SH 164)

Improvements to Km 14/2- 16/2 of Avinashi- 1-CRIDP-11- 574 Coimbatore Mettupalayam Mettupplayam road 2.00 90.00 12-S-0574 including reconstruction of culvert at Km 15/2 (SH 80)

SH Page 73 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in Km.2/5 - 1-CRIDP-11- 575 Coimbatore Coimbatorenorth 3/6 of Coimbatore - 1.10 95.00 12-S-0575 Anaikatty Road (SH 164)

Improvements to 1-CRIDP-11- 576 Coimbatore Coimbatoresouth Valankulam Byepass road 1.00 85.00 12-S-0576 km 0/0 - 1/0 (SU 70)

Improvements at Km.22/0 - 1-CRIDP-11- 577 Coimbatore Coimbatorenorth 23/0 of Coimbatore - 1.00 40.00 12-S-0577 Anaikatty Road (SH 164)

Improvements to Karamadai - 1-CRIDP-11- 578 Coimbatore Mettupalayam Kariyampalayam Road at 2.00 83.00 12-S-0578 Km 2/0 - 4/0 (SH 168)

Improvements to Karamadai - 1-CRIDP-11- 579 Coimbatore Mettupalayam Kariyampalayam Road at 1.80 84.00 12-S-0579 Km 4/0 - 5/8 (SH 168)

Strengthening/ Improvements 11.30 642.00 Total

Coimbatore 14.90 1227.00 Total Improvements to riding quality in km 1/6 - 1/8, 2/6 1-CRIDP-11- 580 Pollachi Udumalapet -3/0 & 4/6 - 5/2 of Pollachi - 1.20 60.00 12-S-0580 Dharapuram - Karur road (SH 21) Improvements to riding quality in km 5/2 - 6/6 including reconstruction of 1-CRIDP-11- culvert at km 5/4, 5/8 & 581 Pollachi Udumalapet 1.40 79.00 12-S-0581 including construction of pipe culvert at km 7/4 of Pollachi - Dharapuram - Karur road (SH 21) Improvements to riding quality in km 0/0 - 0/4 & 1-CRIDP-11- 582 Pollachi Udumalapet 1/0 - 1/6 of Pollachi - 1.00 57.00 12-S-0582 Dharapuram - Karur road (SH 21) Improvements to riding quality in km 40/6 - 42/0 of 1-CRIDP-11- Avinashi - Tiruppur - 583 Pollachi Sulur 1.40 68.00 12-S-0583 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

SH Page 74 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to riding quality in km 42/0 - 44/0 of 1-CRIDP-11- 584 Pollachi Sulur Avinashi - Tiruppur - 2.00 98.00 12-S-0584 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding quality in km 53/2 -53/560, 1-CRIDP-11- 53/850 -55/0, 55/2 - 55/8 585 Pollachi Pollachi 2.10 99.00 12-S-0585 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding quality in km 97/6-97/9, 1-CRIDP-11- 98/0 - 98/2 & 98/4 - 99/6 586 Pollachi Valparai 1.70 79.00 12-S-0586 of Avinashi - Tiruppur - Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding quality in km 71/0 - 72/0 of 1-CRIDP-11- 587 Pollachi Pollachi Avinashi - Tiruppur - 1.00 49.00 12-S-0587 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding quality in km 65/0 - 66/0 of 1-CRIDP-11- 588 Pollachi Pollachi Avinashi - Tiruppur - 1.00 48.00 12-S-0588 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding quality in km 77/2 - 78/6 of 1-CRIDP-11- 589 Pollachi Pollachi Avinashi - Tiruppur - 1.40 91.00 12-S-0589 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Improvements to riding 1-CRIDP-11- quality in km 7/4 - 9/4 of 590 Pollachi Valparai 2.00 89.00 12-S-0590 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 10/4 - 12/4 of 591 Pollachi Valparai 2.00 89.00 12-S-0591 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 9/4 - 10/4 of 592 Pollachi Valparai 1.00 44.00 12-S-0592 Pollachi - Valparai road (SH 78)

SH Page 75 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to riding 1-CRIDP-11- quality in km 12/6 - 14/8 of 593 Pollachi Valparai 2.20 98.00 12-S-0593 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 14/8 - 17/0 of 594 Pollachi Valparai 2.20 98.00 12-S-0594 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 20/4-22/0 & 595 Pollachi Valparai 2.20 98.00 12-S-0595 24/0-24/6 of Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 24/6-26/8 of 596 Pollachi Valparai 2.20 98.00 12-S-0596 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 26/8-29/0 of 597 Pollachi Valparai 2.20 98.00 12-S-0597 Pollachi - Valparai road (SH 78) Improvements to riding 1-CRIDP-11- quality in km 29/0-30/6 of 598 Pollachi Valparai 1.60 71.00 12-S-0598 Pollachi - Valparai road (SH 78)

Improvements to riding quality in km 2/2 - 3/4 of 1-CRIDP-11- 599 Pollachi Udumalapet Pollachi - Valparai road & 1.20 59.00 12-S-0599 including construction of drain (SH 78)

Improvements to riding quality in km 3/4-5/6 of 1-CRIDP-11- 600 Pollachi Udumalapet Pollachi - Valparai road & 2.20 99.00 12-S-0600 including construction of drain (SH 78) Improvements to riding quality in km 5/6 -7/4 of 1-CRIDP-11- 601 Pollachi Udumalapet Pollachi - Valparai road & 1.80 89.00 12-S-0601 including construction of drain (SH 78)

Improvements to riding quality in km 76/0 - 76/900 1-CRIDP-11- of Avinashi - Tiruppur - 602 Pollachi Pollachi 0.90 63.00 12-S-0602 Palladam - Pollachi - Cochin road (via) Meenkarai (SH 19)

Strengthening/ Improvements 37.90 1821.00 Total

SH Page 76 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of Retaining 1-CRIDP-11- wall at km 27/8, 28/4, 41/4 603 Pollachi Valparai 15.00 12-S-0603 & 52/10 of Pollachi - Valparai road (SH 78)

Reconstruction of culvert km 79/10 of Avinashi - Tiruppur 1-CRIDP-11- 604 Pollachi Pollachi - Palladam - Pollachi - 5.00 12-S-0604 Cochin road (via) Meenkarai (SH 19)

Bridges/ CD Works/ Others 2 Nos. 20.00 Total

Pollachi Total 37.90 1841.00

Widening and improvements in Km 128/2 - 128/6 of Ooty- 1-CRIDP-11- Gobichetty 605 Gobi Kothagiri-Mettupalayam- 0.40 60.00 12-S-0605 palayam Sathy-Gobi-Erode road (SH 15)

Widening and improvements in Km 125/4 -125/8 of Ooty- 1-CRIDP-11- Gobichetty 606 Gobi Kothagiri-Mettupalayam- 0.40 90.00 12-S-0606 palayam Sathy-Gobi-Erode road (SH 15)

Widening and improvements in Km 125/8 - 126/4 of Ooty- 1-CRIDP-11- Gobichetty 607 Gobi Kothagiri-Mettupalayam- 0.60 90.00 12-S-0607 palayam Sathy-Gobi-Erode road (SH 15)

Widening and improvements in km 126/4-127/0 of Ooty- 1-CRIDP-11- Gobichetty 608 Gobi Kothagiri-Mettupalayam- 0.60 80.00 12-S-0608 palayam Sathy-Gobi-Erode road (SH 15)

Widening and improvements in km 127/0-127/6 of Ooty- 1-CRIDP-11- Gobichetty 609 Gobi Kothagiri-Mettupalayam- 0.60 90.00 12-S-0609 palayam Sathy-Gobi-Erode road (SH 15)

SH Page 77 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and improvements in in Km 127/6 - 128/2 of 1-CRIDP-11- Gobichetty 610 Gobi Ooty-Kothagiri- 0.60 90.00 12-S-0610 palayam Mettupalayam-Sathy-Gobi- Erode road (SH 15)

Widening and improvements in Km 128/6-129/0 of Ooty- 1-CRIDP-11- Gobichetty 611 Gobi Kothagiri-Mettupalayam- 0.40 70.00 12-S-0611 palayam Sathy-Gobi-Erode road (SH 15)

Widening and improvements 1-CRIDP-11- Gobichetty in km 0/0-0/6 of -Gobi - 612 Gobi 0.60 90.00 12-S-0612 palayam Uthukkuli-Padiyur road (SH 81) Widening and improvements 1-CRIDP-11- Gobichetty to km 0/6 - 1/2 Gobi- 613 Gobi 0.60 90.00 12-S-0613 palayam Uthukkuli-Padiyur road (SH 81) Widening and improvements in km 1/2-2/0 and 1-CRIDP-11- Gobichetty including Widening ofculvert 614 Gobi 0.80 80.00 12-S-0614 palayam at km 3/6 of Gobi - Uthukkuli-Padiyur road (SH 81)

Widening and improvements to km 123/0-123/8 and widening in km 123/8- 1-CRIDP-11- Gobichetty 615 Gobi 124/0 of Ooty-Kothagiri- 1.00 90.00 12-S-0615 palayam Mettupalayam-Sathy-Gobi- Erode road (Black Spot no 117) (SH 15)

Widening & Improvements 6.60 920.00 Total

Improvements to km 18/0- 19/3 including construction 1-CRIDP-11- Gobichetty 616 Gobi of culvert at km 18/8& 19/2 1.30 70.00 12-S-0616 palayam of Cheyur to Erode sathy road (SH 15A)

Improvements to km 22/6- 1-CRIDP-11- Gobichetty 617 Gobi 24/2 of Cheyur to Erode 1.60 100.00 12-S-0617 palayam sathy road (SH 15A)

Improvements to km 24/2- 1-CRIDP-11- Gobichetty 25/2,25/8-26/8 of Cheyur 618 Gobi 2.00 90.00 12-S-0618 palayam to Erode sathy road (SH 15A)

SH Page 78 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km16/2- 1-CRIDP-11- Gobichetty 16/5 and km 27/2-28/2 of 619 Gobi 1.30 60.00 12-S-0619 palayam Cheyur to Erode sathy road (SH 15A)

Strengthening/ Improvements 6.20 320.00 Total

Construction of High level Bridge at km 5/10 in lieu of 1-CRIDP-11- exsiting narrow bed level 620 Gobi Bhavanisagar 135.00 12-S-0620 causway at km 5/10 of Sathy-Athani -Bhavani road (SH )

Construction of High level Bridge at km 0/10 in lieu of 1-CRIDP-11- exsiting narrow bed level 621 Gobi Bhavanisagar 150.00 12-S-0621 causway at km 0/10 of Sathy-Athani -Bhavani road (SH 82)

Bridges/ CD Works/ Others 2 Nos. 285.00 Total Gobi Total 12.80 1525.00 Improvements to the 1-CRIDP-11- blackspot area in Km 112/6 622 Udhagai Gudalur 45.00 12-S-0622 of Calicut Vythiri Gudalur road (SH 12)

Improvements in Km 107/6 - 1-CRIDP-11- 623 Udhagai Gudalur 109/0of Calicut - Vythiri - 1.40 80.00 12-S-0623 Gudalur road (SH 12)

Improvements to Km 16/0- 1-CRIDP-11- 18/0 of Gudalur 624 Udhagai Gudalur 2.00 85.00 12-S-0624 sulthanbathery road (SH 98) Improvements to Km 18/0- 1-CRIDP-11- 20/0 of Gudalur 625 Udhagai Gudalur 2.00 85.00 12-S-0625 sulthanbathery road (SH 98) Improvements to Km 20/0- 1-CRIDP-11- 22/0 of Gudalur 626 Udhagai Gudalur 2.00 85.00 12-S-0626 sulthanbathery road (SH 98) Improvements to Km 26/0- 1-CRIDP-11- 27/4 of Gudalur 627 Udhagai Gudalur 1.40 60.00 12-S-0627 sulthanbathery road (SH 98)

SH Page 79 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in Km 109/0 - 1-CRIDP-11- 628 Udhagai Gudalur 110/4 of Calicut - Vythiri - 1.40 70.00 12-S-0628 Gudalur road (SH 12)

Improvements to Km 96/4- 1-CRIDP-11- 629 Udhagai Gudalur 98/4 of Calicut Vythiri 2.00 100.00 12-S-0629 Gudalur road (SH 12)

Improvements to Km 106/0- 1-CRIDP-11- 630 Udhagai Gudalur 107/0 of Calicut Vythiri 1.00 50.00 12-S-0630 Gudalur road (SH 12)

Improvements to Km 16/0- 17/0 of Udhagai Kotagiri 1-CRIDP-11- 631 Udhagai Uthagamandalam Mettupalayam Sathi Gobi 1.00 60.00 12-S-0631 Erode road including Protective works (SH 15)

Improvements in Km 27/0 - 27/4 & 28/4-30/0 of udhagai 1-CRIDP-11- 632 Udhagai Uthagamandalam Kotagiri Mettupalayam Sathi 2.00 75.00 12-S-0632 Gobi Erode road including Protective works (SH 15)

Strengthening/ Improvements 16.20 795.00 Total Imrovements to Junction at 1-CRIDP-11- 633 Udhagai Gudalur Km 123/2 of Calicut Vythiri 20.00 12-S-0633 Gudalur road (SH 12)

Bridges/ CD Works/ Others 1 No. 20.00 Total

Udhagai Total 16.20 815.00

Coimbatore Other works : 5 Nos 81.80 5408.00 Circle Total Improvements to NH 49 Extension (Urban Limit) km 1-CRIDP-11- 4/10 , 5/2 using Paver 634 Madurai Maduraicentral 0.40 55.00 12-S-0634 Block and Construction of Drain at km 4/10 & 5/2 (SU 107) Raising the existing road level in Melur- Tirupattur 1-CRIDP-11- road km 0/10,8/4-9/0 635 Madurai Melur 0.80 65.00 12-S-0635 including Construction of Drain at km 8/4-9/0. (SH 191)

SH Page 80 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening in Km 7/0- 1-CRIDP-11- 636 Madurai Melur 8/4 of Melur - Thiruppathur 1.40 60.00 12-S-0636 Road (SH 191)

Improvements to NH 49 1-CRIDP-11- 637 Madurai Maduraicentral Extension (Urban Limit) km 1.06 80.00 12-S-0637 3/2-4/260 (SU 107)

Junction Improvements to 1-CRIDP-11- 638 Madurai Maduraicentral Abandoned NH7 (M.K 22.00 12-S-0638 Section) at km 0/2 (SU 101)

Improvements to Madurai- 1-CRIDP-11- Thiruparan 639 Madurai Tuticorin road km 4/4-5/0 0.80 65.00 12-S-0639 kundram & 7/2 (SH 32)

Improvements to Madurai- 1-CRIDP-11- Thiruparan 640 Madurai Tuticorin road km 7/2-8/0 0.80 65.00 12-S-0640 kundram (SH 32)

Strengthening/ Improvements 5.26 412.00 Total

Reconstruction of high level 1-CRIDP-11- bridge at km 2/10-3/2 of 641 Madurai Thirumangalam 190.00 12-S-0641 Thirumangalam-Usilampatti road (SH 73A)

Reconstruction of culvert at km 99/6 and Widening for Providing Buslayby at km 1-CRIDP-11- 642 Madurai Melur 99/4-99/6 of Trichy- 83.00 12-S-0642 Madurai road (NH 45B) Abandoned NH Melur Town (SU 104)

Bridges/ CD Works/ Others 2 Nos. 273.00 Total

Madurai Total 5.26 685.00

SH Page 81 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from DL to ML in km.27/500-28/0,29/4-31/0 and Improvements @ km 27/500-27/8. of Palayam - 1-CRIDP-11- Bodi road and widening the 643 Theni Bodinayakanur 2.10 99.00 12-S-0643 pipe culvert at km.29/6.30/2 including construction of Retaining wall at km.27/10, 28/10 (SH 100)

Widening from DL to ML in km 25/200-26/100,26/700- 27/500 and Improvements 1-CRIDP-11- @ km 26/8-27/5 of Palayam 644 Theni Bodinayakanur 1.70 99.00 12-S-0644 - Bodi road Including Reconstruction of culvert at km 26/10, 27/2 (26/10, 27/2 -1x0.90M) (SH 100)

Widening from DL to ML in km 21/0-22/0, 23/0-24/0 and 24/900-25/2 of 1-CRIDP-11- 645 Theni Bodinayakanur Palayam - Bodi road 2.30 94.00 12-S-0645 including construction of retaining wall at km.23/10 (SH 100)

Widening from DL to ML in km 19/0-21/0 of Palayam - 1-CRIDP-11- 646 Theni Bodinayakanur Bodi road including 2.00 90.00 12-S-0646 construction of retaining wall at km.19/2, 19/4 (SH 100)

Widening from DL to ML in km 17/0-18/3,18/4-19/0 of 1-CRIDP-11- Palayam - Bodi road 647 Theni Bodinayakanur 1.90 80.00 12-S-0647 including construction of retaining wall at km.18/4, 18/10 (SH 100)

Widening from DL to ML in km 13/8-15/4, 16/4-17/0 1-CRIDP-11- of Palayam - Bodi road 648 Theni Cumbam 2.20 92.00 12-S-0648 including construction of retaining wall at 13/10, 16/4 (SH 100)

SH Page 82 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from DL to ML in km 12/4-13/6 of Palayam - 1-CRIDP-11- 649 Theni Cumbam Bodi road including 1.20 58.00 12-S-0649 Reconstruction of culvert at km.13/6 (1x3.60m) (SH 100)

Widening & Improvements 13.40 612.00 Total Improvements to Palayam - 1-CRIDP-11- 650 Theni Cumbam Bodi road km 9/6-10/6 (SH 1.00 38.00 12-S-0650 100)

Strengthening/ Improvements 1.00 38.00 Total

Reconstruction of culvert at 1-CRIDP-11- 651 Theni Periyakulam km.2/4 of Devadanapatti - 10.00 12-S-0651 Varusanadu Road. (SH 101)

Reconstruction of the pipe culvert at Km 34/10 of 1-CRIDP-11- 652 Theni Andipatti Devadanapatti - Varusanadu 10.00 12-S-0652 road including Retaining wall (SH 101)

Construction of 1-CRIDP-11- Retainingwall at km.4/8 - 653 Theni Periyakulam 30.00 12-S-0653 5/2, of Devadanapatti - Varusanadu road. (SH 101)

Construction of 1-CRIDP-11- Retainingwall at km. 5/4, of 654 Theni Periyakulam 15.00 12-S-0654 Devadanapatti - Varusanadu road. (SH 101)

Construction of 1-CRIDP-11- Retainingwall at km.2/2 and 655 Theni Periyakulam 16.00 12-S-0655 10/10, of Devadanapatti - Varusanadu road. (SH 101)

Bridges/ CD Works/ Others 5 Nos. 81.00 Total Theni Total 14.40 731.00

SH Page 83 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL to km 4/150-4/600 of Palani - Dharapuram road (via) 1-CRIDP-11- 656 Dindigul Palani Alangiam including 0.45 18.00 12-S-0656 construction of Pipe culvert and Retaining wall at km 4/4 (SH 83)

Widening IL to DL in km 16/0-17/0 of Thadicombu - Pallapatti - Aravakuruchi 1-CRIDP-11- 657 Dindigul Oddanchathiram road including construction 1.00 55.50 12-S-0657 of Retaining wall at km 16/2 - 6 and Reconstruction of culvert at km 16/4 (SH 193)

Widening IL to DL in km 14/0-16/0 of Thadicombu - 1-CRIDP-11- Pallapatti - Aravakuruchi 658 Dindigul Oddanchathiram 2.00 41.70 12-S-0658 road including Reconstruction of culvert at km 14/6 (SH 193)

Widening IL to DL in km 10/0-14/0 of Thadicombu - Pallapatti - Aravakuruchi 1-CRIDP-11- road including 659 Dindigul Oddanchathiram 4.00 82.50 12-S-0659 Reconstruction of culverts at km 11/2,11/6,12/2 and Widening of culvert at km 13/10 (SH 193)

Widening IL to DL km 0/0- 4/0 of Thadicombu - 1-CRIDP-11- Pallapatti - Aravakuruchi 660 Dindigul Athoor 4.00 77.00 12-S-0660 road including construction of culvert at km 1/2, 2/6, 3/4, 3/8 (SH 193)

Widening IL to DL km 4/0- 8/0 of Thadicombu - 1-CRIDP-11- Pallapatti - Aravakuruchi 661 Dindigul Athoor 4.00 79.00 12-S-0661 road including construction of culvert at km 4/4, 4/8, 6/4, 7/2, 7/8 (SH 193)

SH Page 84 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL km 8/0- 10/0 of Thadicombu - 1-CRIDP-11- Pallapatti - Aravakuruchi 662 Dindigul Athoor 2.00 51.00 12-S-0662 road including construction of culvert at km 8/2, 9/4 (SH 193) Widening & Improvements 17.45 404.70 Total

strengthening in km 45/0- 45/400 of Dindigul - Natham - Singampunari - 1-CRIDP-11- 663 Dindigul Natham Thiruppathur - Devakottai 0.40 55.00 12-S-0663 Rastha road inlcuding Reconstruction of culvert at km 45/2 (SH 35)

Strengthening Mettur - Palakkanuthu - 1-CRIDP-11- Oddanchatram - 664 Dindigul Athoor 1.00 70.00 12-S-0664 Dharapuram - Thirupur road in km 25/0-26/0 (SH 37)

Elevating the existing Low lying surface in km 20/9- 21/3 of Dindigul - Natham - Singampunari - 1-CRIDP-11- Thiruppathur - Devakottai 665 Dindigul Natham 0.40 84.00 12-S-0665 Rastha Road inlcuding Reconstruction of culvert at km 20/10, 21/2 (i&ii) and Easing the branching other district roads (SH 35)

Strengthening Mettur - Palakkanuthu - 1-CRIDP-11- Oddanchatram - 666 Dindigul Athoor 1.00 70.00 12-S-0666 Dharapuram - Thirupur road in km 23/0-24/0 (SH 37)

Strengthening Dindigul - 1-CRIDP-11- 667 Dindigul Vedachandur Gujiliamparai - Karur road 1.20 58.00 12-S-0667 in km 37/0-38/2 (SH 74)

Strengthening to Dindigul - 1-CRIDP-11- Gujiliamparai - Karur road 668 Dindigul Vedachandur 1.80 89.00 12-S-0668 in km 20/2-21/0 & 25/0- 26/0 (SH 74)

SH Page 85 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening to Dindigul - 1-CRIDP-11- 669 Dindigul Vedachandur Gujiliamparai - Karur road 0.80 38.00 12-S-0669 in km 30/0-30/8 (SH 74)

Strengthening to Dindigul - Gujiliamparai - Karur road 1-CRIDP-11- 670 Dindigul Vedachandur in km 11/0-12/0 including 1.00 84.00 12-S-0670 Construction of culvert at km 11/8 (SH 74)

Strengthening Ammayanaickanur- 1-CRIDP-11- 671 Dindigul Nilakottai Vathalagundu road in Km 1.80 88.00 12-S-0671 7/2 - 8/0, 9/0-10/0 (SH 155)

Strengthening Vathalagundu 1-CRIDP-11- 672 Dindigul Nilakottai - Peraiyur - Kariyapatty road 1.00 52.00 12-S-0672 in Km 9/0 - 10/0 (SH 154)

Strengthening Vadamadurai - 1-CRIDP-11- 673 Dindigul Vedachandur Oddanchatram roadin km 0.60 31.00 12-S-0673 25/8-26/4 (SH 152)

Strengthening Vadamadurai - 1-CRIDP-11- 674 Dindigul Vedachandur Oddanchatram road(SH- 1.00 62.00 12-S-0674 152) in km 22/0-23/0

Strengthening Vadamadurai - 1-CRIDP-11- 675 Dindigul Vedachandur Oddanchatram road in km 1.80 89.00 12-S-0675 1/2-3/0 (SH 152)

Strengthening Kodai Ghat road km 34/0-36/0 1-CRIDP-11- including Providing Paving 676 Dindigul Palani 2.00 86.00 12-S-0676 block in km 25/6, 28/4,38/10 & 43/2 (SH 156) Strengthening Dindigul - 1-CRIDP-11- Coimbatore - Thimam - 677 Dindigul Palani 1.25 87.00 12-S-0677 Mysore road in km 55/2- 56/450 (SU 108)

Strengthening/ Improvements 17.05 1043.00 Total

Reconstruction of protective 1-CRIDP-11- wall at km7/4, 9/10, 10/10, 678 Dindigul Nilakottai 23.00 12-S-0678 12/8,13/4 of Kodai Ghat road (SH 156)

SH Page 86 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of narrow cut stone culvert at Km.2/10, 1-CRIDP-11- 4/10, 5/8, 7/10 of Dindigul - 679 Dindigul Dindigul 20.50 12-S-0679 Natham - Singampunari - Thirupathur - Devakottai Rastha Road (SH 35)

Bridges/ CD Works/ Others 2 Nos. 43.50 Total Dindigul 34.50 1491.20 Total Widening IL to DL of Uppur - 1-CRIDP-11- Kottaiyur road km. 32/2- 680 Sivagangai Manamadurai 3.40 79.00 12-S-0680 33/2 and 34/4-36/8 (SH34A)

Widening from IL to DL of Uppur -Kottaiyur road km. 1-CRIDP-11- 21/6-21/8,24/6-27/2 681 Sivagangai Manamadurai 2.80 95.00 12-S-0681 including Reconstruction of culvert at Km. 25/8,26/4 (SH 34A)

Widening from IL to DL of 1-CRIDP-11- Uppur -Kottaiyur road km. 682 Sivagangai Manamadurai 2.40 94.00 12-S-0682 27/2-29/6 and Improvemnts in Km, 27/6-28/4 (SH 34A)

Widening from IL to DL km. 29/6-32/4 of Uppur - Kottaiyur road and 1-CRIDP-11- 683 Sivagangai Manamadurai Improvements km 29/8- 2.60 99.00 12-S-0683 30/4 including Reconstruction of culvert at km, 30/8,31/2 (SH 34A)

Widening & Improvements 11.20 367.00 Total

SH Page 87 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Thanjavur- Pattukottai - Aranthangi - Karaikudi - Kallal - 1-CRIDP-11- Maravamangalam - 684 Sivagangai Karaikudi 1.30 45.00 12-S-0684 Elayangudi -Paramakudi- Mudukulathur - Sayalkudi road Km 116 /700 -118/0 , (SH 29)

Impts to Dindugul - Natham - Singampunari - 1-CRIDP-11- 685 Sivagangai Tirupattur Thiruppathur - Devakottai 1.90 70.00 12-S-0685 rastha road km. 57/5-58/6, 59/6-60/4 (SH 35)

Improvements to Thanjavur- Pattukottai - Aranthangi - Karaikudi - Kallal - 1-CRIDP-11- Maravamangalam - 686 Sivagangai Karaikudi 1.80 66.00 12-S-0686 Elayangudi -Paramakudi- Mudukulathur - Sayalkudi road Km 156/6-157/8 ,& 158/0 - 158/6 (SH 29)

Impts to Dindugul - Natham - Singampunari - 1-CRIDP-11- Thiruppathur - Devakottai 687 Sivagangai Tirupattur 2.60 98.00 12-S-0687 rastha road km. 72/0 - 73/0,73/4-73/8,74/0-75/0 and 75/10 (SH 35)

Improvemnts to Melur - 1-CRIDP-11- Thiruppathur road km.14/2- 688 Sivagangai Tirupattur 1.80 67.00 12-S-0688 15/0,18/0- 18/2,19/0-19/8 (SH 191)

Improvemnts to Melur - 1-CRIDP-11- Thiruppathur road km. 689 Sivagangai Tirupattur 2.20 83.00 12-S-0689 ,23/4-24/4, 26/0- 27/0,27/10 (SH 191)

Improvements to Thanjavur - Pattukottai - Aranthangi - Karaikudi - Kallal - 1-CRIDP-11- Maravamangalam - 690 Sivagangai Karaikudi 1.00 35.00 12-S-0690 Elayangudi - Paramakudi - Mudukolathur - Sayalkudi road km. 137/0 - 138/0. (SH 29) Strengthen ing/ Improvements 12.60 464.00 Total

SH Page 88 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of Culvert at km. 117/2 of Thanjavur- Pattukottai - Aranthangi - 1-CRIDP-11- Karaikudi - Kallal - 691 Sivagangai Karaikudi 4.00 12-S-0691 Maravamangalam - Elayangudi -Paramakudi- Mudukulathur - Sayalkudi road (SH 29)

Reconstruction of Culvert at km. 160/6 of Thanjavur- Pattukottai - Aranthangi - 1-CRIDP-11- Karaikudi - Kallal - 692 Sivagangai Sivaganga 15.00 12-S-0692 Maravamangalam - Elayangudi -Paramakudi- Mudukulathur - Sayalkudi road (SH 29)

Sivaganga Bye pass road 1-CRIDP-11- 693 Sivagangai Sivaganga km. 0/0-10/6 (Land 100.00 12-S-0693 Aquistion) (New proposal) Bridges/ CD Works/ Others 3 Nos. 119.00 Total Sivagangai 23.80 950.00 Total

Widening and Improvements 1-CRIDP-11- from IL to DL Km.0/0-1/2 of 694 Ramnad Tiruvadanai 1.20 99.00 12-S-0694 Uppoor - Kottaiyur Road (SH 34A)

Widening and Improvements 1-CRIDP-11- from IL to DL Km.1/2-2/7 of 695 Ramnad Tiruvadanai 1.50 98.00 12-S-0695 Uppoor - Kottaiyur Road (SH 34A)

Widening of IL to DL at km.2/7-4/8 and 1-CRIDP-11- 696 Ramnad Tiruvadanai Improvements of Km.2/7- 2.10 95.00 12-S-0696 3/0 & 4/0-4/8 of Uppoor - Kottaiyur Road (SH 34A)

Widening and Improvements 1-CRIDP-11- from IL to DL Km.4/8-6/0 of 697 Ramnad Tiruvadanai 1.20 76.00 12-S-0697 Uppoor - Kottaiyur Road (SH 34A)

Widening & Improvements 6.00 368.00 Total

SH Page 89 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Thanjavur - Pattukottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil- 1-CRIDP-11- Maravamangalam - 698 Ramnad Mudhukulathur 1.10 59.00 12-S-0698 Elayankudi - Paramakudi - Mudukulathur - Sayalkudi Road Km.212/550-212/950, 215/900-216/0 & 218/4- 219/0 (SH 29)

Improvements to Thanjavur - Pattukottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil- 1-CRIDP-11- 699 Ramnad Mudhukulathur Maravamangalam - 1.50 85.00 12-S-0699 Elayankudi - Paramakudi - Mudukulathur - Sayalkudi Road Km.219/0-220/5 (SH 29)

Improvements to Thanjavur - Pattukottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil- 1-CRIDP-11- 700 Ramnad Mudhukulathur Maravamangalam - 1.60 86.00 12-S-0700 Elayankudi - Paramakudi - Mudukulathur - Sayalkudi Road Km. 231/900-233/500 (SH 29)

Improvements to Thanjavur - Pattukottai - Aranthangi - Karaikudi - Kallal - Kalaiyarkoil- 1-CRIDP-11- 701 Ramnad Mudhukulathur Maravamangalam - 1.50 81.00 12-S-0701 Elayankudi - Paramakudi - Mudukulathur - Sayalkudi Road Km.233/500 - 235/0 (SH 29)

Improvements to Ramnad 1-CRIDP-11- –Nainarkoil-Andakudi- 702 Ramnad Paramakudi 1.00 55.00 12-S-0702 Elayankudi-Sivaganga-Melur Road km.8/0-9/0 (SH 34)

SH Page 90 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Madurai- Thonuskodi road km. 74/0 - 1-CRIDP-11- 703 Ramnad Paramakudi 74/200 including single 0.20 30.00 12-S-0703 span slab culvert at km. 74/2 (SU 109)

Strengthening/ Improvements 6.90 396.00 Total

Construction of slab culvert at Km.39/2 of Aruppukottai - 1-CRIDP-11- 704 Ramnad Mudhukulathur perunali -Sayalkudi - 8.00 12-S-0704 Kadugusandai - Mariyur - Valinokkam Road (SH 38)

Bridges/ CD Works/ Others 1 No. 8.00 Total

Ramnad Total 12.90 772.00

Madurai Other works : 12 Nos 90.86 4629.20 Circle Total Improvements to Ambasamudram - 1-CRIDP-11- 705 Tirunelveli Ambasamudram Papanasam - Upperdam 3.80 80.00 12-S-0705 Road Km 4/2 - 5/0 & 15/4 - 18/4. (SH 178)

Improvements to Tirunelveli - 1-CRIDP-11- 706 Tirunelveli Alangulam Pottalpudur Road Km 29/2 - 3.20 100.00 12-S-0706 32/4. (SH 41A)

Improvements to 1-CRIDP-11- Cheranmahadevi - Panagudi 707 Tirunelveli Ambasamudram 2.00 70.00 12-S-0707 Road Km 0/0 - 2/0. (SH 177)

Improvements to Tirunelveli 1-CRIDP-11- 708 Tirunelveli Tirunelveli Bye Pass Road Km 0/0 - 2.00 92.00 12-S-0708 2/0. (SH 75A)

Improvements to Tirunelveli 1-CRIDP-11- 709 Tirunelveli Tirunelveli Bye Pass Road Km 2/0 - 1.20 62.00 12-S-0709 3/2. (SH 75A)

Improvements to Tirunelveli - 1-CRIDP-11- 710 Tirunelveli Tirunelveli Shencottai - Kollam Road 2.60 93.00 12-S-0710 Km 7/4 - 10/0. (SH 39)

SH Page 91 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 711 Tirunelveli Palayamkottai 2.60 82.50 12-S-0711 Tirunelveli Town Limti) Km 154/4 - 157/0. (SU 93)

Improvements to 1-CRIDP-11- Cheranmahadevi - Panagudi 712 Tirunelveli Nanguneri 2.00 70.00 12-S-0712 Road Km 26/0 - 28/0. (SH 75A)

Improvements to Nanguneri - 1-CRIDP-11- Eruvadi - Vallioor - 713 Tirunelveli Radhapuram 2.83 100.00 12-S-0713 Vijayapathy Road Km 10/6 - 13/430. (SH 92)

Improvements to Alwarthirunagari - Nazareth - 1-CRIDP-11- 714 Tirunelveli Radhapuram Sathankulam - Ittamozhi - 2.24 83.00 12-S-0714 Vallioor Road Km 58/0 - 60/240. (SH 93)

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 715 Tirunelveli Tirunelveli 2.20 75.00 12-S-0715 Tirunelveli Town Limit) Km 142/8 - 145/0. (SU 93)

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 716 Tirunelveli Tirunelveli 2.00 80.00 12-S-0716 Tirunelveli Town Limit) Km 145/0 - 147/0. (SU 93)

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 717 Tirunelveli Tirunelveli 2.00 75.00 12-S-0717 Tirunelveli Town Limit) Km 147/0 - 149/0. (SU 93)

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 718 Tirunelveli Tirunelveli 2.00 75.00 12-S-0718 Tirunelveli Town Limit) Km 149/0 - 151/0. (SU 93)

Improvements to Madurai - 1-CRIDP-11- Kanyakumari Road (NH 7 - 719 Tirunelveli Palayamkottai 1.80 80.00 12-S-0719 Tirunelveli Town Limit) Km 151/8 - 153/6. (SU 93)

SH Page 92 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Tiruchendur - Palayamkottai 1-CRIDP-11- - Ambasamudram - Tenkasi - 720 Tirunelveli Nanguneri 1.00 40.00 12-S-0720 Courtallam - Shencottai Road Km 42/6 - 43/6. (SH 40)

Improvements to Tiruchendur - Palayamkottai 1-CRIDP-11- - Ambasamudram - Tenkasi - 721 Tirunelveli Palayamkottai 1.10 45.00 12-S-0721 Courtallam - Shencottai Road Km 53/0 - 54/100. (SH 40)

Strengthening/ Improvements 36.57 1302.50 Total

Reconstruction of Culvert at 1-CRIDP-11- 722 Tirunelveli Nanguneri Km 18/8 of Cheranmahadevi 7.00 12-S-0722 - Panagudy Road. (SH 177)

Reconstruction of Culvert at Km 1/8 (i), (ii) & (iii) of 1-CRIDP-11- 723 Tirunelveli Nanguneri Nanguneri - Eruvadi - 23.00 12-S-0723 Vallioor - Vijayapathy Road. (SH 92)

Bridges/ CD Works/ Others 2 Nos. 30.00 Total Tirunelveli 36.57 1332.50 Total

Widening IL to DL Shencottai- Pavoorchatram road (via) 1-CRIDP-11- 724 Thenkasi Tenkasi Surandai in km 17/6-22/6 5.00 100.00 12-S-0724 including CD works. (SH 39A)

Widening IL to DL and improvements to Shencottai- Pavoorchatram road (via) 1-CRIDP-11- 725 Thenkasi Tenkasi Surandai km 28/4-31/2 2.80 100.00 12-S-0725 including Construction of Culvert and Drain works, (SH 39A)

Widening & Improvements 7.80 200.00 Total

SH Page 93 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 52/0- 1-CRIDP-11- 53/0 of Tirunelveli- 726 Thenkasi Tenkasi 1.00 43.00 12-S-0726 Shencottai-Kollam road. (SH 39)

Improvements to km 53/0- 53/060 and 53/290-53/800 and Providing cement concrete pavement end to 1-CRIDP-11- end of carriageway in km 727 Thenkasi Tenkasi 0.80 100.00 12-S-0727 53/060-53/290 including side drain and construction of culvert at km 53/2 of Tirunelveli-Shencottai- Kollam road. (SH 40)

Improvements in km 122/6- 125/2 of Tiruchendur- Palayamkottai- 1-CRIDP-11- 728 Thenkasi Tenkasi Ambasamuduram-Tenkasi- 2.60 100.00 12-S-0728 Courtallam-Shencottai road and including CD works (SH 40)

Improvements in km 5/2- 6/0 & 6/6-7/4 of 1-CRIDP-11- Puliyangudi-Sankarankoil- 729 Thenkasi Vasudevanallur 1.60 61.00 12-S-0729 Kalugumalai-Nalatinputhur Road including bus lay bye at km 11/2. (SH 76)

Improvements to Puliangudi - Sankarankovil - 1-CRIDP-11- 730 Thenkasi Sankarankoil Kalugumalai - Nalattinpudur 2.80 102.00 12-S-0730 Road Km 24/0 - 26/8 (SH 76)

Improvements to Puliangudi - Sankarankovil - 1-CRIDP-11- 731 Thenkasi Sankarankoil Kalugumalai - Nalattinpudur 2.80 102.00 12-S-0731 Road Km 26/8 - 29/6 (SH 76)

SH Page 94 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Puliangudi - Sankarankovil - 1-CRIDP-11- Kalugumalai - Nalattinpudur 732 Thenkasi Sankarankoil 1.83 70.00 12-S-0732 Road Km 29/6 - 30/8 and 33/0 - 33/625 including CD works @ Km 32/10 (SH 76)

Strengthening/ Improvements 13.43 578.00 Total

Reconstruction of minor bridge in km 3/2 of Puliyangudi-Sankarankoil- 1-CRIDP-11- 733 Thenkasi Vasudevanallur Kalugumalai-Nalatinputhur 54.00 12-S-0733 Road including construction of protective wall in km 2/8- 3/2 (SH 76)

Reconstruction of Weak and narrow bridge across Manur 1-CRIDP-11- channel at km 26/2 of 734 Thenkasi Tenkasi 30.00 12-S-0734 Shencottai - Pavoorchatram road (via) Surandai. (SH 39A)

Improvements to junction 1-CRIDP-11- (Ilanji) in km 56/10 of 735 Thenkasi Tenkasi 20.00 12-S-0735 Tirunelveli-Shencottai- Kollam road. (SH 39)

Bridges/ CD Works/ Others 3 Nos. 104.00 Total Thenkasi 21.23 882.00 Total

Widening and Rebuilding from IL to DL in km 22/0- 23/0 of Palayamcottai - 1-CRIDP-11- 736 Tuticorin Ottapidaram Kurukkuchalai - Kulatlhur - 1.00 95.00 12-S-0736 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

SH Page 95 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Rebuilding from IL to DL in km 21/0- 22/0 of Palayamcottai - 1-CRIDP-11- 737 Tuticorin Ottapidaram Kurukkuchalai - Kulatlhur - 1.00 95.00 12-S-0737 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

widening and Rebuilding from IL to DL in km3/5-4/0 of Alwarthirunageri - 1-CRIDP-11- 738 Tuticorin Srivaikundam Nazareth - Sathankulam - 0.50 90.00 12-S-0738 Ittamozhi - Valliyoor Road including Retaining wall (SH 93) widening and Rebuilding from IL to DL in km 2/4-3/0 of Alwarthirunageri - 1-CRIDP-11- 739 Tuticorin Srivaikundam Nazareth - Sathankulam - 0.60 95.00 12-S-0739 Ittamozhi - Valliyoor Road including Retaining wall (SH 93) widening and Rebuilding from IL to DL in km3/0-3/5 of Alwarthirunageri - 1-CRIDP-11- 740 Tuticorin Srivaikundam Nazareth - Sathankulam - 0.50 90.00 12-S-0740 Ittamozhi - Valliyoor Road including Retaining wall (SH 93) widening and Rebuilding from IL to DL in km 1/8-2/4 of Alwarthirunageri - 1-CRIDP-11- 741 Tuticorin Srivaikundam Nazareth - Sathankulam - 0.60 95.00 12-S-0741 Ittamozhi - Valliyoor Road including Retaining wall (SH 93) widening and Rebuilding from IL to DL in km 1/2-1/8 of Alwarthirunageri - 1-CRIDP-11- 742 Tuticorin Srivaikundam Nazareth - Sathankulam - 0.60 90.00 12-S-0742 Ittamozhi - Valliyoor Road including Retaining wall (SH 93)

SH Page 96 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Rebuilding from IL to DL in km 23/0- 24/0 of Palayamcottai - 1-CRIDP-11- 743 Tuticorin Ottapidaram Kurukkuchalai - Kulatlhur - 1.00 95.00 12-S-0743 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Widening from IL to DL in km 55/0-57/2 of Palayamcottai - 1-CRIDP-11- 744 Tuticorin Vilathikulam Kurukkuchalai - Kulatlhur - 2.20 45.00 12-S-0744 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Widening from IL to DL in km 57/2-60/2 of Palayamcottai - 1-CRIDP-11- 745 Tuticorin Vilathikulam Kurukkuchalai - Kulatlhur - 3.00 60.00 12-S-0745 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Widening & Improvements 11.00 850.00 Total

Rebuilding in km 71/2-71/8 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 746 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 0.60 60.00 12-S-0746 Vembar Road including Retaining Wall (SH 44)

Rebuilding in km 59/6-60/6 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 747 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 1.00 95.00 12-S-0747 Vembar Road including Retaining Wall (SH 4)

Improvements in km 5/0- 1-CRIDP-11- 748 Tuticorin Thoothukudi 6/0 of Thoothukudi - Quilon 1.00 68.00 12-S-0748 Road (SU 92)

SH Page 97 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening in km 35/0- 35/2 & 35/4-36/0 of 1-CRIDP-11- Puliyankudi - Sankarankovil 749 Tuticorin Kovilpatti 0.80 78.00 12-S-0749 - Kalugumalai - Nalattinputhur Road (SH 76)

Rebuilding in km 25/0-26/0 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai - Kulatlhur - 750 Tuticorin Ottapidaram 1.00 95.00 12-S-0750 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Rebuilding in km 26/0-27/0 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai - Kulatlhur - 751 Tuticorin Ottapidaram 1.00 95.00 12-S-0751 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Rebuilding in km 27/0-28/0 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai - Kulatlhur - 752 Tuticorin Ottapidaram 1.00 95.00 12-S-0752 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Rebuilding in km 28/0-28/6 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai - Kulatlhur - 753 Tuticorin Ottapidaram 0.60 60.00 12-S-0753 Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Rebuilding in km 69/0-69/7 of Palayamcottai - Kurukkuchalai - Kulathur - 1-CRIDP-11- 754 Tuticorin Vilathikulam Vilathikulam - Nagalapuram - 0.70 70.00 12-S-0754 pandhalkudi - Aruppucottai Road including drainage works (SH 75)

SH Page 98 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Rebuilding in km 69/7-70/4 of Palayamcottai - Kurukkuchalai - Kulathur - 1-CRIDP-11- 755 Tuticorin Vilathikulam Vilathikulam - Nagalapuram - 0.70 70.00 12-S-0755 pandhalkudi - Aruppucottai Road including CD works (SH 75)

Rebuilding in km 71/4-72/0 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai - Kulathur - 756 Tuticorin Vilathikulam 0.60 60.00 12-S-0756 Vilathikula -Nagalapuram - pandhalkudi - Aruppucottai Road (SH 75)

Rebuilding in km 72/0-72/8 of Palayamcottai - 1-CRIDP-11- Kurukkuchalai-Kulathur - 757 Tuticorin Vilathikulam 0.80 80.00 12-S-0757 Vilathikulam-Nagalapuram - pandhalkudi-Aruppucottai Road (SH 75)

Rebuilding in km 64/2-65/0 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 758 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 0.80 78.00 12-S-0758 Vembar Road including Retaining Wall (SH 44)

Rebuilding in km 67/4-68/4 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 759 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 1.00 95.00 12-S-0759 Vembar Road including Retaining wall (SH 44)

Rebuilding in km 68/4-69/4 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 760 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 1.00 95.00 12-S-0760 Vembar Road including Retaining wall (SH 44)

Rebuilding in km 69/4-70/4 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 761 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 1.00 95.00 12-S-0761 Vembar Road including Retaining Wall (SH 44)

SH Page 99 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Rebuilding in km 70/4-71/2 of Paruvakudi - Kovilpatti - 1-CRIDP-11- 762 Tuticorin Vilathikulam Ettayapuram - Vilathikulam - 0.80 80.00 12-S-0762 Vembar Road including Retaining wall (SH 44)

Improvements in km 2/0- 1-CRIDP-11- 763 Tuticorin Thoothukudi 2/8 of Thoothukudi - Quilon 0.80 70.00 12-S-0763 Road (SU 92)

Improvements in km 40/6- 41/4 of Tiruchendur - Palayamcottai - 1-CRIDP-11- 764 Tuticorin Srivaikundam Ambasamudram - Tenkasi - 0.80 55.00 12-S-0764 Courtallam - Shencottai Road including Drainage Works (SH 40)

Strengthening in km26/0- 26/7 of Tiruchendur - Palayamcottai - 1-CRIDP-11- 765 Tuticorin Srivaikundam Ambasamudram - Tenkasi - 0.70 55.00 12-S-0765 Courtallam - Shencottai Road including Retaining wall (SH 40)

Strengthening in km 36/0- 37/0 of Puliyankudi - 1-CRIDP-11- Sankarankovil - 766 Tuticorin Kovilpatti 1.00 85.00 12-S-0766 Kalugumalai - Nalattinputhur Road (SH 76)

Strengthening in km 37/0- 39/0 of Puliyankudi - 1-CRIDP-11- Sankarankovil - 767 Tuticorin Kovilpatti 2.00 95.00 12-S-0767 Kalugumalai - Nalattinputhur Road (SH 76)

Strengthening in km 39/0- 41/0 of Puliyankudi - 1-CRIDP-11- Sankarankovil - 768 Tuticorin Kovilpatti 2.00 95.00 12-S-0768 Kalugumalai - Nalattinputhur Road (SH 76)

SH Page 100 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Tiruchendur - Palayamcottai - Ambasamudram - Tenkasi - Courtallam - Shenkottai Road in km 30/020-30/225 1-CRIDP-11- 769 Tuticorin Srivaikundam including rebuilding the 0.21 95.00 12-S-0769 approaches leading to the srivaikundam High Level new bridge at km 30/110 including construction of retaining wall (SH 40)

Strengthening/ Improvements 21.91 1919.00 Total

Reconstruction of RCC slab culvert with retaining wall in lieu of causeway at km 73/2 1-CRIDP-11- of Palayamcottai - 770 Tuticorin Vilathikulam 35.00 12-S-0770 Kurukkuchalai - Kulathur - Vilathikulam - Nagalapuram - Pandhalkudi - Aruppucottai Road (SH 75)

Bridges/ CD Works/ Others 1 No. 35.00 Total Tuticorin 32.91 2804.00 Total

Widening from IL to DL of 1-CRIDP-11- 771 Virudhunagar Sattur Km 7/2 -11/0 of Sivakasi - 3.80 90.00 12-S-0771 Alangulam road (SH 183)

Widening IL to DL to Km 13/0-14/6 including 1-CRIDP-11- 772 Virudhunagar Sattur Improvements to centre 1.60 83.00 12-S-0772 portion of Sivakasi - Alangulam road (SH 183)

Widening from IL to DL km 1-CRIDP-11- 0/0-0/830 of Virudhunagar - 773 Virudhunagar Virudhunagar 0.83 25.00 12-S-0773 Krishnapuram road (SH 184)

SH Page 101 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening IL to DL to Km 4/0- 1-CRIDP-11- 5/6 including Improvements 774 Virudhunagar Sivakasi 1.60 82.00 12-S-0774 to centre portion of Sivakasi - Alangulam road (SH 183)

Widening form IL to DL and 1-CRIDP-11- Improvements Sattur - 775 Virudhunagar Sattur 1.60 74.00 12-S-0775 Sivakasi - Kalugumalai road km 31/4-33/0 (SH 187)

Widening from IL to DL and 1-CRIDP-11- Improvements to Sattur - 776 Virudhunagar Sattur 1.40 65.00 12-S-0776 Sivakasi - Kalugumalai road km 33/0-34/4 (SH 187)

Widening form IL to DL 1-CRIDP-11- Sattur - Sivakasi - 777 Virudhunagar Sattur 4.00 75.00 12-S-0777 Kalugumalai road km 34/4- 38/4 (SH 187)

Widening from IL to DL Km 20/4-25/0 of Rajapalayam - 1-CRIDP-11- 778 Virudhunagar Sattur Vembakottai road including 4.60 99.00 12-S-0778 widening of culvert at km 21/4, 23/8,24/4 (SH 186)

Widening from IL to DL 0/0- 1-CRIDP-11- 779 Virudhunagar Sivakasi 3/2 & 3/8-4/0 of Sivakasi - 3.40 80.00 12-S-0779 Alangulam road (SH 183)

Widening IL to DL to Km 5/6- 1-CRIDP-11- 7/2 including Improvements 780 Virudhunagar Sivakasi 1.60 80.00 12-S-0780 to centre portion of Sivakasi - Alangulam road (SH 183)

Widening IL to DL to Km 11/0-13/0 including 1-CRIDP-11- 781 Virudhunagar Sattur Improvements to center 2.00 90.00 12-S-0781 portion of Sivakasi - Alangulam road (SH 183)

Widening IL to DL to Km 1-CRIDP-11- 782 Virudhunagar Sattur 21/0-24/0 Sattur - Sivakasi - 3.00 80.00 12-S-0782 Kalugumalai Road (SH 187)

SH Page 102 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from SL to DL & 1-CRIDP-11- Improvements of km 17/0- 783 Virudhunagar Sattur 0.14 10.00 12-S-0783 17/140 of Rajapalayam - Vembakottai road (SH 186)

Widening & Improvements 29.57 933.00 Total

Improvements to Madurai - 1-CRIDP-11- Tuticorin road (within 784 Virudhunagar Aruppukottai 2.00 70.00 12-S-0784 Pandalkudi Town limit) km 61/2-63/2 (SU 96)

Improvements to - Sivakasi - Virudhunagar - 1-CRIDP-11- 785 Virudhunagar Sivakasi Aruppukottai - Thiruchuli - 2.40 90.00 12-S-0785 Narikudi - Parthibanoor road Km 17/0-18/4 and 19/0- 19/10 (SH 42)

Improvements to Madurai - Kanniyakumari road (with in 1-CRIDP-11- Sattur Municipal limt ) km 786 Virudhunagar Sattur 2.00 91.00 12-S-0786 70/6 -72/6 including reconstruction of culvert at km 72/4 (SU 32)

Improvements to Srivilliputhur - Sivakasi - Virudhunagar - 1-CRIDP-11- 787 Virudhunagar Virudhunagar Aruppukottai - Thiruchuli - 1.40 50.00 12-S-0787 Narikudi - Parthibanoor road km 44/6 - 45/0 & 46/0- 47/0 (SH 42)

Improvements to Madurai - 1-CRIDP-11- Tuticorin road (within 788 Virudhunagar Aruppukottai 1.60 56.00 12-S-0788 Pandalkudi Town limit) km 63/2-64/8 (SU 96)

Improvements to Madurai - 1-CRIDP-11- Tuticorin road (within 789 Virudhunagar Aruppukottai 1.40 50.00 12-S-0789 Pandalkudi Town limit) km 64/8-66/2 (SU 96)

SH Page 103 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- 790 Virudhunagar Rajapalayam Rajapalayam - Vembakottai 3.60 110.00 12-S-0790 road km 2/0-5/6 (SH 186)

Improvements to Srivilliputhur - Sivakasi - 1-CRIDP-11- Virudhunagar - 791 Virudhunagar Aruppukottai 2.00 67.00 12-S-0791 Aruppukottai - Thiruchuli - Narikudi - Parthibanoor road km 65/4 - 67/4 (SH 42)

Improvements to Srivilliputhur - Sivakasi - 1-CRIDP-11- Virudhunagar - 792 Virudhunagar Aruppukottai 1.60 56.00 12-S-0792 Aruppukottai - Thiruchuli - Narikudi - Parthibanoor road km 67/4 - 69/0 (SH 42)

Improvements to Palaiyamkottai - Kurukkusalai - Kulathoor - 1-CRIDP-11- 793 Virudhunagar Aruppukottai Vilathikulam - Nagalapuram - 1.60 56.00 12-S-0793 Pandalkudi - Aruppukottai road km 107/780 - 109/380 (SH 75)

Improvements to Srivilliputhur - Sivakasi - Virudhunagar - 1-CRIDP-11- 794 Virudhunagar Srivilliputhur Aruppukottai - Thiruchuli - 2.00 77.00 12-S-0794 Narikudi - Parthibanoor road Km 0/0 - 1/7 & 2/7 - 3/0. (SH 42)

Improvements to Srivilliputhur - Sivakasi - 1-CRIDP-11- Virudhunagar - 795 Virudhunagar Srivilliputhur 3.00 99.50 12-S-0795 Aruppukottai - Thiruchuli - Narikudi - Parthibanoor road Km 3/0 - 6/0. (SH 42)

Strengthening/ Improvements 24.60 872.50 Total

Virudhunagar 54.17 1805.50 Total

SH Page 104 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Aralvoimozhi - Nagercoil - 1-CRIDP-11- 796 Nagercoil Nagercoil Rajakkamangalam - 2.00 80.00 12-S-0796 Colachel road km 22/0 - 24/0. (SH 46)

Improvements to Nagercoil - 1-CRIDP-11- 797 Nagercoil Kanniyakumari Thuvarankadu road Km. 7/0- 1.90 80.00 12-S-0797 8/9 (SH 194)

Improvements to Nagercoil - 1-CRIDP-11- 798 Nagercoil Kanniyakumari Thuvarankadu road Km. 5/6- 1.40 60.00 12-S-0798 7/0 (SH 194)

Improvements to Aralvoimozhi - Nagercoil - 1-CRIDP-11- 799 Nagercoil Nagercoil Rajakkmangalam - Colachel 2.00 80.00 12-S-0799 road km 20/0 - 22/0. (SH 46)

Strengthen ing/ Improvements 7.30 300.00 Total

Construction of drainage at km 10/8 - 11/4, Construction of retaining wall at km 13/6 - 14/0, 1-CRIDP-11- 16/8 - 17/0 and 800 Nagercoil Kanniyakumari 50.00 12-S-0800 Reconstruction of culvert at km 10/2, 17/4, of Aralvoimozhi - Nedumangadu road. (SH 45)

Reconstruction of weak and narrow culvert at km 8/4, 1-CRIDP-11- 14/2 and construction of 801 Nagercoil Vilavancode 26.00 12-S-0801 retaining wall and drinage at 13/2 & 15/2 of Marthandam - Pechiparai road. (SH 90)

SH Page 105 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of Drainage and Retaining wall at km 23/10, 24/2, 24/6, 24/8, 1-CRIDP-11- 24/10, 27/4 & widening of 802 Nagercoil Nagercoil 75.00 12-S-0802 Culverts at km 24/2 (i), (ii) of Kanyakumari - Pazhayauchakadai road. (SH 179)

Bridges/ CD Works/ Others 3 Nos. 151.00 Total

Nagercoil 7.30 451.00 Total

Tirunelveli Other works : 9 Nos. 152.17 7275.00 Total

Grand Total Other works : 87 Nos. 1164.72 59092.20

SH Page 106 CRIDP ECR PROPOSAL 2011-2012

ECR : Thoothukudi - Tiruchendur - Kanniyakumari Road

Cost Sl. Length Work code Division constituency Name of Work (Rs.in. No. in km Lakhs) Widening and Rebuilding the existing Intermediate Lane into Double Lane in Km 68/0 - 70/300, 75/2 - 76/2, 80/0 - 83/2 & 85/6 - 92/0 of Thoothukudi - Tiruchendur - 1-CRIDP-11- 803 Tirunelveli Radhapuram Kanniyakumari Road 12.90 2600.00 12-S-0803 including Construction of Major Bridge at Km 90/2, 11 Slab Culverts, 20 Pipe Culverts and Protective Works. (Including LA) (SH 176)

Widening and Rebuilding the existing Intermediate Lane into Double Lane in Km 92/0 - 94/0 & Rebuilding the existing Two Lane in Km 94/0 - 101/4, 105/2 - 109/700 & 1-CRIDP-11- 117/250 - 119/710 of 804 Tirunelveli Radhapuram 16.360 2600.00 12-S-0804 Thoothukudi - Tiruchendur - Kanniyakumari Road including Construction of 15 Slab Culverts, 20 Pipe Culverts and Protective Works. (Including LA) (SH 176)

Forming Kuttam, Kunjanvilai Bye Pass Starting at Km 70/300 and Ending at Km 75/2 (4.780 KM), Uvari Bye Pass Starting at Km 76/2 and Ending at Km 80/0 (3.260 KM), Kalikumarapuram Bye Pass Starting at Km 83/2 and Ending at Km 1-CRIDP-11- 805 Tirunelveli Radhapuram 85/6 (1.920 KM) of 9.96 2100.00 12-S-0805 Thoothukudi - Tiruchendur - Kanyakumari Road including Construction of 8 Slab Culverts, 13 Pipe Culverts and Protective Works. (Including LA) (SH 176)

SH Page No 107 Cost Sl. Length Work code Division constituency Name of Work (Rs.in. No. in km Lakhs) Forming Koodankulam Bye Pass Starting at Km 101/4 and Ending at Km 105/2 (4.100 KM), Srirenganarayanapuram Realignment Starting at Km 109/700 and Ending at Km 113/8 (3.930 KM) and Chettikulam Bye Pass Starting at Km 113/8 and 1-CRIDP-11- 806 Tirunelveli Radhapuram Ending at Km 117/250 11.22 2200.00 12-S-0806 (3.190 KM) of Thoothukudi - Tiruchendur - Kanyakumari Road including Construction of Two Minor Bridges, 5 Slab Culverts, 9 Pipe Culverts and Protective Works. (Including LA) (SH 176)

Total for Tirunelveli Division 50.44 9500.00 Rebuilding the existing Multi Lane Road to four lane in Km 0/0 - 6/700 and Two Lane in Km 6/700 - 13/650 & 16/700 - 20/4 with two lane Paved Shoulder of Thoothukudi - 1-CRIDP-11- Thoothukud Tiruchendur, Tiruchendur - 807 17.35 4600.00 12-S-0807 i Srivaikundam Kanyakumari Road construction of Major Bridge at Km 3/10 & One Minor Bridge, 15 Slab Culverts and 9 Pipe Culverts including Protective Works. (Including LA) (SH 176)

SH Page No 108 Cost Sl. Length Work code Division constituency Name of Work (Rs.in. No. in km Lakhs) Forming the Palayagayal Bye Pass Starting at Km 13/650 & Ending at Km 16/700 (2.975 KM), Athur - Arumuganeri - Tiruchendur Combined Bye Pass Starting at Km 21/0 and Ending at Km 41/640 (19.220 KM) of 1-CRIDP-11- Thoothukud 808 Tiruchendur Thoothukudi - Tiruchendur 22.175 6900.00 12-S-0808 i - Kanyakumari Road into Two Lane with Paved Shoulder including ROB at Ch. 7450 of combined Bye Pass, Two Minor Bridges, 13 Slab Culverts, 31 Pipe Culverts and Protective Works. (Including LA) (SH 176) Rebuilding the existing Two Lane Pavement in Km 41/640 - 55/2 to two lane with Paved Shoulder and Rebuilding the existing Two Lane Pavement in Km 58/0 - 63/4 & 65/2 - 66/300 of 1-CRIDP-11- Thoothukud Tiruchendur, 809 Thoothukudi - Tiruchendur 19.70 3750.00 12-S-0809 i Srivaikundam - Kanyakumari Road,construction of high level bridge at Km 54/8, 8 Slab Culverts, 14 Pipe Culverts and Protective Works. (Including LA) (SH 176)

Forming Manappadu Bye Pass Starting at Km 55/2 and Ending at Km 58/0 (1.470 KM), Sithan Kudiyiruppu realignment Starting at Km 63/4 and Ending at Km 65/2 (1.200 KM) and Periyathalai Bye 1-CRIDP-11- Thoothukud 810 Srivaikundam Pass Starting at Km 4.170 950.00 12-S-0810 i 66/300 and Ending at Km 68/0 (1.500 KM) of Thoothukudi - Tiruchendur - Kanyakumari Road including 6 Slab Culverts, 8 Pipe Culverts and Protective Works. (Including LA) (SH 176)

Total for Thoothukudi Division 63.395 16200.00

ECR TOTAL (SH) 113.835 25700.00 Grand Total (SH) 1278.555 84792.20

SH Page No 109 ANNEXURE CRIDP PROPOSAL 2011-12 LIST OF WORKS - MAJOR DISTRICT ROADS

Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 1-CRIDP- Strengthening of Agarenthen Chennai city 811 - 11-12-M- Tambaram - Kovilanchery road km 1/6 - 1.60 82.00 roads C 0811 3/2 (MD566) R 1 1-CRIDP- Strengthening of Agarenthen - Chennai city 812 11-12-M- Tambaram - Kovilanchery road km 0/0 - 1.60 82.00 C roads R 0812 1/6 (MD566) I 1 - 1-CRIDP- Strengthening of Agarenthen Chennai city 813 C11-12-M- Tambaram - Kovilanchery road km 3/2 - 1.70 86.00 roads R 0813 4/9 (MD566) I

Strengthening/ Improvements 4.90 250.00 Total

Chennai city 4.90 250.00 roads Total

1 - Widening from single lane to C Intermediate lane and R1-CRIDP- strengthening of Pudhupadi - 814 I 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 2.40 90.00 D 0814 - Vishar - P Kanchipuram Road Km.27/2 - - 29/6 (MD666) 1 1 - Widening from single lane to C Intermediate lane and R1-CRIDP- strengthening of Pudhupadi - 815 I 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 2.40 90.00 D 0815 Perumbakkam - Vishar - P Kanchipuram Road Km.24/8 - - 27/2 (MD666) 1 1

MDR Page No 1 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from single lane to - Intermediate lane and C1-CRIDP- Strengthening to 816 R 11-12-M- Chengalpattu Uthiramerur 1.00 60.00 Tirumukkudal Nelvoy I 0816 Tirukalukundram Road D Km.3/0 - 4/0 (MD789) P 1- - Widening from single lane to C Intermediate lane and R strengthening of road branching from Km.33/6 of I 1-CRIDP- Thiruvanmaiyur - 817 D11-12-M- Chengalpattu Thiruporur 0.84 35.00 Mamallapuram Marakkanam P 0817 - Pondichery Road to 1 Muttukadu Picturesque 1 beauty spot road Km.0/0 - - 0/840 (MD477) 1 Widening from single lane to - Intermediate lane and C1-CRIDP- Strengthening to 818 R 11-12-M- Chengalpattu Uthiramerur 1.00 60.00 Tirumukkudal -Nelvoy - I 0818 Tirukalukundram Road D Km.0/0 - 1/0 (MD789) P - 1 Widening from single lane to - Intermediate lane and 1-CRIDP- C Strengthening to 819 11-12-M- Chengalpattu Uthiramerur 1.00 60.00 R Tirumukkudal -Nelvoy - 0819 I Tirukalukundram Road D Km.1/0 - 2/0 (MD789) P 1 Widening from single lane to - Intermediate lane and C1-CRIDP- Strengthening to 820 R 11-12-M- Chengalpattu Uthiramerur 1.00 60.00 Tirumukkudal Nelvoy I 0820 Tirukalukundram Road D Km.2/0 - 3/0 (MD789) P

MDR Page No 2 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 - C R I D Widening from single lane to P Intermediate lane and - 1-CRIDP- strengthening of Pudhupadi - 821 1 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 2.40 90.00 1 0821 Perumbakkam - Vishar - - Kanchipuram Road Km.29/6 - 1 32/0 (MD666) 2 - M - 0 1 - Widening from single lane to C Intermediate lane and R1-CRIDP- strengthening of Pudhupadi - 822 I 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 2.40 90.00 D 0822 Perumbakkam - Vishar - P Kanchipuram Road Km.32/0- - 34/4 (MD666) 1 1 1 - Widening from single lane to C Intermediate lane and R1-CRIDP- strengthening of Pudhupadi - 823 I 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 2.40 90.00 D 0823 Perumbakkam - Vishar - P Kanchipuram Road Km.34/4- - 36/8 (MD666) 1 1 - Widening from single lane to C Intermediate lane and R1-CRIDP- strengthening of Pudhupadi - 824 I 11-12-M- Chengalpattu Kanchipuram Illuppai Vadaillupai - 0.80 30.00 D 0824 Perumbakkam - Vishar - P Kanchipuram Road Km.36/8- - 37/6 (MD666) 1 Widening & Improvements 17.64 755.00 Total

MDR Page No 3 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Strengthening to - 1-CRIDP- Tirumukkudal -Nelvoy - 825 C11-12-M- Chengalpattu Uthiramerur 2.00 95.00 Tirukalukundram Road Km R 0825 7/0 - 9/0 (MD789) I 1D Strengthening to - 1-CRIDP- Tirumukkudal -Nelvoy - 826 C11-12-M- Chengalpattu Uthiramerur 2.00 95.00 Tirukalukundram Road Km R 0826 9/0 - 11/0 (MD789) I 1D Strengthening to - 1-CRIDP- Tirumukkudal -Nelvoy - 827 C11-12-M- Chengalpattu Uthiramerur 2.00 100.00 Tirukalukundram Road Km R 0827 11/0 - 13/0 (MD789) I 1D Strengthening to - 1-CRIDP- Tirumukkudal -Nelvoy - 828 C11-12-M- Chengalpattu Uthiramerur 2.00 100.00 Tirukalukundram Road Km R 0828 13/0 - 15/0 (MD789) I 1D Strengthening to - 1-CRIDP- Tirumukkudal -Nelvoy - 829 C11-12-M- Chengalpattu Uthiramerur 1.20 60.00 Tirukalukundram Road Km R 0829 15/0 - 16/2 (MD789) I 1D - 1-CRIDP- Strengthening of 830 C11-12-M- Chengalpattu Kanchipuram Kanchipuram Byepass Road 1.00 100.00 R 0830 Km.0/0 - 1/0 (MD143) I 1D - 1-CRIDP- Strengthening of 831 C11-12-M- Chengalpattu Kanchipuram Kanchipuram Byepass Road 1.00 100.00 R 0831 Km.1/0 - 2/0 (MD143) I 1D - 1-CRIDP- Strengthening of 832 C11-12-M- Chengalpattu Kanchipuram Kanchipuram Byepass Road 1.00 100.00 R 0832 Km.4/6 - 5/6 (MD143) I 1D - 1-CRIDP- Strengthening of 833 C11-12-M- Chengalpattu Kanchipuram Kanchipuram Byepass Road 0.80 75.00 R 0833 Km.5/6 - 6/4 (MD143) I D Strengthening/ Improvements 13.00 825.00 Total

MDR Page No 4 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs Chengalpattu 30.64 1580.00 Total 1 Widening from SL to IL and - 1-CRIDP- Strengthening Of Vengal- 834 C11-12-M- Thiruvallur Gummidipoondi 2.50 100.00 Seethancheri-Kannigaipeir R 0834 I Road Km :7/5-10/0(MD740) D 1 Widening from SL to IL and - 1-CRIDP- Strengthening Of Vengal- 835 C11-12-M- Thiruvallur Poonamallee 2.50 100.00 Seethancheri-Kannigaipeir R 0835 I Road Km :5/0-7/5(MD740) D 1 Widening from SL to IL and - 1-CRIDP- Improvements to Medur- 836 C11-12-M- Thiruvallur Ponneri 2.00 99.00 Gummidipoondi Road Km R 0836 I 5/0 - 7/0(MD634) D 1 Widening from SL to IL and - 1-CRIDP- Improvements toMedur- 837 C11-12-M- Thiruvallur Ponneri 2.00 97.00 Gummidipoondi Road Km R 0837 I :7/0-9/0(MD634) D 1 - Widening from SL to IL and 1-CRIDP- C Improvements toMedur- 838 11-12-M- Thiruvallur Ponneri 2.00 93.00 R Gummidipoondi Road Km 0838 I :11/0-13/0(MD634) D 1 Widening from SL to IL and - 1-CRIDP- Improvements toMedur- 839 C11-12-M- Thiruvallur Ponneri 2.00 99.00 Gummidipoondi Road Km R 0839 I :9/0-11/0(MD634) D Widening & Improvements 13.00 588.00 Total 1 1-CRIDP- Rebuilding the Thiruvallur - - 840 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 14/0 - 1.00 97.50 C 0840 15/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 841 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 15/0 - 0.80 78.00 C 0841 15/8(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 842 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 7/0 - 1.00 97.50 C 0842 8/0(MD32) R I

MDR Page No 5 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 1-CRIDP- Rebuilding the Thiruvallur - - 843 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 9/0 - 1.00 97.50 C 0843 10/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 844 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 8/0 - 1.00 97.50 C 0844 9/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 845 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 12/0 - 1.00 97.50 C 0845 13/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 846 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 13/0 - 1.00 97.50 C 0846 14/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 847 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 11/0 - 1.00 97.50 C 0847 12/0(MD32) R 1I 1-CRIDP- Rebuilding the Thiruvallur - - 848 11-12-M- Thiruvallur Thiruvallur Arakkonam Road Km 10/0 - 1.00 97.50 C 0848 11/0(MD32) R 1I - 1-CRIDP- " Improvements to 849 C11-12-M- Thiruvallur Poonamallee Ponnamallee-Kundrathur 0.80 80.00 R 0849 Road Km 0/0 - 0/8"(MD369) I 1D 1-CRIDP- Improvements to - 850 11-12-M- Thiruvallur Poonamallee Ponnamallee-Kundrathur 0.80 80.00 C 0850 Road Km 0/8 - 1/6(MD369) R I Strengthening/ Improvements 10.40 1018.00 Total

Thiruvallur 23.40 1606.00 Total 1 Widening SL to IL and - 1-CRIDP- Improvements to 851 C11-12-M- Vellore Arcot 2.00 73.00 Muppathuvetti Kaniyanur R 0851 I Road Km.0/0 - 2/0(MD795) D

MDR Page No 6 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening SL to IL and - 1-CRIDP- Improvements to 852 C11-12-M- Vellore Arcot 2.00 74.00 Muppathuvetti Kaniyanur R 0852 I Road Km.2/0 - 4/0(MD795) D 1 Widening SL to IL and - 1-CRIDP- Improvements to 853 C11-12-M- Vellore Arcot 2.00 73.00 Muppathuvetti Kaniyanur R 0853 I Road Km.4/0 - 6/0(MD795) D 1 Widening from SL to IL to - 1-CRIDP- Muppathuvetti Kaniyanur 854 C11-12-M- Vellore Arcot 1.42 85.00 Road Km.8/785 - R 0854 I 10/2(MD795) D 1 Widening from SL to IL and - 1-CRIDP- Improvements to 855 C11-12-M- Vellore Arcot Muppathuvetti Kaniyanur 1.40 75.00 R 0855 Road Km.10/2 - I 11/6(MD795) D 1 - Widening from SL to IL and C1-CRIDP- Improvements at Km 14/0 - 856 R 11-12-M- Vellore Arakonam 2.00 80.00 16/0 of Keelveedhi Minnal I 0856 Ameerpet Road(MD792) D P 1 Widening from SL to IL and - 1-CRIDP- Improvements at Km 16/0 - 857 C11-12-M- Vellore Arakonam 2.00 80.00 18/0 of Keelveedhi Minnal R 0857 I Ameerpet Road(MD792) D 1 Widening from SL to IL and - 1-CRIDP- Improvements at Km 18/0 - 858 C11-12-M- Vellore Arakonam 1.00 40.00 19/0 of Keelveedhi Minnal R 0858 I Ameerpet Road(MD792) D 1 - Widening from SL to IL and C Improvements to km 2/2 - R1-CRIDP- 4/2 of Banavaram 859 I 11-12-M- Vellore Arakonam Senthamangalam 2.00 90.00 D 0859 Ganapathipuram Road P including Construction of - Culvert(MD577) 1

MDR Page No 7 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and Improvements to km 4/2 - C1-CRIDP- 6/2 of Banavaram 860 R 11-12-M- Vellore Arakonam 2.00 90.00 Senthamangalam I 0860 D Ganapathipuram P Road(MD577) - 1 Widening from SL to IL and - Improvements to Km 6/2 - C1-CRIDP- 8/6 of Banavaram 861 R 11-12-M- Vellore Arakonam 2.40 98.00 Senthamangalam I 0861 Ganapathipuram D road(MD577) P 1 Widening from SL to IL and - Improvements to Km 10/6 - C1-CRIDP- 12/0 of Banavaram 862 R 11-12-M- Vellore Sholinghur 1.40 82.00 Senthamangalam I 0862 Ganapathipuram D Road(MD577) P 1- - Widening from SL to IL and C Improvements to Km 20/0 - 1-CRIDP- R 22/0 of Banavaram 863 11-12-M- Vellore Sholinghur 2.00 90.00 I Senthamangalam 0863 D Ganapathipuram P Road(MD577) - 1 Widening from SL to IL and - Improvements to Km 22/0 - C1-CRIDP- 24/0 of Banavaram 864 R 11-12-M- Vellore Sholinghur 2.00 90.00 Senthamangalam I 0864 Ganapathipuram D Road(MD577) P 1- Widening from SL to IL and - Improvements to Km 18/0 - C1-CRIDP- 20/0 of Banavaram 865 R 11-12-M- Vellore Sholinghur 2.00 90.00 Senthamangalam I 0865 Ganapathipuram D Road(MD577) P 1- Widening from SL to IL and - Improvements to Km 24/0 - C1-CRIDP- 26/0 of Banavaram 866 R 11-12-M- Vellore Sholinghur 2.00 90.00 Senthamangalam I 0866 Ganapathipuram D Road(MD577) P

MDR Page No 8 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from SL to IL and - Improvements to Km 26/0 - C1-CRIDP- 27/6 of Banavaram 867 R 11-12-M- Vellore Sholinghur 1.60 70.00 Senthamangalam I 0867 Ganapathipuram D Road(MD577) P Widening & Improvements 31.22 1370.00 Total 1 1-CRIDP- - Improvements to Delhigate 868 11-12-M- Vellore Arcot 1.40 85.00 C Road Km 0/0 - 1/4.(MD798) 0868 R 1 1-CRIDP- Improvements to Delhigate 869 - 11-12-M- Vellore Arcot 1.40 65.00 Road Km 1/4 - 2/8.(MD798) C 0869 R 1 1-CRIDP- Improvements to Walajah - 870 - 11-12-M- Vellore Ranipet Walajah Railway Station 3.20 135.00 C 0870 Road Km 1/0 - 4/2.(MD555) R 1 - 1-CRIDP- Improvements to BHEL 871 C11-12-M- Vellore Ranipet Feeder Road Km 0/0 - 1/3 1.27 77.00 R 0871 (11.00m Width)(MD797) I Strengthening/ Improvements 7.27 362.00 Total

Vellore Total 38.49 1732.00 1 - Widening and Improvements C1-CRIDP- from IL to DL Tirupattur - 872 R 11-12-M- Vaniyambadi Jolarpet Natrampalli road km 12/0 - 2.80 88.00 I 0872 14/8including CD D works(MD716) P 1 - Widening and Improvements C1-CRIDP- from IL to DL Tirupattur - 873 R 11-12-M- Vaniyambadi Jolarpet Natrampalli road km 10/0 - 2.00 67.00 I 0873 12/0 including CD D works(MD716) P

MDR Page No 9 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C1-CRIDP- from IL to DL of Tirupattur - 874 R 11-12-M- Vaniyambadi Jolarpet Natrampalli road km 5/0 - 6/8 3.20 99.00 I 0874 & 8/6 - 10/0 including CD D works(MD716) P Widening & Improvements 8.00 254.00 Total 1 - 1-CRIDP- Improvements to Elagiri hill 875 C11-12-M- Vaniyambadi Jolarpet 1.80 75.00 road km 0/0 - 1/8(MD560) R 0875 I D 1 Improvements to Polur - - 1-CRIDP- Jamunamarathur - 876 C11-12-M- Vaniyambadi Vaniyambadi Alangayam - Vaniyambadi 1.00 40.00 R 0876 Road. Km 80/0 - I 81/0(MD659) D

MDR Page No 10 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Improvements to Polur - - 1-CRIDP- Jamunamarathur - 877 C11-12-M- Vaniyambadi Vaniyambadi Alangayam - Vaniyambadi 2.00 80.00 R 0877 Road. Km 78/0 - I 80/0(MD659) D

Strengthening/ Improvements 4.80 195.00 Total

Vaniyambadi 12.80 449.00 Total 1 Widening & improvements - 1-CRIDP- Tiruvanna from SL to IL in 878 C11-12-M- Kalasapakkam 2.50 90.00 malai Kalasapakkam Melarni road R 0878 I Km 0/0 - 2/5(MD806) 1D Widening & improvements - 1-CRIDP- Tiruvanna from SL to IL in 879 C11-12-M- Kalasapakkam 2.50 90.00 malai Kalasapakkam Melarni road R 0879 I Km 2/5 - 5/0(MD806) 1D - 1-CRIDP- Widening from SL to IL in Tiruvanna 880 C11-12-M- Vandawasi Kozhapalur Avaniyapuram 3.00 60.00 malai R 0880 road Km 0/0 - 3/0(MD804) I 1D - Widening from SL to IL in C1-CRIDP- Pudupadi Illupai Vadaillupai Tiruvanna 881 R 11-12-M- Cheyyar Vizhar Perumbakkam Vizhar 1.60 60.00 malai I 0881 Kancheepuram road Km D 22/4 - 24/0(MD666) P 1 - Widening & improvements C1-CRIDP- Tiruvanna from SL to IL in Thellar 882 R 11-12-M- Vandawasi 2.60 85.00 malai Mazhayur road Km 10/0 - I 0882 12/6(MD710) D P 1 - Widening & improvements C1-CRIDP- from SL to IL in Polur Tiruvanna 883 R 11-12-M- Polur Jamunamarathur Alangayam 2.50 80.00 malai I 0883 Vaniyambadi road Km 7/5 - D 10/0(MD659) P

MDR Page No 11 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening & improvements C1-CRIDP- from SL to IL in Polur Tiruvanna 884 R 11-12-M- Polur Jamunamarathur Alangayam 2.50 80.00 malai I 0884 Vaniyambadi road Km 5/0 - D 7/5(MD659) P 1 - Widening & improvements 1-CRIDP- C Tiruvanna from SL to IL in 885 11-12-M- Kalasapakkam 1.80 70.00 R malai Kalasapakkam Melarni road 0885 I Km 5/0 - 6/8(MD806) D 1 - Widening & improvements 1-CRIDP- C Tiruvanna from SL to IL in Thellar 886 11-12-M- Vandawasi 2.60 85.00 R malai Mazhayur road Km 12/6 - 0886 I 15/2(MD710) D 1 - 1-CRIDP- Widening from SL to IL in C Tiruvanna 887 11-12-M- Kilpennathur Veraiyur Thandarai road Km 3.80 95.00 R malai 0887 6/0 - 9/8(MD803) I D 1 Widening & improvements - 1-CRIDP- from SL to IL in C Tiruvanna 888 11-12-M- Kalasapakkam Ammapalayam 2.60 90.00 R malai 0888 Puduapalayam road Km 3/4 - I 6/0(MD800) D Widening & Improvements 28.00 885.00 Total 1 1-CRIDP- Improvements to Arni - Tiruvanna 889 11-12-M- Arani Vandavasi road Km 7/8 - 3.20 90.00 C malai 0889 11/0(MD43) R 1I Improvements to - 1-CRIDP- Tiruvanna Kancheepuram 890 C11-12-M- Cheyyar 1.60 70.00 malai Thiruvathipuram road Km R 0890 27/8 - 29/4(MD770) I 1D - 1-CRIDP- Improvements to Tiruvanna 891 C11-12-M- Cheyyar Thiruvathipuram Arni road 3.40 85.00 malai R 0891 Km 0/6 - 4/0(MD505) I D

MDR Page No 12 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 1-CRIDP- Improvements to Arni - Tiruvanna 892 11-12-M- Arani Devikapuram road Km 2/0 - 4.00 90.00 C malai 0892 6/0(MD40) R 1I 1-CRIDP- Improvements to - Tiruvanna 893 11-12-M- Arani Thiruvathipuram Arni road 3.80 90.00 C malai R 0893 Km 9/2 - 13/0(MD505) 1I - Improvements to Polur 1-CRIDP- C Tiruvanna Jamunamarathur Alangayam 894 11-12-M- Kalasapakkam 5.00 90.00 R malai Vaniyambadi road Km 37/0 - 0894 I 42/0(MD659) D 1 1-CRIDP- - Tiruvanna Improvements to Hill Round 895 11-12-M- Tiruvannamalai 2.00 90.00 C malai road Km 0/0 - 2/0(MD345) R 0895 1I - Improvements to Polur 1-CRIDP- Jamunamarathur Alangayam C Tiruvanna 896 11-12-M- Kalasapakkam Vaniyambadi road Km 12/10, 3.60 60.00 R malai I 0896 13/10, 14/0-15/2, 19/0- D 21/0(MD659) P 1 1-CRIDP- Improvements to Cheyyar - Tiruvanna 897 11-12-M- Cheyyar Anaicut road Km 0/0 - 2/0, 4.00 90.00 C malai R 0897 5/0 - 7/0(MD582) 1I 1-CRIDP- Improvements to Arni - Tiruvanna 898 11-12-M- Arani Devikapuram road Km 6/0 - 3.00 55.00 C malai R 0898 10/0(MD40) I Strengthening/ Improvements 33.60 810.00 Total

Tiruvanna 61.60 1695.00 malai Total Chennai Circle 171.83 7312.00 Total 1 Widening from SL to IL and - 1-CRIDP- Improvements of Olakkur 899 C11-12-M- Villupuram Tindivanam 2.40 100.00 Railway feeder road Km.0/0- R 0899 2/4(MD301) I D

MDR Page No 13 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and 1-CRIDP- C Improvements of 900 11-12-M- Villupuram Mailam 2.00 85.00 R Vellimedupettai-Mailam road 0900 I Km.13/0-15/0(MD739) D 1P - Widening from SL to IL and 1-CRIDP- C Improvements of 901 11-12-M- Villupuram Mailam 1.00 50.00 R Vellimedupettai-Mailam road 0901 I Km.16/6-17/6(MD739) D 1P - 1-CRIDP- Widening from SL to IL of 902 C11-12-M- Villupuram Vanur Mailam-Karattai road 4.00 80.00 R 0902 Km.10/0-14/0(MD626) I 1D - Widening from SL to IL and 1-CRIDP- C Improvements of 903 11-12-M- Villupuram Mailam 2.00 80.00 R Vellimedupettai-Mailam road 0903 I Km.17/6-19/6(MD739) D 1P Widening from SL to IL and - 1-CRIDP- Improvements of 904 C11-12-M- Villupuram Mailam 2.00 85.00 Vellimedupettai-Mailam road R 0904 I Km.19/6-21/6(MD739) D 1 - 1-CRIDP- Widening from SL to IL of 905 C11-12-M- Villupuram Mailam Mailam-Karattai road Km.3/7- 3.30 84.00 R 0905 7/0(MD626) I D 1 Widening from SL to IL of - 1-CRIDP- Mailam-Karattai road 906 C11-12-M- Villupuram Vanur 4.30 90.00 Km.14/0-15/0 & 15/2- R 0906 I 18/5(MD626) D 1 Widening from SL to IL of - 1-CRIDP- Soorapattu-Ottampattu (via) 907 C11-12-M- Villupuram Gingee 3.80 72.00 -Anandapuram road R 0907 I Km.15/2-19/0(MD807) D

MDR Page No 14 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL of 1-CRIDP- C Soorapattu-Ottampattu (via) 908 11-12-M- Villupuram Gingee 2.70 57.00 R Athiyur-Anandapuram road 0908 I Km.19/0-21/7(MD807) D 1P - Widening from SL to IL of 1-CRIDP- C Alankuppam-Konerikuppam 909 11-12-M- Villupuram Tindivanam 3.15 60.00 R road (via) Avanipur 0909 I Km.9/850-13/0(MD748) D 1P - Widening from SL to IL of 1-CRIDP- C Alankuppam-Konerikuppam 910 11-12-M- Villupuram Tindivanam 3.00 60.00 R road (via) Avanipur Km.13/0- 0910 I 16/0(MD748) D 1P - Widening from SL to IL of C1-CRIDP- Brammadesam- 911 R 11-12-M- Villupuram Vanur Ranganthapuram road (via) 4.00 90.00 I 0911 Kiliyanur Km.12/0- D 16/0(MD578) 1P - Widening from SL to IL of C1-CRIDP- Brammadesam- 912 R 11-12-M- Villupuram Vanur Ranganthapuram road (via) 4.20 90.00 I 0912 Kiliyanur Km.16/0- D 20/2(MD578) 1P Widening from SL to IL and - 1-CRIDP- Improvements of 913 C11-12-M- Villupuram Mailam 1.60 70.00 Vellimedupettai-Mailam road R 0913 I Km.15/0-16/6(MD739) 1D - 1-CRIDP- Widening from SL to IL of 914 C11-12-M- Villupuram Mailam Mailam-Karattai road Km. 3.00 70.00 R 0914 7/0-10/0(MD626) I 1D Widening from SL to IL and - 1-CRIDP- Improvements of Panchalam 915 C11-12-M- Villupuram Tindivanam 0.20 10.00 Railway feeder road Km.0/0- R 0915 I 0/2(MD322) D

MDR Page No 15 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from SL to IL and - 1-CRIDP- Impts of Alamponody- 916 C11-12-M- Villupuram Gingee 2.50 65.00 Mazhavanthangal road R 0916 I Km.20/0-22/5(MD576) D 1 Widening from SL to IL of - 1-CRIDP- Alamponody- 917 C11-12-M- Villupuram Gingee Mazhavanthangal road 1.80 40.00 R 0917 Km.18/0-18/8 & 19/0- I 20/0(MD576) 1D Widening from SL to IL of - 1-CRIDP- Alankuppam-Konerikuppam 918 C11-12-M- Villupuram Tindivanam 2.00 40.00 road (via) Avanipur Km.19/0- R 0918 I 21/0(MD748) 1D - Widening from SL to IL of C 1-CRIDP- Alankuppam-Konerikuppam R 919 11-12-M- Villupuram Tindivanam road (via) Avanipur Km.16/0- 3.00 80.00 I 0919 19/0 and Improvements D Km.18/0-19/0(MD748) P - 1 - C 1-CRIDP- Widening from SL to IL of R 920 11-12-M- Villupuram Mailam Mailam-Karattai road 4.60 92.00 I 0920 Km.18/5-23/1(MD626) D P - Widening & Improvements 60.55 1550.00 Total 1 - 1-CRIDP- Improvements to Chunampet 921 C11-12-M- Villupuram Tindivanam 3.00 45.00 road Km.0/0-3/0(MD80) R 0921 I 1D - 1-CRIDP- Improvements to Cuddalore- C 922 11-12-M- Villupuram Vanur Pallineliyanur road Km.18/0- 2.00 50.00 R 0922 20/0(MD89) I D P

MDR Page No 16 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Cuddalore- 1-CRIDP- C Pallineliyanur road Km.20/0- 923 11-12-M- Villupuram Vanur 3.20 100.00 R 23/2 incluidng reconstruction 0923 I of culvert at Km.23/2(MD89) D P

Strengthening/ Improvements 8.20 195.00 Total

1 - Widening the existing culvert C1-CRIDP- at Km.12/4 of Alankuppam- 924 R 11-12-M- Villupuram Tindivanam 32.00 Konerikuppam road (via) I 0924 Avanipur(MD748) D P - Bridges/ CD Works/ Others 1 No 32.00 Total

Villupuram 68.75 1777.00 Total 1 - 1-CRIDP- Widening from SL to IL of 925 C11-12-M- Cuddalore Kurinjipadi Kurinjipadi-Palur road Km 1.30 40.00 R 0925 20/0-21/3(MD619) 1I - Widening from IL to DL and improvements to C1-CRIDP- Pattampakkam - 926 R 11-12-M- Cuddalore Panruti 1.90 99.00 Rasapalayam Road (via) I 0926 D Maligaimedu Road Km 0/0 - P 1/9(MD1015) 1- Widening from IL to DL and - improvements to C1-CRIDP- Pattampakkam - 927 R 11-12-M- Cuddalore Panruti 1.90 99.00 Rasapalayam Road (via) I 0927 Maligaimedu Road Km 1/9- D 3/8(MD1015) P -

MDR Page No 17 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from IL to DL and improvements to C1-CRIDP- Pattampakkam - 928 R 11-12-M- Cuddalore Panruti 1.90 99.00 Rasapalayam Road (via) I 0928 D Maligaimedu Road Km 3/8- P 5/7(MD1015) - 1 - Widening from Single lane to C Intermediate lane of R1-CRIDP- Kurinjipadi - Palur road Km 929 I 11-12-M- Cuddalore Kurinjipadi 18/0-20/0 and Improvements 2.00 60.00 D 0929 to km.18/350-18/6 including P C.D works at Km - 18/4,19/2,19/6(MD619) 1 1 - Widening from Sl to IL and C1-CRIDP- Improvements to Thittagudi - 930 R 11-12-M- Cuddalore Tittakudi sirupakkam Road Via Avatti 1.70 100.00 I 0930 Ma-Pudaiyur Km.6/3- D 8/0(MD814) P 1 - C1-CRIDP- Widening from IL to DL of 931 R 11-12-M- Cuddalore Cuddalore Cuddalore-Pallinelliyanur 1.40 30.00 I 0931 road Km 2/8-4/2(MD89) D P 1 - Widening from SL to IL and 1-CRIDP- C Improvements to Kumarachi- 932 11-12-M- Cuddalore Kattumannarkoil 1.70 80.00 R Puliyangudi road km 4/0- 0932 I 5/7(MD201) D P 1 - Widening from SL to IL & C1-CRIDP- improvements to 933 R 11-12-M- Cuddalore Neyveli Kullanchavady - 1.65 90.00 I 0933 Kattugudalore Road Km D 19/950 - 21/6(MD199) P 1 - Widening from SL to IL and C1-CRIDP- Improvements to 934 R 11-12-M- Cuddalore Neyveli Kullanchavady - 1.60 88.00 I 0934 Kattugudalore Road Km 21/6 D - 23/2(MD199) P

MDR Page No 18 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C1-CRIDP- improvements to 935 R 11-12-M- Cuddalore Neyveli Kullanchavady - 1.60 88.00 I 0935 Kattugudalore Road Km 24/8 D - 26/4(MD199) P 1 - Widening from SL to IL and C1-CRIDP- improvements to 936 R 11-12-M- Cuddalore Neyveli Kullanchavady - 1.60 88.00 I 0936 Kattugudalore Road Km 23/2 D - 24/8(MD199) P 1 - Providing Cement concrete C pavement with side Drains IL 1-CRIDP- R to DL to Thittagudi - 937 11-12-M- Cuddalore Tittakudi 0.50 73.00 I sirupakkam Road Via Avatti 0937 D Ma-Pudaiyur Km. 0/0 - P 0/5(MD814) - 1 - Widening from Sl to IL and C1-CRIDP- improvements to Thittagudi - 938 R 11-12-M- Cuddalore Tittakudi sirupakkam Road Via Avatti i 1.50 92.00 I 0938 Ma-Pudaiyur Km. 0/5- D 2/0(MD814) P 1 Widening from Sl to IL of - Thittagudi - sirupakkam 1-CRIDP- C Road (via) Avatti Ma- 939 11-12-M- Cuddalore Tittakudi 2.60 72.00 R Pudaiyur Km. 2/0-4/6 and 0939 I Improvements to km.2/0- D 2/4(MD814) P 1 - Widening from Sl to IL and C1-CRIDP- Improvements to Thittagudi - 940 R 11-12-M- Cuddalore Tittakudi sirupakkam Road Via Avatti 1.70 100.00 I 0940 Ma-Pudaiyur Km.4/6- D 6/3(MD814) P 1- - Widening from Single Lane 1-CRIDP- C to Intermediate Lane and 941 11-12-M- Cuddalore Chidamabaram 2.00 100.00 R Improvements to Killai road 0941 I Km.9/0-11/0(MD162) D P

MDR Page No 19 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL of 1-CRIDP- C Kattumannar Kumarachi-Puliyangudi road 942 11-12-M- Cuddalore 2.00 70.00 R koil km 0/0-2/0 including 0942 I Retainingwall(MD201) D P 1 - Widening from SL to IL of 1-CRIDP- C Kattumannar Kumarachi-Puliyangudi road 943 11-12-M- Cuddalore 2.00 70.00 R koil km 2/0-4/0 including 0943 I Retainingwall(MD201) D P 1 - C1-CRIDP- Widening from IL to DL of 944 R 11-12-M- Cuddalore Cuddalore Cuddalore-Pallinelliyanur 4.70 95.00 I 0944 road Km.7/7-12/4(MD89) D P 1 - Widening from SL to IL and 1-CRIDP- C Impovements to Kumarachi- 945 11-12-M- Cuddalore Kattumannarkoil 1.70 80.00 R Puliyangudi road km 5/7- 0945 I 7/4(MD201) D P 1 - Widening from IL to DL and improvements to C1-CRIDP- Pattampakkam - 946 R 11-12-M- Cuddalore Panruti 1.90 99.00 Rasapalayam Road (via) I 0946 D Maligaimedu Road Km 5/7 - P 7/6(MD1015) - Widening & Improvements 40.85 1812.00 Total

1 1-CRIDP- - Improvements to Arungunam 947 11-12-M- Cuddalore Panruti 1.80 45.00 C road Km 0/0-1/8(MD44) 0947 R 1 - 1-CRIDP- Improvements to 948 C11-12-M- Cuddalore Bhuvanagiri Bhuvanagiri - Kurinjipadi 4.50 100.00 R 0948 Road Km 0/0 - 4/5(MD816) I D

MDR Page No 20 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to - 1-CRIDP- Keerapalayam - 949 C11-12-M- Cuddalore Bhuvanagiri 2.40 69.00 Sethiyathope road Km.7/6- R 0949 I 10/0(MD161) D 1 Improvements to - 1-CRIDP- Keerapalayam - 950 C11-12-M- Cuddalore Bhuvanagiri 2.60 78.00 Sethiyathope road Km.10/0- R 0950 I 12/6(MD161) D 1 1-CRIDP- Improvements to - 951 11-12-M- Cuddalore Bhuvanagiri Bhuvanagiri - Kurinjipadi 4.50 95.00 C 0951 Road Km 4/5-9/0(MD816) R 1I Improvements to - 1-CRIDP- Keerapalayam - 952 C11-12-M- Cuddalore Bhuvanagiri 2.60 76.00 Sethiyathope road Km.5/0- R 0952 7/6(MD161) I

Strengthening/ Improvements 18.40 463.00 Total

Cuddalore 59.25 2275.00 Total 1 - Widening and Strengthening C1-CRIDP- (SL-IL) Thiyagadugam Adari 953 R 11-12-M- Kallakurichi Kallakurichi Road km 1/0-2/0 including 1.00 55.00 I 0953 Widening of CD D work(MD811) P 1 - Widening and Strengthening C1-CRIDP- (SL-IL) Thiyagadugam Adari 954 R 11-12-M- Kallakurichi Kallakurichi Road km 0/0-1/0 including 1.00 55.00 I 0954 Widening of CD D work(MD811) P 1 - Widening and Strengthen ing C from SL to IL in Kallakurichi- 1-CRIDP- R Sankara puram Road (via) 955 11-12-M- Kallakurichi Sankarapuram 1.60 95.00 I Kachira palayam Km.15/4- 0955 D 17/0 including Widening of P CD Works(MD135) - 1

MDR Page No 21 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Strengthen ing C from SL to IL in Kallakurichi- 1-CRIDP- R Sankara puram Road (via) 956 11-12-M- Kallakurichi Sankarapuram 1.60 95.00 I Kachira palayam Km.13/8- 0956 D 15/4 including Widening of P CD Works(MD135) - 1 Widening & Improvements 5.20 300.00 Total 1 Strengthening Kallakurichi- - 1-CRIDP- Sankarapuram Road (via) 957 C11-12-M- Kallakurichi Kallakurichi 1.20 70.00 Kachirapalayam Km.0/0- R 0957 I 1/2(MD135) D

Strengthening/ Improvements 1.20 70.00 Total

Kallakurichi 6.40 370.00 Total 1 Widening SL to IL and - 1-CRIDP- improvements in Km 18/0- C 958 11-12-M- Ariyalur Perambalur 20/0 of Mannachanallur - 2.00 92.00 R 0958 Edumalai - Elanthalaipatti I Road (MD244) D 1P Widening SL to IL & - 1-CRIDP- improvements in km 15/4- C 959 11-12-M- Ariyalur Jayankonadam 17/4 of Vilankkudi 2.00 97.00 R 0959 Annakaranpettai Road (Via) I T. Palur (MD744) D 1P Widening SL to IL & - 1-CRIDP- improvements in km 17/4- C 960 11-12-M- Ariyalur Jayankonadam 19/0 of Vilankkudi 1.60 78.00 R 0960 Annakaranpettai Road (Via) I T. Palur (MD744) D 1P Widening SL to IL and - 1-CRIDP- improvements in Km 22/0 - C 961 11-12-M- Ariyalur Perambalur 23/0 of Mannachanallur - 1.00 45.00 R 0961 Edumalai - Elanthalaipatti I Road (MD244) D P

MDR Page No 22 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL and C1-CRIDP- improvements in Km 1/6-3/0 962 R 11-12-M- Ariyalur Perambalur of Veppanthattai - Neikuppai - 1.40 70.00 I 0962 GST Road including CD D works (MD820) P 1- - Widening SL to IL and C1-CRIDP- improvements in km 18/8 - 963 R 11-12-M- Ariyalur Jayankonadam 20/8 of Sendhurai - 2.00 91.00 I 0963 Udayarpallayam Annaikarai D Road (MD684) P 1- - Widening SL to IL and C1-CRIDP- improvements in Km21/8- 964 R 11-12-M- Ariyalur Kunnam 2.20 100.00 24/0 of Alathur - Ariyalur I 0964 D Road (MD818) P 1- - Widening SL to IL and C1-CRIDP- improvements in km 20/8 - 965 R 11-12-M- Ariyalur Jayankonadam 22/0 of Sendhurai - 1.20 60.00 I 0965 Udayarpallayam Annaikarai D Road (MD684) P 1- - Widening SL to IL and C1-CRIDP- improvements in km 22/0 - 966 R 11-12-M- Ariyalur Jayankonadam 23/0 of Sendhurai - 1.00 47.00 I 0966 Udayarpallayam Annaikarai D Road (MD684) P 1- - Widening SL to IL and C1-CRIDP- improvements in Km 20/0 - 967 R 11-12-M- Ariyalur Perambalur 22/0 of Mannachanallur - 2.00 83.00 I 0967 Edumalai - Elanthalaipatti D Road (MD244) P 1- - Widening SL to IL and 1-CRIDP- C improvements in Km 19/6- 968 11-12-M- Ariyalur Kunnam 2.20 100.00 R 21/8 of Alathur - Ariyalur 0968 I Road (MD818) D

MDR Page No 23 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL and C1-CRIDP- improvements in Km 0/0-1/6 969 R 11-12-M- Ariyalur Perambalur of Veppanthattai - Neikuppai - 1.60 90.00 I 0969 GST Road including CD D works (MD820) P 1 - Widening SL to IL and 1-CRIDP- C improvements in Km 3/0-5/0 970 11-12-M- Ariyalur Perambalur 2.00 90.00 R of Alathur - Ariyalur Road. 0970 I (MD818) D 1 - Widening SL to IL and 1-CRIDP- C improvements in Km 5/0-7/0 971 11-12-M- Ariyalur Perambalur 2.00 90.00 R of Alathur - Ariyalur Road. 0971 I (MD818) D Widening & Improvements 24.20 1133.00 Total

Ariyalur 24.20 1133.00 Total

Villupuram Other works 1 No 158.60 5555.00 Circle Total

1 - Widening SL to IL in km 24/0- 1-CRIDP- C 25/4 and 31/4-32/6 of 972 11-12-M- Trichy Manapparai 2.60 70.00 R Vaiyampatty -Konnaiyur 0972 I Road (Single lane ) (MD729) D 1P Widening SL to IL - 1-CRIDP- Thiruverambur -Sooriyur 973 C11-12-M- Trichy Thiruverumbur 1.40 35.00 Road km 14/0-15/4 (Single R 0973 lane )(MD824) I 1 - Widening from SL to IL and 1-CRIDP- C Improvements at km 0/0-2/0, 974 11-12-M- Trichy Srirangam 2.00 70.00 R Kulathur -Viralimalai Road 0974 I (Single lane )(MD197) D

MDR Page No 24 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL at km 3/0- C1-CRIDP- 5/8, including Improvements 975 R 11-12-M- Trichy Srirangam at km 3/8-5/0 of Kulathur - 2.80 87.00 I 0975 Viralimalai Road (Single lane D )(MD197) P 1- - Widening DL to ML at Km C1-CRIDP- 0/0-0/6 including 976 R 11-12-M- Trichy Srirangam construction of Retainingwall 0.60 100.00 I 0976 at Cauvery Left bank D Road(MD822) P 1- - Widening DL to ML at Km C1-CRIDP- 0/6 -1/ 2 including 977 R 11-12-M- Trichy Srirangam construction of Retainingwall 0.60 100.00 I 0977 at Cauvery Left bank D Road(MD822) P 1- - Widening DL to ML at Km C1-CRIDP- 1/2-2/0 including 978 R 11-12-M- Trichy Srirangam construction of Retainingwall 0.80 100.00 I 0978 at Cauvery Left bank D Road(MD822) P 1- Widening from single lane - Itermediate alne and C1-CRIDP- Improvements of in km 979 R 11-12-M- Trichy Srirangam 1.90 100.00 13/100-15/0 of Trichy - I 0979 Kulumani - Jeeyapuram D Road(MD461) P 1- - Widening Single lane to 1-CRIDP- C Intermediate lane of 980 11-12-M- Trichy Musiri 1.00 30.00 R Thottiyam - Kattuputhur 0980 I Road Km 6/0-7/0(MD487) D 1P - Widening Single lane to 1-CRIDP- C Intermediate lane of 981 11-12-M- Trichy Musiri 1.00 22.00 R Thottiyam - Kattuputhur 0981 I Road Km 9/0-10/0(MD487) D P

MDR Page No 25 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from Single lane to Intermediate lane at Km 8/0- R1-CRIDP- 9/0 of Thottiyam -Kattuputhur 982 I 11-12-M- Trichy Musiri 1.00 25.00 Road including Protective D 0982 P wall at km 8/4 (Single - lane)(MD487) 1 1 1 - Widening from Single lane to Intermediate lane and C1-CRIDP- Improvements at Km 10/0- 983 R 11-12-M- Trichy Musiri 2.00 82.00 12/0 of Thottiyam - I 0983 D Kattuputhur Road (Single P lane)(MD487) - 1 Widening from Single lane to - Intermediate lane and 1-CRIDP- C Improvements at Km 20/0- 984 11-12-M- Trichy Musiri 2.00 99.00 R 22/0 of Musiri -T.Pet - 0984 I Murugur -Eargudy D Road(MD277) P 1 - Widening from Single lane to Intermediate lane and C1-CRIDP- Improvements at Km 22/0- 985 R 11-12-M- Trichy Musiri 1.00 46.00 23/0 of Musiri -T.Pet - I 0985 D Murugur -Eragudy Road P (Single lane)(MD277) - 1 - Widening from Single lane to Intermediate lane and C1-CRIDP- Improvements at Km 23/0- 986 R 11-12-M- Trichy Musiri 2.00 85.00 25/0 of Musiri -T.Pet - I 0986 D Murugur -Eragudy P Road(MD277) - 1 - Widening from Single lane to C Intermediate laneat Km 20/0- 1-CRIDP- R 23/0 and Improvements at 987 11-12-M- Trichy Manachanallur 3.00 100.00 I Km 20/0-21/0 and 22/0-23/0 0987 D of Musiri Pulivalam P Road(MD276) - 1

MDR Page No 26 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 2/8- 988 R 11-12-M- Trichy Lalgudi 2.20 50.00 5/0 of Poovalur -Siruganur - I 0988 D Thiruppattur Road(MD371) P - 1 - Widening from Single lane to C1-CRIDP- Intermediate lane and 989 R 11-12-M- Trichy Manachanallur Improvements at Km 20/0- 2.00 90.00 I 0989 22/0 of Poovalur -Siruganur - D Thiruppattur Road(MD371) P - 1 - Widening from Single lane to C Intermediate lane and 1-CRIDP- R Improvements at Km 22/0- 990 11-12-M- Trichy Manachanallur 1.00 40.00 I 23/0 of Poovalur -Siruganur - 0990 D Thiruppattur Road(Single P lane)(MD371) - 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 23/0- 991 R 11-12-M- Trichy Manachanallur 2.60 70.00 25/6 of Poovalur -Siruganur - I 0991 D Thiruppattur Road(MD371) P 1- - Widening from Single lane to C Intermediate lane and R1-CRIDP- Improvements at Km 12/0- 992 I 11-12-M- Trichy Manachanallur 14/0 of Samayapuram - 2.00 90.00 D 0992 Keelakannukulam P (Via)mannachanallur - - Thuruppanjali Road(MD823) 1 1 - Widening from Single lane to C Intermediate lane and Improvements at Km 14/0- R1-CRIDP- 16/0 of Samayapuram - 993 I 11-12-M- Trichy Manachanallur 2.00 90.00 Keelakannukulam D 0993 P (Via)mannachanallur - - Thuruppanjali Road(Single 1 lane)(MD823) 1

MDR Page No 27 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from Single lane to - Intermediate lane and C Improvements at Km 16/0- R1-CRIDP- 18/0 of Samayapuram - 994 I 11-12-M- Trichy Manachanallur 2.00 90.00 Keelakannukulam D 0994 (Via)mannachanallur - P Thiruppanjali Road(Single - lane)(MD823) 1 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 0/0- 995 R 11-12-M- Trichy Manapparai 4/0 of Vaiyampatty - 4.00 97.00 I 0995 Konnaiyur Road (Single D lane)(MD729) P 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 20/0- 996 R 11-12-M- Trichy Manapparai 21/4 and 32/6-35/2 of 4.00 98.00 I 0996 Vaiyampatty -Konnaiyur D Road (Single lane)(MD729) P 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 0/0- 997 R 11-12-M- Trichy Manapparai 4/0 of Manapparai - 4.00 98.00 I 0997 Gujiliyamamparai D Road(Single lane)(MD628) P 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 11/0- 998 R 11-12-M- Trichy Manapparai 15/4 of Manapparai - 4.40 98.00 I 0998 Gujiliyamamparai D Road(Single lane)(MD628) P 1 - Widening from Single lane to C Intermediate lane and 1-CRIDP- R Improvements at Km 7/0-9/0 999 11-12-M- Trichy Musiri 2.00 97.00 I of Seeplaputhur -Kattuputhur 0999 D -Namakkal Road(Single P lane)(MD416) - 1

MDR Page No 28 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from Single lane to - Intermediate lane and C1-CRIDP- Improvements at Km 9/0 - 1000 R 11-12-M- Trichy Musiri 1.80 80.00 10/8 of Seeplaputhur - I 01000 Kattuputhur -Namakkal D Road(Single lane)(MD416) P 1- - Widening from Single lane to C Intermediate lane at Km 8/0- R1-CRIDP- 9/0 including Re construction 1001 I 11-12-M- Trichy Musiri of minor bridge at km 8/2 of 1.00 70.00 D 1001 Musiri -T.Pet -Murugur - P Eragudy Road(Single - lane)(MD277) 1 1 - Widening from Single lane to C1-CRIDP- Intermediate lane at Km 9/0 - 1002 R 11-12-M- Trichy Musiri 11/0of Musiri -T.Pet - 2.00 54.50 I 1002 Murugur -Eragudy D Road(Single lane)(MD277) 1P - Widening from Single lane to C Intermediate lane and 1-CRIDP- R Improvements at Km 11/0- 1003 11-12-M- Trichy Musiri 1.00 40.00 I 12/0 of Musiri -T.Pet - 1003 D Murugur -Eragudy P Road(Single lane)(MD277) - 1 - Widening from Single lane to C1-CRIDP- Intermediate lane and 1004 R 11-12-M- Trichy Musiri Improvements at Km 4/0-5/0 1.00 45.00 I 1004 of Musiri -Pulivalam D Road(Single lane)(MD276) P 1 - Widening from Single lane to 1-CRIDP- C Intermediate lane at Km 5/0- 1005 11-12-M- Trichy Musiri 2.00 50.00 R 7/0 of Musiri -Pulivalam 1005 I Road(Single lane)(MD276) D 1P - Widening from Single lane to C1-CRIDP- Intermediate lane and 1006 R 11-12-M- Trichy Musiri Improvements at Km 7/0-9/0 2.00 80.00 I 1006 of Musiri -Pulivalam D Road(Single lane)(MD276) P

MDR Page No 29 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C1-CRIDP- Intermediate lane and 1007 R 11-12-M- Trichy Musiri Improvements at Km 9/0- 2.00 85.00 I 1007 11/0 of Musiri -Pulivalam D Road(Single lane)(MD276) 1P Widening from Single lane to - 1-CRIDP- Intermediate lane and C 1008 11-12-M- Trichy Musiri Improvements at Km 11/0 - 1.00 43.00 R 1008 12/0 of Musiri -Pulivalam I Road(Single lane)(MD276) D 1 - Widening from Single lane to double lane and C1-CRIDP- Improvements at Km 34/0- 1009 R 11-12-M- Trichy Thuraiyur 0.90 65.00 34/904 of Musiri -T.Pet - I 1009 D Murugur -Eragudy P Road(Single lane)(MD277) - 1 - Widening from Single lane to C double lane and 1-CRIDP- R Improvements at Km 40/0- 1010 11-12-M- Trichy Thuraiyur 0.81 60.00 I 40/805 of Musiri -T.Pet - 1010 D Murugur -Eragudy P Road(Single lane)(MD277) - 1 - Widening from Single lane to C Intermediate lane and R1-CRIDP- Improvements at Km 27/0- 1011 I 11-12-M- Trichy Lalgudi 30/0 of Keelapalur - 3.00 98.00 D 1011 Pullambady (vIa) P Thirumalabady Road(Single - lane)(MD608) 1 1 - Widening from Single lane to Intermediate lane and C1-CRIDP- Improvements at Km -0/0- 1012 R 11-12-M- Trichy Lalgudi 2.00 98.00 2/0 of Poovalur -Siruganur - I 1012 D Thiruppathur Road (Single P lane)(MD371) -

MDR Page No 30 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C Intermediate lane at Km -2/0- R1-CRIDP- 2/8 and 5/0-7/0 and 1013 I 11-12-M- Trichy Lalgudi Improvements at Km -2/0- 2.80 98.00 D 1013 2/8 of Poovalur -Siruganur - P Thiruppathur Road (Single - lane)(MD371) 1 1 - Widening from Single lane to C Intermediate lane and R Improvements at Km 7/0-8/6 1-CRIDP- I of Samayapuram - 1014 11-12-M- Trichy Manachanallur 1.60 72.00 D Keelakannukulam 1014 P (Via)mannachanallur - - Thuruppanjali Road(Single 1 lane)(MD823) 1 1- - Widening from Single lane to C Intermediate lane and Improvements at Km 8/6- R1-CRIDP- 10/2 of Samayapuram - 1015 I 11-12-M- Trichy Manachanallur 1.60 72.00 Keelakannukulam D 1015 P (Via)mannachanallur - - Thuruppanjali Road(Single 1 lane)(MD823) 1 1 Widening from Single lane to - Intermediate lane and C Improvements at Km 10/2 - R1-CRIDP- 12/0of Samayapuram - 1016 I 11-12-M- Trichy Manachanallur 1.80 81.00 Keelakannukulam D 1016 (Via)mannachanallur - P Thuruppanjali Road(Single - lane)(MD823) 1 1 - Widening from Single lane to Intermediate lane and C1-CRIDP- Improvements at Km 15/0- 1017 R 11-12-M- Trichy Srirangam 1.40 85.00 16/4 of Trichy -Kulumani - I 1017 D Jeeyapuram Road(Single P lane)(MD461) - Widening & Improvements 87.61 3435.50 Total

MDR Page No 31 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements in km 11/4- - 1-CRIDP- 12/7 of Trichy -Kulumani - C 1018 11-12-M- Trichy Srirangam Jeeyapuram Road including 1.30 70.00 R 1018 Busleyby at km 11/6 I (doublelane)(MD461) D 1 - 1-CRIDP- Improvements to Allithurai - 1019 C11-12-M- Trichy Srirangam Thogaimalai Road km 10/0- 0.60 30.00 R 1019 10/6 (double Lane)(MD12) I D 1 - Improvements to Thottiyam - 1-CRIDP- C Kattuputhur Road Km 0/0- 1020 11-12-M- Trichy Musiri 3.00 90.00 R 3/0 (intermediate 1020 I Lane)(MD487) D P 1 - Improvements to Thottiyam - C1-CRIDP- Kattuputhur Road Km 3/0- 1021 R 11-12-M- Trichy Musiri 6/0 including Retaining wall 3.00 98.00 I 1021 at km 4/8 (intermediate D Lane)(MD487) P 1 - Improvements to 1-CRIDP- C Thuvarankurichi - Kosikurichi 1022 11-12-M- Trichy Manapparai 2.00 60.00 R Road Km 6/0-8/0 1022 I (intermediate Lane)(MD899) D P 1 - Improvements to C1-CRIDP- Thuvarankurichi -Kosikurichi 1023 R 11-12-M- Trichy Manapparai 3.00 95.00 Road at Km 5/0-6/0, 8/0-10/0 I 1023 D (Intermediate lane )(MD899) P - Strengthening/ Improvements 12.90 443.00 Total

Trichy Total 100.51 3878.50

MDR Page No 32 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single lane to C Intermediate lane and 1-CRIDP- R Improvements in KM 20/0- 1024 11-12-M- Pudukottai Viralimalai 2.20 83.00 I 22/2 of Illuppur - Mathur road 1024 D including culvert at KM 20/8 ( P M826 ) - 1 - Widening Single lane to C Intermediate lane and 1-CRIDP- R Improvements in KM 22/2- 1025 11-12-M- Pudukottai Viralimalai 1.80 75.00 I 24/0 of Illuppur - Mathur road 1025 D including culvert at KM 23/8, P 23/10 ( M826 ) - 1 - Widening Single lane to C Intermediate lane and 1-CRIDP- R Improvements in KM 24/0- 1026 11-12-M- Pudukottai Viralimalai 2.00 82.00 I 26/0 of Illuppur - Mathur road 1026 D including culvert at KM 24/4 ( P M826 ) - 1 - Widening Single lane to C1-CRIDP- Intermediate lane and 1027 R 11-12-M- Pudukottai Viralimalai Improvements in KM 26/0- 3.20 99.00 I 1027 29/2 of Illuppur - Mathur road D ( M826 ) 1P - Widening Single lane to C Intermediate lane in KM R1-CRIDP- 24/410-26/6 and 1028 I 11-12-M- Pudukottai Aranthangi Improvements in KM 24/410- 2.19 80.00 D 1028 25/8 of Kalagam - P Avudayarkoil road including - culvert at KM 25/10 (MD603) 1 1 - Widening Single lane to C Intermediate lane and R1-CRIDP- Improvements in KM 26/6- 1029 I 11-12-M- Pudukottai Aranthangi 28/0 of Kalagam - 1.40 60.00 D 1029 Avudayarkoil road including P reconstruction of culvert at - KM 27/10 ( M603 ) 1

MDR Page No 33 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single lane to C1-CRIDP- Intermediate lane and 1030 R 11-12-M- Pudukottai Aranthangi Improvements in KM 28/0- 2.00 84.00 I 1030 30/0 of Kalagam - D Avudayarkoil road ( M603 ) P 1 Widening Single lane to - Intermediate lane and C 1-CRIDP- Improvements in KM 14/0- R 1031 11-12-M- Pudukottai Gandharvakottai 16/0 of Thanjavur - 2.00 84.00 I 1031 Karambakudi - D Seethambalpuram road ( P M705 ) - 1

MDR Page No 34 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single lane to C Intermediate lane and Improvements in KM 16/0- R1-CRIDP- 18/0 of Thanjavur - 1032 I 11-12-M- Pudukottai Gandharvakottai 2.00 94.00 Karambakudi - D 1032 P Seethambalpuram road - including reconstruction of 1 culvert at KM 16/4 ( M705 ) 1 Widening & Improvements 18.79 741.00 Total 1 - Improvements in KM 30/0- C 31/4 of Pudukkottai - 1-CRIDP- R Killukkottai - Manayeripatti 1033 11-12-M- Pudukottai Gandharva kottai 1.40 60.00 I road including reconstruction 1033 D of culvert at KM 30/2 P (MD664) - 1 1 - C R I D Improvements in KM 31/4- P 32/2 of Pudukkottai - 1-CRIDP- - Killukkottai - Manayeripatti 1034 11-12-M- Pudukottai Gandharva kottai 0.80 56.00 1 road including reconstruction 1034 1 of Culvert at KM 31/6 & 31/8 - (MD664) 1 2 - M - 1 - 1-CRIDP- Improvements in KM 1/4-4/0 1035 C11-12-M- Pudukottai Thirumayam of Perumanadu - Konnaiyur 2.60 74.50 R 1035 road ( IL ) (MD827) I 1D - 1-CRIDP- Improvements in KM 4/0-7/0 1036 C11-12-M- Pudukottai Thirumayam of Perumanadu - Konnaiyur 3.00 84.50 R 1036 road ( IL ) (MD827) I D

MDR Page No 35 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements in KM 7/0- - 1-CRIDP- 10/0 of Perumanadu - 1037 C11-12-M- Pudukottai Thirumayam 3.00 84.50 Konnaiyur road ( IL ) R 1037 (MD827) I 1D - 1-CRIDP- Improvements in KM 2/4-5/0 1038 C11-12-M- Pudukottai pudukottai of Pudukkottai - Embal road 2.60 74.00 R 1038 ( IL ) (MD663) I 1D - 1-CRIDP- Improvements in KM 7/4-9/4 1039 C11-12-M- Pudukottai Alangudi Alangudi - Maramadakki - 2.00 58.00 R 1039 Kurumbur road (MD1006) I 1D - Improvements in KM 0/0-3/0 1-CRIDP- C of Keeranur - Adhanakottai 1040 11-12-M- Pudukottai Gandharva kottai 3.00 90.00 R road ( 5.50M road width ) 1040 I (MD825) D 1 - Improvements in KM 3/0-5/0 C of Keeranur - Adhanakottai R 1-CRIDP- road including reconstruction I 1041 11-12-M- Pudukottai Gandharva kottai of culvert in liue of narrow 2.00 80.00 D 1041 cutstone slab culvert at KM P 3/10, 4/2, 4/6 ( 5.50M road - width ) (MD825) 1 1 1- - 1-CRIDP- Improvements in KM 0/0-2/6 1042 C11-12-M- Pudukottai Viralimalai of Viralimalai - Kalamavur 2.60 80.00 R 1042 road ( IL width ) (MD745) I D 1 Improvements in KM 19/0- - 1-CRIDP- 20/0 of Viralimalai - 1043 C11-12-M- Pudukottai Viralimalai 1.00 30.00 Kalamavur road ( IL width ) R 1043 I (MD745) D 1 - 1-CRIDP- Improvements in Arimalam - 1044 C11-12-M- Pudukottai Thirumayam Thirumayam road KM 2/0- 2.00 57.50 R 1044 4/0 ( IL width ) (MD1005) I D

MDR Page No 36 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements in KM 37/4- - 1-CRIDP- 39/2 of Vaiyampatti - 1045 C11-12-M- Pudukottai Thirumayam 1.80 51.50 Konnaiyur road ( IL width ) R 1045 I (MD729) D 1 Improvements in KM 39/2- - 1-CRIDP- 40/10 of Vaiyampatti - 1046 C11-12-M- Pudukottai Thirumayam 1.80 51.50 Konnaiyur road ( IL width ) R 1046 I (MD729) D 1 Improvements in KM 15/0- - 1-CRIDP- 17/0 of Pudukkottai - 1047 C11-12-M- Pudukottai Viralimalai 2.00 62.00 Manapparai road ( 5.50M R 1047 I road width ) (MD665) D 1 Improvements in KM 17/0- - 1-CRIDP- 19/2 of Pudukkottai - 1048 C11-12-M- Pudukottai Viralimalai 2.20 68.00 Manapparai road ( 5.50M R 1048 I road width )(MD665) D 1 Improvements in KM 6/0-7/2 - 1-CRIDP- of Pudukkottai - Manapparai 1049 C11-12-M- Pudukottai Viralimalai 1.20 35.00 road ( 5.50M road width ) R 1049 I (MD665) D 1 Improvements in KM 12/0- - 1-CRIDP- 15/0 of Keeranur - 1050 C11-12-M- Pudukottai Gandharva kottai 3.00 90.00 Adhanakottai road ( 5.50M R 1050 I road width ) (MD825) D

Strengthening/ Improvements 38.00 1187.00 Total

Pudukottai 56.79 1928.00 Total 1 - C Widening and Improvements R1-CRIDP- to Pattukkottai-Peravurani - 1051 I 11-12-M- Tanjavur Peravurani Aranthangi Road Km 22/0 - 2.20 140.00 D 1051 24/2 including culvert at Km P 22/2, 6, 8, 23/8 &10.(MD653) - 1

MDR Page No 37 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C1-CRIDP- to Pattukkottai-Peravurani - 1052 R 11-12-M- Tanjavur Peravurani Aranthangi Road Km17/0 - 0.80 30.00 I 1052 17/8 including culvert at Km D 17/4.(MD653) P - 1 - Widening Single lane to C Indermetiate lane & R Improvements to Pappanadu I 1-CRIDP- - - 1053 D11-12-M- Tanjavur Pattukottai Perugavalanthan Road Km 1.60 98.00 P 1053 14/0 - 15/6 including culvert - at Km 14/4 ( pipe culvert ) & 1 RCC Slab culvert widening 1 14/6 ( span 3.6 m )(MD778) - 1 Widening Single lane to - Indermetiate lane & C1-CRIDP- Improvements to Pappanadu 1054 R 11-12-M- Tanjavur Pattukottai 2.00 120.00 - Madukkur - I 1054 Perugavalanthan Road Km D 12/0 - 14/0.(MD778) P 1- - Widening from SL to IL and C Improvements to R1-CRIDP- Mannargudi -Orathanadu - 1055 I 11-12-M- Tanjavur Orathanadu Thiruvonam Road Km 3.35 172.00 D 1055 25/650 -29/0 including pipe P culvert at km 26/2,26/8,27/2, - 27/10, 28/8.(MD248) 1 1 - Widening from SL to IL and C Improvements to R1-CRIDP- Mannargudi -Orathanadu - 1056 I 11-12-M- Tanjavur Orathanadu 2.40 143.00 Thiruvonam Road Km 41/2 - D 1056 43/6 including Slab culvert at P Km 42/2, 43/2(MD248) - 1 1 - Widening SL to IL and Improvements to C1-CRIDP- Ammapettai - Vaduvur Road 1057 R 11-12-M- Tanjavur Papanasam 2.00 120.00 Km 2/2-3/2 & 3/4-4/4 I 1057 D including culvert at Km 2/10, P 3/8 & 4/2.(MD21) -

MDR Page No 38 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL & C1-CRIDP- Improvements of Km 31/8 - 1058 R 11-12-M- Tanjavur 32/8 of Thogur - Ayyampettai 1.00 50.00 I 1058 Road.Including Culvert at D Km 32/2, 32/8(MD782) P - 1 - Widening from SL to IL & C1-CRIDP- Improvements to Thittai - 1059 R 11-12-M- Tanjavur Thiruvaiyaru Dharasuram Road 0/0 - 2.00 100.00 I 1059 2/0.Including Culverts at Km D 0/2,0/6,1/2(MD720) P 1- - Widening from SL to IL & C1-CRIDP- Improvements to 1060 R 11-12-M- Tanjavur Thiruvaiyaru Pudukkottai - Killukkottai - 2.00 120.00 I 1060 Maneripatti Road Km 37/0- D 39/0(MD664) P 1- - Widening from SL to IL & Improvements to Thittai - C1-CRIDP- Dharasuram Road 2/0 - 1061 R 11-12-M- Tanjavur Thiruvaiyaru 2.20 120.00 4/2.Including Culverts at Km I 1061 D 2/2,2/6(i),2/6(ii),3/2,4/2(MD7 P 20) - 1 - Widening from SL to IL & C1-CRIDP- Improvements of Km 1/0 - 1062 R 11-12-M- Tanjavur Thiruvaiyaru 3.60 162.00 4/6 of Thogur - Ayyampettai I 1062 Road.(MD782) D P 1- Widening SL to IL and - Improvements to C 1-CRIDP- Ammapettai - Vaduvur Road R 1063 11-12-M- Tanjavur Papanasam Km 4/4-7/0 including culvert 2.60 160.00 I 1063 at Km 4/6, 5/10, 6/2, 4, 6 & D slab culvert at Km P 6/10(MD21) - 1

MDR Page No 39 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening SL to IL and - Improvements to Thittai - C1-CRIDP- Dharasuram Road Km 4/2- 1064 R 11-12-M- Tanjavur Papanasam 3.20 181.00 7/4 including culvert at Km I 1064 4/4 & Retaining wall at Km D 5/6(MD720) P 1- - Widening SL to IL and C Improvements to Thittai - R1-CRIDP- Dharasuram Road Km 7/4- 1065 9/4 including culvert at Km I 11-12-M- Tanjavur Papanasam 2.00 160.00 8/4 & Retaining wall at Km D 1065 7/10, reconstruction of minor P bridge at Km 7/8(MD72) - 1 Widening & Improvements 32.95 1876.00 Total 1 - Improvements C - Aduthurai R1-CRIDP- Thiruvidaimaruthu Road in KM.1/0-2/0 including 1066 11-12-M- Tanjavur 1.00 50.00 I r CD works in KM.1/4(i) ,1/4(ii) 1066 D ,1/6(i), 1/6 (ii), P 1/8(i),1/8(ii),1/10(MD472) - 1 1 - 1-CRIDP- Improvements to 1067 C11-12-M- Tanjavur Pattukottai Pattukkottai - Muthupettai 1.20 46.00 R 1067 Road Km 59/6-60/8(MD343) I D 1 Improvements to Thanjavur - - 1-CRIDP- Karambakudy - 1068 C11-12-M- Tanjavur Thanjavur 1.20 39.00 Seethambalpuram Road Km R 1068 I 3/8-5/0(MD705) 1D - Improvements to Thanjavur - 1-CRIDP- C Karambakudy - 1069 11-12-M- Tanjavur Thanjavur 1.40 46.00 R Seethambalpuram Road Km 1069 I 2/4-3/8(MD705) D 1P - 1-CRIDP- Improvements to Thanjavur - C 1070 11-12-M- Tanjavur Thiruvaiyaru Periyakangayanpatty Road 1.00 37.00 R 1070 Km 9/0-10/0(MD706) I D P MDR Page No 40 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Thanjavur - 1-CRIDP- C Karambakudy - 1071 11-12-M- Tanjavur Thanjavur 1.20 39.00 R Seethambalpuram Road Km 1071 I 6/4-7/6(MD705) D 1P - Improvements to Thanjavur - 1-CRIDP- C Karambakudy - 1072 11-12-M- Tanjavur Thanjavur 1.40 46.00 R Seethambalpuram Road Km 1072 I 5/0-6/4(MD705) D 1P - Improvements to Thanjavur - 1-CRIDP- C Karambakudy - 1073 11-12-M- Tanjavur Thanjavur 1.00 35.00 R Seethambalpuram Road Km 1073 I 7/6-8/6(MD705) D 1P - C1-CRIDP- Improvements to 1074 R 11-12-M- Tanjavur Pattukottai Pattukkottai - Muthupettai 1.20 45.00 Road Km 60/8-62/6(MD343) I 1074 D 1P - Improvements to 1-CRIDP- C Pattukkottai - Peravurani - 1075 11-12-M- Tanjavur Peravurani 1.00 30.00 R Aranthangi road K.M.18/0- 1075 I 19/0.(MD653) D 1P Improvements to Thanjavur - - 1-CRIDP- Karambakudy - 1076 C11-12-M- Tanjavur Thanjavur 1.40 48.00 Seethambalpuram Road Km R 1076 I 8/6-10/0(MD705) D 1 - 1-CRIDP- Improvements to Thogur- 1077 C11-12-M- Tanjavur Thiruvaiyaru Ayyampatti Road Km 31/0- 1.20 42.00 R 1077 31/8&32/8-33/2(MD782) I D 1 - C1-CRIDP- Improvements to Thanjavur - 1078 R 11-12-M- Tanjavur Thiruvaiyaru Periyakangayanpatty Road 0.60 23.00 I 1078 Km 8/4 - 9/0(MD706) D P -

MDR Page No 41 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to C1-CRIDP- Maruthanallur - 1079 R 11-12-M- Tanjavur Kumbakonam 1.40 45.00 Annalagraharam road Km I 1079 D 0/0 - 1/0 & 4/8 - 5/2.(MD832) P - 1 - Improvements C1-CRIDP- Thiruppanandal- Aduthurai Thiruvidaimaru 1080 R 11-12-M- Tanjavur Road in KM.2/0-3/0 including 1.00 50.00 thur I 1080 CD works in KM.2/2(i), 2/2 D (ii), 2/4,2/6(i), 2/6(ii)(MD472) P - 1 - Improvements C1-CRIDP- Thiruppanandal- Aduthurai Thiruvidaimaru 1081 R 11-12-M- Tanjavur Road in KM.3/0-4/0 including 1.00 50.00 thur I 1081 CD works in KM.3/2,3/6 , 3/8 D (i),3/8 (ii),3/8 (iii)(MD472) P - 1 - Improvements Thiruppanandal- Aduthurai C1-CRIDP- Thiruvidaimaru Road in KM.5/0-5/6 & 6/900- 1082 R 11-12-M- Tanjavur 0.90 47.00 thur 7/2 including CD works in I 1082 D KM.5/4, 5/6, 6/10 & P 7/2(MD472) - 1 - Improvements C1-CRIDP- Thiruppanandal- Aduthurai Thiruvidaimaru 1083 R 11-12-M- Tanjavur Road in KM.9/0-10/0 1.00 49.00 thur I 1083 including CD work in D KM.9/2(MD472) P - 1 - Improvements C1-CRIDP- Thiruvidaimaru Thiruppanandal- Aduthurai 1084 R 11-12-M- Tanjavur 0.40 17.00 thur Road in KM.10/0- I 1084 D 10/4(MD472) P -

MDR Page No 42 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements C1-CRIDP- Thiruppanandal- Aduthurai Thiruvidaimaru 1085 R 11-12-M- Tanjavur Road in KM.4/0-5/0 including 1.00 50.00 thur I 1085 CD works in D KM.4/4,4/6,4/8,4/10(MD472) P - 1 - C Improvements to 1-CRIDP- R Thiruchitrambalam - 1086 11-12-M- Tanjavur Peravurani 1.00 27.00 I Andikkadu road K.M. 3/8- 1086 D 4/8(MD828) P - 1 Strengthening/ Improvements 22.50 861.00 Total Tanjavur 55.45 2737.00 Total 1 Widening from SL to IL and - 1-CRIDP- Nagapattinam Improvements in Km 4/0-5/0 1087 C11-12-M- Kilvelur 1.00 59.00 of Kizhvelur-Katchanam R 1087 I Road(MD1043) 1D Widening from SL - IL km - 1-CRIDP- Nagapattinam 9/0 - 11/2 of Tharangambady 1088 C11-12-M- Poompuhar 2.20 67.00 - Manganallur - Aduthurai R 1088 I road(MD708) 1D - 1-CRIDP- Widening from SL - IL in Km Nagapattinam 1089 C11-12-M- Poompuhar 5/4 - 7/8 of Kuthalam - 2.40 75.00 R 1089 Komal Road.(MD211) I 1D - 1-CRIDP- Widening from SL-IL in Km Nagapattinam 1090 C11-12-M- Mayiladuthurai 1/8 - 3/8 of Kuthalam - 2.00 63.00 R 1090 Pandanallur Road(MD213) I D 1 Widening from SL - IL and - 1-CRIDP- Improvments 11/2 - 12/8 of Nagapattinam 1091 C11-12-M- Poompuhar Tharangambady - 1.60 85.00 R 1091 Manganallur - Aduthurai I road(MD708) D

MDR Page No 43 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening and Improvements - from SL to IL in Km 7/4 - 8/7 C1-CRIDP- Nagapattinam and curve improvements in 1092 R 11-12-M- Sirkazhi 1.30 99.00 km 8/4 of Puthur - I 1092 Pudupattinam - Palaiyar D road.(MD670) P 1- Widening from SL - IL in Km - 1-CRIDP- Nagapattinam 0/0 - 2/4 of Sembodai - 1093 C11-12-M- Vedaranyam 2.40 91.00 Chettipualm - Kariyapattinam R 1093 I Road(MD835) 1D - Widening from SL - IL and 1-CRIDP- Improvments 14/0 - 15/8 of C Nagapattinam 1094 R 11-12-M- Poompuhar Tharangambady - 1.80 92.00 I 1094 Manganallur - Aduthurai D road(MD708) P 1 - Widening from SL to IL in Km 8/0 - 9/9 and C1-CRIDP- Nagapattinam Improvements to Km 1095 R 11-12-M- Sirkazhi 1.90 97.00 9/8(100), of I 1095 D Anaickaranchatram - P Mahendrapalli road.(MD836) 1- - Widening from SL - IL in Km C1-CRIDP- Nagapattinam 5/0 - 7/0 of Sembodai - 1096 11-12-M- Vedaranyam 2.00 75.00 R Chettipualm - Kariyapattinam 1096 I Road(MD835) D P 1 - Widening and Improvements C1-CRIDP- from SL to IL in Km 0/0- 0/8 Nagapattinam 1097 R 11-12-M- Vedaranyam of Kuravapulam - 0.80 58.00 I 1097 Karuppambulam D KadinelvayalRoad(MD837) P 1 - C1-CRIDP- Widening from SL to IL in km Nagapattinam 1098 R 11-12-M- Poompuhar 7/8-10/0 of Kuthalam - 2.20 69.00 I 1098 Komal Road,(MD211) D P

MDR Page No 44 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL in km C1-CRIDP- Nagapattinam 2/4-5/0 of Sembodai - 1099 11-12-M- Vedaranyam 2.60 88.00 R Chettipulam - Kariyapattinam 1099 I Road.(MD835) D P 1 - Widening from SL to IL and C1-CRIDP- Improvements in km 15/8 - Nagapattinam 1100 R 11-12-M- Poompuhar 17/6 of Tharangambadi - 1.80 97.00 I 1100 Manganallur - Aduthurai D Road.(MD708) P 1 Widening from SL to IL and - Improvements in km 8/7- C1-CRIDP- Nagapattinam 10/2 and curve 1101 11-12-M- Sirkazhi 1.50 99.00 R Improvements at km 10/2 of 1101 I Puthur - Pudupattinam - D Palaiyar Road.(MD670) P 1 - Widening from SL to IL and C1-CRIDP- Improvements in km 12/8- Nagapattinam 1102 R 11-12-M- Poompuhar 14/0 of Tharangambadi - 1.20 64.00 I 1102 Manganallur - D Aduthurairoad.(MD708) P 1 - C1-CRIDP- Widening from SL to IL in km Nagapattinam 1103 R 11-12-M- Mayiladuthurai 3/8-5/8 of Kuthalam - 2.00 62.00 I 1103 Pandanallur Road(MD213) D P 1 Widening from SL to IL in km - 9/9-11/480 and C1-CRIDP- Improvements in km 10/9 - Nagapattinam 1104 R 11-12-M- Sirkazhi 11/480 of 1.58 89.00 I 1104 Anaikkaranchatiram - D Mahendrapalli P Road.(MD836) - Widening & Improvements 32.28 1429.00 Total 1 1-CRIDP- Improvements to Velankanni - Nagapattinam 1105 11-12-M- Kilvelur - Vedranyam Road Km 0/0- 1.20 46.00 C 1105 1/2(MD737) R I

MDR Page No 45 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 1-CRIDP- Improvements to Mavoor - - Nagapattinam 1106 11-12-M- Kilvelur Sattiyakkudy Road Km 5/4- 1.80 58.00 C 1106 7/2(MD255) R I Strengthening/ Improvements 3.00 104.00 Total 1 - C Reconstruction of bridge at 1-CRIDP- Km 16/10 of Kizhvelur- R Nagapattinam 1107 I 11-12-M- Vedaranyam Katchanam Road including 27.00 D 1107 forming approaches on both P sides(MD1043) - 1 - C Reconstruction of bridge at 1-CRIDP- km 5/8 of Mayiladuthurai- R Nagapattinam 1108 I 11-12-M- Mayiladuthurai pattavarthy road including 75.00 D 1108 forming approaches on both P sides(MD257) - 1 Bridges/ CD Works/ Others 2 Nos 102.00 Total Nagapatti nam 35.28 1635.00 Total 1 Widening from Single lane to - 1-CRIDP- Intermediate lane Thittai - 1109 C11-12-M- Tiruvarur Nannilam 1.50 56.00 Tharasuram road Km.20/0- R 1109 I 21/500(MD720) 1D Widening from Single lane to - 1-CRIDP- Intermediate lane Thittai - 1110 C11-12-M- Tiruvarur Nannilam 1.50 57.00 Tharasuram road Km.21/500- R 1110 I 23/0(MD720) 1D Widening from Single lane to - 1-CRIDP- Intermediate lane Thittai - 1111 C11-12-M- Tiruvarur Nannilam 2.00 76.00 Tharasuram road Km.18/0- R 1111 I 20/0(MD720) D

MDR Page No 46 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C from Single lane to 1-CRIDP- R Intermediate lane of 1112 11-12-M- Tiruvarur Mannargudi 2.00 100.00 I Mannargudi - Thirumakottai - 1112 D Chokkanavoor road Km.3/0- P 5/0(MD840) - 1 1 Widening from Single lane to - 1-CRIDP- Intermediate lane Kodavasal - 1113 C11-12-M- Tiruvarur Nannilam 3.00 90.00 Valangaiman - Papanasam R 1113 I road Km.41/0- 44/0(MD753) 1D Widening from Single lane to - 1-CRIDP- Intermediate lane Thittai - 1114 C11-12-M- Tiruvarur Nannilam 1.40 54.00 Tharasuram road Km.16/6- R 1114 I 18/0(MD720) 1D - Widening and Improvements C from Single lane to 1-CRIDP- R Intermediate lane of 1115 11-12-M- Tiruvarur Mannargudi 1.40 70.00 I Mannargudi - Thirumakottai - 1115 D Chokkanavoor road Km.5/0- P 6/4(MD840) - 1 - C Widening and Improvements R from Single lane to I Intermediate lane of D1-CRIDP- Thirunellikaval -Kolappad - 1116 P 11-12-M- Tiruvarur Tiruvarur Karunganni road Km.16/4 - 1.00 90.00 - 1116 17/4 including Construction 1 of Retaining wall at Km.16/6, 1 17/4 and Reconstruction of - culvert at Km.17/4(MD467) 1 2 1 - Widening and Improvements C from Single lane to R Intermediate lane of 1-CRIDP- I Thirunellikaval -Kolappad - 1117 11-12-M- Tiruvarur Tiruvarur 0.60 75.00 D Karunganni road Km.17/4 - 1117 P 18/0 including Construction - of Retaining wall at 1 Km.17/6,17/10(MD467) 1 -

MDR Page No 47 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from Single lane to - 1-CRIDP- Intermediate lane Kodavasal - 1118 C11-12-M- Tiruvarur Nannilam 2.40 72.00 Valangaiman - Papanasam R 1118 I road Km.38/6- 41/0(MD753) D Widening & Improvements 16.80 740.00 Total 1 - 1-CRIDP- Improvements to Andipandal- 1119 C11-12-M- Tiruvarur Nannilam Nannilam Road Km 41/0- 2.00 80.00 R 1119 43/0 (5.50m)(MD762) I 1 - Improvements of C1-CRIDP- Poonthottam-Nachiyarkoil 1120 R 11-12-M- Tiruvarur Nannilam Road Km 0/0-5/0 (Existing 5.00 45.00 I 1120 widening portion D only)(MD370) P 1 Improvements of - 1-CRIDP- Poonthottam-Nachiyarkoil 1121 C11-12-M- Tiruvarur Nannilam 2.60 85.00 Road Km 7/4-10/0 R 1121 I (5.50m)(MD370) D 1 Improvements of - 1-CRIDP- Thiruthurai Mayiladuthurai - Muthupet 1122 C11-12-M- Tiruvarur 2.40 99.00 poondi road Km.69/2 - 71/6 R 1122 I (7.00m)(MD256) D 1 Improvements to - 1-CRIDP- Mannargudi - Thirumakottai - 1123 C11-12-M- Tiruvarur Mannargudi 3.40 80.00 Chokkanavoor road Km.8/4 - R 1123 I 11/8(MD840) D 1 Improvements of Kodavasal- - 1-CRIDP- Valangaiman-Papanansam 1124 C11-12-M- Tiruvarur Nannilam 3.00 98.00 Road Km.33/0-36/0 R 1124 I (5.50m)(MD753) D 1 Improvements of Kodavasal- - 1-CRIDP- Valangaiman-Papanansam 1125 C11-12-M- Tiruvarur Nannilam 2.60 85.00 Road Km.36/0-38/6 R 1125 I (5.50m)(MD753) D

MDR Page No 48 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Improvements to Andipandal- 1126 C11-12-M- Tiruvarur Nannilam Nannilam Road Km 39/100- 1.90 80.00 R 1126 41/0 (5.50m)(MD762) I D Strengthening/ Improvements 22.90 652.00 Total Tiruvarur 39.70 1392.00 Total Trichy Circle Other works 2 Nos 287.73 11570.50 Total 1 - Widening and Improvements C from SL to IL in Km. 26/6 - 28/0 and 28/4-30/0 and R1-CRIDP- widening from SL to IL in 1127 I 11-12-M- Salem Yercaud 3.40 199.00 Km, 28/0-28/4 including CD D 1127 P works 3Nos. and Protective - works of Yercaud Loop 1 Road(MD563) 1 1 - Widening from SL to IL and improvements in KM.12/2- C1-CRIDP- 14/6 of 1128 R 11-12-M- Salem Attur 2.40 100.00 Puthiragoundampalayam- I 1128 D Edapatty Road (via) P Panamadal(MD669) - 1 - Widening from SL to IL in C Km.21/0-25/0 of 1-CRIDP- R Deevattipatty- Danishpet- 1129 11-12-M- Salem Omalur 4.00 100.00 I Bommidi road including 1129 D construction of CD works in P Km.21/10 & 24/10(MD851) - 1 1 - Widening from SL to IL and C Improvements in Km.18/0- 1-CRIDP- R 21/0 of Deevattipatty- 1130 11-12-M- Salem Omalur 3.00 130.00 I Danishpet- Bommidi road 1130 D including construction of CD P works in Km.20/6(MD851) - 1

MDR Page No 49 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C 1-CRIDP- from SL to IL in Km. 16/0 - R 1131 11-12-M- Salem Yercaud 19/0 including CD works 5 3.00 194.00 I 1131 Nos. and Protective works of D Yercaud loop road(MD563) P - 1 - C Widening and Improvements R from SL to IL at Km.6/4-7/4, 12/0-13/2, 14/0-15/6 and I 1-CRIDP- Widening from SL to IL in 1132 D11-12-M- Salem Yercaud 4.20 199.00 Km. 15/6 - 16/0 including CD P 1132 works 3 Nos. and Protective - works of Yercaud loop 1 road(MD563) 1 - 1 - Widening from single lane to C intermediate lane and R improvements from Km 27/0- 31/0 and including widening I 1-CRIDP- of culvert at km. 27/8, 28/2, 1133 D11-12-M- Salem Yercaud 4.00 190.00 28/8, 29/4, 29/6, 29/10, and P 1133 - reconstruction of culvert at 1 km 30/6 of Ayothiyapattinam - 1 Belur - Kilakkadu Road(MD1044) - 1 - Widening from single lane to C intermediate lane and 1-CRIDP- R improvements from Km 49/4- 1134 11-12-M- Salem Yercaud 1.60 70.00 I 51/0 of Ayothiyapattinam - 1134 D Belur - Kilakkadu P Road.(MD1044) - 1 - Widening from single lane to C intermediate lane and R improvements from Km 23/0- I 1-CRIDP- 27/0 and including widening 1135 D11-12-M- Salem Yercaud of culvert at km 23/2, 23/4(i), 4.00 190.00 P 1135 23/4(ii), 23/8, 23/10(i), - 23/10(ii) 26/2 & 26/10 of 1 Ayothiyapattinam - Belur - 1 Kilakkadu Road(MD1044) - 1

MDR Page No 50 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C Improvements to Km.4/350- R 7/0 of Malaiyalapatty - 1-CRIDP- I Thammampatty (via) 1136 11-12-M- Salem Gangavalli 2.65 130.00 D Ulipuram road including 1136 P reconstruction of culvert at - Km.4/6, 4/8, 5/4, 5/6 & 1 5/8(MD852) 1 1- - Widening and Improvements C from SL to IL to Km.7/0- R 9/500 and Improvements to I 1-CRIDP- Km.9/500-9/900 of 1137 D11-12-M- Salem Gangavalli Malaiyalapatty- 2.90 140.00 P 1137 Thammampatty (via) - Ulipuram road including 1 reconstruction of culvert at 1 Km.8/8(MD852) - 1 - Widening to IL - DL 1-CRIDP- C Edappady - Magudanchavadi 1138 11-12-M- Salem Sankari 3.60 65.00 R Road Km 13/0- 1138 I 16/600(MD103) D P 1 - Widening from IL to DL in 1-CRIDP- C Km.5/0-9/0 of 1139 11-12-M- Salem Eadpadi 4.00 70.00 R Tharamangalam- Nangavalli - 1139 I Kunchandiyur road(MD707) D P 1 - 1-CRIDP- Widening from SL to IL in 1140 C11-12-M- Salem Mettur Km.0/0-6/0 of Mallikundam- 6.00 105.00 R 1140 Koonandiyur road(MD238) I 1D - Widening to IL - DL C1-CRIDP- Kumarapalayam - Edappady 1141 R 11-12-M- Salem Sankari Road Km 3/0-4/2, 13/6-15/0 3.01 84.00 I 1141 & extra length of D 405M.(MD182) P

MDR Page No 51 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from DL - ML & C improvements to Edappady - R1-CRIDP- Magudanchavadi Road Km 1142 I 11-12-M- Salem Eadpadi 0/0-2/2 & Widening of culvert 2.20 185.00 D 1142 at Km 0/8 & 1/10 and P construction of centre - median.(MD103) 1 1 - Widening from SL - DL & C1-CRIDP- Improvements to Edappady - 1143 R 11-12-M- Salem Eadpadi 3.00 174.00 Jalagandapuram - Mecheri I 1143 D Road Km 6/0-9/0(MD103) P 1- - Widening from SL to IL KM C 22/490 - 27/8 and 1-CRIDP- R improvements in Km.23/0- 1144 11-12-M- Salem Eadpadi 5.31 200.00 I 27/8 of Edappady - 1144 D Jalagandapuram - Mecheri P Road(MD103) - 1 - Widening from SL to IL and Improvements to km.13/0- C1-CRIDP- 17/0 of Gajalnaickanpatty 1145 R 11-12-M- Salem Veerapandi 4.00 180.00 Panamarathupatty I 1145 D Seshanchavadi P road(MD594) - 1 - Widening from SL to IL and Improvements to Km.21/0- C1-CRIDP- 22/220 of Gajalnaickanpatty- 1146 R 11-12-M- Salem Veerapandi 1.22 60.00 Panamarathupatty - I 1146 D Seshanchavadi P road.(MD594) 1- - Widening from single lane to C intermediate lane and R improvements from Km 22/220-27/0 and including I 1-CRIDP- Widening of culvert at km 1147 D11-12-M- Salem Yercaud 4.78 185.00 22/6, 23/4, 23/8, 24/2, 24/6, P 1147 - of Gajalnaickentpatty - 1 Panamarathpatty - 1 Sechansavadi - Road.(MD594) 1

MDR Page No 52 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C Improvements to KM.5/0 - R1-CRIDP- 7/4 of Kattukottai - 1148 I 11-12-M- Salem Gangavalli Sadasivpuram - Thidavoor 2.40 130.00 D 1148 Road including P Reconstruction of Culvert in - km. 6/6 & 7/4(MD841) 1 1 - C Widening from SL to IL and R Improvements to KM.10/0 - 13/0 of Kattukottai - I 1-CRIDP- Sadasivpuram - Thidavoor 1149 D11-12-M- Salem Gangavalli 3.00 195.00 Road Including construction P 1149 - of retaining Wall and 1 Reconstruction of cuvlert at 1 Km.10/2 & 12/10.(MD841) - 1 1 - C R I Widening from SL to IL and D Improvements to KM 8/0 - P 11/920 of Thalaivasal - 1-CRIDP- - Govindamaplayam Road. 1150 11-12-M- Salem Gangavalli 3.92 175.00 1 Including Reconstruction of 1150 1 culvert at Km.8/8, - 9/2,9/10,10/2 & 1 11/2.(MD848) 2 - M - 1 Widening from IL to DL and - improvements Km 2/850 - C 3/0 and Widening from SL to R1-CRIDP- DL and improvements 1151 I 11-12-M- Salem Omalur 1.20 62.00 Km.3/950 - 5/0 of D 1151 Tharamangalam - P Jalagandapuram - Road(MD451) 1

MDR Page No 53 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL Km 24/0- C 29/4 and Improvements from R Km 24/0-26/0 and Widening I 1-CRIDP- of Culvert at Km.24/2, 25/4, 1152 D11-12-M- Salem Mettur 25/8, 26/8, 26/10, 27/2, 27/4, 5.40 195.00 P 1152 28/4 and Construction of - Retaining wall at Km.26/4- 1 28/4 of Mettur - Palar 1 road.(MD268) - 1 1 - C R I D widening from SL - IL & P 1-CRIDP- Improvements to - 1153 11-12-M- Salem Sankari Konganapuram - Vaikundam 3.20 140.00 1 1153 - Kalipatty Road Km 6/8- 1 10/0(MD843) - 1 2 - M - 1 - Widening and Improvements C 1-CRIDP- from SL to IL at Km. 30/0 - R 1154 11-12-M- Salem Yercaud 33/6 including CD works 7 3.60 199.00 I 1154 Nos. and Protective works of D Yercaud Loop Road(MD563) P - 1 - Widening from SL to IL and Improvements to km.17/0- C1-CRIDP- 21/0 of Gajalnaickanpatty 1155 R 11-12-M- Salem Veerapandi 4.00 180.00 Panamarathupatty I 1155 D Seshanchavadi P road(MD594) -

MDR Page No 54 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL - DL & C1-CRIDP- Improvements to Edappady - 1156 R 11-12-M- Salem Eadpadi 2.80 165.00 Jalagandapuram - Mecheri I 1156 D Road Km 11/0-13/8(MD103) P - 1 - C Widening from SL to IL and R improvements in KM 9/6- 12/2 & Culvert widening at I 1-CRIDP- Km. 9/6, 9/8(i), 9/8(ii), 10/4, 1157 D11-12-M- Salem Attur 2.60 130.00 10/10(i) & 10/10 (ii) of P 1157 Puthiragoundampalayam- - Edapatty Road (via) 1 Panamadal(MD669) 1 - 1 - Widening from SL - DL & 1-CRIDP- C Improvements to Edappady - 1158 11-12-M- Salem Eadpadi 2.40 140.00 R Jalagandapuram - Mecheri 1158 I Road Km 3/6-6/0(MD103) D P 1 - Widening and Improvements C1-CRIDP- from SL to IL at Km. 2/0-6/4 1159 R 11-12-M- Salem Yercaud of Yercaud Loop Road and 4.40 199.00 I 1159 Construction of retaining D wall(MD563) P Widening & Improvements 111.19 4860.00 Total 1 1-CRIDP- - Improvements to km.0/0-2/6 1160 11-12-M- Salem Salemwest 2.60 110.00 C of Alagapuram road(MD996) 1160 R 1 Improvements in Km.6/0- - 1-CRIDP- 10/4 of Edapady - 1161 C11-12-M- Salem Eadpadi Poolampatty - Mettur R.S 4.40 165.00 R 1161 road and Widening of culvert I at Km.9/6(MD591) D 1 - 1-CRIDP- Improvements in Km.1/6-6/0 1162 C11-12-M- Salem Eadpadi of Edapady - Poolampatty - 4.40 165.00 R 1162 Mettur R.S road(MD591) I D

MDR Page No 55 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements in Km.15/630- - 1-CRIDP- 19/580 of Edapady- 1163 C11-12-M- Salem Eadpadi 3.95 127.00 Jalagandapuram - Mecheri R 1163 I road(MD103) D 1 Improvements to km.6/0- - 6/425 and 7/0-8/0 of C 1-CRIDP- Suramangalam R 1164 11-12-M- Salem Veerapandi Tharamangalam road 1.43 125.00 I 1164 leading to Salem Steel Plant D Project area connecting P NH7(MD439) - 1 - Improvements to km.9/0- 10/6 of Suramangalam C1-CRIDP- Tharamangalam road 1165 R 11-12-M- Salem Veerapandi 1.60 125.00 leading to Salem Steel Plant I 1165 D Project area connecting P NH7(MD439) 1- - 1-CRIDP- Improvements to km.15/0- 1166 C11-12-M- Salem Veerapandi 17/2 of Shevapet Elampillai 2.20 110.00 R 1166 road(MD421) I 1 - Improvements to km.0/0-3/2 1-CRIDP- C of Suramangalm -Omalur 1167 11-12-M- Salem Salemwest 3.20 150.00 R road(via) Muthunaickanpatty 1167 I road(MD696) D 1 - Improvements in Km 5/4 - C1-CRIDP- 6/0, 6/6 - 7/2 and Km.7/8-9/0 1168 R 11-12-M- Salem Omalur of Tharamangalam - 2.40 70.00 I 1168 Jalagandapuram D road(MD451) 1P - 1-CRIDP- Improvements to Sankari- 1169 C11-12-M- Salem Sankari Edappady - Road Km 4/0- 4.00 150.00 R 1169 8/0(MD677) I 1 Improvements in Km.6/4-8/0 - 1-CRIDP- of Edapady - C 1170 11-12-M- Salem Eadpadi Magudanchavadi road and 1.60 70.00 R 1170 and Widening of culvert at I Km.7/6(MD103) D

MDR Page No 56 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

Strengthening/ Improvements 31.78 1367.00 Total

1 - LA for Forming Edapady Bye C pass bye pass road R branching from Km.12/8 of I Sankari - Edapady road and D joint at Km.23/2 of 1-CRIDP- P Kumarapalayam- Edapady 1171 11-12-M- Salem Eadpadi 600.00 - road (via) Edapady - 1171 1 Magudanchavadi road, 1 Edapady - Jalagandapuram- - Mecheri road and Edpady - 1 Poolampatty - Mettur R.S 2 road - 1 - Construction of additional bridge across Sarabanga C1-CRIDP- River at Km.20/2 of 1172 R 11-12-M- Salem Salemwest 115.00 Suramangalam- I 1172 D Tharamangalam P road(MD439) - Bridges/ CD Works/ Others 2 Nos 715.00 Total

Salem Total 142.96 6942.00 1 - Widening SL to IL of C Mallasamudram - 1-CRIDP- R Vaiyappamalai Road Km 1/0- 1173 11-12-M- Namakkal Tiruchengodu 1.20 15.00 I 1/8 and 7/2-7/6, Construciton 1173 D of 1.00 span RCC pipe P culvert at Km 7/4.(MD858) - 1

MDR Page No 57 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL from C Km 14/0-16/3 and R Improvements to Km 14/0- I 14/3 & 14/7-16/3 of Mettala - D1-CRIDP- Mullukuruchi - Periyacombai 1174 P 11-12-M- Namakkal Rasipuram 2.30 100.00 Road including widening of - 1174 RCC Pipe Culverts at 1 Km.14/4, 15/8, 16/2(i), 16/2 1 (ii) and RCC Slab Culvert at - Km 14/10.(MD853) 1 2 1 - C Widening from SL to IL and Improvements from Km.12/0- R 14/0 of Mettala- Mullukuruchi I - Periyacombai Road D1-CRIDP- including Widening of RCC 1175 P 11-12-M- Namakkal Rasipuram 2.00 100.00 Pipe Culverts at Km.12/10, - 1175 RCC Slab Culverts at 1 Km.12/6 and Cutstone Slab 1 Culverts at Km13/8 & - 13/10.(MD853) 1 2 1- - Widening from SL to IL C Km.10/8-11/0 & 11/2-12/0 R and Improvements from Km I 1-CRIDP- 10/8-12/0 of Mettala - 1176 D11-12-M- Namakkal Rasipuram 1.00 60.00 Mullukuruchi - Periyacombai 1176 P Road including Widening of - RCC Pipe Culvert at 1 Km.11/10.(MD853) 1 - Widening & Improvements 6.50 275.00 Total 1 - Improvements the road C Vaiyappamalai - R1-CRIDP- Velagoundampatti at Km 1177 I 11-12-M- Namakkal Paramathivelur 12/0-14/675 and 2.68 99.00 D 1177 Construction of strom water P drain at Km 14/4-14/675 (left - side)(MD857) 1

MDR Page No 58 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Rebuilding of the road 1178 C11-12-M- Namakkal Namakkal Mohanur - Oruvandur road 0.27 17.00 R 1178 Km.0/0-0/270.(MD999) I 1D - 1-CRIDP- Improvements from Km.1/6- 1179 C11-12-M- Namakkal Rasipuram 5/0 of Rasipuram - Pattanam 3.40 125.00 R 1179 - Pudupatty Road.(MD856) I 1D - 1-CRIDP- Improvements from Km.5/6- 1180 C11-12-M- Namakkal Namakkal 7/0 of Mohanur - Valaiyapatti 1.40 45.00 R 1180 road.(MD270) I D Strengthening/ Improvements 7.75 286.00 Total

Namakkal 14.25 561.00 Total 1 - Widening from SL to IL in km C 6/0-7/9, 8/2-11/2, and R Improvements to Km 8/2- I 11/2 Reconstruction of RCC 1-CRIDP- D culverts at km 7/6, 7/10, 8/4, 1181 11-12-M- Krishnagiri Thalli 5.10 195.00 P 8/8(ii) and Reconstruction , 1181 - widening of other culverts 1 Thally - Jawalagiri - 1 State Border - road(MD703) 1 2 1 - Widening from SL to IL in km C 0/0-1/4, 1/8-6/0 and R Improvements to Km 0/0-1/8, Reconstruction of RCC slab I 1-CRIDP- culverts at km 2/8, 3/2, 3/8 1182 D11-12-M- Krishnagiri Thalli 5.60 175.00 (i), 5/6(ii) and reconstruction P 1182 - , widening of other culvert of 1 Thally - Jawalagiri - 1 Karnataka State Border - road(MD703) 1

MDR Page No 59 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and 1-CRIDP- C Improvements in km 24/0- 1183 11-12-M- Krishnagiri Uthangarai 3.60 150.00 R 27/6 of Kaveripattinam - 1183 I Kakkangarai road(MD157) D 1P - 1-CRIDP- Widening from SL to IL in km 1184 C11-12-M- Krishnagiri Uthangarai 19/6-24/0 of Kaveripattinam - 4.40 90.00 R 1184 Kakkangarai road(MD157) I Widening & Improvements 18.70 610.00 Total 1 - 1-CRIDP- Improvements to 1185 C11-12-M- Krishnagiri Uthangarai Jandamedu-Puliyur road Km 3.00 90.00 R 1185 5/8-6/8 & 7/0-9/0(MD863) I 1D - 1-CRIDP- Improvements to 1186 C11-12-M- Krishnagiri Bargur Jandamedu-Puliyur road Km 3.30 100.00 R 1186 12/9-13/9, 17/9-20/2(MD863) I 1D Improvements to - 1-CRIDP- Denkanikotta - 1187 C11-12-M- Krishnagiri Thalli 5.80 200.00 Kelamangalam Road Km 6/0- R 1187 I 8/0, 9/0-12/8(MD91) 1D - 1-CRIDP- Improvements to 1188 C11-12-M- Krishnagiri Bargur Kaveripattinam Kakkangarai 2.00 80.00 R 1188 road km 4/0-6/0(MD157) I 1D - 1-CRIDP- Impts. To Kaveripattinam 1189 C11-12-M- Krishnagiri Bargur Kakkangarai road km 8/0- 2.00 80.00 R 1189 10/0(MD157) I 1D - 1-CRIDP- Improvements to 1190 C11-12-M- Krishnagiri Krishnagiri Kaveripattinam Kakkangarai 2.90 110.00 R 1190 road km 0/8-3/7(MD157) I D

MDR Page No 60 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to 1-CRIDP- C Kurubarapalli 1191 11-12-M- Krishnagiri Veppanahalli 2.40 70.00 R Kothakrishnapalli road km 1191 I 3/6-5/0 , 11/0-12/0(MD1001) D 1P Improvements to - 1-CRIDP- Kaveripattinam Palacode 1192 C11-12-M- Krishnagiri Krishnagiri 3.00 90.00 road km 2/0-3/0 , 8/0- R 1192 I 10/0(MD861) 1D - 1-CRIDP- Improvements to Krishnagiri 1193 C11-12-M- Krishnagiri Krishnagiri Rayakottai road km 8/0-8/8, 4.20 170.00 R 1193 9/4-11/8, 19/0-20/0(MD192) I 1D - 1-CRIDP- Improvements to Krishnagiri 1194 C11-12-M- Krishnagiri Krishnagiri Rayakottai road km , 3/0- 1.80 70.00 R 1194 4/8(MD192) I 1D - 1-CRIDP- Improvements to Krishnagiri - 1195 C11-12-M- Krishnagiri Krishnagiri Rayakottai road km 6/2- 0.80 35.00 R 1195 7/0(MD192) I D

MDR Page No 61 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to C Singarapettai-Thirupathur R road Km 19/6-21/0, 25/0- I 26/6 & 29/0-29/6 inlcuding D1-CRIDP- Reconstruction of RCC Pipe 1196 P 11-12-M- Krishnagiri Uthangarai Culvert at km 19/10, 26/4(i), 3.60 160.00 - 1196 29/2 Construction of Pipe 1 Culvert at km 25/6 and 1 Widening of RCC pipe - Culvert at km 26/4 1 (ii)(MD424) 2

Strengthening/ Improvements 34.80 1255.00 Total

Krishnagiri 53.50 1865.00 Total 1 - Widening from S.L to I.L and Improvements in Km 27/6- C1-CRIDP- 29/6 & Widening of pipe 1197 R 11-12-M- Dharmapuri Pennagaram 2.00 78.00 culvert at KM 28/8 of I 1197 D Pennagaram - Nagamarai P road(MD654) - 1 - Widening from S.L to I.L and C1-CRIDP- Improvements in Km 25/0 - 1198 R 11-12-M- Dharmapuri Pennagaram 2.60 107.00 27/6 of Pennagaram - I 1198 D Nagamarai road(MD654) P - 1 - Widening from SL to IL Km C 2/6-5/6 and Improvements in R1-CRIDP- Km 2/6-4/0 & 5/0-5/6 1199 I 11-12-M- Dharmapuri Pappireddipatti including and widening of 3.00 100.00 D 1199 culvert at Km 3/6, 4/4 of P Bommidi Rs to Thoppaiyar - road(MD860) 1

MDR Page No 62 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL Km C 0/0-2/6 and Improvements in R1-CRIDP- Km 0/2-2/6 including 1200 I 11-12-M- Dharmapuri Pappireddipatti Reconstruction of culvert at 2.60 100.00 D 1200 Km 1/8, 1/10, 2/6 of Bommidi P Rs to Thoppaiyar - road(MD860) 1 1 Widening from SL to IL at - KM 19/4-22/4 and C Improvements to Km R1-CRIDP- 19/6,19/8-20/2, 20/6, 20/10, 1201 I 11-12-M- Dharmapuri Pappireddipatti 3.00 88.00 21/6-22/2 including widening D 1201 of culverts at Km 20/2, 20/8, P of Mookanur - Harur - road(MD777) 1 1 - Widening from SL to IL at C KM 16/0-19/4 and R1-CRIDP- Improvements to Km 19/0- 1202 I 11-12-M- Dharmapuri Pappireddipatti 19/4 including widening of 3.40 82.00 D 1202 culvert at Km 16/4, of P Mookanur - Harur - road(MD777) 1 1 - Widening from SL to IL at C KM 13/0-16/0 and R1-CRIDP- Improvements to Km 14/0- 1203 I 11-12-M- Dharmapuri Pappireddipatti 14/6 including widening of 3.00 67.50 D 1203 culverts at Km 13/4, 14/8of P Mookanur - Harur - road(MD777) 1 1 - Widening from SL to IL at C KM 9/0-11/300, 11/340-13/0 R1-CRIDP- and Improvements to Km 1204 I 11-12-M- Dharmapuri Pappireddipatti 12/2-12/8 including widening 3.96 89.00 D 1204 of culverts at Km 10/2,12/2, P 12/8, of Mookanur - Harur - road(MD777) 1 1 - Widening from SL to IL in 1-CRIDP- C KM 30/650 - 30/800 of 1205 11-12-M- Dharmapuri Palacodu 0.15 7.00 R Morappur - Marandahalli 1205 I road(MD271) D

MDR Page No 63 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from IL to DL at KM 13/0-14/8 & including C1-CRIDP- Reconstruction of culvert at 1206 R 11-12-M- Dharmapuri Pappireddipatti 1.80 40.00 KM 13/6, Widening of culvert I 1206 D at KM 14/8 of Mallapuram - P Mookanur road(MD237) - 1 Widening from SL to IL at - KM 4/4-9/0 and including C1-CRIDP- Reconstruction of culvert at 1207 R 11-12-M- Dharmapuri Pappireddipatti Km 5/2 and construction of 4.60 87.50 I 1207 culvert at Km 6/8 of D Mookanur - Harur P road(MD777) - 1 - Widening from SL to IL at C1-CRIDP- KM 0/4-4/4 and including 1208 R 11-12-M- Dharmapuri Pappireddipatti Widening of culverts at Km 4.00 79.00 I 1208 0/8, 0/10 of Mookanur - D Harur road(MD777) P - Widening & Improvements 34.11 925.00 Total 1 Improvements to KM 19/0- - 1-CRIDP- 19/6,20/4-21/0 of Palacode - 1209 C11-12-M- Dharmapuri Pennagaram 1.20 50.00 Nagadasampatti R 1209 I road(MD308) D 1 - 1-CRIDP- Improvements to KM 31/6- 1210 C11-12-M- Dharmapuri Pennagaram 34/4 of Pennagaram - 2.80 82.00 R 1210 Perumbalai road(MD348) I D 1 - 1-CRIDP- Improvements to at KM 0/10, 1211 C11-12-M- Dharmapuri Pennagaram 1/4-2/6 of Pennagaram Bye 1.40 60.00 R 1211 pass road(MD349) I D 1 Improvements to KM 4/0-5/0, - 1-CRIDP- 16/6-17/2, 29/9-31/6 of 1212 C11-12-M- Dharmapuri Pennagaram 3.30 97.00 Pennagaram - Perumbalai R 1212 I road(MD348) D

MDR Page No 64 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Improvements at KM 35/6- - 1-CRIDP- 36/0 and Construction of 1213 C11-12-M- Dharmapuri Palacodu minor bridge at KM 35/8 of 0.40 60.00 R 1213 Morappur - Marandahalli I road(MD271) D 1 - 1-CRIDP- Improvements to KM 42/10 1214 C11-12-M- Dharmapuri Palacodu of Morappur - Marandahalli 0.20 25.00 R 1214 road (Black Spot)(MD271) I D 1 - 1-CRIDP- Improvements to KM 3/2-3/6 1215 C11-12-M- Dharmapuri Dharmapuri of HaleDharmapuri - 0.40 22.00 R 1215 Papparapatti road(MD100) I D 1 - Improvements to KM 26/650- C1-CRIDP- 27/8, 28/6-29/6, 31/0- 1216 R 11-12-M- Dharmapuri Palacodu 31/100,&36/4-37/700 of 3.55 96.00 I 1216 Morappur - Marandahalli D road(MD271) P 1 - Improvements to KM 23/7 - 26/3 & including construction C1-CRIDP- of Culvert at km 24/4, 24/10, 1217 R 11-12-M- Dharmapuri Palacodu 2.60 85.00 25/4, 25/8, 25/10 of I 1217 D Morappur - Marandahalli P road(MD271) - 1 - C R I D P 1-CRIDP- Improvements to KM 22/600- - 1218 11-12-M- Dharmapuri Palacodu 23/700 of Morappur - 1.10 49.00 1 1218 Marandahalli road(MD271) 1 - 1 2 - M -

MDR Page No 65 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

Strengthening/ Improvements 16.95 626.00 Total

Dharmapuri 51.06 1551.00 Total Salem Circle Other works 2 Nos 261.77 10919.00 Total 1 Widening from SL - IL & - Strengthening in km 8/5 - 9/1 1-CRIDP- C of Pongalur - Mettukadai 1219 11-12-M- Tiruppur Palladam 0.60 20.00 R road (via) 1219 I Genganaickenpalayam" D .(MD883) P 1 - Widening from SL - IL & C1-CRIDP- Strengthening in km 2/4 - 4/4 1220 R 11-12-M- Tiruppur Palladam of Karaipudur pirivu - 2.00 73.00 I 1220 V.T.iyyankoil road (including D CD Works)(MD871) P 1 - Widening from SL - IL & C1-CRIDP- Strengthening in km 4/4 - 6/4 1221 R 11-12-M- Tiruppur Palladam of Karaipudur pirivu - 2.00 68.00 I 1221 V.T.iyyankoil road (including D CD Works)(MD871) P 1 - "Widening from SL to IL in C1-CRIDP- Km 12/2-15/2 of Koduvai - 1222 R 11-12-M- Tiruppur Palladam Nachipalayam road. 3.00 58.00 I 1222 (Including slab D culvert)"(MD611) P 1 - Widening from SL to IL and 1-CRIDP- C Improvements in Km.0/0 - 1223 11-12-M- Tiruppur Kangeyam 1.00 50.00 R 1/0 of Sivagiri Nathakadayur 1223 I Muthur road.(MD688) D P 1 Widening SL-IL in Km 3/8 - - 8/0 of Veerapandi - 1-CRIDP- C Ugayanur road. Including 1224 11-12-M- Tiruppur Tiruppursouth 4.20 90.00 R Widening narrow Culverts 1224 I Km 4/8 (I) & (II) 5/4, 5/8, 5/10 D & 7/6(MD875) P

MDR Page No 66 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Widening from IL to DL and - improvements in km 6/6 - 1-CRIDP- C 7/0, 7/4 - 8/2, 12/0 - 12/5, 1225 11-12-M- Tiruppur Avinashi 5.30 90.00 R 13/0 - 15/6 & 16/6 - 17/6 of 1225 I Avinashi - Puliyampatti D road(MD764) P Widening & Improvements 18.10 449.00 Total 1 - 1-CRIDP- Improvements Uthukuli RS 1226 C11-12-M- Tiruppur Tiruppurnorth to Uthukuli Town road 1.60 70.00 R 1226 Km,0/2 - 1/8.(MD521) 1I - 1-CRIDP- Improvements to Dip at Km 1227 C11-12-M- Tiruppur Avinashi 16/4 of Avinashi - 0.20 14.00 R 1227 Puliampatty Road.(MD764) I D Strengthening/ Improvements 1.80 84.00 Total Tiruppur 19.90 533.00 Total 1 - Widening from intermediate C1-CRIDP- lane to double lane and 1228 R 11-12-M- Dharapuram Madathukulam Improvements to km 4/0-5/0 1.00 60.00 I 1228 of Udumalpet – D Komaralingam road(MD510) P - 1 - "Widening from Intermediate C lane to double lane and 1-CRIDP- R improvements to Km 12/5- 1229 11-12-M- Dharapuram Madathukulam 1.50 75.00 I 14/0 of Udumalpet - 1229 D Komaralingam P road"(MD510) - 1 - Widening from Single lane to C1-CRIDP- Intermediate lane and 1230 R 11-12-M- Dharapuram Madathukulam Improvements in Km 13/0- 2.60 90.00 I 1230 15/6 of Karatholuvu - D Komuralingam road(MD149) P -

MDR Page No 67 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL & 1-CRIDP- C Strengthening in 1231 11-12-M- Dharapuram Dharapuram 1.66 70.00 R Dharapuram -Poolavadi road 1231 I Km 26/0 -27/660(MD884) D P 1 - C Widening from intermediate R1-CRIDP- lane to double lane and 1232 I 11-12-M- Dharapuram Madathukulam Improvements to km10/0- 2.50 95.00 D 1232 12/5 of Udumalpet – P Komaralingam road(MD510) - 1 - Widening from SL to IL & 1-CRIDP- C Strengthening in 1233 11-12-M- Dharapuram Dharapuram 2.00 95.00 R Dharapuram -Poolavadi road 1233 I Km 24/0-26/0(MD884) D P 1 - C Widening from intermediate R1-CRIDP- lane to double lane and 1234 I 11-12-M- Dharapuram Madathukulam Improvements to km 8/0- 2.00 90.00 D 1234 10/0 of Udumalpet – P Komaralingam road(MD510) - 1 - Widening from intermediate C1-CRIDP- lane to double lane to km 5/0- 1235 R 11-12-M- Dharapuram Madathukulam 3.00 90.00 8/0 of Udumalpet – I 1235 Komaralingam road(MD510) D P 1- - C Widening from intermediate R1-CRIDP- lane to double lane and 1236 Improvements to km 2/550- I 11-12-M- Dharapuram Madathukulam 1.45 90.00 4/0 of Udumalpet – D 1236 Komaralingam road(MD510) P - 1

MDR Page No 68 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening of Single lane to C1-CRIDP- Intermediate lane in Dhali- 1237 R 11-12-M- Dharapuram Madathukulam Komaralingam road km 0/0- 3.00 80.00 3/0 including CD I 1237 works(MD94) D 1P - Widening from S.L To I.L C1-CRIDP- and Improvements in km 8/0 - 1238 R 11-12-M- Dharapuram Kangeyam 8/400 of Uthiyur - 0.40 17.00 Dasanaickenpatty I 1238 road(MD933) D 1P - Widening from S.L To I.L C1-CRIDP- and Improvements in km 1239 R 11-12-M- Dharapuram Kangeyam 16/0-18/6 of Nathakadaiyur - 2.60 99.00 I 1239 Uthamapalayam D road(MD886) P 1 - Widening from S.L To I.L C1-CRIDP- and Improvements in km 1240 R 11-12-M- Dharapuram Kangeyam 18/6 -21/2 of Nathakadaiyur - 2.60 99.00 I 1240 Uthamapalayam D road(MD886) P 1- - Widening from Single lane to C Intermediate lane to Km 15/6 1-CRIDP- R of Udumalpet-Chinnar road 1241 11-12-M- Dharapuram Madathukulam 1.00 25.00 I to Amaravathi Nagar road 1241 D km 0/0-1/0 including CD P works(MD509) - Widening & Improvements 27.31 1075.00 Total 1 Improvements to Km 6/8-8/4 - 1-CRIDP- of Mulanur - C 1242 11-12-M- Dharapuram Dharapuram Chinniyagoundenvalasu road 1.60 50.00 R 1242 (via) Kilangundal, I Moolakkadai.(MD896) D 1 - 1-CRIDP- Improvements to km 14/0- C 1243 11-12-M- Dharapuram Madathukulam 15/2 of Dhali – 1.20 21.00 R 1243 Komaralingam Road(MD94) I D

MDR Page No 69 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Improvements to Anaimalai- C 1244 11-12-M- Dharapuram Madathukulam Poolankinar Road Km. 19/0- 1.80 47.00 R 1244 19/8 & 31/4-32/4(MD22) I D 1 - Improvements to km 11/0- 1-CRIDP- C 14/0 of Uthiyur - 1245 11-12-M- Dharapuram Kangeyam 3.00 88.00 R Dasanaickenpatty 1245 I road(MD993) D 1 - 1-CRIDP- Improvements to Km 4/0-7/0 C 1246 11-12-M- Dharapuram Dharapuram of Akkaraipalayam - Karaiyur 3.00 97.00 R 1246 road(MD989) I D 1 - 1-CRIDP- Improvements to Km 1/8-2/1 C 1247 11-12-M- Dharapuram Dharapuram & 3/2 of Uthur - Anangur 0.50 20.50 R 1247 road(MD887) I D 1 - Improvements to km 7/6 - 1-CRIDP- C 8/0 & km 8/6 - 10/6 of 1248 11-12-M- Dharapuram Dharapuram 2.40 77.00 R Dharapuram - Poolavadi 1248 I road(MD884) D 1 - Improvements to km 7/8- 1-CRIDP- C 10/8 of Nathakadaiyur - 1249 11-12-M- Dharapuram Kangeyam 3.00 99.00 R Uthamapalayam 1249 I road(MD886) D 1 - 1-CRIDP- Improvements to Udumalpet - 1250 C11-12-M- Dharapuram Udumalapet Chinnar Road Km.1/5-4/0 & 3.10 100.00 R 1250 4/6-5/2(MD509) I 1D - 1-CRIDP- Improvements to Udumalpet - 1251 C11-12-M- Dharapuram Madathukulam Chinnar Road Km. 6/0-6/8 & 2.00 60.00 R 1251 8/4-9/6(MD509) I D

MDR Page No 70 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Udumalpet- 1-CRIDP- C Thirumoorthi hills Road Km. 1252 11-12-M- Dharapuram Madathukulam 3.20 75.00 R 10/2-11/0, 12/0-13/4 & 13/6- 1252 I 14/6.(MD512) D P 1 Improvements to km 8/0- - 1-CRIDP- 10/5 of Karatholuvu – 1253 C11-12-M- Dharapuram Madathukulam 2.50 75.00 Komaralingam R 1253 I Road(MD149) 1D - 1-CRIDP- Improvements to Km 11/0- 1254 C11-12-M- Dharapuram Dharapuram 12/6 of Akkaraipalayam - 1.60 50.00 R 1254 Karaiyur road(MD989) I D Strengthening/ Improvements 28.90 859.50 Total Dharapuram 56.21 1934.50 Total 1 - Widening Single Lane to C Intermediate Lane at Km. 0/0 1-CRIDP- R - 5/0 of Pasur RS - Vellode 1255 11-12-M- Erode Modakkurichi 5.00 90.00 I Road including widening of 1255 D culverts at Km 2/2, 3/4, 4/4, P 4/10(MD885) - 1 - C Widening from S.L to I.L and 1-CRIDP- R improvements at Km 2/700- 1256 11-12-M- Erode Erodewest 0.55 25.00 I 3/250 of Perundurai RS - 1256 D Arachalur road.(MD990) P - 1 - Widening from SL to IL in C 23/0-27/0 and Improvements 1-CRIDP- R Gobichetty in Km 25/0 - 26/0 of 1257 11-12-M- Erode 4.00 95.00 I palayam Perundalaiyur - 1257 D Kavandapady - Gettiseviyur P road(MD657) - 1

MDR Page No 71 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single Lane to C Intermediate Lane at Km.5/0 - R 11/0 and improvements to 1-CRIDP- I Km10/0 -11/0 of Pasur RS - 1258 11-12-M- Erode Modakkurichi 6.00 130.00 D Vellode Road including 1258 P widening of culverts at Km - 5/6,6/4,6/8,7/4, 7/10,8/4 & 1 8/8(MD885) 1 1 - Widening from IL to DL in C km 2/8-3/6, 3/8-7/0 and R1-CRIDP- improvements to km 1/4-2/8, 1259 I 11-12-M- Erode Anthiyur 3/6-3/8 of Anthiyur -Athani 4.00 125.00 D 1259 road Including widening P Culvert at km - 1/8,1/10.(MD29) 1 - Widening from SL to IL in C 27/0 - 29/8 and 1-CRIDP- R Gobichetty Improvements in Km 28/4 - 1260 11-12-M- Erode 2.80 80.00 I palayam 29/6 of Perundalaiyur - 1260 D Kavandapady - Gettiseviyur P road(MD657) - 1 Widening & Improvements 22.35 545.00 Total 1 - Improvements from Km 9/2- C 11/0 of Perundurai RS- R Arachalur road and widening 1-CRIDP- I of culvert at Km 9/6, 9/10, 1261 11-12-M- Erode Modakkurichi 1.80 80.00 D 10/8, Reconstruction of 1261 P minor bridge in lieu of - existing damaged causeway 1 at km 10/6(MD990) 1 1 - Improvements to km 2/0-4/0 C1-CRIDP- of Bye-Pass road connecting 1262 R 11-12-M- Erode Erodewest Km 5/4 of Erode -Perundurai 2.00 65.00 I 1262 road and Km 6/2 of Erode - D Sathy road(MD62) P -

MDR Page No 72 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Km 8/4- C 1-CRIDP- 11/300 of Chennimalai R 1263 11-12-M- Erode Modakkurichi Arachalur - Kodumudi Road 2.90 130.00 I 1263 Including culert widening and D dip raising at km 9/2(MD70) P - 1 - Improvements in Km 2/6 - C 4/0 and Widening the builtup R area with curve 1-CRIDP- I improvements at km 3/0-3/4 1264 11-12-M- Erode Perundhurai 1.40 100.00 D and construction of culvert at 1264 P km 3/8 of Perundurai - - maccanancombai 1 road(MD357) 1 1- - Improvements to km 4/0-6/0 C of Bye-Pass road connecting R Km 5/4 of Erode -Perundurai 1-CRIDP- I road and Km 6/2 of Erode - 1265 11-12-M- Erode Erodewest 2.00 65.00 D Sathy road and 1265 P Reconstruction of culvert at - Km 5/6 & Widening of culvert 1 at km 5/6(MD62) 1 - 1 - Improvements to Km 9/090- C 10/0, 23/2-24/0 of 1-CRIDP- R Chellampalayam - Burgur - 1266 11-12-M- Erode Anthiyur 1.75 60.00 I Kollegal road and Widening 1266 D of culvert at Km P 23/6,32/6(MD1045) - 1 1 - C Improvements to Km.21/6 - R 22/8 of Erode - Chennimalai 1-CRIDP- I road including dip raising at 1267 11-12-M- Erode Perundhurai 1.20 55.00 D km 21/8 and Reconstruction 1267 P of narrow culvert at km 16/6 - & 16/10(MD108) 1 1 -

MDR Page No 73 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to Km 9/0- - 1-CRIDP- 10/9 of the road from 1268 C11-12-M- Erode Anthiyur 1.90 73.00 Thoppur Mettur Bhavani R 1268 I road to Vellitirupur(MD486) D 1 - Improvements to km 11/0- 12/6 of Perundurai R.S - C1-CRIDP- Arachalur Road, widneing of 1269 R 11-12-M- Erode Modakkurichi 1.60 57.00 culvert at Km 11/4, 11/8, I 1269 D 12/2 and Reconstruction of P culvert at Km.12/4(MD990) - 1 - Improvements to Km 11/4- C1-CRIDP- 12/6,15/0-15/6 of the road 1270 R 11-12-M- Erode Anthiyur from Thoppur Mettur 1.80 70.00 I 1270 Bhavani road to D Vellitirupur(MD486) P Strengthening/ Improvements 18.35 755.00 Total 1 Construction of retaining wall - 1-CRIDP- at Km 11/10, 12/2, 16/2 & 1271 C11-12-M- Erode Anthiyur 16/4 of Chellampalayam- 12.00 R 1271 Burgur - kollegal I road(MD1045) D 1 Reconstruction of damaged - 1-CRIDP- cut stone culvert at Km 13/6 1272 C11-12-M- Erode Anthiyur 3.00 of Chellampalayam- Burgur - R 1272 I Kollegal road(MD1045) D Bridges/ CD Works/ Others 2 Nos 15.00 Total Erode Total 40.70 1315.00 1 Widening single lane to - Intermediate lane and C 1-CRIDP- Improvements in km 24/0 - 1273 R 11-12-M- Karur Kulithalai 26/4 of Pettavaithalai - 2.40 90.00 I 1273 Nangavaram - D Kavalkaranpatty P Road(MD658) -

MDR Page No 74 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C1-CRIDP- from Km.18/6-21/2 of 1274 R 11-12-M- Karur Aravakurichi 2.60 99.00 Vairamadai - Thoppampatty - I 1274 D Kuppam Road(MD728) P - 1 - Widening from Single lane to intermediate lane and C1-CRIDP- Improvements in Km.0/0 - 1275 R 11-12-M- Karur Karur 1.60 60.00 1/0 & 2/0-2/6 of I 1275 D Manmangalam - Vangal P Road(MD867) - 1 - Widening from single lane to intermediate lane and C1-CRIDP- Improvements in Km.2/6 - 1276 R 11-12-M- Karur Karur 2.20 77.00 3/6, 4/0-4/8 and 5/2 - 5/6 of I 1276 D Manmangalam - Vangal P Road(MD867) - 1 - Widening from single lane to intermediate lane and C1-CRIDP- Improvements from Km.16/0- 1277 R 11-12-M- Karur Aravakurichi 2.60 99.00 18/6 of Vairamadai - I 1277 D Thoppampatty - Kuppam P Road(MD728) - 1 - Widening SL - IL in Km 13/0 - 1-CRIDP- 15/0 and Improvements in C Krishnaraya 1278 11-12-M- Karur Km 14/0 - 15/0 of 2.00 56.00 R puram I 1278 Mahathanapuram - D Mylampatty road.(MD625) P 1 - Widening SL - IL and 1-CRIDP- C Krishnaraya Improvements in Km 15/0 - 1279 11-12-M- Karur 2.00 75.00 R puram 17/0 of Mahathanapuram - 1279 I Mylampatty road.(MD625) D 1 - Widening SL - IL and 1-CRIDP- C Krishnaraya Improvements in Km 6/0 - 1280 11-12-M- Karur 3.00 90.00 R puram 9/0 of Mayanur - Sengal - 1280 I Panchapatty road.(MD632) D

MDR Page No 75 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL and C Improvements to Km 15/4 - 1-CRIDP- 17/0 of Manapparai - R Krishnaraya 1281 11-12-M- Karur Gujiliamparai Road. 1.60 100.00 I puram D 1281 Including construcion of P culverts @ Km 15/6, 15/8, - 16/2, 16/4 & 16/8.(MD628) 1 - Widening Single lane to C Intermediate lane and R Improvements to Km 13/0 - I 1-CRIDP- 15/0 of Aru road - 1282 D11-12-M- Karur Aravakurichi Pungambadi road (via) 2.00 96.00 P 1282 Venjamangudalur including - construction of culverts at 1 Km 13/2, 13/4 and 1 13/8(MD574) - 1 - Widening Single lane to C Intermediate lane and Improvements to Km 15/0 - R1-CRIDP- 16/190 of Aru road - 1283 I 11-12-M- Karur Aravakurichi 1.19 60.00 Pungambadi road (via) D 1283 P Venjamangudalur including - construction of culvert at Km 1 15/4, 15/10(MD574) 1 1 - Widening Single lane to C1-CRIDP- Indermetiate lane to Km 7/0- 1284 R 11-12-M- Karur Aravakurichi 9/0 of Pallapatti - 2.00 75.00 I 1284 Aravakurichy - Esanatham - D Gujiliamparai road(MD650) P 1- - Widening Single lane to C Indermetiate lane to Km 9/0 - R1-CRIDP- 11/0 of Pallapatti - 1285 I 11-12-M- Karur Aravakurichi Aravakurichy - Esanatham - 2.00 75.00 D 1285 Gujiliamparai road including P Widening culvert at Km 9/6 & - 10/8(MD650) 1 1

MDR Page No 76 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single lane to C Indermetiate lane to Km 11/0 R1-CRIDP- - 13/0 of Pallapatti - 1286 I 11-12-M- Karur Aravakurichi Aravakurichy - Esanatham - 2.00 98.00 D 1286 Gujiliamparai road including P Widening culvert at Km - 12/10(MD650) 1 Widening & Improvements 29.19 1150.00 Total 1 Improvements to Km 10/4- - 1-CRIDP- Krishnaraya 12/0 & 13/0-14/0 of 1287 C11-12-M- Karur 2.60 80.00 puram Thogaimalai - Mylampatty R 1287 I Road(MD482) D 1 Improvements to - 1-CRIDP- Pettavaithalai - Nangavaram - 1288 C11-12-M- Karur Kulithalai 3.00 120.00 Kavalkaranpatty Road km R 1288 I 13/0 - 16/0(MD658) D 1 - 1-CRIDP- Improvements to Km 7/0 - 1289 C11-12-M- Karur Aravakurichi 8/6 of Punnam - Pugalur 1.60 65.00 R 1289 Road.(MD668) I D 1 ImÁovements to - 1-CRIDP- Pettavaithalai - Nangavaram - 1290 C11-12-M- Karur Kulithalai 2.40 100.00 Kavalkaranpatty Road km R 1290 I 10/6 - 13/0(MD658) D 1 ImÁovements to - 1-CRIDP- Pettavaithalai - Nangavaram - 1291 C11-12-M- Karur Kulithalai 2.00 80.00 Kavalkaranpatty Road km R 1291 I 16/0 - 18/0(MD685) D 1 Improvements to Km 6/0-6/6, - 1-CRIDP- 7/0-8/0 and 8/2-9/8 of Karur - 1292 C11-12-M- Karur Karur 3.20 95.00 Esanatham - Koombur - R 1292 I Viriyampatty Road(MD606) D

MDR Page No 77 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Km.2/8-3/2 C 1-CRIDP- and13/0 - 16/0 Vairamadai - R 1293 11-12-M- Karur Aravakurichi Thoppampatty - Kuppam 3.40 99.00 I 1293 Road and Construction of D culvert at Km.3/2.(MD728) P - 1 - 1-CRIDP- Improvements to Km 11/0 - Krishnaraya 1294 C11-12-M- Karur 14/0 of Mayanur - Sengal - 3.00 80.00 puram R 1294 Panchapatty road.(MD632) I D 1 - 1-CRIDP- Improvements to Km 0/6 - 1295 C11-12-M- Karur Aravakurichi 1/0, 6/4 - 8/4 of Paramathi - 2.40 65.00 R 1295 Rajapuram road(MD333) I D Strengthening/ Improvements 23.60 784.00 Total 1 Construction of damaged - 1-CRIDP- causeway at Km 9/0 of C 1296 11-12-M- Karur Aravakurichi Pallapatti - Aravakurichy - 25.00 R 1296 Esanatham - Gujiliamparai I road.(MD650) D

MDR Page No 78 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Construction of culvert at Km 1-CRIDP- C 11/4 & 14/6 of Karur - 1297 11-12-M- Karur Karur 25.00 R Esanatham - Koombur - 1297 I Viriyampatty Road(MD606) D P Bridges/ CD Works/ Others 2 Nos 50.00 Total Karur Total 52.79 1984.00 Tiruppur Other works 4 Nos 169.60 5766.50 Circle Total 1 Widening from SL to IL and - 1-CRIDP- Kavundam Impts in Km 4/6 - 6/4 of 1298 C11-12-M- Coimbatore 1.80 90.00 palayam Ganapathy Athipalayam R 1298 I road(MD872) D 1 - Widening from IL to DL in C1-CRIDP- Km 0/6 - 1/6 and Impts in Kavundam 1299 R 11-12-M- Coimbatore Km 0/0-1/6 of 1.60 80.00 palayam I 1299 Goundampalayam - D Onappalayam road(MD982) P 1 Widening from SL to IL and - 1-CRIDP- Impts In Km 7/315-9/0 of 1300 C11-12-M- Coimbatore Sulur 1.69 77.00 Sulur - Selekarichal R 1300 I road(MD437) D 1 Widening from SL to IL and - 1-CRIDP- Kavundam and Impts in Km 8/0-9/8 of 1301 C11-12-M- Coimbatore 1.80 97.00 palayam Ganapathy Athipalayam R 1301 I road(MD872) D 1 - "Widening from IL to DL and C1-CRIDP- Improvements in Km 3/6-5/2 Kavundam 1302 R 11-12-M- Coimbatore of Goundampalayam - 1.60 90.00 palayam I 1302 Onappalayam road D "(MD982) P -

MDR Page No 79 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C Impts in Km 15/0-16/0 and 1-CRIDP- R Impts to the Dip at Km 15/2 1303 11-12-M- Coimbatore Sulur 1.00 52.00 I of Thennampalayam - Annur 1303 D road (via) P Vagarayampalayam(MD713) - 1 1 - Widening from SL to IL and C1-CRIDP- Improvements In Km 16/0 - 1304 R 11-12-M- Coimbatore Sulur 18/0 of Thennampalayam - 2.00 91.00 I 1304 Annur road (via) D Vagarayampalayam(MD713) P - 1 Widening from SL to IL in - Km 2/8-5/0 and Impts in Km C1-CRIDP- 3/0-5/0 from Km 18/10 of 1305 R 11-12-M- Coimbatore Sulur 2.20 89.00 PCF road to I 1305 Appanaickenpatti (Via) D Kalangal(MD1100) P 1 - Widening from SL to IL and C1-CRIDP- Impts in Km 13/4-15/0 of 1306 R 11-12-M- Coimbatore Sulur Thennampalayam - Annur 1.60 66.00 I 1306 road (via) D Vagarayampalayam(MD713) P 1- - Widening from SL to IL in 1-CRIDP- C Km 0/0-3/0 of Selekarichal - 1307 11-12-M- Coimbatore Sulur 3.00 65.00 R Sulthanpet road (Via) 1307 I Thannerpandal(MD417) D 1 - Widening from IL to DL and C1-CRIDP- Kavundam Improvements in Km 1/6 - 1308 R 11-12-M- Coimbatore 2.00 85.00 palayam 3/6 of Goundampalayam - I 1308 Onappalayam road(MD982) D P 1 Widening from SL to IL and - 1-CRIDP- Kavundam Impts in Km 6/4 - 8/0 of 1309 C11-12-M- Coimbatore 1.60 93.00 palayam Ganapathy Athipalayam R 1309 I road(MD872) D

MDR Page No 80 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C Improvements in Km 5/0 - R 1-CRIDP- 6/6 including Construction of I 1310 11-12-M- Coimbatore Sulur Culvert at Km 6/6 from Km 1.60 75.00 D 1310 18/10 of PCF road to P Appanaichenpatti (Via) - Kalangal(MD1100) 1 1 1- - Widening from SL to IL and C1-CRIDP- Improvements In Km 18/0 - 1311 R 11-12-M- Coimbatore Sulur 19/8 Thennampalayam - 1.80 94.00 I 1311 Annur road (via) D Vagarayampalayam(MD713) P 1 - Widening from SL to IL and 1-CRIDP- C Impts In Km 9/0 -11/0 of 1312 11-12-M- Coimbatore Sulur 2.00 88.00 R Sulur - Selekarichal 1312 I road(MD437) D P Widening & Improvements 27.29 1232.00 Total 1 - Improvements to Km 3/8 - 1-CRIDP- C 5/0 of the road from Km 1313 11-12-M- Coimbatore Sulur 1.20 50.00 R 331/6 of NGM Road - 1313 I Pappampatty Road(MD985) D 1P - Improvements to Karamadai - 1-CRIDP- C Tholampalayam Road at Km 1314 11-12-M- Coimbatore Mettupalayam 1.60 70.00 R 0/0-0/2, 0/8-1/2, 4/6 - 1314 I 5/6(MD605) D P 1 - Improvements in Km 7/4-9/8 C including construction of R1-CRIDP- culverts and Retaining walls 1315 I 11-12-M- Coimbatore Sulur at Km 9/2, 9/4, 9/6 of 2.40 95.00 D 1315 Chinniyampalayam - P Somanur road (Via) Ravathur(MD879) - 1

MDR Page No 81 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to km 6/8 of - 1-CRIDP- Coimbatore Siruvani road to 1316 C11-12-M- Coimbatore Thondamuthur 2.40 85.00 km 165/8 of Salem Cochin R 1316 I road km 0/0 - 2/4(MD169) 1D Improvements to Km 2/215 - - 1-CRIDP- 3/8 of the road from Km 1317 C11-12-M- Coimbatore Sulur 1.59 68.00 331/6 of NGM Road - R 1317 I Pappampatty Road(MD985) 1D - 1-CRIDP- Improvements to Karamadai - 1318 C11-12-M- Coimbatore Mettupalayam Sirumugai Road at Km 5/4 - 1.40 60.00 R 1318 5/8, 7/4 - 8/4(MD979) I 1D - 1-CRIDP- Improvements in Km.14/4 - 1319 C11-12-M- Coimbatore Thondamuthur 16/0 of Coimbatore - 1.60 60.00 R 1319 Siruvani Road(MD81) I 1D Improvements to km 6/8 of - 1-CRIDP- Coimbatore Siruvani road to 1320 C11-12-M- Coimbatore Thondamuthur 2.00 80.00 km 165/8 of Salem Cochin R 1320 I road km 4/6 - 6/6(MD81) 1D Improvements to Coimbatore - 1-CRIDP- Siruvani road km 7/0 - 8/6 1321 C11-12-M- Coimbatore Kinathukadavu 1.60 80.00 including Dip Improvement at R 1321 Km 7/8(MD81) I 1D - 1-CRIDP- Improvements in Km.21/0 - 1322 C11-12-M- Coimbatore Thondamuthur 23/0 of Coimbatore - 2.00 80.00 R 1322 Siruvani Road(MD81) I 1D - 1-CRIDP- Improvements in Km.23/0 - 1323 C11-12-M- Coimbatore Thondamuthur 25/0 and 26/2 of Coimbatore - 2.20 85.00 R 1323 Siruvani Road(MD81) I 1D Improvements to km 6/8 of - 1-CRIDP- Coimbatore Siruvani road to 1324 C11-12-M- Coimbatore Thondamuthur 2.20 90.00 km 165/8 of Salem Cochin R 1324 I road km 2/4 - 4/6(MD169) D

MDR Page No 82 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Providing Approaches to the - 1-CRIDP- Culvert at Km 1/8 of C 1325 11-12-M- Coimbatore Sulur Thennampalayam - Annur 0.20 15.00 R 1325 road (via) I Vagarayampalayam(MD713) D P Strengthening/ Improvements 22.39 918.00 Total

1 - C1-CRIDP- "Providing of Centre median Kavundampalaya 1326 R 11-12-M- Coimbatore to Sitra Kurumbapalayam 20.00 m I 1326 road km 0/2 - 1/0."(MD980) D P - Bridges/ CD Works/ Others 1 No 20.00 Total Coimbatore 49.67 2170.00 Total 1 - Widening from Single lane to C1-CRIDP- intermediate lane and 1327 R 11-12-M- Pollachi Pollachi improvements in km 8/2 - 9/6 1.40 78.00 of Kinathukadavu - I 1327 Kattampatty Road(MD165) D P 1 Widening from Single lane to - 1-CRIDP- intermediate lane and 1328 C11-12-M- Pollachi Pollachi improvements in km 9/6 - 1.40 78.00 R 1328 11/0 of Kinathukadavu - I Kattampatty Road(MD165) D 1 Widening from Single lane to - 1-CRIDP- intermediate lane and C 1329 11-12-M- Pollachi Pollachi improvements in km 11/0 - 1.50 84.00 R 1329 12/5 of Kinathukadavu - I Kattampatty Road(MD165) D 1P Widening from Single lane to - 1-CRIDP- intermediate lane in km 10/6 - 1330 C11-12-M- Pollachi Sulur 1.60 35.00 12/2 of Kattampatty - R 1330 I Koduvai road(MD155) D

MDR Page No 83 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C1-CRIDP- intermediate lane in km 3/0 - 1331 R 11-12-M- Pollachi Sulur 6/4 of Selarkarachal - 3.40 84.00 I 1331 Sulthanpet - Thaneerpanthal D road(MD417) P 1 - Widening from Single lane to C intermediate lane in km 7/0 - R1-CRIDP- 7/8, 8/4 - 9/8, 11/0 - 11/6 & 1332 I 11-12-M- Pollachi Sulur improvements in km 9/8 - 4.40 89.00 D 1332 10/4 of Selarkarachal - P Sulthanpet - Thaneerpanthal - road(MD417) 1 1 - Widening from Single lane to C1-CRIDP- intermediate lane & 1333 R 11-12-M- Pollachi Pollachi improvements in km 6/0 - 7/8 1.80 94.00 I 1333 of Vadachitoor - D Chettipalayam road(MD522) P 1 Widening from Single lane to - 1-CRIDP- intermediate lane in km 0/0 - 1334 C11-12-M- Pollachi Valparai 2/8 of Valparai - 2.80 84.00 R 1334 Manickagurangumudi I road(MD534) 1D Widening from Single lane to - 1-CRIDP- intermediate lane in km 0/0 - 1335 C11-12-M- Pollachi Valparai 2.00 60.00 2/0 of Anaimalai Loop R 1335 I road(MD23) 1D Widening from Single lane to - 1-CRIDP- intermediate lane in km 2/0- 1336 C11-12-M- Pollachi Valparai 3.00 90.00 5/0 of Anaimalai Loop R 1336 I road(MD23) D Widening & Improvements 23.30 776.00 Total 1 - 1-CRIDP- Improvements in km 0/0 - 1337 C11-12-M- Pollachi Pollachi 2/0 of Kattampatty - Koduvai 2.00 73.00 R 1337 road(MD155) I D

MDR Page No 84 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Improvements in km 9/2 - 1338 C11-12-M- Pollachi Pollachi 10/8 of Vadachitoor - 1.60 53.00 R 1338 Negamam road(MD523) I 1D Improvements in km 5/2 - - 1-CRIDP- 6/6 of Kinathukadavu - 1339 C11-12-M- Pollachi Kinathukadavu 1.40 46.00 Cochin Frontier R 1339 I road(MD988) D Strengthening/ Improvements 5.00 172.00 Total 1 - Construction of Pipe culvert C1-CRIDP- at km 11/4 of Senjerihills - 1340 R 11-12-M- Pollachi Sulur Vadachittor road (via) 2.00 I 1340 Mettulakshminaickenpalaya D m(MD881) P - 1 - 1-CRIDP- Construction of Pipe culvert 1341 C11-12-M- Pollachi Valparai at km 8/4 of Anaimalai - 2.00 R 1341 Poolankinar road(MD22) I D Bridges/ CD Works/ Others 2 Nos 4.00 Total Pollachi 28.30 952.00 Total 1 Widening SL To I L in km 1-CRIDP- - 15/0-17/0 of Sathy- 1342 11-12-M- Gobi Bhavanisagar 2.00 90.00 C Periakodiveri-Kadambur 1342 R road(MD679) I 1 Widening SL To IL and 1-CRIDP- - Improvements in km 75/0- 1343 11-12-M- Gobi Bhavanisagar 1.60 90.00 C 76/6of Kollegal Hassanur 1343 R road(MD180) I 1 Widening SL To IL and 1-CRIDP- - Improvements in km 76/6- 1344 11-12-M- Gobi Bhavanisagar 1.60 90.00 C 78/2 of Kollegal Hassanur 1344 R road(MD180) I 1 Widening SL To IL and 1-CRIDP- - Improvements in km 71/0- 1345 11-12-M- Gobi Bhavanisagar 2.00 90.00 C 73/0 of Kollegal Hassanur 1345 R road(MD180) I

MDR Page No 85 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Widening SL To IL and 1-CRIDP- - Improvements in km 73/0- 1346 11-12-M- Gobi Bhavanisagar 2.00 90.00 C 75/0 of Kollegal Hassanur 1346 R road(MD180) I 1 - 1-CRIDP- Widening SL To I L 17/0- 1347 C11-12-M- Gobi Bhavanisagar 19/0 of Sathy-Periakodiveri- 2.00 90.00 R 1347 Kadambur road(MD679) I Widening & Improvements 11.20 540.00 Total 1 Improvements to km 25/4- - 1-CRIDP- 28/6 of Puliampatti- 1348 C11-12-M- Gobi Bhavanisagar 3.20 90.00 Bhavanisagar-Bannari R 1348 I road(MD889) D 1 - Improvements to km 13/0- 1-CRIDP- C 13/8, 14/2-14/6 & 19/0-20/0 1349 11-12-M- Gobi Bhavanisagar 2.20 75.00 R of Puliampatti-Bhavanisagar- 1349 I Bannari road(MD889) D P 1 Improvements to km 16/0- - 1-CRIDP- Gobichetty 19/0 of Perundalaiyur- 1350 C11-12-M- Gobi 3.00 90.00 palayam Kavandapadi-Getticheyur R 1350 I road(MD657) D 1 Improvements to km 21/0- - 1-CRIDP- 22/0, 23/6-25/0 of Gobichetty 1351 C11-12-M- Gobi Perundurai- 2.40 90.00 palayam R 1351 Maccanamcombai I road.(MD357) D 1 Improvements to km 25/0- - 1-CRIDP- Gobichetty 26/6 of Perundurai- 1352 C11-12-M- Gobi 1.60 90.00 palayam Maccanamcombai R 1352 I road.(MD357) D 1 Improvements to km 26/6- - 1-CRIDP- 28/3, 29/8-30/6 of Gobichetty 1353 C11-12-M- Gobi Perundurai- 2.50 80.00 palayam R 1353 Maccanamcombai I road.(MD357) D

MDR Page No 86 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to km 31/0- - 1-CRIDP- Gobichetty 32/500 of Perundurai- 1354 C11-12-M- Gobi 1.50 85.00 palayam Maccanamcombai R 1354 I road(MD357) D 1 Improvements to km11/0- - 1-CRIDP- Gobichetty 12/100,12/4-13/2 of 1355 C11-12-M- Gobi 1.90 70.00 palayam Perundalaiyur-Kavandapadi- R 1355 I Getticheyur road(MD657) D 1 - 1-CRIDP- Improvements in Km 8/0-9/6 1356 C11-12-M- Gobi Perundhurai & 10/0-10/4 of Perundurai - 2.00 90.00 R 1356 Kavundappadi road(MD657) I D Strengthening/ Improvements 20.30 760.00 Total 1 - Construction of bridge in liew 1-CRIDP- C of existing narrow causeway 1357 11-12-M- Gobi Bhavanisagar 80.00 R at 20/10 of Avinashi- 1357 I Puliampatti road(MD764) D 1P - 1-CRIDP- Construction of Culvert and C Gobichetty 1358 11-12-M- Gobi drain at km 0/2 of Gobi- 25.00 R palayam 1358 Savandapur road(MD116) I D Bridges/ CD Works/ Others 2 Nos 105.00 Total Gobi Total 31.50 1405.00 1 - Widening from IL to DL and C improvemments in km 0/0 - R1-CRIDP- 0/5 of Kotagiri-Kodanadu 1359 I 11-12-M- Udhagai Coonoor view point road (via) 0.50 65.00 D 1359 Kodanadu including CC drain P and protective - works.(MD995) 1

MDR Page No 87 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements C to Km 34/0-35/0 of Udhagai R1-CRIDP- Uthagaman Avalanchi Kundah Thaishola 1360 I 11-12-M- Udhagai 1.00 75.00 dalam road including construction D 1360 of protective Works and cc P drain(MD1071) - 1 1 - Widening and Improvements C to Km 33/0-34/0 of Udhagai R1-CRIDP- Uthagaman Avalanchi Kundah Thaishola 1361 I 11-12-M- Udhagai 1.00 75.00 dalam road including construction D 1361 of protective Works and cc P drain(MD1071) - 1 1 - Widening from IL to DL and C improvemments in km 0/5 - R1-CRIDP- 1/0 of Kotagiri-Kodanadu 1362 I 11-12-M- Udhagai Coonoor view point road (via) 0.50 60.00 D 1362 Kodanadu including CC drain P and protective - works.(MD995) 1 1 - Widening and Improvements C to Km 30/0-30/8 of Udhagai R 1-CRIDP- Avalanchi Kundah Thaishola I Uthagaman 1363 11-12-M- Udhagai road including improvements 0.80 80.00 D dalam 1363 to Hairpin bend and P construction of protective - wall(MD1071) 1 1 1 - Widening and Improvements C to Km 30/8-31/5 of Udhagai R 1-CRIDP- Avalanchi Kundah Thaishola I Uthagaman 1364 11-12-M- Udhagai road including improvements 0.70 70.00 D dalam 1364 to Hairpin bend and P construction of protective - wall(MD1071) 1 1

MDR Page No 88 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening and Improvements R to Km 35/0-36/0 of Udhagai 1-CRIDP- I Uthagaman Avalanchi Kundah Thaishola 1365 11-12-M- Udhagai 1.00 75.00 D dalam road including construction 1365 P of protective Works and cc - drain(MD1071) 1 1 Widening & Improvements 5.50 500.00 Total 1 - C1-CRIDP- Improvements to Doddabetta Uthagaman 1366 R 11-12-M- Udhagai Iduhatty Kattabettu road Km 1.60 90.00 dalam I 1366 6/4-8/0(MD994) D P 1- - Improvements to Km 4/0-5/0 C1-CRIDP- of Udhagai avalanchi Uthagaman 1367 R 11-12-M- Udhagai Kundah Thaishola road 1.00 70.00 dalam I 1367 including CC Drain and D protective works(MD1071) P 1- - Improvements to Km 10/6- C1-CRIDP- 12/6 of Udhagai avalanchi Uthagaman 1368 R 11-12-M- Udhagai Kundah Thaishola road 2.00 99.00 dalam I 1368 including CC Drain and D protective works(MD1071) P 1- - Improvements to Km 17/6 - C1-CRIDP- 18/8 of Coonoor Kundah Uthagaman 1369 R 11-12-M- Udhagai Road Including CD Works 1.20 75.00 dalam I 1369 and Protective D Works.(MD86) P 1- - Improvements to Km 3/2 - C1-CRIDP- 4/6 of Coonoor Kundah Uthagaman 1370 R 11-12-M- Udhagai Road. Including CD Works 1.40 83.00 dalam I 1370 and Protective D Works.(MD86) P -

MDR Page No 89 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Improvements to Km 4/6 - C1-CRIDP- 6/0 of Coonoor Kundah Uthagaman 1371 R 11-12-M- Udhagai Road. Including CD Works 1.40 85.00 dalam I 1371 and Protective D Works.(MD86) P 1- - Improvemments to km 1/0- 2/0 of Kotagiri-Kodanadu C1-CRIDP- view point road (via) 1372 R 11-12-M- Udhagai Coonoor 1.00 80.00 Kodanadu including CC drain I 1372 D and protective P works.(MD995) - Strengthening/ Improvements 9.60 582.00 Total

MDR Page No 90 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Providing Protective works at Uthagaman 1373 C11-12-M- Udhagai Km 5/8 of Coonoor 15.00 dalam R 1373 Kattabettu road.(MD1073) I D Bridges/ CD Works/ Others 1 No 15.00 Total Udhagai 15.10 1097.00 Total

Coimbatore Other works 6 Nos 124.57 5624.00 Circle Total 1 - Widening from Single lane to C Double lane in km 4/0-5/0 of R1-CRIDP- Kallupatti Virudhunagar road 1374 I 11-12-M- Madurai Usilampatti 1.00 100.00 and Reconstruction of culvert D 1374 at km 4/2, 4/4, 4/8 & P 4/10(MD956) - 1 1 - Widening from Single lane to C Double lane and R1-CRIDP- Strengthening in km 8/2-9/4 1375 I 11-12-M- Madurai Melur of Thumbaipatti- 1.00 100.00 D 1375 Jeyankondan Nilai road and P Reconstruction of culvert at - km 8/6, 8/8, 9/2,(MD959) 1 1 - C Widening from Single lane to R1-CRIDP- Thiruparan Intermediate lane at Km 1376 I 11-12-M- Madurai 1.70 45.00 kundram 0/300-2/0 of New Austinpatti D 1376 road.(MD294) P - 1 1 - Widening from Single lane to C Intermediate lane at Km 0/0- R1-CRIDP- Thiruparan 2/0 of Old Austinpatti road 1377 I 11-12-M- Madurai 2.00 45.00 kundram including construction of D 1377 Pipe culvert at km 1/6 (1), (2) P and km 1/8(MD302) - 1

MDR Page No 91 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C Double lane and R1-CRIDP- Strengthening in km 4/4-5/6 1378 I 11-12-M- Madurai Melur of Thumbaipatti- 1.20 100.00 D 1378 Jeyankondan Nilai road and P Reconstruction of culvert at - km 4/6, 5/4,5/6(MD959) 1 1 - Widening from Single lane to C Double lane and R1-CRIDP- Strengthening in km 7/0-8/2 1379 I 11-12-M- Madurai Melur of Thumbaipatti- 1.20 100.00 D 1379 Jeyankondan Nilai road and P Reconstruction of culvert at - km 7/8 (i), (ii), 7/10(MD959) 1 1 - Widening from Single lane to C Intermediate lane in km 5/8- 8//0 of Pudupatti- R1-CRIDP- Mangalrewu road including 1380 I 11-12-M- Madurai Thirumangalam 2.20 60.00 Construction of culvert at km D 1380 P 6/10 & Widening of Pipe - culver at km 7/4, 7/6, 1 7/10,(MD376) 1 - Widening from Single lane to C Double lane and R1-CRIDP- Strengthening in km 9/4-10/2 1381 I 11-12-M- Madurai Melur of Thumbaipatti- 0.60 75.00 D 1381 Jeyankondan Nilai road and P Reconstruction of culvert at - km 9/6(MD959) 1 1 1 - Widening from Single lane to C Double lane in km 8/0-9/715 R1-CRIDP- of Kallupatti Virudhunagar 1382 I 11-12-M- Madurai Usilampatti road and Reconstruction of 1.72 90.00 D 1382 culvert at km 8/2 (i), (ii), 8/4, P 8/6 (i), (ii) 8/8, 9/2 (i), - (ii)(MD956) 1 1

MDR Page No 92 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C Double lane and R1-CRIDP- Strengthening in km 5/6-7/0 1383 I 11-12-M- Madurai Melur of Thumbaipatti- 1.40 100.00 D 1383 Jeyankondan Nilai road and P Reconstruction of culvert at - km 5/8,5/10, 6/6(MD959) 1 1 1 - C Widening from Single lane to Double lane in km 6/7-8/0 of R1-CRIDP- Kallupatti Virudhunagar road 1384 I 11-12-M- Madurai Usilampatti 1.30 80.00 and Reconstruction of culvert D 1384 P at km 6/8, 6/10, 7/2, 7/4, 7/6 - (i), (ii), 7/10(MD956) 1 1 1 Widening from Single lane to - Intermediate lane and C Strengthening in km 2/6- R1-CRIDP- 4/100 of Kallandiri- 1385 I 11-12-M- Madurai Maduraieast Panaikulam road including 1.50 97.00 D 1385 Reconstruction of culvert at P km 2/10, 3/8 and widening of - culvert at km 3/2, 3/6, 1 3/10(MD957) 1 1 - Widening from Single lane to C Intermediate lane and R1-CRIDP- Strengthening in km 4/100- 1386 I 11-12-M- Madurai Maduraieast 5/6 of Kallandiri-Panaikulam 1.50 82.00 D 1386 road including Widening of P culvert at km - 4/4,4/10,5/2(MD957) 1 1 Widening from Single lane to - Intermediate lane and C Strengthening in km 5/6- R1-CRIDP- 7/100 of Kallandiri- 1387 I 11-12-M- Madurai Maduraieast Panaikulam road including 1.50 79.00 D 1387 Widening of culvert at km 6/4 P and Construction of - Retaining Wall at Km 1 6/4(MD957)

MDR Page No 93 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from Single lane to C Intermediate lane and R1-CRIDP- Strengthening in km 7/100- 1388 I 11-12-M- Madurai Maduraieast 8/745 of Kallandiri- 1.65 89.00 D 1388 Panaikulam road including P Widening of culvert at km - 7/4, 8/2 , 8/6(MD957) 1 1 - Widening from Single lane to C Intermediate lane in km 8/0- 1-CRIDP- R 10/0 of Pudupatti- 1389 11-12-M- Madurai Thirumangalam 2.00 60.00 I Mangalrewu road including 1389 D Widening of Pipe culver at P km 8/8 & 8/10(MD376) - 1 1 - Widening from Single lane to C Intermediate lane in km 10/0- 1-CRIDP- R 12/0 of Pudupatti- 1390 11-12-M- Madurai Usilampatti 2.00 55.00 I Mangalrewu road and 1390 D Reconstruction of culvert at P km 11/6, 11/8(MD376) - 1 1 - Widening from Single lane to C Intermediate lane in km 12/0- 13/8 of Pudupatti- R1-CRIDP- Mangalrewu road and 1391 I 11-12-M- Madurai Usilampatti 1.80 68.00 Reconstruction of culvert at D 1391 P km 12/8, 12/10, 13/2, 13/6 - and Widening of Culvert at 1 Km 13/8(MD376) 1 1 - Widening from Single lane to C Double lane in km 1/0-2/4 of 1-CRIDP- R Kallupatti Virudhunagar road 1392 11-12-M- Madurai Usilampatti 1.40 90.00 I and Reconstruction of culvert 1392 D at km 1/8,1/10 and P 2/4(MD956) - 1

MDR Page No 94 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from Single lane to R1-CRIDP- Double lane in km 2/4/-4/0 of 1393 I 11-12-M- Madurai Usilampatti Kallupatti Virudhunagar road 1.60 90.00 D 1393 and Reconstruction of culvert P at km 2/8 and 3/10(MD956) - 1 - Widening from Single lane to C Double lane in km 5/0-6/7 of 1-CRIDP- R Kallupatti Virudhunagar road 1394 11-12-M- Madurai Usilampatti 1.70 90.00 I and Reconstruction of culvert 1394 D at km 5/2, 6/2, 6/4, P 6/6,(MD956) - 1 - Widening from Single Lane C to Intermediate Lane of R1-CRIDP- Kokulam - Uthappanaickanur 1395 I 11-12-M- Madurai Usilampatti Road Km 21/6 - 3.80 100.00 D 1395 25/4including Reconstruction P of culvert at Km 21/8,22/10, - 24/4,24/6,24/8, 25/2(MD613) 1 1 1 - C Widening from Single Lane R to Intermediate Lane of 1-CRIDP- I Kokulam - Uthappanaickanur 1396 11-12-M- Madurai Usilampatti Road Km 25/4 - 29/2 3.80 100.00 D 1396 including Reconstruction of P culvert at Km 25/6, 26/6 - (i),(ii),,27/10,29/2(MD613) 1 1 1- - Widening from Single lane to C Intermediate lane of R Sholavandan-Valayapatti 1-CRIDP- I (via) Andipatti road km 8/6- 1397 11-12-M- Madurai Sholavandan 2.20 100.00 D 10/8 and Strengthening to 1397 P km 9/2-10/8 and - Reconstruction of culvert at 1 km 10/4(i)(ii)(MD568) 1 -

MDR Page No 95 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from Single lane to R Intermediate lane of 1-CRIDP- I Sholavandan-Valayapatti 1398 11-12-M- Madurai Sholavandan (via) Andipatti road km 10/8- 4.20 100.00 D 1398 15/0 and Reconstruction of P culvert at km 14/2, 14/4, 14/6 - , 14/8(MD568) 1 1 1- - Widening from Single lane to C Intermediate lane of R Sholavandan-Valayapatti 1-CRIDP- I (via) Andipatti road km 19/6- 1399 11-12-M- Madurai Sholavandan 23/6 and Reconstruction of 4.00 100.00 D 1399 culvert at km 19/10, P 21/2,21/4, 22/4 and - Widening Culvert at Km 1 23/6(MD568) 1 1- - Widening from Single Lane C to Intermediate Lane at Km R 0/0-3/0 of Chitalai - Thidiyan I Road via Vagaikulam, 1-CRIDP- D Munduvelampatti, 1400 11-12-M- Madurai Thirumangalam 3.00 100.00 P Valagankulam Road 1400 - including Reconstruction of 1 Culverts 1 0/4,0/6,1/2,1/6,1/8,2/4,2/6 - (i)(ii),2/10(MD954) 1 12 - Widening from Single Lane C to Intermediate Lane at Km R 3/0-5/6 of Chitalai - Thidiyan I Road via Vagaikulam, 1-CRIDP- D Munduvelampatti, 1401 11-12-M- Madurai Thirumangalam 2.60 100.00 P Valagankulam Road 1401 - including Reconstruction of 1 Culverts at Km 1 3/2,3/4,3/8,4/2(i)(ii),4/6,5/2,5/ - 4, 5/6(MD954) 1 2

MDR Page No 96 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Widening from Single Lane - to Intermediate Lane at Km C 5/6-8/6 of Chitalai - Thidiyan R1-CRIDP- Road via Vagaikulam, 1402 I 11-12-M- Madurai Thirumangalam Munduvelampatti, 3.00 100.00 D 1402 Valagankulam Road P including Reconstruction of - Culverts at Km 6/2,7/6 1 (i)(ii),7/10(MD954) 1 1 - Widening from Single Lane C to Intermediate Lane at Km R 8/6-11/0 of Chitalai - Thidiyan Road via I 1-CRIDP- Vagaikulam, 1403 D11-12-M- Madurai Thirumangalam 2.40 100.00 Munduvelampatti, P 1403 - Valagankulam Road 1 including Reconstruction of 1 Culverts at Km 8/10(i)(ii),10/8(MD954) - 1 1 Widening from Single Lane - to Intermediate Lane at Km C 11/0-14/0 of Chitalai - R Thidiyan Road via I 1-CRIDP- Vagaikulam, 1404 D11-12-M- Madurai Thirumangalam Munduvelampatti, 3.00 100.00 P 1404 Valagankulam Road - including Reconstruction of 1 Culverts at Km 1 11/10,12/8,13/4 (i)(ii) , 13/6, - 13/8,13/10(MD954) 1 - Widening from Single Lane C to Intermediate Lane at Km R 14/0-17/0 of Chitalai - Thidiyan Road via I 1-CRIDP- Vagaikulam, 1405 D11-12-M- Madurai Thirumangalam 3.00 80.00 Munduvelampatti, P 1405 - Valagankulam Road 1 including Reconstruction of 1 Culverts at Km 14/2 (i),(iii),(MD954) - 1

MDR Page No 97 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from Single Lane - to Intermediate Lane at Km C 17/0-19/2 of Chitalai - R Thidiyan Road via I Vagaikulam, D1-CRIDP- Munduvelampatti, 1406 P 11-12-M- Madurai Usilampatti 2.20 90.00 Valagankulam Road - 1406 including Reconstruction of 1 Culverts at Km 1 18/4(1),(2),18/6 and - Protective wall at Km 17/4- 1 18/0(MD954) 2 Widening & Improvements 69.16 2865.00 Total 1 1-CRIDP- Improvements to Elumalai 1407 - 11-12-M- Madurai Usilampatti 2.45 90.00 Road KM 0/150-2/6(MD104) C 1407 R 1 1-CRIDP- - Improvements to Elumalai 1408 11-12-M- Madurai Usilampatti 2.40 90.00 C Road KM 2/6-5/0(MD104) 1408 R Strengthening/ Improvements 4.85 180.00 Total 1 - Reconstruction of Culvert at 1-CRIDP- C km 2/10 & 3/6 of 1409 11-12-M- Madurai Sholavandan 75.00 R Sholavandan-Valayapatti 1409 I (via) Andipatti road(MD568) D P Bridges/ CD Works/ Others 1 No 75.00 Total Madurai 74.01 3120.00 Total 1 - Widening from IL to DL in Andipatty - Vellapparkovil C1-CRIDP- road Km.12/6 - 14/4 1410 R 11-12-M- Theni Andipatti 1.80 60.00 including construction of I 1410 D Retaining wall at km.13/8, P 13/10, 14/2 & 14/4(MD570) -

MDR Page No 98 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Widening from IL to DL and - improvements in Andipatty - C Vellapparkovil road in R1-CRIDP- Km.14/4 - 15/4 including 1411 I 11-12-M- Theni Andipatti construction of culvert 1.00 90.00 D 1411 km.14/10 & 15/4 and P construction of Retaining - wall (km.14/10 &15/4 - 1 1x5.60m)(MD570) 1 1 - Widening from IL to DL and improvements in Andipatty - C1-CRIDP- Vellapparkovil road in 1412 R 11-12-M- Theni Andipatti 1.60 75.00 Km.15/4-17/0. including I 1412 D construction of retaining P wall(MD570) 1- Widening from IL to DL in - km 9/0-12/0 of Veerapandi - C Nagalapuram road Including 1-CRIDP- R Reconstruction of culvert at 1413 11-12-M- Theni Bodinayakanur 3.00 99.00 I km9/10,10/6,11/6,11/8(i),11/ 1413 D 8 (ii), 11/10, 9/10, 10/6, 11/6, P 11/8(1) (2) - - 1x2.60M(MD734) 1 Widening from IL to DL in - km 12/0-15/2 of Veerapandi - C 1-CRIDP- Nagalapuram road Including R 1414 11-12-M- Theni Bodinayakanur Reconstruction of culvert at 3.20 80.00 I 1414 km 12/4,14/4 and Retaining D wall at km 13/6 12/4, 14/4 - P 1x2.60M(MD734) - 1 Widening from IL to DL in - km 8/6-11/8 of Veerapandi - C Seepalakottai road and R 1-CRIDP- improvements at km.8/6- I 1415 11-12-M- Theni Bodinayakanur 8/10, 11/300-11/800, 3.20 98.00 D 1415 Reconstruction of culvert at P km.11/8 including - construction of retaining wall 1 (11/8-1x3.60m)(MD735) 1

MDR Page No 99 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from IL to DL and C improvements in km 11/8- R 13/2 of Veerapandi - 1-CRIDP- I Seepalakottai road and 1416 11-12-M- Theni Bodinayakanur 1.40 83.00 D Reconstruction of culvertat 1416 P km.12/6, 12/8 including - construction of retaining wall 1 (1x2.60m)(MD735) 1 1 - C Widening from IL to DL and R 1-CRIDP- Improvements to Palayam- I 1417 11-12-M- Theni Cumbam Uppukottai Road Km 0/4-2/0 1.60 79.00 D 1417 including construction of P retaining wall(MD649) - 1 1 1 - C Widening from IL to DL and R1-CRIDP- Improvements to Palayam- 1418 I 11-12-M- Theni Cumbam Uppukottai Road Km 2/0-4/0 2.00 98.00 D 1418 including construction of P retaining wall(MD649) - 1 1 Widening from IL to DL and - 1-CRIDP- Improvements to Palayam- 1419 C11-12-M- Theni Bodinayakanur 1.00 49.00 Uppukottai Road Km.4/0- R 1419 5/0(MD649) I 1D Widening from DL to ML in - km 0/0-1/4, and bus lay bye C1-CRIDP- at km.0/2 of Andipatty- 1420 R 11-12-M- Theni Andipatti Jeyamangalam road 1.40 77.00 I 1420 including construction of D Retaining wall at km,0/2, P 0/4(MD649) 1- - Widening from DL to ML in km 1/4-3/0 of Andipatty- C1-CRIDP- Jeyamangalam road 1421 R 11-12-M- Theni Andipatti 1.60 99.00 including Reconstruction of I 1421 D culvert at km.1/6(i). (ii) and P 2/8 (1x2.60m)(MD763) -

MDR Page No 100 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from DL to ML in C km,3/0-5/0 of Andipatty- Jeyamangalam road , R1-CRIDP- Reconstruction of culvert at 1422 I 11-12-M- Theni Andipatti 2.00 99.00 km.3/10 including D 1422 P construction of Retaining - wall at km,3/4 (3/10- 1 1x3.60m)(MD763) 1 - Widening from SL to IL in C km.58/4 -60/0 of Kodai - R Cochin road including I 1-CRIDP- construction of pipe culvert 1423 D11-12-M- Theni Bodinayakanur @ Km 59/4 and widening of 1.60 95.00 P 1423 pipe culverts @ Km 58/6, - 58/10, 59/6 and retaining 1 wall at Km 58/6, 58/8, 58/10, 1 59/2, 59/8, 59/10(MD170) - 1 - Widening from SL to IL in C km.-60/0-61/4 of Kodai - R1-CRIDP- Cochin road including 1424 I 11-12-M- Theni Bodinayakanur construction of pipe culvert 1.40 80.00 D 1424 @ Km 60/2,60/4 and P retaining wall at Km 60/2, - 60/4,60/6(MD170) 1 1 - Widening from DL to ML in C km,km 5/0-6/6 of Andipatty- R Jeyamangalam road , 1-CRIDP- I including Reconstruction of 1425 11-12-M- Theni Andipatti 1.60 97.00 D culvert at km.5/2, & 5/6 and 1425 P construction of Retaining - wall at km.5/8, 6/4 (5/2, 5/6- 1 2.60m)(MD763) 1 1- - Widening from IL to DL and C improvements in Andipatty - R Vellapparkovil road in I 1-CRIDP- Km.17/0-17/8,Widening from 1426 D11-12-M- Theni Andipatti SL to DL and improvements 1.00 85.00 P 1426 in Km.17/8 - 18/0 and - construction of retaining wall 1 at km.17/2, 17/8, & 1 17/10(MD570) - 1

MDR Page No 101 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Widening from IL to DL in - km 4/8-6/8, 7/4-8/6, of C 1-CRIDP- Veerapandi - Seepalakottai R 1427 11-12-M- Theni Bodinayakanur road and improvements at 3.20 96.00 I 1427 km.7/4-8/6 including D construction of retaining P wall(MD735) - 1 Widening & Improvements 33.60 1539.00 Total 1 - 1-CRIDP- Improvements to C 1428 11-12-M- Theni Andipatti Pullimancombai road Km.8/4- 1.60 50.00 R 1428 10/0 (5.50m width)(MD667) I D 1 Improvements to - 1-CRIDP- Sankarapuram - C 1429 11-12-M- Theni Bodinayakanur Chinnamanur road km 4/2- 1.70 55.00 R 1429 5/4,7/8-8/3 (7..00m I width)(MD676) D 1 Improvements to - 1-CRIDP- Chinnamanur-Seepalakottai C 1430 11-12-M- Theni Cumbam Road Km 1/8-4/0 including 2.20 84.00 R 1430 construction of retaining wall I (7.00m width)(MD78) D 1 - Improvements to C1-CRIDP- Chinnamanur-Seepalakottai 1431 R 11-12-M- Theni Cumbam 1.60 61.00 Road Km 6/0-7/6 (7.00m I 1431 width)(MD78) D P 1- - Improvements to C Koduvilarpatti - R Seelayampatti road 1-CRIDP- I (via)S.Alagapuri km.13/835- 1432 11-12-M- Theni Cumbam 1.57 59.00 D 15/4 and reconstruction of 1432 P culvert including Retaining - wall at km.13/10,14/8 & 1 (13/10. 14/8 -1.50M)(MD612) 1

MDR Page No 102 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

1 Improvements to - Koduvilarpatti - C Seelayampatti road R1-CRIDP- (via)S.Alagapuri road 1433 I 11-12-M- Theni Cumbam km.15/4-18/0 and 2.60 85.00 D 1433 reconstruction of culvert at P km.15/8. 17/10. including - retaining wall (km,15/8, 1 17/10-1x1.50M)(MD612) 1 1 - Improvements to C1-CRIDP- Koduvilarpatti - 1434 R 11-12-M- Theni Cumbam Seelayampatti road 2.00 50.00 I 1434 (via)S.Alagapuri road D km.18/0-20/0(MD612) P Strengthening/ Improvements 13.27 444.00 Total 1 - Reconstruction of Minor C1-CRIDP- Bridge at Km.7/10 of 1435 R 11-12-M- Theni Periyakulam Jeyamangalam - 20.00 I 1435 Eluvanampatti road. D (1x5.60m)(MD600) 1P - Reconstruction of culvert at C1-CRIDP- km.3/10 of Veerapandi - 1436 R 11-12-M- Theni Bodinayakanur Seepalakottai road including 10.00 I 1436 Retaining wall D (1x1.50m)(MD735) 1P - Reconstruction of culvert @ 1-CRIDP- C km 14/10 of Palayam- 1437 11-12-M- Theni Bodinayakanur 12.00 R Uppukottai road (14/10- 1437 I 1x2.60m)(MD649) D 1P - Reconstruction of culvert at C km.7/8 and construction of 1-CRIDP- R culvert at km.2/6,11/6 of 1438 11-12-M- Theni Periyakulam 25.00 I Varatharajnagar - 1438 D Renganathapuram Road. P (2/6, 11/6-1x1.00)(MD732) -

MDR Page No 103 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Reconstruction of culvert at 1-CRIDP- C Km.6/4 of Periyakulam - 1439 11-12-M- Theni Periyakulam 10.00 R Devadanapatti road. (1- 1439 I 1.50m)(MD656) D 1P - Reconstruction of culvert at 1-CRIDP- C Km.6/10 of Periyakulam - 1440 11-12-M- Theni Periyakulam 18.00 R Devadanapatti road. 1440 I (1x1.50m)(MD656) D 1P Reconstruction of culvert at - Km 13/10 of Veerapandi- C1-CRIDP- Seepalakottai Road (1 x 1441 R 11-12-M- Theni Cumbam 10.00 2.60) and including I 1441 construction of Retaining D wall(MD735) P 1- - Reconstruction of Minor C1-CRIDP- Bridge at Km.7/2 of 1442 R 11-12-M- Theni Periyakulam Jeyamangalam - 30.00 I 1442 Eluvanampatti D road.(1x7.60m)(MD600) P 1- - Construction of Retaining C1-CRIDP- wall at Km.11/6-11/8 and 1443 R 11-12-M- Theni Andipatti 20.00 11/10 of Andipatty - I 1443 Vellapparkovil road(MD570) D P 1- Construction of retaining wall - & Concrete side drain in C1-CRIDP- berms including 1444 R 11-12-M- Theni Bodinayakanur 88.00 improvements of shoulders I 1444 in km.6/0-11/0 of Bodi - D Kurangani road(MD58) P 1- Construction of retaining wall - & Concrete side drain in C1-CRIDP- berms including 1445 R 11-12-M- Theni Bodinayakanur 85.00 improvements of shoulders I 1445 in km.11/0 -16/0 of Bodi - D Kurangani road(MD58) P -

MDR Page No 104 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Construction of Retaining C1-CRIDP- wall at km.4/7 - 5/0 of 1446 R 11-12-M- Theni Periyakulam Varatharajnagar - 20.00 I 1446 Renganathapuram D Road.(MD732) P 1- - Construction of Retainingwall C1-CRIDP- at km5/0- 5/4 of 1447 R 11-12-M- Theni Periyakulam Varatharajnagar - 20.00 I 1447 Renganathapuram D Road.(MD732) P 1- - Construction of Retainingwall C1-CRIDP- at km.0/6 - 1/2 of 1448 R 11-12-M- Theni Periyakulam 15.00 Periyakulam - Devadanapatti I 1448 road.(MD656) D P 1- - Construction of Retainingwall C1-CRIDP- at Km.2/7 - 3/0 of 1449 R 11-12-M- Theni Periyakulam 30.00 Jeyamangalam - I 1449 Eluvanampatti road.(MD600) D P - Bridges/ CD Works/ Others 15 Nos 413.00 Total Theni Total 46.87 2396.00 1 - Widening and Strengthening C from SL to IL in Km 3/0-4/0 R1-CRIDP- of Natchikulam - Sempatty 1450 I 11-12-M- Dindigul Nilakottai road including reconstruction 1.00 90.50 D 1450 of culvert at km 3/2(1& 2) P 3/4(1& 2), 3/6 and Retaining - wall at km 3/0-4/0 (MD643) 1 1

MDR Page No 105 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from SL to IL in km 34/6-37/0 of Melakkal - R1-CRIDP- Peranai road including 1451 I 11-12-M- Dindigul Nilakottai 2.40 72.00 reconstruction of culverts km D 1451 34/8, 35/4, 35/8, 36/2, 36/6, P 36/8,36/10 (MD262) - 1 1 - Widening and Strengthening C from SL to IL in Km 1/8-3/0 R1-CRIDP- of Natchikulam - Sempatty 1452 I 11-12-M- Dindigul Nilakottai road including reconstruction 1.20 87.00 D 1452 of culvert at km 2/2,2/8, 2/10 P and Retaining wall at km 2/4- - 3/0(MD643) 1 1 - C Widening and Strengthening SL to IL in Pannaikadu - R1-CRIDP- Mangalamcombu road in km 1453 I 11-12-M- Dindigul Palani 1.00 54.00 10/0-11/0 including D 1453 Reconstruction of Retaining P wall in km 10/6(MD325) - 1 1 - C Widening and Strengthening R1-CRIDP- from SL to IL in Km 0/0-1/8 1454 I 11-12-M- Dindigul Nilakottai of Natchikulam - Sempatty 1.80 89.00 D 1454 road including reconstruction P of culvert at km 1/2(MD643) - 1 1 1 - C Widening and Strengthening R1-CRIDP- SL to IL in Kodai - Pallangi 1455 I 11-12-M- Dindigul Palani road in km 8/0-9/4 including 1.40 75.00 D 1455 Reconstruction of culvert at P km 8/2, 8/10(MD897) - 1 1

MDR Page No 106 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening and Strengthening R1-CRIDP- SL to IL in Kodai - Pallangi 1456 I 11-12-M- Dindigul Palani road in km 6/8-8/0 including 1.20 60.00 D 1456 Reconstruction of culvert at P km 7/4(MD897) - 1 1 1 - Widening from SL to IL and C Strengthening to Km. 37/8- R1-CRIDP- 39/8 of Karur - Esanatham - 1457 I 11-12-M- Dindigul Vedachandur Vedasandur Road including 2.00 95.00 D 1457 Reconstruction of Culverts at P km 37/10, 38/2, - 39/6(MD606) 1 1 1 - C Widening from SL to IL and Strengthening to Km. 35/8 - R1-CRIDP- 37/8 of Karur - Esanatham - 1458 I 11-12-M- Dindigul Vedachandur 2.00 95.00 Vedasandur Road including D 1458 P Reconstruction of Culverts at - km 36/8(MD606) 1 1 1 - C Widening from SL to IL and Strengthening to Km. 22/4 - R1-CRIDP- 24/2 of Karur - Esanatham - 1459 I 11-12-M- Dindigul Vedachandur 1.80 90.00 Vedasandur Road and D 1459 P Reconstruction of Culvert at - km 23/2(MD606) 1 1 1 - C Widening from SL to IL and Strengthening to Km. 20/8- R1-CRIDP- 22/8 of Palaviduthi - Kadavur 1460 I 11-12-M- Dindigul Vedachandur 2.00 94.00 - Ayyalore Road including D 1460 P Reconstruction of Culvert at - Km. 22/4(MD648) 1 1

MDR Page No 107 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL and C Strengthening to Km. 18/8- 1-CRIDP- R 20/8 of Palaviduthi - Kadavur 1461 11-12-M- Dindigul Vedachandur 2.00 95.00 I - Ayyalore Road including 1461 D Reconstruction of Culverts at P Km.19/2(i,ii), 20/6.(MD648) - 1 - Widening from SL to IL and C Strengthening to Km. 27/0 - 28/8 of Pallapatty - R1-CRIDP- Aravakurichi - Esanatham - 1462 I 11-12-M- Dindigul Vedachandur 1.80 94.00 Gujiliamparai Road including D 1462 P Reconstruction of Pipe - Culvert at km 27/6, 1 27/10(MD650) 1 1 - Widening from SL to IL and C Strengthening to Km. 24/0 - R 25/0 & 26/0 - 27/0 of I 1-CRIDP- Pallapatty - Aravakurichi - 1463 D11-12-M- Dindigul Vedachandur Esanatham - Gujiliamparai 2.00 94.00 P 1463 Road including - Reconstruction of Pipe 1 Culverts at km 24/6,24/8, 1 26/4, 26/6(MD650) - 1 1 Widening Single Lane to - Intermediate lane and C 1-CRIDP- Strengthening in KM.21/0- R 1464 11-12-M- Dindigul Natham 22/2 of Melur - Samudrapatti 1.20 62.00 I 1464 Road (via) Seikkipatti. D Including Reconstruction of P culvert at Km 22/2.(MD892) - 1 - C Widening Single Lane to R Intermediate lane and I 1-CRIDP- Strengthening in KM.31/2 - 1465 D11-12-M- Dindigul Natham 32/8 of Natham - 1.60 91.00 P 1465 Pillayarnatham road, - including Reconstruction of 1 culvert at km 32/2(MD644) 1 - 1

MDR Page No 108 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening Single Lane to C Intermediate lane in km 19/0- 1-CRIDP- R 21/0 and Strengthening in 1466 11-12-M- Dindigul Natham 2.00 52.00 I KM.19/2, 20/6-21/0 of Melur - 1466 D Samudrapatti Road (via) P Seikkipatti(MD892) - 1 - Widening Single Lane to C Intermediate lane and R strengthening in KM.29/6 - 1-CRIDP- I 31/2 of Natham - 1467 11-12-M- Dindigul Natham 1.60 91.00 D Pillayarnatham road, 1467 P including Reconstruction of - culverts at km 30/4, 1 30/10(MD644) 1 1- - Widening Single Lane to C Intermediate lane and Strengthening in km 27/0- R1-CRIDP- 28/0 of Natham - 1468 I 11-12-M- Dindigul Natham 1.00 55.00 Pillayarnatham road, D 1468 P including Reconstruction of - culverts at km 1 27/2,27/6(MD644) 1 1 - Widening Single Lane to C Intermediate lane and R1-CRIDP- Strengthening in KM.25/2 - 1469 I 11-12-M- Dindigul Natham 27/0 of Natham - 1.80 78.00 D 1469 Pillayarnatham road, P including construction culvert - Km 25/6, 26/10(MD644) 1 1 - Widening Single Lane to C Intermediate lane and R1-CRIDP- Strengthening in KM.23/6 - 1470 I 11-12-M- Dindigul Natham 25/2 of Natham - 1.60 79.00 D 1470 Pillayarnatham road P including construction of - culvert at Km 23/10(MD644) 1

MDR Page No 109 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening Single Lane to R1-CRIDP- Intermediate lane and 1471 I 11-12-M- Dindigul Natham Strengthening in Km 21/6 - 2.00 79.00 D 1471 23/6 of Natham - P Pillayarnatham road(MD644) - 1 1 - Widening Single Lane to C Intermediate lane in km 28/0- R1-CRIDP- 29/6 and Strengthening in 1472 I 11-12-M- Dindigul Natham km 29/0-29/6 of Natham - 1.60 51.00 D 1472 Pillayarnatham road, P including Reconstruction of - culverts at km 28/4(MD644) 1 1 1 - C Widening and Strengthening SL to IL in Pannaikadu - R1-CRIDP- Mangalamcombu road in km 1473 I 11-12-M- Dindigul Dindigul 1.00 51.00 11/0-12/0 including D 1473 P Reconstruction of Retaining - wall in km 11/6(MD325) 1 1 Widening & Improvements 39.00 1873.50 Total 1 1-CRIDP- Strengthening to Kodai - - 1474 11-12-M- Dindigul Palani Cochin road km 8/0- 1.00 51.00 C 1474 9/0(MD170) R 1 - 1-CRIDP- Strengthening Palani - C 1475 11-12-M- Dindigul Palani Kolumam road km 10/0-11/2, 1.35 82.00 R 1475 11/6-11/750(MD901) I D 1 - Strengthening to Kodai - 1-CRIDP- C Cochin road km 7/0-8/0 1476 11-12-M- Dindigul Palani 1.00 58.00 R inlcuding Providing paving 1476 I block at km 5/10(MD170) D

MDR Page No 110 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Strengthening Palani - C 1477 11-12-M- Dindigul Palani Kolumam road km 3/0- 1.00 58.00 R 1477 4/0(MD901) I D 1 Strengthening to Goshen - 1-CRIDP- road km 60/0-61/0 including C 1478 11-12-M- Dindigul Palani Reconstruction of Retaining 1.00 58.00 R 1478 wall in km 60/4, I 60/10(MD117) D 1 Strengthening to Goshen - 1-CRIDP- Road at Km. 59/0 - 60/0 C 1479 11-12-M- Dindigul Palani including Providing the 1.00 56.00 R 1479 Paving block at Km. 56/2, I 61/4 & 61/6(MD117) D 1 Strengthening to Natham - - 1-CRIDP- Pillaiyarnatham Road in Km C 1480 11-12-M- Dindigul Natham 19/6-21/6 including 2.00 80.00 R 1480 reconstruction of culvert at I km 21/2(MD644) D 1 - 1-CRIDP- Strengthening to Natham - C 1481 11-12-M- Dindigul Natham Pillaiyarnatham Road in Km 2.60 75.00 R 1481 17/0-19/6(MD644) I D 1 1-CRIDP- Strengthening to Natham - - 1482 11-12-M- Dindigul Natham Pillaiyarnatham Road in Km 2.00 61.00 C 1482 15/0-17/0(MD644) R I 1 1-CRIDP- Strengthening to Natham - 1483 - 11-12-M- Dindigul Natham Pillaiyarnatham Road in Km 2.40 89.00 C 1483 12/6 - 15/0(MD644) R 1 Strengthening to Natham - - 1-CRIDP- Pillaiyarnatham Road in Km C 1484 11-12-M- Dindigul Natham 10/6 - 12/6, including Re- 2.00 88.00 R 1484 Construction of culvert at Km I 11/2(MD644) D 1P - 1-CRIDP- Strengthening to Natham - 1485 C11-12-M- Dindigul Natham Pillaiyarnatham Road in Km 2.20 80.00 R 1485 8/4 - 10/6(MD644) I Strengthening/ Improvements 19.55 836.00 Total

MDR Page No 111 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs Dindigul 58.55 2709.50 Total 1 - C Widening SL to IL and improvements in km. 5/0- 6/0 R1-CRIDP- of NH 210 - Vattanam Road 1486 I 11-12-M- Sivagangai Karaikudi 1.00 58.00 and Reconstruction of Pipe D 1486 P culvert at Km 4/10, - 6/10,7/10(MD917) 1 1 1 - C Widening SL to IL and R1-CRIDP- improvements in km. 6/0- 1487 I 11-12-M- Sivagangai Karaikudi 2.29 99.00 8/290 of NH 210 - Vattanam D 1487 P Road(MD917) - 1 1 1 - Widening SL to IL and C1-CRIDP- Improvements to NH 49 to 1488 R 11-12-M- Sivagangai Manamadurai 1.90 92.00 Kattanur Road Km 7/900- I 1488 D 9/8(MD579) P - 1 Widening SL to IL and - 1-CRIDP- Improvements to NH 49 to 1489 C11-12-M- Sivagangai Manamadurai 1.90 93.00 Kattanur Road Km 9/8- R 1489 11/7(MD579) I 1D - Widening from SL to IL and C1-CRIDP- improvements in km, 18/0- 1490 R 11-12-M- Sivagangai Karaikudi 1.60 77.00 19/6 of Kunnakudi - I 1490 D Kanadukathan road(MD209) P -

MDR Page No 112 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from SL to IL and R1-CRIDP- improvements in km, 16/6- 1491 I 11-12-M- Sivagangai Karaikudi 1.40 65.00 18/0 of Kunnakudi - D 1491 P Kanadukathan road(MD209) - 1 1 1 - C Widening from SL to IL km. R1-CRIDP- 13/4-15/0 and improvements 1492 I 11-12-M- Sivagangai Karaikudi from km.13/4-14/0 of 1.60 53.00 D 1492 Kunnakudi - Kanadukathan P road(MD209) - 1 1 1 - C Widening from SL to IL km. 11/8-13/4 & improvements R1-CRIDP- from km 12/2-13/4 including 1493 I 11-12-M- Sivagangai Karaikudi 1.60 71.00 reconstruction of culvert at D 1493 P km 12/2,12/8 of Kunnakudi - - Kanadukathan road(MD209) 1 1 1 - C Widening from SL to IL and R1-CRIDP- improvements of Elayangudi - 1494 I 11-12-M- Sivagangai Sivaganga 2.00 93.00 Vandal - Sukkirapatti road D 1494 P km. 14/6-16/6(MD593) - 1 1 1 - C Widening from SL to IL and improvements of Elayangudi - R1-CRIDP- Vandal - Sukkirapatti raod 1495 I 11-12-M- Sivagangai Sivaganga 2.20 95.00 km. 12/4-14/6 and including D 1495 P Reconstruction of pipe - culvert at km, 12/6(MD593) 1 1

MDR Page No 113 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from SL to IL and R1-CRIDP- improvements of Elayangudi - 1496 I 11-12-M- Sivagangai Sivaganga 2.00 92.00 Vandal - Sukkirapatti raod D 1496 P km. 10/4-12/4(MD593) - 1 1 1 - C Widening from SL to IL of Okkur -Keelapoongudi road R1-CRIDP- km. 17/8-20/8 and 1497 I 11-12-M- Sivagangai Sivaganga 3.00 88.00 reconstruction of Culvert at D 1497 P km. 18/8,18/10, - 19/2,19/6,20/6,20/8(MD899) 1 1 1 - C Widening from Sl to IL in km 19/6-20/6 including R1-CRIDP- reconstruction of culvert at 1498 I 11-12-M- Sivagangai Karaikudi 1.00 53.00 km 19/8,19/10,20/2,20/6 of D 1498 P Kunnakudi -Kanadukathan - road(MD209) 1 1 1 - C Wdg from SL to IL at km. R1-CRIDP- 12/0-15/0 of Manamadurai - 1499 I 11-12-M- Sivagangai Manamadurai 3.00 74.00 Paramakudi (via) D 1499 P T.Pudukottai road(MD627) - 1 1 1 - C Widening from SL to IL of R1-CRIDP- Manamadurai - Paramakudi 1500 I 11-12-M- Sivagangai Manamadurai 3.00 74.00 (via) T.Pudukottai road km. D 1500 P 15/0-18/0(MD627) - 1 1

MDR Page No 114 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from SL-IL km 15/0-16/6 and Improvements R1-CRIDP- from km 15/4-16/6 including 1501 I 11-12-M- Sivagangai Karaikudi 1.60 68.00 reconstruction of culvert at D 1501 P km 15/4 of Kunnakudi - - Kanadukathan road(MD209) 1 1 1 - C Widening from SL to IL of Okkur -Keelapoongudi road R1-CRIDP- km. 20/8-23/0 including 1502 I 11-12-M- Sivagangai Sivaganga 2.20 77.00 reconstruction of Culvert at D 1502 P km.21/2,21/4,21/10,22/2,22/ - 8(MD299) 1 1 1 - C Widening from SL to IL of R1-CRIDP- Okkur -Keelapoongudi road 1503 I 11-12-M- Sivagangai Sivaganga km.23/0-24/683 including 1.68 55.00 D 1503 reconstruction of culvet at P km. 23/6-23/10-24/6(MD299) - 1 1 1 - C Widening from IL to DL Km R1-CRIDP- 2/6 - 4/4 of Karaikudi - 1504 I 11-12-M- Sivagangai Karaikudi Soorakudi Road including 1.80 52.00 D 1504 reconstruction of culvert at P km 3/2,3/10(MD974) - 1 1 1 - C Widening SL to IL in R1-CRIDP- Thiruppuvanam - 1505 I 11-12-M- Sivagangai Manamadurai 3.00 72.00 Pulvaikkarai narikkudi Road D 1505 P Km 2/0-5/0(MD266) - 1 1

MDR Page No 115 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL and C improvements Devakottai - Pudukottai Dist. Border Road R1-CRIDP- (via) Kannankudi 15/4-17/4 1506 I 11-12-M- Sivagangai Karaikudi 2.00 100.00 and Reconstruction of Pipe D 1506 P culvert at Km - 15/8,15/10,16/2,16/6(MD973 1 ) 1 1 - Widening SL to IL and C improvements to Devakottai - R1-CRIDP- Pudukottai Dist. Border Road 1507 I 11-12-M- Sivagangai Karaikudi (via) Kannankudi km 17/4- 2.00 99.00 D 1507 19/4 and Reconstruction of P Pipe culvert at Km 17/10, - 18/4,18/10,19/2(MD973) 1 1 1 - Widening SL to IL and C improvements Devakottai - R1-CRIDP- Pudukottai Dist. Border Road 1508 I 11-12-M- Sivagangai Karaikudi (via) Kannankudi km 19/4 - 2.00 100.00 D 1508 21/4 and Reconstruction of P Pipe culvert at Km 19/6(i)(ii) - ,20/2,21/6(MD973) 1 1 Widening & Improvements 45.77 1800.00 Total 1 Improvements to Koilapatty - 1-CRIDP- Junction road to Pudukottai 1509 C11-12-M- Sivagangai Tirupattur 1.20 45.00 District Border road km. 1/6- R 1509 2/8.(MD176) I 1D Improvements Devakottai - - 1-CRIDP- Pudukottai Dist. Border Road 1510 C11-12-M- Sivagangai Karaikudi 2.40 67.00 (via) Kannankudi 4/0- R 1510 6/4(MD973) I 1D Improvements to Koilapatty - 1-CRIDP- Junction road to Pudukottai 1511 C11-12-M- Sivagangai Tirupattur 1.80 67.00 District Border road km. 5/0- R 1511 6/8(MD176) I D

MDR Page No 116 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to - 1-CRIDP- Padamathur - 1512 C11-12-M- Sivagangai Manamadurai 2.40 70.00 Thiruppachethy road km. 4/6- R 1512 7/0(MD647) I 1D - 1-CRIDP- Improvements to Kottaiyur - 1513 C11-12-M- Sivagangai Karaikudi Aranthangi road Km. 11/0- 3.00 89.00 R 1513 14/0(MD185) I D Strengthening/ Improvements 10.80 338.00 Total Sivagangai 56.57 2138.00 Total 1 Widening and Improvements - from SL to IL Km.76/900- 1-CRIDP- C 78/300 of Kallikudi - 1514 11-12-M- Ramnad Mudhukulathur 1.40 63.00 R Kariyapatti - Thiruchuli - 1514 I Kamuthi - Sayalkudi D Road(MD768) P 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.9/2-10/800 1515 11-12-M- Ramnad Mudhukulathur 1.60 98.00 R of Paramakudi - Keerandai 1515 I Road(MD652) D P 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.10/800- 1516 11-12-M- Ramnad Mudhukulathur 1.60 98.00 R 12/400 of Paramakudi - 1516 I Keerandai Road(MD652) D P 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.12/4-14/0 1517 11-12-M- Ramnad Mudhukulathur 1.60 98.00 R of Paramakudi - Keerandai 1517 I Road(MD652) D P 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.14/0- 1518 11-12-M- Ramnad Mudhukulathur 1.60 98.00 R 15/600 of Paramakudi - 1518 I Keerandai Road(MD652) D P

MDR Page No 117 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.15/600- 1519 11-12-M- Ramnad Mudhukulathur 1.60 98.00 R 17/200 of Paramakudi - 1519 I Keerandai Road(MD652) D P 1 - Widening and Strenthening 1-CRIDP- C from SL to IL Km.17/2-18/0of 1520 11-12-M- Ramnad Mudhukulathur 0.80 50.00 R Paramakudi - Keerandai 1520 I Road(MD652) D P 1 - Widening and Improvements C1-CRIDP- from SL to IL Km.16/0-18/0 1521 R 11-12-M- Ramnad Ramnad of Thiruppullani - 2.00 99.00 I 1521 Pirappanvalasai D Road(MD717) P 1 - Widening from SL to IL C1-CRIDP- Km.21/6-21/8 of 1522 R 11-12-M- Ramnad Mudhukulathur Mudukulathur - 0.20 7.00 I 1522 Uthirakosamangai D Road(MD637) P 1 - Widening and Improvements C1-CRIDP- from SL to IL Km.8/0-10/0 of 1523 R 11-12-M- Ramnad Ramnad Thiruppullani - 2.00 99.00 I 1523 Pirappanvalasai D Road(MD717) P 1 - Widening and Improvements C1-CRIDP- from SL to IL Km.10/0-11/8 1524 R 11-12-M- Ramnad Ramnad of Thiruppullani - 1.80 99.00 I 1524 Pirappanvalasai D Road(MD717) P 1 - Widening and Improvements C1-CRIDP- from SL to IL Km.14/2-16/0 1525 R 11-12-M- Ramnad Ramnad of Thiruppullani - 1.80 99.00 I 1525 Pirappanvalasai D Road(MD717) P

MDR Page No 118 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements 1-CRIDP- C from SL to IL Km.13/0-13/2 1526 11-12-M- Ramnad Mudhukulathur 0.20 9.00 R of Mudukulathur - Kamuthi 1526 I Road(MD273) D P

MDR Page No 119 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening and Improvements from SL to IL Km.82/0- C1-CRIDP- 83/100 of Kallikudi - 1527 R 11-12-M- Ramnad Mudhukulathur 1.10 64.00 Kariyapatti - Thiruchuli - I 1527 D Kamuthi - Sayalkudi P Road(MD768) - Widening & Improvements 19.30 1079.00 Total 1 Improvements to - 1-CRIDP- Thiruppullani - 1528 C11-12-M- Ramnad Ramnad 2.00 50.00 Pirappanvalasai Road R 1528 Km.2/0-4/0(MD717) I 1D Improvements to Ramnad- - 1-CRIDP- Emaneswaram (via) 1529 C11-12-M- Ramnad Paramakudi 1.80 72.00 Nainakoil road at km.30/2- R 1529 I 31/0 & 34/0-35/0(MD390) D 1 Improvements to - 1-CRIDP- Mudukulathur - Kamuthi 1530 C11-12-M- Ramnad Mudhukulathur 1.60 70.00 Road Km.7/0-8/0 and 9/0- R 1530 I 9/6(MD273) D 1 Strenthening to - 1-CRIDP- Mudukulathur - Kamuthi 1531 C11-12-M- Ramnad Mudhukulathur 2.00 98.00 Road Km.0/0-1/6 & 2/4- R 1531 I 2/8(MD273) D 1 Improvements from Km. - 1-CRIDP- 69/6-72/0 of Kallikudi - 1532 C11-12-M- Ramnad Mudhukulathur Kariyapatti - Thiruchuli - 2.40 98.00 R 1532 Kamuthi - Sayalkudi I Road(MD768) D 1 - 1-CRIDP- Improvements to 1533 C11-12-M- Ramnad Paramakudi Paramakudi Keerandai road 2.00 64.00 R 1533 at km.0/0-2/0(MD652) I D 1 Improvements to Ramnad- - 1-CRIDP- Emaneswaram (via) 1534 C11-12-M- Ramnad Paramakudi 2.00 79.00 Nainakoil road at km.35/0- R 1534 I 37/0(MD390) D

MDR Page No 120 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Improvements to - 1-CRIDP- Thiruvadanai-S.P.Pattinam 1535 C11-12-M- Ramnad Tiruvadanai 3.20 80.00 road km.1/6-2/6, 3/0-3/2 & R 1535 I 8/2-10/2(MD916) D 1 - 1-CRIDP- Improvements to NH210 to 1536 C11-12-M- Ramnad Tiruvadanai Vattanam road km.11/2-13/2 3.80 83.00 R 1536 & 14/2 - 16/0(MD917) I D 1 Improvements to - 1-CRIDP- Paramakudi Keerandai road 1537 C11-12-M- Ramnad Paramakudi 2.00 64.00 at km.2/0-3/0 and 4/0- R 1537 I 5/0(MD652) D 1 Improvements to - 1-CRIDP- Mudukulathur - Sikkal Road 1538 C11-12-M- Ramnad Mudhukulathur 1.20 88.00 Km.4/6-5/2 and 10/2- R 1538 I 10/8(MD976) D 1 - 1-CRIDP- Improvements to 1539 C11-12-M- Ramnad Mudhukulathur Mudukulathur - Sikkal Road 1.30 94.00 R 1539 Km.2/0-3/3(MD976) I D 1 Improvements to - 1-CRIDP- Thiruppullani - 1540 C11-12-M- Ramnad Ramnad 2.00 50.00 Pirappanvalasai Road R 1540 I Km.6/0-8/0(MD717) D 1 - 1-CRIDP- Improvements to 1541 C11-12-M- Ramnad Mudhukulathur Mudukulathur - Sikkal Road 1.30 94.00 R 1541 Km.3/3-4/6(MD976) I D Strengthening/ Improvements 28.60 1084.00 Total 1 - 1-CRIDP- Construction of slab culvert C 1542 11-12-M- Ramnad Mudhukulathur at Km.19/6 of Paramakudi- 23.00 R 1542 Keeranthai road(MD652) I D Bridges/ CD Works/ Others 1 No 23.00 Total

MDR Page No 121 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs

Ramnad 47.90 2186.00 Total

Madurai Other works 17 Nos 283.90 12549.50 Circle Total

1 - Widening SL to IL and C Improvements in Km 6/0 - 1-CRIDP- R 8/0 of Nanguneri - 1543 11-12-M- Tirunelveli Nanguneri 2.00 90.00 I Moolaikaraipatti Road 1543 D including CD P Works.(MD292) - 1 - Widening SL to IL and C Improvements in Km 8/0 - 1-CRIDP- R 10/0 of Nanguneri - 1544 11-12-M- Tirunelveli Nanguneri 2.00 90.00 I Moolaikaraipatti Road 1544 D including CD P Works.(MD292) - 1 - C Widening from SL to DL in 1-CRIDP- R Km 2/2 - 2/4 of Reddiyarpatti 1545 11-12-M- Tirunelveli Palayamkottai 0.20 6.00 I - Vijayanarayanam 1545 D Road.(MD403) P - 1 - Widening from SL - IL and C Improvements in Km 23/6 - 1-CRIDP- R 25/6 of Reddiyarpatti - 1546 11-12-M- Tirunelveli Nanguneri 2.00 100.00 I Vijayanarayanam Road 1546 D including CD P Works.(MD403) - 1 - Widening from SL - IL and C 1-CRIDP- Improvements in Km 25/6 - R 1547 11-12-M- Tirunelveli Nanguneri 27/6 of Reddiyarpatti - 2.00 100.00 I 1547 Vijayanarayanam D Road.(MD403) P - 1

MDR Page No 122 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL - IL and C Improvements in Km 27/6 - 1-CRIDP- R 29/6 of Reddiyarpatti - 1548 11-12-M- Tirunelveli Nanguneri 2.00 100.00 I Vijayanarayanam Road 1548 D including CD P Works.(MD403) - 1 - Widening from SL - IL and C 1-CRIDP- Improvements in Km 29/6 - R 1549 11-12-M- Tirunelveli Nanguneri 31/6 of Reddiyarpatti - 2.00 100.00 I 1549 Vijayanarayanam D Road.(MD403) P - 1 Widening from SL - IL in Km - 31/6 - 33/0, 33/2 - 34/0 and C 1-CRIDP- Improvements in Km 31/6 - R 1550 11-12-M- Tirunelveli Nanguneri 32/0 & 33/2 - 34/0 of 2.20 99.00 I 1550 Reddiyarpatti - D Vijayanarayanam P Road.(MD403) - 1 - Widening and Improvements C from SL - IL in Km 34 - 36/0 1-CRIDP- R of Reddiyarpatti - 1551 11-12-M- Tirunelveli Nanguneri 2.00 80.00 I Vijayanarayanam Road 1551 D including CD P Works.(MD403) - 1 - Widening from SL - IL and C Improvements in Km 37/0 - 1-CRIDP- R 39/0 of Reddiyarpatti - 1552 11-12-M- Tirunelveli Nanguneri 2.00 100.00 I Vijayanarayanam Road 1552 D including CD P Works.(MD403) - 1 - Widening from SL - IL and C 1-CRIDP- Improvements in Km 39/0 - R 1553 11-12-M- Tirunelveli Nanguneri 40/8 of Reddiyarpatti - 1.80 80.00 I 1553 Vijayanarayanam D Road.(MD403) P - 1

MDR Page No 123 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening from SL - IL in Km 1-CRIDP- R 22/8 - 24/8 of Karungadal - 1554 11-12-M- Tirunelveli Nanguneri 2.00 50.00 I Munanjipatti Road including 1554 D CD Works.(MD151) P - 1 - Widening from SL - IL and C 1-CRIDP- Improvements in Km 12/8 - R 1555 11-12-M- Tirunelveli Nanguneri 14/0 of Karungulam - 1.20 55.00 I 1555 Moolaikaraipatti Road D including CD works.(MD152) P - 1 - Widening from SL - IL and C Improvements in Km 14/0 - 1-CRIDP- R 15/6 of Karungulam - 1556 11-12-M- Tirunelveli Nanguneri 1.60 75.00 I Moolaikaraipatti Road 1556 D including CD P Works.(MD152) - 1 - Widening from SL - IL and C 1-CRIDP- Improvements in Km 4/6 - R 1557 11-12-M- Tirunelveli Alangulam 5/0 of Ambasamudram - 0.40 27.00 I 1557 Alangulam Road with D Protective Works.(MD14) P - 1 - Widening and Improvements C from SL - IL in Km 10/8 - 1-CRIDP- R 11/4 of VK Pudur - 1558 11-12-M- Tirunelveli Alangulam 0.60 60.00 I Shanmuganallur Road 1558 D including Minor Bridge at Km P 10/10.(MD541) - 1 Widening from SL - IL in Km - 11/4 - 13/4 and C 1-CRIDP- Improvements in Km 12/2 - R 1559 11-12-M- Tirunelveli Alangulam 12/8 of VK Pudur - 2.00 60.00 I 1559 Shanmuganallur Road D including Pipe Culvert in Km P 13/4.(MD541) - 1

MDR Page No 124 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs Widening & Improvements 28.00 1272.00 Total 1 Improvements to - 1-CRIDP- Ambasamudram - 1560 C11-12-M- Tirunelveli Alangulam 3.00 95.00 Alangulam Road Km 12/0 - R 1560 15/0.(MD14) I 1 - 1-CRIDP- Improvements to Eruvadi - 1561 C11-12-M- Tirunelveli Nanguneri Thirukkurankudi Road Km 1.00 35.00 R 1561 1/0 - 2/0.(MD112) I 1 - 1-CRIDP- Improvements in km 0/0-1/4 1562 C11-12-M- Tirunelveli Tirunelveli of Theneerkulam 1.40 35.00 R 1562 Road.(MD919) I 1 - 1-CRIDP- Improvements in km 6/0 - 1563 C11-12-M- Tirunelveli Palayamkottai 8/0 of Kokkirakulam - 2.00 72.00 R 1563 Nanguneri Road.(MD178) I Strengthening/ Improvements 7.40 237.00 Total 1 Reconstruction of culvert at - 1-CRIDP- Km 0/2 of Nanguneri - 1564 C11-12-M- Tirunelveli Nanguneri 6.00 Moolaikaraipatti R 1564 I Road.(MD292) 1D Reconstruction of Culvert at - 1-CRIDP- Km 0/4 of Eruvadi - 1565 C11-12-M- Tirunelveli Nanguneri 6.50 Thirukkurankudi R 1565 I Road.(MD112) D Bridges/ CD Works/ Others 2 Nos 12.50 Total Tirunelveli 35.40 1521.50 Total 1 - C Widening SL to IL in km 0/0- R1-CRIDP- 2/6 of Vadakarai - 1566 I 11-12-M- Thenkasi Kadaianallur 2.60 70.00 Adavinainar Dam road D 1566 P including CD works.(MD924) - 1 1

MDR Page No 125 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL in km 2/6- C 4/0 of Vadakarai - R1-CRIDP- Adavinainar Dam road and 1567 I 11-12-M- Thenkasi Kadaianallur improvements in km 3/750 - 1.40 90.00 D 1567 4/0 including Recontruction P of weak & narrow minior - bridge at Km 2/8(MD924) 1 1 - C Widening SL to IL in km 4/0- R1-CRIDP- 5/6 of Vadakarai - 1568 I 11-12-M- Thenkasi Kadaianallur 1.60 80.00 Adavinainar Dam road D 1568 P including CD works.(MD924) - 1 1 - C Widening SL to IL in km 5/6- 6/8 of Vadakarai - R1-CRIDP- Adavinainar Dam road & 1569 I 11-12-M- Thenkasi Kadaianallur 1.20 90.00 improvements in Km 6/2-6/8 D 1569 P including CD works and protective works(MD924) - 1 1 - C Widening SL to IL and R1-CRIDP- Improvements in Km 8/0 - 1570 I 11-12-M- Thenkasi Sankarankoil 10/0 of Sankarankovil - 2.00 105.00 D 1570 Thiruvenkadam Road P including CD works,(MD408) - 1 1 - C Widening SL to IL and R1-CRIDP- Improvements in Km 10/0 - 1571 I 11-12-M- Thenkasi Sankarankoil 12/0 of Sankarankovil - 2.00 100.00 D 1571 Thiruvenkadam Road P including CD works,(MD408) - 1 1

MDR Page No 126 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - C Widening SL to IL and R1-CRIDP- Strengthening in Km 12/0 - 1572 I 11-12-M- Thenkasi Sankarankoil 13/6 of Sankarankovil - 1.60 100.00 D 1572 Thiruvenkadam Road P including CD works,(MD408) - 1 1 - C Widening SL to IL and R1-CRIDP- Strengthening in Km 13/6 - 1573 I 11-12-M- Thenkasi Sankarankoil 15/0 of Sankarankovil - 1.40 91.00 D 1573 Thiruvenkadam Road P including CD works,(MD408) - 1 1 - C Widening SL to IL and R1-CRIDP- Strengthening in Km 15/0 - 1574 I 11-12-M- Thenkasi Sankarankoil 16/4 of Sankarankovil - 1.40 90.00 D 1574 Thiruvenkadam Road P including CD works,(MD408) - 1 1 - C Widening SL to IL and R1-CRIDP- Strengthening in Km 16/4 - 1575 I 11-12-M- Thenkasi Sankarankoil 17/6 of Sankarankovil - 1.20 70.00 D 1575 Thiruvenkadam Road P including CD works,(MD408) - 1 1 - C Widening SL to IL and R1-CRIDP- Improvements in km 0/0-1/8 1576 I 11-12-M- Thenkasi Kadaianallur of Ayikudy - Nainagaram 1.80 100.00 D 1576 road including CD P works,(MD6) - 1 1

MDR Page No 127 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening SL to IL and C Improvements in km 1/8-3/2 R1-CRIDP- of Ayikudy - Nainagaram 1577 I 11-12-M- Thenkasi Kadaianallur road including CD works 1.40 80.00 D 1577 including Land aquisition for P bridge at km 9/8 of Tenkasi - - Madurai road.(MD6) 1 1 Widening & Improvements 19.60 1066.00 Total 1 - Improvements to Courtallam - 1-CRIDP- C Mathalamparai road km 2/4- 1578 11-12-M- Thenkasi Tenkasi 1.80 62.00 R 4/2 including CD 1578 I works.(MD88) D 1 - 1-CRIDP- Improvements to C 1579 11-12-M- Thenkasi Kadaianallur Kadayanallur - Valasai road 2.60 75.00 R 1579 km 3/6-6/2(MD132) I D Strengthening/ Improvements 4.40 137.00 Total Thenkasi 24.00 1203.00 Total 1 - C Widening and Improvements from SL to IL in Km 13/0 - R1-CRIDP- 14/0 of Meignanapuram- 1580 I 11-12-M- Tuticorin Srivaikundam 1.00 80.00 Munanjipatti Road including D 1580 P CD Works,Retaining wall at - km 13/10(MD261) 1 1 - Widening from SL to IL in km C1-CRIDP- 0/0-3/0 of Peikulam - 1581 R 11-12-M- Tuticorin Srivaikundam 3.00 70.00 Perungulam Road including I 1581 CD Works(MD346) D P -

MDR Page No 128 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL in km C1-CRIDP- 3/0-5/0 of Peikulam - 1582 R 11-12-M- Tuticorin Srivaikundam 2.00 40.00 Perungulam Road including I 1582 CD Works(MD346) D P 1- - Widening from SL to IL in km C1-CRIDP- 5/0-9/6 of Peikulam - 1583 R 11-12-M- Tuticorin Srivaikundam 4.60 90.00 Perungulam Road including I 1583 CD Works(MD346) D P 1- - Widening and improvements C1-CRIDP- from SL to IL in Km 14/0 - 1584 R 11-12-M- Tuticorin Srivaikundam 15/0 of Meignanapuram- 1.00 70.00 I 1584 Munanjipatti Road including D CD works(MD261). P 1- - Widening and improvements C1-CRIDP- from SL to IL in Km 15/0 - 1585 R 11-12-M- Tuticorin Srivaikundam 16/0 of Meignanapuram- 1.00 67.00 I 1585 Munanjipatti Road including D CD works. (MD261) P 1- - Widening and Improvements C1-CRIDP- SL to IL in Km 16/0 - 17/0 1586 R 11-12-M- Tuticorin Srivaikundam and rebuilding in km 16/0- 1.00 67.00 I 1586 16/8 of Meignanapuram- D Munanjipatti Road (MD261) P 1- - Widening and Improvements C1-CRIDP- from SL to IL in Km 17/0 - 1587 R 11-12-M- Tuticorin Srivaikundam 1.00 67.00 18/0 and of Meignanapuram- I 1587 Munanjipatti Road (MD261) D P - Widening & Improvements 14.60 551.00 Total

MDR Page No 129 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 Reconstruction of Culvert at - 1-CRIDP- km 4/2 of Thoothukudi - 1588 C11-12-M- Tuticorin Ottapidaram 10.00 Tharuvaikulam Road R 1588 (MD484) I D Bridges/ CD Works/ Others 1 No 10.00 Total Tuticorin 14.60 561.00 Total 1 - C Widening from SL to IL of 1-CRIDP- R km 12/8-16/0 of Sattur- 1589 11-12-M- Virudhunagar Sattur 3.20 70.00 I Elayirampannai- Guganparai 1589 D road(MD681) P - 1 - Widening from SL to IL of C km 16/0-19/0 of Sattur- 1-CRIDP- R Elayirampannai- Guganparai 1590 11-12-M- Virudhunagar Sattur 3.00 98.00 I road and inculding 1590 D reconstruction of Minor P Bridge at Km 16/8(MD681) - 1 - Widening from SL to IL of C km 19/0-22/211 of Sattur- 1-CRIDP- R Elayirampannai- Guganparai 1591 11-12-M- Virudhunagar Sattur 3.21 92.00 I road and inculding 1591 D reconstruction of Minor P Bridge at Km 20/4(MD681) - 1 - Widening SL to IL Km 0/0- C 2/6 including Improvements R1-CRIDP- Km 0/0-1/5 & 2/0-2/6 to 1592 I 11-12-M- Virudhunagar Sivakasi Viswanatham - 2.60 98.00 D 1592 Venkadachalapuram road P and reconstruction of culvert - at Km 1/2 and 1/4.(MD1048) 1 1

MDR Page No 130 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL Km C 2/6-5/0 including 1-CRIDP- R Improvements Km 4/6-5/0 to 1593 11-12-M- Virudhunagar Sivakasi 2.40 65.00 I Viswanatham - 1593 D Venkadachalapuram P road(MD1048) - 1 - Widening from SL to IL Km C 5/0-8/2 and Improvements to 1-CRIDP- R Km 7/8-8/2 of Viswanatham - 1594 11-12-M- Virudhunagar Sattur 3.20 73.00 I Venkadachalapuram road 1594 D and reconstruction culvert at P km 6/4, 8/2.(MD1048) - 1 Widening from SL to IL in - Km 8/2-9/8 and C 1-CRIDP- Improvements to R 1595 11-12-M- Virudhunagar Sattur Viswanatham - 1.60 70.00 I 1595 Venkadachalapuram road D and reconstruction culvert at P km 9/2 & 9/6(MD1048) -

MDR Page No 131 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Widening from SL to IL in C Km 14/490-18/0 of Kalluptti- 1-CRIDP- R Virudhunagar Road including 1596 11-12-M- Virudhunagar Virudhunagar 3.51 100.00 I reconstruction of culvert at 1596 D Km 14/8,14/10, 15/2 (i) 15/2 P (ii) and 15/6.(MD956) - Widening & Improvements 22.72 666.00 Total 1 - Improvements to Tenkasi - 1-CRIDP- C Thirumangalam road to 1597 11-12-M- Virudhunagar Rajapalayam 2.20 72.60 R road km 0/0-0/8 1597 I & 1/6-3/0(MD698) D 1P - Improvements to Kallikudi - 1-CRIDP- C Kariapatti (via) Thiruchuli, 1598 11-12-M- Virudhunagar Thiruchuli 5.10 100.00 R Kamuthi road Km 48/0- 1598 I 53/100(MD768) D 1P - Improvements to Road C1-CRIDP- branching from Km 43/2 of 1599 R 11-12-M- Virudhunagar Thiruchuli NH49 road to Kattanoor road 4.28 85.00 I 1599 Km 17/6-19/6 and 20/6- D 22/883(MD579) 1P - C1-CRIDP- Improvements to Kariapatti - 1600 R 11-12-M- Virudhunagar Thiruchuli Narikudi road Km 20/6- 3.60 75.00 I 1600 24/2(MD926) D 1P Improvements to Tenkasi - - 1-CRIDP- Thirumangalam road to 1601 C11-12-M- Virudhunagar Rajapalayam 2.00 60.00 cholapuram road km 3/0- R 1601 5/0.(MD698) I 1D Improvements to Tenkasi - - 1-CRIDP- Thirumangalam road to 1602 C11-12-M- Virudhunagar Rajapalayam 2.00 60.00 cholapuram road km 5/0- R 1602 7/0.(MD698) I 1 Improvements to Tenkasi - - 1-CRIDP- Thirumangalam road to 1603 C11-12-M- Virudhunagar Rajapalayam 3.40 100.00 cholapuram road km 7/0- R 1603 10/4.(MD698) I

MDR Page No 132 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs Strengthening/ Improvements 22.58 552.60 Total 1 - Construction of RCC Slab 1-CRIDP- C culvert at Km 20/8 of 1604 11-12-M- Virudhunagar Thiruchuli 22.00 R Kariapatti - Narikudi 1604 I road(MD926) D P Bridges/ CD Works/ Others 1 No 22.00 Total

Virudhu 45.30 1240.60 nagar Total

1 Widening SL to IL and - 1-CRIDP- Padmanabha Improvements of Meycode - 1605 C11-12-M- Nagercoil 1.70 77.00 puram Kulasekaram Road Km, 0/0- R 1605 I 0/2 and 3/5-5/0(MD269) D 1 Widening SL to IL and - 1-CRIDP- Padmanabha Improvements of 1606 C11-12-M- Nagercoil 0.40 20.00 puram Swamiyarmadam - Meycode R 1606 I Road in Km, 3/2-3/6(MD929) D 1 improvements and widening - 1-CRIDP- SL to IL in Km. 0/0-2/0 of 1607 C11-12-M- Nagercoil Colachal 2.00 90.00 Mulagumoodu - Colachel R 1607 I Road.(MD932) D 1 Widening SL to IL in Km. 3/0 - 1-CRIDP- Padmanabha - 5/0 and Improvements to 1608 C11-12-M- Nagercoil 2.00 90.00 puram Thiruvattar - Thirparappu R 1608 I road Km. 3/7-5/0(MD933) D 1 Widening SL to IL in Km. 5/0 - 1-CRIDP- Padmanabha - 6/0 and Improvements to 1609 C11-12-M- Nagercoil 1.00 45.00 puram Thiruvattar - Thirparappu R 1609 I road Km. 5/0-6/0(MD933) D

MDR Page No 133 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Widening SL to IL in Km. 1610 C11-12-M- Nagercoil Kanniyakumari 23/0-26/2 of Balamore 3.20 64.00 R 1610 Road.(MD54) I D 1 improvements and widening - 1-CRIDP- SL to IL in Km. 2/0-3/8 of 1611 C11-12-M- Nagercoil Colachal 1.80 81.00 Mulagumoodu - Colachel R 1611 I Road.(MD932) D 1 - 1-CRIDP- Widening SL to IL in Km. 0/0- Padmanabha 1612 C11-12-M- Nagercoil 3/0 of Thiruvattar - 3.00 60.00 puram R 1612 Thirparappu road(MD933) I D 1 Widening SL to IL in Km. 6/0 - 1-CRIDP- Padmanabha - 7/9 and Improvements to 1613 C11-12-M- Nagercoil 1.90 86.00 puram Thiruvattar - Thirparappu R 1613 I road Km. 6/0-7/6(MD933) D 1 Widening SL to IL and - 1-CRIDP- Padmanabha Improvements of Meycode - 1614 C11-12-M- Nagercoil 2.20 100.00 puram Kulasekaram Road Km, 5/0- R 1614 I 7/2(MD269) D Widening & Improvements 19.20 713.00 Total 1 - 1-CRIDP- Improvements to Vattakottai - 1615 C11-12-M- Nagercoil Kanniyakumari Kottaram - Agastheeswaram 1.50 53.00 R 1615 Road Km. 7/0 - 8/5(MD931) I 1 - 1-CRIDP- Improvements to Vattakottai - 1616 C11-12-M- Nagercoil Kanniyakumari Kottaram - Agastheeswaram 2.20 77.00 R 1616 Road Km. 4/8 - 7/0(MD931) I 1 - 1-CRIDP- Improvements to Nagercoil 1617 C11-12-M- Nagercoil Nagercoil Beach road Km. 6/2- 2.30 95.00 R 1617 8/5(MD930) I 1 - 1-CRIDP- Improvements to Vattakottai - 1618 C11-12-M- Nagercoil Kanniyakumari Kottaram - Agastheeswaram 1.20 48.00 R 1618 Road Km. 0/0-1/2(MD931) I

MDR Page No 134 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - 1-CRIDP- Improvements to Parasalai - 1619 C11-12-M- Nagercoil Vilavancode Kollenkode road km 6/0 - 1.60 75.00 R 1619 7/6.(MD928) I 1 - 1-CRIDP- Improvements to Parasalai - 1620 C11-12-M- Nagercoil Vilavancode Kollencode road km 4/0 - 2.00 90.00 R 1620 6/0.(MD928) I Strengthening/ Improvements 10.80 438.00 Total 1 - Reconstruction of culvert at C1-CRIDP- km 0/6 and construction of 1621 R 11-12-M- Nagercoil Nagercoil drainage at km 1/2, 1/4, of 14.00 I 1621 Kottar - Dharmapuram D road.(MD187) 1P - C1-CRIDP- Construction of drainage at 1622 R 11-12-M- Nagercoil Nagercoil km 7/2 of Santhapuram 10.00 I 1622 road.(MD412) D P 1 Reconstruction of culvert at - km 0/2, 9/2, construction of 1-CRIDP- C retaining wall at km 1/2 and 1623 11-12-M- Nagercoil Kanniyakumari 30.00 R Construction of drain at km 1623 I 0/2 of Anjugramam D road.(MD27) P 1 Reconstruction of culvert at - km 0/8,0/10, 1/10, 2/6, 5/4, 1-CRIDP- C 5/6 and Construction of 1624 11-12-M- Nagercoil Nagercoil 75.00 R drainage and retaining wall 1624 I at km 0/6 - 4/2 of Kottar - D Manakudy road.(MD188) 1P - C1-CRIDP- Reconstruction of culvert at 1625 R 11-12-M- Nagercoil Colachal km 9/2 of Santhapuram road 6.00 I 1625 including drainage.(MD412) D 1P - Reconstruction of culvert at 1-CRIDP- C km 1/0 & 2/4 of Eraniel - 1626 11-12-M- Nagercoil Colachal 12.00 R Rajakkamangalam road 1626 I including drainage.(MD106) D P

MDR Page No 135 Cost Sl. Length Work code Division Constituency Name of work in No. in Km Lakhs 1 - Reconstruction of culvert at 1-CRIDP- C km 6/4 of Mulagumoodu - 1627 11-12-M- Nagercoil Colachal 30.00 R Colachel road including 1627 I drainage.(MD932) D 1P - C1-CRIDP- Reconstruction of culvert at 1628 R 11-12-M- Nagercoil Killiyoor km 6/2 of Marthandam - 5.00 I 1628 Karungal road.(MD250) D 1P - Construction of hard bed at 1-CRIDP- C km 0/2, 0/4, 0/6, 7/4 of 1629 11-12-M- Nagercoil Killiyoor 45.00 R Marthandam - Karungal 1629 I road.(MD250) D 1P - C1-CRIDP- Construction of hard bed at 1630 R 11-12-M- Nagercoil Killiyoor km 7/4 of Eraviputhoorkadai - 15.00 I 1630 Karungal road.(MD943) D P Bridges/ CD Works/ Others 242.00 Total Nagercoil 30.00 1393.00 Total Tirunelveli Other works 14 Nos 149.30 5919.10 Circle Total

Grand Total Other works 46 Nos 1607.29 65215.60

MDR Page No 136 ANNEXURE

CRIDP PROPOSAL 2011-12

LIST OF WORKS - OTHER DISTRICT ROADS

Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Providing Cement 1-CRIDP-11- Chennai city concrete pavement in 1631 Pallavaram 0.10 18.00 12-O-1631 roads Km 2/9-3/0 of road

Strengthen ing/ Improvements 0.10 18.00 Total

Chennai city 0.10 18.00 roads Total

Improvements to 1-CRIDP-11- Padalam - Cheyyur to 1632 Chengalpattu Maduranthagam 2.87 30.00 12-O-1632 Ammanur cart track Road K.m.0/0-2/870

Strengthen ing/ Improvements 2.87 30.00 Total

Formation of Link Road 1-CRIDP-11- 1633 Chengalpattu Thiruporur connecting Thiruporur - 100.00 12-O-1633 Nemili Road - (LA)

Construction of High level Bridge across river Kiliyar at Km.1/2 of the 1-CRIDP-11- road branching from 1634 Chengalpattu Maduranthagam 150.00 12-O-1634 Km.4/10 of GST Road to Endathur Road to Perumbakkam - Thandarai.

Construction of Bridge 1-CRIDP-11- at Km.2/8 of Cheyyur - 1635 Chengalpattu Cheyyur 170.00 12-O-1635 Panaiyur Road including approaches

ODR Page 1 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of Bridge 1-CRIDP-11- at Km.3/2 of Cheyyur - 1636 Chengalpattu Cheyyur 130.00 12-O-1636 Panaiyur Road including approaches

Construction of Piped causeway at Km 3/6 of Km 6/8 of Manamathy 1-CRIDP-11- Mullipakkam road to 1637 Chengalpattu Thiruporur 12.00 12-O-1637 Thandarai (via) Chinnairumbedu,Periay airumbedu,Amirthapall am

Construction of Piped 1-CRIDP-11- Causeway at Km.1/4 of 1638 Chengalpattu Uthiramerur 30.00 12-O-1638 Ullavoor - Thollazhi Road

Bridges/ CD Works/ Others 6 Nos. 592.00 Total

Chengalpattu 2.87 622.00 Total

Strengthening the – K.S. Road 1-CRIDP-11- 1639 Thiruvallur Gummidipoondi (via) Kannan Kottai 1.60 27.00 12-O-1639 Karadiputhur km 12/0- 13/6

Strengthening the Palavakkam – K.S. Road 1-CRIDP-11- 1640 Thiruvallur Gummidipoondi (via) Kannan Kottai 3.00 50.00 12-O-1640 Karadiputhur km 7/0- 10/0

Improvements to Km 1-CRIDP-11- 1641 Thiruvallur Thiruvallur 0/0 - 2/0 of CTR road - 2.00 20.00 12-O-1641 Kanchipadi road

Improvements to 1-CRIDP-11- 1642 Thiruvallur Poonamallee T.R.T.C. Road to Putlur 3.80 38.00 12-O-1642 road km.0/0-3/8

"Improvements to 1-CRIDP-11- 1643 Thiruvallur Thiruvallur Nelvoy Kunjalam road 3.00 30.00 12-O-1643 km.0/0-3/0"

ODR Page 2 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Strengthening the Palavakkam – K.S. Road 1-CRIDP-11- 1644 Thiruvallur Gummidipoondi (via) Kannan Kottai 2.60 43.00 12-O-1644 Karadiputhur km 3/4 - 6/0

Strengthening the 1-CRIDP-11- G.N.T. Road – 1645 Thiruvallur Gummidipoondi 1.00 10.00 12-O-1645 Ayyanallur Road km 2/0 - 3/0

Improvements to Km 1-CRIDP-11- 4/750 - 8/0 of 1646 Thiruvallur Thiruvallur 3.25 35.00 12-O-1646 Tiruvalangadu - Vedaiyur road

Improvements to Km3/8 - 5/2 of 1-CRIDP-11- 1647 Thiruvallur Thiruvallur Arakkonam-Tiruvallur 1.40 22.00 12-O-1647 Road to Valarpuram road

Strengthen ing/ Improvements 21.65 275.00 Total

Thiruvallur 21.65 275.00 Total

Improvements to Central Jail to Amirthy 1-CRIDP-11- 1648 Vellore Vellore Road including junction 1.00 45.00 12-O-1648 improvements Km 0/0- 1/0

Improvements to 1-CRIDP-11- Krishnagiri Ranipet 1649 Vellore Anaicut 2.40 25.00 12-O-1649 Road to Sembedu Km.0/0-2/4

Improvements to Krishanagiri Ranipet 1-CRIDP-11- road - Abdullapuram 1650 Vellore Anaicut 4.90 50.00 12-O-1650 Pakkam Road (Via) Marudhavalli Palayam Road Km.0/0 - 4/9

Strengthen ing/ Improvements 8.30 120.00 Total

Vellore Total 8.30 120.00

ODR Page 3 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and Improvements of SL to IL from Jolarpet - 1-CRIDP-11- 1651 Vaniyambadi Jolarpet Natrampalli raod km 3.30 93.00 12-O-1651 6/0 - 8/0 & Improvements to 8/0 - 9/3

Widening and Improvements of SL to 1-CRIDP-11- 1652 Vaniyambadi Jolarpet DL for Jolarpet - 2.00 66.00 12-O-1652 Natrampalli raod km4/0 - 6/0

Widening SL to IL of Jolarpet - Natrampalli 1-CRIDP-11- 1653 Vaniyambadi Jolarpet raod km 2/0 - 4/0 and 4.00 86.00 12-O-1653 Improvements to km 0/0 - 4/0

Widening & Improvements 9.30 245.00 Total

Improvements to 1-CRIDP-11- Jayapuram - 1654 Vaniyambadi Jolarpet 2.00 17.00 12-O-1654 Veppalnatham road km 1/0 - 2/0, 4/0 - 5/0

Improvements to Gudiyattam -Gadambur- 1-CRIDP-11- Kailasagiri - 1655 Vaniyambadi Gudiyatham 2.20 18.70 12-O-1655 Vaniyambadi Road to Kilpatti Via Ediyathpur Road KM 0/0-2/2

Strengthen ing/ Improvements 4.20 35.70 Total

Vaniyambadi 13.50 280.70 Total

Improvements to Sevoor 1-CRIDP-11- 1656 Tiruvannamalai Arani Vedhajipuram road Km 2.00 20.00 12-O-1656 9/0 - 11/0

ODR Page 4 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Kannamangalam 1-CRIDP-11- 1657 Tiruvannamalai Kalasapakkam Padavedu road Km 5/6 - 2.60 25.00 12-O-1657 6/2, 7/2 - 8/2 & 10/0 - 11/0

Improvements to Tiruvannamalai Kanji 1-CRIDP-11- 1658 Tiruvannamalai Kalasapakkam road to 2.20 20.00 12-O-1658 Japthikariyandal road Km 0/0 - 2/2

Improvements to 1-CRIDP-11- Mothakkal road Km 0/0 1659 Tiruvannamalai Chengam 4.20 40.00 12-O-1659 - 4/2 (Centre portion only)

Improvements to 1-CRIDP-11- Sibbandhi 1660 Tiruvannamalai Kalasapakkam 11.70 85.00 12-O-1660 Kanji road Km 5/0 - 16/7

Improvements to 1-CRIDP-11- Vedanthavadi Durgam 1661 Tiruvannamalai Kilpennathur 6.00 60.00 12-O-1661 road Km 6/0-12/0 including 4 Culverts

Improvements to 1-CRIDP-11- Thenpallipattu 1662 Tiruvannamalai Kalasapakkam 4.00 40.00 12-O-1662 Pazhankoil Kilpotharai road Km 0/0-4/0

Improvements to 1-CRIDP-11- 1663 Tiruvannamalai Cheyyar Mamandoor Suruttal 8.00 75.00 12-O-1663 road Km 0/0 - 8/0

Improvements to 1-CRIDP-11- 1664 Tiruvannamalai Cheyyar Vellakulam Vadaillupai 1.50 20.00 12-O-1664 road Km 3/5-5/0

Formation of 1-CRIDP-11- Approaches to 1665 Tiruvannamalai Vandawasi 0.40 40.00 12-O-1665 Kilkodungalore road Km 2/10

Strengthen ing/ Improvements 42.60 425.00 Total

Tiruvannamala 42.60 425.00 i Total Chennai Other works : 6 Nos. 89.02 1740.70 Total

ODR Page 5 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from SL to IL and Impts of 1-CRIDP-11- 1666 Villupuram Villupuram Villupuram- 1.20 50.00 12-O-1666 Panampattu road Km.0/2-1/4

Widening from SL to IL and Impts of 1-CRIDP-11- 1667 Villupuram Villupuram Villupuram- 1.60 70.00 12-O-1667 Panampattu road Km.1/4-3/0 Widening from SL to IL and Impts of 1-CRIDP-11- 1668 Villupuram Villupuram Villupuram- 1.30 58.00 12-O-1668 Panampattu road Km.3/0-4/3

Widening from SL to IL and Impts of 1-CRIDP-11- 1669 Villupuram Villupuram Villupuram- 1.40 60.00 12-O-1669 Panampattu road Km.4/3-5/7

Widening & Improvements 5.50 238.00 Total

Improvements to Nallapalayam- 1-CRIDP-11- 1670 Villupuram Vikravandi Panamalai road (via) 6.00 75.00 12-O-1670 Kadayam road Km.5/0- 11/0

Improvements to 1-CRIDP-11- 1671 Villupuram Villupuram Salayampalayam road 3.00 50.00 12-O-1671 Km.0/0-3/0

Improvements to 1-CRIDP-11- 1672 Villupuram Vikravandi Kakkanur road Km.0/0- 2.60 35.00 12-O-1672 2/6

Improvements to road from Km.2/0 of Ariyur- Anandapuram road to 1-CRIDP-11- 1673 Villupuram Vanur Chinnababusamuthira 3.00 40.00 12-O-1673 m road (via) Kendiyankupam road Km.0/0-3/0

ODR Page 6 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Kalyanampoondy- 1-CRIDP-11- Annandapuram road to 1674 Villupuram Vikravandi 2.85 40.00 12-O-1674 Sangeethamangalam, Nangathur road Km.0/0-2/85

Improvements to 1-CRIDP-11- Pallicherry- 1675 Villupuram Vanur 3.20 45.00 12-O-1675 Lingareddipalayam road Km.0/0-3/2

Improvements to Marur- 1-CRIDP-11- 1676 Villupuram Mailam Nagandur road (via) 2.00 20.00 12-O-1676 Nallalam Km.0/0-2/0

Improvements to 1-CRIDP-11- 1677 Villupuram Gingee Kottapoondy road 2.00 20.00 12-O-1677 Km.0/0-2/0

Improvements to Gingee- 1-CRIDP-11- 1678 Villupuram Gingee Kanakkankuppam road 1.60 40.00 12-O-1678 Km. 0/0-1/6

Improvements to 1-CRIDP-11- 1679 Villupuram Mailam Vallam-G.S.T. road 4.20 85.00 12-O-1679 Km.15/0-19/2

Improvements to 1-CRIDP-11- Mundiyampakkam 1680 Villupuram Vikravandi 0.80 50.00 12-O-1680 Factory approach road Km.0/4-1/2

Improvements to 1-CRIDP-11- 1681 Villupuram Tindivanam Olakkur-Murungai road 3.00 44.00 12-O-1681 Km.0/0-3/0

Strengthen ing/ Improvements 34.25 544.00 Total

Reconstruction of culvert at Km.3/4 and 1-CRIDP-11- Repairs to piped 1682 Villupuram Villupuram 35.00 12-O-1682 causeway at Km.2/10 of Villupuram- Kavanipakkam road

ODR Page 7 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Bridges/ CD Works/ Others 1 No. 35.00 Total Villupuram 39.75 817.00 Total

Improvements to 1-CRIDP-11- 1683 Cuddalore Cuddalore Devanampattinam road 2.20 55.00 12-O-1683 Km 0/0-2/2

1-CRIDP-11- Improvements Pillali- 1684 Cuddalore Kurinjipadi 1.80 18.00 12-O-1684 road Km.0/0-1/8

Improvements to 1-CRIDP-11- Kozhipakkam- 1685 Cuddalore Panruti 4.20 42.00 12-O-1685 Madagadipattu road Km 0/0-4/2

Improvements to 1-CRIDP-11- Pethanayakankuppam- 1686 Cuddalore Kurinjipadi 1.50 15.00 12-O-1686 Melaputhupettai road km.4/0-5/5

Improvements to 1-CRIDP-11- Kandarakottai - 1687 Cuddalore Panruti 4.40 70.00 12-O-1687 Thiruthuraiyur Road Km 0/0 - 4/4

Improvments to sethiyathoppu- 1-CRIDP-11- kammapuram Road 1688 Cuddalore Bhuvanagiri 4.60 60.00 12-O-1688 (via) veeramudaiyanatham km 4/0 -6/0, 7/0-9/6

Improvments to sethiyathoppu- kammapuram Road 1-CRIDP-11- 1689 Cuddalore Bhuvanagiri (via) 4.60 60.00 12-O-1689 veeramudaiyanatham km.9/6-12/0 and 13/0- 15/2

Strengthen ing/ Improvements 23.30 320.00 Total

Cuddalore 23.30 320.00 Total

Widening Sl to IL & 1-CRIDP-11- improvements in Km 1690 Ariyalur Ariyalur 2.40 100.00 12-O-1690 2/4-4/8 of Thirumanur - Palayapadi road

ODR Page 8 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening Sl to IL & 1-CRIDP-11- improvements in Km 1691 Ariyalur Ariyalur 1.90 100.00 12-O-1691 8/100 - -10/0 of Poiyur, Sundakudi road

Widening Sl to IL & 1-CRIDP-11- improvements in Km 1692 Ariyalur Ariyalur 1.90 100.00 12-O-1692 6/2-8/100 of Poiyur, Sundakudi road

Widening Sl to IL & 1-CRIDP-11- improvements in Km 1693 Ariyalur Ariyalur 2.40 100.00 12-O-1693 0/0-2/4 of Thirumanur - Palayapadi road

Widening & Improvements 8.60 400.00 Total

Improvementsin Km 1-CRIDP-11- 1694 Ariyalur Ariyalur 4/0-6/6 of Karivetti 2.60 40.00 12-O-1694 villagam road

Improvements in Km 1-CRIDP-11- 0/0-2/0 of 1695 Ariyalur Jayankonadam 2.00 20.00 12-O-1695 Vdukarpalayam - Anikurichan road

Improvements in km 8/0-9/0 & 10/0-12/8 of Edaiyar Kaduvettan 1-CRIDP-11- 1696 Ariyalur Jayankonadam Kuruchi road and 3.80 35.00 12-O-1696 construction of Retaining wall at km 10/0-10/4

Improvements in Km 2/0-5/0 of Utkottai - 1-CRIDP-11- Thaluthalai medu road 1697 Ariyalur Jayankonadam 3.00 46.00 12-O-1697 and construction of Drainage at Km 1/10- 2/5

Improvements in Km 1-CRIDP-11- 1698 Ariyalur Perambalur 1/0-5/0 of Perambalur - 4.00 40.00 12-O-1698 Alambadi road

Improvementsin Km 16/0-19/0 of 1-CRIDP-11- 1699 Ariyalur Kunnam Sengunam - 3.00 35.00 12-O-1699 Murukkankudi - Mangalmedu road

ODR Page 9 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in Km 1-CRIDP-11- 1700 Ariyalur Kunnam 0/0-1/650 of Elumur - 1.65 23.00 12-O-1700 Malavarayanallur road

Improvementsin 1-CRIDP-11- Km12/0-15/0 of 1701 Ariyalur Kunnam 3.00 47.00 12-O-1701 Ponparappi - Thittakudi road Improvements in Km 1-CRIDP-11- 2/0-3/6 of 1702 Ariyalur Kunnam 1.60 20.00 12-O-1702 Vaithiyanatha puram - Kiliyur road

Improvementsin Km 1-CRIDP-11- 0/0-2/205 of Chinnar - 1703 Ariyalur Perambalur 2.21 80.00 12-O-1703 Junction to Eariyur Sugar mill road

Improvements to km 0/0 - 2/2 of 1-CRIDP-11- Krishnapuram - 1704 Ariyalur Perambalur 2.20 28.00 12-O-1704 Poolambadi - Kallapatti road to Melakkunangudi road.

Improvements in Km 1-CRIDP-11- 7/0-12/0 of 1705 Ariyalur Kunnam 5.00 45.00 12-O-1705 Variyakaval - Mathur road

Improvements in Km 1-CRIDP-11- 12/0 - -15/2 of 1706 Ariyalur Kunnam 3.20 65.00 12-O-1706 Variyakaval - Mathur road

Strengthen ing/ Improvements 37.26 524.00 Total

Ariyalur Total 45.86 924.00

Villupuram Other works : 1 No. 108.91 2061.00 Total

Widening single lane to Intermediate lane km 0/0-0/6 and 1-CRIDP-11- Improvements in km 1707 Trichy Trichyeast 1.40 35.00 12-O-1707 1/6-2/4 of K. Sathanur - Manamelpatty - Vadugapatty Road (Single Lane)

ODR Page 10 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from Single lane to Intermediate lane and Improvements at 0/0-0/8 of 1-CRIDP-11- 1708 Trichy Srirangam Srirangam North gate - 0.80 100.00 12-O-1708 Poosamandapam Road including Construction of Retaining wall (Single Lane)

Widening from Single lane to Intermediate lane at 0/8-1/6 of 1-CRIDP-11- Srirangam North gate - 1709 Trichy Srirangam 0.80 100.00 12-O-1709 Poosamandapam Road including Construction of Retaining wall(Single Lane)

Widening from Single lane to Intermediate 1-CRIDP-11- 1710 Trichy Manapparai lane at Km 11/2-14/4 3.20 85.00 12-O-1710 of Pothapatty - Kosur road (Single Lane)

Widening & Improvements 6.20 320.00 Total

Improvements to 1-CRIDP-11- Jambunathapuram 1711 Trichy Musiri 1.60 25.50 12-O-1711 Aracha Road 4/4- 6/0(Intermediate lane )

Improvements to Km 10/4 of Nedungur - 1-CRIDP-11- Neikulam - 1712 Trichy Lalgudi 3.40 33.00 12-O-1712 Peruvalappur road to Periakurikkai Road Km 2/0-5/4 (Single Lane)

Improvements toPeriyakurukkai - 1-CRIDP-11- 1713 Trichy Lalgudi Thatchankurichy Road 4.80 45.00 12-O-1713 Km 0/0-4/8 (Single Lane)

ODR Page 11 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in Km 0/0-0/4,9/0-10/0 , 12/0-14/6 of 1-CRIDP-11- 1714 Trichy Manachanallur Samayapuram - 4.00 45.00 12-O-1714 Palaiyur (via) 94 Kariyamanickam (Single Lane)

Improvements to GST 1-CRIDP-11- Road Chinthamani 1715 Trichy Trichyeast 0.55 50.00 12-O-1715 Byepass Road km 0/0- 0/550 (mulitilane)

Improvements to 1-CRIDP-11- Ganesapuram - 1716 Trichy Srirangam 2.40 28.00 12-O-1716 Thayanur Road km 0/0- 2/4)

Improvements to Road from km 10/6 of NH 45B to join North - 1-CRIDP-11- South Paganur 1717 Trichy Srirangam 6.40 60.00 12-O-1717 Road(Via)Poongudi - Manikandam Road at km 0/0-6/4 (Single lane)

Improvements to Alundhur - 1-CRIDP-11- 1718 Trichy Srirangam Suravalipatty Road (via) 1.20 11.00 12-O-1718 Yagapudaiyanpatty Km 3/8-5/0 (Single Lane)

Improvements to 1-CRIDP-11- Maikalnayakanpatty - 1719 Trichy Musiri 2.40 25.00 12-O-1719 M. Kalathur Road Km 1/0 -3/4 (Single Lane)

Improvements to 1-CRIDP-11- Paithamparai - 1720 Trichy Musiri 1.00 11.00 12-O-1720 Serugudi Road Km 5/4- 6/4 (Single Lane)

Improvements to Devanur - 1-CRIDP-11- 1721 Trichy Musiri Krishnapuram Road 1.00 10.00 12-O-1721 Km 0/0-1/0 (Single Lane)

ODR Page 12 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Manamedu - Kollakudy - 1-CRIDP-11- 1722 Trichy Musiri Surampatty Road Km 4.00 50.00 12-O-1722 8/0-12/0 (Intermidate Lane)

Improvements to Left 1-CRIDP-11- Bank of Akandacauvery 1723 Trichy Musiri 2.00 25.00 12-O-1723 Road km 10/0-12/0 (Single Lane)

Improvements to 1-CRIDP-11- Pothapatty - Kosur 1724 Trichy Manapparai 2.00 16.00 12-O-1724 Road Km 4/0-5/0, 6/0- 7/0 (Single Lane)

Improvements to Road branching at km 374/2 1-CRIDP-11- of NH.45 road to 1725 Trichy Manapparai 2.00 16.00 12-O-1725 Elangakurichi (Via) Azad Road Km 0/0-2/ 0 (Single Lane)

Improvements to 1-CRIDP-11- Thinnanur - 1726 Trichy Manachanallur 3.60 30.00 12-O-1726 Karatampatty Road km 0/0-3/6 (Single Lane)

Improvements to Patchampettai - Edayathumangalam 1-CRIDP-11- road Km 0/0-2/8 1727 Trichy Lalgudi 2.80 40.00 12-O-1727 including reconstruction of slab culvert at Km 1/4 (Single Lane)

Improvements in Km 1-CRIDP-11- 0/0-1/2 of Athavathur - 1728 Trichy Srirangam 1.20 25.00 12-O-1728 Koyyathoppu Road (Single Lane)

Improvements to 1-CRIDP-11- Sithambur - 1729 Trichy Manachanallur 1.00 8.50 12-O-1729 Guruvampatty Road km 0/0-1/0(Single lane)

ODR Page 13 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Ariyamangalam - 1-CRIDP-11- Village Road km 0/0- 1730 Trichy Thiruverumbur 2.00 18.00 12-O-1730 2/0 including Reconstruction of Pipe culvert at km 1/6

Improvements to G.S.T. 1-CRIDP-11- road toThirupattur 1731 Trichy Manachanallur 4.80 45.00 12-O-1731 Road Km 0/0-4/8 (Single Lane)

Improvements to 1-CRIDP-11- Manalodai -Nagorue 1732 Trichy Thuraiyur 7.40 74.00 12-O-1732 Road km 5/6-13/0 (Single Lane)

Improvements to Vathalai - T. Puthur 1-CRIDP-11- 1733 Trichy Manachanallur Road Km 4/4-5/2, 7/0- 3.20 30.00 12-O-1733 7/6, 8/0-9/4, 11/6- 12/0 (Single Lane)

Improvements to Evoor - Velakkanatham Road 1-CRIDP-11- 1734 Trichy Manachanallur km 0/0-0/6, 4/6-5/0, 5.60 50.00 12-O-1734 5/4-8/0, 9/0-11/0, (Single lane)

Improvements to Sangliyandarpuram - 1-CRIDP-11- 1735 Trichy Trichyeast Senthaneerpuram Road 1.40 37.00 12-O-1735 km 0/0-1/4 (Single Lane)

Improvements to Km 4/6 of Manapparai - 1-CRIDP-11- Kulithalai Road to meet 1736 Trichy Srirangam 3.20 26.00 12-O-1736 Km 352/0 of MTD Road Road Km 1/0-3/6 & 5/0-5/6 (Single Lane)

Improvements to Manapparai - 1-CRIDP-11- Veerappur road to 1737 Trichy Srirangam 2.80 30.00 12-O-1737 Karumbulipatty road km 3/6-6/4 ( Single lane )

ODR Page 14 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to NH 45 1-CRIDP-11- Road to Old Bridge 1738 Trichy Srirangam 0.82 15.00 12-O-1738 approach road Km 360/330-361/150

Improvements to 1-CRIDP-11- Keelurkattukulam - 1739 Trichy Manachanallur 3.60 30.00 12-O-1739 Kalavaipatty Road km 4/0-7/6(Single lane)

Improvements to 1-CRIDP-11- Siruvayalur -Thappai 1740 Trichy Lalgudi 2.40 30.00 12-O-1740 Road km 0/0-2/4 (Single lane)

Improvements to km 30/2 of Trichy - 1-CRIDP-11- Chidhambaram Road 1741 Trichy Lalgudi 4.00 50.00 12-O-1741 km to Kallakudy - Thappai Road km 0/0- 4/ (Single lane)

Improvements to Pudur 1-CRIDP-11- -Uthamanur -Vellanur 1742 Trichy Lalgudi 2.80 24.00 12-O-1742 Road km 0/0-2/8 (Single lane)

Improvements to 1-CRIDP-11- Irungalau -Sengenthi 1743 Trichy Lalgudi 3.00 25.00 12-O-1743 Road km 11/4-14/4 (Single lane)

Improvements to Malvoi 1-CRIDP-11- 1744 Trichy Lalgudi -Kannaur Road km 5/6- 3.40 30.00 12-O-1744 9/0 (Single lane)

Improvements to Km 8/4 of Pullambady - 1-CRIDP-11- Thirumalabady Road 1745 Trichy Lalgudi 1.40 15.00 12-O-1745 km to Viragalur Road km 0/0-1/4(Single lane)

ODR Page 15 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Kalingapatty - 1-CRIDP-11- 1746 Trichy Musiri Jambumadai -Serugudy 3.60 30.50 12-O-1746 Road km 1/0-4/6 (Single lane)

Improvements to Kalingapatty - 1-CRIDP-11- 1747 Trichy Musiri Jambumadai -Serugudy 3.40 35.00 12-O-1747 Road km 6/6-10/0 (Single lane)

Improvements to Kalingapatty - 1-CRIDP-11- 1748 Trichy Musiri Jambumadai -Serugudy 1.00 11.50 12-O-1748 Road km 13/0-14/0 (Intermidatelane)

Improvements to 1-CRIDP-11- Jadamangalam - 1749 Trichy Musiri 2.00 18.00 12-O-1749 Valasiramani Road km 0/0-2/0 (Single lane)

Improvements to Manamedu -Kolakudi - 1-CRIDP-11- 1750 Trichy Musiri Soorampatty Road km 1.40 23.00 12-O-1750 12/0-13/4(Intermidate lane)

Improvements to 1-CRIDP-11- 1751 Trichy Musiri Sittilarai Road km 0/0- 4.60 43.50 12-O-1751 4/6(Single lane)

Improvements to 1-CRIDP-11- 1752 Trichy Musiri Valasiramani Road km 1.80 16.00 12-O-1752 2/0-3/8(Single lane)

Improvements to Appanallur - 1-CRIDP-11- Kamalapuram 1753 Trichy Musiri 5.00 44.50 12-O-1753 (Via)Ammankudi Road km 0/0-5/0(Single lane)

ODR Page 16 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Serugudy -Vellapatty 1754 Trichy Musiri 7.10 69.00 12-O-1754 Road km 0/0- 7/1(Single lane)

Improvements to Sirugambur - Karattampatty Road km 1-CRIDP-11- 1755 Trichy Manachanallur 0/0-1/4, 7/0-10/0 4.40 45.00 12-O-1755 including side drains at km 0/0-1/4 Single lane)

Improvements to 1-CRIDP-11- Edumalai -Peragambi 1756 Trichy Manachanallur 4.00 35.00 12-O-1756 Road km 1/0-4/0 ,5/0- 6/0(Single lane)

Improvements to 1-CRIDP-11- Thiruvellarai -Omandur 1757 Trichy Manachanallur 4.00 40.00 12-O-1757 Road km 0/0- 4/0(Single lane)

Improvements to 1-CRIDP-11- 1758 Trichy Manachanallur Guruvampatty Road km 1.00 8.50 12-O-1758 0/0-1/0(Single lane)

Improvements to 1-CRIDP-11- Thathamangalam- 1759 Trichy Manachanallur 1.00 10.00 12-O-1759 Salappatty Road 1/0- 2/0(Single lane)

Strengthen ing/ Improvements 143.47 1512.50 Total

Trichy Total 149.67 1832.50

Improvements in KM 5/0-6/0, 8/0-11/0 of 1-CRIDP-11- Annavasal - Kulathur 1760 Pudukottai Viralimalai 4.00 49.00 12-O-1760 road including culvert at KM 5/4, 8/2, 9/6 ( SL road )

ODR Page 17 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in KM 5/6-7/2 of Keeranur - Killukkottai road 1-CRIDP-11- 1761 Pudukottai Gandharvakottai including construction 1.60 19.00 12-O-1761 of pipe culvert at KM 6/2 and retaining wall at KM 6/4

Improvements in KM 1-CRIDP-11- 1762 Pudukottai Aranthangi 0/0-1/2 of Kodivayal - 1.20 12.00 12-O-1762 Vijayapuram road

Improvements in KM 1-CRIDP-11- 35/0-37/6 of 1763 Pudukottai Thirumayam 2.60 21.00 12-O-1763 Melathaniyum - Oliyamangalam road

ODR Page 18 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Railway station road 1-CRIDP-11- 1764 Pudukottai Pudukottai KM 0/0-0/3 including 0.30 19.00 12-O-1764 reconstruction of culvert at KM 0/3

Improvements to 1-CRIDP-11- Konapet - 1765 Pudukottai Thirumayam 4.80 41.00 12-O-1765 Nemathanpatti road KM 0/0-4/8

Strengthen ing/ Improvements 14.50 161.00 Total

Reconstruction of pipe culvert inliue of narrow 1-CRIDP-11- 1766 Pudukottai Alangudi damaged culvert at KM 5.00 12-O-1766 0/2 of Nagaram - Kothamangalam road

Reconstruction of Minor Bridge inlieu of rain 1-CRIDP-11- 1767 Pudukottai Thirumayam damaged cut stone one 50.00 12-O-1767 at KM 24/6 of Karaiyur - Oliyamangalam road

Bridges/ CD Works/ Others 2 Nos. 55.00 Total Pudukottai 14.50 216.00 Total

ODR Page 19 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Nirthanamangalam- 1768 Nagapattinam Kilvelur 5.60 79.00 12-O-1768 Sembianmahadevi Road Km 0/0-5/6

Improvments 1-CRIDP-11- toAnathandavapuram 1769 Nagapattinam Mayiladuthurai 2.60 50.00 12-O-1769 Village road Km 3/0 - 5/6

Improvements to 1-CRIDP-11- Sembiyavilagam - 1770 Nagapattinam Vedaranyam 3.50 42.00 12-O-1770 Aymoor Road in Km 0/0 - 3/5

Improvements to Virkudy - 1-CRIDP-11- Thirupayathangudy 1771 Nagapattinam Nagapattinam 3.60 63.00 12-O-1771 Road Km 3/0-6/6 and protective works at km 4/10.

Strengthen ing/ Improvements 15.30 234.00 Total

Reconstruction of 1-CRIDP-11- bridge at km 0/2 of 1772 Nagapattinam Sirkazhi 48.00 12-O-1772 Thandavankulam- peravaguppu road

Reconstruction of 1-CRIDP-11- bridge at Km 4/10 of 1773 Nagapattinam Nagapattinam 22.00 12-O-1773 Sikkal-Palakkurichi Road

ODR Page 20 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of 1-CRIDP-11- Culvert at Km 17/8 of 1774 Nagapattinam Nagapattinam 20.00 12-O-1774 Sikkal-Palakkurichi Road

Reconstruction of bridge at km 0/10 of 1-CRIDP-11- 1775 Nagapattinam Poompuhar Thirukkadaiyur- 40.00 12-O-1775 Kannankudi- Killiur road

Bridges/ CD Works/ Others 4 Nos. 130.00 Total

Nagapattinam 15.30 364.00 Total

Trichy Total Other works : 6 Nos. 179.47 2412.50

widening from SL - IL & Improvements to 1-CRIDP-11- 1776 Salem Eadpadi Silluvampalayam - 1.40 55.00 12-O-1776 Thambagoundanur Road Km 0/0 - 1/4

Widening & Improvements 1.40 55.00 Total

Improvements in Km 1-CRIDP-11- 1/4 - 2/6 of Km 191/4 1777 Salem Omalur 1.20 20.00 12-O-1777 of V.C.C. road to Kullagoundanur road

Improvements in Km 4/2 - 5/0, 6/0 - 7/0 & 8/2 - 8/6 of 1-CRIDP-11- 1778 Salem Omalur Elavaramarathur - 2.20 20.00 12-O-1778 Tharamangalam (via) Reddipatty, Vedappatty road

Improvements in Km 0/0- 4/0 of 1-CRIDP-11- 1779 Salem Omalur Kamalapuram - 4.00 50.00 12-O-1779 Chinnathirupathi - Jodukuli road

ODR Page 21 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in Km 1-CRIDP-11- 0/0 - 0/6 of 1780 Salem Sankari 0.60 6.00 12-O-1780 Chinnappampatty high school road

Improvements in Km 0/0 - 4/0 of 1-CRIDP-11- 1781 Salem Omalur Amarakunthi - 4.00 32.00 12-O-1781 Mallikuttai - Olaipatti road

Strengthen ing/ Improvements 12.00 128.00 Total

Widening of RCC slab 1-CRIDP-11- culvert at Km 10/2 of 1782 Salem Eadpadi 1.00 12-O-1782 Kalvadagam - Poolampatti Road

Construction of bridge at Km.0/8 of road branching from Km.1/6 1-CRIDP-11- 1783 Salem Eadpadi of Edapady - 130.00 12-O-1783 Magudanchavadi road to Goundampatty (via) Vellandivalasu

Bridges/ CD Works/ Others 2 Nos. 131.00 Total

Salem Total 13.40 314.00

Widening SL to IL and Improvements from Km 14/6-18/0 of Sendamangalam - 1-CRIDP-11- 1784 Namakkal Senthamangalam Alangantham road 3.40 190.00 12-O-1784 (Including widening culvert at Km 15/4,16/4 16/6, 17/10)

Widening SL to IL and Improvements from Km 12/8-14/6 of 1-CRIDP-11- 1785 Namakkal Senthamangalam Sendamangalam - 1.80 190.00 12-O-1785 Alangantham road (Construction of retaining wall)

ODR Page 22 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening SL to IL and Improvements from Km 9/6-12/8 of Sendamangalam - Alangantham road 1-CRIDP-11- (Including widening 1786 Namakkal Senthamangalam 3.20 180.00 12-O-1786 culverts at Km 10/2, 11/4 (ii), 11/6 (i), (ii) and reconstruction of culverts at Km 11/4 (i) and construction of retaining wall)

Widening & Improvements 8.40 560.00 Total Namakkal 8.40 560.00 Total

Widening from SL to IL in km 0/0-5/150 of Pochampalli - 1-CRIDP-11- Kodamandapatty road 1787 Krishnagiri Bargur 5.15 105.00 12-O-1787 and Reconstruction of Culvert at km 0/6, 0/10(i)(ii), 1/8, 3/2, 3/10, 4/8

Widening & Improvements 5.15 105.00 Total

Improvements to Km 22/0-23/6 of 1-CRIDP-11- 1788 Krishnagiri Bargur Pochampalli- 1.60 15.00 12-O-1788 Thogarapalli - Kappalvadi road

Improvements to 1-CRIDP-11- Bellapalli - 1789 Krishnagiri Thalli 2.60 30.00 12-O-1789 Kempathapalli Road Km 0/0-2/6.

Improvements to 1-CRIDP-11- Kaveripattinam - KRP 1790 Krishnagiri Krishnagiri 1.89 15.00 12-O-1790 Dam via Kalvehalli km 0/0-0/2, 5/0-6/685

ODR Page 23 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- 1791 Krishnagiri Krishnagiri Devarmukkulam road 2.40 20.00 12-O-1791 km 0/0-2/4

Improvements to 1-CRIDP-11- 1792 Krishnagiri Bargur Nedungal Avathavadi 2.00 16.00 12-O-1792 km 3/0- 4/0, 5/0-6/0

Improvements to Denkanikotta - Anchetty - Urigum Road 1-CRIDP-11- at Km 24/2, 24/4, 1793 Krishnagiri Thalli 5.80 60.00 12-O-1793 24/8, 24/10, 27/6, 28/0-30/0, 33/0-35/0, 35/6, 41/8, 41/10, 42/6.

Improvements to Km 1-CRIDP-11- 1794 Krishnagiri Krishnagiri 6/0-7/2 of Krishnagiri - 1.20 35.00 12-O-1794 Kandhikuppam road

Improvements to Km 1-CRIDP-11- 1795 Krishnagiri Krishnagiri 4/0-5/8 of Krishnagiri - 1.80 50.00 12-O-1795 Kandhikuppam road

Strengthen ing/ Improvements 19.29 241.00 Total

Krishnagiri 24.44 346.00 Total

Improvements to KM 1/4-1/8, 2/4-4/2,5/0- 6/8 Wideining of culvert at Km 5/4 Construction 1-CRIDP-11- 1796 Dharmapuri Dharmapuri of culvert and well 4.00 46.00 12-O-1796 protective wall at Km 6/2 of Nallampalli - Mittareddihalli (Via) Laligam road

Improvements to KM 2/0-4/0 of Nagarkoodal 1-CRIDP-11- road to 1797 Dharmapuri Dharmapuri 2.00 20.00 12-O-1797 Palanigoundankottai road (Via) Eachampatti road

Improvements at KM 1-CRIDP-11- 1798 Dharmapuri Pappireddipatti 0/0-1/2 of Odasalpatti - 1.20 12.00 12-O-1798 Kambainallur road

ODR Page 24 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km 0/0-1/6 including 1-CRIDP-11- 1799 Dharmapuri Pappireddipatti construction of culvert 1.60 14.00 12-O-1799 at Km 0/8 of DTV road to Kuppur road

Strengthen ing/ Improvements 8.80 92.00 Total

Dharmapuri 8.80 92.00 Total Other works : Salem Total 55.04 1312.00 2 Nos.

Improvements to km 1-CRIDP-11- 0/0 - 1/2 of Keeranur - 1800 Tiruppur Kangeyam 1.20 10.00 12-O-1800 Velayuthampalayam road

Improvements to km 2/0 - 3/0 of road from 1-CRIDP-11- Gobi - Dharapuram 1801 Tiruppur Kangeyam 1.00 8.00 12-O-1801 road to Koduvai (via) Kongarpalayam - Ellappalayam

Strengthen ing/ Improvements 2.20 18.00 Total

Tiruppur 2.20 18.00 Total

Improvements to Km 29/0-30/2 & 37/2 of 1-CRIDP-11- 1802 Dharapuram Dharapuram Vellakovil to District 1.40 14.00 12-O-1802 limit road (via) Mylrangam

Improvements to Km 1-CRIDP-11- 8/0-9/4 & 10/8-11/6 1803 Dharapuram Dharapuram 2.20 17.80 12-O-1803 of Karaiyur - Athimarathupudur road

Improvements to Km 1/2-2/0 & 5/0-6/0 of 1-CRIDP-11- Kasilingampalayam 1804 Dharapuram Dharapuram 1.80 14.50 12-O-1804 pirivu - Bhagavankovil road (via) Uchannavalasu

ODR Page 25 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km 4/0-8/2 of 1-CRIDP-11- 1805 Dharapuram Dharapuram Puthukkottai pirivu - 4.20 33.70 12-O-1805 Kambaliyampatty road (via) Vellinagar

Improvements to Km 1-CRIDP-11- 0/0-2/0 & 2/4-4/0 of 1806 Dharapuram Dharapuram 3.60 29.00 12-O-1806 Vadugapatty - Markkampatty road

Improvements to Km 1-CRIDP-11- 0/0-1/2 of Mallipatty 1807 Dharapuram Dharapuram 1.20 9.80 12-O-1807 pirivu - Kottai Mulanur road

Improvements to Km 0/0-1/7 of Muthur 1-CRIDP-11- 1808 Dharapuram Dharapuram Mulanur road to 1.70 13.80 12-O-1808 Vanjivalasu (via) Sunnampukattuvalasu

Improvements to Km 1-CRIDP-11- 0/0-1/1 & 1/8-2/8 of 1809 Dharapuram Dharapuram 2.10 17.00 12-O-1809 Bommipalayam pirivu - Nalukalkuttai road

Improvements to Km 1/0-2/0 of 1-CRIDP-11- Muthugoundenvalasu 1810 Dharapuram Dharapuram 1.00 10.00 12-O-1810 pirivu - Muthur, Mulanur road (via) Thalakkarai

Improvements to Km 2/4-3/6 of 1-CRIDP-11- 1811 Dharapuram Dharapuram Chinnakkampatty 1.20 9.60 12-O-1811 pirivu - Vellavavipudur road

Improvements to Km 1-CRIDP-11- 0/0-1/0 of Karur - 1812 Dharapuram Dharapuram 1.00 8.00 12-O-1812 Dharapuram road to Salarapatty

ODR Page 26 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to the narrow 'S' curve in km 1-CRIDP-11- 1813 Dharapuram Kangeyam 3/6-4/0 of NGM road to 0.40 16.00 12-O-1813 Ganapathypalayam road

Improvements to km 1-CRIDP-11- 1814 Dharapuram Kangeyam 7/0-10/8 of Ponparappi 3.80 31.00 12-O-1814 - Kambiliampatty road

Improvements to km 1-CRIDP-11- 3/1-3/6 of Muthur - 1815 Dharapuram Kangeyam 0.50 4.00 12-O-1815 Mulanur Road to Nachipalayam road

Improvements to km 1-CRIDP-11- 16/6 - 18/0 of 1816 Dharapuram Dharapuram 1.40 12.00 12-O-1816 Vellakovil to Dist. Limit road (via) Myilranggam

Improvements to km 0/8-0/10, 2/6 - 2/8 & 1-CRIDP-11- 1817 Dharapuram Kangeyam 5/4-9/6 of Vellakovil - 4.60 54.00 12-O-1817 Veppampalayam - Noyyal road

Improvements to km 14/2-17/2 of 1-CRIDP-11- Mullipuram - 1818 Dharapuram Kangeyam 3.00 24.00 12-O-1818 Bhagavathi Palayam - Silabagoundanvalasu road Improvements to km 4/0-4/8 & 6/6-7/0 of 1-CRIDP-11- Nagapattinam - 1819 Dharapuram Kangeyam 1.20 9.60 12-O-1819 Gudalur - Mysore road to Ganapathi-palayam road

Improvements to km 0/0-1/0, 3/0-3/6 & 1-CRIDP-11- 1820 Dharapuram Kangeyam 5/6-7/6 of NH -67 to 3.60 30.00 12-O-1820 Sengalipalayam road (via) Irataikinaru

Improvements to km 12/8-15/0 of 1-CRIDP-11- Thanneerpandal - 1821 Dharapuram Kangeyam 2.20 24.00 12-O-1821 Kambiliampatty - Lakkumanaickenpatty road

ODR Page 27 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 0/0- 6/0 of 1-CRIDP-11- 1822 Dharapuram Madathukulam Modakupatti - 6.00 65.00 12-O-1822 Thirumoorthi Nagar road

Strengthen ing/ Improvements 48.10 446.80 Total

Dharapuram 48.10 446.80 Total

Improvements to Km 4/0-5/2,6/0-17/4 & 1-CRIDP-11- 1823 Erode Anthiyur 24/0-24/4 of 13.00 100.00 12-O-1823 Vellitirupur Thottikinar road

Improvements to 1-CRIDP-11- 1824 Erode Bhavani Km.4/0-5/0 of 1.00 8.00 12-O-1824 Poonachi Chithar road

Strengthen ing/ Improvements 14.00 108.00 Total

Reconstruction of Bridge in lieu of existing 1-CRIDP-11- cause way at km 1/4 of 1825 Erode Erodewest 90.00 12-O-1825 Palayapalayam to Rangampalayam (via) Nalliampalayam road

Reconstruction of Bridge in lieu of existing 1-CRIDP-11- 1826 Erode Erodewest cause way at km 3/2 of 110.00 12-O-1826 Nasiyanur - Kambiliampatty road

Reconstruction of damaged cut stone 1-CRIDP-11- culvert at Km 0/6 of 1827 Erode Bhavani 3.00 12-O-1827 Bhavani Old Bus stand to Anthiyur road and Pavadi street road

ODR Page 28 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of Minor 1-CRIDP-11- Bridge at km 0/4 of 1828 Erode Modakkurichi 25.00 12-O-1828 Palliyuthu-Ayaparappu (via) Mankaradu road

Bridges/ CD Works/ Others 4 Nos. 228.00 Total

Erode Total 14.00 336.00

Tiruppur Other works : 4 Nos. 64.30 800.80 Total

"Widening Single Lane to Intermediate lane including improvements 1-CRIDP-11- in km 0/0 - 1/8 of road 1829 Coimbatore Kinathukadavu 1.80 95.00 12-O-1829 from km 168/4 of Salem Cochin road to Kurumbapalayam road "

"Widening Intermediate Lane to Double lane 1-CRIDP-11- including Improvements 1830 Coimbatore Kinathukadavu 1.40 75.00 12-O-1830 in km 2/0 - 3/4 to Podanur Singanallur road "

Widening from single lane to intermediate lane and improvements to km 0/0-1/2 of the 1-CRIDP-11- road from km 3/8 of 1831 Coimbatore Coimbatorenorth 1.20 50.00 12-O-1831 Coimbatore - Madampatty Road to join at Km 5/6 of Agri college - Maruthamalai road (via) Veerakeralam

Widening from Single Lane to Intermediate Lane and Impts in Km 1/2-2/4 of the road 1-CRIDP-11- from Km 3/8 of 1832 Coimbatore Coimbatorenorth 1.20 50.00 12-O-1832 Coimbatore - Madampatti road to Join at Km 5/6 of Agri college -Maruthamalai road (Via) Veerakeralam

ODR Page 29 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening Intermediate Lane to Double lane 1-CRIDP-11- including Improvements 1833 Coimbatore Kinathukadavu 1.40 80.00 12-O-1833 in km 3/4 - 4/8 to Podanur Singanallur road

Widening & Improvements 7.00 350.00 Total

Coimbatore 7.00 350.00 Total

Improvements in km 1-CRIDP-11- 2/0 - 2/550 of 1834 Pollachi Udumalapet 0.55 5.00 12-O-1834 Gomanagalam - Kozhikuttai road

Strengthen ing/ Improvements 0.55 5.00 Total

Reconstruction of 1-CRIDP-11- culvert at km 12/2 of 1835 Pollachi Pollachi 2.00 12-O-1835 Mullupady - Sirukaladai road

Reconstruction of culverts at km 1/4 & 1-CRIDP-11- 2/4 of the road from km 1836 Pollachi Kinathukadavu 4.00 12-O-1836 0/8 of Kinathukadavu - Cochin Frontier road to Kallapuram

Reconstruction of culvert at km 5/2 & 1-CRIDP-11- 5/8 of the road from km 1837 Pollachi Kinathukadavu 22.00 12-O-1837 140/2 of Dindugal - Bangalore road to Kanjikonampalayam

Reconstruction of 1-CRIDP-11- culvert at km 5/2 of 1838 Pollachi Pollachi 2.00 12-O-1838 Seripalayam - Thamarikulam road

Reconstruction of culvert at km 1/8 of the 1-CRIDP-11- 1839 Pollachi Kinathukadavu road from km 138/8 of 2.00 12-O-1839 Dindugal - Bangalore road to Arasampalayam

ODR Page 30 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert at km 6/10 of 1-CRIDP-11- 1840 Pollachi Valparai Vettaikaranpudur - 20.00 12-O-1840 Ponnalammanthurai road

Reconstruction of damaged body wall for the causeway at km 1-CRIDP-11- 1841 Pollachi Valparai 5/2 of the road from km 10.00 12-O-1841 5/4 of Kottur - Thengaparai road to Vettaikaranpudur

Reconstruction of culvert at km 4/10 of the road from km 2/6 of 1-CRIDP-11- 1842 Pollachi Udumalapet Pollachi - Dharapuram - 3.00 12-O-1842 Karur road to Rasakapalayam (via) Alampalayam

Construction of culvert 1-CRIDP-11- 1843 Pollachi Pollachi at km 3/4 of Muthur - 4.00 12-O-1843 Ramapattinam road

Reconstruction of 1-CRIDP-11- culvert at km 3/4 of 1844 Pollachi Udumalapet 3.00 12-O-1844 Naickenpalayam - Suleswaranpatty road

Bridges/ CD Works/ Others 10 Nos. 72.00 Total

Pollachi Total 0.55 77.00

Improvements to km 13/6-14/2,17/0-18/2 and Improvements to 1-CRIDP-11- Road junctionand 1845 Gobi Gobichettypalayam 1.80 90.00 12-O-1845 construction of retaining wall at km 18/2Puliampaty- Nambiyur road

ODR Page 31 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements and Widening to KM 1/8- 3/0 including 1-CRIDP-11- improvements to dip at 1846 Gobi Gobichettypalayam 1.20 50.00 12-O-1846 km 2/2 and construction of drain at km 2/2 of Pariyur- Vellalapalayam road

Improvements to km 6/4-9/2 and 12/0-13/0 and reconstruction of 1-CRIDP-11- culvert at km 10/4 and 1847 Gobi Perundhurai 3.80 40.00 12-O-1847 providing revetment at km 5/10 of Thudupatthi Chittampalayam road

Improvements to KM 1-CRIDP-11- 0/0-2/9 Kavandapdy- 1848 Gobi Perundhurai 2.90 30.00 12-O-1848 Nalligoudenpudur road road

Improvements to KM 1-CRIDP-11- 0/0-5/7 of 1849 Gobi Gobichettypalayam 5.70 65.00 12-O-1849 Nagadevampalayam- Korakkattur road

Improvements to KM 7/6-8/0,9/2-9/8,11/0- 1-CRIDP-11- 1850 Gobi Bhavanisagar 11/2,11/6-12/2,12/4- 2.40 70.00 12-O-1850 13/0 of Puliampatti- Nambiyur road

Improvements to KM 0/4-2/4including 1-CRIDP-11- 1851 Gobi Gobichettypalayam construction of culvert 2.00 20.00 12-O-1851 at km 0/10 of Nagarpalayam road

Improvements to KM 1-CRIDP-11- 2/2-3/4 of 1852 Gobi Gobichettypalayam 1.20 13.00 12-O-1852 Mangalapuram- Unjapalayam road

Improvements to KM 1-CRIDP-11- 0/0-3/6 & 7/6-9/0 of 1853 Gobi Bhavanisagar 5.00 47.00 12-O-1853 Palayam-Sathanpuram road

Strengthening/ Improvements 26.00 425.00 Total

Gobi Total 26.00 425.00

ODR Page 32 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 2/0-3/2 of Mellithane 1-CRIDP-11- 1854 Udhagai Coonoor Kurukatty road 1.20 35.00 12-O-1854 including CC drain and protective works

Improvements to Km 1/5-3/0 of Adashola 1-CRIDP-11- 1855 Udhagai Uthagamandalam Ebbanadu road 1.50 30.00 12-O-1855 including Protective works

Improvements to Km 4/2-7/0 of 1-CRIDP-11- Buttercombai Kappachi 1856 Udhagai Uthagamandalam 2.80 49.00 12-O-1856 (Via) Thummanatty road including Protective works

Providing interlocking paver block pavement and protective works in 1-CRIDP-11- 1857 Udhagai Uthagamandalam water logging swamp 49.00 12-O-1857 portions at Km 0/8, 1/4, 1/6 & 2/2 of Ithalar Nanjanadu road

Improvements to fernhill road Km 0/0- 1-CRIDP-11- 1858 Udhagai Uthagamandalam 1/0 including and paver 1.00 99.00 12-O-1858 block pavement at shaded swamp portion

Improvements to Km 0/0-1/0 of Charringcross south 1-CRIDP-11- 1859 Udhagai Uthagamandalam lake (Via) Lower bazaar 1.00 60.00 12-O-1859 road including paver block pavement at swamp portion

Improvements to Km 1/0-1/8 of Charringcross south 1-CRIDP-11- 1860 Udhagai Uthagamandalam lake (Via) Lower bazaar 0.80 49.00 12-O-1860 road including paver block pavement at swamp portion

ODR Page 33 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Km 10/0-12/0 of Thaishola 1-CRIDP-11- Korakundah 1861 Udhagai Uthagamandalam 2.00 30.00 12-O-1861 Upperbhavani road including protective works

Providing interlocking paver block pavement and protective works in water logging swamp 1-CRIDP-11- portions at Km 1862 Udhagai Uthagamandalam 30.00 12-O-1862 0/2,0/6,8 and 1/6 of M. Palada B. Manihatty road(Via) Kallakorai hada Gandhi Nagar road

Providing interlocking paver block pavement and protective works in water logging swamp 1-CRIDP-11- portions at Km 1/8, 1863 Udhagai Uthagamandalam 30.00 12-O-1863 3/10 & 4/2 of M. Palada B. Manihatty road(Via) Kallakorai hada Gandhi Nagar road

Improvements to Km 1-CRIDP-11- 0/0 - 3/2 of Kaikatty 1864 Udhagai Coonoor 3.20 63.00 12-O-1864 Kolacombai Road including CC Drain.

Improvements and Construction of CC 1-CRIDP-11- Drain and Protective 1865 Udhagai Uthagamandalam 2.40 50.00 12-O-1865 works at Km 0/0 - 2/4 of Hubathalai Sogathorai Road.

Improvements and construction of CC 1-CRIDP-11- 1866 Udhagai Uthagamandalam Drain and protective 1.40 50.00 12-O-1866 works at Km 0/0-1/4 of Havukkal Idukorai road

Improvementsto km 1-CRIDP-11- 0/0 - 2/0 of Marvala 1867 Udhagai Coonoor 2.00 50.00 12-O-1867 road including CC drain and protective works

ODR Page 34 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to km 0/0 - 1/6 of Nedugula - 1-CRIDP-11- 1868 Udhagai Coonoor Kottanalli road 1.60 30.00 12-O-1868 including CC drain and protective works

Improvementsto km 1-CRIDP-11- 2/0-4/0 of Marvala 1869 Udhagai Coonoor 2.00 35.00 12-O-1869 road including CC drain and protective works

Improvements to Km 12/0-15/0 of Thaishola 1-CRIDP-11- Korakundah 1870 Udhagai Uthagamandalam 3.00 49.00 12-O-1870 Upperbhavani road including protective works

Udhagai Total 25.90 788.00

Coimbatore Other works : 10 Nos. 59.45 1640.00 Total

Reconstruction of 1-CRIDP-11- Thiruparankundra bridge at km 1/8 & 2/6 1871 Madurai 52.00 12-O-1871 m of Pasumalai- Thirunagar road

Reconstruction of Minor bridge at Km 0/2 1-CRIDP-11- 1872 Madurai Usilampatti &culvert at 0/4of 65.00 12-O-1872 Valandur - Pappapatti Road

Bridges/ CD Works/ Others 2 Nos. 117.00 Total

Madurai Total 117.00

Widening from S.L to I.L in km 0/0-0/8 of km 28/8 of Palayam - Bodi road to 1-CRIDP-11- 1873 Theni Bodinayakanur Melachokkanathapura 0.80 30.00 12-O-1873 m road Including construction of Retaining wall @ km 0/2,0/4, 0/6 & 0/8

ODR Page 35 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from S.L to I.L in km 0/0-2/0 of Theni - 1-CRIDP-11- 1874 Theni Bodinayakanur Bodi road to Rediapatty 2.00 30.00 12-O-1874 (via) Anaikaraipatty road

Widening from S.L to I.L in km 0/0-1/0 of Melachokkanathapura m road including 1-CRIDP-11- 1875 Theni Bodinayakanur construction of pipe 1.00 15.00 12-O-1875 culvert at km.0/2, 0/10 including construction of retaining wall at km.0/10 (1x0.90m)

Widening from SL to IL 1-CRIDP-11- of Dindigul - Kumuli 1876 Theni Bodinayakanur 0.80 18.00 12-O-1876 road to Boothipuram road km.0/2-1/0

Widening from SL to IL of Madurai - Theni road to T.Subbulapuram road km.0/0-1/2 1-CRIDP-11- including 1877 Theni Andipatti 1.20 45.00 12-O-1877 Reconstruction of culvert at km.0/4 & 0/8 and construction of Retaining wall ( 0/4, 0/8-1x2.60m)

Widening & Improvements 5.80 138.00 Total

Improvements to Thangammalpuram - 1-CRIDP-11- Karuppaiahpuram 1878 Theni Andipatti 2.78 24.00 12-O-1878 vilakku road (via) Vaikkalparai km 5/0 - 7/780

Improvements to 1-CRIDP-11- Lakshmipuram - 1879 Theni Bodinayakanur 2.00 17.00 12-O-1879 Jangalpatti road km.0/0-2/0

Strengthen ing/ Improvements 4.78 41.00 Total

ODR Page 36 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert at km 2/6 of 1-CRIDP-11- Jampuliputhur - 1880 Theni Andipatti 15.00 12-O-1880 Renganathapuram road (via) Rengasamuthiram (1x2.60m)

Construction of culvert at Km.0/10 of 1-CRIDP-11- 1881 Theni Andipatti Rajathani - Sitharpatti 15.00 12-O-1881 (via) Ammapatti road (0/10-1x4.60m)

Reconstructiion of Culvert in lieu of existing causeway at km,1/2, 1/6 including Retaining wall and 1-CRIDP-11- Reconstruction of 1882 Theni Andipatti 45.00 12-O-1882 culvert at Km.3/4 of Thangammalpuram - Karupaihpuram villakku (via) Vaikkalparai road (1/2, 1/6, 3/4- 1x4.60m)

Reconstruction of culvert @ km 2/2,2/6 of Sillamarathupatty - 1-CRIDP-11- 1883 Theni Bodinayakanur Melachokkanathapura 14.00 12-O-1883 m (via) Ammapatty road (2/2-1x3.6m) 2/6- 1x0.90m)

Reconstruction of culvert @ km 3/2,3/6 of 1-CRIDP-11- 1884 Theni Bodinayakanur Sankarapuram- 22.00 12-O-1884 Kuchanur road (1x3.60m)

Construction of culvert 1-CRIDP-11- @ km 2/2 of Veerapandi 1885 Theni Bodinayakanur 7.00 12-O-1885 - Koduvilarpatti road (1x2.60m)

Construction of Protective wall near 1-CRIDP-11- bridge at Km 0/8 of 1886 Theni Cumbam 20.00 12-O-1886 Karunagamuthanpatty Villaku - Vannathiparai Road.

Bridges/ CD Works/ Others 7 Nos. 138.00 Total Theni Total 10.58 317.00

ODR Page 37 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Poolankuruchi - Periyamaruthipatti road km. 2/4-3/0,3/2-3/6 , 1-CRIDP-11- 1887 Sivagangai Tirupattur 3/8-5/0,6/0-8/678 & 4.88 50.00 12-O-1887 Reconstruction of Culvert at km. 6/6,7/4(i),(ii),7/6,7/8, 7/10

improvements to 1-CRIDP-11- 1888 Sivagangai Karaikudi kandanoor - Aravayal 3.38 24.00 12-O-1888 road Km. 7/420-10/8

Improvements to 1-CRIDP-11- 1889 Sivagangai Manamadurai Munaivendri road km 0.80 7.00 12-O-1889 3/0-3/8

1-CRIDP-11- kandanoor - Aravayal 1890 Sivagangai Karaikudi 2.02 16.00 12-O-1890 road Km. 11/6-13/620

Strengthen ing/ Improvements 11.08 97.00 Total

Sivagangai 11.08 97.00 Total

Madurai Total Other works : 9 Nos. 21.66 531.00

Improvements to Maruthakulam - 1-CRIDP-11- 1891 Tirunelveli Nanguneri Moolaikaraipatti Road 2.00 20.00 12-O-1891 (via) Deivanayagaperi Road Km 1/0 - 3/0.

Improvements to BCC Road To 1-CRIDP-11- 1892 Tirunelveli Nanguneri Thiruvengadanathapura 2.90 29.00 12-O-1892 m Road Km 0/0 - 1/6 & 1/700 - 3/0.

Improvements to 1-CRIDP-11- 1893 Tirunelveli Ambasamudram Ambur - Papanasam 1.80 20.00 12-O-1893 Road Km 0/8 - 2/6.

Improvements to 1-CRIDP-11- Chinnamoolaikaraipatti 1894 Tirunelveli Nanguneri 3.70 33.00 12-O-1894 - Chinthamani Road Km 0/0 - 3/700.

ODR Page 38 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Vallioor - Rajapudur 1895 Tirunelveli Nanguneri 2.93 24.00 12-O-1895 Road Km 3/100 - 6/032.

Improvements to 1-CRIDP-11- 1896 Tirunelveli Nanguneri Parapadi - Chithoor 1.20 12.00 12-O-1896 Road Km 2/0 - 3/2.

Providing cement concrete pavement in Km 0/0 - 0/2 & 1-CRIDP-11- 1897 Tirunelveli Alangulam Improvements in Km 2.80 38.00 12-O-1897 0/2 - 2/8 of Odaimarichan - Maranthai Road.

Strengthen ing/ Improvements 17.33 176.00 Total

Reconstruction of Culvert at Km 0/4 of 1-CRIDP-11- 1898 Tirunelveli Tirunelveli Thenkalam - 20.00 12-O-1898 Therkuchelianallur Road.

Construction of Pipe 1-CRIDP-11- Culvert at Km 1/4 of 1899 Tirunelveli Radhapuram 3.00 12-O-1899 Therkku Vallioor - Vadalivilai Road.

Reconstruction of Culvert at Km 9/6 of 1-CRIDP-11- 1900 Tirunelveli Nanguneri Karanthaneri - 8.00 12-O-1900 Subramaniapuram Road.

Reconstruction of 1-CRIDP-11- Culvert at Km 10/10 of 1901 Tirunelveli Nanguneri 8.00 12-O-1901 Melaseval - Singikulam - Panankulam Road.

Reconstruction of 1-CRIDP-11- Culvert at Km 0/8 (i) & 1902 Tirunelveli Nanguneri 6.50 12-O-1902 (ii) of Marukalkurichi Road.

Bridges/ CD Works/ Others 5 Nos. 45.50 Total

Tirunelveli 17.33 221.50 Total

ODR Page 39 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening from SL to IL and Improvements in 1-CRIDP-11- 1903 Thenkasi Vasudevanallur km 8/2-10/0 of 1.80 73.00 12-O-1903 Sankarankoil- Vasudevanallur Road

Widening SL to IL and Improvements to road branching from Km 6/0 1-CRIDP-11- of Shencottai - 1904 Thenkasi Kadaianallur 1.60 77.50 12-O-1904 Sambavarvadakarai road to Tenkasi road Km 0/0-1/6 including CD works.

Widening & Improvements 3.40 150.50 Total

Improvements to Mela 1-CRIDP-11- 1905 Thenkasi Sankarankoil Ilanthaikulam Road Km 2.00 21.00 12-O-1905 2/0 - 4/0.

Improvements to road branching from Km 6/0 1-CRIDP-11- of Shencottai - 1906 Thenkasi Kadaianallur 3.80 90.00 12-O-1906 Sambavarvadakarai road to Achampudur road Km 0/0-3/8

Improvements in km 1-CRIDP-11- 12/0-16/0 of 1907 Thenkasi Vasudevanallur 4.00 68.00 12-O-1907 Sankarankoil- Vasudevanallur Road

Improvements to 1-CRIDP-11- Othakadai- 1908 Thenkasi Vasudevanallur 3.00 52.00 12-O-1908 Karivalamvanthanallur Road in km 0/0-3/0

Improvements to 1-CRIDP-11- Othakadai- 1909 Thenkasi Vasudevanallur 5.40 94.00 12-O-1909 Karivalamvanthanallur Road in km 6/6-12/0

Improvements to 1-CRIDP-11- Muthukrishnaperi- 1910 Thenkasi Alangulam 5.00 45.00 12-O-1910 Tuthikulam road km 0/0-5/0

ODR Page 40 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Aadaikalapuram- 1911 Thenkasi Alangulam 1.00 11.00 12-O-1911 Pattamudaiyarpuram road km 2/0-3/0

Improvements to 1-CRIDP-11- Naluvasankottai - 1912 Thenkasi Sankarankoil 2.00 20.00 12-O-1912 Mahendravadi Road Km 2/0 - 4/0.

Improvements to road branching from Km 9/8 1-CRIDP-11- of Sivaramapettai- 1913 Thenkasi Kadaianallur 1.20 21.00 12-O-1913 panpoli-Shenkottai road to Karisalkudiyruppu road km 0/0-1/2,

Strengthen ing/ Improvements 27.40 422.00 Total

Thenkasi 30.80 572.50 Total

Widening and improvements from SL 1-CRIDP-11- to IL in km 2/6-4/0 of 1914 Tuticorin Thiruchendur 1.40 90.00 12-O-1914 Thenthiruperai - Eral Road including protective works

Widening and Rebuilding from SL to 1-CRIDP-11- IL in km 4/0-5/0 of 1915 Tuticorin Srivaikundam 1.00 80.00 12-O-1915 ponankuruchi - peikulam Road and Retaining wall

Widening and Rebuilding from SL to 1-CRIDP-11- 1916 Tuticorin Srivaikundam IL in km 5/0-6/6 of 1.60 90.00 12-O-1916 ponankuruchi - peikulam Road

Widening and Junction 1-CRIDP-11- improvements from SL 1917 Tuticorin Srivaikundam 0.40 50.00 12-O-1917 to IL in km 0/0-0/4 of Alwarthoppu Road

ODR Page 41 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Widening and improvements from SL 1-CRIDP-11- to IL in km 4/0-5/6 of 1918 Tuticorin Thiruchendur 1.60 90.00 12-O-1918 Thenthiruperai - Eral Road including protective works

Widening & Improvements 6.00 400.00 Total

Improvements in km 1-CRIDP-11- 2/0-3/8 of Udangudy - 1919 Tuticorin Thiruchendur 1.80 15.00 12-O-1919 Uthiramadankudiyrupp u Road

ODR Page 42 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements in km 4/0-5/8 of 1-CRIDP-11- 1920 Tuticorin Thiruchendur Menganapuram – 1.80 15.00 12-O-1920 Kayamozli Road (Via) Therikudiruppu Road

Strengthen ing/ Improvements 3.60 30.00 Total

Constrution of Culvert 1-CRIDP-11- 1921 Tuticorin Kovilpatti at km 1/8 of 5.00 12-O-1921 Kumaragiri Road

Bridges/ CD Works/ Others 1 No. 5.00 Total

Tuticorin 9.60 435.00 Total Improvements to 1-CRIDP-11- Chinnakollampatti- 1922 Virudhunagar Sattur 5.00 48.00 12-O-1922 Ayyampatti road km 3/0 - 8/0

Improvements to 1-CRIDP-11- Kumarapuram - 1923 Virudhunagar Virudhunagar 1.60 24.00 12-O-1923 Koundampatti road Km 0/0-1/6

Improvements to Madurai - 1-CRIDP-11- 1924 Virudhunagar Virudhunagar Kanniyakumari road to 2.00 30.00 12-O-1924 E.Kumaralingapuram road km 0/0-2/0

Improvements to 1-CRIDP-11- Appayanayakanpatti - 1925 Virudhunagar Virudhunagar 2.00 30.00 12-O-1925 Mallaiyanaickanpatti road km 0/0-2/0

Improvements to 1-CRIDP-11- Sankaralingapuram - 1926 Virudhunagar Virudhunagar 1.00 15.50 12-O-1926 Railway station road km 2/0-3/0

ODR Page 43 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to Madurai - 1-CRIDP-11- 1927 Virudhunagar Virudhunagar Kanniyakumari road to 0.80 13.00 12-O-1927 chatrareddiyapatti road km 0/0-0/8

Improvements to Trichy 1-CRIDP-11- - Tuticorin Road to 1928 Virudhunagar Aruppukottai 1.20 22.00 12-O-1928 Periyanayakapuram Road Km 0/0 - 1/2

Improvements to 1-CRIDP-11- T.Managaseri - 1929 Virudhunagar Sivakasi 2.80 42.00 12-O-1929 Krishnaperi road km 0/0-2/8

Improvements to Rajapalayam - 1-CRIDP-11- 1930 Virudhunagar Sattur Keelarajakularaman 2.00 33.00 12-O-1930 road to Thombakulam road km 0/0-2/0

Improvemets to 1-CRIDP-11- Asilapuram - 1931 Virudhunagar Sattur 3.24 30.00 12-O-1931 Chenthadiyapuram road km 0/0-3/240

Improvements to Alangulam District limit 1-CRIDP-11- 1932 Virudhunagar Sattur (via) Valaiyapatti road 1.60 14.00 12-O-1932 to Melanmarainadu road km 0/0-1/6

Improvements to Watrap - 1-CRIDP-11- 1933 Virudhunagar Srivilliputhur Archunapuram - 3.05 32.70 12-O-1933 Pudupatti road km 2/0- 5/045

Improvements to 1-CRIDP-11- 1934 Virudhunagar Thiruchuli Aladipatti - Ammanpatti 3.00 45.00 12-O-1934 road Km 8/0-11/0

Improvements to Thiruppuvanam - 1-CRIDP-11- 1935 Virudhunagar Thiruchuli Pulvoikarai road to 1.00 15.00 12-O-1935 Alathur road Km 8/0- 9/0

Improvements to 1-CRIDP-11- Idaiyapottal- 1936 Virudhunagar Srivilliputhur 0.80 10.00 12-O-1936 Avittanpuram road km 0/0-0/8

ODR Page 44 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Improvements to 1-CRIDP-11- Ramachandrapuram - 1937 Virudhunagar Srivilliputhur 4.86 56.80 12-O-1937 Reddiyapatti road km 0/0-4/859.

Improvements to T. 1-CRIDP-11- Karisalkulam - 1938 Virudhunagar Rajapalayam 2.20 34.40 12-O-1938 Thombakulam road km 0/0-2/2.

Improvements to Srivilliputhur - 1-CRIDP-11- 1939 Virudhunagar Aruppukottai Parthibanoor Road to 2.80 30.00 12-O-1939 Konnappanendal Road Km 0/0-2/8

Improvements to Sathur-Nenmeni road 1-CRIDP-11- to Madurai- 1940 Virudhunagar Sattur 1.40 23.00 12-O-1940 Kaniyakumari road (via) Maniyampatti road km 1/4-2/8

Strengthening/ Improvements 42.34 548.40 Total

Virudhunagar 42.34 548.40 Total

Improvements to 1-CRIDP-11- 1941 Nagercoil Vilavancode Kuzhivilai - Vilacheri 2.20 35.00 12-O-1941 road km 0/0 - 2/2.

Improvement to Melpalai - 1-CRIDP-11- Kodukkachivilai (via) 1942 Nagercoil Vilavancode 1.40 20.00 12-O-1942 Vadakkanvilagam Hrijan Colony road Km 0/0-1/4.

Strengthen ing/ Improvements 3.60 55.00 Total

Construction of culvert 1-CRIDP-11- at km 4/2 of 1943 Nagercoil Kanniyakumari 5.00 12-O-1943 Kanyakumari - Andivilai road.

ODR Page 45 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Reconstruction of culvert at km 0/6 and 1-CRIDP-11- construction of 1944 Nagercoil Vilavancode 10.00 12-O-1944 Retaining wall at km 0/10 Meycode - Parakkunu road.

Reconstruction of 1-CRIDP-11- culvert at km 2/4 of 1945 Nagercoil Vilavancode 21.00 12-O-1945 Ironipuram - Vericode road

Reconstruction of 1-CRIDP-11- culvert at km 0/2 (i), (ii) 1946 Nagercoil Killiyoor 10.00 12-O-1946 of Vazhuthalampallam - Padoor road

Construction of Retaining wall at km 1-CRIDP-11- Padmanabhapura 1947 Nagercoil 0/2 & 0/4 of 13.00 12-O-1947 m Padmanapapuram - Mekkamandapam road.

Reconstruction of weak and narrow bridge at 1-CRIDP-11- km 3/2 of Muttom - 1948 Nagercoil Kanniyakumari 10.00 12-O-1948 Kadiyapattanam - Manavalakurichi road inluding drainage.

Construction of 1-CRIDP-11- Padmanabhapura Retaining wall at km 1949 Nagercoil 10.00 12-O-1949 m 2/6 of Kumarankudy road.

Construction of hard 1-CRIDP-11- bed at km 0/6, 0/8 of 1950 Nagercoil Vilavancode 12.00 12-O-1950 Manjalamoodu - Kuttaicode road.

Construction of hard bed at km 0/4 of 1-CRIDP-11- 1951 Nagercoil Vilavancode Melpalai - 15.00 12-O-1951 Kodukkachivilai (via) Vadakkanvilagam road.

ODR Page 46 Sl. Length Cost Work code Division Constituency Name of work No. in Km in Lakhs

Construction of 1-CRIDP-11- Drainage at km 2/4, 1952 Nagercoil Vilavancode 15.00 12-O-1952 2/6 of Arumanai - Attoor road.

Construction of hard 1-CRIDP-11- bed at km 3/8, 3/10 of 1953 Nagercoil Vilavancode 12.00 12-O-1953 Edaicode - Kannumamoodu road.

Reconstruction of pipe culvert at km 1/2, hard bed at km 0/8 and 1-CRIDP-11- 1954 Nagercoil Vilavancode construction of 15.00 12-O-1954 Retaining wall at km 0/10 Padanthalamoodu - Meenachel road.

Reconstruction of pipe 1-CRIDP-11- culvert at km 0/6 of 1955 Nagercoil Killiyoor 5.00 12-O-1955 Thazhakkanvilai - Manukuzhi road.

Bridges/ CD Works/ Others 13 Nos. 153.00 Total

Nagercoil 3.60 208.00 Total Tirunelveli Other works : 19 Nos. 103.68 1985.40 Total

Grand Total Other works : 57 Nos. 681.51 12483.40

ODR Page 47 ANNEXURE CRIDP PROPOSAL 2011-12 LIST OF WORKS - OTHER DISTRICT ROADS - SCP

Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Strengthening to Kolathur 1956 11-12-P- Chengalpattu Chengalpattu 0.80 13.00 Road Km.1/2 - 2/0 1956 Strengthening Chunambedu - Perumbair 1-CRIDP- Road Km.15/4 - 17/0 1957 11-12-P- Chengalpattu Maduranthagam 1.60 85.00 including construction of 1957 culvert at Km.16/4

Strengthening of 1-CRIDP- Maruvalam - Venmani 1958 11-12-P- Chengalpattu Maduranthagam 4.20 40.00 Road Km.0/0 - 4/2 1958

1-CRIDP- Strengthening of Kondangi 1959 11-12-P- Chengalpattu Thiruporur Road Km.1/8 - 4/960 3.16 40.00 1959

Strengthening 1-CRIDP- Mettukuppam - 1960 11-12-P- Chengalpattu Kanchipuram 8.00 100.00 Perumbakkam Road 1960 Km.0/0 - 8/0

1-CRIDP- Strengthening to 1961 11-12-P- Chengalpattu Thiruporur Thirumani - Mosivakkam 1.40 17.00 1961 Road Km.1/6 - 3/0

Strengthening of Cheyyur - 1-CRIDP- Wandavasi to 1962 11-12-P- Chengalpattu Maduranthagam Thaneerpanthal (via) 4.70 85.00 1962 Devarajapuram Road Km.0/4 - 5/1

Strengthening of G.S.T 1-CRIDP- Road to 1963 11-12-P- Chengalpattu Thiruporur Thirukkalukundram (via) 3.20 95.00 1963 P.V.Kalathur Km.1/4 - 3/0 & 4/0 - 5/6

ODR SCP Page 1 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Strengthening of G.S.T 1-CRIDP- Road to 1964 11-12-P- Chengalpattu Thiruporur Thirukkalukundram (via) 1.60 15.00 1964 P.V.Kalathur Km.10/0 - 11/6

Strengthening of G.S.T 1-CRIDP- Road to 1965 11-12-P- Chengalpattu Thiruporur Thirukkalukundram (via) 1.60 15.00 1965 P.V.Kalathur Km.12/0 - 13/6

1-CRIDP- Strengthening 1966 11-12-P- Chengalpattu Cheyyur Chunambedu - Perumbair 2.40 85.00 1966 Road Km.13/0 - 15/4

1-CRIDP- Strengthening 1967 11-12-P- Chengalpattu Maduranthagam Chunambedu - Perumbair 2.00 80.00 1967 Road Km.17/0 - 19/0

Strengthening to 1-CRIDP- Thiruppulivanam - 1968 11-12-P- Chengalpattu Uthiramerur 2.15 95.00 Salavakkam Road 1968 Km.5/450 - 7/6

Strengthening to 1-CRIDP- Thiruppulivanam - 1969 11-12-P- Chengalpattu Uthiramerur 1.60 75.00 Salavakkam Road Km.7/6 - 1969 9/2

Strengthen ing/ Improvements 38.41 840.00 Total

Chengal 38.41 840.00 pattu Total Improvements to 1-CRIDP- Melpakkam - 1970 11-12-P- Thiruvallur Poonamallee 2.50 98.00 Kannampalayam Road Km 1970 0/0 - 2/5

Improvements to 1-CRIDP- Melpakkam - 1971 11-12-P- Thiruvallur Poonamallee 2.00 77.00 Kannampalayam Road Km 1971 2/5 - 4/5

ODR SCP Page 2 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Strengthening to 1-CRIDP- Guruvoyal - Arikkambedu 1972 11-12-P- Thiruvallur Poonamallee 3.20 20.00 to Sothupakkam road 1972 km.0/0-3/2

1-CRIDP- Strengthening K.T.P.roadto 1973 11-12-P- Thiruvallur Poonamallee 2.60 24.00 Agaram road km.0/0-2/6 1973

Improvements to Aaladu - 1-CRIDP- Manopuram - 1974 11-12-P- Thiruvallur Ponneri Somancherry - 4.00 79.00 1974 Thathamanji Road Km 4/0 - 8/0

Improvements to Aaladu - 1-CRIDP- Manopuram - 1975 11-12-P- Thiruvallur Ponneri Somancherry - 2.40 52.00 1975 Thathamanji Road Km 11/0 - 13/4

Improvements to Aaladu - 1-CRIDP- Manopuram - 1976 11-12-P- Thiruvallur Ponneri Somancherry - 3.00 60.00 1976 Thathamanji Road Km 8/0 - 11/0

Improvements to Km 9/2 1-CRIDP- of G.M. Road, - 1977 11-12-P- Thiruvallur Gummidipoondi 2.00 20.00 Sannaputhur Road Km 1977 1/0 - 3/0

1-CRIDP- Improvements to Elavur - 1978 11-12-P- Thiruvallur Gummidipoondi Sunnambukulam Road Km 2.60 30.00 1978 2/0 - 4/6

Improvements to Aaladu - 1-CRIDP- Manopuram - 1979 11-12-P- Thiruvallur Ponneri Somancherry - 4.00 80.00 1979 Thathamanji Road Km 0/0 - 4/0

ODR SCP Page 3 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

improvements to 1-CRIDP- Perambakkam - 1980 11-12-P- Thiruvallur Thiruttani 0.60 10.00 Chinnamandali Road Km 1980 0/0 - 0/4, 1/6

1-CRIDP- Improvements to kattur 1981 11-12-P- Thiruvallur Thiruttani Mahankalikapuram road 2.40 30.00 1981 km 0/0 - 2/4

Improvements to Nagari- 1-CRIDP- Pallipet Road to 1982 11-12-P- Thiruvallur Thiruttani 0.80 15.00 Veppagunta road km 0/0 - 1982 0/8

1-CRIDP- Improvements to 1983 11-12-P- Thiruvallur Thiruttani Vediyangadu road km 0/0 - 0.80 8.00 1983 0/8

Strengthen ing/ Improvements 32.90 603.00 Total Thiruvallur 32.90 603.00 Total

1-CRIDP- Improvements to Kilvaithinan 1984 11-12-P- Vellore Kothamangalam Road Km 3.00 30.00 kuppam 1984 0/0 - 3/0

Improvements to 1-CRIDP- Kilvaithinan K.V.Kottah Road to Nagal 1985 11-12-P- Vellore 1.80 17.00 kuppam Chinna Nagal Road Km 1985 0/0 - 1/8

1-CRIDP- Improvements to 1986 11-12-P- Vellore Arcot Villapakkam Road Km 0/0 - 2.80 38.00 1986 2/8.

Improvements to Km 8/8 1-CRIDP- of Arcot Villupuram Road 1987 11-12-P- Vellore Arcot 2.80 33.00 to Nambarai Road Km 0/0- 1987 2/8.

ODR SCP Page 4 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to kalnjur- 1-CRIDP- Kilvaithinan Jafrabad road to Senur 1988 11-12-P- Vellore 1.40 15.00 kuppam road (via) Vanjur Road Km 1988 0/0-1/4

1-CRIDP- Improvements to 1989 11-12-P- Vellore Katpadi Kammavarpudur Kasam 1.40 15.00 1989 Road km 0/0-1/4

1-CRIDP- Improvements to 1990 11-12-P- Vellore Katpadi Jaffarabath Road km 4/0- 2.00 60.00 1990 6/0

1-CRIDP- Improvements to 1991 11-12-P- Vellore Sholinghur Pudupattu Karanavur 2.50 23.00 1991 Km.0/0-2/5

1-CRIDP- Improvements to 1992 11-12-P- Vellore Sholinghur Pudupattu Karanavur 2.50 27.00 1992 Km.2/5-5/0

Improvements to Km 9/4 1-CRIDP- of Walajah - Sholinghur - 1993 11-12-P- Vellore Sholinghur Arakonam road to 1.60 15.00 1993 Marudalam road Km 0/0 - 1/6.

1-CRIDP- Improvements to Thalangai 1994 11-12-P- Vellore Sholinghur - Thalangai R.S.road Km 2.40 20.00 1994 0/0 - 2/4.

Improvements to 1-CRIDP- Katrambakkam Mottur 1995 11-12-P- Vellore Sholinghur Road Km 0/0-3/4 and 3.40 40.00 1995 Reconstruction of RCC Culvert at Km 2/8.

Widening (End to End) and 1-CRIDP- Improvements to Central 1996 11-12-P- Vellore Vellore Jail Round road Km.0/0 - 1.80 100.00 1996 1/8 and Construction of Culvert @ Km.0/4

ODR SCP Page 5 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Ranipet - 1-CRIDP- Sholinghur road to 1997 11-12-P- Vellore Ranipet 1.00 15.00 Tagarakuppam Road Km 1997 2/2 - 3/2.

Improvements to 1-CRIDP- Kilvaithinankup Kilmuttkur Chenalyanpalli 1998 11-12-P- Vellore 3.80 38.00 pam Melmoili Road Km 0/0 - 1998 2/0 and 5/2 - 7/0

1-CRIDP- Improvements to Arcot 1999 11-12-P- Vellore Arcot Villupuram Road to Kalar 2.00 19.00 1999 (via) Tajpura km 0/0 - 2/0.

1-CRIDP- Improvements to K.V Kilvaithinankup 2000 11-12-P- Vellore Kuppam Kavanur Road 1.60 15.00 pam 2000 Km.0/0 - 1/6

Improvements to Km 0/2 1-CRIDP- of Ekambaranellore - 2001 11-12-P- Vellore Katpadi Thakkampalayam to 1.40 12.00 2001 Marudambakkam Road Km 0/0-1/4.

Improvements to 1-CRIDP- Arakkonam Sholinghur 2002 11-12-P- Vellore Arakonam 1.80 18.00 Road to Vedal Road 2002 Km.0/0-1/8

Improvements to 1-CRIDP- Nandivedanthangal to 2003 11-12-P- Vellore Arakonam 2.20 22.00 Sempedu Road Km.0/0 - 2003 2/2

1-CRIDP- Improvements to CC road 2004 11-12-P- Vellore Anaicut to Kannigapuram road Km 2.20 30.00 2004 0/0 - 2/2

1-CRIDP- Improvements to Saduperi 2005 11-12-P- Vellore Anaicut Sembedu Thellur Road 4.60 50.00 2005 Km.3/0-7/6

ODR SCP Page 6 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Balamuthur cross road to 2006 11-12-P- Vellore Katpadi 2.50 25.00 ollettikandigai road Km 2006 0/0-2/5

Improvements to 1-CRIDP- Vinnampalli Ramapuram 2007 11-12-P- Vellore Katpadi 4.40 45.00 Kodukkanthangal road Km 2007 0/0-4/4

Improvements to 1-CRIDP- Kattukandigai 2008 11-12-P- Vellore Arakonam Asanallikuppam 2.00 25.00 2008 Kilvenkatapuram Km.7/0- 9/0

Improvements to 1-CRIDP- Kattukandigai 2009 11-12-P- Vellore Arakonam Asanallikuppam 2.00 25.00 2009 Kilvenkatapuram Km.5/0- 7/0

1-CRIDP- Improvements to Visharam 2010 11-12-P- Vellore Arcot Bye Pass Road Km 0/0 - 0.30 10.00 2010 0/3

1-CRIDP- Improvements to Punganur 2011 11-12-P- Vellore Arcot Vellakullam Road Km.0/0- 1.40 20.00 2011 1/4

Strengthen ing/ Improvements 62.60 802.00 Total

Vellore Total 62.60 802.00

Improvements to Athanavoor highways 1-CRIDP- Travellers Bunglow to 2012 11-12-P- Vaniyambadi Jolarpet 1.80 21.50 Nilavoor road km 0/7 - 2012 1/0, 1/9 - 2/0, 3/6 - 4/0 & 4/6 - 5/6

ODR SCP Page 7 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Tirupattur - Jalagamparai 2013 11-12-P- Vaniyambadi Jolarpet 3.40 29.00 road km 0/2 - 2/8, 4/4 - 2013 4/8 & 5/4 - 5/8

Improvements to 1-CRIDP- Selandampalli - 2014 11-12-P- Vaniyambadi Jolarpet 3.60 31.00 Kodumampalli road km 2014 4/0 - 7/6

Improvements to 1-CRIDP- Tirupattur - Karupanoor - 2015 11-12-P- Vaniyambadi Jolarpet 2.20 19.00 Elagiri H.C road km 6/0 - 2015 8/2

Improvements to road 1-CRIDP- branching 3/8 of Puram 2016 11-12-P- Vaniyambadi Jolarpet road and join at km 6/2 of 3.40 29.00 2016 Mookanaur - Pudupet road km 0/0 - 3/4

Improvements to 1-CRIDP- Udayamuthur - 2017 11-12-P- Vaniyambadi Jolarpet 4.40 40.00 Thirumapuram road km 2017 0/0 - 4/4

1-CRIDP- Improvements to 2018 11-12-P- Vaniyambadi Jolarpet Kurumberi road km 0/0 - 2.00 17.00 2018 2/0

Improvements to 1-CRIDP- Thimmanamathur - 2019 11-12-P- Vaniyambadi Thirupattur 1.80 15.50 Thamanoor road km 0/0 - 2019 1/8

Improvements to 1-CRIDP- Mambakkam - 2020 11-12-P- Vaniyambadi Thirupattur 2.60 22.00 Anganathavalasai road km 2020 2/0 -4/6

Improvements to 1-CRIDP- Kaveripattinam - 2021 11-12-P- Vaniyambadi Thirupattur 3.20 27.00 Kakangarai raod km 32/0 - 2021 35/2

ODR SCP Page 8 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Kilvaithinankup Gudiyattam Gadambur 2022 11-12-P- Vaniyambadi 2.60 22.00 pam Road to Melmuttukur KM 2022 0/0 - 2/6

1-CRIDP- Improvements to Chittoor Kilvaithinankup 2023 11-12-P- Vaniyambadi Gudiyattam Road to 1.00 8.50 pam 2023 Kallapadi KM 0/0-1/0

Improvements to Chittoor 1-CRIDP- Kilvaithinankup Gudiyattam Road to D.P. 2024 11-12-P- Vaniyambadi 3.80 32.50 pam Palayam K.V. Palayam 2024 Road KM 0/0-3/8

Improvements to 1-CRIDP- Perumbadi Sempalli 2025 11-12-P- Vaniyambadi Gudiyatham 3.00 25.30 Jittapalli Road KM 3/0- 2025 6/0

1-CRIDP- Improvements to 2026 11-12-P- Vaniyambadi Jolarpet Jolarpettai - Ambalore 3.40 30.00 2026 Road. Km 6/8 - 10/2

1-CRIDP- Improvements to 2027 11-12-P- Vaniyambadi Ambur Madhanencheri Road. Km 3.00 25.50 2027 0/0 - 3/0

1-CRIDP- Improvements to Ambalore 2028 11-12-P- Vaniyambadi Vaniyambadi - Kodaiyanchi Road. Km 1.60 13.00 2028 0/0 - 1/6

1-CRIDP- Improvements to Serpadi - 2029 11-12-P- Vaniyambadi Anaicut Pananthoppurapatti Road. 2.00 17.00 2029 Km 0/0 - 2/0

Improvements to 1-CRIDP- Abdullapuram - Pakkam to 2030 11-12-P- Vaniyambadi Anaicut Nelvoy Pallikonda (via) 3.80 32.50 2030 Unai Pallathur Road. Km 0/0 - 3/8 Improvements to 1-CRIDP- Pallikonda - Palamaneri 2031 11-12-P- Vaniyambadi Gudiyatham Road KM 14/6 to join KM 2.20 19.00 2031 15/4 Venkatapuram KM 0/0-2/2

ODR SCP Page 9 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Thippasamudiram - 2032 11-12-P- Vaniyambadi Anaicut 5.00 42.50 Mohamadupuram Road. 2032 Km 0/0 - 5/0

Improvements to Mittoor - 1-CRIDP- Nimmiyampattu - 2033 11-12-P- Vaniyambadi Vaniyambadi 3.00 25.50 Vaniyambadi Road. Km 2033 9/0 -12/0

Improvements to 1-CRIDP- Avarankuppam - 2034 11-12-P- Vaniyambadi Vaniyambadi 5.00 42.50 Narayanapuram Road. Km 2034 0/0 - 5/0

1-CRIDP- Improvements to Mittoor - 2035 11-12-P- Vaniyambadi Vaniyambadi Nimmiyampattu Road. Km 3.00 25.50 2035 6/0 - 9/0

Strengthen ing/ Improvements 70.80 612.30 Total

1-CRIDP- Construction of Side Drain Kilvaithinan 2036 11-12-P- Vaniyambadi at KM 0/0 - 1/4 of 40.00 kuppam 2036 Camping thoppu road

ODR SCP Page 10 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Construction of Piped 2037 11-12-P- Vaniyambadi Gudiyatham causeway at Km 6/6 of 10.00 2037 Melpatti - Sathgur Road.

Bridges/ CD Works/ Others 2 Nos. 50.00 Total

Vaniyambadi 70.80 662.30 Total

1-CRIDP- Improvements to Polur Tiruvanna 2038 11-12-P- Kalasapakkam Chengam road to 5.40 55.00 malai 2038 Melkuppam Km 0/0-5/4

Improvements to 1-CRIDP- Cuddalore Chittoor road to Tiruvanna 2039 11-12-P- Kalasapakkam Arpakkam (via) Kovoor Km 6.00 70.00 malai 2039 0/0 - 6/0 including 3 Culverts

Improvements to 1-CRIDP- Tiruvanna Izukazhikatteri 2040 11-12-P- Kilpennathur 4.00 45.00 malai Andampallam road Km 0/0- 2040 4/0

1-CRIDP- Improvements to Melpadur Tiruvanna 2041 11-12-P- Kalasapakkam Vaividanthangal road Km 1.60 15.00 malai 2041 0/0-1/6

1-CRIDP- Improvements to Tiruvanna 2042 11-12-P- Kilpennathur Seriyandal road Km 0/0 - 5.00 50.00 malai 2042 5/0

ODR SCP Page 11 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Tiruvannamalai Thanipadi 1-CRIDP- Tiruvanna road to Tiruvannamalai 2043 11-12-P- Chengam 2.40 30.00 malai Thanipadi road (via) 2043 Chinniyampettai Km 0/0 - 2/4

1-CRIDP- Improvements to Bondai Tiruvanna 2044 11-12-P- Chengam Puliyampatti road Km 6/0 - 4.80 50.00 malai 2044 10/8

Improvements to 1-CRIDP- Tiruvanna Thandrampet 2045 11-12-P- Chengam 4.80 45.00 malai Thenmudianur road to 2045 Edathanur Km 0/0 - 4/8

1-CRIDP- Improvements to Polur Tiruvanna 2046 11-12-P- Chengam Chengam road to Quilam 2.60 30.00 malai 2046 Km 0/0 - 2/6

1-CRIDP- Improvements to Tiruvanna 2047 11-12-P- Chengam Arattavadi Ilangunni road 5.00 45.00 malai 2047 Km 0/0-5/0

Improvements to 1-CRIDP- Tiruvanna Thenpallipattu Pazhankoil 2048 11-12-P- Kalasapakkam 6.00 55.00 malai Kilpotharai road Km 4/0- 2048 10/0

1-CRIDP- Improvements to Central Tiruvanna 2049 11-12-P- Kalasapakkam Jail Amirthi road to 2.00 25.00 malai 2049 Kalpattu Km 0/0 - 2/0

ODR SCP Page 12 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Mattapirayur Randam Tiruvanna 2050 11-12-P- Polur Padagam road to 1.40 20.00 malai 2050 Alangaramangalam road Km 0/0-1/4

Improvements to 1-CRIDP- Tiruvanna Mattapirayur Randam 2051 11-12-P- Polur 2.60 35.00 malai Padagam road Km 2/4 - 2051 5/0 Improvements to Tiruvannamalai Avalurpet 1-CRIDP- Tiruvanna road to Mansurabad (Via) 2052 11-12-P- Kilpennathur 4.60 45.00 malai Arpakkam Km 0/0 -3/0 & 2052 5/6 - 7/2 including 4 Culverts

1-CRIDP- Improvements to Tiruvanna 2053 11-12-P- Arani Kattukanallur Kalpattu 3.20 25.00 malai 2053 road Km 0/0 - 3/2

Improvements to Arcot 1-CRIDP- Tiruvanna Villupuram road to 2054 11-12-P- Arani 3.60 30.00 malai Ladavaram HC road Km 2054 0/0 - 3/6

1-CRIDP- Improvements to Tiruvanna 2055 11-12-P- Cheyyar Anakkavoor Kovilur road 10.20 80.00 malai 2055 Km 0/0 - 10/2

Improvements to 1-CRIDP- Vandavasi Polur road to Tiruvanna 2056 11-12-P- Vandawasi Thellar Mazhayur (via) 4.40 50.00 malai 2056 Venkatapuram Kadambai Km 0/0 - 4/4

Strengthening/ Improvements 79.60 800.00 Total

Tiruvannamal 79.60 800.00 ai Total

ODR SCP Page 13 Cost Sl Work Division Constituency Name of work Length in No code Lakhs Chennai Other works : 2 Nos. 284.31 3707.30 Circle Total Widening from SL to IL and Improvements of 1-CRIDP- Villupuram-Pondy road to 2057 11-12-P- Villupuram Villupuram 1.20 80.00 Ka.kuppam (via) 2057 Poyyapakkam road Km.1/2- 2/4

Widening & Improvements 1.20 80.00 Total

Improvements to 1-CRIDP- Villupuram-Pondy road to 2058 11-12-P- Villupuram Villupuram Ka.kuppam (via) 1.20 100.00 2058 Poyyapakkam road Km.0/0- 1/2 ( C.C. pavement)

1-CRIDP- Improvements to Athiyur- 2059 11-12-P- Villupuram Vikravandi Thirukkai road Km.0/0- 3.00 70.00 2059 3/0 (400m CC pavement)

1-CRIDP- Improvements to Pillur- 2060 11-12-P- Villupuram Villupuram Sendanur road Km.0/0- 1.53 30.00 2060 1/530 (200m CC)

Improvements to 1-CRIDP- Katrampakkam- 2061 11-12-P- Villupuram Vanur 6.60 66.00 Keelpudupattu road 2061 Km.6/5-13/1

1-CRIDP- Improvements to 2062 11-12-P- Villupuram Vanur Kondhamur-Karasanur 2.50 95.00 2062 road Km.5/0-7/5

1-CRIDP- Improvements to 2063 11-12-P- Villupuram Vanur Kondhamur-Karasanur 2.50 95.00 2063 road Km 7/5-10/0

ODR SCP Page 14 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Kovadi- 2064 11-12-P- Villupuram Tindivanam Thennerkunam road 3.00 50.00 2064 Km.0/0-3/0

1-CRIDP- Improvements to Nemur- 2065 11-12-P- Villupuram Vikravandi Esalam road Km.6/9-8/0 1.10 94.00 2065 (CC Pavement)

1-CRIDP- Improvements to Palapattu 2066 11-12-P- Villupuram Gingee 1.35 20.00 road Km.5/250-6/6 2066

1-CRIDP- Improvements to 2067 11-12-P- Villupuram Vanur Kondhamur-Karasanur 1.24 50.00 2067 road Km 10/0-11/240

1-CRIDP- Improvements to Kovadi- 2068 11-12-P- Villupuram Tindivanam Thennerkunam road 3.60 50.00 2068 Km.3/0-6/6

Strengthen ing/ Improvements 27.62 720.00 Total

Villupuram 28.82 800.00 Total

1-CRIDP- Improvements to Bahoor- 2069 11-12-P- Cuddalore Cuddalore Villiyanur road Km 0/0- 0.99 25.00 2069 0/990

Improvements to 1-CRIDP- Maligaimedu- 2070 11-12-P- Cuddalore Panruti 6.00 75.00 Melkumaramangalam road 2070 Km 0/0-6/0

ODR SCP Page 15 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Andipalayam- 2071 11-12-P- Cuddalore Panruti 3.21 35.00 Vathipalayam road Km 0/0- 2071 3/213

Improvements to 1-CRIDP- Melpattampakkam- 2072 11-12-P- Cuddalore Panruti 4.00 50.00 Narimedu road Km 0/0- 2072 4/0

Improvements to 1-CRIDP- Pudhupettai - Oraiyur - 2073 11-12-P- Cuddalore Panruti 3.60 73.00 Karumbur - Paithampady 2073 Road Km 8/3-11/9

1-CRIDP- Improvements E. Keeranur 2074 11-12-P- Cuddalore Tittakudi - Pudukulam Road Km.0/0- 5.00 85.00 2074 5/0

Improvements to Perur 1-CRIDP- road (Via) 2075 11-12-P- Cuddalore Kattumannarkoil 2.00 30.00 Nandeeswararmangalam 2075 km 0/0-2/0

Improvements to 1-CRIDP- Akkaravelagudy - Sivayam 2076 11-12-P- Cuddalore Chidamabaram 4.00 70.00 (via) Kattugudalore road 2076 Km.0/0-4/0

1-CRIDP- Improvements to K.Adoor 2077 11-12-P- Cuddalore Bhuvanagiri 3.40 50.00 road Km.0/0-3/4 2077

ODR SCP Page 16 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Pagandai- 2078 11-12-P- Cuddalore Panruti Melpattampakkam- road 3.80 45.00 2078 Km 0/0-3/8

Improvments to 1-CRIDP- Melavanniyur - 2079 11-12-P- Cuddalore Kattumannarkoil 3.00 50.00 Veeranatham road Km.0/0- 2079 3/0

1-CRIDP- Improvements to 2080 11-12-P- Cuddalore Vridhachalam Kattumailur Kongarapalam 3.20 50.00 2080 Road Km 6/0 - 9/2

Improvments to Ramapuram - 1-CRIDP- Thaandakarankuppam 2081 11-12-P- Cuddalore Kattumannarkoil road (via) Valeespettai 4.90 70.00 2081 Km.0/0-4/9 (except Km.2/4-3/3 (Overlap Portion)

Improvements to 1-CRIDP- Pudhupettai - Oraiyur - 2082 11-12-P- Cuddalore Panruti 3.80 77.00 Karumbur - Paithampady 2082 Road Km 11/9-15/7

Strengthen ing/ Improvements 50.90 785.00 Total Cuddalore 50.90 785.00 Total

Improvements to 1-CRIDP- Thiyagadurgam-Pudhukeni 2083 11-12-P- Kallakurichi Kallakurichi 5.40 58.00 Road Km.5/6-11/0 2083 including CD work

ODR SCP Page 17 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Tholuvandhangal-Pakkam 2084 11-12-P- Kallakurichi Rishivandhiyam Road Km.0/0-4/0 4.00 55.00 2084 including Construction of Retaining

Improvements to Mattigai- 1-CRIDP- Odappankuppam Road 2085 11-12-P- Kallakurichi Ulundurpettai Km.1/0-3/0 including CD 2.00 56.00 2085 Works and Construction of Retaining Wall.

1-CRIDP- Improvements to 2086 11-12-P- Kallakurichi Sankarapuram Devapandalam-Vriyur 6.45 60.00 2086 Road Km.0/0-6/450

Improvements to 1-CRIDP- Kottamarudhur road 2087 11-12-P- Kallakurichi Tirukkoyilur Km.0/0-4/8 Including 4.80 70.00 2087 Construction of Retaining wall

Improvements to 1-CRIDP- Mudiyanur Madam Road 2088 11-12-P- Kallakurichi Kallakurichi 4.60 75.00 Km 0/0-4/6including CD 2088 work

Improvements to 1-CRIDP- Thiyagadurgam-Pudhukeni 2089 11-12-P- Kallakurichi Kallakurichi Road Km.0/0-5/6 5.60 62.00 2089 including Construction of Retaining wall

Improvements to 1-CRIDP- Moongilthuraipattu- 2090 11-12-P- Kallakurichi Rishivandhiyam Thiruvarangam Road 4.00 55.00 2090 Km.0/0-4/0 Including CD work

1-CRIDP- Improvements to 2091 11-12-P- Kallakurichi Tirukkoyilur Thaduthatkondur Road 5.20 62.00 2091 Km 0/0-5/2

ODR SCP Page 18 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Alur H/C 2092 11-12-P- Kallakurichi Rishivandhiyam 3.20 57.00 Road Km.0/0-3/2 2092

1-CRIDP- Improvements to 2093 11-12-P- Kallakurichi Sankarapuram Seshasamudram Road 5.80 60.00 2093 Km.0/0-5/8

1-CRIDP- Improvements to Marur- 2094 11-12-P- Kallakurichi Rishivandhiyam Enthal Road Km.0/0-5/0 5.00 60.00 2094 including CD work

Improvements to 1-CRIDP- Rayappanur Vettiperumal 2095 11-12-P- Kallakurichi Sankarapuram 6.67 70.00 agaram road via Thagarai 2095 Km 13/0-19/667

Strengthening/ Improvements 62.72 800.00 Total Kallakurichi 62.72 800.00 Total

Improvements in km 3/0 - 1-CRIDP- 4/8 of Earaiyur - Nannaki 2096 11-12-P- Ariyalur Perambalur 1.80 20.00 road (via) Nallur - 2096 Peramathur road

1-CRIDP- Improvements in Km 0/0- 2097 11-12-P- Ariyalur Ariyalur 0/900 of Ariyalur - 0.90 70.00 2097 Ayyanathur road

Improvements in Km 9/0 - 1-CRIDP- 13/5 of Thirumanur - 2098 11-12-P- Ariyalur Ariyalur 4.50 55.00 Elakuruchi - Thoothur 2098 road

ODR SCP Page 19 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements in Km 0/0- 2099 11-12-P- Ariyalur Kunnam 5/0 of Thungapuram - 5.00 100.00 2099 Kuzhumur road

Improvements in Km 15/2- 1-CRIDP- 20/2 of Agaram - Seegur - 2100 11-12-P- Ariyalur Kunnam Thamaraipoondi road (via) 5.00 85.00 2100 Anganur, Sannasinallur road

Improvementsin Km 4/0- 1-CRIDP- 6/0 of Anaikudam - 2101 11-12-P- Ariyalur Jayankonadam 2.00 20.00 Cholanmadhavi - 2101 Kodalikarupur road

Strengthen ing/ Improvements 19.20 350.00 Total Construction of Bridge @ 1-CRIDP- Km 6/2 of Agaram - 2102 11-12-P- Ariyalur Kunnam Seegur - Thamaraipoondi 460.00 2102 road (via) Anganur, Sannasinallur road

Bridges/ CD Works/ Others 1 No. 460.00 Total

Ariyalur Total 19.20 810.00

Villupuram Other works : 1 No. 161.64 3195.00 Circle Total

Widening Singlelane to Intermediatelane 1-CRIDP- Improvements to Navalur - 2103 11-12-P- Trichy Srirangam 1.60 75.00 Kuttapattu Road Km 0/0- 2103 1/6 (Single Lane)Including Buslay at km 1/4

ODR SCP Page 20 Cost Sl Work Division Constituency Name of work Length in No code Lakhs Widening & Improvements 1.60 75.00 Total

1-CRIDP- Improvements to Poongudy 2104 11-12-P- Trichy Srirangam - Manikandam Road km 4.40 40.00 2104 0/0-4/4 (Single Lane) Improvements in Km 1-CRIDP- 0.0/2.0 of Palaniudayantty 2105 11-12-P- Trichy Srirangam 2.00 45.00 / Olaiyur Road (Single 2105 Lane) 1-CRIDP- Improvemnets to Puliyur - 2106 11-12-P- Trichy Srirangam sepalapatty Road Km 0/0- 3.60 30.00 2106 3/6 (Single Lane) Improvements to 1-CRIDP- Kodiyalam - Pulivalam 2107 11-12-P- Trichy Srirangam 2.80 25.00 Road Km 0/0-2/8 (Single 2107 Lane) 1-CRIDP- Improvements to olaiyur - 2108 11-12-P- Trichy Srirangam Mulipatty Road km 0/0- 2.60 22.00 2108 2/6 (Single Lane)

1-CRIDP- Improvements to Allithurai 2109 11-12-P- Trichy Srirangam - Athavathur Road km 0/0- 1.00 15.00 2109 1/0 (Single Lane)

Improvements to 1-CRIDP- Viyalanmedu - Puliyur 2110 11-12-P- Trichy Srirangam 1.20 10.00 Road Km 0/0-1/0 & 1/2- 2110 1/4(Single Lane)

Improvements in Km 0/0- 1-CRIDP- 2/6 of SAP - 2111 11-12-P- Trichy Thiruverumbur 2.60 18.00 Palanganakudy Road 2111 (Single Lane)

Improvements to 1-CRIDP- Kannanur - Kattanampatty 2112 11-12-P- Trichy Thuraiyur 3.00 24.00 Road Km 0/0-3/0 (Single 2112 Lane)

1-CRIDP- Improvements to Eragudy - 2113 11-12-P- Trichy Musiri Mahadevi Road km 0/0- 5.00 52.00 2113 4/0 & 5/0-6/0(Single lane)

ODR SCP Page 21 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to T.Pet - 2114 11-12-P- Trichy Musiri Mettupalayam Road km 2.00 18.00 2114 1/0-3/0(Single lane)

Improvements to NH 45 to 1-CRIDP- Valanthanagaram (Via) N. 2115 11-12-P- Trichy Manapparai Poolampatty Road Km 0/0- 2.40 20.00 2115 0/8 & 4/0-5/6 (Single Lane)

Improvements to 1-CRIDP- Vengaikurichi - 2116 11-12-P- Trichy Manapparai 1.80 15.00 Muhavanoor Road Km 0/0- 2116 1/8 (Single Lane)

Improvements to 1-CRIDP- Thoppagoundanur - 2117 11-12-P- Trichy Manapparai 2.00 16.00 Chinnauthampatty Road 2117 Km 0/0-2/0 (Single Lane)

Improvements to 1-CRIDP- Nalliyampatty - 2118 11-12-P- Trichy Thuraiyur 3.00 24.00 Katukarupankottam Road 2118 Km 0/0-3/0 (Single Lane)

Improvements to 1-CRIDP- Peramangalam - Keelavady 2119 11-12-P- Trichy Thuraiyur 8.60 71.00 Road Km 9/8-14/4, 16/0- 2119 20/0 (Single Lane)

Improvements to 1-CRIDP- Karuppampatty - 2120 11-12-P- Trichy Thuraiyur 2.60 22.00 Vannanthurai Road km 2120 0/0-2/6 (Single Lane)

Improvements to 1-CRIDP- Kannanur palayam - 2121 11-12-P- Trichy Thuraiyur Visalachi 4.40 41.00 2121 ammalsamudhiram road km 8/0-12/4 (Single Lane)

ODR SCP Page 22 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Thuraiyur - sorathur - 2122 11-12-P- Trichy Thuraiyur 5.00 41.00 Kallipatty Road Km 2/0- 2122 7/0 (Single Lane)

Improvements to Angiam - 1-CRIDP- Patchaperumalpatty (Via) 2123 11-12-P- Trichy Thuraiyur Koneripatty -Reddiyarpatty 2.00 25.00 2123 Road km 0/0-2/0 (Single Lane)

Improvements to 1-CRIDP- Thirunagar - 2124 11-12-P- Trichy Thiruverumbur 2.00 37.00 Nathamadipatty Road km 2124 0/0-2/0 (Single Lane)

Improvements to 1-CRIDP- Keealkalkandarkottai - 2125 11-12-P- Trichy Thiruverumbur 2.00 37.00 Keelakurichi Road km 0/0- 2125 2/0 (Single Lane)

1-CRIDP- Improvements to 2126 11-12-P- Trichy Thiruverumbur Nathamadipatty Road km 1.00 18.50 2126 0/0-1/0 (Single Lane)

Improvements to 1-CRIDP- Thirunagar - 2127 11-12-P- Trichy Thiruverumbur 1.00 18.50 Arrkatanthurai Road km 2127 0/0-1/0 (Single Lane)

Improvements to Asoor 1-CRIDP- Road Km 0/0-1/6 2128 11-12-P- Trichy Thiruverumbur including Repairs to slab 1.60 35.00 2128 Culvert at Km 0/2 (Single Lane)

Improvements to 1-CRIDP- Thiruverambur - Suriyur- 2129 11-12-P- Trichy Thiruverumbur Sholamadevi Road Km 0/0- 1.20 25.00 2129 1/2 and construction to Retaningwall

ODR SCP Page 23 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Mettupalayam -Koneripatty 2130 11-12-P- Trichy Musiri 1.80 22.00 Road km 0/0-1/8(Single 2130 lane)

Strengthening/ Improvements 72.60 767.00 Total

Trichy Total 74.20 842.00

Improvements in KM 0/0- 1-CRIDP- 3/0 of Paravattivayal road 2131 11-12-P- Pudukottai Gandharvakottai including culvert at KM 3.00 90.00 2131 0/8, 1/2 and Retaining wall at KM 0/2 ( SL )

1-CRIDP- Improvements in KM 3/0- 2132 11-12-P- Pudukottai Gandharvakottai 6/0 of Paravattivayal road ( 3.00 60.00 2132 SL )

1-CRIDP- Improvements in KM 6/0- 2133 11-12-P- Pudukottai Viralimalai 9/0 of Paravattivayal road ( 3.00 74.00 2133 SL )

1-CRIDP- Improvements in KM 9/0- 2134 11-12-P- Pudukottai Viralimalai 11/0 of Paravattivayal road 2.00 53.00 2134 ( SL )

Improvements in KM 0/0- 1-CRIDP- 3/4 of Kadayathupatti - 2135 11-12-P- Pudukottai Alangudi Narpavalakudi road 3.40 96.00 2135 including culvert at KM 1/4, 1/8, 3/4 ( SL road )

Improvements in KM 3/4- 7/0 of Kadayathupatti - 1-CRIDP- Narpavalakudi road 2136 11-12-P- Pudukottai Alangudi 3.60 98.00 including culvert at KM 2136 3/8, 3/10, 4/10, 6/2 ( SL road )

ODR SCP Page 24 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements in KM 0/0- 1-CRIDP- 5/0 of Nilaiyur - 2137 11-12-P- Pudukottai Aranthangi Eripurakarai road 5.00 90.00 2137 including culvert at KM 2/2, 3/8 ( SL road )

Improvements in KM 5/0- 1-CRIDP- 9/4 of Nilaiyur - 2138 11-12-P- Pudukottai Aranthangi Eripurakarai road 4.40 80.00 2138 including culvert at KM 6/8, 7/2, 9/4 ( SL road )

Strengthening/ Improvements 27.40 641.00 Total

Pudukottai 27.40 641.00 Total

Improvements to 1-CRIDP- Pulavankadu - 2139 11-12-P- Tanjavur Orathanadu 2.00 18.00 Peikaramankottai Road Km 2139 0/0 -2/0

Improvements to 1-CRIDP- Okkanadu - 2140 11-12-P- Tanjavur Orathanadu 1.00 10.00 Thondarampattu Road Km 2140 5/0-6/0 Improvements to 1-CRIDP- Mandalakkottai - 2141 11-12-P- Tanjavur Orathanadu 1.00 12.00 Vadakkur Road Km 0/0- 2141 1/0 1-CRIDP- Improvements to 2142 11-12-P- Tanjavur Orathanadu Adhanakkottai - Pachur 1.00 10.00 2142 Road Km 0/0-1/0

1-CRIDP- Improvements to Vadakkur 2143 11-12-P- Tanjavur Orathanadu - Poyyundarkottai Road 1.00 10.00 2143 Km 0/0-1/0

ODR SCP Page 25 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Road branching from Km 5/4 of 1-CRIDP- Thanjavur-Budalore Road 2144 11-12-P- Tanjavur Thanjavur 4.20 38.00 & joining at Km 4/6 of 2144 Thanjavur - Vallam Road Km 0/0-4/2

1-CRIDP- Improvements toVallam - 2145 11-12-P- Tanjavur Thanjavur Kallaperambur Road Km 2.00 18.00 2145 2/0-4/0

Improvements to Maraimmankoil- 1-CRIDP- Sunganthidal Road (Via) 2146 11-12-P- Tanjavur Thanjavur 3.00 34.00 Kadakadappai - 2146 Sitharkadu -Kadukaval Road Km 0/0 - 3/0

1-CRIDP- Improvements to 2147 11-12-P- Tanjavur Papanasam office 1.20 41.00 2147 road Km 0/0-1/2 (IL)

1-CRIDP- Strengthening to 2148 11-12-P- Tanjavur Papanasam Kambanthankudi - Bridge 1.40 46.00 2148 approach road Km 0/0-1/4

1-CRIDP- Improvements to Poondi - 2149 11-12-P- Tanjavur Papanasam Vandaiyariruppu Road Km 1.20 15.00 2149 2/8-4/0

1-CRIDP- Improvements to 2150 11-12-P- Tanjavur Papanasam Pattavarthi - Adhanur 2.00 25.00 2150 Road Km 1/6-3/6

1-CRIDP- Improvements to 2151 11-12-P- Tanjavur Papanasam Eluthupattarai Street Road 0.80 8.00 2151 Km 0/0-0/8

1-CRIDP- Improvements to Peramur- 2152 11-12-P- Tanjavur Thiruvaiyaru Anaikkudy Road Km 0/0- 3.00 30.00 2152 2/0 & 3/0-4/0

1-CRIDP- Improvements to Rajagiri 2153 11-12-P- Tanjavur Thiruvaiyaru Unjini Elangadu Road Km 1.00 15.00 2153 0/0-1/0 ODR SCP Page 26 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Pudukudi 2154 11-12-P- Tanjavur Thiruvaiyaru Rayamundanpatti Road 1.00 15.00 2154 Km 3/0-4/0

1-CRIDP- Improvements to 2155 11-12-P- Tanjavur Thiruvaiyaru Dheetchasamudiram - 2.40 35.00 2155 Km 2/0-4/4

1-CRIDP- Improvements to 2156 11-12-P- Tanjavur Thiruvaiyaru Sakkarasamantham Road 1.20 19.00 2156 Km 0/0-1/2

Improvements to Vennar 1-CRIDP- Vettar Regulator to 2157 11-12-P- Tanjavur Thiruvaiyaru 2.00 22.00 Palliagraharam Road Km 2157 2/0-4/0

Improvements to Vennar 1-CRIDP- Vettar Regulator to 2158 11-12-P- Tanjavur Thiruvaiyaru 2.00 22.00 Palliagraharam Road Km 2158 4/0-6/0

Improvements to Left bank of Vennar Vettar 1-CRIDP- Ammapettai - 2159 11-12-P- Tanjavur Thiruvaiyaru Vinnamangalam (Via) 3.00 32.00 2159 Nagathy Thenperambur Allur Road Km 3/0- 5/0&8/0-9/0 1-CRIDP- Improvements to 2160 11-12-P- Tanjavur Kumbakonam Krishnampuram Road Km 2.80 30.00 2160 0/0-2/8

1-CRIDP- Improvements to Sakkottai 2161 11-12-P- Tanjavur Kumbakonam - Sivapuram Road Km 0/0- 1.00 11.00 2161 1/0

1-CRIDP- Improvements to 2162 11-12-P- Tanjavur Kumbakonam Pilancherry Road Km 1/2 - 1.40 18.00 2162 1/8 & 2/4 - 3/2.

ODR SCP Page 27 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Thiruvidaimaruthur - 2163 11-12-P- Tanjavur Kumbakonam 1.00 10.00 Thandanthottam Road Km 2163 3/6 - 4/0 & 5/4 - 6/0.

Improvements to 1-CRIDP- Melathukuruchi - 2164 11-12-P- Tanjavur Kumbakonam 2.00 27.00 Kavarkoodam Road Km 2164 0/0 - 2/0

Improvements to 1-CRIDP- Pandanallur - Mullangudy Thiruvidai 2165 11-12-P- Tanjavur Road in KM.0/0-5/2 5.20 50.00 maruthur 2165 including CD works in KM.1/4, 4/4

Improvements to 1-CRIDP- Mullangudy - Pozhakudy Thiruvidai 2166 11-12-P- Tanjavur Road in KM.1/0-2/7 1.70 35.00 maruthur 2166 including CD works in KM.2/4,(i) 2/4(ii)2/6

Improvements to Koothanur - 1-CRIDP- Keelasooriyamoolai Road Thiruvidaimarut 2167 11-12-P- Tanjavur in KM.1/725 -4/040 2.32 50.00 hur 2167 including CD works in KM.1/10,2/2 (i) 2/2(ii), 2/4, 2/8, 3/4, 3/8 Improvements to 1-CRIDP- Thamarankkottai - 2168 11-12-P- Tanjavur Pattukottai 4.20 47.00 Vickramam Road Km 4/0- 2168 5/0 & 6/0 - 9/2. Improvements to 1-CRIDP- Pallikondan (via) 2169 11-12-P- Tanjavur Pattukottai 2.40 23.00 Muthalcheri Road Km 3/0- 2169 5/4 Strengthen ing/ Improvements 61.42 776.00 Total

ODR SCP Page 28 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Construction of Bridge and 1-CRIDP- approach road at Km 3/6 2170 11-12-P- Tanjavur Orathanadu of Valanthantheru 257.00 2170 Thelungankudikadu road (via) No 2 Kovilur road

1-CRIDP- Reconstruction of bridge at 2171 11-12-P- Tanjavur Papanasam Km 0/10 of Poondi - 24.00 2171 Vandaiyariruppu Road.

Bridges/ CD Works/ Others 2 Nos. 281.00 Total

Tanjavur 61.42 1057.00 Total

Widening from SL to IL and 1-CRIDP- Improvements Alangudi - 2172 11-12-P- Nagapattinam Vedaranyam Thalainayar - 0.60 98.00 2172 Thalnthiruvasal Road in Km 38/0 - 38/6

Widening from SL to IL and 1-CRIDP- Improvements in km 38/6- 2173 11-12-P- Nagapattinam Vedaranyam 39/2 of Alangudi - 0.60 87.00 2173 Thalainayar - Thalanthiruvasal Road.

Widening & Improvements 1.20 185.00 Total

Improvements to Virkudy- 1-CRIDP- Thirupayathankudi road 2174 11-12-P- Nagapattinam Nagapattinam 3.00 42.00 km 0/0-3/0 and Protective 2174 works at km 4/10 and 5/2.

ODR SCP Page 29 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Enangudi- 2175 11-12-P- Nagapattinam Nagapattinam 3.60 50.00 Kottur Road Km 0/0-3/6 2175

Improvements to 1-CRIDP- Thiruvarur - Alivalam - 2176 11-12-P- Nagapattinam Kilvelur Vadugacherry Road Km 1.60 19.00 2176 11/0 - 12/0 and 15/0 - 15/6

1-CRIDP- Improvements 2177 11-12-P- Nagapattinam Nagapattinam Poonthottam - Karaikal 2.00 70.00 2177 Road Km 6/0 - 8/0

1-CRIDP- Improvemnts to Parasalur - 2178 11-12-P- Nagapattinam Poompuhar Elayalur road km 0/0 - 3.60 64.00 2178 3/6

Improvemts to 1-CRIDP- Arunmozhithevan 2179 11-12-P- Nagapattinam Mayiladuthurai 4.00 65.00 Harisana Coloney road Km 2179 0/0 - 4/0

Improvements to 1-CRIDP- Mappadugai - Kadalangudi 2180 11-12-P- Nagapattinam Mayiladuthurai 3.00 48.00 road km 0/0-0/8, 6/8 - 2180 9/0

1-CRIDP- Improvements to Kurichi - 2181 11-12-P- Nagapattinam Mayiladuthurai Sithamalli road km 0/4 - 1.40 23.00 2181 1/8.

Improvements to 1-CRIDP- Mangaimadam- 2182 11-12-P- Nagapattinam Sirkazhi 2.20 34.00 Perunthottam road km 1/0- 2182 3/2

1-CRIDP- Improvements to Alakkudy 2183 11-12-P- Nagapattinam Sirkazhi - Kothandapuram road Km 2.40 32.00 2183 0/0-2/4

Improvements to 1-CRIDP- Semangalam - Koothur - 2184 11-12-P- Nagapattinam Sirkazhi 3.00 35.00 Olyamputhur road Km 0/0 2184 - 3/0

ODR SCP Page 30 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Vaitheeswarankoil - 2185 11-12-P- Nagapattinam Sirkazhi 5.00 75.00 Thennalakudy road Km 2185 0/0 - 5/0

Strengthening/ Improve ments 34.80 557.00 Total

Nagapattinam 36.00 742.00 Total

1-CRIDP- Improvements to Annugudi 2186 11-12-P- Tiruvarur Nannilam 1.60 20.00 Road Km 0/0-1/6 2186

1-CRIDP- Improvements to Nallur- 2187 11-12-P- Tiruvarur Nannilam Manakodu Road Km 0/0- 1.00 9.00 2187 1/0

Improvements to 1-CRIDP- Kadalangudi-Kodavasal 2188 11-12-P- Tiruvarur Nannilam 3.00 35.00 road Km.3/0 - 4/0, 6/0 - 2188 6/8, 9/4-10/0, 13/0-13/6. Improvements to 1-CRIDP- Kappaludaiyan- 2189 11-12-P- Tiruvarur Nannilam 1.80 20.00 Ashkanodai Road Km 6/6- 2189 8/4 Improvements to 1-CRIDP- Edaiyirupu-Mannakal- 2190 11-12-P- Tiruvarur Nannilam 1.80 24.00 Munniyur Road Km.4/4- 2190 6/2 Improvements to Kumbakonam- Mannnargudi- 1-CRIDP- Adhirampatinam Road Km 2191 11-12-P- Tiruvarur Nannilam 3.40 40.00 17/8 - Saranatham Road 2191 Km 1/4 - 4/8 including construction of Retaining Wall at Km 3/10

ODR SCP Page 31 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Narikudi- 2192 11-12-P- Tiruvarur Nannilam Manickamangalam road 4.60 60.00 2192 Km 0/0-4/6 Improvements to 1-CRIDP- Kanganlanchery - 2193 11-12-P- Tiruvarur Tiruvarur 3.40 47.00 Manakkal road Km.5/0 - 2193 8/4 1-CRIDP- Improvements to 2194 11-12-P- Tiruvarur Tiruvarur Kulamanickam - Virkudi 2.35 40.00 2194 road Km.0/0 - 2/350

1-CRIDP- Improvements to 2195 11-12-P- Tiruvarur Tiruvarur Overchery - Virkudi road 1.98 35.00 2195 Km.0/0 -1/982 Improvements to 1-CRIDP- Sithamalli - 2196 11-12-P- Tiruvarur Mannargudi 3.60 47.00 Pannimangalam road 2196 Km.0/0- 3/6

Improvements to 1-CRIDP- Maruthapattinam - 2197 11-12-P- Tiruvarur Tiruvarur 1.83 20.50 Palavanagudi road Km.0/0 2197 - 1/825

1-CRIDP- Improvements to Thiruthuraipoon 2198 11-12-P- Tiruvarur Alathapadi - Alangudi road 2.40 35.00 di 2198 Km.16/0 -18/4

1-CRIDP- Improvements to Thiruthuraipoon 2199 11-12-P- Tiruvarur Thirukalar village road 1.00 17.00 di 2199 Km.0/0 - 1/0

1-CRIDP- Improvements to Thiruthuraipoon 2200 11-12-P- Tiruvarur Paingattur village road 2.40 41.00 di 2200 Km.0/0- 2/4

1-CRIDP- Improvements to Thiruthuraipoon 2201 11-12-P- Tiruvarur Kothamangalam Village 3.20 35.00 di 2201 Road Km. 1/2 -4/4

1-CRIDP- Improvements to Thiruthuraipoon 2202 11-12-P- Tiruvarur Harichandranathi Right 1.00 10.00 di 2202 Bank road Km.9/4 - 10/4

ODR SCP Page 32 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to 2203 11-12-P- Tiruvarur Nannilam Uthukadu village road 0.80 9.00 2203 Km.0/0 -0/8

1-CRIDP- Improvements to Killiyur - 2204 11-12-P- Tiruvarur Nannilam Kadagakudi road Km.0/0 - 1.40 15.00 2204 1/4

Improvements to 1-CRIDP- Kanganlanchery - 2205 11-12-P- Tiruvarur Nannilam 3.00 40.00 Manakkal road Km.0/0- 2205 2/0, 4/0 - 5/0

1-CRIDP- Improvements to 2206 11-12-P- Tiruvarur Tiruvarur Koothangudi village road 2.46 21.50 2206 Km.0/0- 2/460

Improvements to Melamaruthur - Ekkal 1-CRIDP- Road Km. 0/0 - 2/0 and Thiruthuraipoon 2207 11-12-P- Tiruvarur Construction of Pipe 2.00 35.00 di 2207 Culvert at Km. 0/10, 1/4, 1/6 and Protective Works at Km. 0/8 Improvements to Mayiladuthurai - 1-CRIDP- Thiruthuraipoon Thiruthuraipoondi road 2208 11-12-P- Tiruvarur 1.60 15.00 di Km.66/6 branching 2208 Varambiyam road Km.0/0- 1/6

Improvements to 1-CRIDP- Thiruthuraipoon Nedumbalam - 2209 11-12-P- Tiruvarur 1.80 15.00 di Marudhavanam road Km, 2209 0/0 - 1/8

Strengthening/ Improvements 53.42 686.00 Total

Construction of High level 1-CRIDP- bridge at Km.0/4 of 2210 11-12-P- Tiruvarur Mannargudi 250.00 Pamani village road across 2210 Pamani river

ODR SCP Page 33 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Bridges/ CD Works/ Others 1 No. 250.00 Total

Tiruvarur 53.42 936.00 Total

Trichy Circle Other works : 3 Nos. 252.43 4218.00 Total

Widening SL to IL Km.3/0- 6/0 and Improvements, Widening and Construction of Culvert at 1-CRIDP- Km.3/2, 3/6, 3/8, 4/2, 2211 11-12-P- Salem 3.00 135.00 4/4, 4/6, 4/10 2211 Construction of Retaining wall at Km.3/4-5/4 of Mettur Thermal Power Station to Koodakkal road

Widening & Improvements 3.00 135.00 Total

Improvements from Km.9/0-13/0, 14/0-14/6, 15/0-17/0 of Palaniapuri to Km.32/8 of salem- 1-CRIDP- ulundurpet road (via) 2212 11-12-P- Salem Attur 6.60 60.00 Thalavaipatty, 2212 Thennampillaiyur Ariyapalayam,E.Karadipatt y,West Rajapalayam and Thamayanur

Improvements in Km 19/0 - 1-CRIDP- 23/3 of Kadayampatty - 2213 11-12-P- Salem Omalur Santhaipettai - 4.30 55.00 2213 Ramamoorthy Nagar (via) Thatravur road

ODR SCP Page 34 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements in Km 0/0 - 2214 11-12-P- Salem Omalur 0/2, 0/8 - 2/2 of 1.60 24.00 2214 Naranampalayam road

1-CRIDP- Improvements to Paithur - 2215 11-12-P- Salem Gangavalli Kanavaikadu Road KM.6/0- 4.15 65.00 2215 10/145

1-CRIDP- Improvements to 2216 11-12-P- Salem Attur Gandhipuram - Manjini 2.59 40.00 2216 Road KM 2/0 - 4/585

1-CRIDP- Improvements to 2217 11-12-P- Salem Attur Kalpaganur - Reddikuttai 1.70 35.00 2217 Road KM 6/0 - 7/7

Improvements from 1-CRIDP- Km.6/6-8/0, 9/2-9/8 & 2218 11-12-P- Salem Mettur 10/2-11/2 of Mettur 3.00 24.00 2218 Thermal power plant road to Koodakkal road

1-CRIDP- Improvements in Km.0/0- 2219 11-12-P- Salem Eadpadi 1/0 of Pakkanadu - 1.00 10.00 2219 Etterivalavu road

Improvements from Km 1-CRIDP- 0/0-1/0,6/6,8/0-8/954 of 2220 11-12-P- Salem Yercaud 2.15 30.00 Karumandurai-Vellimalai 2220 road.

Improvements from Km 1-CRIDP- 4/0-7/2 of 2221 11-12-P- Salem Attur 3.20 32.00 Puthiragoundampalayam - 2221 Malligarai road

Improvements from Km 1-CRIDP- 0/0-1/4 of Palaniapuram 2222 11-12-P- Salem Yercaud 1.40 16.00 colony to Singipuram 2222 Colony road

ODR SCP Page 35 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements from 1-CRIDP- Km.1/6-1/8, 2/2-2/6, 3/2- 2223 11-12-P- Salem Eadpadi 3/8, 4/8-5/6 and 5/8-6/2 2.40 20.00 2223 of Vanavasi - Moolakadu road

1-CRIDP- Improvements from 2224 11-12-P- Salem Eadpadi Km.0/6-2/0 of Mallapanur 1.40 12.00 2224 - Village road

1-CRIDP- Improvements from 2225 11-12-P- Salem Mettur Km.16/4-18/2 of Kolathur- 1.80 35.00 2225 Guruvareddiyur road

1-CRIDP- Improvements in Km.4/8- 2226 11-12-P- Salem Eadpadi 6/8 & 8/0-9/0 of 3.00 29.00 2226 Moolapathai - Erupali road

Improvements in Km.0/0- 1-CRIDP- 0/6, 3/8-5/0, 5/6-7/4 & 2227 11-12-P- Salem Eadpadi Km.7/8-8/6 of Katchupalli- 4.40 42.00 2227 Pudupalayam - Panikanur road

Improvements in Km.5/0- 1-CRIDP- 6/0 & Km.7/0-8/0 of 2228 11-12-P- Salem Eadpadi Edapady- Dhathapuram 2.00 16.00 2228 road to Katchupalli- Pudupalayam road

Improvements in Km.0/0- 1-CRIDP- 2/0 & 6/0-8/0 of 2229 11-12-P- Salem Eadpadi 4.00 35.00 Pakkanadu - Mettu Theru 2229 Anaipallam road

1-CRIDP- Improvements in Km.0/0- 2230 11-12-P- Salem Eadpadi 1/0 of Vannankuttai - 1.00 9.00 2230 Kanniyampatty road

Strengthening/ Improvements 51.68 589.00 Total

ODR SCP Page 36 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Salem Total 54.68 724.00

Widening SL to IL and Improvements from Km 1-CRIDP- Senthamangala 4/1-6/0 of Erumapatty - 2231 11-12-P- Namakkal 1.90 105.00 m Valayapatty road 2231 (Including Reconstruction of Culvert at Km 4/2)

Widening SL to IL and Improvements from Km 6/0-8/6 of Erumapatty - 1-CRIDP- Senthamangala Valayapatty road 2232 11-12-P- Namakkal 2.60 135.00 m (Including widening culvert 2232 at Km 6/2 (i), (ii), 6/4, 8/4 and reconstruction of culvert at Km 6/6)

Widening & Improvements 4.50 240.00 Total

Improvements from Km 1-CRIDP- Senthamangala 0/0-3/8 of Namakkal - 2233 11-12-P- Namakkal 3.80 150.00 m Thuraiyur road to 2233 Kalichettipatty road.

Improvements from Km.10/2-12/050 of Elur- Nattamangalam - Gurusamypalayam Road including Construction of 1-CRIDP- RCC slab culvert at 2234 11-12-P- Namakkal Rasipuram 1.85 28.00 Km.11/4, Construction of 2234 Storm Water Drain in Km.11/4 & 11/6 (Left Side) and Construction of Well Protection wall at Km.10/6 (Left Side)

ODR SCP Page 37 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements from 2235 11-12-P- Namakkal Rasipuram Kakkaveri - Pattanam Road 1.20 11.00 2235 Km.1/0-2/2

Improvements from 1-CRIDP- R.Pudupalayam - 2236 11-12-P- Namakkal Rasipuram 4.60 40.00 Karadiyanur - Athikuttai 2236 Road Km.0/0-4/6.

1-CRIDP- Improvements from Km 2237 11-12-P- Namakkal Kumarapalayam 0/0-1/2 of Avathipalayam- 1.20 10.00 2237 Senguttaipalayam road. Improvements from Km 1-CRIDP- 0/0-0/6 of 2238 11-12-P- Namakkal Tiruchengodu 0.60 10.00 Mallasamudram Kaspa 2238 road

Improvements from Km 0/0-4/8 of Serukkalai cross road and 1-CRIDP- Construction of new RCC 2239 11-12-P- Namakkal Paramathivelur 1.00 m span slab culvert 4.80 45.00 2239 and Construction of well protective wall at Km 1/2 and 1/4 and Curve improvements.

Improvements from Km 0/0-4/645 of Sakkarampalayam- 1-CRIDP- Periyamanali-Elur road 2240 11-12-P- Namakkal Paramathivelur and Km 0/4 and 4.65 45.00 2240 Construction of new RCC 1.00 m span slab culvert and Retaining wall at Km 1/6 and 1/8. 1-CRIDP- Improvements from Km 2241 11-12-P- Namakkal Kumarapalayam 0/0-1/8 of Odapalli- 1.80 20.00 2241 Papampalayam Road.

ODR SCP Page 38 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Strengthening/ Improvements 24.50 359.00 Total

Namakkal 29.00 599.00 Total

1-CRIDP- Improvements to Mathur- 2242 11-12-P- Krishnagiri Uthangarai Mallapadi road Km 11/2- 4.00 28.00 2242 15/2

1-CRIDP- Improvements to Kallavi- 2243 11-12-P- Krishnagiri Uthangarai Anandur road Km 0/0- 6.80 60.00 2243 1/0, 2/2-8/0

1-CRIDP- Improvements to Mittapalli- 2244 11-12-P- Krishnagiri Uthangarai Periya thallapadi road Km 2.00 20.00 2244 0/0-2/0

1-CRIDP- Improvements to Ayyur - 2245 11-12-P- Krishnagiri Thalli 2.60 25.00 Melur Road Km 0/0-2/6 2245

Improvements to 1-CRIDP- Denkanikotta - Jawalagiri - 2246 11-12-P- Krishnagiri Thalli 8.00 82.00 Karnataka State Boarder 2246 Road Km 0/0-8/0.

Improvements to 1-CRIDP- Biragondapalli - Hosur - 2247 11-12-P- Krishnagiri Thalli Thally Road (via) C.R. 4.40 50.00 2247 Palayam - Kupatti Road at Km 0/0-4/4

1-CRIDP- Improvements to Mathur- 2248 11-12-P- Krishnagiri Uthangarai Sanipatty road Km 0/0- 5.60 40.00 2248 5/6

ODR SCP Page 39 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Palayamkotta - 1-CRIDP- Savarambatham Road (via) 2249 11-12-P- Krishnagiri Thalli Kadusaipalli - 6.60 60.00 2249 Mudugiridoddi- Padiganalam Road Km 4/0- 10/6

Strengthening/ Improvements 40.00 365.00 Total

Krishnagiri 40.00 365.00 Total

1-CRIDP- Improvements at KM 18/4- 2250 11-12-P- Dharmapuri Pappireddipatti 19/8 of Mallapuram - 1.40 15.00 2250 Gopinathampatti road

1-CRIDP- Improvements at KM 2/0- 2251 11-12-P- Dharmapuri Pappireddipatti 4/0 of Boothanatham - 2.00 20.00 2251 Venkatasamutharm road

Improvements at KM 0/0- 1-CRIDP- 3/0 of Boothanatham - 2252 11-12-P- Dharmapuri Pappireddipatti 3.00 28.00 Venkatasamutharm road 2252 To Kozhimakkanur

1-CRIDP- Improvements at KM 15/0- 2253 11-12-P- Dharmapuri Pappireddipatti 16/7 of A.Pallipatti - 1.70 15.00 2253 Morappur road

1-CRIDP- Improvements at KM 0/0- 2254 11-12-P- Dharmapuri Pappireddipatti 2.00 20.00 2/0 of Sitheri road 2254

1-CRIDP- Improvements at KM 16/7- 2255 11-12-P- Dharmapuri Pappireddipatti 18/4 of A.Pallipatti - 1.70 15.00 2255 Morappur road

ODR SCP Page 40 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements at KM 2/0- 2256 11-12-P- Dharmapuri Pappireddipatti 2.00 20.00 4/0 of Sitheri road 2256

Improvements to Km 0/0- 1-CRIDP- 0/8 & 1/8-3/8 of 2257 11-12-P- Dharmapuri Dharmapuri Dharmapuri Hogenakkal to 2.80 24.00 2257 Papparapatti road (via) Attukarampatti road

1-CRIDP- Improvements to Km 5/6- 2258 11-12-P- Dharmapuri Pappireddipatti 7/0 of Kambainallur – 1.40 12.00 2258 Semmanahalli

Improvements at Km 1/0 - 3/2, 3/6, 3/10 of National 1-CRIDP- Highways -7 to 2259 11-12-P- Dharmapuri Pappireddipatti 2.60 25.00 Mukkalnaickenpatti (via) 2259 Emakuttiyur, Ettimarathupatti road

1-CRIDP- Improvements to Km 1/4- 2260 11-12-P- Dharmapuri Dharmapuri 2/8 of Annasagaram - 1.40 16.00 2260 Kombai road

Improvements to Km 6/6- 7/2 and improvement to 1-CRIDP- widen portion at Km 7/2- 2261 11-12-P- Dharmapuri Pappireddipatti 8/0 and consntruction of 1.40 14.00 2261 culvert at Km 6/10 of Semmanahalli - Ariyakulam road Improvements to KM 7/6- 1-CRIDP- 9/4 of Pennagaram - 2262 11-12-P- Dharmapuri Pennagaram 1.80 16.00 Perumbalai road To 2262 B.Agarharam 1-CRIDP- Improvements to KM 0/0 - 2263 11-12-P- Dharmapuri Pennagaram 2/0 of Pennagaram - 2.00 18.00 2263 Dasampatti road

Improvements at KM 0/0- 1-CRIDP- 2/0 of Pillparuthi - 2264 11-12-P- Dharmapuri Pappireddipatti 2.00 20.00 Gurubarahalli road (Via) 2264 Thalanatham Attur

ODR SCP Page 41 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements at KM 2/0- 1-CRIDP- 4/0 of Pillparuthi - 2265 11-12-P- Dharmapuri Pappireddipatti 2.00 20.00 Gurubarahalli road (Via) 2265 Thalanatham Attur

Improvements at KM 12/0- 1-CRIDP- 15/0 of Pillparuthi - 2266 11-12-P- Dharmapuri Pappireddipatti 3.00 28.00 Gurubarahalli road (Via) 2266 Thalanatham Attur

1-CRIDP- Improvements to KM 9/4- 2267 11-12-P- Dharmapuri Palacodu 13/4 of Pulikarai- 4.00 45.00 2267 Mukkulam road.

Improvements to KM 0/0- 1-CRIDP- 1/2 including 2268 11-12-P- Dharmapuri Palacodu 1.20 25.00 reconstruction of culvert at 2268 KM 0/8 of Samanur road

1-CRIDP- Improvements to KM 0/0- 2269 11-12-P- Dharmapuri Palacodu 2.66 30.00 2/660 of Gundalahalli road 2269 Improvements to KM 4/6- 6/2 of Pulikarai- 1-CRIDP- Mukkulam road Including 2270 11-12-P- Dharmapuri Pennagaram 1.60 25.00 Junction imrovement at 2270 KM 6/2 of Pulikarai- Mukkulam road 1-CRIDP- Improvements to KM 13/4- 2271 11-12-P- Dharmapuri Palacodu 16/0 of Pulikarai- 2.60 35.00 2271 Mukkulam road.

Improvements to KM 4/8- 5/2, 5/10, 6/6-7/3, 8/0- 1-CRIDP- 8/6, 9/0-9/750, 11/6- 2272 11-12-P- Dharmapuri Palacodu 4.05 49.00 12/0, 14/6-15/6 of 2272 Belarahalli To joining at KM 121/6 of - NH-7.

ODR SCP Page 42 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to KM 1-CRIDP- 2/2,2/4-3/2,3/8-4/2,4/6- 2273 11-12-P- Dharmapuri Palacodu 5/0,6/0-6/4,6/10 of 2.40 30.00 2273 Matlamatti-Murukkamatti road

Improvements to Km 5/4- 6/0, 7/2, 7/6, 8/6, 10/4- 1-CRIDP- 11/8 of Nallampalli - 2274 11-12-P- Dharmapuri Dharmapuri 2.60 22.00 Papparapatti road (via) 2274 Nagarkodal, Indur, Ganapatti road

Improvements to Km 3/0- 5/0 including construction 1-CRIDP- of culvert at Km 3/4 of 2275 11-12-P- Dharmapuri Dharmapuri 2.00 18.00 Kombai – 2275 Thandukarampatti (via) Palayampudur road

Improvements to Km 12/0- 1-CRIDP- 14/4 of Nallampalli - 2276 11-12-P- Dharmapuri Dharmapuri Papparapatti road (via) 2.40 24.00 2276 Nagarkodal, Indur, Ganapatti road

Improvements to Km 0/0- 1-CRIDP- 2/6, 4/4-5/2 of 2277 11-12-P- Dharmapuri Dharmapuri Nallampalli - Papparapatti 3.40 25.00 2277 road (via) Nagarkodal, Indur, Ganapatti road

Improvements to KM 5/4 - 1-CRIDP- 6/0, 7/0-10/0, 11/0 - 2278 11-12-P- Dharmapuri Harur 5.20 46.30 12/6 of Morappur - 2278 Eachambadi road

1-CRIDP- Improvements to KM 0/0- 2279 11-12-P- Dharmapuri Harur 1.20 10.80 1/2 of M. Vetrapatti road 2279

ODR SCP Page 43 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to KM 0/0- 2280 11-12-P- Dharmapuri Harur 1.40 12.60 1/4 of Appiyampatti road 2280

1-CRIDP- Improvements to KM 0/0- 2281 11-12-P- Dharmapuri Harur 1/2 of Setrapatti - 1.20 10.80 2281 Kotrapatti road

1-CRIDP- Improvements to KM 0/0- 2282 11-12-P- Dharmapuri Harur 1/2 of Kambainallure 1.20 10.80 2282 Semmanahalli road

Improvements to KM 0/0 - 1-CRIDP- 5/2 of Odasalpatti - 2283 11-12-P- Dharmapuri Harur Kambainallore - D. 5.20 46.80 2283 Puliyampatti (Via) Vetharampatti road

1-CRIDP- Improvements to KM 0/0- 2284 11-12-P- Dharmapuri Harur 5/035 of Ponneri 5.04 45.00 2284 Ellapudayampatti road

Improvements to KM 0/0- 1-CRIDP- 4/0 of Kallavi 2285 11-12-P- Dharmapuri Harur Samandahalli road to 4.00 36.00 2285 Peramanadapatti (via) Veeranakuppam road

Improvements to KM 2/2- 1-CRIDP- 3/2 of Mookkanur Harur 2286 11-12-P- Dharmapuri Harur 1.00 9.00 road to Reddipatti (via) 2286 Dhasirahalli

1-CRIDP- Improvements to KM 0/0- 2287 11-12-P- Dharmapuri Harur 3/9 of Keeraipatti 3.90 35.10 2287 Achalvadi road

1-CRIDP- Improvements to KM 0/0- 2288 11-12-P- Dharmapuri Harur 2/2 of Ponneri Kelapparai 2.20 19.80 2288 road

ODR SCP Page 44 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Strengthening/ Improvements 94.65 937.00 Total

Dharmapuri 94.65 937.00 Total

Salem Circle 218.32 2625.00 Total

Widening from SL to IL in km 4/8-9/0 and 1-CRIDP- improvements in km 7/0 - 2289 11-12-P- Tiruppur Avinashi 4.20 80.00 8/0 of 2289 Thandukkaranpalayam - Pasur road

Widening from SL to IL in km 7/8 - 11/6 of of 1-CRIDP- Karuvalur - Alampalayam 2290 11-12-P- Tiruppur Avinashi 3.80 70.00 road (via) Mondipalayam 2290 including construction of culvert at km 10/2

Widening from SL to IL in km 3/6 - 7/8 of of 1-CRIDP- Karuvalur - Alampalayam 2291 11-12-P- Tiruppur Avinashi road (via) Mondipalayam 4.20 80.00 2291 including construction of culverts at km 4/10, 5/8, 6/10 & 7/8

Widening from SL to IL in km 0/0 - 3/6 and 1-CRIDP- Improvements in km 0/8 - 2292 11-12-P- Tiruppur Avinashi 1/4, 2/2 - 2/4 & 2/8 - 3/4 3.60 100.00 2292 of Karuvalur - Alampalayam road (via) Mondipalayam

ODR SCP Page 45 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening from SL to IL in km 5/150 - 7/990 and Improvements in km 1-CRIDP- 5/150 - 5/4, 6/0 - 7/0 & 2293 11-12-P- Tiruppur Palladam 2.84 55.00 7/4 - 7/920 of Mangalam - 2293 Valai Thottathu Ayyankovil road (via) Boomalur - Pallipalayam

ODR SCP Page 46 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening in km 1/0 - 8/0 and Improvements in km 1-CRIDP- 1/0 - 4/4 of 2294 11-12-P- Tiruppur Kangeyam 7.00 100.00 Thanneerpandal - 2294 Kambiliampatti - Lakkamanaickenpatti road.

Widening & Improvements 25.64 485.00 Total

Improvements to km 0/0 - 1-CRIDP- 5/4 of Km 32/4 of 2295 11-12-P- Tiruppur Palladam Dharapuram - Tirupur 5.40 46.00 2295 road to join at km 294/0 of NGM road

Improvements in km 0/0- 1-CRIDP- 1/6 of the road from Km 2296 11-12-P- Tiruppur Palladam 1.60 11.00 2/0 of Palladam- Boomalur 2296 road to Kalivalampatty.

Improvements in km 7/0- 1-CRIDP- 7/4, 8/2-8/8 & 10/6-13/0 2297 11-12-P- Tiruppur Palladam 3.40 23.00 of Venkitapuram- 2297 Kalipalayam road

Improvements in km 1/0- 1-CRIDP- 2/0 of the road from 2298 11-12-P- Tiruppur Palladam mangalam road to 1.00 7.00 2298 Arulpuram (via) sedapalayam

Improvements in km 0/0- 2/0 of the road from Km 1-CRIDP- 2/2 of road Branching 2299 11-12-P- Tiruppur Palladam 2.00 16.00 from Km 7/6 of Palladam- 2299 Dharapuram - Pongalur road to Valayapalam.

ODR SCP Page 47 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements in km 0/0- 1-CRIDP- 1/2 & 5/2-6/2 of 2300 11-12-P- Tiruppur Palladam 2.20 15.00 Thutaripalayam Pongalure 2300 road

Improvements in km 0/2- 0/6 & 0/8-2/0 of the road 1-CRIDP- from Km 21/6 of Avinashi- 2301 11-12-P- Tiruppur Palladam 1.60 11.00 Kochin road to Goundam 2301 palayam AD colony (via) Kungumampalayam.

Improvements to km 0/0 - 1-CRIDP- 3/0 , 5/0 - 5/4 of 2302 11-12-P- Tiruppur Palladam 3.40 30.00 Kuppichipalayam - 2302 Kaikatty road

Strengthening the road 1-CRIDP- from Km.14/2 of Tirupur 2303 11-12-P- Tiruppur Tiruppurnorth Kunnathur road to 1.60 35.00 2303 Sokkanur road Km.3/0 - 3/8, 5/4 - 6/0 & 6/6.

Improvements in km 0/6 - 1/0 & 1/6 - 3/0 & 3/2 - 1-CRIDP- 4/6 & 5/2 - 5/8 of the 2304 11-12-P- Tiruppur Avinashi road from km 5/0 of 3.80 28.00 2304 Avinashi - Mettuppalayam road to Asanallipalayam road (via) Vettuvapalayam

Improvements in km0/8- 1-CRIDP- 3/2 of Rayaprpalayam- 2305 11-12-P- Tiruppur Palladam 2.40 32.00 Ganapathypalayam road 2305 (via) Goundampalayam

Improvements in km 0/0- 1-CRIDP- 3/590 of the road from 2306 11-12-P- Tiruppur Palladam 3.59 25.00 Kattampatty- Koduvai road 2306 to Velapagoundampudur

ODR SCP Page 48 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to km 0/0 - 1-CRIDP- 1/2, 2/0 - 2/8, 4/8 - 7/4 2307 11-12-P- Tiruppur Kangeyam 6.20 50.00 and 7/6 - 9/2 of Kadaiyur - 2307 Padiyur road

Strengthening/ Improvements 38.19 329.00 Total

Tiruppur 63.83 814.00 Total

Widening from S.L To I.L and Improvements in km 1-CRIDP- 0/0 - 4/0 of 2308 11-12-P- Dharapuram Kangeyam 4.00 65.00 Karatupalayam - 2308 Mylrangam - Vellathankaraipudur road

Widening from S.L To I.L 1-CRIDP- and Improvements in km 2309 11-12-P- Dharapuram Kangeyam 0/0 - 3/2 of Manthapuram 3.20 54.00 2309 - Valliarachal - Veerasolapuram road

Widening & Improvements 7.20 119.00 Total

1-CRIDP- Improvements to km 21/4- 2310 11-12-P- Dharapuram Udumalapet 23/0 & 25/0 - 27/0 3.60 35.00 2310 Erisanampatti - Dhali road

1-CRIDP- Improvements to km 4/0- 2311 11-12-P- Dharapuram Udumalapet 7/0 of Anthiyur - 3.00 30.00 2311 Kongalnagaram road Improvements to km 4/0- 1-CRIDP- 5/2 of 2312 11-12-P- Dharapuram Udumalapet 1.20 15.00 Jelapinaickenpalayam - 2312 Palar road 1-CRIDP- Improvements to km 0/0 - 2313 11-12-P- Dharapuram Udumalapet 2/2 of Vallakundapuram - 2.20 18.00 2313 Palar road

ODR SCP Page 49 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to km 0/0 - 2314 11-12-P- Dharapuram Udumalapet 1/0 of Ravanapuram 1.00 12.00 2314 Village road Improvements to km 0/0 - 1-CRIDP- 1/0 of Dhali – 2315 11-12-P- Dharapuram Udumalapet 1.00 11.00 Komaralingam road to 2315 Jallipatti road Improvements to km 8/6- 1-CRIDP- 10/0 of Periyapatti - 2316 11-12-P- Dharapuram Udumalapet 1.40 14.00 Negamam road (via) 2316 Ammapatti road

Improvements to km 12/8 - 13/700 of the road from 1-CRIDP- km 83/8 of Gobi - 2317 11-12-P- Dharapuram Kangeyam Dharapuram road to join 0.90 45.00 2317 at km 8/6 of Uthiyur- Dasanaickenpatty road (via) Sankarandampalayam

Improvements to 1-CRIDP- Veethampatti - 2318 11-12-P- Dharapuram Udumalapet 1.40 16.00 Bomanikanpatti road Km 2318 0/0 - 1/4 Improvements to Km 3/8- 1-CRIDP- 7/0 & 9/2-10/0 of 2319 11-12-P- Dharapuram Dharapuram 4.00 33.00 Periyapatti - 2319 Sadaiyapalayam road

Forming Bye pass road in Dharapuram Town at Tiruppur District from 1-CRIDP- Palani - Dharapuram road 2320 11-12-P- Dharapuram Dharapuram 1.05 200.00 to Mettur - Palakkanuthu - 2320 Oddanchatram - Dharapuram - Tirupur in Km 2/550-3/600

ODR SCP Page 50 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Forming Bye pass road in Dharapuram Town at Tiruppur District from Mettur - Palakkanuthu- 1-CRIDP- Oddanchatram - 2321 11-12-P- Dharapuram Dharapuram Dharapuram - Tirupur Km 1.20 200.00 2321 74/10 to Pollachi - Dharapuram - Karur road Km 58/2 Km 0/0-1/2. (Upputhuraipalayam to ,Madugampalayam Pirivu)

Improvements to 1-CRIDP- Periyapatti - 2322 11-12-P- Dharapuram Dharapuram 3.00 22.20 Sadaiyapalayam road Km 2322 11/0-14/0

Improvements to 1-CRIDP- Dharapuram - Tiruppur 2323 11-12-P- Dharapuram Dharapuram road Km 16/2 to 3.00 22.50 2323 Kundadam (via) Sedapayalam Km 0/0-3/0.

1-CRIDP- Improvements to Km 0/0- 2324 11-12-P- Dharapuram Dharapuram 4/0 of Karaiyur - 4.00 32.00 2324 Athimarathupudur road

1-CRIDP- Improvements to Km 5/0- 2325 11-12-P- Dharapuram Dharapuram 6/0 of Karaiyur - 1.00 8.00 2325 Athimarathupudur road

1-CRIDP- Improvements to Km 0/0- 2326 11-12-P- Dharapuram Dharapuram 1/4 of Pattuthurai - 1.40 11.00 2326 Thulukkavalasu road

Strengthening/ Improvements 34.35 724.70 Total

Dharapuram 41.55 843.70 Total

ODR SCP Page 51 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Km.0/0- 1-CRIDP- 2/0 of the road branching 2327 11-12-P- Erode Anthiyur from Km 31/2 of Sathy - 2.00 16.00 2327 Athani - Bhavani road to Kuppandampalayam Improvements to Km.0/0 - 1-CRIDP- 1/0, 1/8-2/4 of 2328 11-12-P- Erode Anthiyur 1.60 13.00 Ennamangalam - 2328 Selambur Ammankoil road Improvements to Km. 5/0- 1-CRIDP- 5/8, 7/0-7/4 of 2329 11-12-P- Erode Anthiyur 1.20 10.00 Singampettai 2329 Guruvareddiyur road

Improvements to Km. 0/0- 1-CRIDP- 3/8 of the road branching 2330 11-12-P- Erode Anthiyur from km 6/2 of Mathur 3.80 30.00 2330 Viralikattur road to Vellakarattur

Improvements to Km. 0/0- 2/0 of the road branching 1-CRIDP- from km 5/6 of 2331 11-12-P- Erode Anthiyur 2.00 15.00 Singampettai 2331 Guruvareddiyur road to Thoppalpayam

1-CRIDP- Improvements to Km. 0/0- 2332 11-12-P- Erode Bhavani 0.80 7.00 0/8 of Nallipalayam road 2332

1-CRIDP- Improvements to Km.1/0- 2333 11-12-P- Erode Bhavani 1/6, 2/0-2/4 of Olagadam 1.00 8.00 2333 Brammadesam road

1-CRIDP- Improvements to Km. 3/0- 2334 11-12-P- Erode Bhavani 4/0 of Uratchikottai 1.00 8.00 2334 Jambai road (part I)

1-CRIDP- Improvements to Km.0/6- 2335 11-12-P- Erode Bhavani 1/6 of Uratchikottai 1.00 8.00 2335 Jambai road ( part II)

ODR SCP Page 52 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Km. 2/8- 1-CRIDP- 3/0,3/5-4/7 of 2336 11-12-P- Erode Anthiyur 1.40 12.00 Chinnathambipalayam to 2336 Perumapalayam road

Improvements to Km. 0/8- 1-CRIDP- 1/4,1/8-3/0,4/4-5/2 of 2337 11-12-P- Erode Bhavani the road from km 12/6 of 2.60 20.00 2337 Vellithiruppur road to Kolanthapalayam

1-CRIDP- Improvements to km 0/0- 2338 11-12-P- Erode Modakkurichi 2/6 of Modakurichi- 2.60 20.00 2338 Chavadipalayam road

Improvements at Km 0/0- 1-CRIDP- 2/0 of Uthandipalayam- 2339 11-12-P- Erode Modakkurichi Pasur R.S road including 2.60 18.00 2339 construction of retaining walls at Km 1/8

Improvements to Km 5/4- 1-CRIDP- 7/0 of Thavittupalayam - 2340 11-12-P- Erode Anthiyur 1.60 13.00 Malaikaruppusamy koil 2340 road

Improvements to km 0/0- 1-CRIDP- 2/0 of Erode - Sathy road 2341 11-12-P- Erode Erodewest to Sadayampalayam road 2.00 25.00 2341 and Construction of Retaining wall at km 1/8

Improvements at Km 1/8- 3/4 of Mettupalayam- 1-CRIDP- Pandipalayam Road 2342 11-12-P- Erode Modakkurichi including widening of 1.60 15.00 2342 culverts at Km 1/2, 1/6,2/2 and construction of retaining walls at Km 1/2, 1/6, 2/2 Improvements to Km 0/0- 1-CRIDP- 1/0 of Paruvachi - 2343 11-12-P- Erode Bhavani 1.00 8.00 Ammanpalayam- 2343 Thandampalayam road

ODR SCP Page 53 Cost Sl Work Division Constituency Name of work Length in No code Lakhs Improvements to Km.0/0- 1-CRIDP- Gobichettypalay 5/2 of Kolappalur - 2344 11-12-P- Erode 5.20 50.00 am Neelampalayam - 2344 Pallipalayam road

Improvements to km 0/0- 1-CRIDP- 1/0 of Erode Chennimalai 2345 11-12-P- Erode Erodewest road to Thottipalayam RS 1.00 11.00 2345 road and Reconstruction of culvert at km 0/6,0/8

Improvements at Km 3/0 - 6/0 of Road from km 29/4 of Kangayam-Kodumudi and Km16/8 Arachalur- 1-CRIDP- Kodumudi Road (Via) 2346 11-12-P- Erode Modakkurichi 3.00 25.00 Perumparrappu including 2346 widening of culverts at Km 3/6,4/10 and construction of retaining walls at Km 3/6,4/10 Improvements to Km.0/0- 1/2 & 6/0 -10/0 of the road branching at Km 6/0 1-CRIDP- of Chennimali - Uthukuli 2347 11-12-P- Erode Perundhurai 5.20 45.00 Road to Ponnamkuttai 2347 road including Reconstruction of narrow culvert at km 4/10 & 5/4 Improvements to Km 0/0- 2/8 of the road from Km 1-CRIDP- 2/8 of Kandayeekuttai - 2348 11-12-P- Erode Modakkurichi Kollampalayam road to 2.80 23.00 2348 Kollampalayam to Erode - Muthur road (via) Andakottampalayam

1-CRIDP- Improvements to km 18/6 - 2349 11-12-P- Erode Perundhurai 20/2 of Nasiyanur - 1.60 60.00 2349 Kampuliampatti road

ODR SCP Page 54 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to km 0/0- 1-CRIDP- 3/4 Bye pass road to Erode 2350 11-12-P- Erode Erodewest 3.40 28.00 - Bhavani road (via) 2350 Ramnad pudur

Improvements to km 0/0- 1-CRIDP- 2/6 ofVellithiruppur - 2351 11-12-P- Erode Anthiyur 2.60 22.00 Alampalayam road to 2351 Chinnamathur road Improvements to km 0/0 - 1-CRIDP- 1/0 of Perundurai - 2352 11-12-P- Erode Perundhurai 1.00 35.00 Kanjikoil road (Via) 2352 Kolathanvalasu road

Improvements to km 0/0- 1-CRIDP- 2/896 of Kandeykuttai - 2353 11-12-P- Erode Modakkurichi 2.90 23.00 sangarampalayam (via) 2353 Velankattuvalasu

Improvements to km 0/0- 1/2 and widening of 1-CRIDP- culvert at km 0/2 of 2354 11-12-P- Erode Modakkurichi 1.20 11.00 Km.2/6 of Avalpoondurai - 2354 Anandampalayam road to Velankattuvalasu road

1-CRIDP- Improvements to Km 0/0- 2355 11-12-P- Erode Bhavani 4/6 of Oricheripudur - 4.60 35.00 2355 Osaipatty road

Improvements to km 0/0- 1-CRIDP- 3/4 of Mullamparappu 2356 11-12-P- Erode Erodewest Mettupalayam road and 3.40 35.00 2356 reconstrution of culvert at km 0/4,1/8,1/10 and 2/8

1-CRIDP- Improvements to Km. 0/0- 2357 11-12-P- Erode Bhavani 1/0, 2/8-4/4 of Murali - 2.60 21.00 2357 Jarathal road

ODR SCP Page 55 Cost Sl Work Division Constituency Name of work Length in No code Lakhs Improvements to km 0/0- 2/6 of Kaspapettai 1-CRIDP- kanagapuram road and 2358 11-12-P- Erode Modakkurichi reconstruction of culvert at 2.60 30.00 2358 km 0/10,1/4 and widening of RCC slab culvert at km 2/4

Improvements to Km. 0/0- 1-CRIDP- 3/0 of Road from km 4/4 2359 11-12-P- Erode Anthiyur of Gettisamudram road to 3.00 24.00 2359 Kallimadai kuttai (via) Odaimedu, Palakuttai road

Improvements to km 0/0- 1-CRIDP- 2/4 of Erode Perundurai 2360 11-12-P- Erode Erodewest 2.40 28.00 road to Nanjanapuram (H) 2360 colony via Cinnamedu

Improvements to Km. 0/0- 1-CRIDP- 1/0 of the Road from km 2361 11-12-P- Erode Anthiyur 57/8 of Thoppur Mettur 1.00 8.00 2361 Bhavani road to Sanathikkal

1-CRIDP- Improvements to Km. 0/0- 2362 11-12-P- Erode Anthiyur 0/6 of Muniappampalayam 0.60 5.00 2362 Karattur road Improvements to Km. 0/0 - 1-CRIDP- 1/2 of Kaluthaipali 2363 11-12-P- Erode Anthiyur 1.20 21.00 (Gandhi Nagar) Palakutai 2363 road

Improvements to Km. 0/8 - 2/0 & 3/0-4/2 of the road 1-CRIDP- branching from km 2/4 of 2364 11-12-P- Erode Anthiyur Vellitiruppur 2.40 20.00 2364 Aalampalayam road to join at km 2/2 of Vellitirupur Thottikinar road

ODR SCP Page 56 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Strengthening/ Improvements 83.50 806.00 Total

Erode Total 83.50 806.00

Widening from single lane 1-CRIDP- to intermediate lane and 2365 11-12-P- Karur Karur Improvements in Km.0/0 - 4.40 98.00 2365 4/4 of Manmangalam - Nanniyur Road

Widening & Improvements 4.40 98.00 Total

1-CRIDP- Improvements to Km 5/0 - 2366 11-12-P- Karur Aravakurichi 6/0 of Sellivalasu pirivu - 1.00 8.00 2366 Vennaikothur road

Improvements to Km 2/0 - 1-CRIDP- 3/0 of Thennilai - 2367 11-12-P- Karur Aravakurichi 1.00 8.00 Mylrengam road to 2367 Kodanthur road

1-CRIDP- Improvements to Km 3/0 - 2368 11-12-P- Karur Karur 5/0 of Koravapatty - 2.00 16.00 2368 Kullampatty Road

Improvements to Km 2/0 - 1-CRIDP- 5/4 of Panjamadevi - 2369 11-12-P- Karur Karur 3.40 22.00 Kavundanpudur, Palaiyur 2369 Road

Improvements to road 1-CRIDP- branching at km 17/6 of 2370 11-12-P- Karur Kulithalai Allithurai - Thogamali road 3.00 25.00 2370 to Archampatty km 0/0 - 3/0

ODR SCP Page 57 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to KM.0/0- 1-CRIDP- 3/6 of Km 8/6 of Krishnarayapura 2371 11-12-P- Karur Palaviduthi - Kadavur 3.60 30.00 m 2371 Road to D.Edayapatty road. Improvments to Km. 2/0 - 1-CRIDP- 3/0 and 5/4 - 6/0 of Nerur 2372 11-12-P- Karur Karur 1.60 80.00 - Thalavapalayam C.C. 2372 Road. Improvments to Km 0/0 - 1-CRIDP- 0/6 of Nerur - 2373 11-12-P- Karur Karur 0.60 30.00 Thalavapalayam Byepass 2373 Road Improvements to Km 1/2 - 6/0 & 8/0 - 8/6 of Erode - 1-CRIDP- Karur Road to Old NH 7 2374 11-12-P- Karur Aravakurichi 5.40 45.00 (via) Attur - 2374 Moorthipalayam, Nanaparapu to Road

1-CRIDP- Improvements to Km 4/0 - 2375 11-12-P- Karur Aravakurichi 1.00 13.00 5/0 of Karvali - Anjur Road 2375 Improvements to Km 0/0 - 1-CRIDP- 3/0 of Karur - Esanatham 2376 11-12-P- Karur Karur 2.00 25.00 Road to Karumparapu 2376 Road

Improvements to 1-CRIDP- Thenkadaikurichi - 2377 11-12-P- Karur Kulithalai 1.36 20.00 Ayyanarkoil road km 0/0 - 2377 1/355

Improvements to 1-CRIDP- Nangavaram - Nachalur 2378 11-12-P- Karur Kulithalai 1.60 15.00 Road km 2/0 - 3/0 & 4/8 - 2378 5/4 1-CRIDP- Improvements to 2379 11-12-P- Karur Kulithalai Poyyamani - Inungur Road 4.20 45.00 2379 Km 0/0 - 4/2

ODR SCP Page 58 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to road from 1-CRIDP- Km 26/4 off Allithurai - 2380 11-12-P- Karur Kulithalai 1.00 10.00 Thogamalai road to 2380 Kalladai Km 0/0 - 1/0

1-CRIDP- Improvements Inungur - 2381 11-12-P- Karur Kulithalai 2.00 20.00 Nallur road Km 3/2 - 5/2 2381

Improvements to Road 1-CRIDP- branching Km 171/6 off 2382 11-12-P- Karur Kulithalai NH 67 to Thanneerplli - 2.40 25.00 2382 Karungalapalli road 2/0 - 4/4

1-CRIDP- Improvements to KM.0/0- Krishnarayapura 2383 11-12-P- Karur 3/0 of Kurunikulathupatty- 3.00 25.00 m 2383 Mettupatty road

Improvements to the road 1-CRIDP- from Km 342/4 of NH 45 to 2384 11-12-P- Karur Kulithalai 1.00 10.00 Pulutheri road Km 0/0 - 2384 1/0

Improvements to Km 0/0- 1-CRIDP- Krishnarayapura 1/0, 2/0-3/0 & 8/8-11/0 2385 11-12-P- Karur 4.20 35.00 m of Udaiyapatty - 2385 Madhukarai Road

1-CRIDP- Improvents to Km 5/0 - Krishnarayapura 2386 11-12-P- Karur 6/8 of Krishnarayapuram - 1.80 14.00 m 2386 Palajeyakondam Road Improvements to KM.0/0- 1-CRIDP- Krishnarayapura 1/0 & 2/0-3/8 of 2387 11-12-P- Karur 2.80 24.00 m Nalluranpatty- 2387 Chinnamuthapady road 1-CRIDP- Improvements to KM.0/0- Krishnarayapura 2388 11-12-P- Karur 2/4 of Thimmachipuram - 2.40 20.00 m 2388 Veeravalli road

ODR SCP Page 59 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to KM.0/6- Krishnarayapura 2389 11-12-P- Karur 3/0 of Panjapatty - 24.00 19.00 m 2389 Keeranur Road

1-CRIDP- Improvements to KM.2/8 - Krishnarayapura 2390 11-12-P- Karur 3/8 of Ranganathapuram 1.00 8.00 m 2390 Road

1-CRIDP- Improvements to Km 8/2 - 2391 11-12-P- Karur Aravakurichi 9/0 of Thennilai - 0.80 7.00 2391 Mylrengam road

1-CRIDP- Improvements to Km 1/0 - 2392 11-12-P- Karur Aravakurichi 6/686 of Kumarapalayam - 5.69 40.00 2392 Karuppapillaipudur road

1-CRIDP- Improvements to Km 0/0 - 2393 11-12-P- Karur Aravakurichi 2/0 and 2/6 - 3/0 of 2.40 20.00 2393 Periyathirumangalam road

Improvements to Km 0/0 - 1-CRIDP- 2/0 of Chinnadharapuram 2394 11-12-P- Karur Aravakurichi Petrol bunk - Kodanthur 2.00 16.00 2394 road (via) Periyathirumangalam road

ODR SCP Page 60 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Km 10/2- 2395 11-12-P- Karur Aravakurichi 12/0 and 13/2 - 15/2 of 4.80 39.00 2395 Markkampatti road.

Strengthening/ Improvements 93.04 714.00 Total

Karur Total 97.44 812.00

Tiruppur 286.32 3275.70 Circle Total

Widening from Single Lane to Intermediate Lane and 1-CRIDP- Improvements in Km 5/4- 2396 11-12-P- Coimbatore Sulur 7/2 including junction 1.80 100.00 2396 Improvements in Km 7/2 of Karuvalur - Kovilpalayam road

Widening from Single Lane 1-CRIDP- to Intermediate Lane and Kavundampalay 2397 11-12-P- Coimbatore Impts in Km 18/0-19/0 of 1.00 55.00 am 2397 Karuvalur - Kovilpalayam road

Widening from Single Lane to Intermediate Lane and Impts in Km 4/0-5/8 of 1-CRIDP- the road from Km 2/8 of 2398 11-12-P- Coimbatore Mettupalayam 1.80 78.00 Karamadai - 2398 Kariyampalayam road to Vadavalli (Via) Sikkarampalayam

Widening from Single Lane 1-CRIDP- to Intermediate Lane and Kavundampalay 2399 11-12-P- Coimbatore Impts in Km 16/4-18/0 of 1.60 90.00 am 2399 Karuvalur - Kovilpalayam road

ODR SCP Page 61 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening & Improvements 6.20 323.00 Total

ODR SCP Page 62 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Construction of High Level 1-CRIDP- Bridge at Km 12/10 of 2400 11-12-P- Coimbatore Mettupalayam Mettupalayam - 430.00 2400 Kitchakathur road (via) Moolathurai Bridges/ CD Works/ Others 1 No. 430.00 Total

Coimbatore 6.20 753.00 Total

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 6/6 - 2401 11-12-P- Pollachi Valparai 8/2 of the road from km 1.60 85.00 2401 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 8/2 - 2402 11-12-P- Pollachi Valparai 9/8 of the road from km 1.60 85.00 2402 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 9/8 - 2403 11-12-P- Pollachi Valparai 11/2 of the road from km 1.21 60.00 2403 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

ODR SCP Page 63 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 2/2 - 2404 11-12-P- Pollachi Valparai 3/8 of the road from km 1.60 85.00 2404 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 3/8 - 2405 11-12-P- Pollachi Valparai 5/4 of the road from km 1.60 85.00 2405 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

Widening from Single lane to intermediate lane and 1-CRIDP- Strengthening in km 5/4 - 2406 11-12-P- Pollachi Valparai 6/6 of the road from km 1.20 62.00 2406 9/2 of Ambarampalayam - Sethumadai road to Semmanampathy

Widening & Improvements 8.81 462.00 Total

Improvements in km 1/2- 1-CRIDP- 1/6, 2/4-3/0 & 4/0-4/6 of 2407 11-12-P- Pollachi Udumalapet 1.60 13.00 Samathur - Devanurpudur 2407 Road

Improvements in km 1/4 - 1-CRIDP- 2/2 &7/0 - 8/505 of 2408 11-12-P- Pollachi Udumalapet 2.61 21.00 Pollachi - Kanjampatty 2408 road (via) Nattukalpalayam

ODR SCP Page 64 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements in km 0/0 - 1-CRIDP- 2/0 of the road from km 2409 11-12-P- Pollachi Udumalapet 109/4 of Dindugal - 2.00 16.00 2409 Bangalore road to Kanjampatty

1-CRIDP- Improvements to km 0/0 - 2410 11-12-P- Pollachi Pollachi 6/0 Mulupady - 6.00 57.00 2410 Sirukaladai road Improvements to km 0/0 - 1-CRIDP- 4/6 & 6/0 - 7/0 of 2411 11-12-P- Pollachi Udumalapet 5.60 45.00 Thippampatty - 2411 Sellappampalayam road

Improvements to km 2/6 - 1-CRIDP- 3/0, 4/0 -5/0 & 5/6 -6/0 2412 11-12-P- Pollachi Kinathukadavu 1.80 21.00 of Kovilpalayam - 2412 Negamam road

Improvements to km 12/0 - 1-CRIDP- 18/4 of Kuruchi - 2413 11-12-P- Pollachi Kinathukadavu 6.40 50.00 Kannamanaickenur road 2413 (via) Nachipalayam road

Improvements to km 7/4 - 1-CRIDP- 9/080 of the road from km 2414 11-12-P- Pollachi Pollachi 1.68 16.00 135/8 of Dindgual - 2414 Bangalore road to Sulakkal

1-CRIDP- Improvements to km 7/0 - 2415 11-12-P- Pollachi Udumalapet 12/0 of Negamam - 5.00 39.00 2415 Erisanampatty road

Improvements to km 2/4- 1-CRIDP- 4/2 of the road from km 2416 11-12-P- Pollachi Udumalapet 109/8 of Dindugal - 1.80 15.00 2416 Bangalore road to Poosaripatty

1-CRIDP- Improvements to km 0/0 - 2417 11-12-P- Pollachi Pollachi 2/4 of Achipatty - 2.40 20.00 2417 Palanigoundenpudur road

ODR SCP Page 65 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to km 0/0 - 1/0 & 2/0 -3/6 of the road 1-CRIDP- from km 133/8 of 2418 11-12-P- Pollachi Pollachi 2.60 21.00 Dindgual - Bangalore road 2418 to Velauthampalayam (via) Nalligoundenpalayam

ODR SCP Page 66 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to km 1/8 - 1-CRIDP- 3/6 of the road from km 2419 11-12-P- Pollachi Kinathukadavu 138/8 of Dindgual - 1.80 15.00 2419 Bangalore road to Arasampalayam

Strengthening/ Improvements 41.29 349.00 Total

Pollachi Total 50.10 811.00

Widening SL to IL and to 1-CRIDP- Gobichettypalay km 2/0-3/0of Arasur 2420 11-12-P- Gobi 1.00 25.00 am Market-Nambiyur Market 2420 road

Widening SL to IL and to 1-CRIDP- km 7/6-9/2 and Gobichettypalay 2421 11-12-P- Gobi improvements to km 9/2- 2.60 60.00 am 2421 10/2 of Arasur Market- Nambiyur Market road

Widening & Improvements 3.60 85.00 Total

Improvements to KM 0/0- 0/4 and 2/0-6/2 of 1-CRIDP- Kanjikoil to 2422 11-12-P- Gobi Perundhurai 4.60 45.00 Thambikalaiayyan koil 2422 Road (VIA) Thangamedu (H) Colony

Improvements to KM 0/0- 1-CRIDP- 4/2 and construction of 2423 11-12-P- Gobi Bhavanisagar culverts at km 2/2 4.20 40.00 2423 Kondappanayakkanpalaya m road

ODR SCP Page 67 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to KM3/2- 1-CRIDP- 10/0 and improvements to Gobichettypalay 2424 11-12-P- Gobi Dip at km 5/6of 6.80 60.00 am 2424 Getticheyur - Nambiyur road

1-CRIDP- Improvements to KM 0/0- 2425 11-12-P- Gobi Bhavanisagar 3/4of Pungampalli- 3.40 30.00 2425 Panayampalli road

1-CRIDP- Improvements to KM 0/0- 2426 11-12-P- Gobi Anthiyur 5/0 of Kugalur- 5.00 50.00 2426 Perunthalaiyur road

Improvements to KM 0/0- 1/0,2/0-3/0 including 1-CRIDP- Gobichettypalay widening of narrow culvert 2427 11-12-P- Gobi 2.00 30.00 am at km 2/6 of 2427 Kullampalayam- Korakkatur road

1-CRIDP- Improvements to KM 0/0- 2428 11-12-P- Gobi Anthiyur 4/0 of Mevani 4.00 35.00 2428 Thalaikompudur road

Improvements to KM 0/0- 1-CRIDP- 5/6 of Perunthalaiyur to 2429 11-12-P- Gobi Anthiyur 5.60 50.00 join @ km 1/0 of Mevani 2429 Thalaikompudur road

Improvements to KM 0/0- 1-CRIDP- 7/0 of Thingalore- 2430 11-12-P- Gobi Perundhurai road (via) 7.00 60.00 2430 Broughnagar, Periyagounden- valasu

Improvements to km 0/0- 1/4 and reconstruction of 1-CRIDP- bed level causeway at km 2431 11-12-P- Gobi Bhavanisagar 0/6 of Road from Km 25/4 1.40 40.00 2431 of Sathy-Athani-Bhavani road to Erangattur AD colony

ODR SCP Page 68 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to km 0/0- 2/8 and construction of 1-CRIDP- culvert at km 1/2 of Gobichettypalay 2432 11-12-P- Gobi Nambiyur-Piliyampalayam 2.80 30.00 am 2432 road to Kattupalayam (via) Palanigoundanpalayam A.D.Colony

1-CRIDP- Improvements to KM 1/0- 2433 11-12-P- Gobi Bhavanisagar 2/4 of Anaikarai-Thikarai 1.40 30.00 2433 road

Improvents to KM 0/0-3/6 1-CRIDP- including Repairs to bed Gobichettypalay 2434 11-12-P- Gobi level causeway at km 0/10 3.60 45.00 am 2434 of Gobi palayam Alukkuli road

Improvements to km 1/4- 1-CRIDP- 3/4 of Sathy-Athani- 2435 11-12-P- Gobi Bhavanisagar Bhavani road to 2.00 20.00 2435 Anganagoundenpudur AD colony

1-CRIDP- Improvements to KM 3/6- 2436 11-12-P- Gobi Anthiyur 5/4 of Kondayanpalayam- 1.80 20.00 2436 Kanakkampalayam road

1-CRIDP- Improvements to KM 0/0- 2437 11-12-P- Gobi Bhavanisagar 4.80 47.00 4/8 of Sidhtankuttai road 2437

1-CRIDP- Improvements to KM 0/0- Gobichettypalay 2438 11-12-P- Gobi 3/2of Mamarathupalayam 3.20 25.00 am 2438 road

1-CRIDP- Improvements to KM 0/0- 2439 11-12-P- Gobi Bhavanisagar 2/0 of Rajan Nagar- 2.00 16.00 2439 Kasthurinagar road

ODR SCP Page 69 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to KM3/6- 2440 11-12-P- Gobi Bhavanisagar 4/8 of Panayampalli- 1.20 12.00 2440 Periakallipatti road

Improvements toKM 11/2- 11/4 11/6-11/8, 12/0- 1-CRIDP- 12/2,12/4-12/8, 13/2- 2441 11-12-P- Gobi Bhavanisagar 13/6,14/0-14/2, 15/0- 5.00 50.00 2441 16/8, 17/0-17/2, 17/4- 17/6, 17/8-19/0 of Thalavadi-Kongahalli road

Improvements to KM 31/0- 1-CRIDP- 32/4,37/6-38/0of 2442 11-12-P- Gobi Bhavanisagar 1.80 17.00 Dhimbam-Thalamalai- 2442 Thalavady road

1-CRIDP- Improvements to KM 1/0- 2443 11-12-P- Gobi Bhavanisagar 2/0 of Nalroad - 1.00 8.00 2443 Vellapalayam road

Strengthening/ Improvements 74.60 760.00 Total

Gobi Total 78.20 845.00

Improvements to Adashola 1-CRIDP- Uthagamandala Ebbanadu road Km 7/6- 2444 11-12-P- Udhagai 1.40 25.00 m 9/0 including CC drain 2444 and protective works

Providing interlocking paver block pavement and 1-CRIDP- protective works and CD Uthagamandala 2445 11-12-P- Udhagai works in water logging 49.00 m 2445 swamp portions at Km 0/2, 0/4 & 0/6 of B. Manihatty road

ODR SCP Page 70 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Providing interlocking paver block pavement and 1-CRIDP- Uthagamandala protective works in water 2446 11-12-P- Udhagai 46.00 m logging swamp portions at 2446 Km 0/10,1/2 and 2/10 of B. Manihatty road

Providing interlocking 1-CRIDP- Uthagamandala paver block pavement at 2447 11-12-P- Udhagai 20.00 m Km 0/2, 0/10 of Nunthala 2447 road Improvements to Km 0/0 - 1-CRIDP- Uthagamandala 3/4 of Yellanali Myanala 2448 11-12-P- Udhagai 3.40 70.00 m raod Including CD Works 2448 and Protective Works. Providing Cc Drain and 1-CRIDP- Protective works from Km 2449 11-12-P- Udhagai Coonoor 1.60 30.00 0/0 - 1/6 of Halakarai 2449 road

Improvement Km 2/0 - 4/0 1-CRIDP- of Nihaung Pudiyangi 2450 11-12-P- Udhagai Coonoor 2.00 50.00 Road. Including CC Drain 2450 and Protective works.

Improvement to Km 13/6- 1-CRIDP- 16/4 of Kattery Selas (Via) 2451 11-12-P- Udhagai Coonoor 2.80 70.00 Hulickal Nonsuch road 2451 including CC drain

Improvements and 1-CRIDP- construction of CC Drain 2452 11-12-P- Udhagai Gudalur 1.00 40.00 at Km 10/0-11/0 of 2452 Silverjubilee road

Improvement to Km0/0- 1-CRIDP- Uthagamandala 1/6 of Gandhi Kandi 2453 11-12-P- Udhagai 1.60 95.00 m pudur including CC drain 2453 and protective works

ODR SCP Page 71 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvement to Km 8/0- 1-CRIDP- 10/2 of Dolphin nose 2454 11-12-P- Udhagai Coonoor 2.20 50.00 roadincluding CC drain 2454 and protective works

Improvement to Km 1/6- 1-CRIDP- Uthagamandala 4/0 of Udhagai Sholur 2455 11-12-P- Udhagai 2.40 65.00 m roadincluding CC drain 2455 and protective works

Improvement to Km1/0- 1-CRIDP- 2/0 of Kengarai road 2456 11-12-P- Udhagai Coonoor 1.00 50.00 including CC drain and 2456 protective works

Improvement to Km3/0- 1-CRIDP- Uthagamandala 5/0of Adashola Ebbanad 2457 11-12-P- Udhagai 2.00 50.00 m road including CC drain 2457 and protective works

Improvement to Km 5/0 - 1-CRIDP- 7/6 of Devalah Athikunna 2458 11-12-P- Udhagai Gudalur 2.60 40.00 Uppatty road including CC 2458 drain

Strengthening/ Improvements 24.00 750.00 Total

1-CRIDP- Providing CC drain and 2459 11-12-P- Udhagai Coonoor protective works from 6/0- 50.00 2459 8/0 of Dolphin nose road

Bridges/ CD Works/ Others 1 No. 50.00 Total

Udhagai Total 24.00 800.00

Coimbatore Other works : 2 Nos. 158.50 3209.00 Circle Total

ODR SCP Page 72 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening from Single lane to Intermediate lane and 1-CRIDP- Strengthening in km 5/0- 2460 11-12-P- Madurai Melur 6/4 of Karungalakudi- 1.40 58.00 2460 Kambur road and Reconstruction of culvert at km 5/2

Widening from Single lane to Intermediate lane and 1-CRIDP- Strengthening in km 0/0- 2461 11-12-P- Madurai Melur 1/0 & 4/0-5/0 of 2.00 80.00 2461 Karungalakudi-Kambur road and Reconstruction of culvert at km 4/2

Widening & Improvements 3.40 138.00 Total

1-CRIDP- Improvements to Oorseri- 2462 11-12-P- Madurai Sholavandan 3.20 55.00 Kovilpatti road km 0/0-3/2 2462

1-CRIDP- Improvements to 2463 11-12-P- Madurai Sholavandan Kalvalipatti-A.Pudupatti 6.60 90.00 2463 road km 0/0-6/6

1-CRIDP- Improvements to Kadupatti 2464 11-12-P- Madurai Sholavandan 4.00 60.00 village road km 0/0-4/0 2464

Strengthening/ Improvements 13.80 205.00 Total

Reconstruction of Minor 1-CRIDP- bridge at km 0/6 of 2465 11-12-P- Madurai Usilampatti Athipatti road branching 60.00 2465 km 14/4 of Kallupatti- Saptur road

Bridges/ CD Works/ Others 1 No. 60.00 Total

ODR SCP Page 73 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Madurai Total 17.20 403.00

Widening from SL to IL in Km 1/0 - 2/6 of 1-CRIDP- Thirumalapuram - 2466 11-12-P- Theni Bodinayakanur Meenatchipuram road 1.60 60.00 2466 including construction of retaining wall at Km 1/8, 1/10, 2/2

Widening from SL to IL in 1-CRIDP- Sitharpatty road in Km0/0- 2467 11-12-P- Theni Andipatti 5/0 (Except Km.4/10) 4.80 75.00 2467 including construction of retaining wall

Widening from SL to IL in 1-CRIDP- Sitharpatty road in Km.5/0 2468 11-12-P- Theni Andipatti - 10/0 including 5.00 80.00 2468 construction of retaining wall

Widening from S.L to I.L in km 3/4-4/0,4/6-7/8 of 1-CRIDP- Meenatchipuram vilakku - 2469 11-12-P- Theni Bodinayakanur Dombucherry road 3.80 73.00 2469 Including Reconstruction of culvert at km 5/4,6/8 (1x2.60m) Widening from S.L to I.L in km 0/0-3/0 of Kodangipatty- Badrakalipuram raod (via) Sadayalpatty road 1-CRIDP- including Reconstruction 2470 11-12-P- Theni Bodinayakanur of culvert @ km 3.00 75.00 2470 0/4,0/6,1/4,1/6, 1/10, 2/2,2/10 and Retaining wall @ km 0/8, 0/10, 1/2, 1/4 (1/4-1x2.60m) (0/4,0/6,1/6, 1/10,2/2,2/10-1x0.90m)

ODR SCP Page 74 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening from S.L to I.L in km 3/0-7/075 of 1-CRIDP- Kodangipatty- 2471 11-12-P- Theni Bodinayakanur Badrakalipuram road (via) 4.08 67.00 2471 Sadayalpatty including construction of retaining wall at km.5/6 & 5/8

Widening & Improvements 22.28 430.00 Total

Improvements to M.Kallupatty - 1-CRIDP- Myladumparai road in 2472 11-12-P- Theni Andipatti 2.60 35.00 Km.12/8-15/4 including 2472 construction of pipe culvert at km.12/10

Improvements to 1-CRIDP- Sankarapuram - Kuchanur 2473 11-12-P- Theni Bodinayakanur 2.00 25.00 road to Duraisamypuram 2473 road km 0/0-2/0

Improvements to 1-CRIDP- Kadamalaikundu - 2474 11-12-P- Theni Andipatti 3.00 43.00 Vellimalai road in Km.2/0- 2474 5/0 Improvements to 1-CRIDP- Kadamalaikundu - 2475 11-12-P- Theni Andipatti 3.00 50.00 Vellimalai road in Km.5/0- 2475 8/0 Improvements to Maduai - 1-CRIDP- Theni road to Asaripatty 2476 11-12-P- Theni Andipatti 1.60 13.00 (via) Karisalpatty road in 2476 Km.2/0 - 3/6 Improvements to 1-CRIDP- Kammankallu - 2477 11-12-P- Theni Andipatti 1.80 15.00 Kombaitholu road in 2477 Km.0/2 - 2/0

ODR SCP Page 75 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Gandamanur - 2478 11-12-P- Theni Andipatti T.Meenashipuram road 1.20 10.00 2478 (via) Adaikkampatty road in Km.0/0-1/2

1-CRIDP- Improvements to 2479 11-12-P- Theni Bodinayakanur Upparpatti road km.0/0- 1.75 16.00 2479 1/750

Improvements to 1-CRIDP- Thappukundu - 2480 11-12-P- Theni Bodinayakanur 1.60 14.00 Poomalaikundu road 2480 km.0/0-1/6 Improvements to 1-CRIDP- Aranmanaipudur - 2481 11-12-P- Theni Bodinayakanur 1.00 8.00 Vayalpatti road km.1/0- 2481 2/0 Improvements to 1-CRIDP- Kadamalaikundu - 2482 11-12-P- Theni Andipatti 4.00 47.00 Vellimalai road in Km.8/0- 2482 12/0 Strengthening/ Improvements 23.55 276.00 Total

Theni Total 45.83 706.00

Improvements to Vadamadurai - Siluvathur 1-CRIDP- road to meet Vattanam 2483 11-12-P- Dindigul Natham 3.00 24.00 road km 19/0-19/4, 20/0- 2483 20/6, 20/8-21/8, 22/2- 23/2 Improvements to 1-CRIDP- Vilampatty - Palaya 2484 11-12-P- Dindigul Nilakottai 2.00 16.00 Silukkuvarpatty road Km 2484 0/0 - 2/0. Improvements to Palaya 1-CRIDP- Vathalagundu - 2485 11-12-P- Dindigul Nilakottai Eluvanampatty road to 1.20 9.00 2485 Kavalpatty road Km 0/0 - 1/2 ODR SCP Page 76 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Goshen - 2486 11-12-P- Dindigul Palani Killavarai road in km1/4- 2.20 20.00 2486 2/0, 4/0-5/6

1-CRIDP- Improvements to N.G. 2487 11-12-P- Dindigul Palani Pudur - Vayalur road km 2.52 33.00 2487 0/2-2/720

1-CRIDP- Improvements to 2488 11-12-P- Dindigul Palani Vadakavungi village road 2.60 25.00 2488 km 0/0-2/6

Improvements to 1-CRIDP- Sivagiripatty village road 2489 11-12-P- Dindigul Palani 1.00 12.00 km 0/0-1/0 with side 2489 drain in built up area

1-CRIDP- Improvements to 2490 11-12-P- Dindigul Palani Pethanaickenpatty village 2.60 20.00 2490 road km 0/0-2/6

Improvements to 1-CRIDP- Karadikootam - 2491 11-12-P- Dindigul Palani 2.60 19.00 Thathanaickenpatti road 2491 km 0/0-2/6

Improvements Palani - 1-CRIDP- Palaru Porundalaru Dam 2492 11-12-P- Dindigul Palani 1.60 17.50 road (via) Balasamuthiram 2492 km 3/6-4/0, 6/0-7/2

1-CRIDP- Improvements to 2493 11-12-P- Dindigul Oddanchathiram Veeralapatti village road 2.20 16.00 2493 km 0/0-2/2

Improvements to 1-CRIDP- Manjanaickenpatty - 2494 11-12-P- Dindigul Oddanchathiram Kallimandayam road to 2.20 16.70 2494 Ambilikkai (via) Kappalpatty km 3/0-5/2

ODR SCP Page 77 Cost Sl Work Division Constituency Name of work Length in No code Lakhs Improvements to 1-CRIDP- Kallimandayam - 2495 11-12-P- Dindigul Oddanchathiram 3.00 22.50 Oddaipatti road km 0/0- 2495 3/0

Improvements to 1-CRIDP- Kallimandayam - 2496 11-12-P- Dindigul Oddanchathiram Ediyakottai road to 4.00 30.00 2496 Ambilikai (via) Navakani km 3/0-7/0

Improvements to 1-CRIDP- Nagaiyakottai - 2497 11-12-P- Dindigul Vedachandur 4.87 38.00 Muthupalaniyur Road Km. 2497 0/2 & 0/6 - 5/270

1-CRIDP- Improvements to Ayyalore - 2498 11-12-P- Dindigul Vedachandur Alampatty Road Km. 2/0 - 4.00 32.00 2498 5/0 & 8/0 - 9/0.

Improvements to 1-CRIDP- Vedasandur - 2499 11-12-P- Dindigul Vedachandur Vadamadurai Road (Via) 1.00 8.00 2499 Nallamanarkottai Km. 10/0 - 11/0.

1-CRIDP- Improvements to Ramnad - 2500 11-12-P- Dindigul Vedachandur Kasipalayam Road Km. 3.05 24.00 2500 12/8 - 15/847.

1-CRIDP- Improvements to 2501 11-12-P- Dindigul Vedachandur Vedasandur - Kovilur Road 1.00 8.00 2501 Km. 13/0-14/0

1-CRIDP- Improvements to km 6/0- 2502 11-12-P- Dindigul Vedachandur 6/6 of D.Gudalore - 0.60 6.00 2502 Vellianai road

1-CRIDP- Improvements to 2503 11-12-P- Dindigul Vedachandur Mallapuram - Chatrapatty 1.00 8.00 2503 Road Km.3/0 - 4/0.

ODR SCP Page 78 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Dindigul - Karaikudi road to Sakkiliankodai road in km 1-CRIDP- 0/0 - 2/0, including 2504 11-12-P- Dindigul Natham 2.00 40.00 construction of culverts at 2504 km 1/4 and construction of Retaining wall at km 0/4, 1/4

Improvements to Natham - Sendurai Road to Sirugudi Road in Km 4/4-4/6, 6/0- 1-CRIDP- 6/6, 7/8 - 8/0 including 2505 11-12-P- Dindigul Natham 1.00 25.00 construction of culvert at 2505 km 4/6 and construction of Retaining wall at km 6/10

Improvements to vedapatti - 1-CRIDP- Vellodu road (via) 2506 11-12-P- Dindigul Natham 7.80 65.00 Narasingapuram km 0/0- 2506 7/8

Improvements to 1-CRIDP- Angunagar - Viralipatti 2507 11-12-P- Dindigul Dindigul road km 4/0-7/0 including 3.00 24.00 2507 construction of Pipe culvert at km 4/6

Strengthening/ Improvements 62.04 558.70 Total

Reconstruction of culverts 1-CRIDP- at km 0/8, 0/10, 1/10, 2508 11-12-P- Dindigul Natham 45.60 2/4, 3/10 of Parali - 2508 Reddiapatti road

1-CRIDP- Construction of Bridge at 2509 11-12-P- Dindigul Dindigul km 2/6 of Seelapadi village 195.00 2509 road

ODR SCP Page 79 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Bridges/ CD Works/ Others 2 Nos. 240.60 Total

Dindigul 62.04 799.30 Total

Improvements to Sevvor - 1-CRIDP- Kandavarayanpatti road 2510 11-12-P- Sivagangai Tirupattur 3.00 23.00 sevunipatti road km. 0/0- 2510 3/0 Improvements to 1-CRIDP- Nerkuppai - 2511 11-12-P- Sivagangai Tirupattur 4.80 37.00 Kandavarayanpatti road 2511 km. 0/2-5/0

Improvements to 1-CRIDP- S.V.Mangalam - Melapatti 2512 11-12-P- Sivagangai Tirupattur 2.20 17.00 road to Mattikaraipatti 2512 road km. 2/6-4/8

Improvements to 1-CRIDP- Singampunari - 2513 11-12-P- Sivagangai Tirupattur Kumaripatti 1.00 8.00 2513 (via)Kannamangalapatti road km. 1/0-2/0 Improvements to 1-CRIDP- Usilampatti -Methilaipatti 2514 11-12-P- Sivagangai Tirupattur 2.20 17.00 road km. 6/0-7/2 & 8/0- 2514 9/0 1-CRIDP- Improvements to V.Pudur- 2515 11-12-P- Sivagangai Tirupattur Balakuruchi road km. 2/0- 1.80 14.00 2515 2/4, 3/0-4/4

Improvements to Thirukostiyur to meet 1-CRIDP- Madurai -Devakottai road 2516 11-12-P- Sivagangai Tirupattur (via) Melayampatti - 4.26 34.00 2516 Kilukiluppai patti Kalingampatti road km. 0/0-4/255

ODR SCP Page 80 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Sengudi - 2517 11-12-P- Sivagangai Manamadurai Vadavaneri road km. 0/0- 3.00 25.00 2517 3/0

Improvements to Oruvatti - 1-CRIDP- Melavaikottai road km.2/0- 2518 11-12-P- Sivagangai Karaikudi 6/8 including 4.80 41.00 2518 Reconstruction of pipe culvert at km. 6/2

1-CRIDP- Improvements to Sekkalai - 2519 11-12-P- Sivagangai Karaikudi Kalanivasal raod km. 0/0- 1.37 52.00 2519 1/369

1-CRIDP- Improvements to 2520 11-12-P- Sivagangai Tirupattur Kandaramanikam Oorani 0.17 2.00 2520 road km. 0/0-0/165

Improvements to Sarugani - 1-CRIDP- Devakottai road to 2521 11-12-P- Sivagangai Karaikudi 7.40 86.00 Muppaiyur road km. 0/0- 2521 7/4(5.5 m)

Improvements to Sevvaipattai - 1-CRIDP- Govindamangalam road to 2522 11-12-P- Sivagangai Karaikudi Pudukuruchi road km. 2/0- 1.60 17.00 2522 3/6 including Reconstruction of pipe culvert at km. 2/8.

Improvements to Kappalur - 1-CRIDP- Embal road branching at 2523 11-12-P- Sivagangai Karaikudi km. 5/4 to Kudukadu road 5.40 45.00 2523 km. 0/0-5/46 and Perunganur Junction

1-CRIDP- Improvements to 2524 11-12-P- Sivagangai Karaikudi Salaigramam / Sarugani 4.50 36.00 2524 road km, 15/0-19/500

ODR SCP Page 81 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Emaneswaram - Nainarkoil 1-CRIDP- road to Vani road km. 0/0- 2525 11-12-P- Sivagangai Sivaganga 2.00 20.00 2/0 including 2525 Reconstruction of pipe culvert at km. 0/4.

Improvents to Kumangudi - 1-CRIDP- SiruKoodalpatty (via) 2526 11-12-P- Sivagangai Tirupattur 3.00 28.00 Oorkulathanpatty km 0/0- 2526 3/0

Strengthening/ Improvements 52.50 502.00 Total

1-CRIDP- Reconstruction of Culvert 2527 11-12-P- Sivagangai Karaikudi at km. 0/2,0/8 of 4.00 2527 Kannakudi - Kukudi road

1-CRIDP- Reconstruction of Culvert 2528 11-12-P- Sivagangai Tirupattur at km. 2/6&3/4of 5.00 2528 Pattamangalam cross road Reconstruction of culvert 1-CRIDP- at km. 1/4, 2/4 of 2529 11-12-P- Sivagangai Manamadurai 4.00 Kottaiyur - Ariyandipuram 2529 road

Reconstruction of Culvert 1-CRIDP- at km. 0/2(1 & 2) 2530 11-12-P- Sivagangai Tirupattur 4.00 Nerkuppai - Venthanpatti 2530 road

Reconstruction of Culvert 1-CRIDP- at km. 0/6,6/8 of 2531 11-12-P- Sivagangai Tirupattur 3.00 Maruthipatti -S.S.Kottai 2531 road

ODR SCP Page 82 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Reconstruction of Culvert 1-CRIDP- at km. 0/8,1/2 of 2532 11-12-P- Sivagangai Tirupattur 34.00 Thirukostiyur - 2532 Kandaramanikam road

Reconstruction of Culvert 1-CRIDP- at km. 5/4 of 2533 11-12-P- Sivagangai Tirupattur 20.00 Thirukostiyur - 2533 Kandaramanikam road

Construction of Body wall 1-CRIDP- and protective works at 2534 11-12-P- Sivagangai Tirupattur km. 2/10 Bed level cause 12.00 2534 way of Thirukalapatti - Alampatti road

1-CRIDP- Reconstruction of Culvert 2535 11-12-P- Sivagangai Tirupattur at km. 6/10 of Sevoor - 10.00 2535 Kandavarayanpatti road

1-CRIDP- Reconstruction of Culvert 2536 11-12-P- Sivagangai Tirupattur at km. 7/4 of Sevoor - 15.00 2536 Kandavarayanpatti road

Reconstruction of Culvert 1-CRIDP- at km. 15/10 & 19/8 of 2537 11-12-P- Sivagangai Karaikudi 5.00 Salaigramam -Sarugani 2537 road

Bridges/ CD Works/ Others 11 Nos. 116.00 Total

Sivagangai 52.50 618.00 Total

1-CRIDP- Improvements to NH.49. to 2538 11-12-P- Ramnad Paramakudi Mudaloor Road km.0/0- 3.00 25.00 2538 3/0

ODR SCP Page 83 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to NH 49 to 2539 11-12-P- Ramnad Paramakudi Vairavanendal Road 2.00 26.00 2539 km.6/0-8/0

1-CRIDP- Improvements to 2540 11-12-P- Ramnad Mudhukulathur Mudukulathur - Marandai 1.00 13.00 2540 Road km.1/6-2/4, 3/4

Improvements to 1-CRIDP- Mudukulathur - 2541 11-12-P- Ramnad Mudhukulathur U.K.Mangai Road to 2.00 27.00 2541 PeriyaElai Road km.0/0- 2/0

1-CRIDP- Improvements to Natham - 2542 11-12-P- Ramnad Mudhukulathur Nediyamanickam road 1.00 13.00 2542 km.12/6-13/6

Improvements to Ramnad - 1-CRIDP- Devipattinam Road to 2543 11-12-P- Ramnad Ramnad Therkku peruvayal(Via) 3.00 48.00 2543 Pullangudi Road km.3/2- 6/2

1-CRIDP- Improvements to 2544 11-12-P- Ramnad Ramnad Puthendal - Erwadi road 5.00 75.00 2544 km.5/0-10/0 Improvements to 1-CRIDP- Pandukudi to Anjukottai 2545 11-12-P- Ramnad Tiruvadanai Kunjangulam (Via) 4.40 43.00 2545 pillaiyarendal Road km.0/0- 4/4 1-CRIDP- Improvements to N.H.210 2546 11-12-P- Ramnad Tiruvadanai to Ananthur Road km.0/0- 3.00 40.00 2546 3/0

Improvements to 1-CRIDP- Valamavoor - 2547 11-12-P- Ramnad Tiruvadanai 1.20 16.00 Thiruppalaikudi road 2547 km.0/0-1/2

1-CRIDP- Improvements to Peraiyur - 2548 11-12-P- Ramnad Mudhukulathur Vilathikulam road 2.60 35.00 2548 km.18/4-21/0

ODR SCP Page 84 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Keelakidaram -Valinockam 2549 11-12-P- Ramnad Mudhukulathur 2.40 37.00 Road km.0/0-1/4 & 3/0- 2549 4/0

Improvements to 1-CRIDP- Venneervaikkal - 2550 11-12-P- Ramnad Mudhukulathur 2.00 23.00 Pandikanmoi road km.0/0- 2550 2/0

Improvements to U.K. 1-CRIDP- Mangai - Sevalpatti Road 2551 11-12-P- Ramnad Mudhukulathur 4.60 75.00 Km.49/300-51/0, 53/0- 2551 53/8 & 58/100-60/2

1-CRIDP- Improvements to 2552 11-12-P- Ramnad Paramakudi Sathirakudi - Pooseri road 5.47 72.00 2552 km.1/0-6/474

1-CRIDP- Improvements to Mangudi - 2553 11-12-P- Ramnad Paramakudi Urakkudi Road km.0/0- 3.44 35.00 2553 3/440

1-CRIDP- Improvements to 2554 11-12-P- Ramnad Paramakudi Valimarichan-Veerasolan 1.00 13.00 2554 Road km.0/0-1/0 Improvements to Ramnad - 1-CRIDP- Devipattinam Road to 2555 11-12-P- Ramnad Ramnad 2.40 28.00 Kalaiyanur road km.1/0- 2555 3/4

Improvements to 1-CRIDP- Vickirapandiapuram - 2556 11-12-P- Ramnad Mudhukulathur 2.00 26.00 Kolunthurai road km.0/0- 2556 2/0

ODR SCP Page 85 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to 2557 11-12-P- Ramnad Mudhukulathur Sathirakudi - Pooseri road 1.53 22.00 2557 km.6/474-8/0

1-CRIDP- Improvements to 2558 11-12-P- Ramnad Mudhukulathur Sathirakudi - Pooseri road 3.40 48.00 2558 km.12/4-15/8

Strengthening/ Improvements 56.44 740.00 Total Construction of slab 1-CRIDP- culvert at km.26/8 of 2559 11-12-P- Ramnad Mudhukulathur 25.00 Peraiyur - Vilathikulam 2559 road Construction of slab 1-CRIDP- culvert at km.3/4 of 2560 11-12-P- Ramnad Mudhukulathur 20.00 Kovilankulam - Kompoothi 2560 road

Construction of slab 1-CRIDP- culvert at km.2/4 of 2561 11-12-P- Ramnad Mudhukulathur 12.00 Perunali - Soorankudi road 2561 to (via) uchinatham road

Bridges/ CD Works/ Others 3 Nos. 57.00 Total

Ramnad 56.44 797.00 Total

Madurai Other works : 17 Nos. 234.00 3323.30 Circle Total

1-CRIDP- Widening from SL to IL in 2562 11-12-P- Tirunelveli Alangulam Km 0/0 - 4/0 of Alangulam 4.00 70.00 2562 - Nettur Road.

ODR SCP Page 86 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Widening from SL to IL in 2563 11-12-P- Tirunelveli Radhapuram Km 0/0 - 3/2 of Panagudy - 3.20 66.00 2563 Kallikulam Road.

Widening from SL to IL in 1-CRIDP- Km 0/0 - 1/4 of Road 2564 11-12-P- Tirunelveli Palayamkottai branching from Km 155/2 1.40 30.00 2564 of NH 7 to Reddiyarpatti Road. Widening from SL to IL in Km 5/6 - 7/6 of Ittamozhi - 1-CRIDP- Thisayanvilai Road (via) 2565 11-12-P- Tirunelveli Radhapuram 2.00 40.00 Suviseshapuram Road 2565 including CD works at Km 7/4. Widening & Improvements 10.60 206.00 Total

Improvements to 1-CRIDP- Palayamkottai - 2566 11-12-P- Tirunelveli Nanguneri 2.00 26.00 Sivanthipatti Road Km 6/8 2566 - 8/8.

Improvements to 1-CRIDP- Alwarkurichi - 2567 11-12-P- Tirunelveli Alangulam 3.00 32.00 Karuthapillaiyur Road Km 2567 5/0 - 5/4 & 6/6 - 9/2.

1-CRIDP- Improvements to BCC 2568 11-12-P- Tirunelveli Nanguneri Road To Ilayamuthur Road 3.00 30.00 2568 Km 0/0 - 3/0.

1-CRIDP- Improvements to Eruvadi - 2569 11-12-P- Tirunelveli Nanguneri Donavoor Road To Kattalai 1.40 14.00 2569 Road Km 0/0 - 1/4.

ODR SCP Page 87 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Cheranmahadevi - 2570 11-12-P- Tirunelveli Nanguneri Panagudy Road To 1.00 10.00 2570 Manjuvilai Road Km 0/0 - 1/0.

1-CRIDP- Improvements to 2571 11-12-P- Tirunelveli Nanguneri Sadayamankulam Road 2.00 18.00 2571 Km 0/0 - 2/0.

Improvements to Melaseval 1-CRIDP- - Singikulam - 2572 11-12-P- Tirunelveli Ambasamudram 6.00 75.00 Panankulam Road Km 2/0 - 2572 8/0 (Leading to Quarry).

1-CRIDP- Improvements to Kadayam - 2573 11-12-P- Tirunelveli Alangulam Koviluthu Road Km 5/8 - 1.00 20.00 2573 6/8. Improvements to 1-CRIDP- Sivasailam - Dharmapura 2574 11-12-P- Tirunelveli Alangulam 0.80 15.00 Madam Road Km 0/8 - 2574 1/6. Improvements to 1-CRIDP- Birammadesam - 2575 11-12-P- Tirunelveli Ambasamudram 1.00 12.50 Mannarkovil Road Km 2/4 - 2575 3/4.

Improvements to Therkku 1-CRIDP- Pappankulam - Ayan 2576 11-12-P- Tirunelveli Ambasamudram 2.00 17.50 Singampatti Road Km 0/0 - 2576 2/0.

Improvements to Road branching from Km 36/6 of Palayamkottai - 1-CRIDP- Ambasamudram Road To 2577 11-12-P- Tirunelveli Ambasamudram 1.60 12.00 Kallidaikurichi Police 2577 Station (via) Kurakudi - Patcheri Road Km 0/0 - 1/6.

1-CRIDP- Improvements to Kooniyur - 2578 11-12-P- Tirunelveli Ambasamudram Sakthi Nagar Road Km 0/0 3.00 25.00 2578 - 3/0. ODR SCP Page 88 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Improvements to Valuthur - 2579 11-12-P- Tirunelveli Alangulam Sengulam Road Km 0/0 - 1.60 15.00 2579 1/6.

1-CRIDP- Improvements to 2580 11-12-P- Tirunelveli Ambasamudram Venkatrengapuram Road 2.00 20.00 2580 Km 0/0 - 2/0.

Improvements to 1-CRIDP- Alwarthullukkapatti - 2581 11-12-P- Tirunelveli Alangulam 1.40 10.00 Keelapappakudi Road Km 2581 2/0 - 3/4.

Improvements to 1-CRIDP- Vadakkankulam - 2582 11-12-P- Tirunelveli Radhapuram 4.23 45.00 Sembikulam Road Km 0/0 - 2582 4/230.

Improvements to 1-CRIDP- Radhapuram - 2583 11-12-P- Tirunelveli Radhapuram Irukkanthurai Road To 2.00 15.00 2583 Ponnarkulam Road Km 0/0 - 2/0.

1-CRIDP- Improvements to 2584 11-12-P- Tirunelveli Radhapuram Kavalkinaru - Radhapuram 5.00 37.00 2584 Road Km 7/0 - 12/0.

1-CRIDP- Improvements to 2585 11-12-P- Tirunelveli Radhapuram Thisayanvilai - Karikovil 2.00 16.50 2585 Road Km 2/0 - 4/0.

Improvements to 1-CRIDP- Thisayanvilai - 2586 11-12-P- Tirunelveli Radhapuram 1.00 8.00 Karaichittupudur Road Km 2586 0/0 - 1/0.

ODR SCP Page 89 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Ambasamudram - 2587 11-12-P- Tirunelveli Ambasamudram Karumpuliyuthu Road Km 3.80 50.00 2587 1/6 - 5/4 (Leading to Quarry).

Strengthening/ Improvements 50.83 523.50 Total

Tirunelveli 61.43 729.50 Total

Widening SL to IL in Km 0/0-2/0 & Improvements in Km 1/2-2/0 of road branching from Km 14/6 1-CRIDP- of Shencottai - 2588 11-12-P- Thenkasi Kadaianallur 2.00 65.00 Sambavarvadakarai road to 2588 Vinthankottai (Via) Kambily - Sundarapandiyapuram road including CD works. Widening SL to IL in Km 2/0-4/0 & Improvements in Km 2/0-4/0 of road branching from Km 14/6 1-CRIDP- of Shencottai - 2589 11-12-P- Thenkasi Kadaianallur 2.00 95.00 Sambavarvadakarai road to 2589 Vinthankottai (Via) Kambily - Sundarapandiyapuram road including CD works.

Widening from SL to IL in 1-CRIDP- km 11/8-14/8 of 2590 11-12-P- Thenkasi Vasudevanallur Paruvakudi-Sivagiri Road 3.00 67.00 2590 including CD works at km 12/4, 12/8 and 13/2.

ODR SCP Page 90 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Widening SL to IL and 1-CRIDP- Strengthening in Km 0/0 - 2591 11-12-P- Thenkasi Sankarankoil 1/0 Thiruvengadam - 1.00 73.00 2591 Kundampatti Road including CD works,

Widening SL to IL and 1-CRIDP- Strengthening in Km 1/0 - 2592 11-12-P- Thenkasi Sankarankoil 2/0 Thiruvengadam - 1.00 93.50 2592 Kundampatti Road including CD works,

Widening SL to IL and 1-CRIDP- Strengthening in Km 2/0 - 2593 11-12-P- Thenkasi Sankarankoil 3/0 Thiruvengadam - 1.00 75.00 2593 Kundampatti Road including CD works,

Widening SL to IL and 1-CRIDP- Strengthening in Km 3/0 - 2594 11-12-P- Thenkasi Sankarankoil 4/2 Thiruvengadam - 1.20 80.00 2594 Kundampatti Road including CD works,

Widening SL to IL and 1-CRIDP- Improvements in Km 0/0- 2595 11-12-P- Thenkasi Kadaianallur 0/4 of Nainagaram Railway 0.40 27.50 2595 Feeder road including CD works.

Widening & Improvements 11.60 576.00 Total

1-CRIDP- Impts in km 2/4-4/659 of 2596 11-12-P- Thenkasi Vasudevanallur Devipattinam-Westernghat 2.26 25.00 2596 Road

Improvements in km 14/0- 1-CRIDP- 16/432 of 2597 11-12-P- Thenkasi Vasudevanallur 2.43 44.00 Karivalamvanthanallur- 2597 Ullar Road

ODR SCP Page 91 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements in km 1/4- 1-CRIDP- 2/4 of Duraichamiapuram- 2598 11-12-P- Thenkasi Vasudevanallur Thenmalai Road including 1.00 17.00 2598 CD work at km 1/8 , 1/10 & 2/2

Improvements to the road Branching from Km 2/4 of 1-CRIDP- Perunkottur - 2599 11-12-P- Thenkasi Sankarankoil 1.20 13.50 Chathrankondan Road to 2599 Udappankulam Km 0/0 - 1/0 & 2/0 - 2/2

Improvements to Road Branching from Km 34/2 1-CRIDP- of Paruvakudi - Kovilpatti - 2600 11-12-P- Thenkasi Sankarankoil Ettayapuram - 2.30 25.00 2600 Vilathikulam - Vembar Road to Puliangulam Road Km 0/0 - 2/300.

Improvements to Sundarapandiapuram - 1-CRIDP- Surandai road (via) 2601 11-12-P- Thenkasi Tenkasi Thiruchitrambalam road 2.00 22.00 2601 km 0/0-2/0 including construction of retaining wall at km 0/6

Improvements to 1-CRIDP- Pavoorchatram- 2602 11-12-P- Thenkasi Tenkasi Sundarapandiapuram road 1.20 11.00 2602 km 2/8-4/0 including CD works.

Improvements to 1-CRIDP- Puliyankulam - 2603 11-12-P- Thenkasi Sankarankoil 2.00 22.00 Ilayarasanendal Road Km 2603 0/0 - 2/0.

ODR SCP Page 92 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Road Branching from Km 36/2 1-CRIDP- of Paruvakudi - Kovilpatti - 2604 11-12-P- Thenkasi Sankarankoil Ettayapuram - 1.40 16.00 2604 Vilathikulam - Vembar Road to Ayyaneri Km 0/0 - 1/4.

1-CRIDP- Improvements to 2605 11-12-P- Thenkasi Sankarankoil Karivalamvanthanallur - 2.20 25.00 2605 Ullar Road Km 3/0 - 5/2.

1-CRIDP- Impts in km 2/6-3/6 of 2606 11-12-P- Thenkasi Vasudevanallur Duraichamiapuram- 1.00 12.00 2606 Gudalore Road

Strengthening/ Improvements 18.99 232.50 Total

ODR SCP Page 93 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Reconstruction of culvert 1-CRIDP- in km 0/6 (I),(II) , 0/8,& 2607 11-12-P- Thenkasi Vasudevanallur 40.00 4/2 of Nagaram- 2607 Subramaniapuram Road

Bridges/ CD Works/ Others 1 No. 40.00 Total

Thenkasi 30.59 848.50 Total

Widening and Rebuilding 1-CRIDP- from SL to IL in km 9/6- 2608 11-12-P- Tuticorin Srivaikundam 1.60 90.00 11/2 of ponankuruchi - 2608 peikulam Road

Widening and Rebuilding 1-CRIDP- from SL to IL in km 6/6- 2609 11-12-P- Tuticorin Srivaikundam 1.60 90.00 8/2 of ponankuruchi - 2609 peikulam Road

Widening and Rebuilding 1-CRIDP- from SL to IL in km 12/8- 2610 11-12-P- Tuticorin Srivaikundam 1.60 90.00 14/4 of ponankuruchi - 2610 peikulam Road

Widening and Rebuilding 1-CRIDP- from SL to IL in km 8/2 - 2611 11-12-P- Tuticorin Srivaikundam 1.40 85.00 9/6 of ponankuruchi - 2611 peikulam Road

Widening and Rebuilding 1-CRIDP- from SL to IL in km 11/2- 2612 11-12-P- Tuticorin Srivaikundam 1.60 90.00 12/8 of ponankuruchi - 2612 peikulam Road

Widening & Improvements 7.80 445.00 Total

ODR SCP Page 94 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements in km 0/0- 1-CRIDP- 3/0 & 4/0-5/0 of 2613 11-12-P- Tuticorin Srivaikundam Kootampuli - Pottalkadu 4.00 49.00 2613 Road including Retaining wall

Improvements in Km 0/0 - 1-CRIDP- 0/6 of Kalampatti-road to 2614 11-12-P- Tuticorin Kovilpatti 0.60 8.00 join with Gopalapuram 2614 Chettikuruchi road

1-CRIDP- Construction of Protective 2615 11-12-P- Tuticorin Thiruchendur work at km 14/7-15/2 of 0.50 85.00 2615 Nazareth - Eral Road

1-CRIDP- Improvements at km 7/2- 2616 11-12-P- Tuticorin Vilathikulam 8/2 of Kadalaiyur - 1.00 15.00 2616 Muthalapuram Road

1-CRIDP- Improvements at km 11/2- 2617 11-12-P- Tuticorin Vilathikulam 12/2of Kadalaiyur - 1.00 15.00 2617 Muthalapuram Road

1-CRIDP- Improvements at km 9/2- 2618 11-12-P- Tuticorin Vilathikulam 10/2 of Kadalaiyur - 1.00 15.00 2618 Muthalapuram Road

Improvements in km 0/0- 1-CRIDP- 1/29 of Thoothukudi - 2619 11-12-P- Tuticorin Thoothukudi Tharuvaikulam road to 2/6 1.29 40.00 2619 of Mappilaiyurani - Devispuram Road

Improvements at km 27/8- 28/8 of Kovilpatti - 1-CRIDP- Kovilpatti - Kadaiyur - 2620 11-12-P- Tuticorin Vilathikulam 1.00 15.00 Muthulapuram - 2620 Perilovanpatti - Pillaiyarnaththam Road

ODR SCP Page 95 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements at km 25/8- 26/8 of Kovilpatti - 1-CRIDP- Kovilpatti - Kadaiyur - 2621 11-12-P- Tuticorin Vilathikulam 1.00 15.00 Muthulapuram - 2621 Perilovanpatti - Pillaiyarnaththam Road

Strengthening/ Improvements 11.39 257.00 Total

Reconstruction of culvert at Km 4/6 and 11/4 of 1-CRIDP- Kovilpatti - Kadaiyur - 2622 11-12-P- Tuticorin Kovilpatti 8.00 Muthulapuram - 2622 Perilovanpatti - Pillaiyarnaththam Road

1-CRIDP- Reconstruction of culvert 2623 11-12-P- Tuticorin Kovilpatti at Km 7/10 of Kadaiyur - 5.00 2623 Ettyapuram Road

Reconstruction of culvert 1-CRIDP- at km 11/6 of Pottalurani - 2624 11-12-P- Tuticorin Ottapidaram 5.00 Sekkarakudi - Perurani - 2624 Mangalagiri Road

Construction of Additional vent in Causeway 1-CRIDP- submergible Bridge at km 2625 11-12-P- Tuticorin Ottapidaram 80.00 5/0-5/3 of Korampallam - 2625 Kalangarai - Muthiahapuram Road

Bridges/ CD Works/ Others 4 Nos. 98.00 Total

ODR SCP Page 96 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Tuticorin 19.19 800.00 Total

Improvements to Anna 1-CRIDP- Nagar Harijan colony - 2626 11-12-P- Virudhunagar Sattur 2.10 17.00 Karisalpatti road km 5/0- 2626 7/1

1-CRIDP- Improvements to 2627 11-12-P- Virudhunagar Sattur Banduvarpatti-Union limit 0.40 5.00 2627 road km 0/0-0/4

Improvements to Sathur- 1-CRIDP- Elayirampannai road to 2628 11-12-P- Virudhunagar Sattur 2.00 15.00 B.Lakshmiapuram road km 2628 0/0-2/0

Improvements to Sathur- 1-CRIDP- TB-Ramalingapuram road 2629 11-12-P- Virudhunagar Sattur Ammapatti (via) 2.00 20.00 2629 Kathalampatti road km 1/4-3/4

Improvements to 1-CRIDP- O.Kovilpatti - 2630 11-12-P- Virudhunagar Virudhunagar Inamreddiapatti (via) 4.00 60.00 2630 Veerakudumbanpatti road Km 0/0-4/0

Improvements to Amathur 1-CRIDP- to meet Alagapuri - 2631 11-12-P- Virudhunagar Virudhunagar Virudhunagar road (via) 4.00 50.00 2631 Moolipatti road Km 0/6- 3/0 and 5/0-6/6

1-CRIDP- Improvements to 2632 11-12-P- Virudhunagar Virudhunagar Mathiyasenai - Vellore road 5.93 73.50 2632 km 0/0-5/927

ODR SCP Page 97 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to Sevalpatti 1-CRIDP- - Mesalor - 2633 11-12-P- Virudhunagar Virudhunagar 4.51 63.00 Kumaralingapuram road 2633 km 2/0-6/509

1-CRIDP- Improvements to Injar - 2634 11-12-P- Virudhunagar Sivakasi Nagalapuram road Km 1/0- 3.53 49.00 2634 4/525.

Improvements to 1-CRIDP- Duraisamiyapuram - 2635 11-12-P- Virudhunagar Sivakasi 3.00 50.00 Saminatham Union limit 2635 Km 0/0-3/0

ImprovementsVembakkotta 1-CRIDP- i - Alangulam Road to 2636 11-12-P- Virudhunagar Sattur 1.20 21.00 Ramuthevanpatti Road in 2636 Km 1/0-2/2

Improvements to 1-CRIDP- Kalangaperi road to meet 2637 11-12-P- Virudhunagar Rajapalayam Kothangulam - 3.05 50.00 2637 Chattrapatti road Km 0/0- 3/050 1-CRIDP- Improvements to Tenkasi - 2638 11-12-P- Virudhunagar Rajapalayam Tirumangalam road to 1.40 23.50 2638 Sholaseri road Km 0/0-1/4

Improvements to 1-CRIDP- Ayyankollankondan - 2639 11-12-P- Virudhunagar Rajapalayam 3.00 49.50 Therkkuvenganallur road 2639 km 0/0-3/0

1-CRIDP- Improvements to 2640 11-12-P- Virudhunagar Srivilliputhur Koomapatti - Kelavankovil 4.40 82.00 2640 road km 2/2-6/6 Improvements to 1-CRIDP- Valayapatti - Gopalanpatti 2641 11-12-P- Virudhunagar Srivilliputhur 4.12 50.00 road Km 2/0 - 3/0, 3/8- 2641 5/4 and 6/2-7/720

ODR SCP Page 98 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvemets to 1-CRIDP- Krishnankovil - 2642 11-12-P- Virudhunagar Srivilliputhur Koomapatti road to 1.80 20.00 2642 Sethunarayanapuram road km 0/0-1/8 Improvements to 1-CRIDP- Thiruchuli - Kamuthi road 2643 11-12-P- Virudhunagar Thiruchuli 1.60 24.00 to Iluppaiyoor road Km 0/0- 2643 1/6

Improvements to Kariapatti 1-CRIDP- - Thiruchuli road to 2644 11-12-P- Virudhunagar Thiruchuli 2.40 36.00 P.Thottiankulam road Km 2644 0/0-2/4

Improvements to 1-CRIDP- Srivilliputhur - 2645 11-12-P- Virudhunagar Sivakasi Parthibanoor road to 3.20 46.00 2645 Alamarathupatti road km 0/0-3/2

Strengthening/ Improvements 57.63 804.50 Total

1-CRIDP- Construction of RCC Slab 2646 11-12-P- Virudhunagar Thiruchuli culvert at Km 4/6 of 25.00 2646 Narikudi - Muthaneri road

Bridges/ CD Works/ Others 1 No. 25.00 Total

Virudhunagar 57.63 829.50 Total

Improvements to Osaravilai 1-CRIDP- road at km 1/0 - 2/0 and 2647 11-12-P- Nagercoil Kanniyakumari 1.00 28.00 Construction of hard bed 2647 at km 1/2.

ODR SCP Page 99 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Improvements to 1-CRIDP- Derisanamcope - 2648 11-12-P- Nagercoil Kanniyakumari 1.50 50.00 Surulacode road km 6/1 - 2648 7/6.

Improvemtns to link road connecting from Suchindram - Marungoor 1-CRIDP- road to Suchindram - 2649 11-12-P- Nagercoil Kanniyakumari 1.70 55.00 Vellamadam road km 1/0 - 2649 2/7 and Construction of Retaining wall at km 0/0, 0/2, 0/4, 0/6, 0/8, 0/10.

Improvements to 1-CRIDP- Marungoor - 2650 11-12-P- Nagercoil Kanniyakumari 2.20 33.00 Amaravathivilai road km 2650 0/0 - 2/2.

Improvements to 1-CRIDP- Vairakudiyruppu - 2651 11-12-P- Nagercoil Nagercoil 3.20 38.00 Eathamozhi road km 0/0 - 2651 3/2.

Improvements to Avvayarammankoil Road 1-CRIDP- Km. 1/0-1/6, culvert at 2652 11-12-P- Nagercoil Kanniyakumari 0.60 40.00 km 0/2, 0/8, 1/4 2652 including drainage and retaining wall.

Strengthening/ Improvements 10.20 244.00 Total

1-CRIDP- Reconstruction of culvert 2653 11-12-P- Nagercoil Kanniyakumari at km 2/4 of Athikattuvilai 10.00 2653 - Thengamputhoor road.

ODR SCP Page 100 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Reconstruction of culvert 1-CRIDP- at km 2/4 and 2654 11-12-P- Nagercoil Kanniyakumari Construction of drainage at 15.00 2654 km 0/2, 0/4 of Pozhikkarai road. Reconstruction of culvert 1-CRIDP- at km 0/6, 0/8 of 2655 11-12-P- Nagercoil Kanniyakumari 10.00 Kanimadam - 2655 Kanagappapuram road

Reconstruction of culvert 1-CRIDP- at km 0/2, 0/6, 0/8, 1/4 2656 11-12-P- Nagercoil Kanniyakumari 10.00 of Devakulam - 2656 Chettikulam road.

Reconstruction of culvert 1-CRIDP- at km 0/4, 3/2, 9/4 of 2657 11-12-P- Nagercoil Vilavancode 15.00 Arumanai - Panachamoodu 2657 road

Reconstruction of culvert at km 2/2 & 5/6 of 1-CRIDP- Derisanamcope - 2658 11-12-P- Nagercoil Kanniyakumari Surulacode road including 50.00 2658 retaining wall and hard bed at km 0/2, 0/4, 5/8, 6/6 & 6/10.

Reconstruction of culvert 1-CRIDP- at km 3/2 and 2659 11-12-P- Nagercoil Kanniyakumari construction of retaining 20.00 2659 wall at km 3/0 - 4/8 of Old Veeranamangalam road.

Reconstruction of culvert at km 1/6, 1/10, 2/4 (i), 1-CRIDP- (ii) of Km 1/6 of Thoovachi 2660 11-12-P- Nagercoil Kanniyakumari 15.00 road to Kadukkarai - 2660 Katuputhoor road including retaining wall.

ODR SCP Page 101 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Construction of Retaining 1-CRIDP- wall at km 5/2 - 5/6 of 2661 11-12-P- Nagercoil Kanniyakumari 20.00 Derisanamcope - 2661 Surulacode road.

1-CRIDP- Construction of drainage at 2662 11-12-P- Nagercoil Nagercoil km 3/4 of Vempanoor - 5.00 2662 Chenapalli road.

Reconstruction of weak 1-CRIDP- and narrow bridge at km 2663 11-12-P- Nagercoil Colachal 3/2 of Villukuri - 10.00 2663 Rajakkamangalam road including drainage.

1-CRIDP- Construction of Retaining 2664 11-12-P- Nagercoil Kanniyakumari wall at km 2/4 - 2/6 of 30.00 2664 Puthukulam road.

Reconstruction of weak 1-CRIDP- and narrow bridge at km 2665 11-12-P- Nagercoil Colachal 0/4, 1/10 & 2/4 of 45.00 2665 Sungankadai - Aloor road including drainage.

Reconstruction of weak 1-CRIDP- and narrow bridge at km Padmanabhapur 2666 11-12-P- Nagercoil 0/2 of Thuckalay - 6.00 am 2666 Thiruvithancode road including drainage. Reconstruction of culvert at km 3/2, 3/8, 4/6 and 1-CRIDP- construction of hard bed at 2667 11-12-P- Nagercoil Vilavancode 30.00 km 4/10, 5/2 of 2667 Thickurichi - Chitharal road.

Reconstruction of hard bed 1-CRIDP- at km 0/10, 1/4, 1/10 2668 11-12-P- Nagercoil Vilavancode culvert at km 6/8, 7/2, 40.00 2668 7/4 of Kadayal - Pechiparai road

ODR SCP Page 102 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

1-CRIDP- Reconstruction of culvert 2669 11-12-P- Nagercoil Vilavancode at km 1/8, 2/2 of Aluvilai - 8.00 2669 Chitharal road

Reconstruction of culvert 1-CRIDP- at km 1/8 and 2670 11-12-P- Nagercoil Vilavancode construction of drainage at 100.00 2670 km 0/0 - 4/0 of Maruthancode road

Reconstruction of culvert 1-CRIDP- at km 0/2, 1/8 of 2671 11-12-P- Nagercoil Killiyoor Mullanginavilai - 10.00 2671 Tholayavettai - Kanancheri road Reconstruction of culvert 1-CRIDP- at km 0/2, 0/8 of 2672 11-12-P- Nagercoil Kanniyakumari 10.00 Pothayadi - 2672 Vengalarajankottai road

Reconstruction of culvert 1-CRIDP- at km 0/2 (i), (ii), 0/6, 0/8 2673 11-12-P- Nagercoil Nagercoil 20.00 (i), (ii), 1/2 of Pillaithoppu 2673 road

Reconstruction of culvert 1-CRIDP- at km 1/2, 1/4, 1/6 of 2674 11-12-P- Nagercoil Kanniyakumari Karavilai channel - 15.00 2674 Eathamozhi road (via) Vandavilai road.

ODR SCP Page 103 Cost Sl Work Division Constituency Name of work Length in No code Lakhs

Reconstruction of culvert at km 0/2, 0/8 and 1-CRIDP- Construction of Retaining 2675 11-12-P- Nagercoil Kanniyakumari 10.00 wall at km 0/10, 1/2 of 2675 Kulasekaramputhoor - Athalavilai road.

Bridges/ CD Works/ Others 23 Nos. 504.00 Total

Nagercoil 10.20 748.00 Total

Tirunelveli Other works : 29 Nos. 179.04 3955.50 Circle Total

Grand Total Other works : 54 Nos. 1774.56 27508.80

ODR SCP Page 104