FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

Period covered 01.01.2012-31.12.2012

Environment Department OLYMPIA ODOS S.A. FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

2 Olympia Odos

Contents

Introduction 4

Progress of the environmental agenda 6 General 7 Permits - Designs related to construction 11 Environmental management, waste management, 12 hazardous and non hazardous materials Environmental parameters, monitoring programme 15 (noise, traffic load vibrations, air quality, water) Environmental impact response measures during construction 21 Vegetation, planting and road cleaning 22 Management of extraordinary incidents, 25 environmental accident, green areas fire Antiquities 27 Project modernisation, improvement, extension or modification 27 Training – awareness raising 28

3 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

Introduction

Based on the Concession Agreement (article 11.2.2& 16.2), OLYMPIA ODOS S.A. is obliged, throughout the entire Concession Period to deliver to the Service, an annual environmental report. This is the fifth annual Environmental Management Report and covers the period 01.01.2012 to 31.12.2012.

The annual report incorporates Within this framework and as 2 & 3 below briefly present the the data of the two semester a part of its Environmental Project’s works progress in the 1st environmental management Management System, the and 2nd half of 2012. reports and is submitted to EYPE/ constructor, Joint Venture MEPPW until January 31st of each APION KLEOS has developed Please note that in the beginning year and throughout the entire the “Environmental Legislation of the 2nd half of 2011 and within Concession Period. Monitoring Procedure”, the framework of the negotiations incorporating all existing pertinent between all involved parties The above mentioned six-month legislation and updated in case the for the Concession Project’s and annual reports shall be latter is amended or updated. This restructuring, the Concessionaire publicized on the internet site procedure is communicated to all instructed the CJV to suspend all www.olympiaodos.gr created parties who are obliged to then works until December 31st 2012. and maintained by the communicated to all cooperating Hence the limited nature of the Concessionaire, in accordance sub-contractors. executed works. with the Concession Agreement. The work’s progress of the Note: all appendices of the present During the motorway’s Design-Construction Project report have been submitted to the construction and operation, both contractual scope is notified to the Special Environment Service of the the constructor as well as the Concessionaire, the Independent Ministry of Environment, Energy operator comply with all pertinent Engineer and EYDE/MK/EPP and Climate Change, responsible provisions, as they are recorded through Monthly Progress Reports, for the environmental supervision in the Greek Legislation, ensuring which are elaborated by APION of the OLYMPIA ODOS project and the same for their contractors KLEOS CJV as required by the are available upon request. and subcontractors. contractual document. Tables

Appendices

ΑPPENDIX 1 SECTION: ELEFSINA - KORINTHOS (EXCLUDING KAKIA SKALA) ΑPPENDIX 2 SECTION: ANCIENT KORINTHOS I/C – K1 PATRA BY-PASS I/C ΑPPENDIX 3 SECTION : MIDILOGLI I/C - AMALIADA ΑPPENDIX 4 SECTION: AMALIADA – PYRGOS - TSAKONA ΑPPENDIX 5 ARCHAEOLOGICAL INVESTIGATIONS FOR KORINTHOS – PATRAS – PYRGOS - TSAKONA ΑPPENDIX 6 QUANTITY DATA PERTINENT TO THE ENVIRONMENTAL PROTECTION MEASURES DURING CONSTRUCTION AND OPERATION

4 Olympia Odos

5 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012 Progress of the environmental agenda

6 Olympia Odos

General

Appendix A of Annex 2 of the Concession support of the Constructor’s environmental policy as well as Agreement states the Common Ministerial the compliance with the Project’s Decisions (CMD) and the Law comprising the environmental terms. Project’s environmental licensing and forming The EMP constitutes the basic the main framework for the monitoring of the and overalll framework for the management of environmental progress of the Project’s environmental issues. issues, whereas the procedures and directives area tool for the More specifically: rational handling/ management of each environmental issue, Law 2338/1995 1 taking into account the pertinent Thiva I/C – Elefsina Toll Plaza legislation and the decisions applicable to each case. CMD 126393/16.02.2007 2 Elefsina – Korinthos (excluding Kakia Skala section) The EMP as well as the environmental management CMD 108569/18.10.2006 procedures/ directives are at 3 Kakia Skala the disposal of the competent CMD 92073/16.05.1994 authorities involved in the 4 Isthmos – Ancient Korinthos I/C Project.

CMD 104892/16.06.2006 The Operator in order to comply 5 Ancient Korinthos I/C – Patra By-Pass K1 I/C with the Project’s environmental terms and the implementation CMD 106321/28.07.2006 6 of an Environmental Policy has Patra By-Pass K1 I/C – Mydilogli Semi-I/C developed an Environmental Management Plan for: CMD 102696/30.05.2006 • controlling, monitoring and 7 Mydilogli I/C - Amaliada dealing with the environment CMD 100163/30.05.2006 impact of the project 8 Amaliada – Tsakona • optimum management of liquid and solid waste of the Project • promotion of best practices to In the construction as well as Within the framework of the reduce energy and resources in the operation phase, the contractual obligations, the consumption procedures and directives Constructor has developed an for the works’ environmental Environmental Management management are implemented Plan (EMP) for the Project in by the Constructor, aiming at the accordance with ISO 14001:2004. in compliance with the terms and constraints of the above The EMP includes the decisions. organizational structure, planning actions, duties allocation, APION KLEOS submits to technical methods, procedures OLYMPIA ODOS S.A. monthly as well as processes for the reports regarding the progress of development, implementation, the construction related works. achievement, revision and

7 Rio Psathopyrgos

Tunnel Arachovitika Panagopoula

K1 Patra Bypas

Arachovitika

Patra Egio Nikoleika

VIPE Selianitika Akrata Bridge

West Derveni Lykoporia Egio Tunnel Akrata Tunnel Tunnel Platanos Kareika K7 Mintilogli Derveni East Kalavryta Egio Tunnel Mavra Kato Litharia Achaia Thiva Tunnel Elefsina Nea Peramos Varda Kalavryta Xylokastro Ag. Kineta Elefsina Kiato Theodori

Korinthos Loutraki Athens Andravida- Kyllini Zevgolatio Zevgolatio Megara Pachi Bridge Pinios River Gastouni Isthmus

Epidavros Ancient Amaliada Korinthos

Tripoli

Chanakia Pyrgos Tunnel Tunnel Koliri Agios Georgios Ancient Olympia Alphios Pyrgos Bridge Alphios Ancient Olympia River Argos Anemochori

Nafplio

Samiko

Tripoli Zacharo

Figalia Megalopoli Tunnel Elia

Kalo Nero Tsakona

Dorio

Zevgolatio

Interchange

1:250000 Sparta 0 5101520 Rio Psathopyrgos

Tunnel Arachovitika Panagopoula

K1 Patra Bypas

Arachovitika

Patra Egio Nikoleika

VIPE Selianitika Akrata Bridge

West Derveni Lykoporia Egio Tunnel Akrata Tunnel Tunnel Platanos Kareika K7 Mintilogli Derveni East Kalavryta Egio Tunnel Mavra Kato Litharia Achaia Thiva Tunnel Elefsina Xylokastro Nea Kiato Peramos Varda Kalavryta Xylokastro Ag. Kineta Elefsina Kiato Theodori

Korinthos Loutraki Athens Andravida- Kyllini Zevgolatio Zevgolatio Megara Pachi Bridge Pinios River Gastouni Isthmus

Epidavros Ancient Amaliada Korinthos

Tripoli

Chanakia Pyrgos Tunnel Tunnel Koliri Agios Georgios Ancient Olympia Alphios Pyrgos Bridge Alphios Ancient Olympia River Argos Anemochori

Nafplio

Samiko

Tripoli Zacharo

Figalia Megalopoli Tunnel Elia

Kalo Nero Tsakona

Dorio

Zevgolatio

Interchange

1:250000 Sparta 0 5101520 Messini Kalamata FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

10 Olympia Odos

Permits - designs related to construction

In the framework of complying with the Concession Agreement environmental requirements, the approved environmental terms and the required environmental permits: a requests are submitted, when These earthen roads shall be Construction Joint Venture by required, in order for forest up to four meters (4m) wide enforcement of article 5 law and archaeology related and designed in such way, so 3010/2002 and in accordance permits and official opinions to as to be utilized in the future with the provisions of article be issued. as fire protection areas. 11.2.1 of the Project’s Concession Agreement proceeded with b Environmental Impact Study e Hydro geological Design the development of stream (EIS) was elaborated and (ΑQUATERRA – Ch. Kapopoulos delineation designs (D. submitted to EYPE/MEECC - E. Psarropoulou & Co) Sotiropoulos & Co & L.S. Lazaridis (acc. to L.4014/2011) in order has been submitted to the & Co) regarding the stream’s to obtain Environmental competent Public Service. section extended along the Approval for the requested The above pertains to the Projects construction zone or Borrow-pits – Quarries & excavation of eleven (11) new abutted to it and along Korinthos Deposit-pits for the completion water collection works, so as - Patras section for five hundred of the KO-PA section’s to cover the irrigation, fire meters downstream. The designs construction. For the above fighting and other needs that are being submitted to the lands and where required, shall arise in the Project’s Technical Services of the local the elaboration of the short-term parking areas. Regional Units Administrations Technical Exploitation Designs for approval and any other is under way. f Hydraulic Designs have been administrative act necessary elaborated (D. Sotiropoulos & in order to be rendered fully c Cooperation is in progress Co, Hydro-Rationalising “L.S. effective. with the Public Utility Lazaridis & Co”) with the aim Organisations in order to to ensure the uninterrupted The respective process for Patra – relocate various networks flow of surface water (e.g. Pyrgos section is also temporarily located within the Project. rivers, streams etc) by suspended. constructing all necessary d In the cases where new roads structures and taking into Already in this direction, the opening was considered account a flood recurrence modification of project sections, necessary in order to provide interval of at least 50 years. as they are described in the EIS, access for the drilling is conducted according to the equipment at the test existing Environmental legislation boring areas, so as to verify always pursuant to the approved the stratum quality in the environmental terms. tunnelling areas, the consent and the supervision of the local Fire Service and Forest Inspection has been asked. For this purpose, “Forest Road Designs” were developed (NERCO - N. Chlykas & Co), and submitted to the local Forest Services for approval.

11 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

Environmental management, waste management, hazardous and non hazardous materials During the motorway’s construction and operation, both the constructor and the operator as well as the cooperating contractors and sub-contractors comply with all pertinent provisions, according to the Greek Legislation. Joint Venture APION KLEOS in the frame of its Environmental Management Plan has developed procedures for the management of waste.

The respective “Hazardous Materials Selection and Procurement Procedure” has been prepared describing all the constructor’s actions contributing to the prevention of the uncontrollable use of hazardous materials during the Project’s construction period.

During the construction and the operation of the project, waste of any nature is managed based Nea Peramos OMC Kiato TB on the pertinent legislation and the constraints/ requirements imposed by the approved environmental terms, both for the Project’s existing and new sections. The respective “Waste Management Procedure” has been prepared for the management of waste, documenting the existing legislative framework and the means/ directives for their management.

The respective “Water Resources Kiato TB Cleaning of garbage at GU16 (k.p. 95+100) Management Procedure” has been prepared for the management of The results of the Project’s n the same time, the Construction water resources, presenting in environmental performance, such JV was asked to intervene by detail all the constructor’s actions as material recycling, mineral oil, collecting uncontrolled damping contributing to the minimization batteries, vehicle tyres, hazardous sites along the project. of the adverse impact the materials, polluting substances, construction has on the adjacent area restoration, excavation water resources. and demolition products etc management are presented in Appendix 6 of this Report.

12 Olympia Odos

13 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

14 Olympia Odos

Environmental parameters, monitoring programme (noise monitoring, traffic load vibrations, air quality, water) Air quality management as well as noise obstruction minimization due to the motorway’s construction are amongst the main objectives of the Project’s Constructor and its Operator.

The Constructor, based on the relevant study, designs, elaborates and implements a programme for the Project’s environmental monitoring and audit, in order to ensure compliance with the Project’s environmental requirements.

For that purpose, the Constructor develops a programme for the Project’s monitoring and audit during construction.

Existing Sections

The Project’s monitoring and control programme carried out during construction at the existing sections of “Elefsina - Korinthos” and “K1 Patra By-Pass I/C - Installation of sound barriers, in the Project’s existing sections Midilogli Semi-I/C” has already (Zoodochos Pigi Abbey, Patra By-Pass) begun. The above distance is calculated all-weather microphone were In these sections and in the taking pavement’s or structure’s developed in order to satisfy the framework of “Special Acoustic edge as starting point. requirements of the relevant Design for sound barriers European directive regarding installation” was carried out a Besides the above, extra the environmental noise Complete Recording Programme rates, which are considered (measurement high of 4 m). of the daily hourly variation acoustically sensitive, were rate of the appropriate Road explored, even though no Hourly rate analysis of traffic Traffic Noise rates. Moreover, a complete monitoring record is noise to the overall acoustical 24-hour acoustic measurement held for the current acoustical measurements, in combination assessment of the exceeded environment conditions, as the with the geometric and town rates was carried out in selected those rates were not included in planning features of the area, rates, located in proximity to the an approved urban design of a which is in direct proximity to the existing road sections, which are city or settlement. Special self- motorway, and traffic features in a distance equivalent or smaller propelled, appropriate modulated, were the calculation basis for the than 200m from the nearest edge noise stations, equipped with final detailed structural design of the approved land-use plan. special static noise analysers and pertaining to length - height - sort

15 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

- density and materials for the Additionally, during the Project’s Independent Engineer sound barriers. motorway’s operation test as well, was carried out by taking sound measurements shall be into account the results of the Measurements have been conducted while at the same time “Measurements Programme conducted along these sections monitoring the traffic load per six for vibrations and suspended within the framework of the months or less. particles assessment design” “Noise-Barriers Implementation which was elaborated for the Special Acoustic Design” sections in issue. elaboration which has been approved via document No The collection and assessment 122052/8.3.2010 by EYPE/MEECC procedure for the technical where – among others – the and financial tenders, related noise-barrier type is determined. to the supply/installation of the self-propelled air pollution The construction/installation of station and meteorological data the noise-barriers commenced measurement station is provided and shall be completed according to be concluded within 2013. to the approved works time- schedule. New Sections Pollutants monitoring Moreover, an “Additional Special motor station Acoustic Design for sound barriers Along the Motorway’s new installation & Noise-Barriers sections and within the Implementation Special Acoustic Air-pollution & basic framework of the “Special Design” for “Elefsina –Korinthos meteorological data monitoring Final noise protection Design & section” has been submitted, Special Design for sound barrier pertaining to the protection of It is provided to install self- application” were elaborated “Gefyra Isthmou” settlement in propelled air pollution stations acoustical measurements in the Mun. of Loutraki-Perachora, in and basic meteorological data order to register the current Korinthia Regional Unit. measurement stations, in traffic noise conditions (TT & It has to be stressed that even locations, which shall be approved Environment S.A.) for “Ancient though in the frameworks of the both by EYPE/MEECC and by the Korinthos I/C - K1 Patra By-Pass approved Acoustic Design the Project’s Independent Engineer, in I/C”, “Midilogli I/C - Kato Achaia” above residential area had been accordance with provisions of the and Rion - Antirion bridge access controlled regarding the RTN, it Concession Agreement and the roads. wasn’t included in the immediate approved environmental terms. area of sound protection Measurements Programme implementation, since it was Technical Design (TT & for vibrations and suspended included in the Project’s related Environment S.A.) describing particles AS 2,5 & 10 is assigned EIS and the Service of Korinthia the technical requirements and (TT & Environment S.A.) not only Regional Unit was not informed the position of the required for the motorways sections, thereof during the Designer’s monitoring stations at the which presented exceeded T.N.R. research for establishing the city’s Project’s existing sections has (during the recent acoustical and settlements’ limits. been approved by EYPE/MEECC. measurements programme), but The positioning of the stations, also for the locations of operative which has been approved by the working sites.

16 Olympia Odos

Water resources management

Water resources are being managed according to the pertinent legislation and the restrictions/ limitations imposed by the approved environmental terms both for the Project’s existing and the new sections. In order to facilitate the efficient management of both surface and underground water resources, the respective “Water Resources Management Procedure” has been developed, documenting the existing legislative framework and the means/ instructions of their management.

The Construction Joint Venture by the enforcement of article 5 law 3010/2002 and in accordance with the provisions of article 11.2.1 of the Project’s Concession Agreement proceeded in the Vibration monitoring report elaboration of stream delineation designs (D. Sotiropoulos & Co & L.S. Lazaridis & Co) for the stream’s section extended along During Project’s construction In parallel, the Operator the Projects construction zone or measures are taken in order to carries out traffic counts at abutted to it and along Korinthos minimize vibrations produced by the Project’s toll plazas. More - Patras section for five hundred construction activities in buildings specifically, each month the meters downstream. The designs and in sensitive areas within the company drafts an operation are being submitted to the Project’s zone of influence. For report, including precise traffic Technical Services of the local this purpose, apposite systems data, i.e. number of vehicles Regional Unit Administrations (EXORIXI S.A. or working sites passing through all toll plazas for approval and any other privately owned equipment) were and the traffic composition; said administrative act necessary installed in critical locations, in report is duly submitted to the in order to be rendered fully order to measure and monitor competent supervising Services effective. all important variants of the of the Ministry of Infrastructures, phenomenon. A complete record Transport and Networks. The of the collected data is kept in the company has at its disposal both local working sites. the primary and the processed traffic data.

17 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

The respective process for Hydro geological Design Patra – Pyrgos section is also (ΑQUATERRA – Ch. Kapopoulos - temporarily suspended. E. Psarropoulou & Co) has been submitted to the competent Due to the inactivity of the Public Service. The above pertains competent Service and given that to the excavation of eleven (11) the two-month period (60 days) new water collection works, so provided both by the Concession as to cover the irrigation, fire Agreement (art. 14.3) and the fighting and other needs that shall Memorandum of Understanding arise in the Project’s short-term and Cooperation regarding parking areas. the “implemented design” of Korinthos-Patra section, for the Meganitis River issuance of the related approvals Sampling locations for ratifying the established guide lines, the Constructor requested and received a certificate for “issuance of delineation deemed approval” by the EYPE/ML/ EPP, which pertains to five (5) water streams. In the 2nd half of 2011, the competent Services of Korinthia Regional Unit asked and received by the Construction Joint Venture additional information in order to publish the ratified delineations in the Gov. Gaz.

Taking into account both the Samples protection of surface and underground water during the construction period, the local working sites elaborate, when required, a water quality monitoring and assessment programme, maintaining at the same time a complete record of the reports/collected data. The areas and the specific locations where the measurements are carried out, they are established by the Analysis Certificate Environmental Terms and by how sensitive each ecosystem is.

18 Olympia Odos

19 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

20 Olympia Odos

Environmental impact response measures during construction a. Geomorphology - Soil b. Geology

In order to protect the soil from Special attention is paid during fuel leaks etc special areas with construction of sections passing sealed floor and graded collection by geologically sensitive zones, as drain that ends in a sedimentation in those areas stability problems basin are provided in order to might emerge at the formations. swill the machinery in each of the In those sections shall the least construction sites. possible interventions are made.

In the machinery maintenance or c. Ecosystems - Vegetation in other suitable and safe area, used oils from black oils change In the areas where the technical are temporarily stored. The structures are constructed, management of the used oils is and mostly in the areas where in accordance with the provisions bridges are constructed, all the of PD 82/2-3-2004. By the PD necessary precaution are taken is given priority to collect and in order to avoid any impact on dispose used oils for regeneration the riverside ecosystems. All treatment. possible efforts are made in order to use the fewer possible quantity All necessary measures are of concrete. Where possible the taken in order to avoid erosion use of gabions is preferred and or filtration at the slopes during the proper application/use of the tunnel construction and the additives (e.g. betonite), which water and clay supply to the final are used in order to add improved acceptor. The sediment before features to the boring effluents being disposed is being treated in during the borings. apposite sedimentation tanks. Especially during the dry period, in the construction phase, all the necessary measures are taken in order to avoid dust emissions (infusion of earth materials, trucks’ load covered with nets).

In some case the cleared vegetation originated materials are cut and temporarily stored in mounds in order to create organic fertilizer for future use in planting technical activities. After clearance, excavation, collection and temporary disposal of the superficial fertile soil layer follows.

21 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

Vegetation, planting and road cleaning

The vegetation and planting pertain to the environmental integration and protection of the areas adjacent to the project.

Existing Sections

In order to facilitate the fulfillment of the above obligations, a Final Planting Design (S. Voutsinos & Co) for the surrounding areas, the related I/Cs, slopes and median strips was developed for Elefsina – Korinthos section. This design was approved by the project’s Independent Engineer.

The planting of Patra By-Pass is in very good shape due to its “recent” construction and maintenance for the last period of time.

New Sections View of Elefsina-Korinthos section

In order to facilitate the The OLYMPIA ODOS OPERATION Cleaning fulfilment of the above mentioned S.A. (Operator) personnel and obligations Construction Joint the competent subcontractors During 2012, the Operator’s Venture conducted a relevant carried out regular trimming, personnel in collaboration with tender in order to find the suitable weeding and cleaning works for external subcontractors carried designer (agronomist, landscape the most part of the project, and out and still does regular cleaning architect) for the development specifically of 97 km of central works along the entire project of Planting-Technical Design for reserve, 402 km of shoulders and (202 km), in the 28 interchanges, Korinthos – Patra section. of the 28 interchanges and their the toll stations (lanes, booths, branches, as well as of the 45 pavement, surrounding area, The designer (Klea Volovini) parking areas. buildings), in the tunnels and in undertook the project ,the the 45 parking areas (washing, relevant agreement was For green maintenance works sweeping, waste removal from made and the data collection the Operator has entered into bins and surrounding areas). commenced towards the contract with the following development of the Planting- subcontractors: It is noted that cleaning pertains Technical Design for the to the entire cross section until surrounding area, the respective • TOMI (District 1) the expropriation limits. I/Cs, embankment/cut slopes as • J&P AVAX (District 2) well as the sections of the existing national road which will not be included in the motorway. The process is temporarily suspended.

22 Olympia Odos

23 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

24 Olympia Odos

Management of extraordinary incidents, environmental accident, green areas fire

During the operation of the working sites, The Operator’s competent personnel (Intervention Teams) all fire prevention measures are taken in order implement on a daily basis to prevent fire coming potentially from working temporary signage for incidents and for the safe execution of machinery, working teams, transportation of works carried out on the road explosives and to minimize the danger of fire either by the Operation Company being expanded to adjacent areas. The way or the Construction Joint Venture. Regarding Korinthos-Patra NNR according which the fire belt is organised, was special attention is paid due to it controlled and approved by the competent features (no central reserve) and the sections with steep turns and Fire Service before the beginning of the works. limited visibility.

More specifically, fire • 23,618 incidents were handled The Operator has action plans management measures are taken with the Company’s assistance, related to the protection of the in order to protect forest areas on such as: 13,202 immobilized environment either within routine both sides of the road. vehicles (mechanical failure, flat maintenance or emergency and tire, lack of fuel, abandonment), abnormal situations. Within the framework of 7,821 obstacles on the elaborating the fire hoses designs pavement, 1,165 road accidents B.1 Congestion along the EKPPT motorway, (40 with injured and 1,125 Β.2 Road Accident maps were prepared depicting with material damage), 901 Β.3 Immobilized vehicle the forest land for “Elefsina – user problems (pedestrians, B.4 Problem on the pavement Korinthos”, “Ancient Korinthos vehicles moving in the opposite B.5 Problem on infrastructure I/C – Patra By-Pass K1 I/C” and direction, non authorized users, or equipment “Patra By-Pass K1 I/C – Midilogli dangerous traffic violations), B.6 Problem with user Semi-I/C” sections. 105 traffic congestions and 424 B.7 Other emergency incidents other emergency incidents (fire, B.8 Adverse weather conditions In the framework of road safety, adverse weather conditions, B.9 Large scale incident in the Operator has Patrollers and etc.) out of which: tunnel Intervention Teams patrolling B.10 Incident on Korinthos- the Project with specially • 13,432 were handled Patra NNR marked vehicles dealing with immediately by the Company, incidents (immobilized vehicles, since they were detected The Constructor shall work accidents, traffic problems etc.) by (located) by its own vehicles, or and cooperate closely with the implementing temporary signage by its subcontractors’ vehicles Environmental Service and other to safely arrange traffic and assist departments of OLYMPIA ODOS the emergency services (Police, • 10,186 incidents were S.A. in the application of the Fire Brigade and Paramedics). In handled within 12’ in average procedures – directives for the this framework, during 2012: by the Company, since they management of such issues. were otherwise detected • 3,743,385 (about 10,228 per (phone, cameras etc.), while day) kilometers of Patrols and regarding the response of the Interventions were covered to subcontractors respectively: supervise the road network 17’ for light vehicles and 32’ for heavy vehicles

25 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

26 Olympia Odos

Antiquities

Under the principle that cultural heritage and antiquities along the motorway shall be protected, a principle that constitutes prerequisite for the construction of the road, the Constructor has direct contact and collaboration with the competent archaeological services. According to the Concession Agreement and the Design – Construction Contract, Construction Joint Venture is responsible for the execution of archaeological investigations pursuing a recommendation by the pertinent archaeological service. SIKYONA (MOULKI) K.P. 17+100 KO-PA section Architectonical ruins excavation Works in the positions indicated in the Concession Agreement (article 13.1) and where there is a great potential of Antiquities being revealed have commenced.

Antiquities detailed data/activities are reported in the herein Appendix 5.

During the period covered by this report, the greater part of the storage building of the 25th EBA was also delivered. External ground roof – Ground floor Laboratory – Storage House of 25th EBA Storage House of 25th EBA

Project modernisation, improvement, extension or modification

The modification of project sections, as they are described in the EIS, is conducted according to the Environmental legislation always pursuant to the approved environmental terms.

27 FIFTH ANNUAL ENVIRONMENTAL MANAGEMENT REPORT 2012

Training – awareness raising

Environmental training aims to reinforce knowledge and raise awareness about the environment, to develop the necessary skills, to form the right behaviour, to activate and make informed decisions and responsible actions.

The Construction Joint Venture is Environmental training during organizing training and briefing the Project’s construction is seminars whereas all internal divided in 2 categories. The first inspections are accompanied by one pertains to the specialized the training and briefing of all environmental training of the competent persons at working staff related to the Project’s sites regarding issues and environmental management developments pertaining to the (environment engineers, foremen environment. in sensitive areas) and the second one to the general environmental Each working site’s environmental training of the whole staff. Table engineers are regularly organising 9 describes the whole number meetings with all parties involved of hours (persons x time) for in the Project’s construction, environmental training during providing them with the suitable 01/01/2012 – 31/12/2012. training and briefing.

The Construction Joint Venture’s Table 9: Environmental Department in cooperation with the project TRAINING TYPE TIME (HRS) engineers conduct regular SPECIALISED TRAINING 40 inspections, give the necessary instructions or directions pursuant GENERAL TRAINING 20 to the Project’s EMP regarding any arising environmental issue. To fulfill that goal, special reports are elaborated documenting the test results, proposing measures to deal with any environmental issues identified and accompanied by a complete photographic survey.

28 Olympia Odos

29 Olympia Odos S.A. 4, Rizariou street, 152 33 Halandri, Tel +30 210 68 43 041 Fax +30 210 68 43 049 Email [email protected] www.olympiaodos.gr

Project co-financed by the European Union