Nagpur Water Supply Project (Pench-IV)-Distribution Components

Total Page:16

File Type:pdf, Size:1020Kb

Nagpur Water Supply Project (Pench-IV)-Distribution Components Initial Environmental Assessment Document Draft Initial Environmental Examination Document Stage: Draft for Consultation Project Number: June 2010 IND: Innovative Financing Option for Municipal Infrastructure Sector: Nagpur Water Supply Project (Pench-IV)-Distribution Components Prepared by Nagpur Municipal Corporation, Government of Maharashtra The Initial Environmental Examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. CONTENTS Page I. INTRODUCTION 1 A. Identification of Project and Project Proponent 1 B. Purpose of Initial Environmental Examination (IEE) Study 1 C. Indian National Laws on Environment 2 D. Approach and Methodology 3 II. PROJECT DESCRIPTION 4 A. Type, Category and Need 4 III. DESCRIPTION OF THE ENVIRONMENT 10 A. Physical resources 10 B. Infrastructure 20 C. Socio Economic Resources 22 IV. POTENTIAL ENVIRONMENT IMPACT AND MITIGATION MEASURES 27 A. Screening Out of Areas of No Significant Impact 27 B. Methodology 28 C. Mitigation Measures 36 V. INSTITUTIONAL REQUIREMENTS AND ENVIRONMENTAL MONITORING PLAN 51 A. Reporting 53 B. Grievance Redress Mechanism 53 VI. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE 53 VII. CONCLUSION 54 APPENDICES ABBREVIATIONS ADB - Asian Development Bank Avg - average BPT - Break Pressure Tank CI - Cast Iron dBA - Decibels (equivalent human sensitive frequency ) EC - Environmental Clearance EIA - Environment Impact Assessment EMP - Environment Management Plan EPA - Environment Protection Act ESR - Elevated storage reservoir GSR - Ground storage reservoir JNNURM - Jawaharlal Nehru National Urban Renewal Mission km - kilometer Leq - Equivalent sound (noise) pressure MLD - million liters per day Mm3 - million cubic meters MoEF - Ministry of Environment & Forests MS - Mild Steel NMC - Nagpur Municipal Corporation RSPM - respirable particulate matter SPM - suspended particulate matter SPV - Special Purpose Vehicle WTP - Water Treatment Plant 1 I. INTRODUCTION A. Identification of Project and Project Proponent 1. Nagpur is the second capital of Maharashtra State with a population of 2.05 million. Nagpur Municipal Corporation (NMC) was constituted in 1951 under the City Nagpur Corporation Act, 1948 (CNC Act), Based on the Act, NMC has the responsibility of providing basic urban services including water supply, sewerage, waste management etc. At present NMC is providing 470 million liters per day (MLD) of treated water to Nagpur City from Kanhan River Pench Projects-I to III, and a small part from Gorewada Tank. 2. NMC intends to augment Nagpur City water supply by 115 MLD by implementing Pench Phase – III, Stage – II (Pench-IV). This would largely meet the demand of Nagpur City up to 2011. NMC will create a special purpose vehicle (SPV) for this purpose which is sponsored and fully owned by NMC. Asian Development Bank (ADB) is non-sovereign lending for NMC to partially fund capital expenditure in the water supply sector. NMC will purchase water from the SPV on a cost recovery basis including debt servicing costs. B. Purpose of Initial Environmental Examination (IEE) Study 3. ADB’s Environmental policy requires that environmental considerations be incorporated in ADB’s operations. Under this policy, ADB requires environmental assessment of all Project loans, financial intermediation loans, program loans, sector development program loans, and private sector investment operations. 4. Indian law and ADB policy require that the environmental impacts of development projects are identified and assessed as part of the planning and design process, and that action is taken to reduce those impacts to acceptable levels. This is done through the environmental assessment process, which has become an integral part of lending operations and project development and implementation worldwide. 5. The purpose of the IEE study is to: • identify the potential environmental impacts as a result of proposed works on biological, physical, socio-economic and cultural environment of the Project area, and carry out their rapid assessment • recommend practical and site specific environmental mitigation and enhancement measures • prepare and implement an Environmental Monitoring Plan (EMP) for the sub-project, and • Recommend whether the IEE is sufficient for the proposed Project or whether EIA is required as a result of the environmental issues that may arise due to the Project Implementation. 2 6. As per ADB’s latest Safeguard Policy Statement on Environment (SPS dated June 2009 effective January 2010), ADB classifies the projects for environmental assessment in the following manner: i. Category A - A proposed project is classified as category A if it is likely to have significant adverse environmental impacts that are irreversible, diverse, or unprecedented. These impacts may affect an area larger than the sites or facilities subject to physical works. An environmental impact assessment (EIA), including an environmental management plan (EMP), is required. ii. Category B - A proposed project is classified as category B if its potential adverse environmental impacts are less adverse than those of category A projects. These impacts are site-specific, few if any of them are irreversible, and in most cases mitigation measures can be designed more readily than for category A projects. An initial environmental examination (lEE), including an EMP, is required. iii. Category C - A proposed project is classified as category C if it is likely to have minimal or no adverse environmental impacts. An EIA or lEE is not required, although environmental implications need to be reviewed. iv. Category FI - A proposed project is classified as category FI if it involves the investment of ADS funds to, or through, a financial intermediary. 7. As per the above requirements, the Nagpur Water Supply Project is categorized as ‘B’. The category for this project is characterized by the most environmentally sensitive components such as adverse impacts due to construction activities and; ambient air quality and fuel consumption that are expected to be positively impacted. C. Indian National Laws on Environment 8. The Government of India EIA Notification of September 2006 and amendments thereof in 2009 (replacing the EIA Notification of 1994), sets out the requirement for environmental assessment. It states that Environmental Clearance (EC) is required for specified activities/projects, and this must be obtained before any construction work or land preparation (except land acquisition) may commence. Projects are categorised as A or B depending on the sector and scale of the Project provided in Schedule I of the notification. 9. Category A projects requires EC from the national Ministry of Environment and Forests (MoEF). The proponent is required to provide preliminary details of the Project in the form of a Notification, after which an Expert Appraisal Committee (EAC) of the MoEF prepares comprehensive Terms of Reference (ToR) for the EIA study, which are finalized within 60 days. On completion of the study and review of the report by the EAC, MoEF considers the recommendation of the EAC and provides the EC if appropriate. 10. Category B projects require environmental clearance from the State Environment Impact Assessment Authority (SEIAA). The State level EAC categorises the Project as either B1 (requiring EIA study) or B2 (no EIA study), and prepares ToR for B1 projects within 60 days. On completion of the study and review of the report by the EAC, the SEIAA issues the EC based on the EAC recommendation. The Notification also provides that any project or activity classified as category B will be treated as category A if it is located in whole or in part within 10 km from the 3 boundary of protected areas, critically polluted areas, notified eco-sensitive areas and inter- state, or international boundaries. 11. As per Schedule I of the EIA Notification, water supply projects do not require a formal EIA or EC by the state or the centre. Hence the national law on EIA is not applicable to the proposed project that this IEE addresses. D. Approach and Methodology 12. The IEE Report is based on primary data generated through monitoring and analysis of environmental parameters affecting the environment and relevant data collected from various government and consent departments. Based on the result of the analysis of air, water, and land, the status of the environment existing throughout the stretch of the proposed water supply Project has been established. An assessment of related environmental impacts has been carried out using matrices and is presented in this document based on the final scope of the Project. The IEE has been prepared in accordance with ADB’s Environmental Policy (2002), particularly Operations Manual Section F1 in Environmental Considerations in ADB Operations (2003), and compliance with the Government of India's environmental assessment requirements and state regulations on environment. The IEE also proposes an EMP, and following ADB guidelines, to reflect overall IEE findings and recommendations. 13. The IEE report also covers where applicable, a reference source/secondary data on the physical and natural environment, which has been researched and presented through analysis of environmental trends, evaluation of the importance of the environmental assets and assessment of their condition and vulnerability, existing utilities and infrastructure, etc. through various agencies/departments. 14.
Recommended publications
  • Smart City Nagpur
    SMART CITY NAGPUR Image Source: indiamarks.com FACT FINDING MISSION REPORT ON NAGPUR Innovation Centre Denmark, India The East Asiatic Company Foundation, Denmark Contents Abbreviations ............................................................................................................................................................................. 3 Acknowledgement ..................................................................................................................................................................... 4 Executive Summary .................................................................................................................................................................. 5 City Profile .................................................................................................................................................................................. 6 Main Challenges ......................................................................................................................................................................... 9 Smart City Plan for Nagpur .................................................................................................................................................. 13 Project Funding and Financing Model .......................................................................................................................... 14 Opportunities for Danish Companies ...............................................................................................................................
    [Show full text]
  • (EC) (14.03.2018) Accorded for Expansion of Gondegaon Extension OC, Nagpur Area, Dt
    Compliance Report for Amendment in Environmental Clearance (EC) (14.03.2018) Accorded for Expansion of Gondegaon Extension OC, Nagpur Area, Dt. Nagpur Maharashtra. June 2018 Western Coalfields Limited Nagpur 1 Expansion of Gondegaon Extension OC Sub:- Extension in validity of EC accorded for Expansion of Gondegaon Extension OC Coal mine Project from 2.5 MTPA to 3.5 MTPA of Western Coalfields Limited within existing ML area of 917 Ha located in Gondegaon Village, Parseoni Tehsil, Nagpur District, Maharashtra under Clause 7(ii) of the EIA Notification, 2006 – Amendment reg. Ref:- 1. EC letter accorded by MoEF & CC vide letter no. J-11015/106/2009 - IA.II(M) dated 14-03-2018. 1.0 Background: The proposal for Expansion of Gondegaon Extension OC Coal mine Project from 2.5 MTPA to 3.5 MTPA by M/s. Western Coalfields Limited in an area of 917 ha located in village Gondegaon, Tehsil Parseoni, District Nagpur was submitted through online portal of MoEF & CC vide no. IA/MH/CMIN/71601/2017 dated 14-12-2017. Subsequently, the proposal was considered by the EAC (TP & C) in its 24th meeting held on 11-01-2018. Based on the recommendation of the EAC, MoEF & CC accorded EC for the subject project vide letter J-11015/106/2009-IA.II(M) dated 14-03-2018 for enhancement in production capacity from 2.5 MTPA to 3.5 MTPA in a total area of 917 ha (mine lease area 845.74 ha) for a period of one year subject to compliance of terms and conditions and environmental safeguards mentioned below: i.
    [Show full text]
  • District Taluka Center Name Contact Person Address Phone No Mobile No
    District Taluka Center Name Contact Person Address Phone No Mobile No Mhosba Gate , Karjat Tal Karjat Dist AHMEDNAGAR KARJAT Vijay Computer Education Satish Sapkal 9421557122 9421557122 Ahmednagar 7285, URBAN BANK ROAD, AHMEDNAGAR NAGAR Anukul Computers Sunita Londhe 0241-2341070 9970415929 AHMEDNAGAR 414 001. Satyam Computer Behind Idea Offcie Miri AHMEDNAGAR SHEVGAON Satyam Computers Sandeep Jadhav 9881081075 9270967055 Road (College Road) Shevgaon Behind Khedkar Hospital, Pathardi AHMEDNAGAR PATHARDI Dot com computers Kishor Karad 02428-221101 9850351356 Pincode 414102 Gayatri computer OPP.SBI ,PARNER-SUPA ROAD,AT/POST- 02488-221177 AHMEDNAGAR PARNER Indrajit Deshmukh 9404042045 institute PARNER,TAL-PARNER, DIST-AHMEDNAGR /221277/9922007702 Shop no.8, Orange corner, college road AHMEDNAGAR SANGAMNER Dhananjay computer Swapnil Waghchaure Sangamner, Dist- 02425-220704 9850528920 Ahmednagar. Pin- 422605 Near S.T. Stand,4,First Floor Nagarpalika Shopping Center,New Nagar Road, 02425-226981/82 AHMEDNAGAR SANGAMNER Shubham Computers Yogesh Bhagwat 9822069547 Sangamner, Tal. Sangamner, Dist /7588025925 Ahmednagar Opposite OLD Nagarpalika AHMEDNAGAR KOPARGAON Cybernet Systems Shrikant Joshi 02423-222366 / 223566 9763715766 Building,Kopargaon – 423601 Near Bus Stand, Behind Hotel Prashant, AHMEDNAGAR AKOLE Media Infotech Sudhir Fargade 02424-222200 7387112323 Akole, Tal Akole Dist Ahmadnagar K V Road ,Near Anupam photo studio W 02422-226933 / AHMEDNAGAR SHRIRAMPUR Manik Computers Sachin SONI 9763715750 NO 6 ,Shrirampur 9850031828 HI-TECH Computer
    [Show full text]
  • Severe Rainstorms in the Vidarbha Subdivision of Maharashtra State, India
    CLIMATE RESEARCH l Vol. 6: 275-281, 1996 Published June 13 Clim Res NOTE Severe rainstorms in the Vidarbha subdivision of Maharashtra State, India B. D. Kulkarni *, S. Nandargi Indian Institute of Tropical Meteorology, Dr. Homi Bhabha Road, Pune 411008. India ABSTRACT: This paper discusses the results of Depth-Area- the design engineers and hydrologists of this region Duration (DAD) analysis of the 8 most severe rainstorms that for estimating probable maximum flood (PMF) values, affected the Vidarbha subdiv~sion of Maharashtra State, which are required for the design of dam spillway Ind~a,dur~ng the 100 yr period from 1891 to 1990. It was found from this analvsis that rainstorms In June 1908. Julv 1930 and capacities as as verifying and checking the August 1912 yielded greater ramdepths for smaller areas, i.e. spillway capacities of existing dams and reservoirs and 11000 km2 and S25000 km2, and that the August 1986 rain- for takinq remedia] measures where necessary. storm yielded greater raindepths for all the larger areas, for 2. Rainfall climatology of Vidarbha. Areawise, Vi- measurement penods of 1 to 3 days The DAD raindepths of these severe rainstorms for different durat~onswill be useful darbha (about 97537 km2) is the second largest sub- for the desian- storm estimates of different water resources division of Maharashtra State. The rainfall characteris- projects in the Vidarbha region, as well as for checking the tics of this subdivision are governed to a large extent sp~llwaycapacity of existing dams. by its location in the central part of the country. The southwest or summer monsoon rainfall sets in over the KEY WORDS: Rainstorm .
    [Show full text]
  • GRMB Annual Report 2017-18
    Government of India Ministry of Water Resources, RD & GR Godavari River Management Board ANNUAL REPORT 2017-18 GODAVARI BASIN – Dakshina Ganga Origin Brahmagiri near Trimbakeshwar, Nasik Dist., Maharashtra Geographical Area 9.50 % of Total GA of India Area & Location Latitude - 16°19’ to 22°34’ North Longitude – 73°24’ to 83° 4’ East Boundaries West: Western Ghats North: Satmala hills, the Ajanta range and the Mahadeo hills East: Eastern Ghats & the Bay of Bengal South: Balaghat & Mahadeo ranges stretching forth from eastern flank of the Western Ghats & the Anantgiri and other ranges of the hills and ridges separate the Gadavari basin from the Krishna basin. Catchment Area 3,12,812 Sq.km Length of the River 1465 km States Maharashtra (48.6%), Telangana (18.8%), Andhra Pradesh (4.5%), Chhattisgarh (10.9%), Madhya Pradesh (10.0%), Odisha (5.7%), Karnataka (1.4%) and Puducherry (Yanam) and emptying into Bay of Bengal Length in AP & TS 772 km Major Tributaries Pravara, Manjira, Manair – Right side of River Purna, Pranhita, Indravati, Sabari – Left side of River Sub- basins Twelve (G1- G12) Dams Gangapur Dam, Jayakwadi dam, Vishnupuri barrage, Ghatghar Dam, Upper Vaitarna reservoir, Sriram Sagar Dam, Dowleswaram Barrage. Hydro power stations Upper Indravati 600 MW Machkund 120 MW Balimela 510 MW Upper Sileru 240 MW Lower Sileru 460 MW Upper Kolab 320 MW Pench 160 MW Ghatghar pumped storage 250 MW Polavaram (under 960 MW construction) ANNUAL REPORT 2017-18 GODAVARI RIVER MANAGEMENT BOARD 5th Floor, Jalasoudha, Errum Manzil, Hyderabad- 500082 FROM CHAIRMAN’S DESK It gives me immense pleasure to present the Annual Report of Godavari River Management Board (GRMB) for the year 2017-18.
    [Show full text]
  • RIVER KANHAN At
    1 PROPOSED ACTION PLAN FOR REJUVENATION OF RIVER KANHAN at BOREGAON TAH : SAUSAR DISTT : CHHINDWARA PREPARED BY :- M. P. POLLUTION CONTROL BOARD, Chhindwara 2 CONTENTS SR. NO. CONTENTS PAGE NO. 1 Executive summary 3 2 Back Ground /NGT Case No. 673/2018 4 3 Components of Action Plan 5 4 Basic information of Kanhan River 6-10 5 Water Quality of Kanhan river 11-12 6 Industrial Area Status of Borgaon 13 7 Short / long term Action Plan 14-19 3 EXECUTIVE SUMMARY ON PROPOSED ACTION PLANS FOR REJUVENATION OF RIVER FOR IDENTIFIED POLLUTED RIVER STRETCH S. No. DESCRIPTION OF ITEM Details 1 Name of the identified polluted river and its tributaries : Kanhan River 2 Is river is perineal and total length of the polluted river : Yes 3 No of drains contributing to pollution and names of major : 1 ( Barsati River/ Nall) drains 4 Whether ‘River Rejuvenation Committee (RRC) constituted by : the State Govt./UT Administration and If so, Date of constitution of ‘RRC’ 5 Major Towns on the banks of the river with population : Nil a. Total water consumption and sewage generation in MLD : N.A. b. Total no. of existing STPs and the total capacities in MLD : Nil c. Gaps in sewage treatment in MLD and no. of towns not : N.A having STPs d. Total MSW generation in TPA : No city near bank e. Existing treatment and disposal facilities and total : N.A capacity 6 Major industrial estates located with total no. of : 1 No. of ind. 70 industries a. Total water consumption and total industrial effluent : Water Consumption.
    [Show full text]
  • WQI) for the Assessment of Surface Water Quality (Ambazari Lake
    Available online a t www.pelagiaresearchlibrary.com Pelagia Research Library European Journal of Experimental Biology, 2015, 5(2):37-52 ISSN: 2248 –9215 CODEN (USA): EJEBAU Application of water quality index (WQI) for the assessment of surface water quality (Ambazari Lake) P. J. Puri *, M.K.N. Yenkie, D.B. Rana and S.U. Meshram Department of Applied Chemistry, L.I.T., RTM Nagpur University, Nagpur-440033 _____________________________________________________________________________________________ ABSTRACT The present work aims at assessing the water quality index (WQI) in the surface water (Ambazari lake) situated in Nagpur city, Maharashtra India, by monitoring five sampling locations within Ambazari lake (viz., inlet1, inlet2, centre, corner and outlet) for a period of 3 months from August to October-2013. For calculating the WQI, 14 parameters, namely, pH, electrical conductivity, total dissolved solids, total hardness, alkalinity, calcium, magnesium, sodium, potassium, chloride, sulphate, nitrate, fluorides and iron were considered. It is apparent from WQI values that Ambazari Lake water with WQI values ranging from 42.28 to 49.84(pre-immersion period), 58.57 to 109.66(immersion period) and 55.19 to 62.74 (post-immersion period falls under simply good to poor water category. It was observed that the values of physicochemical parameters significantly increased during the immersion period and then declined in the post-immersion period, however the general trend observed was: immersion > post-immersion > pre-immersion values. The present study revealed that Ambazari lake water is polluted (due to surface run-off, bathing activities, agriculture run-off, effluents from upstream from surrounding industrial and garden area, immersion of idols of God and Goddess during festival season), and is unsuitable for human consumption, industrial purpose also for the survival of life forms unless treated properly.
    [Show full text]
  • Detailed Project Report for Nagpur Metro
    Detailed Project Report for Nagpur Metro Presentation By Delhi Metro Rail Corporation Sep.02, 2013 22, 2013 NAGPUR AT A GLANCE • Nagpur is the third largest city of Maharashtra and also the winter capital of the state. • With a population of approximately 25 lakhs, Nagpur Metropolitan Area is the 13th largest urban conglomeration in India. • The last decade population Growth rate in NMC area was 17.26%. • Current Vehicle Statistics (2012) shows number of registered vehicles are 12.37 lakh out of which 10.32 lakhs are two wheelers. • As per provisional reports of Census India, population of Nagpur NMC in 2011 is 2,405,421; of which male and female are 1,226,610 and 1,178,811 respectively. Although Nagpur city has population of 2,405,421; its urban UA / metropolitan population is 2,497,777 of which 1,275,750 are males and 1,222,027 are females. http://www.census2011.co.in/census/city/353- nagpur.html 9/17/2013 DMRC 2 REGISTERED VEHICLES IN NAGPUR CITY (As per Motor Transport Statistics of Maharashtra as on 31st March, 2012) CATEGORY VEHICLES % TOTAL OF TWO WHEELERS 1032607 83.47 AUTO RICKSHAWS 17149 1.38 CARS (Cars, Jeeps, Station Wagons 132709 10.73 & Taxi) OTHERS (Bus, Truck, LCV, 54634 4.42 Tractors etc.) TOTAL OF ALL TYPES 1237099 100 9/17/2013 DMRC 3 RAIL AND AIR TRANSPORT IN NAGPUR CITY • A total of 160 trains from various destinations halt at Nagpur. • Almost 1.5 lakh passengers board/alight different stations in Nagpur Daily. • Nagpur central alone is used by nearly 100,000 passengers.
    [Show full text]
  • Government of India Ministry of Road Transport and Highways
    GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 3971 ANSWERED ON 12TH DECEMBER, 2019 NH PROJECTS IN MAHARASHTRA 3971. DR. SUJAY RADHAKRISHNA VIKHE PATIL: SHRI DHAIRYASHEEL SAMBHAJIRAO MANE: Will the Minister of ROAD TRANSPORT AND HIGHWAYS औ be pleased to state: (a) the details and the present status of the National Highway (NH) projects pending in Maharashtra, district-wise; (b) the details of the NH projects where construction has been delayed due to presence of defence land and dispute over approvals from defence forces; and (c) the steps taken/being taken by the Government to ensure quality of construction of NHs? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) The details and present status of National Highway projects pending (under construction/to be awarded) in the State of Maharashtra,district wise,is at Annexure-I. (b) There are 5 National Highway projects where construction have been delayed due to presence of defence land and delay in approvals from Ministry of Defence (MOD). Deliberations with MODare made for speedy transfer of defence land to this Ministry. The details of these projects are at Annexure-II. (c) To ensure quality construction, the NH projects are executed conforming toMoRT&H specifications, norms laid down in the relevant Manuals / IRC codes duly supervised by Authority’s Engineer / Independent Engineers andofficers of State PWD / MSRDC. ANNEXURE-I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF LOK SABHA UNSTARRED QUESTION NO. 3971 FOR ANSWER ON 12.12.2019 ASKED BY DR. SUJAY RADHAKRISHNA VIKHE PATIL & SHRI DHAIRYASHEEL SAMBHAJIRAO MANE REGARDING NH PROJECTS IN MAHARASHTRA.
    [Show full text]
  • State State Code District Code District Name Town Code Town Name
    State District Town State District Name Town Name Code Code Code A & N Islands 35 640 South Andaman 804041 Port Blair Andhra Pradesh 28 553 Anantapur 803009 Anantapur Andhra Pradesh 28 553 Anantapur 803010 Dharmavaram Andhra Pradesh 28 553 Anantapur 594760 Gooty Andhra Pradesh 28 553 Anantapur 803007 Guntakal Andhra Pradesh 28 553 Anantapur 803012 Hindupur Andhra Pradesh 28 553 Anantapur 803011 Kadiri Andhra Pradesh 28 553 Anantapur 594956 Kalyandurg Andhra Pradesh 28 553 Anantapur 595357 Madakasira Andhra Pradesh 28 553 Anantapur 594864 Pamidi Andhra Pradesh 28 553 Anantapur 595448 Puttaparthi Andhra Pradesh 28 553 Anantapur 803006 Rayadurg Andhra Pradesh 28 553 Anantapur 803008 Tadpatri Andhra Pradesh 28 554 Chittoor 803019 Chittoor Andhra Pradesh 28 554 Chittoor 803015 Madanapalle Andhra Pradesh 28 554 Chittoor 803016 Nagari Andhra Pradesh 28 554 Chittoor 803020 Palamaner Andhra Pradesh 28 554 Chittoor 803018 Punganur Andhra Pradesh 28 554 Chittoor 803017 Puttur Andhra Pradesh 28 554 Chittoor 803013 Srikalahasti Andhra Pradesh 28 554 Chittoor 803014 Tirupati Andhra Pradesh 28 545 East Godavari 802958 Amalapuram Andhra Pradesh 28 545 East Godavari 587337 Gollaprolu Andhra Pradesh 28 545 East Godavari 802955 Kakinada Andhra Pradesh 28 545 East Godavari 802956 Mandapeta Andhra Pradesh 28 545 East Godavari 587758 Mummidivaram Andhra Pradesh 28 545 East Godavari 802951 Peddapuram Andhra Pradesh 28 545 East Godavari 802954 Pithapuram Andhra Pradesh 28 545 East Godavari 802952 Rajahmundry Andhra Pradesh 28 545 East Godavari 802957 Ramachandrapuram
    [Show full text]
  • Water Quality Annual Report 2010-11-Nagpur
    FOR OFFICE USE ONLY GOVERNMENT OF MAHARASHTRA WATER RESOURCES DEPARTMENT HYDROLOGY PROJECT (SW) Executive Engineer, Hydrology Project Division, Nagpur WATER QUALITY LAB LEVEL-II, NAGPUR ANNUAL REPORT YEAR 2010-2011 Executive Engineer Hydrology Project Division, Nagpur 1 PREFACE “Water” is a prime natural resource and is considered as a precious national asset. It is a major constituent of all living beings. Water is available in two basic forms i.e. Surface water and Ground Water. This report includes water quality data in Godavari Basin & Tapi Basin for the period of June 2010 to May 2011 by the agency M/s. Ashwamedh Engineers & Consultants Co. Op. So. Ltd. as awarded a contract towards Operation and Maintenance of Water Quality Lab Level-II, Nagpur for the said period. The data has been interpreted to know the affected locations. It is an event of great pleasure to hand over this precise report on analysis of water samples in WQ Laboratory Level – II at Nagpur which is established in Jal Vidnyan Bhavan. It is also a matter of pride to state that this Laboratory is the first in Hydrology Project (SW) to be accredited with ISO 9001:2008 for implementation of Quality Management System (QMS). This booklet attempts to briefly describe an over view and general conclusion based on the basis of water quality data of water samples collected from selected locations for defined frequencies for the reported period. It is expected that this booklet will provide an idea in brief about Water Quality Lab. Level -II at Nagpur. Our efforts can always be updated through valuable suggestions.
    [Show full text]
  • Moef's Expert Appraial Committee on River Valley Projects
    MoEF’s Expert Appraial Committee on River Valley Projects: Stage 1 and 2 Environment Clearance status From the minutes of EAC meetings Project wise details: April 2007 to Dec 2012 South Asia Network on Dams, Rivers & People www.sandrp.in February 2013 2 TOR & Environment Clearance status of River Valley Projects: Project wise details: April 2007 to Dec 2012 TOR & Environment Clearance status of River Valley Projects Project wise details: April 2007 to Dec 2012 In this document we have given decision of meetings of Expert Appraisal Committee (EAC) for River Valley and Hydroelectric Projects constituted under the provisions of EIA notification 2006 during the period from Apr 2007 to Dec 2012. The document is organized region wise, comprising of North, North East, East, West and South Regions of India. Within each region, state wise information is given and within each state projects are listed river basin wise. For each project besides state, district and river basin, some basic features of the projects are given. After this, the dates of the EAC meetings where these projects were considered and main decisions taken in the EAC meetings are given. This document from the South Asia Network on Dams, RIvers & People1 (www.sandrp.in) provides further background and detailed information about the functioning of the EAC for the above mentioned period, compared to the overview information given in the accompanying SANDRP document2 titled “Analysis of MOEF’s EAC on RVP: The Expert Approval Committee has zero rejection in six years”, that is being simultaneously published. We are hopeful that these two documents will be helpful in giving clear picture about functioning of the EAC to all concerned.
    [Show full text]